47235-002: Trimmu and Panjnad Barrages Improvement Project

Total Page:16

File Type:pdf, Size:1020Kb

47235-002: Trimmu and Panjnad Barrages Improvement Project Additional Financing of Trimmu and Panjnad Barrages Improvement Project (RRP PAK42735-002) Draft Initial Environmental Examination June 2018 PAK: Proposed Loan for Additional Financing Islamic Republic of Pakistan: Trimmu and Panjnad Barrages Improvement Project Prepared by the Project Management Office, Punjab Irrigation Department, for the Asian Development Bank. This initial environmental examination is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section on ADB’s website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic are in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Rehabilitation and Upgrading of Islam Barrage Initial Environmental Examination PUNJAB IRRIGATION DEPARTMENT First Draft GOVERNMENT OF PUNJAB IIINNIIITTIIIAALL EENNVVIIIRROONNMMEENNTTAALL EEXXIIIMMIIINNAATTIIIOONN ((IIIEEEE)) OOFF RREEHHBBIIILLIIITTAATTIIIOONN AANNDD UUPPGGRRAADDNNGG OOFF IIISSLLAAMM BBAARRRRAAGGEE August 2018 Project Management Office Irrigation Department Lahore Rehabilitation and Upgrading of Islam Barrage Initial Environmental Examination Rehabilitation and Upgrading of Islam Barrage TABLE OF CONTENTS 1. INTRODUCTION ............................................................................................. 1 1.1 PROJECT LOCATION------------------------------------------------------------------------1 1.2 PROJECT BACKGROUND ................................................................................... 2 1.3 INDUS WATER TREATY…….……………………………………………………………………………………… .3 1.4 OBJECTIVES OF THE STUDY ............................................................................. 6 1.5 PURPOSE OF THE REPORT ............................................................................... 6 1.6 REVIEW OF PREVIOUS STUDIES ........................................................................... 6 1.7 APPROACHES ADOPTED FOR THE STUDY .......................................................... 7 1.8 SCOPE OF WORK .................................................................................................... 7 1.9 STRUCTURE OF THE REPORT ............................................................................... 8 2. LEGAL AND ADMINISTRATIVE FRAMEWORK POLICY……………………….…..11 2.1 GENERAL ............................................................................................................... 12 2.2 REGULATORY REQUIREMENTS IN PAKISTAN ................................................... 12 2.2.1 REGULATIONS FOR ENVIRONMENTAL ASSESSMENT ...................................... 13 2.2.2 NATIONAL ENVIRONMENTAL QUALITY STANDARDS 2010 ............................... 13 2.2.3 FOREST ACT, 1927 (AND PROVINCIAL ACT AND RULES) ................................. 17 2.2.4 FORESTRY NOTIFICATION ................................................................................... 17 2.2.5 PROVINCIAL WILDLIFE (PROTECTION, RESERVATION, CONSERVATION AND MANAGEMENT) ACT ORDINANCE AND RULES .................................................. 17 2.2.6 ANTIQUITIES ACT, 1975 ........................................................................................ 18 2.2.7 PROVINCIAL LOCAL GOVERNMENT ORDINANCE, 2001 ................................... 18 2.2.8 REGULATIONS OF MINES AND OIL FIELDS AND MINERAL DEPARTMENT ACT, 1948 18 2.2.9 FACTORIES ACT, 1948 .......................................................................................... 18 2.2.10 EXPLOSIVES ACT, 1884 ....................................................................................... 18 2.2.11 NATIONAL RESETTLEMENT POLICY AND ORDINANCE ..................................... 18 2.2.12 PAKISTAN NATIONAL CONSERVATION STRATEGY .......................................... 19 2.2.13 ENVIRONMENTAL STANDARDS .......................................................................... 19 2.3 INTERNATIONAL CONVENTIONS ........................................................................ 21 2.3.1 CONVENTION ON BIOLOGICAL DIVERSITY ........................................................ 21 2.4 ASIAN DEVELOPMENT BANK GUIDLINES ........................................................... 21 3 PROJECT DESCRIPTION ..................................................................................... 24 3.1 GENERAL............................................................................................................... 24 3.2 BARRAGE STRUCTURE ....................................................................................... 25 3.3 PROJECT OBJECTIVES......................................................................................... 27 3.4 DESCRIPTION OF PROJECT................................................................................. 27 3.5 CIVIL WORKS ........................................................................................................ 27 3.5.1 GROUTING THE CAVITIES AND CRACKS IN STRUCTRE ................................... 27 i Rehabilitation and Upgrading of Islam Barrage Initial Environmental Examination 3.5.2 DREDGING THE DEPOSITED SILT UPSTREAM ................................................... 28 3.5.3 REMODELING OF SUBSIDIARY WEIR ................................................................. 28 3.6 MECHANICAL / ELECTRICAL WORKS ................................................................. 29 3.6.1 REPAIR OF BARRAGE GATES, INSTALLING HOISTING SYSTEM & ELECTRIC MOTORS ................................................................................................................ 29 3.6.2 INSTALLATION OF PRESSURE MONITORING INSTRUMENTS .......................... 29 3.7 MATERIAL REQUIREMENTS ................................................................................. 29 3.7.1 CIVIL WORKS ......................................................................................................... 29 3.7.2 MECHANICAL / ELETRCIAL WORKS .................................................................... 29 3.8 SOURCE OF MATERIAL ........................................................................................ 30 3.9 EQUIPMENT AND MACHINERY YARD ................................................................. 31 3.10 MATERIAL DEPOTS ............................................................................................... 31 3.11 WORK BASES ........................................................................................................ 31 3.12 APPROACHES TO WORK SITE ............................................................................ 32 3.13 WATER FOR HUMAN CONSUMPTION AND CONSTRUCTION WORK------------32 3.14 LABORER CAMP -----------------------------------------------------------------------------------32 3.15 CONSTRUCTION SCHEDULE AND IMPLEMENTATION ARRANGEMENTS--------32 4 ENVIRONMENTAL BASELINE CONDITION ......................................................... 34 4.1 GENERAL ............................................................................................................... 34 4.2 PROJECT AREA INFLUENCE ................................................................................ 34 4.3 PHYSICAL ENVIRONMENT ................................................................................... 36 4.3.1 PHYSIOGRAPHY AND SOIL .................................................................................. 36 4.3.2 WATER .................................................................................................................. 38 4.3.2.1 SURFACE WATER................................................................................................. 38 4.3.2.2 GROUND WATER ................................................................................................. 43 4.3.3 AMBIENT AIR QUALITY ....................................................................................... 47 4.3.4 CLIMATE ............................................................................................................... 53 4.3.5 CLIMATE CHANGE ............................................................................................... 53 4.4 BIOLOGICAL ENVIRONMENT ............................................................................. 58 4.5 SOCIO-ECONOMIC STUDIES .............................................................................. 63 4.6 CONCLUSION ...................................................................................................... 67 5 PUBLIC CONSULTATION AND INFORMATION DISCLOSURE ......................... 68 5.1 GENERAL ............................................................................................................. 68 5.2 LEGAL REQUIREMENT FOR PUBLIC CONSULTATION ..................................... 68 5.3 CONSULTATION METHODOLOGY ..................................................................... 68 5.3.1 STAKEHOLDER IDENTIFICATION ....................................................................... 68 5.4 CONSULTATION PROCESS AND TECHNOLOGY .............................................. 68 5.5 MEETINGS WITH PUBLIC MEMBERS ................................................................. 70 5.6 INFORMATION DISCLOSURE ............................................................................. 72 5.7 EPA APPROVAL ....................................................................................................
Recommended publications
  • Author: Ali JAMSHED Matriculation No. 2846835 Submission Date: 05
    International Master’s Program in Infrastructure Planning UNIVERSITY OF STUTTGART, GERMANY Master’s Thesis ASSESSING VULNERABILITY AND CAPACITY OF FLOOD AFFECTED COMMUNITIES IN PUNJAB, PAKISTAN CASE STUDY: DISTRICT JHANG AND MUZAFFARGARH Author: Ali JAMSHED Matriculation No. 2846835 Submission date: 05 November 2015 First supervisor: Prof. Dr.-Ing. habil. Jörn Birkmann Institute for Regional Development and Spatial Planning (IREUS) University of Stuttgart, Stuttgart Germany. Email: [email protected] Photographs: Second supervisor: Prof. Dr. Obaidullah Nadeem Left - Department of City and Regional Planning De Souza,Carl Right 2014; (DCRP) University of Engineering and Technology, Lahore Pakistan. Email: [email protected] - Mirza Hassan, 2014. Hassan, Mirza 1 Abstract ABSTRACT In Punjab, the continuous floods in the last six years especially in 2010 and 2014, due to climatic and non-climatic reasons, have exposed physical, socio-economic, and environmental vulnerabilities. The flood disaster management in Punjab is primarily focused on rescue, relief, and dependence of structural measures. The assessment of vulnerability is limited to district level (in form of mapping) which is incapable of identifying essential socio-economic drivers of vulnerability and local ability to cope and adapt. The mega flood of 2010 inflicted several changes in government structure and within communities. This research study assessed the vulnerability and capacity of flood affected communities as well as fluctuation in their vulnerability and capacity by analyzing planned and unplanned post flood responses. The study also determined the role of spatial planning in reducing flood vulnerabilities. To conduct the study, a vulnerability assessment framework was modified from sustainable livelihood and BBC framework.
    [Show full text]
  • Flood Emergency Reconstruction and Resilience Project, Loan No
    Social Due Diligence Report Document stage: Final Date: 23 October 2016 PAK: Flood Emergency Reconstruction and Resilience Project, Loan No. 3264 Social Due Diligence Report of Left Marginal Bund (LMB) of Qadirabad Headwords. Reviewed by: Abdul Hameed, TA Resettlement Specialist for Project Implementation Unit, Punjab Irrigation Department (PID), Government of Punjab, Lahore. This due diligence report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Due Diligence Report of Left Marginal Bund, Qadirabad Flood Emergency Reconstruction and Resilience Project GOVERNMENT OF THE PUNJAB Loan 3264: PAK - FLOOD EMERGENCY RECONSTRUCTION AND RESILIENCE PROJECT (FERRP) DUE DILIGENCE REPORT OF LEFT MARGINAL BUND OF Qadirabad HEADWORKS October 2016 Prepared by: Project Implementation Unit, Punjab Irrigation Department (PID), Lahore 2 Due Diligence Report of Left Marginal Bund, Qadirabad Flood Emergency Reconstruction and Resilience Project TABLE OF CONTENTS CHAPTER 1 Abbreviations I. INTRODUCTION 5-7 Background 5-5 Flood Emergency Reconstruction and Resilience Project (FERRP) 5-5 Irrigation Component 5-5 Qadirabad Head works Left Marginal Bund (LMB) 5-5 Scope of Work 5-5 Project Design and Design Cross-section 6-8 CHAPTER 2 II. DUE DILIGENCE REVIEW 9-10 Purpose of DDR 9-9 Methodology 9-9 Desk Review of Project Documents 9-9 Consultations with ADB, PIU and Consultant 9-9 Field Visits 9-9 Community Consultations 9-9 Key Findings 9-9 LAR Impacts and Project Categorization 9-9 LAR and IPs Impacts 9-9 Socioeconomic and Impact Assessment Survey and Community Consultations 10-10 Institutions and Roles and Responsibilities 10-10 Grievance Redress Mechanism 10-10 Project Selection Criterion 10-10 Unanticipated Impacts 10-10 CHAPTER 3 III.
    [Show full text]
  • AJUDHYA NATH KHOSLA Elected Fellow 1951
    AJUDHYA NATH KHOSLA Elected Fellow 1951 "An eminent engineer, an able administrator and a generous human being" will be the epithets by which AJUDHYA NATH KHOSLAwill be known to the posterity in India. Belonging to a generation of Indians, born when the country was under foreign domination, Dr Xhosla was proud to be an Indian and had great confidence in the capabilities of Indian engineers. There is no doubt that he had few equals to match his qualities, achievements and abilities. EARLYLIFE AND EDUCATION Ajudhya Nath Khosla was born in Jullunder City in the Punjab on December 11, 1892. He had his early education at the Government High School and later at the Anglo-Sanskrit H~ghSchool, Jullunder, from which he passed his Matric exami- nation in 1908. He had his college education at the DAV College, Lahore, from where he graduated in Arts (Hons) in 1912 securing the first position in the University ' and the highest marks in mathematics. Young Khosla joined the Thomson College of Civil Engineering, Roorkee in October 1913 and graduated with honours. Soon after passing out from the Engineering College, in July 1916, he joined the Punjab Public Works Department (Irrigation Branch). It is interesting to note that his first assignment was to investigate and survey connected with Bhakra Dam Project, a major challenge faced and overcame by him with great distinction in later life. The dam, one of the highest in the world, stands on the same axis as he had proposed in 1917 as an apprentice engineer. From July 1918 to March 1920, during the First World War, he was with the Mesopotamia Expeditionary Force in Iraq as a Commissioned Officer, when he made his first original contribution to engineering by designing Khosla Disc for precision levelling across rivers and wide valleys.
    [Show full text]
  • WATER SECTOR in PAKISTAN POLICY, POLITICS, MANAGEMENT
    IDSA Monograph Series No. 18 April 2013 WATER SECTOR in PAKISTAN POLICY, POLITICS, MANAGEMENT MEDHA BISHT WATER SECTOR IN PAKISTAN: POLICY, POLITICS, MANAGEMENT | 1 IDSA Monograph Series No. 18 April 2013 WATER SECTOR IN PAKISTAN POLICY, POLITICS, MANAGEMENT MEDHA BISHT 2 | MEDHA BISHT Institute for Defence Studies and Analyses, New Delhi. All rights reserved. No part of this publication may be reproduced, sorted in a retrieval system or transmitted in any form or by any means, electronic, mechanical, photo-copying, recording or otherwise, without the prior permission of the Institute for Defence Studies and Analyses (IDSA). ISBN: 978-93-82169-17-8 Disclaimer: The views expressed in this Monograph are those of the author and do not necessarily reflect those of the Institute or the Government of India. First Published: April 2013 Price: Rs. 280/- Published by: Institute for Defence Studies and Analyses No.1, Development Enclave, Rao Tula Ram Marg, Delhi Cantt., New Delhi - 110 010 Tel. (91-11) 2671-7983 Fax.(91-11) 2615 4191 E-mail: [email protected] Website: http://www.idsa.in Layout & Cover by: Vaijayanti Patankar & Geeta Printed at: M/S A. M. Offsetters A-57, Sector-10, Noida-201 301 (U.P.) Mob: 09810888667 E-mail: [email protected] WATER SECTOR IN PAKISTAN: POLICY, POLITICS, MANAGEMENT | 3 CONTENTS Acknowledgements ......................................................... 5 INTRODUCTION .............................................................. 6 PART I Chapter One .................................................................
    [Show full text]
  • 2015 " 35Th PAKISTAN CONGRESS of ZOOLOGY (INTERNATIONAL) CENTRE OF
    PROCEEDINGS OF PAKISTAN CONGRESS OF ZOOLOGY Volume 35, 2015 All the papers in this Proceedings were refereed by experts in respective disciplines THIRTY FOURTH PAKISTAN CONGRESS OF ZOOLOGY held under auspices of THE ZOOLOGICAL SOCIETY OF PAKISTAN at CENTRE OF EXCELLENCE IN MARINE BIOLOGY, UNIVERSITY OF KARACHI, KARACHI MARCH 1 – 4, 2015 CONTENTS Acknowledgements i Programme ii Members of the Congress xi Citations Life Time Achievement Award 2015 Late Prof. Dr. Shahzad A. Mufti ............................................xv Dr. Quddusi B. Kazmi .........................................................xvii Dr. Muhammad Ramzan Mirza.............................................xix Abdul Aziz Khan...................................................................xx Zoologist of the year award 2015............................................... xxii Prof. Dr. A.R. Shakoori Gold Medal 2015 ............................... xxiii Prof. Dr. Mirza Azhar Beg Gold Medal 2015 ........................... xxiv Prof. Imtiaz Ahmad Gold Medal 2015 ........................................xxv Prof. Dr. Nasima M. Tirmizi Memorial Gold Medal 2015..........xxvi Gold Medals for M.Sc. and Ph.D. positions 2015 ................... xxviii Certificate of Appreciation .........................................................xxx Research papers SAMI, A.J. JABBAR, B., AHMAD, N., NAZIR, M.T. AND SHAKOORI, A.R. in silico analysis of structure-function relationship of a neutral lipase from Tribolium castaneum .......................... 1 KHAN, I., HUSSAIN, A., KHAN, A. AND
    [Show full text]
  • Dams of India.Cdr
    eBook IMPORTANT DAMS OF INDIA List of state-wise important dams of India and their respective rivers List of Important Dams in India Volume 1(2017) Dams are an important part of the Static GK under the General Awareness section of Bank and Government exams. In the following eBook, we have provided a state-wise list of all the important Dams in India along with their respective rivers to help you with your Bank and Government exam preparation. Here’s a sample question: In which state is the Koyna Dam located? a. Gujarat b. Maharashtra c. Sikkim d. Himachal Pradesh Answer: B Learning the following eBook might just earn you a brownie point in your next Bank and Government exam. Banking & REGISTER FOR A Government Banking MBA Government Exam 2017 Free All India Test 2 oliveboard www.oliveboard.in List of Important Dams in India Volume 1(2017) LIST OF IMPORTANT DAMS IN INDIA Andhra Pradesh NAME OF THE DAM RIVER Nagarjuna Sagar Dam (also in Telangana) Krishna Somasila Dam Penna Srisailam Dam (also in Telangana) Krishna Arunachal Pradesh NAME OF THE DAM RIVER Ranganadi Dam Ranganadi Bihar NAME OF THE DAM 2 RIVER Nagi Dam Nagi Chhattisgarh NAME OF THE DAM RIVER Minimata (Hasdeo) Bango Dam Hasdeo Gujarat NAME OF THE DAM RIVER Kadana Dam Mahi Karjan Dam Karjan Sardar Sarover Dam Narmada Ukai Dam Tapi 3 oliveboard www.oliveboard.in List of Important Dams in India Volume 1(2017) Himachal Pradesh NAME OF THE DAM RIVER Bhakra Dam Sutlej Chamera I Dam Ravi Kishau Dam Tons Koldam Dam Sutlej Nathpa Jhakri Dam Sutlej Pong Dam Beas Jammu & Kashmir NAME
    [Show full text]
  • AIT Thesis Template
    INVESTIGATING IRRIGATION SYSTEMS’ PERFORMANCE UNDER TWO DIFFERENT GOVERNANCE SYSTEMS IN PAKISTAN by Sajjad Ahmad A dissertation submitted in partial fulfillment of the requirements for the degree of Doctor of Philosophy in Natural Resources Management Examination Committee: Dr. Sylvain Roger Perret (Chairperson) Dr. Roberto S. Clemente Prof. Ganesh P. Shivakoti Prof. Jayant Kumar Routray External Examiner: Dr. Marcel Kuper CIRAD / Institute Agronomique et Veterinaire Agricultural University, Morocco Nationality: Pakistani Previous Degree: Master of Science in Natural Resources Management Asian Institute of Technology, Thailand Scholarship Donor: Higher Education Commission (HEC), Pakistan – AIT Fellowship Asian Institute of Technology School of Environment, Resources and Development Thailand August 2012 i Acknowledgements I would like to express my profoundest gratitude to Dr. Sylvain Roger Perret, my supervisor, for scholastic guidance, kind supervision, utmost cooperation, untiring advice, benevolence, encouragement, inspiration and very strong motivation during the difficult phases of the study. I am also indebted to Dr. Roberto, S. Clemente, Professor Ganesh P. Shivakoti, and Professor, Jayant Kumar Routray, who as members of my dissertation committee, critically reviewed my work and provided me with all possible help. Their valuable suggestions were extremely important to improve the work. The role of doctoral advisory committee was exemplary during this study with their suggestions and inputs. The author is indebted to Higher Education Commission (HEC) of Pakistan for providing MS leading to PhD scholarship at Asian Institute of Technology (AIT), and Centre de Coopération Internationale en Recherche Agronomique pour le Développement (CIRAD) for financial assistance during field surveys. I would like to thank all those who helped me in the collection of data during the field work in Pakistan.
    [Show full text]
  • Of Indus River at Darband
    RESTRICTED For official use only Not for . UNN42 Vol. 6 Public Disclosure Authorized REPORT TO THE PRESIDENT OF THF, INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT AS ADMINISTRATOR OF THE INDUS BASIN DEVELOPMENT FUND STUDY OF THIE WATER AND POWER RESOURCES OF WEST PAKISI AN Public Disclosure Authorized VOLUME III Program for the Development of Surface Water Storage Public Disclosure Authorized Prepared by a Group of the World Barnk Staff Headed by Dr. P. Lieftinck July 28, 1967 Public Disclosure Authorized i R0C FPU-F ClJRRENCY EQUIVALENTS 4.76 rupees = U.S. $1.00 1 rupee = U.S. $0. 21 1 millior rupees = U. S. $210, 000 TABLE OF CONTENTS Page No. I, INTRODUCTION 11..........- II-.. SURFACE. WATER HYDROLOGY. .3 .. .. , 3 Meteorological and GeographicalI Factors, .................... 3 Discharge- Measurement and River. F-lows- ... ....... .. ,44... Sediment-.Movement ..... v...............8....... 8. Floods-.JO,:,. ,10: III.. HISTORICAL. USE OF SURFACE WATER, . 12 Development of- the. System ....... ... 12 IV.. THE IACA APPROACH ..... 17 Method- of Analysis. ........... v.. 17 Surface. Water Re.quirements;. ........ r19. Integration, of.Surface and Groundwater Supplies' .. 22 Storable. Water. 23 Balancng- of Irrigation and Power..-Requi:rements.. 25 Future. River Regime ... .. 27 Accuracy- of Basic. Data . ....................... , ,,.. 27 Vt., IDENTIFICATION OF DAM'SITES AND, COMPARISON OF. PROJECTS' 29: S'cope of-the Studies ... 29. A. The Valley of the Indus,.......... 31 Suitability of the- Valley, for: Reservoir' Storagel 31 A(l.) The Middle Indus-. ...........-.. 31 Tarbela.Projject- . .. 32 Side Valley- ProjS'ectsi Associatedt w-ith Tar.bela ... 36 The Gariala' Site......... 36 The. Dhok Pathan S.te . ... ... 39 The Sanjwal-Akhori S'ites -.- , ... 40- The Attock Site .
    [Show full text]
  • Accession of the States Had Been the Big Issue After the Division of Subcontinent Into Two Major Countries
    Journal of Historical Studies Vol. II, No.I (January-June 2016) An Historical Overview of the Accession of Princely States Attiya Khanam The Women University, Multan Abstract The paper presents the historical overview of the accession of princely states. The British ruled India with two administrative systems, the princely states and British provinces. The states were ruled by native rulers who had entered into treaty with the British government. With the fall of Paramountacy, the states had to confirm their accession to one Constituent Assembly or the other. The paper discusses the position of states at the time of independence and unfolds the British, congress and Muslim league policies towards the accession of princely states. It further discloses the evil plans and scheming of British to save the congress interests as it considered the proposal of the cabinet Mission 1946 as ‘balkanisation of India’. Congress was deadly against the proposal of allowing states to opt for independence following the lapse of paramountancy. Congress adopted very aggressive policy and threatened the states for accession. Muslim league did not interfere with the internal affair of any sate and remained neutral. It respected the right of the states to decide their own future by their own choice. The paper documents the policies of these main parties and unveils the hidden motives of main actors. It also provides the historical and political details of those states acceded to Pakistan. 84 Attiya Khanam Key Words: Transfer of Power 1947, Accession of State to Pakistan, Partition of India, Princely States Introduction Accession of the states had been the big issue after the division of subcontinent into two major countries.
    [Show full text]
  • Government of Pakistan Ministry of Water Resources Office of Chief Engineering Advisor/ Chairman, Federal Flood Commission
    Government of Pakistan Ministry of Water Resources Office of Chief Engineering Advisor/ Chairman, Federal Flood Commission 6-Attaturk Avenue, G-5/1, Islamabad Fax No. 051-9244621 & www.ffc.gov.pk DAILY FLOOD SITUATION REPORT TUESDAY AUGUST 20, 2019 Rivers & Reservoirs Situation: River Indus is flowing in Medium Flood at Guddu and in Low Flood at Taunsa & Sukkur Barrages. All other main rivers (Jhelum, Chenab, Ravi & Sutlej) are flowing normal. River flows at important sites, reservoir elevations & live storage of three major reservoirs and today's temperature of Skardu may be seen at Annexure-I. By the grace of Almighty Allah, Tarbela Dam has attained its Maximum Conservation Level (MCL) of 1550.00 feet today, whereas, Mangla Dam is at an elevation of 1214.50 feet (27.50 feet below its MCL of 1242.00 feet). Today's Combined Lived Storage capacity of Tarbela, Chashma & Mangla reservoirs is 11.424 MAF i.e. 83.49% of the existing Combined Live Storage capacity of 13.683 MAF. The Dam Operating Authorities based on the advice of Office of CEA/ CFFC are exercising utmost care and are vigilance in reservoir operation are strictly following SOPs & associated dam safety guidelines. Weather & Rainfall/Flood Forecast: Yesterday’s trough of Westerly Wave over Kashmir and adjoining areas has moved away Eastwards. Weak Seasonal Low lies over Northern Balochistan. Yesterday’s Monsoon Low over Eastern Jharkhand (India) has moved West-Northwestwards and today lies over Northern Jharkhand (India) and adjoining Eastern Utter Pradesh (India) and is likely to become insignificant for Pakistan. Moist currents from Arabian Sea and Bay of Bengal are cut off at the moment.
    [Show full text]
  • World Bank Document
    477~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~:. ~~~~~~44 .. Public Disclosure Authorized 00o4 Vf4. Xj a I%ARTIL i! f 4-4 .=44 !ffiS96-- * +<6 @ -*s ¢ r J t X I.S _ Public Disclosure Authorized $ 4~~~~4 S 444.44. -; K.ON- Public Disclosure Authorized .4 C'~~~~~~- 4 .,< drS nvftat' S -. 4• -"4--pt ~~~~~~~~~~~~>44z AP -r 4 ~~~~~~~~~~~~~~- -4t L~~*esPakt(tn) Lt . < - : -~ .4: . - :d'44fes-r-m t.4 Public Disclosure Authorized &~~~~~~~~~~~~~~~-Bmi & ater OIsos t TABLE OF CONTENTS c GRAZI-BAROTHA HYDROPOWER PROJECT REPORT ON SUPPLEMENTARY ENVIRONMENTAL STUDIES TABLE OF CONTENTS Page CHAPTER 1 INTRODUCTION 1.1 GENERAL 1.1 1.2 GENERAL DESCRIPTION OF THE PROJECT 1.1 1.3 PREVIOUS ENVIRONMENTAL STUDIES 1.2 1.4 CONCLUSIONS AND RECOMMENDATIONS OF THE ENVIRONMENTAL REVIEW PANEL 1.2 1.5 SUPPLEMENTARY ENVIRONMENTAL STUDIES 1.3 1.6 APPENDICES 1.4 REFERENCES CHAPTER 2 ECOLOGICAL ASPECTS OF THE INDUS RIVER FLOOD PLAIN 2.1 INTRODUCTION 2.1 2.2 APPROACH 2.1 2.3 MORPHOLOGICAL AND ECOLOGICAL SETTING OF THE RIVERAIN AREA 2.2 2.4 PLANT COMMUNITIES IN VARIOUS HABITATS 2.3 2.4.1 General 2.3 2.4.2 Braided Alluvial Channel 2.3 2.4.3 Attock Gorge 2.5 2.4.4 Alluvial Basin 2.6 2.5 WILDLIFE USE OF HABITATS 2.6 2.5.1 Open Water 2.6 2.5.2 Temporary Belas 2.6 2.5.3 Permanent Belas 2.7 2.5.4 Ind-ds Gorge 2.8 2.6 POTENTIAL EFFECTS OF THE PROJECT 2.8 2.6.1 Effects on Natural Vegetation 2.8 2.6.2 Effects on Wildlife 2.10 (i) Page 2.7 CONCLUSION 2.11 REFERENCES CHAPTER 3 WASTEWATER DISPOSAL AND WATER QUALITY 3.1 INTRODUCTION 3.1 3.1.1 Background 3.1 3.1.2
    [Show full text]
  • FLOOD RISK ASSESSMENT REPORT a Hi-Tech Knowledge Management Tool for Disaster Risk Assessment at UNION COUNCIL Level
    2015 FLOOD RISK ASSESSMENT REPORT A Hi-Tech Knowledge Management Tool for Disaster Risk Assessment at UNION COUNCIL Level A PROPOSAL IN VIEW OF LESSONS LEARNED ISBN (P) 978-969-638-093-1 ISBN (D) 978-969-638-094-8 205-C 2nd Floor, Evacuee Trust Complex, F-5/1, Islamabad 195-1st Floor, Deans Trade Center, Peshawar Cantt; Peshawar Landline: +92.51.282.0449, +92.91.525.3347 E-mail: [email protected], Website: www.alhasan.com ALHASAN SYSTEMS PRIVATE LIMITED A Hi-Tech Knowledge Management, Business Psychology Modeling, and Publishing Company 205-C, 2nd Floor, Evacuee Trust Complex, Sector F-5/1, Islamabad, Pakistan 44000 195-1st Floor, Dean Trade Center, Peshawar Can ; Peshawar, Pakistan 25000 Landline: +92.51.282.0449, +92.91.525.3347 Fax: +92.51.835.9287 Email: [email protected] Website: www.alhasan.com Facebook: www.facebook.com/alhasan.com Twi er: @alhasansystems w3w address: *Alhasan COPYRIGHT © 2015 BY ALHASAN SYSTEMS All rights reserved. No part of this publica on may be reproduced, stored in a retrieval system, or transmi ed, in any form or by any means, electronic, mechanical, photocopying, recording, or otherwise, without the prior wri en permission of ALHASAN SYSTEMS. 58 p.; 8.5x11.5 = A3 Size Map ISBN (P) 978-969-638-093-1 ISBN (D) 978-969-638-094-8 CATALOGING REFERENCE: Disaster Risk Reduc on – Disaster Risk Management – Disaster Risk Assessment Hyogo Framework for Ac on 2005-2015 Building the Resilience of Na ons and Communi es to Disasters IDENTIFY, ACCESS, AND MONITOR DISASTER RISKS AND ENHANCE EARLY WARNING x Risk assessments
    [Show full text]