WHO IS SOUND TRANSIT?
We plan, build and operate regional transit systems and services to improve mobility in urban areas of King, Pierce and Snohomish counties.
Sounder commuter rail
Our Sounder trains travel between Lakewood and Seattle (making stops in South Tacoma, Tacoma, Puyallup, Sumner, Auburn, Kent and Tukwila) and between Everett and Seattle (making stops in Mukilteo and Edmonds). Sounder regularly runs weekday mornings and afternoons with weekend service for major events.
Link light rail
Currently, Link light rail runs from Angle Lake and Sea-Tac Airport to and from downtown Seattle and as far north as the University of Washington. Construction is underway to extend service to Northgate in 2021 and to the eastside in 2023. Link light rail runs seven days a week with trains running every 6, 10 or 15 minutes depending on the time of day.
ST Express bus
ST Express bus routes serve urban centers in Snohomish, King and Pierce Counties. Our 28 routes provide fast service between major cities and job centers, and allow for easy transfers to train service and local buses. ST Express service is offered seven days a week for many routes.
Our Board Sound Transit is governed by an 18-member Board made up of local elected officials and the Secretary of the Washington State Department of Transportation. The Board establishes policies and gives direction and oversight.
Funding The system plan is paid for with a combination of voter- approved local taxes, federal grants, farebox revenues, borrowed funds and interest revenues. By 2026, system operating costs will be paid for with local taxes, farebox revenues, interest earnings, private sources and federal operating assistance. FUTURE SERVICE
Sound Transit System Expansion will: • Build a 116-mile light rail network extending from Everett to Tacoma, and from Seattle neighborhoods to Redmond and Issaquah. • Establish Bus Rapid Transit (BRT) to the north, east and south of Lake Washington. • Expand Sounder south line capacity and service, adding two new stations. SOUND TRANSIT FUTURE SERVICE • Improve access and expand parking at stations.
Downtown Everett Everett Link Light Rail Everett 2036 Future service: SR 526/ Everett Seattle West Seattle Evergreen Redmond Seattle Mariner Mukilteo SW Everett Industrial Center Ballard Seattle Tacoma South Everett Issaquah Bellevue South Kirkland SR 99/Airport Rd Tacoma Dome Tacoma Mariner 2036 Community College In service: Univ. of Washington Angle Lake Ash Way Tacoma Dome Theater District West Alderwood Sounder Commuter Rail 2024 Future service: Lynnwood City Center DuPont Lakewood Edmonds 2024 Canyon Park In service: Mountlake North Line (Everett Seattle) Terrace South Line (Lakewood Seattle) Lake Kenmore Bothell 2024 Shoreline North/185th Forest Woodinville Bus Park Future service: Shoreline South/145th Bus Rapid Transit (BRT) Brickyard NE 130th 2031 In service: ST Express bus 2021 Northgate Kingsgate/Totem Lake (service re-evaluated annually) Kirkland NE 85th 2024 Downtown Redmond Ballard 2035 Roosevelt New station or bus facility SE Redmond Interbay U District 2041 Added parking Smith Cove South 2023 Redmond Technology Center Station improvements University of Kirkland Seattle Center Washington Overlake Village Major transfer hub Bel-Red/130th South Lake Union Evergreen North Existing station or bus facility Denny Capitol Hill Point Spring District/120th Sammamish Existing parking Wilburton Bellevue Downtown Provisional light rail station Seattle Westlake University Street Bellevue East Main Pioneer Square Midtown International District/Chinatown South South Bellevue Richards Rd King Street Judkins Mercer Sammamish Stadium 2030 Park Island Eastgate Alaska Mount Junction Beacon Baker Lakemont Issaquah Avalon SODO Hill Highlands Delridge Columbia City 2041 Issaquah S Graham St 2031 NE 44th Othello Westwood Village Rainier Beach 2024 Tukwila/ S Boeing Access Rd International 2031 Blvd 2024 South Renton Burien Tukwila SeaTac/Airport
Angle Lake
Kent/DesMoines Kent
S 272nd
2024 Federal Way
Tacoma Auburn Stadium District S 4th South Old City Hall Federal Way Tacoma General Theater District 6th Avenue Convention Center Tacoma 2039 Hilltop District Union Station Community S 25th College 2022 Pearl Union 2030 Stevens Sprague East Fife AinsworthSt Joseph Tacoma Tacoma Dome South Tacoma Sumner
Puyallup
Lakewood Bonney Lake Towne Center South Hill Lakewood
Tillicum
2036 DuPont Nov. 2017 WEST SEATTLE AND BALLARD LINK EXTENSIONS
The West Seattle and Ballard Link Extensions are part of the regional ST3 package that voters approved funding for in November 2016.
These separate extensions will provide: • Fast, reliable light rail connections to residential and job centers between West Seattle and Ballard. • A new downtown Seattle light rail tunnel. These extensions reflect years of study and public engagement, and are very early in this phase of project planning.
Project schedule
WE ARE HERE
VOTER PLANNING DESIGN CONSTRUCTION START OF APPROVAL 2017–2022 2022–2026* 2025–2035* SERVICE 2016 Alternatives Final route design Conversations with West Seattle: 2030 development property owners Ballard: 2035 Final station designs 2017–2019 Groundbreaking Procure and Early scoping commission station Construction updates Scoping and public art and mitigation ST Board identifies Obtain land use and Safety education preferrred alternative construction permits Testing and preoperations Environmental Review 2019–2022 PUBLIC INVOLVEMENT PUBLIC INVOLVEMENT / TESTING Draft Environmental Impact Statement Final Environmental *West Seattle: Design is expected to begin in 2022 and be completed in 2025, Impact Statement Construction and testing is expected to begin in 2025 and be completed in 2030. ST Board selects project Ballard and downtown Seattle Light Rail Tunnel: Design is expected to begin in 2023 to be built and be completed in 2026, Construction and testing is expected to begin in 2027 and be completed in 2035. Federal Record of Decision
PUBLIC INVOLVEMENT
We heard you ... Public input provided during the development “Build it quickly” of ST3 brought to light the importance of getting light rail extensions in service as fast as possible. To be efficient, we need your input to help the Sound Transit Board identify a preferred alternative early so we can start construction sooner.
We want Your input over the next 18 months will your help be important in helping the Sound Transit Board, after working with stakeholder groups and the community, determine what route alignments and station locations to study in the project Environmental Impact Statement (EIS). The final selection of the project to be built will be made by the Sound Transit Board after the Final EIS. PROJECT MAP
2035 NW Market St Ballard
Salmon Bay Crossing (MOVABLE BRIDGE)
W Dravus St Interbay 15th Ave W
Ballard to downtown Seattle
Lake Union Elliott Ave W Smith Cove Seattle Center South Lake Union Denny Way Denny Link Light Rail Ballard extension Elevated New downtown tunnel Westlake Madison St West Seattle extension Elevated Midtown Surface Current/future service Elliott Yesler Way Int’l District/ To Everett (2036) Bay To Tacoma Dome (2030) Chinatown To Lynnwood/Redmond (2024) Station area Stadium Major transfer hub (2035)
West Seattle to SODO downtown Seattle (2030)
West Seattle Bridge Delridge Duwamish Waterway Crossing 2030 (FI ED STRUCTURE) SW Alaska St Avalon
Alaska Junction Representative project showing transit mode, route and general station locations per ST3 Plan.
Fast and frequent service to destinations West Seattle to SODO in 10 minutes. Ballard to Westlake in 15 minutes. Trains run every 6 minutes from West Seattle to downtown Seattle, and downtown Seattle to Ballard as the system builds out (2040). WEST SEATTLE EXTENSION
Benefits
• 4.7 miles of light rail service from downtown Seattle to West Seattle’s Alaska Junction neighborhood. • 5 light rail stations (3 new and 2 expanded) between the Stadium area and Alaska Junction. • Representative project runs primarily on an elevated guideway with a new rail-only fixed span crossing the Duwamish River. • Open for service in 2030.
What do you think about the West Seattle extension? LET US KNOW
Lake Union
Link Light Rail Ballard extension Elevated New downtown tunnel West Seattle extension Elevated Surface
Current/future service Elliott To Everett (2036) Bay To Tacoma Dome (2030) To Lynnwood/Redmond (2024) Station area Stadium Major transfer hub (2035)
West Seattle to SODO downtown Seattle (2030)
West Seattle Bridge Delridge Duwamish Waterway Crossing 2030 (FI ED STRUCTURE) SW Alaska St Avalon
Alaska Junction Representative project showing transit mode, route and general station locations per ST3 Plan. BALLARD EXTENSION
Benefits
• 7.1 miles of light rail service from downtown Seattle to Ballard’s Market Street area, including a new downtown Seattle rail-only tunnel. • 9 light rail stations (7 new and 2 expanded) between International District/Chinatown and Market Street. • Representative project runs through tunneled and elevated sections with a rail-only movable bridge over Salmon Bay. • Open for service in 2035.
2035 NW Market St Ballard What do you think about the Ballard extension?
Salmon Bay LET US KNOW Crossing (MOVABLE BRIDGE)
W Dravus St Interbay 15th Ave W
Ballard to downtown Seattle
Lake Union Elliott Ave W Smith Cove Seattle Center South Lake Union Denny Way Denny Link Light Rail Ballard extension Elevated New downtown tunnel Westlake Madison St West Seattle extension Elevated Midtown Surface Current/future service Elliott Yesler Way Int’l District/ To Everett (2036) Bay To Tacoma Dome (2030) Chinatown To Lynnwood/Redmond (2024) Station area Stadium Major transfer hub
Representative project showing transit mode, route and general station locations per ST3 Plan. EARLY SCOPING
What is early scoping? Early scoping is work needed to prepare the project for the environmental review process. During this time, Sound Transit is seeking public and agency input on alignment and station location alternatives.
Share your thoughts on:
Representative project VISIT THE MAPS and potential alternatives ON TABLES
Purpose and need TAKE A FLYER of the project
Potential project benefits and impacts on your CHECK OUT THE community, the environment EXTENSIONS BOARD and transportation
Early scoping comments will be accepted through March 5
Visit our Comment Station to submit your feedback. Comments received will be documented in the Early Scoping Summary Report. PROJECT PARTNERS
To meet the challenge of delivering projects as quickly as possible, we’ve developed a System Expansion Implementation Plan that includes working with project partners, local jurisdictions, elected officials, community members and the public.
The following groups will help provide strategic input throughout project development:
Elected Leadership Group • Elected officials who represent the project corridor. • Appoint Stakeholder Advisory Group members. • Represent the communities they serve and share community priorities. • Make recommendation on a preferred alternative.
Stakeholder Advisory Group • Selected community members representing neighborhoods along the extensions. • Highlight issues and consider trade-offs. • Make recommendation on a preferred alternative.
Sound Transit Board • Oversees the implementation and delivery of the project. • Considers recommendations and feedback from stakeholder groups and the public. • Provides final voting authority on preferred alternative and other major decisions. PROCESS FOR IDENTIFYING A PREFERRED ALTERNATIVE
LEVEL 1 Alternatives Screening LEVEL 2 Alternatives Screening LEVEL 3 Alternatives Screening 2018 2019 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR Early EIS Scoping Scoping Period Period
Community Updates Early Scoping Open Houses EIS Scoping Open Houses Community Update (multiple locations) (multiple locations)
Neighborhood Forums
Multiple Locations Multiple Locations Multiple Locations
Stakeholder Advisory Group Level 1 Level 2 Preferred Alternative Recommendation Recommendation Recommendation
Elected Level 1 Level 2 Preferred Alternative Leadership Recommendation Recommendation Recommendation Group
Identification of Preferred Alternative Sound Level 1 Briefing Level 2 Briefing Transit and other alternatives to study in the EIS Board
Meeting dates subject to change. HOW CAN I GET INVOLVED?
CONTACT US Call the project line to speak with an Outreach Specialist 206-903-7229
Email us with questions, concerns or comments [email protected]
GO ONLINE
Learn about the project Respond to online soundtransit.org/wsblink Surveys
Subscribe to our Follow us on Email Updates Social Media
GET INVOLVED
Neighborhood Forums Join your community and roll up your sleeves to participate in planning workshops; dive into the details about how this project can fulfill your community vision.
Open Houses Come back to the next open house to learn about how the community’s input has helped shape the project. Provide your feedback and comment on current plans. NEXT STEPS
Thank you for attending our early scoping open Thank you house. Your feedback will play an important part in developing and refining project alternatives.
What we’ll do with your feedback: • Document input in the Early Scoping Summary Report. • Share input with the Stakeholder Advisory Group, Elected Leadership Group and the Sound Transit Board. • Discuss project in greater detail at upcoming neighborhood forums. • Bring back alternatives to review later this year.
Stay engaged
Sign up to receive project emails soundtransit.org/wsblink
Participate in neighborhood forums
Visit future open houses
Send us your thoughts Email: [email protected]
Follow us on social media COMMENT HERE
Share your early scoping comments
Fill out: comment card Visit: wsblink.participate.online Email: [email protected] Mail: West Seattle and Ballard Link Extensions c/o Lauren Swift Sound Transit 401 S. Jackson St. Seattle, WA 98104
አስተያየት ሃሳቦችዎን ያካፍሉ!
ይሙሉት፥ አስተያየት መስጫ ካርድ ይጎብኙ፥ wsblink.participate.online ኢሜይል፥ [email protected] የፖስታ አድራሻ፥ West Seattle and Ballard Link Extensions c/o Lauren Swift Sound Transit 401 S. Jackson St. Seattle, WA 98104
Early scoping comments will be accepted through March 5
Helpful comment-writing tips: • Provide input on the ST3 representative project and potential alternatives. • Comment on the purpose and need of the project. • Help identify and provide feedback on potential project benefits and impacts on your community, the environment and transportation.
Your feedback is vital in developing and narrowing project alternatives.