Yatala Distribution Centre Darlington Drive, Yatala, QLD

Total Page:16

File Type:pdf, Size:1020Kb

Yatala Distribution Centre Darlington Drive, Yatala, QLD Yatala Distribution Centre Darlington Drive, Yatala, QLD Stage 2 & Stage 3 units leasing now Yatala Distribution Centre Introducing Yatala Distribution Centre Stockland is proud to offer pre-lease design and construct opportunities at our latest industrial Development Facts project, the Yatala Distribution Centre. • 9.6ha greenfield development site. Yatala Distribution Centre is situated right in the • 43,500m2 of floor space across heart of one of South East Queensland’s prime 3 development stages offering flexible logistics and distribution hubs. The Centre is half tenancy areas: way between Brisbane and the Gold Coast and comprises a prime 9.6ha greenfield development Stage 1 | D – LEASED site suitable for over 43,500m2 of flexible tenancy Stage 1 | C – LEASED accommodation. Stage 2 | A2 – LEASED The Yatala Enterprise Area has been selected by Stage 2 | A1.1 – 4,920m2 major international and domestic tenants* including: Stage 2 | A1.2 – 4,100m2 • Simtech Creations Stage 2 | A1.1 & A1.2 – 9,020m2 • Crimsafe Security Stage 3 | B – 4,700 to 15,400m2 • Direct M1 access – 40km to both Brisbane • ATCO Structures and Logistics and the Gold Coast. • Cope Sensitive Freight • High Impact Industry Zoned with potential • Caterpillar to operate 24/7. • Buildings can be tailored to fit your • Carlton United Breweries requirements. • OJI Fibre Solutions • Seeking pre-commitments now. • Visy • Owens Illinois • Beaulieu Australia • Aldi Distribution Warehouse. All sizes, areas and distances on this page are approximate only. Please also note that all detail on this page is subject to relevant Stockland and Authority approvals. * As at April 2020. 02 | Yatala Distribution Centre Strategically connected location Yatala Distribution Centre boasts direct access to Brisbane Airport Brisbane CBD Port Of Brisbane H the M1 Pacifi c Motorway, enabling fast, free fl owing A 42km 41km 52km † M travel to both Brisbane and the Gold Coast, which M Beenleigh E are only 40km* away. The site also off ers access to L S the western districts via the Logan Motorway. T Located on Dixon Street, directly opposite MILNE ST the Carlton United Brewery and adjacent to Stockland’s fully sold M1 Yatala Enterprise Park, Yatala Distribution Centre is close to the M1 Pacifi c Motorway Yatala North Exit 38 and and Mount Warren Park approximately 1.5km to the Yatala South Exit 41. † Traffi c conditions may vary. Stapylton Distance from key locations* D R ADDRESS H IG EL Dixon Street, Yatala QLD E DE L R N S E L E IE B R M1 INTERCHANGES T Windaroo D R E S 1.5km E D U A Bahrs Scrub E BRISBANE AIRPORT B 42km Key PORT BRISBANE DARLINGTON DRIVE, D 52km YATALA R E R CBD O M N DARLI A NGTON Yatala Distribution Centre BRISBANE CBD PORT T DR 41km S AIRPORT GOLD COAST TRAIN STATION Bannockburn PACIFIC MWY 40km TRAIN LINE GOLD COAST AIRPORT FREEWAY Kilometres 60km ROADS Map is indicative only and distances are approximate. 0 0.5 1 * Distances are approximate only. LAKES AND RIVERS 03 | Yatala Distribution Centre In good company Exit 2km Exit 41 1km Brisbane CBD 40km North Brisbane Airport 50km North Gold Coast CBD 40km South Port of Brisbane 50km North 2 3 M1 PACIFIC MOTORWAY 1 DIXON STREET 4 Yatala Distribution Centre Key* 1. CATERPILLAR DARLINGTON DRIVE 2. ALDI 3. RICHIE BROS 4. CARLTON UNITED BREWERY *Correct as at June 2020. Map is indicative only. 04 | Yatala Distribution Centre Map is indicative only and correct as at 1st March 2020. Stage 2 & TRUCKS ACCESS TO DIXON STREET Stage 3 leasing 500M A1.1 &OFFICE A1.2 2 2 LEVELS options WAREHOUSE A1.1 4,920M CARPARK 143M OFFICE A1.2 2 2 Site plan – variation 1 1 LEVEL WAREHOUSE A1.2 4,100M 2 Indicative tenancies available: OFFICE 700M HARDSTAND 2 2 OZWIDE Warehouse A1.1 & A1.2 8,520m WAREHOUSE B1 4,023M 2 4,913M Office A1.1 & A1.2 (2 Levels) 500m 2 DIXON STREET HARDSTAND 2 2 Warehouse B1 4,913m WAREHOUSE B2 2 4,701M Office B1 (2 Levels) 300m OFFICE 300M 2 OFFICE 300M 2 Warehouse B2 4,701m2 WAREHOUSE B3 2 4,914M Office B2 300m2 2 HARDSTAND Warehouse B3 4,914m2 HARDSTAND CARPARK 2 CARPARK Office B3 (2 Levels) 300m OFFICE 300M OFFICE 2 2 600M TOTAL 24,448m OFFICE 2 2 CRIMSAFE 920M 4,800M Note: The location of dividing walls are indicative only. They may be relocated to suit specific tenant requirements, subject to Stockland and CARPARK 2 SIMTECH Authority approvals. Please also note all sizes and areas on this page are 7,806M2 approximate only. Legend Building Office DARLINGTON DRIVE PEARSON RD Tenancies Available Landscaping Plan is indicative only. 05 | Yatala Distribution Centre Site plan – variation 2 TRUCKS ACCESS TO DIXON STREET Indicative tenancies available: 500M A1.1 &OFFICE A1.2 2 Warehouse A1.1 & A1.2 8,520m2 2 LEVELS WAREHOUSE A1.1 2 4,920M Office A1.1 & A1.2 (2 Levels) 500m CARPARK 2 Warehouse B1 8,315m2 WAREHOUSE A1.2 Office B1 (2 Levels) 250m2 4,100M 2 Warehouse B2 7,200m 2 OFFICE 700M 2 HARDSTAND Office B2 250m 2 OZWIDE 4,023M TOTAL 25,035m2 2 40M HARDSTAND WAREHOUSE 1 DIXON STREET WAREHOUSE B Note: The location of dividing walls are indicative only. They may be 8,315M relocated to suit specific tenant requirements, subject to Stockland and Authority approvals. Please also note all sizes and areas on this page are 2 approximate only. OFFICE 1 250M WAREHOUSE 2 2 7,200M HARDSTAND 2 OFFICE 2 250M HARDSTAND CARPARK 2 CARPARK OFFICE 600M OFFICE 2 2 CRIMSAFE 920M 4,800M 2 SIMTECH 7,806M2 Legend Building DARLINGTON DRIVE Office PEARSON RD Tenancies Available Landscaping Plan is indicative only. 06 | Yatala Distribution Centre 07 | Yatala Distribution Centre Partnering with Stockland An Overview Asset Manager Stockland is one of the largest diversifi ed real Our Asset Management team, consisting of Asset, estate groups in Australia with $15.0 billion of Property and Facility Managers, works directly real estate assets.* with our customers on all property related matters for leased properties. A high level of We are Australia’s largest community creator covering whole of life housing solutions. customer service is a key focus for this team which helps build commercial relationships and also We own, manage and develop retail town centres, enables future opportunities to be identifi ed. workplace and logistics assets, residential and retirement living communities. Sustainability We have over a decade of sustainability leadership Workplace and Logistics credentials from leading global rating agencies. Owner The Workplace and Logistics portfolio comprises 35 properties encompassing close to 1.4 million square metres of building area with a gross book value of $4.1 billion.* Our properties are strategically positioned in key locations for logistics, Coopers Paddock, Warwick Farm, NSW infrastructure and employment. *As at 30 June 2020. Developer ^ Stockland’s share of expected incremental development spend, including land cost and subject to planning approval. As at 25 August 2020. Our Development business currently has a $5.5 billion development pipeline.^ This pipeline is focused on Melbourne, Sydney and Brisbane in core industrial and offi ce markets. Our Development business works closely with both existing and new customers off ering a range of opportunities including Land Sales, Pre-lease and Turnkey solutions. 2019 Global Real Estate Employer of Choice for CDP Climate A List Global Sector Leader – Sector Leader Gender Equality Global leader on climate action Diversifi ed, Retail/Offi ce Listed Dow Jones Sustainability Index Australia’s Workplace Gender and disclosure Global Real Estate Sustainability 2011, 2013, 2015, 2016, 2018 Equality Agency Benchmark (GRESB) 08 | Yatala Distribution Centre Recent Stockland Logistics Projects Willawong Distribution Centre, QLD Yennora Distribution Centre, NSW KeyWest Distribution Centre, VIC Oakleigh Industrial Estate, VIC Coopers Paddock, Warwick Farm, NSW Ingleburn Logistics Park, NSW 09 | Yatala Distribution Centre For enquiries contact: QLD DEVELOPMENT MANAGER Chris Orr M 0408 879 888 E [email protected] NATIONAL DEVELOPMENT MANAGER Robert MacKay M 0412 338 362 E [email protected] stockland.com.au/yatala Disclaimer: While every endeavour has been made to ensure the accuracy of the information contained in this document, Stockland Corporation Limited and its related entities (Stockland) give no warranty, guarantee or representation that the information provided is complete, accurate, up to date or suitable for your particular use or transaction. Stockland will not be liable for any loss, damage, cost or expense (whether direct or indirect) incurred by you as a result of your use of, or reliance on, or interpretation of the information provided in this document. You should seek legal or other professional advice in relation to the information contained in this document. July 2020. Yatala Distribution Centre.
Recommended publications
  • Building a Better M1 2 WORKING TOGETHER for QUEENSLAND BUILDING a BETTER M1
    2020 POLICY DOCUMENT Building a Better M1 2 WORKING TOGETHER FOR QUEENSLAND BUILDING A BETTER M1 WORKING TOGETHER FOR QUEENSLAND WORKING TOGETHER FOR QUEENSLAND BUILDING A BETTER M1 1 Message from the Premier Labor is building a better M1. Under my government, two major M1 upgrades at the Gateway Merge and between Mudgeeraba and Varsity Lakes have been delivered. Two more are underway now, between Eight Mile Plains and Daisy Hill, and Varsity Lakes and Tugun. We’re not stopping there. My government has a $5 billion plan to cut travel times and improve safety on Queensland’s busiest highway. That includes $2.7 billion in new projects to be delivered, which will support Queensland’s economic recovery with more than 1,390 jobs. Under our plan, we will commit $500 million for the next major M1 upgrade between Daisy Hill and Logan, locking in this jointly funded $1 billion project. Our M1 exit upgrade program will support growing communities, targeting exits at Yatala North, Yatala South, Pimpama and Ormeau. My government will build the Second M1 too, taking cars off the M1 with a $1.5 billion partnership locked in with the Federal Government to start work next year on Stage 1 between Coomera and Nerang as part of our economic recovery plan. The previous LNP Government, with Deb Frecklington as Campbell Newman’s Assistant Minister, ignored the M1 and scrapped plans for the second M1. Not one new dollar was committed to upgrade the M1 by the LNP as they cut $1.6 billion from Queensland’s roads budget and sacked 700 road builders.
    [Show full text]
  • South Coast Region Snapshot
    Queensland Transport and Roads Investment Program 2020–21 to 2023–24 Snapshot – South Coast Region Our region Our key challenges An area of about 6544km2. Environment – Designing and constructing in sustainable ways and achieving best Stretching from New South Wales border in practice environmental outcomes. the south to Springwood in the north, and as far west as the Cunningham Highway, west of Building Information Modelling (BIM) – Boonah. Progressive implementation across all contract levels. Responsible for 130km of National Land Transport Network and 918km of other state- Constructability – High traffic volumes controlled roads. 24/7, works planned to ensure traffic flows. Program – Integration with adjoining projects and tight timelines. Queensland Transport and Roads Investment Program (QTRIP) 2020–21 to 2023–24 budget 1,600 $4.5B 1,400 four year QTRIP 1,200 1,000 800 600 $'Millions 400 200 0 2020–21 2021–22 2022–23 2023–24 South Coast Projects < $50M FY 2020–21 ≥ $50M FY 2021–22 ≥ $50M FY 2022–23 ≥ $50M FY 2023–24 ≥ $50M Total four year QTRIP value of $4.5B excludes Queensland Rail and Gold Coast Waterway Authority 1/4/2021 Duplicate of Page 1 1/4/2021 Duplicate of Page 1 Tenders going to market per quarter $90 16 1 6 $90 16 $80 1 6 14 $80 $70 1214 $60$70 1012 $50$60 8 10 $40$50 6 8 $30$40 4 Contract number Contract value ($M) 6 $30 3 3 4 $20 4 3 3 4 $10$20 2 2 $0$10 0 Jan – Mar 2021 Apr – Jun 2021 Jul – Sept 2021 Oct – Dec 2021 $0 0 Planning DesignJan – MConstructionar 2021 Approximate≤$5MApr Construction– Jun 2quarter021 >$5M
    [Show full text]
  • 1 Approach and Highlights
    Capital Statement 2020-21 1 Approach and highlights Features • The Queensland Government’s ongoing commitment to delivering and facilitating productivity-enhancing and catalytic infrastructure will continue to support economic recovery, resilience and future prosperity, as well as more broadly drive sustainable economic growth, increased employment opportunities and higher living standards. • The substantial capital program outlined in this Budget supports the Palaszczuk Government’s infrastructure commitment to invest $56.031 billion over four years throughout Queensland. This investment is critical to enhance business productivity, connectivity and overall long-term competitiveness, while ensuring that essential services, such as health care and education, are accessible to all Queensland communities and regions. • In 2020-21, the government will invest $14.835 billion on capital across the state. The capital program is important in directly supporting construction-related jobs in the short to medium term, with the capital program in 2020-21 estimated to support around 46,000 jobs, including 28,700 jobs outside of Greater Brisbane. • In 2020-21, the government will deliver a $6.267 billion investment in transformative transport infrastructure. Highlights of the 2020-21 transport capital program include $1.514 billion to continue construction work on Cross River Rail and substantial ongoing investment to fund major upgrades to the M1 Pacific Motorway and the Bruce Highway. • Capital expenditure to support the delivery of health services is $1.625 billion in 2020-21. The government is providing $265 million to build seven satellite hospitals to enable our acute hospitals to continue safely managing patients via alternative models of care across South East Queensland.
    [Show full text]
  • Treeline Estate Mount Cotton, Queensland
    Treeline Estate NVE ZI ST O Mount Cotton, Queensland L L E E E E 10 E E A T S E N YEAR B A A C R K G U A 1/37 Agnes Street, Morningside QLD 4170 P 1800 800 775 F 07 3395 5111 E [email protected] W ozinvest.com.au Disclaimer OzInvest does not provide advice on investments. The investment decision of all interested parties should be based on advice from a qualified Financial Planner or similar professional and on their own research before making any investment decision. This document contains compiled information from various sources to assist you in conducting your due diligence. Please ensure you corroborate all information contained within this document. All sources for information contained within this Property Summary will be disclosed at your request. OzInvest will not accept responsibility for inaccurate information provided from external sources or third parties. Introduction OzInvest have access to brand new house and land packages in Treeline Estate at Mount Cotton. Treeline Estate is close to local shopping centres, education and transport facilities. Mount Cotton is located only 7kms from Redlands Bay which offers reqular ferries to the surrounding islands. Special Features Mount Cotton has easy access to all the following areas:- Brisbane CBD (28kms) 35 mins drive to the Brisbane CBD via the Pacific Highway. Pacific Highway Access Ramp (6.6kms) Provides commuters easy access to the Brisbane CBD. Shopping Centres Public Transport Mount Cotton Village Shopping Centre (1km) Bus service runs along Mount Cotton Road Local shopping
    [Show full text]
  • Mount Lindesay Beaudesert Roads Information Sheet
    Mt Lindesay/Beaudesert Strategic Transport Network Investigation Roads egic Transport Network Investiga esert Strat tion A y/Beaud utumn Lindesa 2009 t the Mt ed abou u inform Keeping yo Figure 1 - Post 2026 road links About the study P a c L n ifi oga Mwy c M The Mt Lindesay/Beaudesert Strategic wy Transport Network Investigation focuses on Browns Loganlea 3 Plains 1 the long-term transport needs in the region, Springfield Study of Lakes Greenbank north/south Central road link east of Mt including road, rail, bus and active Park Beenleigh Ridge Lindesay transport. South Highway 3 Logan Village The road corridors aim to meet future 2 transport demands, connect existing and Flagstone Yarrabilba Undullah Jimboomba future communities to each other and to Valley the external road network and provide for 3 efficient freight movements. The road corridors should enable efficient and Tamborine Development area sustainable travel patterns and cater for 3 Internal road improvements private vehicles, freight, bus and cycle Bromelton Beaudesert Existing road networks. 3 Existing rail line Canungra The study considers the demands for future Proposed regional road network Tunnel investigation road networks but has not identified the Kooralbyn Study of north/south road link specific corridor alignments. However, 1 east of Mt Lindesay Highway as part of the future regional road where appropriate, these investigations network may be undertaken in subsequent studies. Southern Infrastructure Corridor No routes have been determined - the 2 (road) Mt Lindesay
    [Show full text]
  • Queensland-Map.Pdf
    PAPUA NEW GUINEA Darwin . NT Thursday Island QLD Cape York WA SA . Brisbane Perth . NSW . Sydney Adelaide . VIC Canberra . ACT Melbourne TAS . Hobart Weipa PENINSULA Coen Queensland Lizard Is DEVELOPM SCALE 0 10 20 300km 730 ENT Kilometres AL Cooktown DEV 705 ROAD Mossman Port Douglas Mornington 76 Island 64 Mareeba Cairns ROAD Atherton A 1 88 Karumba HWY Innisfail BURKE DY 116 Normanton NE Burketown GULF Tully DEV RD KEN RD Croydon 1 194 450 Hinchinbrook Is WILLS 1 262 RD Ingham GREGOR 262 BRUCE Magnetic Is DEV Y Townsville DEV 347 352 Ayr Home Hill DE A 1 Camooweal BURKE A 6 130 Bowen Whitsunday 233 Y 188 A Charters HWY Group BARKL 180 RD HIGHW Towers RD Airlie Beach Y A 2 Proserpine Y Cloncurry FLINDERS Richmond 246 A 7 396 R 117 A 6 DEV Brampton Is Mount Isa Julia Creek 256 O HWY Hughenden DEV T LANDSB Mackay I 348 BOWEN R OROUGH HWY Sarina R A 2 215 DIAMANTINA KENNEDY E Dajarra ROAD DOWNS T 481 RD 294 Winton DEV PEAK N 354 174 GREG A 1 R HIGHW Clermont BRUCE E KENNEDY Boulia OR 336 A A 7 H Y Y Yeppoon DEV T Longreach Barcaldine Emerald Blackwater RockhamptonHeron Island R A 2 CAPRICORN A 4 HWY HWY 106 A 4 O RD 306 266 Gladstone N Springsure A 5 A 3 HWY 389 Lady Elliot Is LANDSBOR HWY DAWS Bedourie Blackall ON Biloela 310 Rolleston Moura BURNETT DIAMANTINA OUGH RD A 2 C 352 Bundaberg A 404 R N Theodore 385 DEV A Hervey Bay R 326 Eidsvold A 1 V LEICHHARDT Fraser Is D O Windorah E Taroom N 385 V BRUCE EYRE E Augathella Maryborough L Gayndah RD HWY A 3 O DEV A 7 A 5 HWY Birdsville BIRDSVILLE 241 P M HWY A 2 E N W T ARREGO AL Gympie Quilpie
    [Show full text]
  • Look Online at How We Are Building a Better M1 Between Brisbane And
    Getting you to We want you to get where you’re your destination Building a better M1 going more reliably, so you can spend between Brisbane and the Gold Coast more time doing the things you love Reduced congestion Reliable commutes The M1 takes hundreds of thousands of Queenslanders to work, Improved freight network Smarter traffic flow to school, shops and to our incredible beaches and hinterland. It’s also a vital freight link between Queensland and our southern October 2020 neighbours, carrying more than 70,000 trucks each week. 13 QGOV (13 74 68) Connected communities Improved safety www.tmr.qld.gov.au | www.qld.gov.au We’re improving the M1 with over $4.4 billion of upgrades New technology Smart motorway technologies will be delivered Brisbane Logan Gold Coast in stages between Eight Mile Plains in the north, through to Tugun in the south, either as separate smaller construction packages or as Upgrades to the Motorway widening between Motorway widening between Upgrades to exits Coomera New lanes added between Bridges and new lanes added part of major upgrades. M1/M3 Gateway Merge Eight Mile Plains and Daisy Hill Daisy Hill and Logan Motorway 38, 41, 45, 49, 54 and 57 Connector Mudgeeraba to Varsity Lakes between Varsity Lakes and Tugun 2018 – 2020 2020 – 2024 2018 – 2020 2020 – 2024 PROJECT STATUS We have upgraded the This stage will add new lanes, extend The third stage of the M1 North upgrade A 45km north-south To make sure this section We have moved straight to the next M1 / M3 Gateway Merge, the Busway from Eight Mile Plains to will add new lanes southbound corridor between is ready for the future, stage; widening bridges, adding Safety Completed reducing congestion and Springwood, add a new park-n-ride from Springwood to Loganholme Loganholme and Nerang.
    [Show full text]
  • The Hon. Scott Morrison MP the Hon. Michael Mccormack MP the Hon. Annastacia Palaszczuk MP the Hon. Alan Tudge MP JOINT MEDIA RE
    UNOFFICIAL The Hon. Scott Morrison MP Prime Minister The Hon. Michael McCormack MP Deputy Prime Minister Minister for Infrastructure, Transport and Regional Development The Hon. Annastacia Palaszczuk MP Premier of Queensland The Hon. Alan Tudge MP Minister for Population, Cities and Urban Infrastructure JOINT MEDIA RELEASE Wednesday 20 November 2019 $1.9 BILLION ROAD AND RAIL BOOST FOR QUEENSLAND ECONOMY A $1.9 billion road and rail package will boost the Queensland economy and drive more jobs, while getting people home sooner and safer. Prime Minister Scott Morrison and Premier Annastacia Palaszczuk hailed the historic deal which fast- tracks spending on a host of road and rail projects all over the State. The Morrison Government will bring forward nearly $650 million in funding and provide more than $680 million in new funding, with the Palaszczuk Government committing $606 million. Prime Minister Scott Morrison said delivering critical road projects sooner, as part of the Government’s $100 billion pipeline, was responsible and considered economic management. “We want these road and rail projects delivered as quickly as possible so Queenslanders can benefit from better infrastructure, but importantly we want to boost the economy now. “We will bring forward more than $440 million in federal funding on top of the nearly $3.8 billion we will spend across the state over the next 18 months,” the Prime Minister said. “By bringing forward these important road projects we will drive jobs, boost the economy and make Queensland roads and highways safer, while reducing travel times so people can be with their families instead of being stuck in traffic.
    [Show full text]
  • Australian Defence Force Road Transport Exemption Framework
    Australian Defence Force Road Transport Exemption Framework This compilation: Version 6, 9 November 2018 This Framework has evolved from a consultative approach led by the NTC and incorporating the ADF, State and Territory authorities and interested parties. This Framework has been drafted by the NTC and forms part of the NTC Maintenance Program and exists as an NTC paper on the NTC website. A Maintenance Group comprising Commonwealth, State and Territory agency representatives and the ADF exists to ensure the Framework remains current. Based on recommendations and advice from the Maintenance Group, the NTC develops submissions for this purpose and submits them to the Transport and Infrastructure Council. The maintenance sub-project manager for the ADF is the Deputy Director National Logistics - Land. The sub-project manager is responsible for periodically reviewing this Framework on behalf of the ADF. The sub-project manager is responsible for coordinating ADF representation to the NTC, in conjunction with the sponsor for Defence Road Transport Manual (DRTM) and the interested parties. Detailed maintenance processes are contained in the annexure. Prepared in consultation with: Australian Government Department of Infrastructure and Regional Development, Australian Defence Force and the States and Territories of Australia 1 AMENDMENTS Version 1 of the Framework was endorsed by the Australian Transport Council on 18 November 2005 and came into operation on 1 March 2006.1 Version 2 of this Framework, as republished, with amendments (Version 2), was approved on 24 April 2013 by the Transport and Infrastructure Senior Officials Committee under the expedited approval process of the Inter- Governmental Agreement. Under that Agreement that approval is to be treated as if it had been given by the Standing Council on Transport and Infrastructure (the successor to the Australian Transport Council).
    [Show full text]
  • SUNSHINE COAST © Lonelyplanetpublications and Quaint Villages of the Blackall Range
    © Lonely Planet Publications 334 Sunshine Coast The laid-back beach-chic culture of the Sunshine Coast turns lazy summer holidays into treasured memories of melting ice creams, sand between your toes, and fish and chips on the beach. The natural, unaffected charm of this strip of coastline is one of its greatest attractions. From Bribie Island, the Sunshine Coast stretches north for one hundred golden kilome- tres to the Cooloola Coast just beyond the exclusive, leafy resort town of Noosa. Along the coastline, the southern sleepy town of Caloundra gives way to the laconic suburban swell of Mooloolaba with its popular beach, outdoor eateries and cafés. During school holidays the population here mushrooms as Australian families converge en masse. A little further north are the long, uncrowded and unspoilt beaches of Coolum and Peregian. Forming a stunning backdrop to this spectacular coastline are the ethereal Glass House Mountains, and the forested folds and ridges, gorges and waterfalls, lush green pastures and quaint villages of the Blackall Range. HIGHLIGHTS Hiking along the coastal track around the headland of Noosa National Park ( p344 ) Great Sandy Sampling gourmet beach fare in one of National Park Noosa’s ( p350 ) swish restaurants Finding funky treasures at the Eumundi Noosa & Noosa National Park markets ( p353 ) Eumundi Walking through cool subtropical rainforests SUNSHINE COAST at Kondalilla Falls ( p356 ) Kondalilla Falls Mooloolaba Lapping up the sun and sipping lattés in Mooloolaba ( p340 ) Australia Zoo Visiting the
    [Show full text]
  • INTRODUCING BELLS REACH 1 GALLERY HOMES About Us
    GALLERY HOMES THE ART OF LIVING INTRODUCING BELLS REACH 1 GALLERY HOMES About Us Gallery Homes Head Office, QLD ABOUT GALLERY Gallery Homes creates unique living spaces designed specifically to suit the lifestyles’ of our clients with a custom design suited to each individual home site. Our long standing relationships with Australia’s biggest land developers ensures that when you invest with Gallery Homes it will be in a location second to none. With a presence in both South East Queensland and Greater Melbourne we can assure our clients are spoilt for choice. Let us turn your dream into a unique, Gallery Homes Masterpiece. Sanctuary Cove, Marine Village 2 GALLERY HOMES Queensland Location Sunshine Coast Bells Reach is located in Caloundra West with easy BELLS REACH access to the surrounding region and the Bruce Highway. 20km It has all the elements needed for a healthy and active 92km lifestyle close to the very best NORTH OF BRISBANE CBD the Sunshine Coast has to offer. 40km 5km 60km TO CALOUNDRA CBD 9km TO BRUCE HIGHWAY (M1) 90km Brisbane GALLERY HOMES Sunshine Coast AUSTRALIA ZOO SUNSHINE COAST It’s as wild as life gets at Australia Zoo, Home of the Crocodile Hunter, with more wildlife and entertainment than you can poke a stick at! With over 1200 animals and stacks of free shows daily, it’s chock-a-block full of wildlife action and adventure. Get hands-on with cuddly koalas, waddling wombats, slithering snakes and cute kangaroos. Come face to face with majestic tigers, or get your photo taken with a baby alligator.
    [Show full text]
  • March 2009 Volume 1 of 2
    Final Report July 2008 – March 2009 Volume 1 of 2 Department of Main Roads Letter of compliance 7 September 2009 The Honourable Craig Wallace MP Minister for Main Roads Level 13 Mineral House 41 George Street BRISBANE Qld 4000 Dear Minister I have pleasure in presenting you with the final report for the Department of Main Roads for the period 1 July 2008 to 26 March 2009 (Annual Report). I certify that this annual report complies with: • the prescribed requirements of the Financial Administration and Audit Act 1977 and the Financial Management Standard 1997, and • the detailed requirements set out in the Annual Reporting Guidelines for Queensland Government Agencies. A checklist outlining the annual reporting requirements can be accessed at www.mainroads.qld.gov.au Yours sincerely Alan Tesch Director-General Department of Main Roads i Main Roads—Connecting Queensland Final Report July 2008–March 2009 Volume 1 of 2 Letter of compliance Highlights, financial summary, opportunities and challenges HIGHLIGHTS • Delivering our record roads program for the fourth consecutive year, including completing some 200 major road projects (see page 34). • Delivery of a significant program of safety improvements that at March 2009, included 37 projects under the Safer Roads Sooner (SRS) Program valued at $31.4m ( see pages 6, 30, 52). • Implementation of projects and programs to manage the impacts of urban growth, including: • smart transport solutions—Maroochy Road Interchange, alignment of the Boggo Road Busway to the Eastern Busway, and the first stage of the Northern Busway (see pages 8, 10, 33, 34) • improving network capacity and connectivity—Gateway Upgrade Project, Ipswich Motorway Upgrade and Ipswich/Logan Interchange, and the Houghton Highway Duplication (see pages 8, 10, 34, 39) • keeping traffic moving and reducing accident response times—new Traffic Response Units (TRUs) and heavy vehicle tow trucks (see page 60).
    [Show full text]