Unitary Development Plan 2004 This document should be read with the Planning and Transport Statement Supplementary Planning Guidance for the Acton area. Development Sites
Site 9 Address 10-20 Horn Lane, Acton. W3 Area Acton Site Area 0.30 ha (0.60 acres - 3,000 m2)
SUMMARY
Development Aims Quality TC development with active ground floor uses; vitality and viability of TC Land Uses Housing, shops; possible mixed use Overall Capacity using the UDP standard 2:1 plot ratio and 75% site coverage 6,000 m2 (500 m2 additional over existing) Key Design Principles Active street frontage; perimeter block form, quality public realm Key Transport Issues Parking restrictions; rear servicing issues
SITE PLAN
9
For more information contact the Planning Policy Team on 020 8825 5428
1 Site 9 INDICATIVE DEVELOPMENT CAPACITY*
Overall Capacity Existing Estimate (m2): 5,500 Potential floor space (m2): 6,000 (2:1 plot ratio and 75% site coverage)
Housing Existing Estimate (m2): 500 Potential floor space (m2): 2,000 Potential Number of Units: 35 (mixed)
Retail/Leisure Existing Estimate (m2): - Potential floor space (m2): 1,000 Potential Jobs:** -
Employment Existing Estimate (m2): 5,000 Potential floor space (m2): 3,000 Potential Jobs:** 120
Community Facilities Type: - Existing Floor space (m2): - Potential floor space (m2): -
Public Open Space Type: - Deficiency Area District Park deficiency Potential OS: -
Key Transport Infrastructure Considerations (See General Planning Information) Bus Routes: - Rail / Tube: - Roads / Juncs: - Traffic Management: - Cycle Routes: - Pedestrian Routes: - City Car Club: - Green Travel Plan: - Servicing: Yes Car Parking: Yes Comments: Residential development may be subject to ‘low car housing’ policy
Site Adjustment None Potential Units / Jobs: Justification:
* This indicative development capacity should be used as an approximate guide only – potential floor space is based upon an estimation using site coverage and building heights. Where uses currently exist but the floorspace is unknown this is indicated using the symbol u/k **Jobs estimation see appendices
2 Site 9 SITE LOCATION, DESCRIPTION AND PLANNING STATUS
Site description Prominent site in the heart of Acton town centre On Horn Lane - 50m from the High Street 3 storey offices dominant use Vacant units Some residential possible At ‘end’ of Crown Street/King Street ped zone
Town planning Land use/Context Within Acton Town Centre envelope District Centre designation Archaeological Area of interest Regeneration area In town centre Conservation Area Uses - A1, A2 - (Shops) B2 - (Business) C3 - (Residential)
Current site activity Active business with possible residential over
Current planning/development control status Demolition of existing buildings for the construction of a new building comprising 35 flats. Decision: Current - P/2002/4517 (Outline Application - access and siting only) Redevelopment to provide part 5 storey part 3 storey development of 13 one bedroom flats, 45 two bedroom flats & 8 three bedroom flats, including provision of improved access off Horn Lane, off street basement, parking and landscaping details. Decision: Refused - P/1999/2429 (Decision appealed and subsequently withdrawn) Demolition of existing industrial/warehousing buildings and provision of residential accommodation in 3no. linked x 4-storey block with vehicular access under fronting Horn Lane and 4no. x 3-storey block at rear (total 45 residential units), car parking and landscaping. Decision: Conditional Approval - P/2004/2455 Redevelopment with 2X3 storey blocks containing 45 flats with vehicular access from Horn Lane basement car parking and landscaping. Decision: Conditional Approval - P/2000/0625
Relevant Policy Considerations Acton Town Centre Strategy Community & Local Neighbourhood Renewal Strategy Acton Strategy East Acton Action Plan
3 Site 9 Current access issues Within 10 mins from Acton Central Station Just off strategic route - A4020 Easy access to Western Avenue via A4000 Within 50m of 1 bus stop serving Shepherds Bush and Ealing Common Close to designated cycle route Controlled parking zone PTAL 3
CONSTRAINTS AND OPPORTUNITIES
Constraints Existing active uses Current surrounding uses Archaeological interest area Conservation area designation Quality of existing building - could possibly be retained?
Opportunities Precedent set by adjoining 3-4 storey developments Access to rear from both sides Active ground floor use encouraged onto Horn Lane Rear access possible from Derwentwater Road Opportunity to promote mixed use Improve pedestrian environment along Horn Lane
DEVELOPMENT PRINCIPLES
Preferred Land Uses/Mix Mixed use - housing and shops Active retail along Horn Lane A percentage of the residential units could be affordable housing
Urban Form Site/block layout Maintain perimeter block with rear servicing Opportunity for 3 storey development Character Town centre densities with active lower ground floors off pavement Take cue from local character - adjoining 3 storey flatted development
Access/Transport Parking restraint - Zone 1 parking - maximum parking requirement is lower Easy walking distance of Acton Central station (10 minutes) Well served by bus services running along the High Street
Public Open Space Acton Park within 10 minutes Local environmental improvements on Horn Lane
4 Site 9 Land Use development and Management Issues Multiple ownership TC Management Contributor
INDICATIVE DEVELOPMENT DIAGRAM*
Design Principles Perimeter block maintained Take precedent from adjoining development Ensure active ground floor uses Continue building line along Horn Lane Keep development away from rear residential properties Allow for landscaping along rear Allow vehicular access to rear for servicing Keep pedestrian link through to Derwentwater Road
* This diagram provides a possible site layout only and should not be seen as prescriptive. Further study into details may give rise to alternative options ands the final scheme will need to meet all relevant policies.
5 Site 9 SITE PHOTO
AERIAL PHOTO
6 Site 9 Unitary Development Plan 2004 This document should be read with the Planning and Transport Statement Supplementary Planning Guidance for the Acton area. Development Sites
Site: 15 Address Crown Street and King Street, W3 Area Acton Site Area 0.60 ha (1.40 acres - 6,000 m2)
SUMMARY
Development Aims Public realm improvements including the reinstatement of a market place to the town centre; vitality and viability of town centre Land Uses Possible open market; approved pedestrian, cycle and public transport facilities; public realm/town square Overall Capacity (n/a) Key Design Principles Permeable - create quality ‘ends’ to the space; create quality town square Key Transport Issues Parking restrictions; servicing issues; cycle lane obstruction
SITE PLAN
15
For more information contact the Planning Policy Team on 020 8825 5428
1 Site 15 INDICATIVE DEVELOPMENT CAPACITY*
Overall Capacity Existing Estimate (m2): n/a Potential floor space (m2): n/a
Housing Existing Estimate (m2): n/a Potential floor space (m2): - Potential Number of Units: -
Retail/Leisure Existing Estimate (m2): n/a Potential floor space (m2): - Potential Jobs:** -
Employment Existing Estimate (m2): - Potential floor space (m2): - Potential Jobs:** -
Community Facilities Type: - Existing Floor space (m2): - Potential floor space (m2): -
Public Open Space Type: - Deficiency Area - Potential OS: -
Key Transport Infrastructure Considerations (See General Planning Information) Bus Routes: - Rail / Tube: - Roads / Juncs: - Traffic Management: Yes Cycle Routes: Yes Pedestrian Routes: Yes City Car Club: - Green Travel Plan: - Servicing: Yes Car Parking: - Comments:
Site Adjustment None Potential Units / Jobs: Justification:
* This indicative development capacity should be used as an approximate guide only – potential floor space is based upon an estimation using site coverage and building heights. Where uses currently exist but the floorspace is unknown this is indicated using the symbol u/k **Jobs estimation see appendices
2 Site 15 SITE LOCATION, DESCRIPTION AND PLANNING STATUS
Site description Prominent ‘site’ in the heart of Acton town centre Crown Street (crossing High Street) to Kings Street - from Market Place to Mill Hill Rd Cuts through town centre with St Marys Church and Safeway
Town planning Land use/Context Within Acton TC Envelope District Centre designation Archaeological Area of interest Conservation Area Façade value buildings Surrounding Statutory and Locally Listed Buildings Surrounding Uses - A1, A2, A3 - (Shops, restaurants) B2 - (Business) C3 - (Residential)
Current site activity Adopted highway
Current planning/development control status Extension to retail store (1,030 square metres additional floorspace, to sum total of 5,410) at first floor level and development of existing car park to provide three residential blocks of 12 storeys (57 residential units), 9 storeys (60 residential units) and 7 storeys (38 residential units), making a total of 155 units; new car park at first floor level, providing a total of 397 car parking spaces, plus alterations to access, servicing and landscape. Decision: Pending - P/2003/4240
Relevant Policy Considerations Acton Town Centre Strategy Community & Local Neighbourhood Renewal Strategy Acton Strategy East Acton Action Plan
Current access issues Within 10 mins from Acton Central Station Crosses strategic route - A4020 Easy access to Western Avenue via A4000 Within 50m of 2 bus stops serving 2 bus routes - Shepherds Bush and Ealing Common On designated cycle route Controlled parking zone PTAL 4
3 Site 15 CONSTRAINTS AND OPPORTUNITIES
Constraints Adopted highway with vehicular access Current surrounding uses including The Woodlands Locally and statutory listed buildings Conservation area Controlled parking area Servicing issues Consider use and reuse of quality materials in scheme Part of the site around Safeways would need careful redesigning to ensure integration - possibly a new square to the town centre
Opportunities Accessible site Improve pedestrian environment Redev shops along Crown Street Landscaping gateways into the street
DEVELOPMENT PRINCIPLES
Preferred Land Uses/Mix Street market
Urban Form Site/block layout Permeable pedestrian connections Character London street market
Access/Transport Parking restraint - Zone 1 parking – maximum parking requirement is lower. Easy walking distance of Acton Central station (less than five minutes) Well served by bus services running along the High Street
Public Open Space Local park off Crown Street - The Woodlands
4 Site 15 INDICATIVE DEVELOPMENT DIAGRAM*
Design Principles Ensuring the space is useable for market trading Clearing ‘obstacles’ Street improvements Create new town centre square Address church Carry quality ‘across’ High Street
* This diagram provides a possible site layout only and should not be seen as prescriptive. Further study into details may give rise to alternative options ands the final scheme will need to meet all relevant policies.
5 Site 15 SITE PHOTO
AERIAL PHOTO
6 Site 15 Unitary Development Plan 2004 This document should be read with the Planning and Transport Statement Supplementary Planning Guidance for the Acton area. Development Sites
Site 16 Address Atlas Road, Park Royal, NW10 Area Acton Site Area 6.90 ha (17.0 acres - 70,000 m2)
SUMMARY
Development Aims Key strategic employment opportunity site; possible CrossRail connections and safeguarding; waterside frontage Land Uses General industrial uses (B2) and limited B1 uses Overall Capacity using the UDP standard 2:1 PR and 75% coverage 140,000 m2, (69,250 m2 additional) Key Design Principles green corridor improvements; masterplan site for comprehensive development Key Transport Issues Development linked to major transport improvements (includes possible CrossRail); improvement to cycle and footway provision; single site access
SITE PLAN
16
For more information contact the Planning Policy Team on 020 8825 5428
1 Site 16 INDICATIVE DEVELOPMENT CAPACITY*
Overall Capacity Existing Estimate (m2): 20,000 Potential floor space (m2): 140,000(2:1 plot ratio and 75% site coverage)
Housing Existing Estimate (m2): - Potential floor space (m2): - Potential Number of Units: -
Retail/Leisure Existing Estimate (m2): - Potential floor space (m2): - Potential Jobs:** -
Employment Existing Estimate (m2): 20,000 Potential floor space (m2): 140,000 Potential Jobs:** 2,800
Community Facilities Type: - Existing Floor space (m2): - Potential floor space (m2): -
Public Open Space Type: - Deficiency Area Yes Potential OS: Potential for Green Corridor improvements along the Canal
Key Transport Infrastructure Considerations (See General Planning Information) Bus Routes: - Rail / Tube: Yes Roads / Juncs: Yes Traffic Management: Yes Cycle Routes: Yes Pedestrian Routes: Yes City Car Club: - Green Travel Plan: Yes Servicing: Yes Car Parking: Yes Comments: Opportunity for significant transport improvements owning to CrossRail, site adjoins cycle and pedestrian routes - to potential improve these considered; potential area of parking restraint; new servicing and road layouts required - junction improvements to Old Oak and Atlas
Site Adjustment None Potential Units / Jobs: Justification:
* This indicative development capacity should be used as an approximate guide only – potential floor space is based upon an estimation using site coverage and building heights. Where uses currently exist but the floorspace is unknown this is indicated using the symbol u/k **Jobs estimation see appendices
2 Site 16 SITE LOCATION, DESCRIPTION AND PLANNING STATUS
Site description Large back land industrial site located between a rail freight line and the Canal
Town planning land use/Context Special Opportunity Site CrossRail Safe Guarding Land Site Adjacent to a Waterway (Grand Union Canal) Community Regeneration Area Major Employment Location Adjoins Canalside Conservation Area Adjacent to a Locally Listed Building Green Corridor Preferred Industrial Location/Industrial Business Park Partially in area of District Park Deficiency after implementation of proposals In area of Severe Local Park Deficiency The site is within an Area of more than 400m from a designated shopping frontage Within an area more than 1.2km from a sports hall and within an area more than 1.5km from a swimming pool
Current site activity Wholesale warehouse on the southern part of the site (Makro) and industrial use on the northern part of the site (Daytona) Centre of the site may be needed for CrossRail safeguarding
Current planning/development control status No relevant recent planning history
Relevant Policy Considerations LBE
Current transport issues On Main Distributor Route - Old Oak Lane - A4000 CrossRail Safe Guarding Land Site Within Parking Standards: Zone 1 On proposed and existing designated cycle routes Located on the London Walks River Brent Footpath route Within 10 min walking distance of Willesden Junction Within 100 - 200m of several bus stops serving 4 bus routes
CONSTRAINTS AND OPPORTUNITIES
Constraints Significant employment site Impact of CrossRail on ‘dividing’ the site into two Provision of major infrastructure (including transport) Deep site requiring new road layout and servicing
3 Site 16 Canal-side location Multiple ownership Junction improvements at Atlas Road An Environmental Statement and Traffic Impact Statement required Masterplan required with comprehensive development Noise and air quality management issues need to be considered MEL amenities for employees
Opportunities Range of employment uses including B1, B2, limited B8 and some A3 to service the site Masterplan site to ensure comprehensive redevelopment Potential for redevelopment of site in conjunction with CrossRail Contribution to transport improvement - possible alternative route to the Freightliner Terminal site to encourage industrial traffic away from residential streets Potential green space improvement to Canal corridor Improvements to cycle and pedestrian links General industrial uses (B2) and limited B1 uses such as industrial processing and research and development of products and processes Mixed unit sizes to allow for alternative end users Improved architectural quality/high quality materials
DEVELOPMENT PRINCIPLES
Preferred Uses/Mix Potential for mixed industrial development Critical to establish need for CrossRail safeguarding in advance of development process
Urban Form Site will need to consider 2 options one with and one without safeguarding for CrossRail Site/block layout Development should create a central street with blocks facing onto the access road Provide a positive aspect onto the Canal, increasing informal surveillance of the cycle and pedestrian footpath Integrate CrossRail line into scheme Character General industrial estate with positive aspect onto the Grand Union Canal Potential to improve the character of this area
Access/Transport Opportunity for significant transport improvements owning to CrossRail Site adjoins cycle and pedestrian routes therefore potential improvement to these should be considered Potential area of parking restraint once transport improvements are secured; New servicing and road layouts required
4 Site 16 Public Open Space/Public Environment Potential green space improvement to Canal corridor Improvements to cycle and pedestrian links
Land Use development and Management Issues Multiple ownership
INDICATIVE DEVELOPMENT DIAGRAM*
Design Principles Master plan required Single spine to optimise site access Variable site sizes Address canal Possibly include office development on Old Oak Lane (Safeguarded Cross Rail route through site shown red)
* This diagram provides a possible site layout only and should not be seen as prescriptive. Further study into details may give rise to alternative options ands the final scheme will need to meet all relevant policies.
5 Site 16 SITE PHOTO
AERIAL PHOTO
6 Site 16 Unitary Development Plan 2004 This document should be read with the Planning and Transport Statement Supplementary Planning Guidance for the Acton area. Development Sites
Site 17 Address Southern Gateway, Park Royal, W3 Area Acton Site Area 7.2 ha (18.00 acres - 72,500 m2)
SUMMARY
Development Aims Southern Gateway to Park Royal/LB Ealing Land Uses Transport hub, mixed commercial uses (B1), C1 (hotel), limited retail and residential Overall Capacity using 2.5:1 plot ratio and 75% coverage 181,250 m2, (creating an additional 149,250 m2) Key Design Principles Landmark buildings to recognise gateway status; high quality buildings to build prestige location; potential new public space; improved block structure offering landmark B1 and housing use; high quality buildings, set in a quality environment Key Transport Issues Strong links to existing and improved public transport services; parking restraint; mitigate adverse traffic effects
SITE PLAN
17
For more information contact the Planning Policy Team on 020 8825 5428
1 Site 17 INDICATIVE DEVELOPMENT CAPACITY*
Overall Capacity Existing Estimate (m2): 32,000 Potential floor space (m2): 181,250 (2.5:1 plot ratio and 75% site coverage)
Housing Existing Estimate (m2): - Potential floor space (m2): 35,000 Potential Number of Units: 360
Retail/Leisure Existing Estimate (m2): 8,700 Potential floor space (m2): 10,000 Potential Jobs:** 200
Employment Existing Estimate (m2): 23,300 Potential floor space (m2): 135,000 Potential Jobs:** 3,000
Community Facilities Type: - Existing Floor space (m2): - Potential floor space (m2): 1,250
Public Open Space Type: Hard surface public space Deficiency Area Yes Potential OS: Potential for feature hard surface public space to be incorporated
Key Transport Infrastructure Considerations (See General Planning Information) Bus Routes: Yes Rail / Tube: Yes Roads / Juncs: Yes Traffic Management: Yes Cycle Routes: Yes Pedestrian Routes: Yes City Car Club: Yes Green Travel Plan: Yes Servicing: Yes Car Parking: Yes Comments: Public transport improvements; potential area of parking restraint given transport improvements; on site servicing arrangements required; subject to adverse impact by road traffic; potential to improve pedestrian environment
Site Adjustment None Potential Units / Jobs: Justification:
* This indicative development capacity should be used as an approximate guide only – potential floor space is based upon an estimation using site coverage and building heights. Where uses currently exist but the floorspace is unknown this is indicated using the symbol u/k **Jobs estimation see appendices
2 Site 17 SITE LOCATION, DESCRIPTION AND PLANNING STATUS
Site description Large ‘Southern Gateway’ site, which is partially cleared and has a number of prestigious industrial buildings, vacant buildings and other, actively used buildings in varying states of repair
Town planning land use/Context Adjacent to archaeological area of interest Adjacent to a Locally Listed Building Special Opportunity Site Community Regeneration Area Green Corridor Adjacent to both a Major Employment Area and Residential Area In area of District Park Deficiency Severe Local Park Deficiency Uses - B1, B2, B8 - (offices, warehousing) A1, A3 - (retail, leisure) C1 - (hotel)
Current site activity Active warehouse, retail, industrial, office and hotel uses Cleared vacant site
Current planning/development control status Retail development (11,450 m2), car parking (786 spaces) petrol filling station and highway access works. Decision: Not proceeded with (1997) Continued use of part of warehouse as offices, including retention of new mezzanine floor, providing a total of 2762sq metres of offices and 961sq metres of warehouse floor space. Decision: Conditional (1998) Retention of existing office/storage building (3,716 square metres) and change of use of Unit 1B to B1 employment use and introduction of a mezzanine level to provide 9,755 square metres floorspace. Decision: Conditional (2000) Phased development of site to include the reorganisation of the local road gyratory new access road and accesses a car showroom and ancillary workshop (7,841sq m) Class B1 employment uses (16,605sq m) mixed uses comprising Class B1 employment uses (9,200sq m). Decision: Conditional Approval - P/2000/0730 Outline planning permission for mixed use development of site; in respect of 7/8 storey hotel (157 bedrooms) with parking provision (72 spaces). Decision: Approved (2001) Erection of additional 4 floors and conversion of building into hotel involving remodelling of access points to provide coach parking and drop off points plus rear car parking. Decision: Conditional - P/1998/3081 (Legal Agreement) Construction of a single storey building to contain helicopter flight training facility with ancillary accommodation and car parking. Decision: Refused - P/2002/1574
3 Site 17 Mixed use redevelopment to provide two buildings (Block A - 14 storeys plus basement, including part 10 no. and 12 no. storeys; Block C/D - 15 no. storeys, including part 12 no. storeys) comprising 446 residential units (including affordable housing), retail (A1/A3) use, community use, public open space, north-south pedestrian route, vehicle access, car and cycle parking, refuse storage and landscaping. Decision: Approval - P/2004/3977 (Legal Agreement) Demolition of existing building and construction of new 7/8 storey building incorporating 6 new residential self-contained flats on second to fifth floor, coffee shop and fitness suite at ground floor, car parking and associated landscaping and environmental improvements. Decision: Pending - P/2003/3364
Relevant Policy Considerations Community & Local Neighbourhood Renewal Strategy Park Royal Strategy LDA Park Royal Wembley Framework Plan
Current transport issues On Strategic Route - Western Avenue - A40, also on Main Distributor Route - Victoria Road - A4000, and MD5 - Leamington Park Within Parking Standards: Zone 1 On proposed designated cycle route Within 5 min walking distance of North Acton Station Within 100m of several bus stops serving 4 bus routes
CONSTRAINTS AND OPPORTUNITIES
Constraints Accessible site in an employment generation area Gateway status of site Adverse effects of high traffic flows - noise, air pollution Possibly site contamination on north-west corner of site Multiple ownerships, comprehensive development is required Consideration of development of land to the east of the site Masterplan required with comprehensive development strategy incorporating new development Noise and air quality management issues need to be considered Traffic Impact Statement required
Opportunities Potential for high quality, prestige development Mixed use opportunity with strong employment focus Masterplan required for comprehensive development Landmark buildings to denote gateway status Precedent for taller buildings in surrounding area Potential creation for a feature public space within site Opportunity for improvement to cycle route and adjoining green corridor Possible area of parking restraint because of high level of accessibility over the site
4 Site 17 DEVELOPMENT PRINCIPLES
Preferred Uses/Mix High quality, prestige development with a mix of employment uses - B1, B2, hotel. Limited A3 sufficient to service users of the site
Urban Form Site/block layout Development to provide positive, active street frontage to external streets Building massing to recognise gateway status of site - improved block structure with corner sites accentuated Public space opportunity within site to provide focal point for development Ensure pedestrian connection to surrounding development Character High quality development with a mix of scales and employment uses Potential to improve the character of the area - recognise the gateway status of the site
Access/Transport Public transport improvements Parking restraint Improved linkages to North Acton Central Line Station Mitigation of adverse effects of high traffic flows - noise, air pollution
Public Open Space/Public Environment Potential to create a feature public space within site
Land Use development and Management Issues Multiple ownerships Potential for Estate Management
5 Site 17 INDICATIVE DEVELOPMENT DIAGRAM*
Design Principles Perimeter block development Development to provide positive, active street frontage to external streets Building massing to recognise gateway status of site Address surrounding roads Public space opportunity to centre of site Pedestrian access and connections through site Improved linkages to North Acton Central Line Station
Possible Extension To the UDF
* This diagram provides a possible site layout only and should not be seen as prescriptive. Further study into details may give rise to alternative options ands the final scheme will need to meet all relevant policies.
6 Site 17 SITE PHOTO
AERIAL PHOTO
7 Site 17 Unitary Development Plan 2004 This document should be read with the Planning and Transport Statement Supplementary Planning Guidance for the Acton area. Development Sites
Site 18 Address Ex Leamington Park, Park Royal, W3 Area Acton Site Area 0.57 ha (1.4 acres - 5,700 m2)
SUMMARY
Development Aims High quality Southern Gateway development Land Uses Primarily Business use (B1/B2 and/or B8 use class) with potential for a small amount of residential Overall Capacity using the UDP standard 2.5:1 PR and 75% coverage 14,250 m2 (vacant site) Key Design Principles Gateway into Park Royal, protect existing residential accommodation Key Transport Issues Parking restraint; mitigate adverse traffic effects; access and servicing from Jenner Avenue
SITE PLAN
18
For more information contact the Planning Policy Team on 020 8825 5428
1 Site 18 INDICATIVE DEVELOPMENT CAPACITY*
Overall Capacity Existing Estimate (m2): 0 Potential floor space (m2): 14,250 (2:1 plot ratio and 75% site coverage)
Housing Existing Estimate (m2): 0 Potential floor space (m2): 2,250 Potential Number of Units: 20
Retail/Leisure Existing Estimate (m2): 0 Potential floor space (m2): - Potential Jobs:** -
Employment Existing Estimate (m2): 0 Potential floor space (m2): 12,000 Potential Jobs:** 315
Community Facilities Type: 0 Existing Floor space (m2): - Potential floor space (m2): -
Public Open Space Type: - Deficiency Area Yes Potential OS: Potential to contribute to OS provision within the surrounding area
Key Transport Infrastructure Considerations (See General Planning Information) Bus Routes: Yes Rail / Tube: Yes Roads / Juncs: - Traffic Management: Yes Cycle Routes: - Pedestrian Routes: - City Car Club: - Green Travel Plan: Yes Servicing: Yes Car Parking: Yes Comments: Servicing and access on site off Jenner Avenue; potential for car parking restraint on site as in high public transport accessible area; subject to adverse impact by road traffic; potential to improve pedestrian environment.
Site Adjustment None Potential Units / Jobs: Justification:
* This indicative development capacity should be used as an approximate guide only – potential floor space is based upon an estimation using site coverage and building heights. Where uses currently exist but the floorspace is unknown this is indicated using the symbol u/k **Jobs estimation see appendices
2 Site 18 SITE LOCATION, DESCRIPTION AND PLANNING STATUS
Site description Vacant site adjoining a modern residential development to the east and the main line railway to the south east. It is on the fringe of the Southern Gateway entrance site to the Park Royal Regeneration Area.
Town planning land use/Context Special Opportunity Site Community Regeneration Area Green Corridor Adjacent to Residential Area In area of District Park Deficiency after implementation of proposals In area of Severe Local Park Deficiency Within an area more than 1.2km from a sports hall and within an area more than 1.5km from a swimming pool
Current site activity Vacant site, formerly hospital land
Current planning/development control status Planning permission was granted in respect of this site in February 1990 for the erection of three 3-storey buildings for business purposes (Class B1) with parking provision (Ref. No. 20502/8). This permission expired in 1995
Relevant Policy Considerations Draft Urban Design Framework produced for the Southern Gateway Area
Current transport issues On Strategic Route - Western Avenue - A40, also on Main Distributor Routes - Wales Farm Road - A4000 Sole means of access is from Jenner Avenue north-east corner Within Parking Standards: Zone 1 On proposed designated cycle route Within 5 min walking distance of North Acton Station Within 100m of several bus stops serving 4 bus routes
3 Site 18 CONSTRAINTS AND OPPORTUNITIES
Constraints Adjacent to the ‘Southern Gateway’ Accessible site in an employment generation area Adverse effects of high traffic flows and operation of rail line - noise, air pollution, vibration Adjoins sensitive residential uses Access from Jenner Avenue only Provide a continuous frontage along Western Avenue/Wales Farm Road Subject to the Highways Agency A40 Improvement Scheme (land required for a pedestrian footbridge ramp) Junction improvements An Environmental Statement and Traffic Impact Statement required Noise and air quality management issues need to be considered Masterplan required
Opportunities Potential to match high quality prestige development at the Southern Gateway Opportunity to shield sensitive residential uses from traffic noise on Western Avenue Improve architectural quality and pedestrian environment Gateway site to Ealing
DEVELOPMENT PRINCIPLES
Preferred Uses/Mix A Mixed use scheme incorporating high quality employment uses with an small element of residential
Urban Form Site/block layout Development should provide a continuous frontage to Western Avenue / Wales Farm Road this provides an active frontage to the street and shields adjoining residential development from traffic noise Bulk, mass and height should take account of overshadowing adjoining residential Character High quality office development in quality landscaped environment
Access/Transport Improved links to public transport Parking restraint Improved pedestrian environment Vehicle access and servicing off Jenner Avenue
Land Use development and Management Issues Robust building design required to ensure potential for ground floor units to accommodate local retail in the future
4 Site 18 SITE PHOTO
AERIAL PHOTO
5 Site 18 Unitary Development Plan 2004 This document should be read with the Planning and Transport Statement Supplementary Planning Guidance for the Acton area. Development Sites
Site 20 Address Land bounded by Western Ave/Concord Rd/Kendal Ave, Park Royal, W3 Area Acton Site Area 1.34 ha (3.30 acres - 13,300 m2)
SUMMARY
Development Aims Quality office/commercial development Land Uses Commercial or industrial uses primarily within B1, B2 or B8 use classes (possible cultural industries, film and TV production) Overall Capacity using the UDP standard 2:1 PR and 75% coverage 26,600 m2 (20,000 m2 additional) Key Design Principles Positive frontage onto Western Avenue; environmental improvement Key Transport Issues Access and servicing off Concord Road and potentially Kendal Avenue; improvements to service road/highways/traffic safety and pedestrian/cycle environment
SITE PLAN
20
For more information contact the Planning Policy Team on 020 8825 5428
1 Site 20 INDICATIVE DEVELOPMENT CAPACITY*
Overall Capacity Existing Estimate (m2): 6,600 Potential floor space (m2): 26,600 (2:1 plot ratio and 75% site coverage)
Housing Existing Estimate (m2): - Potential floor space (m2): - Potential Number of Units: -
Retail/Leisure Existing Estimate (m2): - Potential floor space (m2): - Potential - Jobs:**
Employment Existing Estimate (m2): 6,600 Potential floor space (m2): 26,600 Potential Jobs:** 500
Community Facilities Type: - Existing Floor space (m2): - Potential floor space (m2): -
Public Open Space Type: - Deficiency Area Yes Potential OS: Potential for contributions to secure open space within the surrounding area
Key Transport Infrastructure Considerations (See General Planning Information) Bus Routes: - Rail / Tube: - Roads / Juncs: Yes Traffic Management: - Cycle Routes: - Pedestrian Routes: - City Car Club: - Green Travel Plan: - Servicing: Yes Car Parking: Yes Comments: Limited off street car parking; servicing from Concord Road; potential to secure improvements to cycle routes; public transport improvements associated with the new station
Site Adjustment None Potential Units / Jobs: Justification:
* This indicative development capacity should be used as an approximate guide only – potential floor space is based upon an estimation using site coverage and building heights. Where uses currently exist but the floorspace is unknown this is indicated using the symbol u/k **Jobs estimation see appendices
2 Site 20 SITE LOCATION, DESCRIPTION AND PLANNING STATUS
Site description A substantial single storey warehouse building with ancillary office block fronting onto Western Avenue Accessed off Concord Road with off street parking
Town planning land use/Context Major Employment Location Green Corridor Community Regeneration Area In area of Severe Local Park Deficiency The site is within an Area of more than 400m from a designated shopping frontage Local Viewpoint over site - view eastwards from Hanger Hill Estate streets towards the City of London
Current site activity Warehouse (B8) and ancillary office uses
Current planning/development control status No recent relevant planning history
Relevant Policy Considerations LBE
Current transport issues Within 5 min walking distance of a proposed station Within 5 min walking distance of Park Royal Station On Strategic Route - Western Avenue - A40 Within Parking Standards: Zone 1 On existing designated cycle route Within 100m of several bus stops serving 2 bus routes
CONSTRAINTS AND OPPORTUNITIES
Constraints High development could interfere with view protected shaft High public transport accessibility Public transport improvement contributions Servicing and access arrangements
Opportunities Highly accessible employment use location Range of employment uses appropriate including B1, B2 and B8 Opportunity for dual access to the site Adjacent to leisure uses
3 Site 20 DEVELOPMENT PRINCIPLES
Preferred Uses/Mix A range of employment generating commercial or industrial uses primarily within B1, B2 or B8 use classes
Urban Form Site/block layout Development should maintain positive aspect onto Western Avenue Access onto Concord Road, Kendal Avenue and the service road at the front of the site Character Employment generating commercial premises potentially accommodating B1, B2 or B8 uses providing a positive setting to Western Avenue
Access/Transport Public transport improvement contributions Potential for contributions to environmental/highway and traffic safety improvements Servicing and access arrangements off Concord Road, Kendal Avenue and service road
Public Open Space/Public Environment Potential contribution to environmental improvements for pedestrians and cyclists
Land Use development and Management Issues Potential contributions for local employment training schemes
4 Site 20 INDICATIVE DEVELOPMENT DIAGRAM*
Design Principles Pavilion style estate Focus on court - landscaped with parking Servicing from rear Address Western Avenue Access onto Concord Road and onto Kendal Avenue
* This diagram provides a possible site layout only and should not be seen as prescriptive. Further study into details may give rise to alternative options ands the final scheme will need to meet all relevant policies.
5 Site 20 SITE PHOTO
AERIAL PHOTO
6 Site 20 Unitary Development Plan 2004 This document should be read with the Planning and Transport Statement Supplementary Planning Guidance for the Acton area. Development Sites
Site 21 Address 23-25 Sunbeam Road, Park Royal, NW10 Area Acton Site Area 0.39 ha (0.96 acres - 3,800 m2)
SUMMARY
Development Aims Quality employment/office development Land Uses Range of employment uses including office, light industrial and general industrial (B1, B2) Overall Capacity using the UDP standard 2:1 PR and 75% coverage 7,600 m2 (vacant site) Key Design Principles Provide positive frontage to Sunbeam Road Key Transport Issues Potential secondary access from Cullen Way; restricted off street parking; narrow and congested access along Sunbeam Road
SITE PLAN
21
For more information contact the Planning Policy Team on 020 8825 5428
1 Site 21 INDICATIVE DEVELOPMENT CAPACITY*
Overall Capacity Existing Estimate (m2): 0 Potential floor space (m2): 7,600 (2:1 plot ratio and 75% site coverage)
Housing Existing Estimate (m2): Potential floor space (m2): - Potential Number of Units: -
Retail/Leisure Existing Estimate (m2): - Potential floor space (m2): - Potential Jobs:** -
Employment Existing Estimate (m2): 0 Potential floor space (m2): 7,600 Potential Jobs:** 309
Community Facilities Type: - Existing Floor space (m2): - Potential floor space (m2): -
Public Open Space Type: - Deficiency Area Yes Potential OS: Potential for contributions to local park provision in area
Key Transport Infrastructure Considerations (See General Planning Information) Bus Routes: - Rail / Tube: - Roads / Juncs: - Traffic Management: Yes Cycle Routes: - Pedestrian Routes: - City Car Club: - Green Travel Plan: - Servicing: Yes Car Parking: Yes Comments: Servicing off Sunbeam Road, potential secondary access off Cullen Way; opportunity for voluntary contributions for public transport and environmental and highway / traffic calming improvements; restricted off street parking
Site Adjustment None Potential Units / Jobs: Justification:
* This indicative development capacity should be used as an approximate guide only – potential floor space is based upon an estimation using site coverage and building heights. Where uses currently exist but the floorspace is unknown this is indicated using the symbol u/k **Jobs estimation see appendices
2 Site 21 SITE LOCATION, DESCRIPTION AND PLANNING STATUS
Site description Narrow frontage site off Sunbeam Road The site is surrounding by industrial units of various sizes, predominantly in B1 and B2 use
Town planning land use/Context Major Employment Location Adjacent to a Green Corridor Close proximity to a Mineral Aggregate Distribution Site District Park Deficiency Area after implementation of proposals Severe Local Park Deficiency Southern part of the site is within an Area of more than 400m from a designated shopping frontage Use: Vacant site
Current site activity New commercial units in active employment use on site
Current planning/development control status Demolition of existing building and development of 4 new warehouse/industrial units within the Use Classes B1(c), B2, and B8; with car parking and service areas. Decision: Conditional Approval - P/2001/2226
Relevant Policy Considerations LBE
Current transport issues Within a 10 min walk to North Acton Station Within 100m of several bus stops serving 6 bus routes
CONSTRAINTS AND OPPORTUNITIES
Constraints Narrow and congested access along Sunbeam Road Long narrow site Servicing and accessing rear of site Within a major employment location
Opportunities Opportunity to provide ‘follow-on’ for existing businesses that have outgrown their premises Servicing off Sunbeam Road, potential opportunity for secondary access off Cullen Way Opportunity for voluntary contributions for public transport and environmental and highway
3 Site 21 DEVELOPMENT PRINCIPLES
Preferred Uses/Mix Employment uses including offices, light industrial and workshop uses (B1) and general industrial (B2)
Urban Form Site/block layout Development along the length of the site allowing sufficient room for access Allowing for restricted off-street parking between buildings Character High quality commercial premises for newly established and successful employment generating uses (B1, B2)
Access/Transport Limited off-street parking owning to the narrow width and congested nature of Sunbeam Road Potential for secondary access to site off Cullen Way
Public Open Space/Public Environment Potential for contributions to local park provision in area and voluntary contributions to environmental improvements
Land Use development and Management Issues Potential voluntary contributions for public transport and environmental and highway/traffic calming improvements Limited off street parking
4 Site 21 INDICATIVE DEVELOPMENT DIAGRAM*
Design Principles Development along the length of the site allowing sufficient room for access Allowing for restricted off-street parking between buildings Limited off-street parking Potential for secondary access to site off Cullen Way
* This diagram provides a possible site layout only and should not be seen as prescriptive. Further study into details may give rise to alternative options ands the final scheme will need to meet all relevant policies.
5 Site 21 SITE PHOTO
AERIAL PHOTO
6 Site 21 Unitary Development Plan 2004 This document should be read with the Planning and Transport Statement Supplementary Planning Guidance for the Acton area. Development Sites
Site 22 Address Western Gateway, Park Royal, NW10 Area Acton Site Area -
SUMMARY
New transport and road plans to be inserted to indicate the permission and on site development of Western Gateway (Diagio development). Scheme involves new offices, hotels, leisure, new tube interchange, new public open spaces and new road access.
SITE PLAN
For more information contact the Planning Policy Team on 020 8825 5428
1 Site 22 INDICATIVE DEVELOPMENT CAPACITY*
Overall Capacity Existing Estimate (m2): TBC Potential floor space (m2): TBC (2:1 plot ratio and 75% site coverage)
Housing Existing Estimate (m2): - Potential floor space (m2): - Potential Number of Units: -
Retail/Leisure Existing Estimate (m2): - Potential floor space (m2): - Potential Jobs:** -
Employment Existing Estimate (m2): TBC Potential floor space (m2): TBC Potential Jobs:** TBC
Community Facilities Type: - Existing Floor space (m2): - Potential floor space (m2): -
Public Open Space Type: - Deficiency Area Yes Potential OS: Potential for contributions to the provision of a local park in the vicinity
Key Transport Infrastructure Considerations (See General Planning Information) Bus Routes: - Rail / Tube: - Roads / Juncs: Yes Traffic Management: Yes Cycle Routes: Yes Pedestrian Routes: Yes City Car Club: - Green Travel Plan: Yes Servicing: Yes Car Parking: Yes Comments: Restricted car parking; high public transport accessibility; servicing and access rationalisation; potential improvements to cycle routes and pedestrian environment
Site Adjustment None Potential Units / Jobs: Justification:
* This indicative development capacity should be used as an approximate guide only – potential floor space is based upon an estimation using site coverage and building heights. Where uses currently exist but the floorspace is unknown this is indicated using the symbol u/k **Jobs estimation see appendices
2 Site 22 SITE LOCATION, DESCRIPTION AND PLANNING STATUS
Site description A number of medium floor plate commercial buildings with access onto Western Avenue
Town planning land use/Context Proposed Station Green Corridor Major Employment Location Community Regeneration Area In area of Severe Local Park Deficiency Site is located opposite a Designated Shopping Frontage Within an area more than 1.2km from a sports hall and within an area more than 1.5km from a swimming pool
Current site activity Active commercial uses
Current planning/development control status Use of first floor office (Class B1) as a place of worship (Class D1) on Wednesday evenings after 7pm and Sundays between 9am and 1pm. Decision: Conditional (1998) Partial demolition of existing building and construction of new car showroom extension with alterations to existing workshop area. Decision: Conditional (1999) Erection of five-storey, sixty-four bedroom Travelodge with parking (614 Western Avenue). Decision Legal Agreement (1998)
Relevant Policy Considerations Acton Town Centre Strategy Acton Strategy East Acton Action Plan
Current transport issues Adjacent to proposed new station site Within 5 min walking distance of Park Royal Station and 10 min walking distance of Hanger Lane Station On Strategic Route - Western Avenue - A40 On existing designated cycle route Within Parking Standards: Zone 1 Within 100m of several bus stops serving 2 bus routes
3 Site 22 CONSTRAINTS AND OPPORTUNITIES
Constraints Located on Strategic Route Access constraints and servicing
Opportunities Opportunity to rationalise access and servicing to new plots and development
DEVELOPMENT PRINCIPLES
Preferred Uses/Mix Employment generating uses including B1, B2 and B8 (subject to determination of likely impact on traffic flow on Western Avenue
Urban Form Site/block layout Individual commercial premises with shared access arrangements Potential for landscaping along front boundary to soften impact of traffic Character Mid size employment generating uses occupying good quality commercial premises
Access/Transport Rationalise access and servicing to new plots and development Restricted parking as the site has good public transport accessibility
Public Open Space/Public Environment Potential for contributions to the provision of a local park in the vicinity
Land Use development and Management Issues Estate management potential
4 Site 22 SITE PHOTO
AERIAL PHOTO
5 Site 22