Award of the Orange/Blue Line Contract 1

Total Page:16

File Type:pdf, Size:1020Kb

Award of the Orange/Blue Line Contract 1 Finance & Administration Committee Action Item III-B October 14, 2010 Award of the Orange/Blue Line Contract 1 Washington Metropolitan Area Transit Authority Board Action/Information Summary MEAD Number: Resolution: Action Information 100676 Yes No TITLE: Orange/Blue Line Rehabilitation Contract-Segment 1 PURPOSE: Request Board approval to: 1) Award contract FQ9206 including exercising all available options for a total of $272,772,000 within the authorized budget for system infrastructure rehabilitation for the Orange/Blue Line from Stadium- Armory to Rosslyn to Reagan National Airport, and 2) Authorize ten (10) new capitally funded positions to be used to provide project management, inspection services and field support. DESCRIPTION: This is the first of three proposed programs for the Orange and Blue lines as part of an overall system infrastructure renewal program that was presented at the July 24, 2008 Committee and Board Meetings. The program will enhance Metro`s ability to keep the system in a state of good repair, with minimal disruption, increased productivity and reduced cost. Base contract work on the Orange and Blue Lines starts at Stadium-Armory Station and extends to Rosslyn Station. Base contract work on the Blue Line starts at Rosslyn Station and extends to Reagan National Airport Station. The option work on the Orange Line starts at Stadium-Armory station and extends to New Carrollton Station. The project utilizes standard Bid-Build construction contract work, where designs currently exist; Design-Build construction, where designs need to be prepared; and job order contracting where a standardized unit price schedule can be applied to the work required. The basic concept is to accomplish all rehabilitation work in a specific length of the system one line contract and starting with the oldest segment first. The contract has two other funding sources which are: 1) CIP 072 Elevator Rehabilitation; 2) CIP 073 Escalator Rehabilitation. The work in the CIPs contained in this MEAD is in the orange blue line base contract. This type of approach will result in a more efficient use of contractor and Metro resources such as escorts, switch crews, vehicles, support offices and equipment, resulting in increased productivity. The work in CIP 072 and 073 are co-located with the base scopes of work. Week night and weekend single tracking in accordance with Metro`s Track Rights Guidelines will be implemented to accomplish the majority of the work. By providing the contractor greater access in a defined area, the productivity is increased greatly, which should decrease the overall time required to complete the work at a reduced overall cost. Typical work to be performed includes, but is not limited to, traction power, automatic train control and communication upgrades, tunnel lighting replacement, tunnel ventilation, and chiller rehabilitation. Station rehabilitation includes platform slab and tile replacement, canopy roof replacements, bridge support bearings, station vault repairs, air conditioning and ventilation equipment rehabilitation and replacement, lighting, and elevator and escalator rehabilitation. The stations involved in this System Infrastructure Rehabilitation are: Minnesota Avenue, Deanwood, Stadium Armory, Potomac Avenue, Eastern Market, Capitol South, Federal Center, L`Enfant Plaza, Smithsonian, Federal Triangle, Metro Center, McPherson Sq, Farragut West, Foggy Bottom-GWU, Rosslyn, Arlington Cemetery, Pentagon, Pentagon City, Crystal City and Ronald Reagan National Airport. Ten (10) new capitally funded positions to be used to provide project management, inspection services and field support. Project Manager will be Richard Shiflet. FUNDING IMPACT: Program Capital Improvement Program Types of FY11-16 budget FY11 FY12 FY13 FY14 FY15 FY16 Total CIP 110 Rail Rehabilitation Tier 1: National Airport to Stadium Project Armory Budget $34,894,729$60,416,423$59,548,002 $98,786,363$80,117,777$68,456,763$402,220,057 This $23,737,000$42,010,000$41,367,000 $55,496,130$44,350,816$15,893,778$222,854,724 action Remaining $11,157,729$18,406,423$18,181,002 $43,290,233$35,766,961$52,562,985$179,365,333 Budget Project CIP 072 Elevator Rehabilitation Budget $2,426,400 $3,490,202 $2,265,318 $1,136,366 $1,644,960 $2,158,968 $13,122,214 This $0 $1,790,200 $1,125,300 $316,400 $1,065,000 $1,158,540 $5,455,440 action Remaining $2,426,400 $1,700,002 $1,140,018 $819,966 $579,960 $1,000,428 $7,666,774 Budget Project CIP 073 Escalator Rehabilitation Budget $6,515,854 $8,314,893$11,738,466 $13,946,310$13,879,350 $9,766,760 $64,161,633 This $0 $7,314,900$10,638,500 $12,796,300$12,679,400 $1,032,736 $44,461,836 action Remaining $6,515,854 $999,993 $1,099,966 $1,150,010 $1,199,950 $8,734,024 $19,699,797 Budget Summary FY11 FY12 FY13 FY14 FY15 FY16 Total of Action Budget $43,836,983$72,221,518$73,551,786$113,869,039$95,642,087$80,382,491$479,503,904 This $23,737,000$51,115,100$53,130,800 $68,608,830$58,095,216$18,085,054$272,772,000 action Remaining $20,099,983$21,106,418$20,420,986 $45,260,209$37,546,871$62,297,437$206,731,904 Budget Remaining budget to be used for PM, Force Account, Engineering Services, Bus Bridges, Remarks Consultant(s) and other Procurements Operating Budget N/A Impact RECOMMENDATION: Request Board approval to: 1) Award contract FQ9206 including exercising all available options totaling $272,772,000 within the authorized budget for system infrastructure rehabilitation for the Orange/Blue Line from Stadium-Armory to Rosslyn to Reagan National Airport, and 2) Authorize ten (10) new capitally funded positions to be used to provide project management, inspection services and field support. Washington Metropolitan Area Transit Authority Sys tem In fras truc ture Re ha bilitati on Orange/Blue Line Segment 1 (OB1) Finance and Administration Committee October 14, 2010 Purpose Obtain Board approval to: • Award contract with all options, totaling $272,772,000 for system infrastructure rehabilitation (including elevator/ escalators)fO) of Orange/Bl /BlLiue Lines f rom R eagan N Niational lAi Airport to Stadium-Armory • Authorize ten new capital positions to support project management, inspection services and field support Background • The six-year project includes the rehabilitation of Orange/Blue Line from Reagan National Airport to New Carrollton covering 27 miles of track and 23 stations in six phases New Carrollton Farragut West Foggy Bottom McPherson Square Landover t e -GWU r ee aa ee uu Deanwood Metro Center Cheverly Rosslyn Minnesota Federal Avenue Triangle Federal Cent Federal Eastern Mark L’Enfant Plaz L’Enfant Smithsonian South Capitol Potomac Aven Arlington Cemetery PHASE III mm PHASE II Stadiu Armory Pentagon PHASE IV Pentagon City Reagan Crystal National City Airport Scope of Work - Safety Bring the stations and line into a state of good repair MjMajor pro ject s i ncl ldude reha bilita tion: Quantity Structure/Equipment/System description 14 Locations Replace ventilation/exhaust fans , filters , duct work which are used for the removal of smoke in an emergency situation and to circulate the air in the underground passenger stations and tunnels. 29 Locations Replace and upgrade the electrical controls for various equipment such as fans to remove smoke in the event of fire, industrial size sump pumps to prevent the tunnels from flooding, and cooling units to reduce the temperature in the underground stations. Scope of Work – Customer Experience ee Quantity Escalators Rehabilitation/Replacement Rehab Replac 103 Units 100 3 Stations Included Capitol South (2), Eastern Market (2), Potomac Phase 1 – 15 Units 15 Avenue (3), Stadium Armory (8) Phase 2 – 35 Units 35 Smithsonian (11), L’Enfant (22), Federal Center (2) Federal Triangle (3), McPherson Square (8), Farragut Phase 3 – 19 Units 19 West (8) Phase 4 – 18 Units Foggy Bottom (3), Rosslyn (4), Arlington Cemetery 15 3 (4), Pentagon (6) Pentagon City (6), Crystal City (6), Reagan National Phase 5 – 16 Units 16 Airport (4) Scope of Work – Customer Experience Quantity Elevators Rehabilitation 22 Units Stations Included Capitol South (2), Eastern Market (1), Potomac Avenue (1), Phase I – 7 Units Stadium Armory (2), Courthouse (1) Phase 2 –7 Units Smithsonian (2), L’Enfant (4), Federal Center (1) Phase 3 – 4 Units Fe dera l T ri angl le (2) , M cPh erson S quare (1) , F arragut W est (1) Phase 4 –1 Unit Foggy Bottom (1) Phase 5 – 3 Units Crystal City (1), Reagan National Airport (2) Scope of Work – Customer Experience Quantity Structure/Equipment/System description 2S2 Stations Reconstruct plflatforms at Deanwooddd and Minnesota Avenue with new surfaces. 6 Stations Replace bumpy tile at the following: Arlington Cemetery, Reagan National Airport, Potomac Avenue, Eastern Market, Minnesota Avenue and Deanwood. 18 Stations Replace Station Manager kiosks with new PA system control and CCTV monitors . The new Kiosk will be larger to accommodate the additional equipment use to service our customers and provide an entrance way without a step. 18 Stations Renovate restrooms utilized by customers and employees. 2 Stations Replace air conditioning systems at Stadium Armory and Rosslyn. Scope of Work - Infrastructure QQyuantity Structure//qEqui pment /y/System descri ption 13 Stations Replace manual operated scissor-type folding gates with electric roll-up gates. 42 Locations Replacement and upgrade of electrical equipment in traction power sub-stations andbkd tie breaker stations to provid e a more reliable electrical feed to the trains 14 Stations Rehabilitate station domes including water leaks, cracks, cleaning of acoustical panels and replacement of broken or lose ceiling tiles. 83,700 lin. ft. Concrete tunnel repair including water leaks, cracks, and water blasting of surfaces to rehabilitate surface to near new condition.
Recommended publications
  • BALLSTON Metro Station Area Demographics
    N . BU C H N N . AN . ST VER AN . N. U T AR S M 4TH ST 1 O GTON T WASHIN . N ST T N . N N ST . ST . BLVD. TH 3 Q 1 . U I N N BLVD. ST C . ON N GT N SHIN WA N T D . Y N AF . A E A 37) U . A. 2 VER E (V ST B YL H F T C N T 11 N E (V AH O . O S R . O . N. D T - ST L R H A. N T ST . I 6 R . N. 11 N PL U D O ST W 6 . M 1 ST I N Metro Station Area Demographics ST N D BALLSTON . D BU . 2 N IE E ST R 0 . TH S T 2 AN 1 . ) . T. N A S ST T D . O . N. S H ST. N N VER 11T H ST R L T . 1 PH 2010 Census (Summary File 1) 1 E W A T M K ST N E O I F . I N E T L D S T . A. 237) N. AX DR. (V . F ST N IR H ST FA 0T . 1 R . N. D B ST RFAX U 9T H FAI C . N . N H ST N . The Ballston Metro Station Area (MSA) is situated on the Orange Metrorial line at the western end of the A H W 9T . N N BU . AKEF T A W O N N R O N . L S O ABI I N ST I T N D EL .
    [Show full text]
  • CESS 2019 – Conference Guidebook
    Central Eurasian Studies Society 20th Annual Conference 2019 Conference Guidebook Hosted by George Washington University’s Central Asia Program at The Institute for European, Russian and Eurasian Studies October 10-13, 2019 Top 10 Recommendations for Hotel Accommodations One Washington Circle Hotel: 1 Washington Circle NW Washington, DC 20037 Conveniently located just a short walk from George Washington University and the Foggy Bottom Metro Station, and about a 10 minute walk from the Elliott School. One Washington Circle has easy access to all of the sights and attractions of Washington DC. Includes a kitchen or kitchenette in every room. The St. Gregory Hotel: 2033 M Street NW Washington, DC 20036 The St. Gregory Hotel is a boutique property at the intersection of D.C.’s Dupont Circle, West End and Georgetown neighborhoods. From this unbeatable location, you’ll be ideally positioned to experience all of the capital city’s best restaurants, high-end shops, and just 15 minutes from Elliott School. Courtyard Marriott Washington DC/Foggy Bottom: 515 20th Street NW Washington, DC 20052 Flexible spaces where you can work or relax, free Wi-fi throughout this DC Foggy Bottom hotel, and right next to the Elliott School. Equipped with a fitness center and indoor pool to help you stay refreshed and energized. Includes local restaurant - The Bistro - for breakfast and/or dinner. The Wink Hotel DC 1143 New Hampshire Avenue NW Washington, DC 20037 Located just a block away from Washington Circle. Complimentary 24-hour fitness center and business center. Handicap accessible, and brasserie serving breakfast, lunch, dinner. Located about 15 minutes from the Elliott School by foot.
    [Show full text]
  • 38B Map and Timetable
    How to use this timetable Effective 12-18-16 ➤ Use the map to find the stops closest to where you will get on and off the bus. ➤ Select the schedule (Weekday, Saturday, Sunday) for when you will travel. Along the top of the schedule, Ballston-Farragut Square Line find the stop at or nearest the point where you will get on the bus. Follow that column down to the time you want to leave. ➤ Use the same method to find the times the bus is scheduled to arrive at the stop where you will get off the bus. Serves these locations- ➤ If the bus stop is not listed, use the Brinda servicio a estas ubicaciones time shown for the bus stop before it as the time to wait at the stop. l Ballston-MU station ➤ The end-of-the-line or last stop is listed l Clarendon station in ALL CAPS on the schedule. l Court House station Rosslyn station Cómo Usar este Horario l ➤ Use este mapa para localizar las l Georgetown paradas más cercanas a donde se l Farragut North station subirá y bajará del autobús. l Farragut West station ➤ Seleccione el horario (Entre semana, sábado, domingo) de cuando viajará. A lo largo de la parte superior del horario, localice la parada o el punto más cercano a la parada en la que se subirá al autobús. Siga esa columna hacia abajo hasta la hora en la que desee salir. ➤ Utilice el mismo método para localizar las horas en que el autobús está programado para llegar a la parada en donde desea bajarse del autobús.
    [Show full text]
  • RTSP Template
    Washington Metropolitan Area Transit Authority Regional Transit System Plan (RTSP) Summary of Projects, Plans, and Strategies Analyzed As Part of the RTSP 2040 Base Case Constrained Long Range Plan (CLRP) Metro 2025 – District of Columbia – 100% 8-car trains • Anacostia Streetcar Phase 1 – Priority Corridor Network service improvements • K Street Busway from CLRP • DC Streetcar - H St/Benning Rd NE – Metro Center/Gallery Place Pedestrian • Tiger Grant Bus Priority Improvements Passageway – Maryland – Farragut North/Farragut West Pedestrian Passageway • Viers Mill Road Busway – Blue Line stub with 2nd Rosslyn Station • Corridor Cities Transitway: – Bus Fleet expansion for non-PCN routes • Purple Line: – Virginia Other Elements • Cherry Hill VRE Station – Round 8.2 Land Use • Columbia Pike Streetcar – Increase train frequencies to maximum • Crystal City Potomac Yard Bus Way supported by infrastructure • I-495 Express Lanes Transit Service – Removed 2020 capacity constraint • Van Dorn Busway – Modified bus routes to connect with CLRP • Potomac Yard Metro Station projects • Dulles Corridor Metrorail – Additional CLRP service improvements 2 Types of Projects, Plans, and/or Strategies Tested Core Capacity Access Surface Transit New Strategies Strategies Strategies Connections Strategies New rail lines In-fill stations & Enhanced bus Metrorail through the core pedestrian priority corridors extensions to connections activity centers Rail inter-lining Improved Enhanced Commuter rail pedestrian commuter rail extensions networks service Enhanced bus Park and Ride lots Enhanced BRT BRT/LRT/Streetcar priority corridors with shuttles to network extensions rail 3 Yellow and Green Line Separation Options Tested New Yellow Line Split Yellow Line to New Yellow Line on 2nd on 10th Street NW, maintain current Street SE/NE to connect to Red Line alignment and add new to Union Station, up line on 2nd Street SE/NE North Capitol Street.
    [Show full text]
  • Final PMOC Safetrackreport (June2017)
    Monthly Report SafeTrack Program Washington Metropolitan Area Transit Authority (WMATA) June 2017 Progress Surge 15 – Building forms for new grout pads between Cheverly and Landover Stations October 25, 2017 PMOC Contract Number: DTFT60-14-D-00011 Task Order Number: 006, Project Number: DC-27-5272, Work Order No. 02 OPs Referenced: 01, 25 Hill International, Inc. One Commerce Square 2005 Market Street, 17th Floor Philadelphia, PA 19103 PMOC Lead: Michael E. Radbill, P.E. (215) 309-7926 [email protected] Length of Time PMOC Assigned to Project under current Contract: 3 years, 5 months Length of Time PMOC Lead Assigned to Project: 5 years, 6 months TABLE OF CONTENTS EXECUTIVE SUMMARY ...................................................................................................... 1 A. PROGRAM DESCRIPTION .............................................................................................. 2 B. PROGRAM STATUS ....................................................................................................... 2 C. CORE ACCOUNTABILITY INFORMATION ....................................................................... 3 D. MAJOR PROBLEMS/ISSUES ........................................................................................... 4 MAIN REPORT ....................................................................................................................... 7 1. PROGRAM STATUS ........................................................................................................... 7 2. PROGRAM COST ............................................................................................................
    [Show full text]
  • Station 1 Welcome Welcome!
    STATION 1 WELCOME WELCOME! THE FUTURE OF THE BLUE, ORANGE, AND SILVER LINES BEGINS WITH YOU! To meet the demands of a growing region, Metro is studying ways to improve service on these three lines in order to: • Better serve our customers • Improve reliability • Meet future ridership demand • Achieve environmental and cost goals Visit the exhibits at each station to learn more and share your ideas and feedback. Share your input at stations whenever you see this symbol STATION 2 NEEDS & PROCESS CURRENT NEEDS The Blue, Orange, and Silver (BOS) lines share the same tunnel between Rosslyn and Stadium-Armory, and this limits Metro’s ability to: • Run enough trains to meet ridership demand • Manage construction and recover from disruptions • Operate different service patterns We are currently exploring potential solutions to these issues and need your input. Peak-hour trains between Court House and Rosslyn are already crowded. Metro can run only 26 trains per hour through the tunnel. This limits our ability to increase service on any line in order to keep pace with ridership. Running three lines through one tunnel means that a delay on one line impacts all three. FUTURE NEEDS Continued growth in jobs and households will increase ridership, but Metro will not be able to run enough trains to meet that demand. That growth will lead to severe crowding on the Blue, Orange, and Silver lines in the system’s core. Moving to all 8-car trains and higher frequencies will help, but not enough. We need to be able to operate more than 26 trains per hour to meet future demand.
    [Show full text]
  • Visitor Guide
    welcome! VISITOR GUIDE VISITOR MAKE IT COUNT AND CHOOSE STRATEGIC BUILDING SUCCESSFUL PORTFOLIOS AND REWARDING CAREERS STRATEGICGROUP.COM Photo credit: Brookfield STRATEGIC INVESTMENT GROUP is located in the Rosslyn neighborhood of Arlington, VA, directly across the Potomac River from Washington, D.C., accessible from the Key Bridge and Curtis Memorial Parkway. The nearest metro stop is Rosslyn Metro Station, which is less than three blocks away from our office. 1001 Nineteenth Street North +1 703.243.4433 tel strategicgroup.com 16th Floor +1 703.243.2266 fax Arlington, VA 22209 USA ® a registered service mark of strategic investment management, llc. DD Logistics ADDRESS DRIVING 1001 19th Street North, 16th Floor » SuperShuttle travels to the D.C. area’s three Arlington, VA 22209 airports 703-243-4433 | strategicgroup.com » Ride-sharing app Uber services the D.C. metro area TRAVEL TIPS » Hail a taxi easily on busy streets or near well-trafficked landmarks and pay with cash or credit card FLYING Ronald Reagan Washington National Airport (DCA) AMTRAK TRAIN 10-minute drive to Rosslyn » We are located a short 25 minute drive from » Accessible on Metrorail’s Blue/Yellow lines D.C.’s Union Station (WAS) » Local Tip: Savor a half smoke from D.C. » Metro rail system is located at Union Station institution Ben’s Chili Bowl in terminal B/C » Take the Orange/Blue/Silver line to the Washington Dulles International Airport Rosslyn Metro Station (IAD) 45-minute drive to Rosslyn » The Silver Line Express Bus to Dulles costs $5 PARKING and gets you to and from the Metro; the 5A There is a garage attached to the right of our Metrobus travels between Dulles and building, managed by Imperial Parking.
    [Show full text]
  • The 2020 Transit Development Plan
    DC Circulator Transit Development Plan 2020 Update April 12, 2021 (Page intentionally left blank) DC Circulator 2020 TDP i April 2021 Transit Development Plan 2020 Update DRAFT Table of Contents 1.046T 46T Introduction46T ..............................................................46T .................................................... 1 46T 46T Purpose of the Transit Development Plan (TDP)46T ..............................................................46T ............ 1 46T 46T Transit Development Plan Process46T ..............................................................46T ................................. 3 2.046T 46T DC Circulator System Overview46T ..............................................................46T ....................... 4 46T 46T History46T ..............................................................46T ............................................................................. 4 46T 46T Organizational Structure46T 46T ............................................................................................................... 6 46T 46T Strategic Goals and Objectives46T ..............................................................46T ....................................... 6 46T 46T Levels of Service46T 46T ............................................................................................................................ 8 46T 46T Fare Structure46T ..............................................................46T ............................................................... 10 46T 46T Fleet
    [Show full text]
  • Ballston-Farragut Square Line fi Nd the Stop at Or Nearest the Point Where You Will Get on the Bus
    How to use this timetable English-Español ➤ Use the map to fi nd the stops closest to where you will get on and off the bus. ➤ Select the schedule (Weekday, Saturday, Sunday) for when you will travel. Along the top of the schedule, Ballston-Farragut Square Line fi nd the stop at or nearest the point where you will get on the bus. Follow that column down to the time you want to leave. ➤ Use the same method to fi nd the times the bus is scheduled to arrive at the stop where you will get off the bus. ➤ If the bus stop is not listed, use the time shown for the bus stop before it as the time to wait at the stop. ➤ The end-of-the-line or last stop is listed Serves these locations- in ALL CAPS on the schedule. Brinda servicio a estas ubicaciones Cómo Usar este Horario Ballston-MU station Clarendon station ➤ Use este mapa para localizar las Court House station paradas más cercanas a donde se Rosslyn station subirá y bajará del autobús. Georgetown ➤ Seleccione el horario (Entre semana, Farragut North station sábado, domingo) de cuando viajará. Farragut West station A lo largo de la parte superior del horario, localice la parada o el punto más cercano a la parada en la que se subirá al autobús. Siga esa columna hacia abajo hasta la hora en la que desee salir. ➤ Utilice el mismo método para localizar las horas en que el autobús está programado para llegar a la parada en donde desea bajarse del autobús.
    [Show full text]
  • DRIVING DIRECTIONS: From: Ronald Reagan Washington National Airport (DCA) 2401 Smith Blvd, Arlington VA 22202
    DRIVING DIRECTIONS: From: Ronald Reagan Washington National Airport (DCA) 2401 Smith Blvd, Arlington VA 22202 Trip = George Washington Memorial Pkwy and 14th St SW to 17th St NW in Washington 11 min (4.6 mi) 1. Slight right onto the ramp to GW Parkway North/Washington/I-395 2. Merge onto George Washington Memorial Pkwy 1.7 mi 3. Use the right lane to merge onto I-395 N via the ramp to Washington Entering District of Columbia 0.6 mi 4. Use the left 2 lanes to take exit 1 for US-1 N/14th Street toward Nat’l Mall 0.1 mi 5. Continue onto US-1/14th St SW 0.9 mi 6. Continue onto 14th St NW 0.6 mi 7. Turn left onto I St NW 0.4 mi 8. Continue on 17th St NW. Drive to K St NW 1 min (0.1 mi) 9. Turn right onto K St NW Destination will be on the right EWERS IP LAW PLLC – 1612 K STREET NW SUITE 1204, WASHINGTON DC 20006 ROUTE MAP EWERS IP LAW PLLC – 1612 K STREET NW SUITE 1204, WASHINGTON DC 20006 PUBLIC TRANSIT DIRECTIONS: From: Washington Dulles Airport Metro Station To: Farragut West Metro Station 1) Departs From – DULLES AIRPORT MAIN TERMINAL & ARRIVALS/DOOR 2) Take Bus 5A towards LENFANT PLAZA STATION Arrive at N MOORE ST & ROSSLYN STATION BUS BAY D 3) Take SILVER LINE towards LARGO TOWN CENTER SL Departs from ROSSLYN METRO STATION 4) Exit @ FARRAGUT WEST METRO STATION Total Trip – 54 Minutes From: Reagan Airport Station To: Farragut West Metro Station 1) Departs From – NATIONAL AIRPORT STATION BL 2) Take BLUE LINE towards LARGO TOWN CENTER 3) Exit @ FARRAGUT WEST METRO STATION Total Trip – 19 Minutes EWERS IP LAW PLLC – 1612 K STREET NW SUITE 1204, WASHINGTON DC 20006 METRO – System Map DULLES AIRPORT SL FARRAGUT WEST METRO STATION BL REAGAN AIRPORT DRIVING DIRECTIONS: From: Dulles International Airport (IAD) 1 Saarinen Cir, Dulles VA 20166 Trip = VA-267 E and I-66 E to Downtown 34 min (26.8 mi) 1.
    [Show full text]
  • Washington Metropolitan Area Transit Authority (WMATA)
    Description of document: Washington Metropolitan Area Transit Authority (WMATA) memoranda from the Deputy General Manager of Administration and Chief Financial Officer (DGMA/CFO) to the General Manager and Chief Executive Officer (GM/CEO), January 1, 2012 - March 31, 2012 Released date: 23-May-2014 Posted date: 23-June-2014 Source of document: Office of General Counsel PARP Administrator Washington Metropolitan Area Transit Authority 600 Fifth Street, NW Washington, D.C. 20001 The governmentattic.org web site (“the site”) is noncommercial and free to the public. The site and materials made available on the site, such as this file, are for reference only. The governmentattic.org web site and its principals have made every effort to make this information as complete and as accurate as possible, however, there may be mistakes and omissions, both typographical and in content. The governmentattic.org web site and its principals shall have neither liability nor responsibility to any person or entity with respect to any loss or damage caused, or alleged to have been caused, directly or indirectly, by the information provided on the governmentattic.org web site or in this file. The public records published on the site were obtained from government agencies using proper legal channels. Each document is identified as to the source. Any concerns about the contents of the site should be directed to the agency originating the document in question. GovernmentAttic.org is not responsible for the contents of documents published on the website. May 23, 2014 Re: PARP Request No. 12-0163 This is in response to your request for a copy of each Memorandum from the Deputy General Manager of Administration and Chief Financial Officer (DGMA/CFO) to the General Manager and Chief Executive Officer (GM/CEO) during January 1, 2012 - March 31, 2012.
    [Show full text]
  • FTA WMATA Safety Oversight Inspection Reports June 2018
    Inspection Form FOIA Exemption: All (b)(6) Form FTA-IR-1 United States Department of Transportation Federal Transit Administration Agency/Department Information YYYY MM DD Inspection Date Report Number 20180601-WMATA-WP-1 2018 06 01 Washington Metropolitan Area Transit Rail Agency Rail Agency Name TRPM Sub- Department Authority Department Name Email Office Phone Mobile Phone Rail Agency Department Contact Information Inspection Location B-Line, Track 1, between Union Station (B03) and Metro Center (A01) Inspection Summary Inspection Activity # 1 2 3 4 5 6 Activity Code TP-JSB-OBS TP-WI-OBS Inspection Units 1 1 Inspection Subunits 1 1 Defects (Number) 0 11 Recommended Finding No No Remedial Action Required1 No Yes Recommended Reinspection No Yes Activity Summaries Inspection Activity # 1 Inspection Subject Job Safety Briefing Activity Code TP JSB OBS Job Briefing Accompanied Out Brief 1000- Outside Employee WMATA RWIC Yes Yes Time No Inspector? Conducted 1400 Shift Name/Title Related Reports N/A Related CAPS / Findings N/A Ref Rule or SOP Standard Other / Title Checklist Reference Related Rules, SOPs, RWPM R-17-02 Standards, or Other MSRPH R-17-03 Main RTA FTA Yard Station OCC At-grade Tunnel Elevated N/A Track Facility Office Inspection Location Track Type X X Track Chain Marker From To Line(s) B-Line N/A Number and/or Station(s) Union Station (B03) Union Station (B03) Head Car Number Number of Cars Vehicles Equipment N/A N/A N/A 1 The rail transit agency must provide FTA with the necessary evidence (e.g. maintenance work order system records, photos, documentation, records, data, or other evidence) to close out the Remedial Action.
    [Show full text]