ALASKAN WAY VIADUCT REPLACEMENT PROJECT Final Environmental Impact Statement

Total Page:16

File Type:pdf, Size:1020Kb

ALASKAN WAY VIADUCT REPLACEMENT PROJECT Final Environmental Impact Statement ALASKAN WAY VIADUCT REPLACEMENT PROJECT Final Environmental Impact Statement APPENDIX L Economics Discipline Report Submitted by: PARSONS BRINCKERHOFF Prepared by: PARSONS BRINCKERHOFF J U L Y 2 0 1 1 Alaskan Way Viaduct Replacement Project Final EIS Economics Discipline Report The Alaskan Way Viaduct Replacement Project is a joint effort between the Federal Highway Administration (FHWA), the Washington State Department of Transportation (WSDOT), and the City of Seattle. To conduct this project, WSDOT contracted with: Parsons Brinckerhoff 999 Third Avenue, Suite 3200 Seattle, WA 98104 In association with: Coughlin Porter Lundeen, Inc. EnviroIssues, Inc. GHD, Inc. HDR Engineering, Inc. Jacobs Engineering Group Inc. Magnusson Klemencic Associates, Inc. Mimi Sheridan, AICP Parametrix, Inc. Power Engineers, Inc. Shannon & Wilson, Inc. William P. Ott Construction Consultants SR 99: Alaskan Way Viaduct Replacement Project July 2011 Economics Discipline Report Final EIS This Page Intentionally Left Blank TABLE OF CONTENTS Chapter 1 Introduction and Summary ................................................................................................................. 1 1.1 Introduction ................................................................................................................................................ 1 1.2 Build Alternatives Overview ....................................................................................................................... 2 1.2.1 Overview of Bored Tunnel Alternative (Preferred) ........................................................................... 3 1.2.2 Overview of Cut-and-Cover Tunnel Alternative ............................................................................... 4 1.2.3 Overview of Elevated Structure Alternative ..................................................................................... 5 1.3 Summary ................................................................................................................................................... 6 1.3.1 Affected Environment ...................................................................................................................... 6 1.3.2 Operational Effects, Mitigation, and Benefits ................................................................................. 10 1.3.3 Construction Effects and Mitigation ............................................................................................... 17 1.3.4 Tolling ............................................................................................................................................ 18 Chapter 2 Methodology ...................................................................................................................................... 19 2.1 Study Area ............................................................................................................................................... 19 2.2 Applicable Regulations and Guidelines ................................................................................................... 19 2.3 Data Needs and Sources ......................................................................................................................... 19 2.4 Analysis of Existing Conditions ................................................................................................................ 20 2.5 Analysis of Environmental Effects ........................................................................................................... 21 2.6 Determining Mitigation Measures ............................................................................................................ 23 Chapter 3 Studies and Coordination ................................................................................................................. 25 3.1 Studies ..................................................................................................................................................... 25 3.2 Coordination ............................................................................................................................................ 25 Chapter 4 Affected Environment ....................................................................................................................... 27 4.1 General Role of the Local Economy ........................................................................................................ 27 4.1.1 Average Wages ............................................................................................................................. 27 4.1.2 Largest Private and Public Employers ........................................................................................... 28 4.1.3 Size of Tourism Industry ................................................................................................................ 28 4.1.4 Amount of Cargo Shipped by Port of Seattle Facilities .................................................................. 29 4.1.5 Transit Facilities Serving the Central Business District ................................................................. 29 4.2 Established Business Districts and Retail/Commercial Centers .............................................................. 30 4.2.1 Greater Duwamish Manufacturing and Industrial Center ............................................................... 30 4.2.2 Pioneer Square District .................................................................................................................. 32 4.2.3 Financial District ............................................................................................................................ 32 4.2.4 Pike Place Market .......................................................................................................................... 32 4.2.5 Central Waterfront ......................................................................................................................... 32 4.2.6 Seattle CBD and Westlake Center Retail Area .............................................................................. 33 4.2.7 Seattle Center................................................................................................................................ 33 4.2.8 South Lake Union Urban Center ................................................................................................... 34 4.2.9 Uptown Urban Center .................................................................................................................... 35 4.2.10 Ballard Interbay Northend Manufacturing and Industrial Center .................................................. 35 4.3 Employment ............................................................................................................................................. 35 4.3.1 Employment by Industry ................................................................................................................ 35 4.3.2 Unemployment Rates .................................................................................................................... 37 4.4 Parking .................................................................................................................................................... 40 SR 99: Alaskan Way Viaduct Replacement Project July 2011 Economics Discipline Report i Final EIS 4.4.1 Parking Inventory ........................................................................................................................... 40 4.4.2 Center City Parking Program ......................................................................................................... 41 4.5 Local Government Revenues .................................................................................................................. 42 4.5.1 Sales and Use Tax ........................................................................................................................ 42 4.5.2 Business and Occupation Tax and Public Utility Tax ..................................................................... 42 4.5.3 Property Tax .................................................................................................................................. 43 4.5.4 Other Taxes and User Fees........................................................................................................... 43 4.5.5 Revenues From On-Street Parking and Public Garages ............................................................... 44 4.6 Traffic Congestion and Its Cost ................................................................................................................ 45 4.7 Ferry and Cruise Ship Facilities ............................................................................................................... 51 4.8 Inventory of Existing Businesses ............................................................................................................. 52 4.8.1 Results of Business Inventory ........................................................................................................ 54 4.8.2 Breakdown of Businesses by Geographic Area ............................................................................. 56 Chapter 5 Operational Effects, Mitigation, and Benefits ................................................................................ 61 5.1 Operational Effects of the Viaduct Closed (No Build Alternative)............................................................. 61 5.1.1 Scenario
Recommended publications
  • Blue Urbanism: Inviting Urban Play on Seattle's North Waterfront Scan L Design Master Studio, Autumn 2014 [Larch 501/Arch504]
    Blue Urbanism: Inviting Urban Play on Seattle's North Waterfront Scan l Design Master Studio, Autumn 2014 [Larch 501/Arch504] Instructors: Nancy Rottle (LA), Jim Nicholls (ARCH), and Leann Andrews (PhD BE) Teaching Assistant: VeraEve Giampietro (LA & UDP) With Gehl Architects/Cititek: Bianca Hermansen GUIDING PRINCIPLES FOR SEATTLE'S CENTRAL WATERFRONT (adopted by City Council): • Create a waterfront for all. • Put the shoreline and innovative, sustainable design at the forefront. • Reconnect the city to its waterfront. • Embrace and celebrate Seattle’s past, present and future. • Improve Access and Mobility (for people and goods). • Create a bold vision that is adaptable over time. • Develop consistent leadership–from concept to construction to operations. PROJECT DESCRIPTION Seattle's Central Waterfront is heralded as one of the most significant civic projects in the city's history. With imminent removal of the Alaskan Way Viaduct and current replacement of the aging Elliott Bay Seawall, Seattle has begun to envision and enact a great "waterfront for all." Removal of the viaduct and rerouting of Alaskan Way along the waterfront will create abundant new and qualitatively different public space, while the seawall replacement will provide for a more ecologically functional edge. However, while the team led by James Corner Field Operations has proposed and designed a new waterfront between Piers 48 and 62/63, less attention has been paid to the waterfront segment between Piers 62/63 and the Olympic Sculpture Park. With the reconfiguration of Alaskan Way, this northern segment offers rich opportunities for better public, pedestrian, bicycle and ecological space along a less-traveled roadway.
    [Show full text]
  • Frommer's Seattle 2004
    01 541277 FM.qxd 11/17/03 9:37 AM Page i Seattle 2004 by Karl Samson Here’s what the critics say about Frommer’s: “Amazingly easy to use. Very portable, very complete.” —Booklist “Detailed, accurate, and easy-to-read information for all price ranges.” —Glamour Magazine “Hotel information is close to encyclopedic.” —Des Moines Sunday Register “Frommer’s Guides have a way of giving you a real feel for a place.” —Knight Ridder Newspapers 01 541277 FM.qxd 11/17/03 9:37 AM Page ii About the Author Karl Samson makes his home in the Northwest. He also covers the rest of Wash- ington for Frommer’s. In addition, Karl is the author of Frommer’s Arizona. Published by: Wiley Publishing, Inc. 111 River St. Hoboken, NJ 07030-5744 Copyright © 2004 Wiley Publishing, Inc., Hoboken, New Jersey. All rights reserved. No part of this publication may be reproduced, stored in a retrieval sys- tem or transmitted in any form or by any means, electronic, mechanical, photo- copying, recording, scanning or otherwise, except as permitted under Sections 107 or 108 of the 1976 United States Copyright Act, without either the prior written permission of the Publisher, or authorization through payment of the appropriate per-copy fee to the Copyright Clearance Center, 222 Rosewood Drive, Danvers, MA 01923, 978/750-8400, fax 978/646-8600. Requests to the Publisher for per- mission should be addressed to the Legal Department, Wiley Publishing, Inc., 10475 Crosspoint Blvd., Indianapolis, IN 46256, 317/572-3447, fax 317/572-4447, E-Mail: [email protected].
    [Show full text]
  • Downtown Access Strategy Phase 1 Context Setting: Projects to Be Constructed in the Next 10 Years Table of Contents
    DOWNTOWN ACCESS STRATEGY PHASE 1 Context Setting: Projects to be Constructed in the Next 10 Years September 25, 2013 Downtown Access Strategy Phase 1 Context Setting: Projects to be Constructed in the Next 10 Years Table of Contents I. Introduction ................................................................................................. 1 II. Review of Existing Plans, Projects, and Programs ......................................... 2 III. Potential Construction Concerns and Opportunities .................................. 3 A. Existing Construction Planning Tools 3 B. SDOT’s Construction Hub Coordination Program 4 C. Construction Mitigation Strategies Used by Other Cities 7 D. Potential Construction Conflicts and Opportunities 10 IV. Future Transportation Network Opportunities ......................................... 12 A. North Downtown 12 B. Denny Triangle / Westlake Hub 14 C. Pioneer Square / Chinatown-ID 15 D. Downtown Core and Waterfront 16 V. Future Phases of Downtown Access Strategy ............................................. 18 A. Framework for Phase 2 (2014 through 2016) 18 B. Framework for Phase 3 (Beyond 2016) 19 - i - September 25, 2013 Downtown Access Strategy Phase 1 Context Setting: Projects to be Constructed in the Next 10 Years I. INTRODUCTION Many important and long planned transportation and development projects are scheduled for con- struction in Downtown Seattle in the coming years. While these investments are essential to support economic development and job growth and to enhance Downtown’s stature as the region’s premier location to live, work, shop and play, in the short-term they present complicated challenges for con- venient and reliable access to and through Downtown. The Downtown Seattle Association (DSA) and its partners, Historic South Downtown (HSD) and the Seat- tle Department of Transportation (SDOT), seek to ensure that Downtown Seattle survives and prospers during the extraordinarily high level of construction activity that will occur in the coming years.
    [Show full text]
  • Alaskan Way Viaduct & Seawall Replacement Program
    Alaskan Way Viaduct & Seawall Replacement Program Central Waterfront 01.09 Learning, Listening, and Moving Ahead - Replacing the Alaskan Way Viaduct and Seawall A diverse group of elected offi cials, transportation “As I spoke with individuals and business leaders, fi ve objectives agencies and experts, interest groups, and the public have emerged that guided my decision making. First, the solution must worked over the last year on a solution for the Alaskan improve safety by removing the existing unsafe viaduct. Second, Way Viaduct and Seawall along the central waterfront. the solution must be affordable, and the state’s contribution to Six principles guided the evaluation of possible solutions and eight scenarios were evaluated. Each scenario included the solution must not be over $2.8 billion. Third, the solution investments to transit, city streets, I-5, SR 99, and demand must cause the least construction disruption to our maritime management strategies. What we learned provides a industry and central waterfront businesses. Fourth, the solution critical foundation for reaching a decision. must provide capacity and mobility now and in the future, for freight, vehicles, and transit users. And fi fth, the solution must The following is a summary of the six guiding principles: contribute to improving the health of our environment and open up Seattle’s waterfront. I have concluded that the bored tunnel • Improve public safety. hybrid alternative is the most balanced solution and best meets these objectives.” • Provide effi cient movement of people and –Governor Chris Gregoire goods now and in the future. • Maintain or improve downtown Seattle, “This agreement will improve our transportation system, improve regional, the port and state economies.
    [Show full text]
  • This City of Ours
    THIS CITY OF OURS By J. WILLIS SAYRE For the illustrations used in this book the author expresses grateful acknowledgment to Mrs. Vivian M. Carkeek, Charles A. Thorndike and R. M. Kinnear. Copyright, 1936 by J. W. SAYRE rot &?+ *$$&&*? *• I^JJMJWW' 1 - *- \£*- ; * M: . * *>. f* j*^* */ ^ *** - • CHIEF SEATTLE Leader of his people both in peace and war, always a friend to the whites; as an orator, the Daniel Webster of his race. Note this excerpt, seldom surpassed in beauty of thought and diction, from his address to Governor Stevens: Why should I mourn at the untimely fate of my people? Tribe follows tribe, and nation follows nation, like the waves of the sea. It is the order of nature and regret is useless. Your time of decay may be distant — but it will surely come, for even the White Man whose God walked and talked with him as friend with friend cannot be exempt from the common destiny. We may be brothers after all. Let the White Man be just and deal kindly with my people, for the dead are not powerless. Dead — I say? There is no death. Only a change of worlds. CONTENTS CHAPTER PAGE 1. BELIEVE IT OR NOT! 1 2. THE ROMANCE OF THE WATERFRONT . 5 3. HOW OUR RAILROADS GREW 11 4. FROM HORSE CARS TO MOTOR BUSES . 16 5. HOW SEATTLE USED TO SEE—AND KEEP WARM 21 6. INDOOR ENTERTAINMENTS 26 7. PLAYING FOOTBALL IN PIONEER PLACE . 29 8. STRANGE "IFS" IN SEATTLE'S HISTORY . 34 9. HISTORICAL POINTS IN FIRST AVENUE . 41 10.
    [Show full text]
  • ALASKAN WAY VIADUCT REPLACEMENT PROJECT Final Environmental Impact Statement
    ALASKAN WAY VIADUCT REPLACEMENT PROJECT Final Environmental Impact Statement APPENDIX M Air Discipline Report Submitted by: PARSONS BRINCKERHOFF Prepared by: PARSONS BRINCKERHOFF J U L Y 2 0 1 1 Alaskan Way Viaduct Replacement Project Final EIS Air Discipline Report The Alaskan Way Viaduct Replacement Project is a joint effort between the Federal Highway Administration (FHWA), the Washington State Department of Transportation (WSDOT), and the City of Seattle. To conduct this project, WSDOT contracted with: Parsons Brinckerhoff 999 Third Avenue, Suite 3200 Seattle, WA 98104 In association with: Coughlin Porter Lundeen, Inc. EnviroIssues, Inc. GHD, Inc. HDR Engineering, Inc. Jacobs Engineering Group, Inc. Magnusson Klemencic Associates, Inc. Mimi Sheridan, AICP Parametrix, Inc. Power Engineers, Inc. Shannon & Wilson, Inc. William P. Ott Construction Consultants SR 99: Alaskan Way Viaduct Replacement Project July 2011 Air Discipline Report Final EIS This Page Intentionally Left Blank TABLE OF CONTENTS Chapter 1 Summary ..............................................................................................................................................1 1.1 Alternatives Considered .............................................................................................................................1 1.2 Build Alternatives Overview .......................................................................................................................2 1.2.1 Bored Tunnel Overview ..................................................................................................................
    [Show full text]
  • Twodee's Shadowrun Storytime, Including but Not Limited to the Full Chapter 15 and Chapters 21 and 21.5
    1 TwoDee’s Shadowrun Storytime Written by TwoDee Edited and Compiled by Jarboot!!j4xjG8Gxyo4 Further Edited and Compiled by Impatient Asshole Anon What follows is arguably the best series of storytime threads ever created. If you're any sort of fan of Shadowrun—whether you're a new GM, newbie player, or even a veteran—this prose will really help flesh out what sort of fun you can have with the system and setting. It's nearly 400 pages and about 130,000 words, so download this to read on your phone/laptop/ebook/commlink, because this will take a while. I'm Jarboot, a fellow fa/tg/uy and Shadowrun fan. Someone suggested that someone make a compilation of this story for easier reading, so I figured I could do it. Editing is minimal, but I fixed a lot of spelling and general syntax error, most of which were mentioned by TwoDee in a post following the original. There are some little Jackpoint-esque comments from other people from the threads included in the document, which are differentiated by a green color and indented text. I may have included a picture or two in there, too. Also, 2D likes to do some foreshadowing at some points, so keep track of the greentexted dates if you feel confused. All these threads (except number 3, which you can search for using some of the other tags) can be found by searching for the “shadowrun storytime” tag on the /tg/ archive. Jarboot is an extremely helpful fa/tg/uy, but this particular Anon is an impatient asshole who wanted a fully updated version of TwoDee's Shadowrun Storytime, including but not limited to the full Chapter 15 and Chapters 21 and 21.5.
    [Show full text]
  • Historic Property Survey Report: Seattle's Neighborhood Commercial
    HISTORIC PROPERTY SURVEY REPORT: SEATTLE’S NEIGHBORHOOD COMMERCIAL DISTRICTS Prepared by: Mimi Sheridan Cultural Resource Specialist Prepared for: City of Seattle Department of Neighborhoods Historic Preservation Program 700 Third Avenue, Seattle WA 98104 November 2002 PROJECT SUMMARY In 2000 the City of Seattle began a multi-year effort to update its inventory of historic resources throughout the city. Existing information, primarily from the 1970s, was out of date and inadequate to meet the challenges of growth management and the threats to the city’s traditional character posed by increasing demand for housing and commercial space. Two building categories and one neighborhood were selected for the initial round of surveys: neighborhood commercial districts, buildings constructed before 1905, and the University District. This report focuses on the methodology and findings of the survey and inventory of Seattle’s neighborhood commercial districts. The project began in the spring of 2001, with development of a work plan, which identified the survey criteria and boundaries. A context statement was then prepared, giving an overview of commercial development patterns throughout the city. Following this, a reconnaissance survey was done, looking at every building in the identified commercial districts. This survey recorded more than 1000 buildings that met the basic criteria of age (built prior to 1962) and architectural integrity. Two hundred of these structures were identified for further research and inclusion in the final inventory. Development patterns and physical characteristics of each neighborhood and of these 200 buildings are summarized here. In addition to this report, the Neighborhood Commercial District inventory includes 200 Historic Property Inventory forms in an electronic database format that will be available to the general public as well as to other city departments.
    [Show full text]
  • Arts in Seattle
    ARTS IN SEATTLE ARCHITECTURE AND DESIGN ................................................................................................................................2 EXPERIENCE MUSIC PROJECT..........................................................................................................................................2 SEATTLE PUBLIC LIBRARY , CENTRAL..............................................................................................................................4 SMITH TOWER ......................................................................................................................................................................5 CHAPEL OF ST. IGNATIUS ..................................................................................................................................................7 OLYMPIC SCULPTURE PARK ..............................................................................................................................................9 SEATTLE ART MUSEUM....................................................................................................................................................11 GAS WORKS PARK ............................................................................................................................................................12 SPACE NEEDLE..................................................................................................................................................................13 SEATTLE ARCHITECTURE FOUNDATION,
    [Show full text]
  • ALASKAN WAY VIADUCT REPLACEMENT PROJECT Final Environmental Impact Statement APPENDIX Q Hazardous Materials Discipline Report
    ALASKAN WAY VIADUCT REPLACEMENT PROJECT Final Environmental Impact Statement APPENDIX Q Hazardous Materials Discipline Report Submitted by: PARSONS BRINCKERHOFF Prepared by: SHANNON & WILSON, INC J U L Y 2 0 1 1 Alaskan Way Viaduct Replacement Project Final EIS Hazardous Materials Discipline Report The Alaskan Way Viaduct Replacement Project is a joint effort between the Federal Highway Administration (FHWA), the Washington State Department of Transportation (WSDOT), and the City of Seattle. To conduct this project, WSDOT contracted with: Parsons Brinckerhoff 999 Third Avenue, Suite 3200 Seattle, WA 98104 In association with: Coughlin Porter Lundeen, Inc. EnviroIssues, Inc. GHD, Inc. HDR Engineering, Inc. Jacobs Engineering Group, Inc. Magnusson Klemencic Associates, Inc. Mimi Sheridan, AICP Parametrix, Inc. Power Engineers, Inc. Shannon & Wilson, Inc. William P. Ott Construction Consultants SR 99: Alaskan Way Viaduct Replacement Project July 2011 Hazardous Materials Discipline Report Final EIS This Page Intentionally Left Blank TABLE OF CONTENTS Chapter 1 Introduction and Summary ........................................................................................... 1 1.1 Introduction .......................................................................................................................... 1 1.2 Build Alternatives Overview ................................................................................................. 2 1.2.1 Bored Tunnel Alternative ..........................................................................................
    [Show full text]
  • National Register of Historic Places Inventory -- Nomination Form
    Forrfi No. 10-300 (Rev, 10-74) UNITED STATES DEPARTMENT OF THE INTERIOR . NATIONAL PARK SERVICE NATIONAL REGISTER OF HISTORIC PLACES INVENTORY -- NOMINATION FORM SEE INSTRUCTIONS IN HOW TO COMPLETE NATIONAL REGISTER FORMS ___________TYPE ALL ENTRIES - COMPLETE APPLICABLE SECTIONS______ | NAME HISTORIC AND/OR COMMON Pioneer Square Historic District LOCATION STREET& NUMBER , S f . A V • "—NOT FOR PUBLICATION CITY, TOWN/ (} fl ' 1 S £ Seattle _ VICINITY OF 7 j.u - Congressman Brock Adams _ r ——•. —— STATE CODE ^ COUNTY CODE Washinoton 53 Kind 033 * CLASSIFI C ATI ON CATEGORY OWNERSHIP STATUS PRESENT USE X-DISTRICT _PUBLIC JLOCCUPIED —AGRICULTURE —MUSEUM _BUILDING(S) _PRIVATE ^-UNOCCUPIED —X.COMMERCIAL -XPARK —STRUCTURE .KBOTH X^WORK IN PROGRESS —EDUCATIONAL —PRIVATE RESIDENCE PUBLIC ACQUISITION ACCESSIBLE ^ENTERTAINMENT —RELIGIOUS —OBJECT _IN PROCESS —YES: RESTRICTED ^GOVERNMENT —SCIENTIFIC .X.BEING CONSIDERED X_YES: UNRESTRICTED JLlNDUSTRIAL -^TRANSPORTATION —NO —MILITARY -XOTHER: OWNER OF PROPERTY Mixed, public and private (see inventory) STREET & NUMBER CITY, TOWN STATE VICINITY OF LOCATION OF LEGAL DESCRIPTION COURTHOUSE. REGISTRY OF DEEDS,ETC King County Courthouse and Seattle Municipal Building STREET & NUMBER CITY, TOWN STATE Seattle Washington 98104 REPRESENTATION IN EXISTING SURVEYS TITLE Historic District Preservation Ordinance (Seattle City Ordinance No. 98852, DATE as amended) 1970 —FEDERAL —STATE —COUNTY X_LOCAL DEPOSITORY FOR SURVEY RECORDS Qfflee of Urban Conservation, Seattle Department of Community Development CITY, TOWN Seattle WashingtonSTATE DESCRIPTION CONDITION CHECK ONE CHECK ONE —EXCELLENT —DETERIORATED —UNALTERED -XORIGINALSITE .X.GOOD —RUINS JCALTERED —MOVED DATE. —FAIR _UNEXPOSED DESCRIBE THE PRESENT AND ORIGINAL (IF KNOWN) PHYSICAL APPEARANCE GENERAL STATEMENT Pioneer Square Historic District, as expanded by city ordinance in 1974 and further modi­ fied by this nomination, encompasses an area of approximately 88 acres.
    [Show full text]
  • Alaskan Way Viaduct Replacement Final
    C-012-001 As an on-going task for the overall planning and design effort, the project team will continue to communicate and coordinate with the Mariners and Seahawks organizations as well as the affected Pioneer Square and SODO businesses to ensure that reasonable measures are in place to accommodate trip activities during large sporting events. The proposed Stadium Area ramp connections to/from the north would essentially relocate the existing First Avenue S ramp connections to the frontage road at S. Royal Brougham Way. Therefore, traffic volumes on S. Atlantic Street or S. Royal Brougham Way east of First Avenue S. would not be expected to substantially change, even for larger sporting events at Qwest Field or Safeco Field. However, it is recognized that the revised SR 99 connections to/from the north and new SR 99 connections to/from the south will result in changes in travel patterns, redirecting some traffic from First Avenue S. to the frontage road and sections of S. Atlantic Street and S. Royal Brougham Way west of First Avenue S. It is also recognized that additional traffic will be concentrated along Alaskan Way and parallel arterials such as First Avenue as a result of the Bored Tunnel Alternative. Please consult the Transportation Discipline Report (Appendix C) of the Final EIS for more information regarding traffic conditions related to the Bored Tunnel Alternative. SR 99: Alaskan Way Viaduct Replacement Project Final EIS - Appendix T 2010 Comments and Responses July 2011 C-012-002 The analyses regarding how tolls might be implemented as part of the proposed action were preliminary for the 2010 Supplemental Draft EIS but have been updated for the Final EIS.