Australian Defence Force Road Transport Exemption Framework

Total Page:16

File Type:pdf, Size:1020Kb

Australian Defence Force Road Transport Exemption Framework Australian Defence Force Road Transport Exemption Framework This compilation: Version 6, 9 November 2018 This Framework has evolved from a consultative approach led by the NTC and incorporating the ADF, State and Territory authorities and interested parties. This Framework has been drafted by the NTC and forms part of the NTC Maintenance Program and exists as an NTC paper on the NTC website. A Maintenance Group comprising Commonwealth, State and Territory agency representatives and the ADF exists to ensure the Framework remains current. Based on recommendations and advice from the Maintenance Group, the NTC develops submissions for this purpose and submits them to the Transport and Infrastructure Council. The maintenance sub-project manager for the ADF is the Deputy Director National Logistics - Land. The sub-project manager is responsible for periodically reviewing this Framework on behalf of the ADF. The sub-project manager is responsible for coordinating ADF representation to the NTC, in conjunction with the sponsor for Defence Road Transport Manual (DRTM) and the interested parties. Detailed maintenance processes are contained in the annexure. Prepared in consultation with: Australian Government Department of Infrastructure and Regional Development, Australian Defence Force and the States and Territories of Australia 1 AMENDMENTS Version 1 of the Framework was endorsed by the Australian Transport Council on 18 November 2005 and came into operation on 1 March 2006.1 Version 2 of this Framework, as republished, with amendments (Version 2), was approved on 24 April 2013 by the Transport and Infrastructure Senior Officials Committee under the expedited approval process of the Inter- Governmental Agreement. Under that Agreement that approval is to be treated as if it had been given by the Standing Council on Transport and Infrastructure (the successor to the Australian Transport Council). Version 3 of this Framework was approved on 7 November 2014 by the Transport and Infrastructure Council. Version 4 of this Framework was approved by the Transport and Infrastructure Council on 3 June 2016. Version 5 of the Framework was approved by the Transport and Infrastructure Council on 19 May 2017. Version 6 of the Framework was approved by the Transport and Infrastructure Council on 9 November 2018. 1 This is the date the Defence (Road Transport Legislation Exemption) Act 2006 received the Royal Assent. 2 Contents Chapter 1 Introductory Matters ................................................................................................. 6 1. Title ......................................................................................................................................... 6 2. Commencement...................................................................................................................... 6 3. Authorising Law ...................................................................................................................... 6 4. Purpose ................................................................................................................................... 6 5. Application .............................................................................................................................. 6 6. Definitions ............................................................................................................................... 7 7. Driver or operator must carry copy of this Framework .......................................................... 9 8. National Heavy Vehicle Regulator .......................................................................................... 9 Chapter 2 Exemptions concerning the use of vehicles – general ................................................ 10 Part 1 Licensing and registration ................................................................................................. 10 9. General licensing ................................................................................................................... 10 10. Registration ........................................................................................................................... 10 11. Production of driver licence .................................................................................................. 10 12. Dangerous goods licences ..................................................................................................... 10 Part 2 Use of vehicle .................................................................................................................... 10 13. Requirement to remain inside a vehicle ............................................................................... 10 Part 3 Driving Hours and Fatigue Management .......................................................................... 10 14. Driving hours, fatigue management and work diary ............................................................ 11 Part 4 Emergency Vehicles .......................................................................................................... 12 15. Defence Force Emergency Vehicles ...................................................................................... 12 Part 5 Pilot and Escort Vehicles ................................................................................................... 12 16. Exemption from licensing requirements – pilot and escort operators ................................. 12 17. Exemption from restrictions on pilot and escort vehicles towing a trailer .......................... 12 18. Exemption from restrictions on carrying personal equipment in pilot and escort vehicles 12 19. Pilot vehicle requirements .................................................................................................... 13 Chapter 3 Exemptions from mass and dimension and other requirements ................................ 14 Part 1 General exemptions .......................................................................................................... 14 20. Exemptions for certain defence vehicles .............................................................................. 14 3 Part 2 Restrictions on mass limit exemptions ............................................................................. 16 Division 1 – Special Purpose Military Vehicles .................................................................................. 16 21. Application ............................................................................................................................ 16 22. Mass limit for a single defence vehicle ................................................................................. 16 23. Mass limits for tyres, wheels and axles ................................................................................ 16 24. Total mass limits for Special Purpose Military Vehicles ........................................................ 16 Division 2 – Other restrictions concerning loads .............................................................................. 17 25. Mass limits for combinations ................................................................................................ 17 Division 3 – Miscellaneous ................................................................................................................ 17 26. Carriage of forklifts ............................................................................................................... 17 Division 4 – Other restrictions .......................................................................................................... 17 27. Peak hour, Clearway and Transit lane travel ........................................................................ 17 Chapter 4 General Operating Conditions .................................................................................. 18 Part 1 Defence convoy ................................................................................................................. 18 28. Signs and placards ................................................................................................................. 18 Part 2 Armoured vehicle .............................................................................................................. 18 29. Signs and placards ................................................................................................................. 18 Part 3 Mack and RMMV vehicles ................................................................................................. 18 30. Oversize warning placards .................................................................................................... 18 Part 4 Rigid ‘A Frame’ towing ...................................................................................................... 19 31. Flat towing with a rigid ‘A Frame’ ......................................................................................... 19 Part 5 Indivisible Loads ................................................................................................................ 19 32. Indivisible load – axle mass ................................................................................................... 19 33. Indivisible load – multiple load ............................................................................................. 20 Chapter 5 Approved Routes – Category 1 SPMVs ........................................................................ 21 Part 1 General National Route Access ........................................................................................
Recommended publications
  • Queensland Transport and Roads Investment Program for 2021–22 to 2024-25: Far North
    Far North 272,216 km2 Area covered by location1 5.68% Population of Queensland1 2,939 km Other state-controlled road network 217 km National Land Transport Network2 211 km National rail network See references section (notes for map pages) for further details on footnotes. Cairns Office 15 Lake Street | Cairns | Qld 4870 PO Box 6185 | Cairns | Qld 4870 (07) 4045 7144 | [email protected] • continue construction of road safety improvements on • commence installation of new Intelligent Transport Program Highlights Gillies Range Road Systems on the Kuranda Range section of Kennedy Highway, jointly funded by the Australian Government • commence construction of the Bruce Highway – Cairns and Queensland Government as part of the COVID-19 In 2020–21 we completed: Southern Access Cycleway, jointly funded by the economic recovery response Australian Government and Queensland Government • completed paving and sealing paving of a section of • commence early works on the Cairns Ring Road (CBD Peninsula Development Road at Fairview (Part B) • continue design of a flood immunity upgrade on the to Smithfield) project, jointly funded by the Australian Bruce Highway at Dallachy Road, jointly funded by the Government and Queensland Government • an upgrade of the Clump Point boating infrastructure at Australian Government and Queensland Government Mission Beach • commence upgrade of the culvert at Parker Creek • continue construction of a new overtaking lane on Crossing on Captain Cook Highway, Mossman, as part • construction of the Harley Street
    [Show full text]
  • NORTH WEST Freight Transport Strategy
    NORTH WEST Freight Transport Strategy Department of Infrastructure NORTH WEST FREIGHT TRANSPORT STRATEGY Final Report May 2002 This report has been prepared by the Department of Infrastructure, VicRoads, Mildura Rural City Council, Swan Hill Rural City Council and the North West Municipalities Association to guide planning and development of the freight transport network in the north-west of Victoria. The State Government acknowledges the participation and support of the Councils of the north-west in preparing the strategy and the many stakeholders and individuals who contributed comments and ideas. Department of Infrastructure Strategic Planning Division Level 23, 80 Collins St Melbourne VIC 3000 www.doi.vic.gov.au Final Report North West Freight Transport Strategy Table of Contents Executive Summary ......................................................................................................................... i 1. Strategy Outline. ...........................................................................................................................1 1.1 Background .............................................................................................................................1 1.2 Strategy Outcomes.................................................................................................................1 1.3 Planning Horizon.....................................................................................................................1 1.4 Other Investigations ................................................................................................................1
    [Show full text]
  • Victoria Rural Addressing State Highways Adopted Segmentation & Addressing Directions
    23 0 00 00 00 00 00 00 00 00 00 MILDURA Direction of Rural Numbering 0 Victoria 00 00 Highway 00 00 00 Sturt 00 00 00 110 00 Hwy_name From To Distance Bass Highway South Gippsland Hwy @ Lang Lang South Gippsland Hwy @ Leongatha 93 Rural Addressing Bellarine Highway Latrobe Tce (Princes Hwy) @ Geelong Queenscliffe 29 Bonang Road Princes Hwy @ Orbost McKillops Rd @ Bonang 90 Bonang Road McKillops Rd @ Bonang New South Wales State Border 21 Borung Highway Calder Hwy @ Charlton Sunraysia Hwy @ Donald 42 99 State Highways Borung Highway Sunraysia Hwy @ Litchfield Borung Hwy @ Warracknabeal 42 ROBINVALE Calder Borung Highway Henty Hwy @ Warracknabeal Western Highway @ Dimboola 41 Calder Alternative Highway Calder Hwy @ Ravenswood Calder Hwy @ Marong 21 48 BOUNDARY BEND Adopted Segmentation & Addressing Directions Calder Highway Kyneton-Trentham Rd @ Kyneton McIvor Hwy @ Bendigo 65 0 Calder Highway McIvor Hwy @ Bendigo Boort-Wedderburn Rd @ Wedderburn 73 000000 000000 000000 Calder Highway Boort-Wedderburn Rd @ Wedderburn Boort-Wycheproof Rd @ Wycheproof 62 Murray MILDURA Calder Highway Boort-Wycheproof Rd @ Wycheproof Sea Lake-Swan Hill Rd @ Sea Lake 77 Calder Highway Sea Lake-Swan Hill Rd @ Sea Lake Mallee Hwy @ Ouyen 88 Calder Highway Mallee Hwy @ Ouyen Deakin Ave-Fifteenth St (Sturt Hwy) @ Mildura 99 Calder Highway Deakin Ave-Fifteenth St (Sturt Hwy) @ Mildura Murray River @ Yelta 23 Glenelg Highway Midland Hwy @ Ballarat Yalla-Y-Poora Rd @ Streatham 76 OUYEN Highway 0 0 97 000000 PIANGIL Glenelg Highway Yalla-Y-Poora Rd @ Streatham Lonsdale
    [Show full text]
  • Periodicals and Recurring Documents
    PERIODICALS AND RECURRING DOCUMENTS May 2012 Legend A ANNUAL S-M SEMI-MONTHLY D DAILY BI-M BI-MONTHLY W WEEKLY Q QUARTERLY BI-W BI-WEEKLY TRI-A TRI-ANNUAL M MONTHLY IRR IRREGULAR S-A SEMI-ANNUAL A ACADEME. (BI-M) 1985-1989 ACADEMY OF POLITICAL SCIENCE. PROCEEDINGS. (IRR) 1960-1991 (MFILM 1975-1980) (MFICHE 1981-1982) ACQUISITION REVIEW QUARTERLY. (Q) 1994-2003 CONTINUED BY DEFENSE ACQUISITION REVIEW JOURNAL. AD ASTRA-TO THE STARS. (M) 1989-1992 ADA. (Q) 1991-1997 FORMERLY AIR DEFENSE ARTILLERY. ADF: AFRICA DEFENSE FORUM. (Q) 2008- ADVANCE. (A) 1986-1994 ADVANCED MANAGEMENT JOURNAL. SEE S.A.M. ADVANCED MANAGEMENT JOURNAL. ADVISOR. (Q) 1974-1978 FORMERLY JOURNAL OF NAVY CIVILIAN MANPOWER MANAGEMENT. ADVOCATE. (BI-M) 1982-1984 - 1 - AEI DEFENSE REVIEW. (BI-M) 1977-1978 CONTINUED BY AEI FOREIGN POLICY AND DEFENSE REVIEW. AEI FOREIGN POLICY AND DEFENSE REVIEW. (BI-M) 1979-1986 FORMERLY AEI DEFENSE REVIEW. AEROSPACE. (Q) 1963-1987 AEROSPACE AMERICA. (M) 1984-1998 FORMERLY ASTRONAUTICS & AERONAUTICS. AEROSPACE AND DEFENSE SCIENCE. (Q) 1990-1991 FORMERLY DEFENSE SCIENCE. AEROSPACE HISTORIAN. (Q) 1965-1988 FORMERLY AIRPOWER HISTORIAN. CONTINUED BY AIR POWER HISTORY. AEROSPACE INTERNATIONAL. (BI-M) 1967-1981 FORMERLY AIR FORCE SPACE DIGEST INTERNATIONAL. AEROSPACE MEDICINE. (M) 1973-1974 CONTINUED BY AVIATION SPACE AND EVIRONMENTAL MEDICINE. AEROSPACE POWER JOURNAL. (Q) 1999-2002 FORMERLY AIRPOWER JOURNAL. CONTINUED BY AIR & SPACE POWER JOURNAL. AEROSPACE SAFETY. (M) 1976-1980 AFRICA REPORT. (BI-M) 1967-1995 (MFICHE 1979-1994) AFRICA TODAY. (Q) 1963-1990; (MFICHE 1979-1990) 1999-2007 AFRICAN SECURITY. (Q) 2010- AGENDA. (M) 1978-1982 AGORA.
    [Show full text]
  • Indigenous Australians Brochure
    SEE YOURSELF IN A REWARDING ROLE CHOOSE A JOB IN A DIVERSE AND SUPPORTIVE WORKPLACE A CONTRIBUTE TO YOUR COUNTRY’S DEFENCE THE AUSTRALIAN DEFENCE FORCE (ADF) IS AN EMPLOYER OF CHOICE FOR HUNDREDS OF INDIGENOUS AUSTRALIANS. Help maintain a proud tradition of service by joining the thousands of Indigenous men and women who for over 100 years, have contributed to the protection of our country and its interests as members of the ADF. In the Navy, Army or Air Force, you’ll work alongside Indigenous Australians from across the ranks, enjoying opportunities rarely found in civilian employment. As you serve your country and community, your abilities will be nurtured and given focus. You’ll receive world-class training and be given the opportunity to earn qualifications that will give you the skills, knowledge and experience to reach your full potential in a fulfilling role. 01 FEATURED 04 GET A GREAT JOB AND MORE 08 RECEIVE WORLD-CLASS TRAINING INSIDE AND EDUCATION 09 CHOOSE YOUR IDEAL ROLE 10 ENTER THE WAY YOU WANT TO 14 ACHIEVE YOUR POTENTIAL 16 INDIGENOUS PRE-RECRUIT PROGRAM 18 NAVY INDIGENOUS DEVELOPMENT PROGRAM 20 ARMY INDIGENOUS DEVELOPMENT PROGRAM 22 AIR FORCE INDIGENOUS DEVELOPMENT OPPORTUNITIES 26 ACCESS FLEXIBLE ENTRY PATHWAYS 28 HOW TO JOIN 32 CONTACT US 02 03 GET A GREAT JOB AND MORE REWARDING, WELL-PAID WORK IS JUST THE START. AS A FULL-TIME MEMBER OF THE ADF YOU’LL ENJOY: A friendly and supportive team environment that embraces cultural, social and workforce diversity A competitive salary and superannuation Equal pay regardless
    [Show full text]
  • Western Australia Manual of Air Traffic Services Supplementary Procedures
    Western Australia Manual of Air Traffic Services Supplementary Procedures Procedure ATS-PROC-0002 Version 39 Effective 21 May 2021 Authorised: High Density Services (Southern FIR) ,Terminal Services (Southern FIR) ,Primary Aerodrome Svcs - Twr (Sth FIR) ATC STAND1 – Headquarters 44 Wing ATTENTION Temporary amendments may apply Ensure document is current before use © Airservices Australia 2012 1 of 42 Western Australia Manual of Air Traffic Services Supplementary Procedures Change summary Western Australia Manual of Air Traffic Services Supplementary Procedures Version 39: Effective 21 May 2021 Location of change Change description CRC All New Template 8344 Cover Page Amended Authorisers Various Formatting Corrections 2.5.1.1 Note Changed to Body text 3.3.1.2 Level for aircraft transiting into class E removed IAW Class E PIR. Paragraph reformatted. 3.3.2 Jet/Non- Jet descriptors added Additional tracking point added for jet aircraft tracking via AVNEX Additional tracking point added for jet aircraft tracking via OTLED Additional route clearance added for aircraft planned via CANRI for destination YNOV 3.4.3 Inclusion of requirement for agency responsible for initiating non-standard tracking to notify PHF 5 RAAF contact numbers updated. This document was created using Air Traffic Services (ATS) Operational Document Template (C-TEMP0256) Version 5. View change summaries for the previous six months Table of contents 1 Definitions ................................................................................................................................
    [Show full text]
  • Darling Downs 79,530 Km2 Area Covered by Location1
    Darling Downs 79,530 km2 Area covered by location1 5.72% Population of Queensland1 3,846 km Other state-controlled road network 687 km National Land Transport Network2 See references section (notes for map pages) for further details on footnotes. Toowoomba Office 1-5 Phillip Street | Toowoomba | Qld 4350 Locked Bag 1 | Warwick | Qld 4370 (07) 4639 0777 | [email protected] Warwick Office 306 Wood Street | Warwick | Qld 4370 Locked Bag 1 | Warwick | Qld 4370 (07) 4661 6333| [email protected] • continue pavement rehabilitation on the Gore Highway • continue planning for bikeways in Central Toowoomba Darling Downs between Toowoomba and Millmerran, jointly funded and the Warwick principal cycle network by the Australian Government and Queensland Government • commence planning to improve Toowoomba In 2020–21 we completed: Connection Road and Hursley Road intersection • continue bridge replacement on the Rocky Creek • upgrading of the Emu Creek bridge on the New England Bridge on Murphy’s Creek Road, as part of the • continue planning to identify a Toowoomba North Highway, jointly funded by the Australian Government Queensland Government’s COVID-19 economic South Transport Corridor. and Queensland Government recovery response Link for TMR Project Page: • construction of Stage 1 of the New England Highway • continue pavement strengthening and widening on https://www.tmr.qld.gov.au/Projects Cycleway between Highfields and Toowoomba CBD the New England Highway between Yarraman and Toowoomba, as part of the Queensland Government’s
    [Show full text]
  • RACQ Unroadworthy Roads Technical Appendix
    RACQ Unroadworthy Roads Technical Appendix Author Public Policy Date March 2016 Title: RACQ Unroadworthy Roads Technical Appendix Issued Date: March 2016 Page: 1 of 104 List of roads with number of responses to identified problems cont’d IDENTIFIED PROBLEMS Tight Vegetation Poor or Slippery / curves / Narrow Narrow Poor Hazardous Poor or or objects Lack of inadequate Rough Loose blind road / bridge / road Poor Poor roadside no guard block overtaking Flood Poor road Steep Road Name # Responses Surface surface crests lanes culvert markings signing shoulders objects rails visibility opportunities prone drainage lighting grade Bruce Highway 67 38 9 10 27 17 14 8 27 8 11 8 30 22 15 11 1 Pacific Motorway 32 8 1 1 6 1 3 - 4 - - 1 4 - 2 - - Mount Lindesay Highway 21 5 - - 5 - 1 2 4 1 1 - 14 4 2 3 1 Captain Cook Highway 19 5 2 2 2 1 2 - 2 2 1 1 1 4 5 - - Rickertt Road 19 18 3 - 8 3 6 1 13 3 2 - 6 16 9 10 - D'Aguilar Highway 16 12 5 4 6 1 4 1 6 2 1 3 12 2 5 1 1 Kennedy Highway 15 2 5 7 6 1 - - 6 1 5 2 13 1 - 1 1 Warrego Highway 14 11 3 3 5 2 3 2 6 2 - 2 3 3 3 2 - New England Highway 11 9 2 2 4 2 1 1 4 2 2 1 5 2 1 - - Telegraph Road 11 4 - - - - - - 2 - - - - 1 1 - - Kingsford Smith Drive 10 8 2 - 4 - 3 - 2 - - - - - 1 - - Maleny-Kenilworth Road 10 10 2 4 10 4 2 1 8 4 - 1 5 - 2 - - Gore Highway 9 8 1 - 5 - - - 5 1 2 - 2 2 - - - Samford Road 9 7 2 3 6 - 1 1 1 2 - - 2 - 2 - - Tinaburra Drive 9 7 3 5 9 2 4 2 6 2 - 1 3 - - 4 - Burnett Highway 8 8 - 3 4 4 2 2 7 2 1 2 5 3 4 1 - Beachmere Road 7 6 1 2 7 6 1 2 7 - 1 2 2 6 3 3 - Beechmont Road 7 1 2 7 7
    [Show full text]
  • Annual Summary Report
    ANNUAL SUMMARY REPORT Project Title: P8 Evaluate the performance of the Transport Network Reconstruction Program (TNRP) (Year 1 – 2014/15) Project No: 007189 Author/s: Dr Jeffrey Lee, Lory Noya, Andrew Beecroft, Dr Christopher Raymond Client: Queensland Department of Transport and Main Roads Date: September 2015 AN INITIATIVE BY: TC-710-4-4-9 P8 EVALUATE THE PERFORMANCE OF THE TRANSPORT NETWORK RECONSTRUCTION PROGRAM (TNRP) TC-710-4-4-9 September 2015 SUMMARY The Transport Network Reconstruction Program (TNRP) is the largest flood Although the Report is believed to be recovery work undertaken in the history of Queensland. The Department of correct at the time of publication, Transport and Main Roads (TMR) engaged ARRB Group to conduct a ARRB Group Ltd, to the extent lawful, research project under the National Asset Centre of Excellence (NACOE) excludes all liability for loss (whether agreement to evaluate the performance of the TNRP flood repair works. The arising under contract, tort, statute or key objective of this project is to identify best practices and lessons learnt otherwise) arising from the contents of during the flood recovery program. This interim report presents the findings the Report or from its use. Where from Year 1 of the three-year research project. such liability cannot be excluded, it is reduced to the full extent lawful. A scoping study was conducted in Year 1. Key tasks that have been Without limiting the foregoing, people accomplished are as follows: should apply their own skill and judgement when using the information . Conduct a workshop with participants from the State Program Office contained in the Report.
    [Show full text]
  • Brindabella Circuit Commercial Leasing Prospectus 01
    6 BRINDABELLA CIRCUIT COMMERCIAL LEASING PROSPECTUS 01 6 Brindabella Circuit is the product of considered design, and promises to be a landmark building located in the heart of A NEW GENERATION OF BUILDING Brindabella Business Park. The collaboration between Capital Airport Group and Bates Smart offers a unique opportunity to secure Canberra’s next premium business address. Anchored by the town square, 6 Brindabella Circuit is thoughtfully positioned within walking distance of all the amenities available across Brindabella Business Park. The central location not only offers proximity to all the facilities available within the Precinct, it also facilitates the opportunity for occupants to bump into clients and collaborators who are co-located within Brindabella Business Park. TWO BUILDINGS; SOUTH 10,545M2 NORTH 9,751M2 CARBON NEUTRAL IN THE HEART OF BRINDABELLA BUSINESS PARK A-GRADE 98 BASEMENT PARKING BAYS Artist’s impression, indicative only and subject to change. 02 BRINDABELLA BUSINESS PARK PRECINCT LEGEND BRINDABELLA BUSINESS PARK PRECINCT LEGEND6 BRINDABELLA CIRCUIT BARBEQUE FACILITIES BRINDABELLA BUSINESS PARK PRECINCT BUILDINGS PLACES TO EAT 6 BRINDABELLA CIRCUIT BARBEQUE FACILITIES RETAIL AND SERVICES PARKING 6 BRINDABELLA CIRCUIT BUILDINGS PLACES TO EAT CHILDCARE BUS STOPS RETAIL AND SERVICES PARKING CONFERENCE MEETING FACILITIES CHILDCARE BUS STOPS CONFERENCE MEETING FACILITIES CANBERRA AIRPORT N N BRINDABELLA BUSINESS PARK QANTAS HANGAR TERMINAL QANTAS HANGAR TERMINAL RETAIL & BUILDINGS8 BRINDABELLA SERVICES CIRCUIT RETAIL
    [Show full text]
  • Ground Transport Plan
    CHAPTER 9 GROUND TRANSPORT PLAN “For high-speed rail, the Eastern Broadacre Planning Study includes an indicative alignment for a future corridor through the Majura Valley and makes provision for an alternative alignment to the Canberra Airport.” PUBLIC INFRASTRUCTURE, PRODUCTIVITY COMMISSION, MAY 2014 9 Ground Transport Plan Canberra Airport has been a strong public supporter for more than 20 years of a fast, efficient, and comfortable transport system with easy access to air, rail, and coach services. Initially, in the first Master Plan approved in August 1999, and then the release in September 1999 of a plan outlining the ambition to be a 'World Class Travelport' - a major transport terminal where fast air, rail, light rail, and coach services will converge, to provide seamless travel for business and leisure passengers. Figure 9.1 - Travelport 1999 concept plan Indeed, the continued objective of Canberra Airport is to work with surrounding jurisdictions in fully integrating all ground transport services with the terminal and retail and business parks. A fully integrated ground transport network will: Service a growing population within Canberra to provide an opportunity to greatly increase Canberra's public ground transport commuter modal split; and Provide a seamless modern, efficient transit ground and air interchange of passengers to benefit tourism, trade and commerce within the region; and Drive the benefits of decentralisation opportunities to the Canberra region plus two hours. Canberra Airport Page 149 2020 Master Plan The Majura Parkway has been completed since the last Canberra Airport 2014 Master Plan was approved, including a slip road from the Majura Parkway to Majura Road - Meddhung Road - as well as an off-road cycling connection to Majura Park.
    [Show full text]
  • Submission No. 01.4 JP2047 Date: 30/05/2014
    Submission No. 01.4 JP2047 Date: 30/05/2014 CEC Owned/Leased DEMS Property ID Site Street City/Suburb State Postcode Country AAB Non Defence N/a TAAATS Bris Brisbane Airport Brisbane Qld 4007 Australia AAE Non Defence 0307 Australian Aerospace Building West Avenue Edinburgh Parks SA 5111 Australia The Australian Advanced Air Traffic AAM Non Defence N/a Control Tower Melbourne Vic 3045 Australia System (TAAATS) Melb Amphibious Afloat Support SPO AAS No foirmal agreement 3296 6B Leach Crescent Rockingham WA 6168 Australia (AASPO) ADA Non Defence N/a Defence Force Recruiting (DFR) SA 191 Pulteney St Adelaide SA 5000 Australia ADF Owned 1003 Australian Defence Force Academy Northcott Drive Campbell ACT 2612 Australia ADI Limited – Brisbane Support ADH Non Defence N/a 39 Iris Place Acacia Ridge Qld 4110 Australia Centre ADJ Owned 0242 ADI Jennings High Street Jennings NSW 2372 Australia ADM Owned 0340 Newcastle Training Depot 351 Brunker Rd Adamstown NSW 2289 Australia 20-22 Stirling ADN Non Defence N/a ADI Nedlands Nedlands WA 6009 Australia Highway AES now EADS CASA, Paseo International N/a Air 5402 (AAR) Project Office Madrid International 28906 Spain MDR John ALB Owned 0026 HMAS Albatross Albatross Road Nowra NSW 2541 Australia South Amberley AMB Owned 0861, 862,1336 RAAF Amberley Amberley Qld 4305 Australia Road AMD Owned 0249 Duntroon Health Centre Harrison Road Campbell ACT 2612 Australia AMR Owned 1004 Russell Health Centre Russell Drive Russell ACT 2600 Australia ANG Owned 0800 Anglesea Barracks Davey Street Battery Point Tas 7004
    [Show full text]