07 3264 9400 Brisbane Veterinary Specialist Centre

Total Page:16

File Type:pdf, Size:1020Kb

07 3264 9400 Brisbane Veterinary Specialist Centre BRISBANE VETERINARY SPECIALIST CENTRE Corner of Old Northern & Keong Rd Albany Creek 4035 07 3264 9400 BVSC is located at both 53 and 57 Old Northern Road, Albany Creek, Brisbane The Animal Hospital + The Specialist Clinic are within walking distance from one another. North Service Station Woolworths Old Nor Shopping Centre Tennis thern Rd Centre Park Keong Rd THE ANIMAL HOSPITAL THE SPECIALIST CLINIC HOSPITALL CLINIC Albany Creek 53 Old Northern Rd State School 2/57 Old Northern Rd Albany Creek 4035 Keong Rd Albany Creek 4035 Childcare Medical Client Carparking Centre Centre To City Client Carparking available on the lower level Old Nor available at the front of of the building thern Rd the Clinic Driving Directions From Gold Coast 1. Follow Pacific Motorway/M1 North bound 2. Continue onto Pacific Motorway/M3 (Signs for City) 3. Take the exit on the right onto Clem Jones Tunnel (Partial Road Toll) 4. Keep right at the fork and merge onto Airport Link M7 HOSPITAL 5. Take the exit (Toll Road) CLINIC 6. Continue straight onto Stafford Rd/Metroad 5 7. Turn right onto South Pine Rd/State Route 29 8. Continue onto Old Northern Rd 9. At traffic light, turn left at BVSC Signage onto Keong Rd 10. For BVSC + The Specialist Clinic - turn right into Carpark For BVSC + The Animal Hospital - continue straight and turn right at the end of the road to the Hospital Driving Directions From Sunshine Coast 1. Follow Bruce Highway/M1 South bound 2. Continue on M3 (signs for National Highway M3/Brisbane) 3. Take exit Linkfield Rd for State Route 40 towards Bald Hills/Sandgate 4. Turn left onto Linkfield Rd/State Route 40 5. Turn left onto Carseldine Rd/State Route 40. Continue to follow State Route 40 6. Continue onto Bridgeman Rd 7. Continue onto Beckett Rd/State Route 40 8. Turn right onto Albany Creek Rd/State Route 28 9. Turn left onto Albany Creek Rd 10. Slight left onto Keong Rd 11. Continue straight through the roundabout. 12. At traffic light continue straight on Keong Rd (BVSC + The Specialist Clinic is on the right) 13. For BVSC + The Specialist Clinic - turn right into Carpark For BVSC + The Animal Hospital - continue straight and turn right at the end of the road to the Hospital.
Recommended publications
  • Cross River Rail APPENDIX F VISUAL AMENITY
    " # $! ! Cross River Rail APPENDIX F VISUAL AMENITY JULY 2011 Contents Appendix F1 Combined urban, landscape and visual context..............................1 Appendix F-2 Evaluation of key locations.............................................................15 Appendix F-3 Visual assessment...........................................................................33 1.1 Methodology .....................................................................................................................33 1.1.1 Establishment of baseline information............................................................ 33 1.2 Impact assessment........................................................................................................... 35 1.2.1 Sensitivity of location or receptor.................................................................... 35 1.2.2 Visual modification.......................................................................................... 40 1.2.3 Impact assessment description ...................................................................... 41 1.3 Visual assessment of target sites ..................................................................................... 41 1.3.1 Target site 1: Mayne Rail Yard and environs ................................................. 41 1.3.2 Target site 2: The Ekka Station and environs................................................. 46 1.3.3 Target site 3: Victoria Park and the Northern Portal....................................... 53 1.3.4 Target site 4: Roma Street Station
    [Show full text]
  • Automatic Number Plate Recognition (ANPR) Camera System Coding Manual a Transurban Queensland Group Standard
    Automatic Number Plate Recognition (ANPR) Camera System Coding Manual A Transurban Queensland Group standard Document code ITS-MAN-001 Approval authority Head of Technology Document owner ITS Operations Manager QLD Document author Andrew Warren Confidentiality Statement Information in this document must be kept confidential as per its classification below, and the rules of disclosure. All documents within the Transurban Queensland Group are classified in the following way: PUBLIC documents are intended for anyone, COMMERCIAL IN CONFIDENCE documents are to be kept confidential between restricted individuals within the Transurban Queensland Group and partner organisations. COMPANY CONFIDENTIAL documents are to be kept confidential within the Transurban Queensland Group, and used for normal business activities by the general office population, HIGHLY CONFIDENTIAL documents are to be kept confidential to restricted individuals within the Transurban Queensland Group. This document is uncontrolled if printed. ©Copyright Transurban Queensland Holdings 1 Pty Limited ABN 64 169 090 804. All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form or by any means, electronic, mechanical, photocopying, recording or otherwise, without the written permission of Transurban Queensland Holdings 1 Pty Limited. Classification PUBLIC Transurban Queensland Contents 1. Purpose 3 1.1 AirportLinkM7 Tunnel 4 1.2 Legacy Way Tunnel 6 1.3 Clem Jones Tunnel 7 2. Glossary 9 STANDARD This document is uncontrolled if printed Classification Public Page 2 of 9 AUTOMATIC NUMBER PLATE RECOGNITION (ANPR) CAMERA SYSTEM CODING MANUAL 1. Purpose The purpose of this ANPR Camera System Coding Manual is to define the Data blocks for the ANPR camera systems for each of Transurban Queensland’s tunnel assets.
    [Show full text]
  • CLEM7 - 2011 AUSTRALIAN CONSTRUCTION ACHIEVEMENT AWARD I Scope of Work
    CLEM7 - 2011 AUSTRALIAN CONSTRUCTION ACHIEVEMENT AWARD i Scope of Work The Clem Jones Tunnel (CLEM7) is alternate route to the many roads that were Tunnel construction included: Brisbane’s first major road tunnel and the impassable or closed due to flooding. ■■ 41 evacuation cross passages between the longest and most technically advanced The Project was delivered by the Leighton two mainline tunnels every 120m; tunnel in Australia. The project has an overall Contractors and Baulderstone Bilfinger ■■ A long passage for evacuation from the length of 6.8km and links the Inner City Berger Joint Venture (LBBJV) under a lump Shafston Avenue ramps; Bypass (ICB) and Lutwyche Road in the sum design and construct (D&C) contract. A ■■ Five underground substations, each north of Brisbane to the Pacific Motorway ‘fast track’ design and construction approach consisting of four individual tunnels and Ipswich Road in the south, with an entry was adopted, which enabled LBBJV to excavated in the space between the two and exit ramp at Shafston Avenue. deliver the Project seven months ahead of mainline tunnels; The CLEM7 is the first critical component of schedule and on budget for their client ■■ A dedicated tunnel in each tube, beneath the Brisbane Lord Mayor’s TransApex vision RiverCity Motorway (RCM), who is in a the road surface for cabling; and to ease congestion and cater for the city’s Public-Private Partnership with Brisbane City future traffic needs. The tunnel, which has Council (Council). The Project cost $3 billion, ■■ A smoke duct in the ceiling of each tunnel, 2 the capacity to carry more than 100,000 which includes financing costs and the 9.2m in cross section, to extract smoke in vehicles a day, bypasses Brisbane’s CBD $2.1 billion of design and construction cost.
    [Show full text]
  • Project Description
    BaT project Chapter 3 Project description Contents 3. Project Description ................................................................................................................ 3-1 3.1 Introduction .................................................................................................................. 3-1 3.2 Overview ...................................................................................................................... 3-1 3.3 Objective and benefits ................................................................................................. 3-1 3.4 Location........................................................................................................................ 3-2 3.4.1 Transport corridor ......................................................................................................... 3-2 3.4.2 Study corridor ............................................................................................................... 3-2 3.5 Adjacent or adjoining infrastructure ............................................................................. 3-2 3.5.1 Existing infrastructure ................................................................................................... 3-2 3.5.2 Other major projects ..................................................................................................... 3-4 3.6 Design .......................................................................................................................... 3-4 3.6.1 Overview ......................................................................................................................
    [Show full text]
  • Western Brisbane Transport Network Strategy
    Western Brisbane Transport Network Strategy Contents Foreword 1 Strategy highlights 2 Introduction 6 Community input and strategy development 10 Rail 12 Bus 16 Active transport 20 Road and freight 24 Implementation 28 Benefits of the strategy 32 This is a strategic vision to provide a framework for planning and delivery of the transport network in western Brisbane. The information on the maps in this document is not intended for reference to specific parcels of land. It should be treated as indicative only and subject to ongoing refinement. 2009 Contact details: Phone 1800 636 896 www.transport.qld.gov.au/wbtni Foreword Western Brisbane Transport Network Strategy The Western Brisbane Transport Network Investigation In relation to road transport, the Investigation is a coordinated approach to the ongoing supports the need for Brisbane City Council’s development of the transport network for western proposed Northern Link tunnel and it proposes an Brisbane. improved north south road connection including a tunnel linking Toowong to Everton Park. More than a million people were asked for their input into a plan which integrates all modes of transport, Much of the work identified in the Western Brisbane such as rail, bus, road, walking and cycling. Transport Network Investigation is already underway. The rail network is being extended to Richlands and The Investigation commenced in 2007, in large part capacity is being expanded between Corinda and as a means of determining whether the long talked- Darra. The Northern Busway to Kedron is under about Western Brisbane Bypass would happen. construction and so is Airport Link. In addition, the That option was ruled out in 2008 after detailed Brisbane City Council is actively pursuing the Northern traffic projections showed insufficient demand but, Link tunnel.
    [Show full text]
  • Clem Jones Tunnel
    NORTH-SOUTH BYPASS TUNNEL PROJECT TERMS OF REFERENCE FOR AN ENVIRONMENTAL IMPACT STATEMENT i Project and Process Information Project Proponent The proponent for the North-South Bypass Tunnel (NSBT) is the Brisbane City Council. Brisbane City Council is Australia’s largest local authority with a population of approximately 930,000 residents. Project Summary The North-South Bypass Tunnel Project (the Project) is part of an overall strategy to improve the efficiency of Brisbane’s road network, consistent with long-established and accepted regional and city-wide transport planning objectives. The Project had its genesis as one part of the implementation of the Transport Plan for Brisbane 2002 – 2016 which is public policy of the Brisbane City Council and is an outcome of the integrated transport planning process. More recently, the North-South Bypass Tunnel is encompassed by the TransApex transportation strategy. The North-South Bypass Tunnel is intended to connect the South-east Arterial Road (Pacific Motorway) and Ipswich Road (at Woolloongabba) to the south with the Inner City Bypass and Lutwyche Road to the north. The proposed route will generally follow the alignment of Ipswich Road/Main Street, cross under the Brisbane River adjacent to the Storey Bridge, and then proceed through Fortitude Valley to emerge at Bowen Hills north-east of the RNA Showgrounds. It is intended that the NSBT connect with the Inner City Bypass and other local roads, such as Lutwyche Road. There would also be connections in the vicinity of Shafston Avenue to provide for traffic to and from the eastern suburbs. The study corridor for the EIS is shown in Figure 1.
    [Show full text]
  • Noise Measurement Services Pty
    Noise Monitoring Report Transurban Clem Jones Tunnel Monitoring December 2019 Report 1529_38 19th December 2019 Noise Measurement Services Pty Ltd Ph: (07) 3355 9707 18 Lade Street, Gayth orn e Q LD 40 51 Fax: (07) 3355 7210 PO Box 2127, Brookside Centre QLD 405 1 Email: [email protected] Noise Monitoring Report for Brisbane Motorway Services – Clem Jones Tunnel Monitoring Period: December 2019 Document Control Page NOISE MEASUREMENT SERVICES PTY LTD 18 Lade Street, Gaythorne, QLD 4051 Telephone: (07) 3355 9707 PO Box 2127 Facsimile: (07) 3355 7210 Brookside Centre, QLD 4053 E-mail: [email protected] Copy No_________ Revision No Issue Date Revision Description Author Review 0 19/12/2019 Report 38 JD MT Copy No(s) Rev No Destination 1 pdf 0 Transurban 2 0 Noise Measurement Services Pty Ltd REPORT FOR Transurban CONTACT Ryan Kathage Signed Joshua Dyer GradDip. Noise Management, CertIV Work Health and Safety, B. Environmental Technology, M.A.A.S (Senior Acoustician of Noise Measurement Services) DISCLAIMER This Report by Noise Measurement Services Pty Ltd is prepared for a particular Client and is based on the agreed objective, scope, conditions and limitations as may be stated in the Executive summary. The Report presents only the information that Noise Measurement Services Pty Ltd believes, in its professional opinion, is relevant and necessary to describe the issues involved. The Report should not be used for anything other than the intended purpose and should not be reproduced, presented or reviewed except in full. The intellectual property of this Report remains with Noise Measurement Services Pty Ltd.
    [Show full text]
  • 6. Strategic Transport Impacts and Benefits of the Project
    6. Strategic transport impacts and benefits of the Project The Project would provide inner city rail and bus network capacity improvements to accommodate future public transport patronage to and from the Brisbane CBD. It would allow increased public transport accessibility to the CBD from new or improved railway stations and from the busway network. This improved transport accessibility would support planned CBD population and employment growth by providing more effective and efficient transport services compared with not investing in the Project. The forecast transport benefits of the Project would have three main beneficiaries groups: • transport users of all modes of transport • public transport operators – TransLink Division of TMR, Queensland Rail and Brisbane Transport • Government – in terms of the Project contributing to wider transport objectives. The key transport benefits, which are described following this introduction, would include: • an increase in rail and bus passenger capacity • an increase in rail and bus patronage • an increase in public transport mode share especially to the CBD • faster rail and bus trip speeds and reduced wait times that would lead to shorter rail and bus trip times • improved rail and bus passenger LoS through reduced passenger crowding • improved travel time reliability for both modes • improved network resilience by providing an alternative corridor through the inner city for bus and rail when the network is interrupted by unexpected incidents or maintenance. • improved public transport accessibility to the CBD • a reduction in the number of buses operating on CBD streets and the Captain Cook Bridge and Victoria Bridge • a small reduction in road trips to the CBD.
    [Show full text]
  • SUBURB STREET ACACIA RIDGE Achievement Crescent
    SUBURB STREET ACACIA RIDGE Achievement Crescent ACACIA RIDGE Beatty Road ACACIA RIDGE Bonanza Avenue ACACIA RIDGE Colebard Street E ACACIA RIDGE Colebard Street W ACACIA RIDGE Dellow Street ACACIA RIDGE Ellesmere ACACIA RIDGE Gregory Street ACACIA RIDGE Larbert Street ACACIA RIDGE Lismore Street ACACIA RIDGE Loam Street ACACIA RIDGE Merchiston Street ACACIA RIDGE Research Street ACACIA RIDGE Rothesay Street ACACIA RIDGE Success Street ACACIA RIDGE Wapping Street ACACIA RIDGE Watson Road ALBION Abbotsford Road ALBION Agnes Street ALBION Albion Overpass ALBION Albion Road ALBION Allison Street ALBION Amy Street ALBION Argyle Street ALBION Bale Street ALBION Beaumont Street ALBION Bimbil Street ALBION Bogan Street ALBION Collingwood Street ALBION Crosby Road ALBION Dover Street ALBION Elliot Street ALBION Fox Street ALBION Frodsham Street ALBION Gartrell Street ALBION Grove Street ALBION Higgs Street ALBION Hudson Road ALBION Hutcheson Street ALBION Immarna Street ALBION Inner City Bypass ALBION Jobson Street ALBION Kingsford Smith Drive ALBION Lucy Street ALBION Mclennan Street ALBION Nariel Street ALBION Park Street ALBION Pedder Street ALBION Sandgate Road ALBION Tate Street ALBION Wakefield Street ALBION Wallace Street ALBION Yulestar Street ANNERLEY Aylesford Street ANNERLEY Denham Street ANNERLEY Ensign Avenue ANSTEAD Boyle Road ANSTEAD Church Road ANSTEAD Essendon Road ANSTEAD Grey Gum Place ANSTEAD Hawkesbury Road ANSTEAD Kangaroo Gully Road ANSTEAD Layfield Road ANSTEAD Mount Crosby Road ANSTEAD Sugars Road ANSTEAD Wirrabara Road
    [Show full text]
  • Building a Better M1 2 WORKING TOGETHER for QUEENSLAND BUILDING a BETTER M1
    2020 POLICY DOCUMENT Building a Better M1 2 WORKING TOGETHER FOR QUEENSLAND BUILDING A BETTER M1 WORKING TOGETHER FOR QUEENSLAND WORKING TOGETHER FOR QUEENSLAND BUILDING A BETTER M1 1 Message from the Premier Labor is building a better M1. Under my government, two major M1 upgrades at the Gateway Merge and between Mudgeeraba and Varsity Lakes have been delivered. Two more are underway now, between Eight Mile Plains and Daisy Hill, and Varsity Lakes and Tugun. We’re not stopping there. My government has a $5 billion plan to cut travel times and improve safety on Queensland’s busiest highway. That includes $2.7 billion in new projects to be delivered, which will support Queensland’s economic recovery with more than 1,390 jobs. Under our plan, we will commit $500 million for the next major M1 upgrade between Daisy Hill and Logan, locking in this jointly funded $1 billion project. Our M1 exit upgrade program will support growing communities, targeting exits at Yatala North, Yatala South, Pimpama and Ormeau. My government will build the Second M1 too, taking cars off the M1 with a $1.5 billion partnership locked in with the Federal Government to start work next year on Stage 1 between Coomera and Nerang as part of our economic recovery plan. The previous LNP Government, with Deb Frecklington as Campbell Newman’s Assistant Minister, ignored the M1 and scrapped plans for the second M1. Not one new dollar was committed to upgrade the M1 by the LNP as they cut $1.6 billion from Queensland’s roads budget and sacked 700 road builders.
    [Show full text]
  • South Coast Region Snapshot
    Queensland Transport and Roads Investment Program 2020–21 to 2023–24 Snapshot – South Coast Region Our region Our key challenges An area of about 6544km2. Environment – Designing and constructing in sustainable ways and achieving best Stretching from New South Wales border in practice environmental outcomes. the south to Springwood in the north, and as far west as the Cunningham Highway, west of Building Information Modelling (BIM) – Boonah. Progressive implementation across all contract levels. Responsible for 130km of National Land Transport Network and 918km of other state- Constructability – High traffic volumes controlled roads. 24/7, works planned to ensure traffic flows. Program – Integration with adjoining projects and tight timelines. Queensland Transport and Roads Investment Program (QTRIP) 2020–21 to 2023–24 budget 1,600 $4.5B 1,400 four year QTRIP 1,200 1,000 800 600 $'Millions 400 200 0 2020–21 2021–22 2022–23 2023–24 South Coast Projects < $50M FY 2020–21 ≥ $50M FY 2021–22 ≥ $50M FY 2022–23 ≥ $50M FY 2023–24 ≥ $50M Total four year QTRIP value of $4.5B excludes Queensland Rail and Gold Coast Waterway Authority 1/4/2021 Duplicate of Page 1 1/4/2021 Duplicate of Page 1 Tenders going to market per quarter $90 16 1 6 $90 16 $80 1 6 14 $80 $70 1214 $60$70 1012 $50$60 8 10 $40$50 6 8 $30$40 4 Contract number Contract value ($M) 6 $30 3 3 4 $20 4 3 3 4 $10$20 2 2 $0$10 0 Jan – Mar 2021 Apr – Jun 2021 Jul – Sept 2021 Oct – Dec 2021 $0 0 Planning DesignJan – MConstructionar 2021 Approximate≤$5MApr Construction– Jun 2quarter021 >$5M
    [Show full text]
  • Brisbane Airport Link – Waterproofing with Sikaplan®
    No. 04.11 – January 2011 Waterproofing Sika at Work Brisbane Airport Link – Waterproofing with Sikaplan® Waterproofing: Sikaplan ®, Sika® Waterbar , SikaFuko®, Sikadur® © Sika Services AG / BU Contractors 04.11 – January 2011 / CMS RB © Sika Services Project Description Project Requirements The Thiess John Holland Joint Venture has been appointed as the prin- The technical specifications set out the requirements for waterproof- cipal contractor to deliver the $ 4.8 billion Airport Link, Northern Busway ing and drainage measures to be installed for drained and undrained (Windsor to Kedron) and Airport Roundabout Upgrade – Australia’s tunnels. The lining in the undrained part is designed to withstand largest road infrastructure project, which is scheduled for comple- the expected hydrostatic pressure and ensure that any watertable tion in 2012. The project is contracted as a PPP project (Private Public drawndown and subsequent effects on the groundwater regime has Partnership) including design, built, operation and maintenance service, no impact on property, adjacent infrastructure, the Project Works and under a fixed-price contract for an initial five-year period following the the Environment. This also includes effects such as settlements, con- tunnel opening. tamination migration and impacts on available water for ground water The Airport Link and busway project involves total 15 km of tunnelling dependent ecosystems and existing groundwater users. including the toll road (5.7 km of twin tunnels), busway tunnels and connecting ramps, as well as 25 bridges and result in over 7 km of new road. The Airport Link is a mined motorway grade road which is under construction in the northern suburbs of Brisbane, Queensland, Australia.
    [Show full text]