Union Railways Compliance Audit Report of the Comptroller and Auditor General of India for the year ended March 2015 Union Government (Railways) No.13 of 2016 TABLEOFCONTENTS Paragraph Pages Preface vii Abbreviation ix Overview xiii Chapter 1 –Introduction Particulars Audit Report outline 1.1 1 Chapter outline 1.2 1 Audited Entity 1.3 2 Integrated Financial Advice and Control 1.4 5 Audit Planning 1.5 5 Reporting 1.6 5 Response of the Ministry/Department to Provisional 1.7 6 Paragraphs Audit objections issued, settled and outstanding 1.8 6 Recoveries at the instance of Audit 1.9 6 Remedial Actions 1.10 7 Paragraphs on which Action Taken Note 1.11 8 received/pending Chapter 2 – Traffic – Commercial and Operations Up-gradation of passenger amenities at stations 2.1 12-44 including modernization of stations in Indian Railways Introduction 2.1.1 12 Audit objectives 2.1.2 12 Audit criteria 2.1.3 13 Scope and Audit methodology 2.1.4 13 Sample size 2.1.5 13 Earlier Audit coverage 2.1.6 14 Audit findings 2.1.7 15 Conclusion 2.1.8 43 i -><HFF>G=:MBHGL $=EBG@ H? IKH=N<MBO> :LL>ML H:<A>L PHKMA <KHK>:G=<HGL>JN>GMEHLLH?>:KGBG@<:I:<BMRH? <KHK> $KK>@NE:K:P:K=H?<HGMK:<M $GMKH=N<MBHGH?HN;E>><D>K/K:BGLPBMAHNM?>:LB;BEBMR LMN=R K>LNEM>= BG B=EBG@ H? KHEEBG@ LMH<D O:ENBG@ <KHK>:G=K>O>GN>EHLLH? <KHK>=N>MH<HGMBGN>= IHHKI:MKHG:@> )HG NMBEBS:MBHGH?G>P!P:@HGL 'HLLH??K>B@AM=N>MH?:BENK>MH>QIEHK>:EM>KG:M> KHNM> >E:R )HG K>:EBS:MBHGH?LA:K>= >:KGBG@ H? +:E:<> HG2A>>EL:G=GHG E>ORH?:IIEB<:;E>BGM>K>LMHG=>E:R>= I:RF>GM )HG K>:EBS:MBHGH?-:BEP:R=N>LMHP:K=L<HLMH?-:BEP:R +KHM><MBHG.I><B:E!HK<>LM:??=>IEHR>=?HK>E><MBHG=NMR OHB=:;E>>QI>G=BMNK>=N>MHA:NE:@>H?>FIMR (0 K:D>L .AHKMK>:EBS:MBHGH?LB=BG@<A:K@>L 0G=>K NMBEBS:MBHGH?HO>KA>:=>E><MKB<:E *# :LL>ML :G= :OHB=:;E> K><NKKBG@ >QI>G=BMNK> HG F:BGM>G:G<>H?=B>L>EMK:<MBHGHO>K>E><MKB<MK:<MBHG Q<>LLBO>=>M>GMBHGMHP:@HGL:M />KFBG:E "HH=L LM:MBHG $KK>@NE:K >QM>GLBHG H? MK:BGEH:= <E:LL K:M> K>LNEMBG@ BG NG=>K<A:K@>LH??K>B@AM :3BF7DO>75FD;53>O);9@3>;@93@6*7>75A??G@;53F;A@G@;FE WorkingD=;@9A8);9@3>&DA6G5F;A@+@;FE;@@6;3@ of Signal Production Units in Indian Railways>I3KE $GMKH=N<MBHG :<D@KHNG= *K@:GBS:MBHG:ELMKN<MNK> N=BMH;C><MBO>L N=BM<KBM>KB: F>MAH=HEH@R:G=L<HI> .:FIE>LBS> N=BM?BG=BG@L B Capability to meet day-to-day requirement 3.1.8 95 Performance of workshops 3.1.9 100 Conclusion 3.1.10 114 Recommendations 3.1.11 115 Unproductive expenditure due to improper planning in 3.2 116 signaling works Chapter 4 – Mechanical – Zonal Hqrs/Workshops/ Production Units Manpower Management in Mechanical Workshops 4.1 121-146 Introduction 4.1.1 121 Organizational structure 4.1.2 121 Audit objectives 4.1.3 122 Audit criteria 4.1.4 123 Audit scope, methodology and sample size 4.1.5 123 Audit findings 4.1.6 123 Conclusion 4.1.7 145 Recommendations 4.1.8 146 Loss of Engine earning capacity due to non- 4.2 147 commissioning of New Diesel Locomotives Improper planning and poor co-ordination led to wasteful 4.3 148 expenditure on procurement of EMU Bogies Unproductive investment in manufacture of High 4.4 149 Capacity bogies Infructuous expenditure on establishment of Electric 4.5 151 Loco Factory Non-recovery of excise duty from the purchasers of scrap 4.6 153 Chapter 5 – Engineering – Open Line and Construction Elimination of Unmanned Level Crossings in Indian 5.1 157-181 Railways Introduction 5.1.1 157 Background 5.1.2 157 Audit objectives 5.1.3 158 Audit criteria 5.1.4 158 Scope of Audit and methodology 5.1.5 159 Sample size 5.1.6 159 iiii Audit findings 5.1.7 159 Conclusion 5.1.8 179 Recommendations 5.1.9 180 Procurement and Utilization of Stone Ballast in 5.2 182-203 Indian Railways Introduction 5.2.1 182 Organizational structure 5.2.2 183 Audit objectives 5.2.3 184 Audit criteria 5.2.4 184 Audit scope, methodology and sample size 5.2.5 184 Issues examined and Audit findings 5.2.6 185 Conclusion 5.2.7 203 Recommendations 5.2.8 203 Injudicious decision in construction of Diesel Multiple 5.3 204 Unit (DMU) Factory at Haldia Non-realisation of land licence fee amounting to ` 11.20 5.4 206 crore from plot holders of Adra Division Avoidable delay in commissioning of IOCL siding 5.5 207 facility at Bangrod resulting in loss of revenue ` 65 crore Execution of traffic facility works without proper 5.6 209 justification Blocking up of capital with State Government towards 5.7 211 compensation of land Avoidable payment of Value Added Tax in procurement 5.8 213 of Sleepers Short realization of maintenance charges due to non- 5.9 215 revaluation of cost of Defence siding Delay in opening of Hanumangarh-Sri Ganganagar 5.10 216 section Loss of revenue due to delay in construction of new 5.11 218 bridge as replacement of a distressed bridge Irregular expenditure of ` 6.55 crore on Road Over 5.12 220 Bridge over a line leased to Bharuch-Dahej Railway Company Limited (BDRCL) Loss due to creation of idle asset 5.13 222 ivi Short accountal of Signalling Relays resulting in loss of 5.14 224 ` 20.68 lakh Chapter 6 – Disaster Management in Indian Railways Introduction 6.1 227 Organizational structure 6.2 227 Audit objectives 6.3 228 Scope of Audit and methodology 6.4 229 Sample size 6.5 229 Sources of Audit criteria 6.6 230 Acknowledgement 6.7 230 Preparedness to face disasters 6.8 230 Post-Disaster response 6.9 243 Capacity building to face disasters 6.10 247 Conclusion 6.11 258 Recommendations 6.12 259 Annexure I to III 260-262 vi PREFACE The Report for the year ended March 2015 has been prepared for submission to the President under Article 151 of the Constitution of India. The Report contains significant result of the compliance audit of the Ministry of Railways of the Union Government. The instances mentioned in this Report are those, which came to notice in the course of test audit for the period 2014-15 as well as those which came to notice in earlier years, but could not be reported in the previous Audit Reports; instances relating to the period subsequent to 2014-15 have also been included, wherever necessary. The audit has been conducted in conformity with the Auditing Standards issued by the Comptroller and Auditor General of India. ----------------------------------------------x---------------------------------------------- - viii Abbreviations used in the Report Automatic Block Signaling Chief Personal Officer Air Conditioned Central Railway Assistant Divisional Engineer Central Road Fund Assistant Engineer Commissioner of Railway Safety Additional General Manager Concrete Sleeper Assistant Loco Pilot Chief Safety Officer Accident Relief Medical Corporate Safety Plan Equipment Accident Relief Medical Van Chatrapati Shivaji Terminus Accident Relief Train Chief Signal and Telecommunication Engineer Automatic Teller Machine Mumbai Action Taken Note Cuttack Automatic ticket vending machine Chief Track Engineer Basin Bridge Jn. (Madras) Complete Track Renewal Broad Gauge Chief Workshop Manager Basic Training Centre Divisional Commercial Manager Chief Administrative Officer Diesel Eletrical Multiple Unit Chemical, Biological, Door Frame Metal Detector Radiological & Nuclear Carrying Capacity Director General Completion Commission of India Doubling Chief Commercial Manager Diesel Locomotive Works Closed Circuit Television Disaster Management Central Excise Disaster Management Plan Chief Electrical Engineer Disaster Management Review Committee Central Value Added Tax Disaster Management System Central Excise Tariff Head Diesel Multiple Unit Chittaranjan Locomotive Works Diesel Modernization Works Chief Medical Director Divisional Operations Manager Chief Mechanical Engineer Diesel Loco Control Office Application ȀǤ East Coast Railway ixi Central Organization for East Central Railway Modernization of Workshops Chief Operations Manager Electrical Multiple Unit Ȁ Construction Eastern Railway Ernakulam Marshalling Yard LWR Long Welded Rail Ƭ Financial Advisor and Chief MEA Minimum Essential Amenities Accounts Officer Foot over bridge MEMU Mainline Electrical Multiple Unit Freight Operation Information MG Meter Gauge system General Arrangement Drawings MHA Ministry of Home Affairs Gauge Conversion MoR Ministry of Railways General Condition of Contract MoT Ministry of Tourism Guard Driver Report MOU Memorandum of Understanding Group Insurance Scheme MPR Manpower ratio General manager MR Metro Railway Hazardous chemicals NCR North Central Railway Higher Carrying Capacity NDMA National Disaster Management Authority High Level Committee NDRF National Disaster Response Force High Level Safety Review NEC National Executive Committee Committee Integral Coach Factory NER North Eastern Railway Indian Institute of Technology NFR/NEFR Northeast Frontier Railway International Level Crossing NG Narrow Gauge Awareness day Indian Oil Corporation Limited NGO Non-Government Organization Intermediate Overhaul NL New Line Internet Protocol NR Northern Railway Indian Railways NWR North Western Railway Indian Railway Permanent Way OHE Overhead Electrical Manual Internal rate of return PA Performance Audit Indian Railway Station PAC Public Accounts Committee Development Corporation International Organisation for PC Personal Computer Standardization Integrated Security System PCC Permissible Carrying Capacity xi Junior Engineer PCE Principal Chief Engineer Joint Venture PO Purchase Order Level Crossing POH Periodical Overhaul Liquidated damage POL Petroleum Linke Hofmann Busch PPP Public Private Partnership Limited Height Subway PSU Public Sector Undertaking Loco Pilot PW Permanent Way Liquefied Petroleum Gas PWP Preliminary Work Programme Railway Board SPARMV Self Propelled Accident Relief Medical Van Rail Coach Factory SPART Self Propelled Accident Relief Train Rail-cum-road Vehicle SPU Signal Production Unit Research, Designs and Standards SPV Special Purpose Vehicle Organization Request for Qualification SR Southern Railway Rail India Technical and Sr.
Recommended publications
  • Bilevel Rail Car - Wikipedia
    Bilevel rail car - Wikipedia https://en.wikipedia.org/wiki/Bilevel_rail_car Bilevel rail car The bilevel car (American English) or double-decker train (British English and Canadian English) is a type of rail car that has two levels of passenger accommodation, as opposed to one, increasing passenger capacity (in example cases of up to 57% per car).[1] In some countries such vehicles are commonly referred to as dostos, derived from the German Doppelstockwagen. The use of double-decker carriages, where feasible, can resolve capacity problems on a railway, avoiding other options which have an associated infrastructure cost such as longer trains (which require longer station Double-deck rail car operated by Agence métropolitaine de transport platforms), more trains per hour (which the signalling or safety in Montreal, Quebec, Canada. The requirements may not allow) or adding extra tracks besides the existing Lucien-L'Allier station is in the back line. ground. Bilevel trains are claimed to be more energy efficient,[2] and may have a lower operating cost per passenger.[3] A bilevel car may carry about twice as many as a normal car, without requiring double the weight to pull or material to build. However, a bilevel train may take longer to exchange passengers at each station, since more people will enter and exit from each car. The increased dwell time makes them most popular on long-distance routes which make fewer stops (and may be popular with passengers for offering a better view).[1] Bilevel cars may not be usable in countries or older railway systems with Bombardier double-deck rail cars in low loading gauges.
    [Show full text]
  • Overview of Mechanical Department
    OVERVIEW OF MECHANICAL DEPARTMENT Mechanical Department plays a vital role in the organization by providing its support to both train operations and project division. The department is headed by Chief Mechanical Engineer, who reports to Director (Operations & Commercial). He is supported with officers and staff at Corporate Office, Ratnagiri and Karwar regions for both Open Line and Project Wing The organization structure for Rolling Stock Operation & Maintenance (Open Line) and Project Wing is as below CME Rolling Stock O&M Project Wing CME(Project) Karwar Region Corporate office Ratnagiri Region Dy CMIT Sr.RME / Madgaon Dy.CME/HQ SME RME/Ratnagriri /Operation SME/Project AME/ Ratnagiri SME AME/ SME/Madgaon /Verna Verna (I&II) The Key Performance Areas (KPAs) of Mechanical Department are following A: Rolling Stock Operation & Maintenance Train Operations including locomotive operation, crew management & training and management of RCDs Passenger Rake Maintenance (Including Primary, Secondary and IOH) Freight Train Examination and Maintenance Conversion/Fabrication and Maintenance of Roll-On Roll-Off Rakes Maintenance and Operation of Track Machines and Rail Mobile Vehicles (RMV) Maintenance of Tower Wagons (DETC) Maintenance and Operation of Rescue Trains (ART/SPARMVs/140T Crane) and disaster management Training of Running and Non Running Staff including Electrical Conversion Training Coordination for Environment & Housekeeping Management B: Project Wing Construction of Rolling Stock Component Factory for Indian Railways Development
    [Show full text]
  • Railways on Environment: Lok Sabha 2012-13
    Railways on Environment: Lok Sabha 2012-13 Q. No. Q. Type Date Ans by Members Title of the Questions Subject Political State Ministry Specific Party Representative 15.03.2012 Shri Sanjay Bhoi Dedicated Freight EIA INC Odisha *55 Starred Railways Corridor Shri Anand Prakash Paranjpe SS Maharashtra 675 15.03.2012 Shri Hamdullah Sayeed Trains Passing through Wildlife INC Lakshadweep Unstarred Railways Forests Management Shri P.L.Punia INC Uttar Pradesh Freshwater Passenger and Marine *138 Starred 22.03.2012 Railways Shri Anirudhan Sampath Facilities/Amenities Conservation CPI(M) Kerala Health and Shri P.L.Punia Sanitation INC Uttar Pradesh Water Management Health and 1492 Unstarred 22.03.2012 Railways Km.Saroj Pandey Public Amenities Sanitation BJP Chhattisgarh Water Shri Sanjay Singh Chauhan Management RLD Uttar Pradesh Shri N. Peethambara Kurup Pollution INC Kerala Shri Rajendra Agrawal BJP Uttar Pradesh Shri Devji Mansingram Patel BJP Rajasthan Toilet Facilities along Health and 2744 Unstarred 29.03.2012 Railways Shri N.Chaluvaraya Swamy Railway Tracks Sanitation JD(S) Karnataka Pollution Amenities at Sitapur Health and 3472 Unstarred 26.04.2012 Railways Smt. Kaisar Jahan Railway Station Sanitation BSP Uttar Pradesh Pollution Disposal of Scrap by *385 Starred 03.05.2012 Railways Shri P.L.Punia Railways Pollution INC Uttar Pradesh Toilets In MEMU Health and 4406 Unstarred 03.05.2012 Railways Shri Naveen Jindal Trains Sanitation INC Haryana Shri Sambandam Water Vending Water 4517 Unstarred 03.05.2012 Railways Keerapalayam Alagiri Machines
    [Show full text]
  • National Infrastructure Pipeline
    National Infrastructure Pipeline Report of the Task Force Department of Economic Affairs Ministry of Finance Government of India Volume II 1 2 Contents Infrastructure Progress 20 Sector Progress, Deficits and Challenges, Vision and Reforms 23 General Reforms 174 Financial Sector Reforms 188 Infrastructure Financing 206 Business Models 230 Financing the NIP 244 Way Forward 248 Annexure 254 3 List of Figures Figure 1 Year-wise investment trend in infrastructure (Rs lakh crore, FY13-17, FY 18E and FY 19E) 21 Figure 2 Share of infrastructure investment by the Centre, states and private sector 21 Figure 3 Power sector investment (Rs lakh crore) and share in total infrastructure investment (%) 24 Figure 4 Trends in power generation capacity (GW) and per capita electricity consumption in India (kWh) 25 Figure 5 Trend in power transmission lines in India (ckm) 25 Figure 6 Length of natural gas pipeline in India (in km) 27 Figure 7 CGD bidding rounds snapshot 27 Figure 8 Per capita consumption (kWh/ person) 29 Figure 9 Share of fossil fuel in electricity generation (%) 29 Figure 10 Electricity distribution losses (%) 29 Figure 11 Gas consumption by different sectors (in MMSCMD) 30 Figure 12 Roads sector infrastructure investment (Rs lakh crore) and share in total infrastructure investment (%) 46 Figure 13 Trend in road network in India (lakh km) 46 Figure 14 Achievement targets set by MoRTH 47 Figure 15 Road connectivity (Score: 1 - 100) 49 Figure 16 Quality of road infrastructure (Score: 1 – 7) 49 Figure 17 Railways infrastructure investment (Rs
    [Show full text]
  • VIDYA BHAWAN BALIKA VIDYA PITH शक्तिउत्थानआश्रमलखीसरायबिहार Class 12Th S
    VIDYA BHAWAN BALIKA VIDYA PITH श啍तिउ配थानआश्रमलखीसरायबिहार Class 12th Sub. CCA Date 25.06.2021 Teacher name – Ajay Kumar Sharma 1.Which of the following is the longest Railway tunnel in the world? A. Gotthard Base Tunnel. B. Seikan Tunnel C. Yulhyeon Tunnel D. Channel Tunnel Ans: A 2. Who among the following is a first female locopilot (train driver) of the Indian Railways in India? A. Rajashree Sachdev. B. Bhavani Kumari C. Ritu Chauhan. D. Surekha Shankar Yadav (Surekha Yadav) Ans: D 3. Which of the following is the highest railway system in the world? A. Qingzang Railway, China. B. Ferrocarril Central Andino, Peru C. Rio Mulatos-Potosi Line, Bolivia. D. PeruRail, Peru Ans: A 4. Which of the following Railways line runs parallel to the Arabian Sea, offering views along the coast? A. Central Railway. B. Konkan Railway C. Southern Railway. D. Western Railway Ans: B 5. Which of the following railway station has the world's longest railway platform in India? A. Gorakhpur Railway Station. B. Kollam Junction, Kharagpur C. Bilaspur Railway Station. D. None of the above Ans: A 6. Which of the following is the world’s busiest metro system? A. Tokyo Subway, Japan. B. Beijing Subway, China C. Seoul Subway, South Korea. D. Shanghai Metro, China Ans: A 7. Which of the following is the busiest suburban railway network in India? A. Chennai Suburban Railway. B. Lucknow - Kanpur Suburban Railway C. Kolkata Suburban Railway D. Mumbai Suburban Railway Ans: D 8. Who among the following is known as the father of Indian Railways? A.
    [Show full text]
  • TOP 100 Expected GK Questions on Indian Railways | Specially for RRB NTPC 2019
    TOP 100 Expected GK Questions on Indian Railways | Specially for RRB NTPC 2019 1) What is the rank of Indian Railways in the world in terms a) Himsagar Express of size of the railroad network? b) Silchar Superfast Express a) 2nd c) Navyug Express b) 5th d) Vivek Express c) 4th d) 10th Answer: d) Vivek Express covers the longest train route in India. It Answer: c) originates in northern Assam and goes all the way to the Indian Railways (IR) is India's national railway system southern tip of India to Kanyakumari. It has the running time operated by the Ministry of Railways. It manages the fourth of 80 hours and 15 minutes and the distance covered is largest railway network in the world by size, with 121,407 4,233 kilometres. kilometres of total track over a 67,368-kilometre route. 5) Which express is the currently operational trans-border 2) Which is India’s first passenger train that ran between train between India and Pakistan? Bombay and Thane in 1853? a) Thar Express a) Great Indian Peninsula Railway b) Akbar Express b) Central Railway c) Samjhauta Express c) Bombay Baroda Railway d) Both a and c d) Mumbai Suburban Railway Answer: d) Answer: a) Currently, there are two trans-border trains between India The Great Indian Peninsula Railway was incorporated on 1 and Pakistan. First Is Samjhauta Express that operates on August 1849 by an act of the British Parliament. It was a Delhi-Lahore Route via Attarti-Wagah Border whereas Thar predecessor of the Central Railway, whose headquarters Express links Jodhpur and Karachi via Munabao-Khokhrapar was at the Boree Bunder in Mumbai.It was India's first border crossing.
    [Show full text]
  • Passenger Business
    Passenger Business The profile of passenger traffic in 2011-12 is outlined below: Suburban Non-suburban 2010-11 2011-12* 2010-11 2011-12 Interior view of the AC chair car of the Passengers 4,061 4,377 3,590 3,847 Rajdhani Express. originating (millions) Passenger kilometres 137,127 144,057 841,381 902,465 (millions) Average lead 33.8 32.9 234.4 234.6 (kilometres) Earnings (` in crore) @1,752.29 (r) 1,925.65 23,953.64 (r) 26,320.78 Average rate per 12.8 (r) 13.4 28.5 (r) 29.2 passenger kilometre (paise) @Excludes earnings of ` 86.98 crore in 2010-11 pertaining to Metro Railway, Kolkata. *Includes Metro Railway, Kolkata. (r) revised The overall trend of passenger traffic in the last three years Train passing between Manki and was as follows: Honnavar Stations on Konkan Railway route. Total Suburban and Non-suburban 2009-10 2010-11 2011-12* Passenger earnings @23,414.44 @25,705.63 (r) 28,246.43 (` in crore) Passenger journeys (millions) 7,246 7,651 8,224 Passenger kilometres 903,465 978,508 1,046,522 (millions) Average lead (kilometres) 124.7 127.9 127.2 @ Excludes earnings of ` 73.73 crore and ` 86.98 crore in 2009-10 and 2010-11 respectively pertaining to Metro Railway, Kolkata. * Including Metro Railway, Kolkata (r) revised Fare Structure The new pilgrims complex at Chengannur in Kerala for Sabarimala pilgrims on Southern Railway. There was no increase in passenger fares during 2011-12. Ticketless Travel During 2011-12, 17.33 lakh checks were conducted against ticketless/irregular travel (including carriage of unbooked luggage).
    [Show full text]
  • Railways in India 2021 Released 24 Dec 2020.Qxp
    Now Available Railways in India 2021 Sector Analysis, Impact of Covid-19, Market Opportunities and Outlook Research Report Data-set (Excel) 52 Weekly Newsletters 11 Monthly Updates India Infrastructure Research has recently released the latest edition of the Railways in India report 2021. The report covers: Analysis of the market trends, key developments and outlook for the railway sector in India A realistic assessment of the short-term, medium-term and long-term impact of Covid-19 on railway sector projects and investments Operational and financial performance of the Indian Railways Analysis of the current size and growth prospects for key segments - Rolling Stock, Tracks, S&T, Bridges, Tunnels, etc. Recent government initiatives to expand the railway infrastructure Update on big-ticket projects Upcoming investment opportunities for the stakeholders across various segments Investment requirements for the next five years Railways in India 2021 Table of Contents Report Summary and Key Insights The railway sector has been on a high growth trajectory since the past few years. While the pace of infrastructure creation has been at an all-time high, new and innovative ways to improve operational efficiency and passenger experience are also being focused upon. From introduction of high speed trains to modernisation of railway stations, the sector has been abuzz with activity. IR has been taking various initiatives to upgrade its rolling stock and improve the passenger experience. IR is also taking initiatives to increase the average speed of trains. Currently, all LHB coaches can run at a maximum speed of 130 kmph. Some of the initiatives by IR in this area include introduction of Vande Bharat Trains, Tejas Express Trains, Anubhuti Coaches, Double Decker Train Coaches and Humsafar Trains.
    [Show full text]
  • Indian Railways
    Indian Railways Das Eisenbahnnetz von Britisch-Indien im Jahr 1909 umfasste etwa 40.000 km. le miteinander.[4] Das Streckennetz vergrößerte sich von Streckennetz von Indian Railways (2006) 1.350 km im Jahre 1860. Die Finanzlage der meisten Bahngesellschaften war Indian Railways, abgekürzt IR, auf Hindi भारतीय रेल schlecht. Schuld daran waren die hohen Baukosten für (bhāratīya rel, Bharatiya Rel) ist die staatliche indische die Breitspurstrecken und die geringen Betriebseinnah- Eisenbahngesellschaft. Als Staatsbahn betreibt sie den men, welche immer wieder eine Bezuschussung durch die größten Teil des landesweiten Schienenverkehrs und die Kolonialregierung notwendig machte und somit auch de- Metro Kolkata. Indian Railways transportiert jährlich ren Finanzlage in Mitleidenschaft zog. Lord Mayo, der ab über acht Milliarden Passagiere und mehr als eine Mil- 1869 Vizekönig von Indien war, versuchte die Lage un- liarde Tonnen Fracht. Jeden Tag fahren ungefähr 12.000 ter Kontrolle zu bringen indem er begann die privaten Ei- Reisezüge, die von 23 Millionen Reisende benutzt wer- senbahngesellschaften zu verstaatlichen und den Bau von den, und 7000 Güterzüge, die drei Millionen Tonnen Meterspurstrecken förderte.[5] 1880 war das Streckennetz Fracht befördern. Indian Railways gehört zusammen mit bereits auf 14.977 km gewachsen, 1900 auf 36.188 km. China Railways, den Russischen Eisenbahnen und den Nordamerikanischen Eisenbahnen[1] zu den einzigen Ei- 1947 musste nach der Machtübergabe von England und senbahnnetzen, die pro Jahr mehr als 1 Milliarde Tonnen der Teilung Britisch Indiens in Indien und Pakistan Güter auf dem Schienenweg befördern. Die Eisenbahn- auch das Eisenbahnnetz geteilt werden. 1951 wurden die gesellschaft ist mit 1,3 Millionen Angestellten einer der bis dahin existierenden verschiedenen Eisenbahngesell- weltweit größten Arbeitgeber.[2] schaften zur heutigen Struktur von Indian Railways über- führt.
    [Show full text]
  • Co N T E N T S
    12.02.2014 1 CO N T E N T S Fifteenth Series, Vol. XXXVII, Fifteenth Session, 2014/1935 (Saka) No. 16, Wednesday, February 12, 2014/Magha 23, 1935 (Saka) S U B J E C T P A G E S ORAL ANSWER TO QUESTION ∗ Starred Question No. 301 2-6 WRITTEN ANSWERS TO QUESTIONS Starred Question Nos. 302 to 320 7-93 Unstarred Question Nos. 3309 to 3315, 3317 to 3532 and 3534 to 3538 94-706 ∗ The sign + marked above the name of a Member indicates that the Question was actually asked on the floor of the House by that Member. 12.02.2014 2 ANNOUNCEMENT BY THE SPEAKER Motion of No-Confidence in Council of Ministers 707 PAPERS LAID ON THE TABLE 708-718 COMMITTEE ON PRIVATE MEMBERS’ BILLS AND RESOLUTIONS 38th Report 719 COMMITTEE ON PETITIONS 33rd and 34th Reports 719 COMMITTEE ON SUBORDINATE LEGISLATION 38th Report 719 STANDING COMMITTEE ON INFORMATION TECHNOLOGY 52nd and 53rd Reports 720 STANDING COMMITTEE ON DEFENCE (i) 21st Report (ii) Statement 720 STANDING COMMITTEE ON CHEMICALS AND FERTILIZERS 44th Report 721 STATEMENTS BY MINISTERS (i) Constitution of a Task Force to address the issues regarding scheduling of communities as Scheduled Tribes and related matters Shri V. Kishore Chandra Deo 722 12.02.2014 3 (ii) Status of implementation of recommendations contained in the 25th Report of the Standing Committee on Urban Development on Demands for Grants (2013-14), pertaining to the Ministry of Housing and Urban Poverty Alleviation Shrimati Deepa Dasmunsi 723 (iii) Status of implementation of recommendations contained in the 69th and 77th Reports of the Standing Committee on Finance on Demands for Grants (2013-14), pertaining to the Ministry of Planning Shri Rajeev Shukla 772 INTERIM RAILWAY BUDGET, 2014-15 724-761 DEMANDS FOR SUPPLEMENTARY GRANTS (RAILWAYS), 2013-14 763 MATTERS UNDER RULE 377 764-771 (i) Need to set up a new Kendriya Vidyalaya at Sambalpur in Odisha Shri Amarnath Pradhan 764 (ii) Need to declare and develop Gingee town in Villupuram district in Tamil Nadu as a tourist centre Shri M.
    [Show full text]
  • Railway Budget 2012-2013
    Budget 2012-2013 Speech of Dinesh Trivedi Minister of Railways March 14, 2012 Madam Speaker, 1. I rise to present the Railway Budget for 2012-13. 2. I consider it a great privilege for me to head the strong and vibrant railway family and present my maiden Railway Budget which is also the first year of the 12th Five Year Plan. I am grateful to the Hon'ble Prime Minister for his inspiring guidance and support in formulating the Budget. 3. I am also grateful to the Hon’ble Finance Minister and the UPA Chairperson, Smt. Sonia Gandhi for their support. It would not have been possible for me to present this budget had I not received the support and confidence of my party, All India Trinamool Congress, and its chairperson, Mamata Banerjee, to whom I shall always remain grateful. Above all, I am grateful to as it is only because of their blessings that I have been able to make it to this Parliament. , . 4. Madam Speaker, when I look at the list of illustrious leaders of this country who had donned the mantle of Indian Railways right from Sh. Asaf Ali to Sh. Lal Bahadur Shastri, to Sh. Jagjivan Ram ji, to Sh. Gulzari Lal Nanda, Sh. Kamalapati Tripathi, Sh. Madhu Dandavate to Mamata Banerjee, I find myself nowhere near their stature. But I have certainly tried to take lessons from the pages of history and from their contribution to this great institution. I am grateful to Mamata Banerjee for giving vision to railways in her Vision 2020 document, which has guided me immensely in framing the roadmap for carrying forward the task.
    [Show full text]
  • Title: Presentation of the Interim Railway Budget for 2014-15. MADAM SPEAKER: Now Hon. Railway Minister Shri Mallikarjun Kharge
    > Title: Presentation of the Interim Railway Budget for 2014-15. MADAM SPEAKER: Now hon. Railway Minister Shri Mallikarjun Kharge will present the Interim Railway Budget for 2014-15. THE MINISTER OF RAILWAYS AND MINISTER OF SOCIAL JUSTICE AND EMPOWERMENT (SHRI MALLIKARJUN KHARGE): Madam Speaker, I rise to present before this august House the Revised Estimates for 2013-14 and the Estimated Receipts and Expenditure for 2014-15 सािदक हँ अपने कौल म गािलब खदु ा गवाह िलखता हँ सच िक " झठू क आदत नह मुझे The Estimates for 2014-15 are for the whole year, but, at present I seek from the august House a 'vote-on-account', sufficient to cover the estimated expenditure for the first four months of the fiscal. The Hon'ble Members are aware that requirements for the remaining part of the year would be voted later, separately. This is my maiden Budget under the inspiring guidance of the Hon'ble Prime Minister and Chairperson UPA, to whom I am grateful for the responsibility entrusted to me. I also wish to profusely thank the Finance Minister for his continued support and encouragement to the Railways, underlined further by his recent gesture of providing additional budgetary support for meeting pressing requirements of a few national projects during the current fiscal. Madam Speaker, the name of Indian Railways evokes fond childhood memories amongst all of us who have grown with this beautiful system. Railways influence all aspects of our lives and untiringly carry people and materials to every nook and corner of the country. Its role in national integration by providing low cost connectivity from Kashmir to Kanyakumari on one hand and Arunachal, Mizoram and Tripura to Gujarat on the other, is unparalleled.
    [Show full text]