Environmental and Social Impact Assessment Report (ESIA) –

Project No.: 51209-002 February 2018

INO: Eastern Renewable Energy Project (Phase 2)

Prepared by ERM for PT Infrastruktur Terbarukan Lestari

The redacted environmental and social impact assessment is a document of the project sponsor. The views expressed herein do not necessarily represent those of ADB’s Board of Director, Management, or staff, and may be preliminary in nature. Your attention is directed to the “Terms of Use” section of this website.

In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of or any territory or area.

Environmental and Social Health Impact Assessment (ESHIA); Solar Farm Project and 20-kV Transmission Line in Pringgabaya, Selong and Sengkol—Nusa Tenggara Barat Province, Indonesia

Prepared for: PT Infrastruktur Terbarukan Adhiguna (“ITA”), PT Infrastruktur Terbarukan Buana (“ITB”) and PT Infrastruktur Terbarukan Cemerlang (“ITC”)

February 2018

The business of sustainability

Environmental and Social Health Impact PT. ERM Indonesia Assessment (ESHIA): Solar Farm Project and 20- Wisma Aldiron Dirgantara nd kV Transmission Line in Pringgabaya, Selong 2 floor, Suite 238-239 Jl. Gatot Subroto Kav. 72 and Sengkol—Nusa Tenggara Barat Province, Jakarta 12870 Indonesia. Indonesia

Telephone +62 21 7918 1904 Facsimile +62 21 7918 1905 Website: www.erm.com

Client Project No. PT Infrastruktur Terbarukan Adhiguna (“ITA”), PT Infrastruktur Terbarukan Buana (“ITB”), and 0411354 Equis Energy ESHIA PT Infrastruktur Terbarukan Cemerlang (“ITC”)

Equis Energy has commissioned PT ERM Date Indonesia (ERM) to undertake an Environmental, Social and Health Impact Assessment (ESHIA) of 8 February 2018 the Project. The purpose of the ESHIA is to provide Approved by an environmental and social assessment of the Project against the International Finance Corporation (IFC) Performance Standards, associated World Bank Group Environmental, Health and Safety (EHS) Guidelines and Asian Samantha McCrea Development Bank (ADB) Safeguard Policies. Partner ERM Indonesia

1 DRAFT ESHIA AH, IF, SA, RA ML, RA SM 12 Sep 17 2 FINAL ESHIA RA, AS, NA RA SM 10/11/17 3 REVISED FINAL ESHIA RA, IR IR SM 17/01/18 4 REVISED FINAL ESHIA Rev1 RA, IR IR SM 08/02/18

Revision Description By Checked Approved Date Distribution

This document has been prepared by PT ERM Indonesia (ERM) with Internal all reasonable skill, care and diligence, incorporating our General Public Terms and Conditions of Business. Confidential We disclaim any responsibility to the client and others in respect or any matters outside the scope of the above. This document or any part thereof is a confidential submission to the client and is not permitted to be released to third parties without ERM’s approval.

TABLE OF CONTENTS

TABLE OF CONTENTS ...... III LIST OF TABLES ...... VIII LIST OF FIGURES ...... XI EXECUTIVE SUMMARY ...... I UNITS AND ABBREVIATIONS ...... IV 1 INTRODUCTION...... 1-1 1.1 PURPOSE AND SCOPE OF THE ESHIA ...... 1-1 1.2 PROJECT PROPONENT ...... 1-2 1.3 PROJECT OBJECTIVES AND JUSTIFICATION ...... 1-2 1.4 OVERVIEW OF THE PROJECT ...... 1-3 1.5 ESHIA METHODOLOGY ...... 1-6 1.5.1 Screening ...... 1-7 1.5.2 Scoping ...... 1-7 1.5.3 Project Description ...... 1-7 1.5.4 Baseline Conditions ...... 1-7 1.5.5 Impact Identification/Prediction ...... 1-7 1.5.6 Analysis of Alternatives ...... 1-8 1.5.7 Environmental and Social Management Plan (ESMP) ...... 1-8 1.5.8 Stakeholder Engagement ...... 1-8 1.6 LIMITATIONS ...... 1-8 1.7 ESHIA STRUCTURE ...... 1-9 2 APPLICABLE STANDARDS AND REGULATORY FRAMEWORK ...... 2-1 2.1 INTRODUCTION ...... 2-1 2.