dms-r EExxerercisingcising CConontrtrolol 49 months of DMS-R Operations

Claus Reimers1 &Daniel Guyomard2 1Head of Future Activities Office,Development Department, 2ATV Follow-On Procurement Engineer,Operations Department, D/MSM,ESTEC,PO Box 299,2200 AG Noordwijk,The Netherlands Email: [email protected]; [email protected]

Introduction Hardware Performance The ‘Data Management System for the Russian After the launch of Zvezda on 12 July 2000 Segment of the ISS’ – more succintly known as carrying two FTCs, a seventh processing unit ‘DMS-R’ – was launched in 2000 as a core part was delivered by -1P as an onboard of ’s Zvezda module, the spare in August 2000.That ferry also brought The ISS control system first habitation element of the the first CP,for installation by the Expedition-1 provided by ESA has now International . crew in November 2000.The second CP been operating sucessfully Provided by ESA, DMS-R manages followed aboard Shuttle 5A and was installed in orbit for 4 years ... the Russian portion of the ISS, in February 2001. and handles Guidance, By early March 2004, the FTC processing Navigation & Control for the entire Station. In units had accumulated more than 36 000 h of parallel, ESA benefits by using this computer operating time (more than 40 000 h with family for its own Columbus and Automated ground testing before launch).The system of Transfer Vehicles (ATVs). these six units is therefore exceeding its Zvezda carries two Fault Tolerant calculated theoretical mean-time-between- Computers (FTCs) for critical system and failure of 45 000 h by almost a factor of six mission control tasks, plus two Control Post without having experienced any (CP) Computers for crew interfaces and hardware failures. A processing experiment control.The computer unit was replaced in February infrastructure connects to the Station’s Russian 2001 solely for operations and US segment via an extended system of reasons, in order to check the MIL-1553B data busses. procedure for on-orbit computer Each FTC consists of three interconnected replacement and to ensure identical processing units working in parallel consistency of software versions redundancy and providing advanced fault- masking by majority voting.Tasks include interaction with the ATV, both during the approach and docked phases. The CP Computers are based on the same basic processing unit but without the advanced fault-tolerance. However, they have a mass memory unit, LAN interfaces and dedicated connections to two standard ISS laptops used for crew interfacing, including between the control of the . operational and spare

on Station While all the hardware, system software and units. ground system were developed by ESA and its The statistics for the contractors, the application software was CPs are not quite as impressive provided by Zvezda prime contractor RSC- because of their less frequent . operational use. However, there 12

on Station no. 17, august 2004 Reimers.qxp 7/14/04 2:44 PM Page 13

Yuri Gidzenko working with the Control Post laptops. A more spectacular event alerted the world’s press on 4 February 2002 when the Station lost have been no hardware failures so far, although its nominal attitude control for several hours some problems seen recently with the mass and transitioned into a survival mode. memory unit have yet to be evaluated. Although the DMS-R is basically responsible for Based on this excellent performance, Station GNC, the Russian Segment depends in RSC-Energia has decided for the moment not some situations on extensive data and to order additional spares beyond the initial set information from the US Segment.These agreed shortly after the development include desaturation of the US Control Moment programme. Gyros, when Zvezda’s thrusters have to take over ISS attitude control.The communication Operational Experience between DMS-R and its NASA counterpart While the CP Computer has seen one ‘warm’ collapsed owing to a number of coincidences restart owing to perturbations on its power and could not be reestablished by a warm supply line, no other problems have been restart because of the lack of valid context reported.With the FTC, a phenomenon was data. After several unsuccessful attempts, the observed soon after launch that has still not data exchange was finally reinitiated via a cold been fully explained and resolved. Although an start (power off/on) of DMS-R.This brought the anomaly, it has never degraded operations Station back into a normal operational mode. thanks to the computer’s inherent fault- Following an investigation of this event, the tolerant design, which masks such faults.The Russian application software was modified to issue is the occasional reset and automatic provide a more robust context management. restart of an FTC processing unit. Evolution to the fourth application software version – required mainly to handle the growing Station, but also offering improved telemetry for software analysis – has reduced the frequency of these events. However, the ultimate origin of this anomaly has not yet been identified and the restarts still happen about every 3 months. Part of the problem is the difficulty in tracing such a rare event because the diagnostic information in the reset processing The two FTCs installed in unit is lost after the warm restart erases its Zvezda are literally black entire volatile memory.Current software boxes. modifications therefore focus on improving the diagnostic possibilities but they are being Applications Beyond the Russian Segment pursued with modest priority because the From the beginning, DMS-R’s development not anomaly has no adverse operational only targeted the Station’s Russian Segment consequences. but also ESA’s own space elements. Derivatives of the FTC and CP Computers are now being used successfully as Data Management Systems for ATV and Columbus, respectively.

Summary RSC Energia and ESA are highly satisfied by the excellent performance of the DMS-R system. Its 49 months of onboard operations feature no DMS-R has wide-ranging responsibilities. hardware failures and minimum effort for Housed in Zvezda (),one FTC solving software and operational problems. serves as the Central Computer (CC) and the DMS-R is clearly a very successful programme other as the Terminal Computer (TC).The both for the Agency and for Industry. ■ other acronyms are not important here but their profusion illustrates the architecture’s complexity. Further information on DMS-R can be found at: esapub.esrin.esa.it/onstation/onstation5.htm on Station

13