Access to Northwest Seattle with the SR 99 Bored Tunnel

Total Page:16

File Type:pdf, Size:1020Kb

Access to Northwest Seattle with the SR 99 Bored Tunnel Maintaining Important Freight Connections to Ballard/Interbay Alaskan Way Viaduct and Seawall Replacement Program / Central Waterfront Maintaining important freight connections to Ballard/Interbay Keeping Seattle’s Neighborhoods Moving Northwest Seattle The bored tunnel and related system NW MARKET ST improvements will maintain all freight Ballard WESTLAKEAVE Ballard, Magnolia, Interbay, Queen Anne connections to Ballard and Interbay LEARY WAY NW WALL ST BATTERY ST BELL ST areas. Both the tunnel and surface N 46TH ST BLANCHARD ST ELLIOTT AVE 2ND AVE Alaskan Way boulevard routes will Battery St. Tunnel Closed 1ST AVE LENORA ST Fremont work well for freight. WESTERN AVE VIRGINIA ST EMERSON ST Victor N 39TH ST Steinbrueck Park The bored tunnel will have full access ALASKAN WAY STEWART ST PINE ST at the south tunnel portal near the PIKE PL 2.09 NIC stadiums and at the north portal near K PIKE ST ER Bridge over DRAVUS ST SO Mercer Street. Routes connecting N railroad tracks S T UNION ST ALASKAN WAY to the tunnel will be designed New Elliott / Western to to accommodate freight turning Alaskan Way Connector Magnolia (4 lanes) UNIVERSITY Access to Northwest Seattle movements. Grades in the tunnel will SENECA N N be five percent or less. The Two- E E 0 0.1 SPRING with the SR 99 Bored Tunnel 15TH AVE NW AVE 15TH 15TH AVE NW AVE 15TH Lake Miles Queen Anne V way Mercer Corridor will provide A Union MAGNOLIA E K Replacing the aging Alaskan Way Viaduct will create new ways to an efficient new freight connection BRIDGE 99 ELLIOTT AVE A to Interbay from I-5 and the bored L T 5 travel through downtown Seattle and beyond. S tunnel. Two-way Mercer St E With improved access from the north, the bored tunnel will W Full access to/from • Using the tunnel: Mercer Corridor to SR-99 DEXTERAVE be an efficient bypass to the stadiums, southwest Seattle and Sea-Tac airport. The improved Alaskan Way boulevard MERCER ST will be designed for efficient traffic Alaskan Way / Elliott Route With a new connection over the railroad Seattle • Getting downtown and beyond: flow, including timed signals, a new Bored Tunnel Route Center tracks, Elliott Avenue will flow directly to the new Alaskan Way boulevard, overpass over the BNSF rail tracks I-5 / Mercer Route Uptown Two-way Mercer St DENNY WAY providing an efficient route through downtown and more options to get into the and reduced conflicts between Hazardous/flammable materials WESTERN AVE 2ND AVE downtown street grid. are not allowed in bored tunnel pedestrians and truck traffic. Grades and must use Alaskan Way on the new section of street between route or I-5 • Two-way Mercer Street: This two-way corridor from Elliott Avenue to I-5 will Alaskan Way and Elliott/Western Bored Tunnel give Northwest Seattle access to and from the tunnel and I-5. New street connecting waterfront to ALASKAN WAY PIKE ST will be about six percent. Hazardous Elliott/Western with grade separation freight will use either I-5 or the over the railroad (SEE INSET) • New transit options: New RapidRide service for Ballard/Uptown and the 5 Aurora Corridor will provide fast frequent service to downtown with easy Alaskan Way route, and oversize New 4-lane boulevard trucks will continue to use the along Central Waterfront connections to the new regional light rail system. YESLER WAY Alaskan Way route. New 6-lane boulevard from Columbia to King The agreement by the Governor, King County Executive and Seattle Mayor to JACKSON ST replace the viaduct with the bored tunnel was made after significant technical Ramp access to / from SR99 at Royal Brougham analysis and input from the Stakeholder Advisory Committee, business and 99 community groups and many residents who participated in the public process. Travel Times for Freight 0 0.5 1 519 Miles Together, new driving routes and better transit will ensure that people and goods 90 While travel times along the Alaskan move quickly and efficiently. Way boulevard may be slightly longer than existing travel via the viaduct, the improvements remove Americans with Disabilities Act & Title VI information a current peak period bottleneck at the entrance to the viaduct at Elliott Americans with Disabilities Act (ADA) Information: Materials can be by creating two continuous through provided in alternative formats: large print, Braille, cassette tape, or on lanes along the corridor. Overall computer disk for people with disabilities by contacting Heather Santic at 206-267-3789 / [email protected]. Persons who are deaf or travel times to Ballard/Interbay hard of hearing may make a request for alternative formats through the using the surface Alaskan Way Washington Relay Service at 7-1-1. boulevard route or the bored tunnel/ Mercer Corridor route are expected Title VI: WSDOT ensures full compliance with Title VI of the Civil Rights to be within two or three minutes of Act of 1964 by prohibiting discrimination against any person on the basis of existing travel times. race, color, national origin or sex in the provision of benefits and services resulting from its federally assisted programs and activities. For questions regarding WSDOT’s Title VI Program, you may contact the Department’s Title VI Coordinator at 360-705-7098. How Northwest Seattle Will Access the New Bored Tunnel How NW Seattle Will Get To and ThroughHow Northwest Downtown Seattle Using will the get Newto and Alaskan through Way How Northwest Seattle will access the Bored Tunnel downtown using the new Alaskan Way Many who now use Elliott Avenue to Travelers from neighborhoods NW MARKET ST NW MARKET ST Ballard get onto the Alaskan Way Viaduct in Ballard in Northwest Seattle will be able the Belltown area will find it convenient WALL ST LEARY WAY NW to use the bored tunnel to travel BATTERY ST to use the new Alaskan Way boulevard LEARY WAY NW N 46TH ST BELL ST BLANCHARD ST through downtown Seattle to get 2ND AVE N 46TH ST along the waterfront to travel through Battery St. Tunnel Closed LENORA ST to multiple destinations, including ELLIOTT AVE 1ST AVE Fremont 5 downtown. The new street will be very Fremont VIRGINIA ST the Duwamish industrial area, West WESTERN AVE Victor EMERSON ST different from Alaskan Way today. EMERSON ST N 39TH ST Steinbrueck Seattle, and the airport. Access There will be a new connection linking N 39TH ST Park ALASKAN WAY STEWART ST to the tunnel will be from Aurora Elliott/Western to Alaskan Way with a PINE ST Avenue N. which will transition NI PIKE PL NI bridge over the railroad tracks. Signals CK CK E New bridge over E R from a surface highway to the R SO DRAVUS ST S DRAVUS ST N railroad tracks O will be timed to move traffic efficiently N ST PIKE ST bored tunnel between Mercer S T and manage pedestrian crossings. ALASKAN WAY Street and Denny Way, replacing New Elliott / Western to Alaskan Way will have two-lanes in each Alaskan Way Connector UNION ST the current route via the Battery (4 lanes) Magnolia direction plus left-turn lanes. There will Magnolia N N N Street Tunnel and the Alaskan Way be three lanes in each direction south E E E V UNIVERSITY A V V 15TH AVE NW NW AVE AVE 15TH 15TH E A Viaduct. At the Mercer corridor, A 15TH AVE NW AVE 15TH of Columbia Street. Near S. Royal NW AVE 15TH K SENECA E Queen Anne Queen Anne A 0 0.1 access to Aurora Avenue N. and the L K Brougham Way a ramp will provide T Lake A MAGNOLIA S L bored tunnel will be provided in all MAGNOLIA BRIDGE BRIDGE ELLIOTT AVE E Union T 99 ELLIOTT AVE 99 direct access to southbound SR 99. W Two-way Mercer St S directions. E W Access to/from SR 99 Improved Access to Downtown at Mercer Corridor DEXTER AVE People who travel into downtown from DEXTERAVE MERCER ST 5 MERCER ST Northwest Seattle will have new options Travel Times Seattle in addition to existing routes. The new Seattle Center New Two-way Mercer St with Bored Tunnel Center New Two-way Mercer St surface street connection from Elliott Uptown Uptown Avenue to Alaskan Way will provide a DENNY WAY DENNY WAY Route To/Through Downtown • Travel times for those who use the WESTERN AVE 2ND AVE Aurora/viaduct route today will WESTERN2ND AVE new option for access to the waterfront DowntownElliott Bay Access 5TH AVE 5TH AVE improve with the bored tunnel by 1 to and to the center of downtown that B o New street connecting waterfront to r is not provided today. Transit service e 2 minutes during peak periods. Elliott/Western with grade separation d Bored Tunnel to downtown will be greatly improved over the railroad SEE INSET T PIKE ST Mercer / Elliott Route PIKE ST ALASKANu WAY n 5 • For those who now access the viaduct ALASKAN WAY n Aurora Avenue North Routes with new RapidRide transit service e New 4-lane boulevard l at the Elliott and Western Avenue Westlake and Dexter Routes from Ballard/Uptown and on Aurora SPRING ST New Downtown along Central Waterfront MARION ST access via ramps, rerouting onto east-west streets 5 Avenue. More frequent service will make Alaskan Way to get to Aurora and the new tunnel it convenient to transfer to Link Light New 6-lane boulevard YESLER WAY will increase their overall travel times YESLER WAY Rail and other transit services to get to from Columbia to King JACKSON ST by about 2 to 3 minutes, depending on JACKSON ST the airport and other destinations to the Ramp access to / from route and time of day.
Recommended publications
  • Blue Urbanism: Inviting Urban Play on Seattle's North Waterfront Scan L Design Master Studio, Autumn 2014 [Larch 501/Arch504]
    Blue Urbanism: Inviting Urban Play on Seattle's North Waterfront Scan l Design Master Studio, Autumn 2014 [Larch 501/Arch504] Instructors: Nancy Rottle (LA), Jim Nicholls (ARCH), and Leann Andrews (PhD BE) Teaching Assistant: VeraEve Giampietro (LA & UDP) With Gehl Architects/Cititek: Bianca Hermansen GUIDING PRINCIPLES FOR SEATTLE'S CENTRAL WATERFRONT (adopted by City Council): • Create a waterfront for all. • Put the shoreline and innovative, sustainable design at the forefront. • Reconnect the city to its waterfront. • Embrace and celebrate Seattle’s past, present and future. • Improve Access and Mobility (for people and goods). • Create a bold vision that is adaptable over time. • Develop consistent leadership–from concept to construction to operations. PROJECT DESCRIPTION Seattle's Central Waterfront is heralded as one of the most significant civic projects in the city's history. With imminent removal of the Alaskan Way Viaduct and current replacement of the aging Elliott Bay Seawall, Seattle has begun to envision and enact a great "waterfront for all." Removal of the viaduct and rerouting of Alaskan Way along the waterfront will create abundant new and qualitatively different public space, while the seawall replacement will provide for a more ecologically functional edge. However, while the team led by James Corner Field Operations has proposed and designed a new waterfront between Piers 48 and 62/63, less attention has been paid to the waterfront segment between Piers 62/63 and the Olympic Sculpture Park. With the reconfiguration of Alaskan Way, this northern segment offers rich opportunities for better public, pedestrian, bicycle and ecological space along a less-traveled roadway.
    [Show full text]
  • Redefining Urban Food Systems to Identify Optimal Rooftop Community Garden Locations
    REDEFINING URBAN FOOD SYSTEMS TO IDENTIFY OPTIMAL ROOFTOP COMMUNITY GARDEN LOCATIONS: A SITE SUITABILITY ANALYSIS IN SEATTLE, WASHINGTON by Ana E. Stoudt A Thesis Presented to the FACULTY OF THE USC GRADUATE SCHOOL UNIVERSITY OF SOUTHERN CALIFORNIA In Partial Fulfillment of the Requirements for the Degree MASTER OF SCIENCE (GEOGRAPHIC INFORMATION SCIENCE AND TECHNOLOGY) May 2015 Copyright 2015 Ana E. Stoudt i DEDICATION I dedicate this paper to my parents, friends, and coworkers for their constant support throughout this entire process. Without them, I would not have made it here today. ii ACKNOWLEDGMENTS I am forever grateful to my advisor, Professor Warshawsky, for his encouragement and guidance throughout this experience. iii TABLE OF CONTENTS DEDICATION ................................................................................................................................ ii ACKNOWLEDGMENTS ............................................................................................................. iii LIST OF TABLES ........................................................................................................................ vii LIST OF FIGURES ..................................................................................................................... viii LIST OF ABBREVIATIONS ......................................................................................................... x ABSTRACT ..................................................................................................................................
    [Show full text]
  • Downtown Access Strategy Phase 1 Context Setting: Projects to Be Constructed in the Next 10 Years Table of Contents
    DOWNTOWN ACCESS STRATEGY PHASE 1 Context Setting: Projects to be Constructed in the Next 10 Years September 25, 2013 Downtown Access Strategy Phase 1 Context Setting: Projects to be Constructed in the Next 10 Years Table of Contents I. Introduction ................................................................................................. 1 II. Review of Existing Plans, Projects, and Programs ......................................... 2 III. Potential Construction Concerns and Opportunities .................................. 3 A. Existing Construction Planning Tools 3 B. SDOT’s Construction Hub Coordination Program 4 C. Construction Mitigation Strategies Used by Other Cities 7 D. Potential Construction Conflicts and Opportunities 10 IV. Future Transportation Network Opportunities ......................................... 12 A. North Downtown 12 B. Denny Triangle / Westlake Hub 14 C. Pioneer Square / Chinatown-ID 15 D. Downtown Core and Waterfront 16 V. Future Phases of Downtown Access Strategy ............................................. 18 A. Framework for Phase 2 (2014 through 2016) 18 B. Framework for Phase 3 (Beyond 2016) 19 - i - September 25, 2013 Downtown Access Strategy Phase 1 Context Setting: Projects to be Constructed in the Next 10 Years I. INTRODUCTION Many important and long planned transportation and development projects are scheduled for con- struction in Downtown Seattle in the coming years. While these investments are essential to support economic development and job growth and to enhance Downtown’s stature as the region’s premier location to live, work, shop and play, in the short-term they present complicated challenges for con- venient and reliable access to and through Downtown. The Downtown Seattle Association (DSA) and its partners, Historic South Downtown (HSD) and the Seat- tle Department of Transportation (SDOT), seek to ensure that Downtown Seattle survives and prospers during the extraordinarily high level of construction activity that will occur in the coming years.
    [Show full text]
  • Alaskan Way Viaduct & Seawall Replacement Program
    Alaskan Way Viaduct & Seawall Replacement Program Central Waterfront 01.09 Learning, Listening, and Moving Ahead - Replacing the Alaskan Way Viaduct and Seawall A diverse group of elected offi cials, transportation “As I spoke with individuals and business leaders, fi ve objectives agencies and experts, interest groups, and the public have emerged that guided my decision making. First, the solution must worked over the last year on a solution for the Alaskan improve safety by removing the existing unsafe viaduct. Second, Way Viaduct and Seawall along the central waterfront. the solution must be affordable, and the state’s contribution to Six principles guided the evaluation of possible solutions and eight scenarios were evaluated. Each scenario included the solution must not be over $2.8 billion. Third, the solution investments to transit, city streets, I-5, SR 99, and demand must cause the least construction disruption to our maritime management strategies. What we learned provides a industry and central waterfront businesses. Fourth, the solution critical foundation for reaching a decision. must provide capacity and mobility now and in the future, for freight, vehicles, and transit users. And fi fth, the solution must The following is a summary of the six guiding principles: contribute to improving the health of our environment and open up Seattle’s waterfront. I have concluded that the bored tunnel • Improve public safety. hybrid alternative is the most balanced solution and best meets these objectives.” • Provide effi cient movement of people and –Governor Chris Gregoire goods now and in the future. • Maintain or improve downtown Seattle, “This agreement will improve our transportation system, improve regional, the port and state economies.
    [Show full text]
  • National Register of Historic Places Multiple Property Documentation Form
    NPS Form 10-900-b OMB No. 1024-0018 United States Department of the Interior National Park Service National Register of Historic Places Multiple Property Documentation Form This form is used for documenting property groups relating to one or several historic contexts. See instructions in National Register Bulletin How to Complete the Multiple Property Documentation Form (formerly 16B). Complete each item by entering the requested information. ___X___ New Submission ________ Amended Submission A. Name of Multiple Property Listing Seattle’s Olmsted Parks and Boulevards (1903–68) B. Associated Historic Contexts None C. Form Prepared by: name/title: Chrisanne Beckner, MS, and Natalie K. Perrin, MS organization: Historical Research Associates, Inc. (HRA) street & number: 1904 Third Ave., Suite 240 city/state/zip: Seattle, WA 98101 e-mail: [email protected]; [email protected] telephone: (503) 247-1319 date: December 15, 2016 D. Certification As the designated authority under the National Historic Preservation Act of 1966, as amended, I hereby certify that this documentation form meets the National Register documentation standards and sets forth requirements for the listing of related properties consistent with the National Register criteria. This submission meets the procedural and professional requirements set forth in 36 CFR 60 and the Secretary of the Interior’s Standards and Guidelines for Archeology and Historic Preservation. _______________________________ ______________________ _________________________ Signature of certifying official Title Date _____________________________________ State or Federal Agency or Tribal government I hereby certify that this multiple property documentation form has been approved by the National Register as a basis for evaluating related properties for listing in the National Register.
    [Show full text]
  • ALASKAN WAY VIADUCT REPLACEMENT PROJECT Final Environmental Impact Statement
    ALASKAN WAY VIADUCT REPLACEMENT PROJECT Final Environmental Impact Statement APPENDIX L Economics Discipline Report Submitted by: PARSONS BRINCKERHOFF Prepared by: PARSONS BRINCKERHOFF J U L Y 2 0 1 1 Alaskan Way Viaduct Replacement Project Final EIS Economics Discipline Report The Alaskan Way Viaduct Replacement Project is a joint effort between the Federal Highway Administration (FHWA), the Washington State Department of Transportation (WSDOT), and the City of Seattle. To conduct this project, WSDOT contracted with: Parsons Brinckerhoff 999 Third Avenue, Suite 3200 Seattle, WA 98104 In association with: Coughlin Porter Lundeen, Inc. EnviroIssues, Inc. GHD, Inc. HDR Engineering, Inc. Jacobs Engineering Group Inc. Magnusson Klemencic Associates, Inc. Mimi Sheridan, AICP Parametrix, Inc. Power Engineers, Inc. Shannon & Wilson, Inc. William P. Ott Construction Consultants SR 99: Alaskan Way Viaduct Replacement Project July 2011 Economics Discipline Report Final EIS This Page Intentionally Left Blank TABLE OF CONTENTS Chapter 1 Introduction and Summary ................................................................................................................. 1 1.1 Introduction ................................................................................................................................................ 1 1.2 Build Alternatives Overview ....................................................................................................................... 2 1.2.1 Overview of Bored Tunnel Alternative (Preferred) ..........................................................................
    [Show full text]
  • Report on Designation Lpb 11/12
    REPORT ON DESIGNATION LPB 11/12 Name and Address of Property: Fashioncraft Building/Recovery Cafe 2022 Boren Avenue Legal Description: Lots 3 and 4 lying West of Fairview Avenue, Block 53 of the Plat of the Second Addition to the Town of Seattle Laid Off by the Heirs of Sarah A. Bell, according to the Plat thereof recorded in Volume 1 of Plats, Page 121, in King County, Washington. At the public meeting held on January 4, 2012 the City of Seattle's Landmarks Preservation Board voted to approve designation of the Fashioncraft Building/Recovery Café at 2022 Boren Avenue as a Seattle Landmark based upon satisfaction of the following standards for designation of SMC 25.12.350: C. It is associated in a significant way with a significant aspect of the cultural, political, or economic heritage of the community, City, state, or nation; and D. It embodies the distinctive visible characteristics of an architectural style, period, or of a method of construction; and F. Because of its prominence of spatial location, contrasts of siting, age, or scale, it is an easily identifiable visual feature of its neighborhood or the City and contributes to the distinctive quality or identity of such neighborhood or the City. PHYSICAL DESCRIPTION Overall Aspect The Fashioncraft Building at 2022 Boren Avenue is sited on the triangular lot, bounded by Denny Way, Fairview Avenue and Boren Avenue. The building, whose plan is basically a chamfered right triangle, is one story in height, but has a basement. The exterior is primarily clad in light brown brick with cast stone ornament, which echoes Churriguresque decoration or the Spanish Eclectic work of American architects, such as Bertram Goodhue.
    [Show full text]
  • This City of Ours
    THIS CITY OF OURS By J. WILLIS SAYRE For the illustrations used in this book the author expresses grateful acknowledgment to Mrs. Vivian M. Carkeek, Charles A. Thorndike and R. M. Kinnear. Copyright, 1936 by J. W. SAYRE rot &?+ *$$&&*? *• I^JJMJWW' 1 - *- \£*- ; * M: . * *>. f* j*^* */ ^ *** - • CHIEF SEATTLE Leader of his people both in peace and war, always a friend to the whites; as an orator, the Daniel Webster of his race. Note this excerpt, seldom surpassed in beauty of thought and diction, from his address to Governor Stevens: Why should I mourn at the untimely fate of my people? Tribe follows tribe, and nation follows nation, like the waves of the sea. It is the order of nature and regret is useless. Your time of decay may be distant — but it will surely come, for even the White Man whose God walked and talked with him as friend with friend cannot be exempt from the common destiny. We may be brothers after all. Let the White Man be just and deal kindly with my people, for the dead are not powerless. Dead — I say? There is no death. Only a change of worlds. CONTENTS CHAPTER PAGE 1. BELIEVE IT OR NOT! 1 2. THE ROMANCE OF THE WATERFRONT . 5 3. HOW OUR RAILROADS GREW 11 4. FROM HORSE CARS TO MOTOR BUSES . 16 5. HOW SEATTLE USED TO SEE—AND KEEP WARM 21 6. INDOOR ENTERTAINMENTS 26 7. PLAYING FOOTBALL IN PIONEER PLACE . 29 8. STRANGE "IFS" IN SEATTLE'S HISTORY . 34 9. HISTORICAL POINTS IN FIRST AVENUE . 41 10.
    [Show full text]
  • West Seattle and Ballard Link Extensions: Downtown Draft EIS
    West Seattle and Ballard Link Extensions Draft EIS alternatives - Downtown segment Centennial Park To Ballard Green Lake BALLARD NW Market St 15th Ave NW Myrtle Edwards Park 99 5 Salmon Bay Elliott Ave W Olympic 4th Ave W W Mercer Pl Sculpture Park W Olympic Pl W Dravus St Western Ave W MAGNOLIA SEATTLE 5th Ave W 520 99 QUEEN Thorndyke Ave W CENTER ANNE Lake Union 99 3rd Ave W Magnolia Bridge 2nd Ave W Pike Place Key INTERBAY SOUTH LAKE Market Arena Mercer St UNION To West Seattle Broad St 1st Ave W Seattle Center 5 /Tacoma Dome 1st Ave W Denny Way Seattle Pine St Pine Queen Anne Ave N Pike St Pike St Battery To Everett Center 2nd Ave St Bell 1st Ave N DOWNTOWN St Blanchard Denny Way Harrison St Warren Ave N W Galer St Pike St 3rd Ave 5th Ave Elliott Bay Republican St Madison St Yesler Way 4th Ave S Jackson St Roy St WESTLAKE Mercer St INTERNATIONAL SOUTH 3rd Ave N DISTRICT CenturyLink Field 90 5th Ave 5th Ave Valley St Safeco Field Westlake Ave N LAKE UNION To Aloha St Redmond S Jackson St 6th Ave 6th Ave Holgate St 5th Ave N SODO Taylor Ave N 5 MIDTOWN Convention Forest St Center Duwamish waterway 8th Ave Thomas St 6th Ave N WEST To Tacoma W Seattle Bridge Aurora Ave N SEATTLE 6th Ave S Dome SW Andover St W Marginal Way SW Avalon Way Pine St Pine Yesler Way St Pike Dexter Ave N 99 5 SW Genesee St BNSF 1st Ave S 4th Ave S Alaska St DENNY 8th Ave N Virginia St Virginia Fairview Ave N Union St James St Spring St St Stewart Boren Ave Cherry St Broadway Seneca St Marion St 35th Ave SW 26th Ave SW California Ave Madison St Fauntleroy Way St Howell Westlake Ave N Columbia St 5 Terry Ave N University St Delridge Way SW Boren Ave To Everett Lake Union KEY MAP John St West Seattle extension/Station area Ballard extension/Station area N DRAFT EIS ALTERNATIVES PREFERRED ALTERNATIVES OTHER ALTERNATIVES AND DESIGN OPTIONS EXISTING LINK ROUTE AND STATION PROFILES ELEVATED AT-GRADE TUNNEL TUNNEL PORTAL N.
    [Show full text]
  • ALASKAN WAY VIADUCT REPLACEMENT PROJECT Final Environmental Impact Statement
    ALASKAN WAY VIADUCT REPLACEMENT PROJECT Final Environmental Impact Statement APPENDIX M Air Discipline Report Submitted by: PARSONS BRINCKERHOFF Prepared by: PARSONS BRINCKERHOFF J U L Y 2 0 1 1 Alaskan Way Viaduct Replacement Project Final EIS Air Discipline Report The Alaskan Way Viaduct Replacement Project is a joint effort between the Federal Highway Administration (FHWA), the Washington State Department of Transportation (WSDOT), and the City of Seattle. To conduct this project, WSDOT contracted with: Parsons Brinckerhoff 999 Third Avenue, Suite 3200 Seattle, WA 98104 In association with: Coughlin Porter Lundeen, Inc. EnviroIssues, Inc. GHD, Inc. HDR Engineering, Inc. Jacobs Engineering Group, Inc. Magnusson Klemencic Associates, Inc. Mimi Sheridan, AICP Parametrix, Inc. Power Engineers, Inc. Shannon & Wilson, Inc. William P. Ott Construction Consultants SR 99: Alaskan Way Viaduct Replacement Project July 2011 Air Discipline Report Final EIS This Page Intentionally Left Blank TABLE OF CONTENTS Chapter 1 Summary ..............................................................................................................................................1 1.1 Alternatives Considered .............................................................................................................................1 1.2 Build Alternatives Overview .......................................................................................................................2 1.2.1 Bored Tunnel Overview ..................................................................................................................
    [Show full text]
  • 2.86-Acres | 124395 Sf
    2.86-acres | 124,395 sf REQUEST FOR PROPOSALS: unique development opportunity premier seattle land site located in south lake union INVESTMENT CONTACTS: Lori Hill Rob Hielscher Bob Hunt Managing Director Managing Director Managing Director Capital Markets International Capital Public Institutions +1 206 971 7006 +1 415 395 4948 +1 206 607 1754 [email protected] [email protected] [email protected] 601 Union Street, Suite 2800, Seattle, WA 98101 +1 206 607 1700 jll.com/seattle TABLE OF CONTENTS Section I The Offering 4 Introduction Investment Highlights Site Summary Objectives and Requirements Transaction Guidelines Section II Project Overview & Development Potential 17 South Lake Union Map and Legend Project Overview Zoning Zoning Map seattle Development Considerations Development Potential Section III RFP Process and Requirements 34 Solicitation Schedule Instructions and Contacts RFP Requirements Evaluation Process Post Selection Process Disclosures Section IV Market Characteristics 50 Market Overview Market Comparables Neighborhood Summary Regional Economy Section V Appendices 74 NORTH See page 75-76 for List of Appendix Documents Copyright ©2018 Jones Lang LaSalle. All rights reserved. Although information has been obtained from sources deemed reliable, Owner, Jones Lang LaSalle, and/or their representatives, brokers or agents make no guarantees as to the accuracy of the information contained herein, and offer the property without express or implied warranties of any kind. The property may be withdrawn without notice. If the recipient of this information has signed a confidentiality agreement regarding this matter, this information is subject to the terms of that agreement. Section I THE OFFERING 4 | Mercer Mega Block | Request for Proposals 520 REPLACE MERCER STREET LAKE UNION DEXTER AVE N ROY STREET ROY 99 NORTH Last large undeveloped site in South Lake Union | Mercer Mega Block | Request for Proposals 5 THE OFFERING INTRODUCTION MERCER MEGA BLOCK JLL is pleased to present the Mercer Mega Block, a 2.86-acre site acquisition opportunity.
    [Show full text]
  • Historic Property Survey Report: Seattle's Neighborhood Commercial
    HISTORIC PROPERTY SURVEY REPORT: SEATTLE’S NEIGHBORHOOD COMMERCIAL DISTRICTS Prepared by: Mimi Sheridan Cultural Resource Specialist Prepared for: City of Seattle Department of Neighborhoods Historic Preservation Program 700 Third Avenue, Seattle WA 98104 November 2002 PROJECT SUMMARY In 2000 the City of Seattle began a multi-year effort to update its inventory of historic resources throughout the city. Existing information, primarily from the 1970s, was out of date and inadequate to meet the challenges of growth management and the threats to the city’s traditional character posed by increasing demand for housing and commercial space. Two building categories and one neighborhood were selected for the initial round of surveys: neighborhood commercial districts, buildings constructed before 1905, and the University District. This report focuses on the methodology and findings of the survey and inventory of Seattle’s neighborhood commercial districts. The project began in the spring of 2001, with development of a work plan, which identified the survey criteria and boundaries. A context statement was then prepared, giving an overview of commercial development patterns throughout the city. Following this, a reconnaissance survey was done, looking at every building in the identified commercial districts. This survey recorded more than 1000 buildings that met the basic criteria of age (built prior to 1962) and architectural integrity. Two hundred of these structures were identified for further research and inclusion in the final inventory. Development patterns and physical characteristics of each neighborhood and of these 200 buildings are summarized here. In addition to this report, the Neighborhood Commercial District inventory includes 200 Historic Property Inventory forms in an electronic database format that will be available to the general public as well as to other city departments.
    [Show full text]