EAST BAY REGIONAL PARK DISTRICT PARK ADVISORY COMMITTEE MONDAY, June 28, 2021 4:00 p.m.

COMMITTEE MEMBERS AND STAFF WILL ATTEND VIA TELECONFERENCE

Pursuant to Governor Newsom’s Executive Order No. N-29-20 and the Alameda County Health Officer’s current Shelter in Place Order, effective March 31, 2020, the Regional Park District (“Park District”) Headquarters will not be open to the public and the Park Advisory Committee and staff will be participating in the meetings via phone/video conferencing.

Members of the public can listen and view the meeting in the following way: Via the Park District’s live video stream which can be found at: https://youtu.be/5ZcsBSKumCk

Public comments may be submitted one of three ways: 1. Live via Zoom. If you would like to make a live public comment during the meeting this option is available through the virtual meeting platform: https://zoom.us/j/99571532975. Note that this virtual meeting platform link will let you into the virtual meeting for the purpose of providing a public comment. If you do not intend to make a public comment, please use the YouTube link above to observe the meeting. It is preferred that those requesting to speak during the meeting contact Sharon Clay at [email protected] by 5:00 pm on Friday, June 25, 2021 via email or voicemail (510) 544-2021 to provide name and the subject of the public comment or item to be addressed.

2. Via email to Sharon Clay at [email protected] by Friday, June 25, 2021 at 5:00 pm. Email must contain in the subject line “ Public Comments – not on the agenda” or “Public Comments – agenda item #”.

3. Via voicemail at (510) 544-2021. The caller must start the message by stating “Public Comments – not on the agenda” or “Public Comments – agenda item # “ followed by their name and place of residence, followed by their comments. It is preferred that these voicemail comments be submitted by Friday, June 25, 2021 at 5:00 pm.

Comments received during the meeting and up until the public comment period on the relevant agenda item is closed will be provided in writing to the Park Advisory Committee including transcribed voicemails. All comments received by the close of the public comment period will be available after the meeting as supplemental materials and will become part of the official meeting record. Please try to limit your written comments to no more than 300 words. The Park District cannot guarantee that its network and/or the site will be uninterrupted. To ensure that the Park District receives your comments, you are strongly encouraged to submit your comments in writing in advance of the meeting.

For future meetings, the Park District is exploring additional ways for the public to submit comments.

If you have any questions about utilizing the audio stream, please contact the Recording Secretary of the Committee, Sharon Clay at [email protected] or 510-544-2021. To ensure the best opportunity for Park District staff to address your question, please contact the Recording Secretary prior to 5:00 pm on Friday, June 25, 2021.

EAST BAY REGIONAL PARK DISTRICT PARK ADVISORY COMMITTEE MONDAY, June 28, 2021 4:00 p.m.

COMMITTEE MEMBERS AND STAFF WILL ATTEND VIA TELECONFERENCE

A copy of the background materials concerning these agenda items, including any material that may have been submitted less than 72 hours before the meeting, is available for inspection on the District’s website (www. ebparks.org), the Headquarters reception desk, and at the meeting.

Accommodations and Access District facilities and meetings comply with the Americans with Disabilities Act. If special accommodations are needed for you to participate, please contact the Clerk of the Board at 510-544-2020 as soon as possible, but preferably at least three working days prior to the meeting.

AGENDA

TIME ITEM STAFF

3:30 pm PAC Finance Subcommittee Best (Chair), Rickard, Burke, Ho, Sanwong, Arce

4:00 pm 1. Roll Call (Virtual) Recording Secretary 2. Approval of the Minutes May 24, 2021

3. Board Member Comments Ayn Wieskamp 4. Public Comments Public comments may be submitted:

• Live via Zoom. If you would like to make a live public comment during the meeting this option is available through the virtual meeting platform: https://zoom.us/j/99571532975. Note that this virtual meeting platform link will let you into the virtual meeting for the purpose of providing a public comment. If you do not intend to make a public comment please use the YouTube link https://youtu.be/5ZcsBSKumCk to observe the meeting. It is preferred that those requesting to speak during the meeting contact the Sharon Clay, Recording Secretary at [email protected] by Friday, June 25, 2021 at 5:00 pm. via email or voicemail at 510-544-2021 to provide name and subject of the public comment or item to be addressed. • Via Email to Sharon Clay at [email protected]. Email must contain the subject line “Public Comments – not on the agenda” or “Public Comments - on the agenda” and indicate the item # by 5:00 pm, Monday, May 10, 2021. • Via voicemail at 510-544-2021. The caller must start the message by stating “Public Comments – not on the agenda” or “Public Comments – agenda item #” followed by their name and place of residence, followed by their comments by 5:00 pm, Friday, June 25, 2021.

4:15 pm 5. Presentations (R) a. 2020 Comprehensive Annual Michelle Strawson O'Hara, Assistant Finance Officer Financial Report Debra Auker, AGM/CFO, Finance & Management Services (I) b. Grants Update Katy Hornbeck, Grants Manager (I) c. 2021 Measure CC, FF and WW Jeff Rasmussen, Assistant Finance Officer Update 5:45 pm 6. PAC Member Comments 7. Report from Chair Rick Rickard, PAC Chair 8. Board Committee Reports 9. Old Business 10. New Business 6:00 pm 11. Adjournment

ATTACHMENTS EXHIBITS 1. 2020 Comprehensive Annual Financial Report memo 1. Grants Program Update Exhibits 2a,2b,2c 2. Grants Program Update memo 2. 2021 Measure CC, FF and WW Exhibits 4, 5a, 7a,7c,7e 3. 2021 Measure CC, FF and WW Update memo 4. PAC Work Plan 5. Status of Recommendations 6. Articles & Correspondence

Park Advisory Committee Members 2021 Meeting Dates Rick Rickard Chair) Carlyn Obringer (Vice Chair) January 25 July 26 Erich Pfuehler, Staff Coordinator February 22 August (No Mtg.) March 22 September 27 R - Recommendation for Future Board April 26 October 25 Consideration May 24 November 22 I - Informational June 28 December 6 D - Discussion (Annual Dinner)

Page Left Blank Intentionally

Unapproved Meeting Minutes PARK ADVISORY COMMITTEE May 24, 2021

MEMBERS Arce, Best, Burke, Cary, Chang, Claxton, Corkin, Deschambault, Dieter, Ho, Lacy, REMOTE: Mahadevan, Nason, Obringer, Rickard, Robinson, Sanwong, Skaredoff, Tsutsui, Williams. ABSENT: Gregory. STAFF: Pfuehler, Clay, Ciaburro, O’Connor, Johnson, Kelchner, Holt, Reiff, Goorjian, Brede, Love, Barial-Knight, James, Erickson (PrimeGov). BOARD: Beverly Lane PUBLIC: Fatima Call, Lewis Thrower, Willie Mims, Victoria Adams, Yulie Padmore, Sabrina Pinell, Bruce ‘Ole’ Ohlson, William Yragui.

1. Roll call: The recording secretary took roll call. PAC chair Rickard opened the meeting. He stated consistent with Governor Gavin Newsom’s Executive Order N-25-20 issued on March 12, 2020 in response to the threat of Covid-19 and the Alameda County Health Department’s Order dated March 16, 2020, the Park Advisory Committee may utilize teleconferencing to remotely participate in meetings.

2. Approval of Minutes – April 2021 Minutes: The April 26, 2021 minutes were approved at the May 24, 2021 meeting. The motion to approve the minutes was made by PAC member Williams and seconded by PAC member Deschambault with an amendment to the minutes made by PAC member Nason. The motion passed unanimously.

3. Board Member Comments: Board Member Lane discussed the reopening of the Park District visitor centers. She stated they are open with limited capacity. Volunteers, such as the Volunteer Safety Patrol, are beginning to work again. Lane commented she attended a dedication at Black Diamond Mines. She explained the idea for having a coal mine exhibit placed underground has been around for decades. It is exciting to see it become a reality. There will be a dedication of the visitor center at Del Valle on May 26 at 11:00 am. This center will showcase interpretation of natural and cultural resources. It includes much information about the watershed around Del Valle.

Lane mentioned the name Concord Hills Regional Park has been a placeholder for many years. The District has received overwhelming advocacy for the name Thurgood Marshall Regional Park – Home of the Port Chicago 50. There will be a presentation tonight regarding the naming. Lane pointed out there is much history and many narratives about this land beginning with the Chupcan Indians whose homeland it is. There is history with the Spanish where Anza came through nearly 250 years ago. Rancho and agriculture are part of the land’s history. The Naval history which includes descendants of former residents of Port Chicago that lost their homes and ranches through eminent domain, as well as the military story and the Port Chicago tragedy. Lane expressed her hope everyone will come to appreciate the many different stories reflected in this new park.

PAC member Sanwong commented she looks forward to the ribbon cutting at Del Valle. It will be a nice visitor center. She expressed her appreciation for the information included about the watershed.

1 PAC member Obringer stated on the agenda for the May 25 Concord City Council meeting there is a resolution to approve support for the name Thurgood Marshall Regional Park – Home of the Port Chicago 50.

4. Foundation Update: Carol Johnson, Executive Director of the Regional Parks Foundation and AGM of Public Affairs reported there have been weekly increases in membership, 30% of which are new members.

The Foundation is funding a study through UC Berkeley on Acacia trees which are dying off. There are over 1,000 acres of trees which are dead or dying. This is cause for fire concern.

The Foundation just finished its annual audit. There was a 34% increase in income and revenue over 2019 with a total of $13 million in assets.

PAC member Skaredoff asked if there will be efforts by the Park District to save the acacias. Kristina Kelchner, AGM of Acquisition, Stewardship and Development responded she has been working with the Stewardship team on this issue. There is no plan to save the acacia trees. It is more a focus about how to deal with the dead fuel and the danger it poses. There are many different pathogens causing these die-offs, but the root cause is drought stress. It is hitting acacia and eucalyptus because they are not native trees. They were planted in a plantation format which is not a natural healthy ecosystem and makes them more stressed to begin with. Chief of Government Relations and Legislative Affairs Erich Pfuehler stated the Park District is pushing hard for funding at the state level.

5. Public Comments: William Yragui, Mission Peak Conservancy urged the Park Advisory Committee to participate in the discussion regarding redistricting Ward boundaries to create maximize representation.

6. Presentations: (R) a. Concord Hills Regional Park Naming Recognition – Brian Holt, Chief of Planning, Trails and GIS Kristina Kelchner, AGM of ASD began by thanking Board Member Lane for her tremendous support of this park for decades. Kelchner stated Board Member Lane is a huge part of the reason the Park District was able to take possession of the property last year, complete the planning process and why it will be a park.

Kelchner introduced Brian Holt, Chief of Planning, Trails and GIS who provided the presentation. Holt oriented the committee to the location of the property. He gave an overview about the history of the 2,540 acres of land. Park features include expansive views of Mt. Diablo, the Diablo Valley, and the San Joaquin Delta. There is a vast network of abandoned rail lines and roadways which will serve as the base network for 22+ miles of new trails. Also planned are group camping facilities, picnicking, outdoor classrooms, a jointly operated visitor center between the National Park Service and Park District. There are also natural and cultural resource protection zones. There are approximately 70 munition magazines spread throughout the property. These will provide opportunities for creative reuse and interpretation of the property’s history. The former maintenance building in the center of the property is planned to house the future visitor center. The visitor center will focus on the history of Port Chicago, its aftermath and the role it played in the nation’s ongoing struggle for civil rights. Thurgood Marshall Regional Park – Home of the Port Chicago 50 has emerged as an important name to honor the advocacy of the former Supreme Court Justice Thurgood Marshall. It also honors the

2 history of the explosion at the Port Chicago Naval Magazine. It specifically honors the history of the 50 young men who in the wake of the explosion stood up to the U.S. government to challenge unjust and unsafe working conditions. They paid the cost by being unfairly charged with mutiny. The name has support from the black community to establish a public space where African American history is told, where Black American heroes are celebrated and where the back community is truly welcomed. Holt stated the Park District will also honor indigenous history. The Park District will work with Native Peoples on a formal land acknowledgement process to ensure accuracy on park maps, signage and interpretive materials. The Park District will also work with Native Peoples on a cultural resource management plan for the East Contra Cost County Habitat Conservation Plan area and explore future naming opportunities at currently unnamed parklands.

PAC member Dieter asked if the Park District has a naming policy. Does the proposed name meet the qualifications within the Park District’s policy? Holt replied the naming policy provides broad latitude aimed at allowing parks to be named after significant geographic, natural, historic features and stories of the property.

PAC member Tsutsui expressed his full support for the name. Tsutsui commented it is a continued injustice that this story is so unknown. The Park District can elevate this story by naming the park Thurgood Marshall Regional Park – Home of the Port Chicago 50. It’s a testimony to the power of this story and this place that the community has come together in such a strong way to support this name.

PAC member Robinson asked if there were options which recognized the civil rights and African American history of this site during the initial naming exercise. Holt replied there was not a specific Port Chicago focus in the beginning because of the National Park Memorial. The District didn’t want its property to take away from the memorial, but with a joint visitor center there is a great opportunity to share the history. Robinson commented she grew up in Pittsburg. For a very long time she had no idea about the Port Chicago 50 or what happened there. It’s not really forgotten, it’s hidden. Like a lot of the history of marginalized people in the , it just isn't told. The naming of the park is significant in acknowledging the history here among us.

PAC member Skaredoff stated this is a piece of land that is dripping with history. He has confidence the best faith effort will be made to capture all of it.

PAC member Lacy stated she is in full support of the naming. Lacy thanked Holt for his presentation. She appreciated inclusion of the entire history of the property and that amplifying the Black community will not exclude the other history.

PAC member Cary commented he grew up in the Bay Area and knew about the explosion at Port Chicago, but did not know about the civil rights ramifications. As a result of this presentation, he is in full support of the naming.

Public Comments: William Mims, Member of the East County NAACP; Fatima Call, Citizens for Historical Equity Board Member; Lewis Thrower, Citizens for Historical Equity Board Member; Victoria Adams, East County NAACP President; Yulie Padmore, EBRPD, BEC Collective and Yolande Barial Knight, EBRPD, BEC Collective spoke in support of naming the park Thurgood Marshall Regional Park – Home of the Port Chicago 50. They thanked staff for their work to bring the naming

3 forward. They expressed their understanding about the citizens whose lives were impacted by the explosion. A yes vote will let citizens know the Park District is willing to act in good faith, embrace diverse representation and accurately share the Black community’s history.

Recommendation: The PAC approved a motion to recommend the Board of Directors approve the naming of Concord Hills Regional Park to Thurgood Marshall Regional Park – Home of the Port Chicago 50. The motion was made by Robinson and seconded by Cary. The motion passed unanimously.

(I) b. 2021 Public Affairs Plan Strategic Work Plan 2021 – Carol Johnson, AGM Public Affairs Due to time constraints, this item will be presented at a future date.

(I) c. Update on 2021 Capital Projects Managed by Design and Construction – Lisa Goorjian, Chief of Design and Construction Lisa Goorjian, Chief of Design and Construction provided an update about 2021 Capital projects. She stated there are currently 66 active projects. About half are major repair and maintenance projects which include Contra Loma Improvements, Hayward Shoreline Cogswell Bridge, and Roberts Pool and Facility Renovation. Seven projects are restoration and stewardship focused. These projects include Coyote Hills Improve Access and Habitat, Sibley Volcanic McCosker Creek Restoration and Temescal Expansion of Sedimentation Basins. These projects can be long in duration, take more staff time and are complex in terms of regulatory permits. They are often very attractive projects to leverage external funding. 27 projects expanded District access by providing new opportunities for the public to connect to the lands of the East Bay Regional Park District. These projects included Coyote Hills Dumbarton Quarry Campground and Service Yard, Martin Luther King, Jr. Shoreline Bay Trail – Doolittle Drive segment and Pleasanton Ridge Tyler Ranch Staging Area.

Goorjian reported two projects were completed in 2020 for a total cost of $16.2 million and 17 projects have been completed this year at a total cost of $56 million. While some projects were delayed, many took a quick pause and then started again. Encinal Beach Restoration in Alameda was one. This project involved dune and shoreline restoration, as well as providing better public access to the beach. The Del Valle Water System Renovation and Visitor Center both received significant funding from the state as a budget ask by former Assembly Member Catharine Baker and Senator Steve Glazer. The Garin Dry Creek Bridge Project replaced four bridges including one by a fjord crossing with boulders.

PAC member Dieter asked if the segment of San Francisco Bay Trail from Martin Luther King, Jr. Regional Shoreline to the Alameda Harbor Bay bridge is part of the current project. The Doolittle Drive project brings the trail from Swan Way to the Shoreline Center. Goorjian replied the connection to Alameda is not part of this phase, but will be done in another phase at a future date.

PAC member Williams inquired about ADA accessibility on the bridges being replaced because they have stairs. Goorjian replied the bridges being replaced are not in ADA accessible parts of the park.

Recommendation: This was an informational item.

Public Comment:

4 Recording Secretary Clay read an e-mail into the record from Bruce Ohlson regarding the widening of Marsh Drive bridge over the Walnut Creek flood channel. As part of the project, the Iron Horse Trail is receiving a protected crossing of the flood channel. Both the bridge and street are quite narrow. The developer will widen Marsh Drive in front of their project sufficiently to include a bicycle lane between Solano Way and the bridge. This will make it easier and safer to access a very important East Bay Regional Park District Regional Trail.

7. PAC Member Comments – None.

8. Report from Chair – Chair Rickard, PAC members Arce and Robinson attended the Black Diamond Mines Ribbon Cutting. Rickard encouraged PAC members to attend Board Committee meetings. Rickard indicated the meeting recordings were also available on the District’s website.

9. Board Committee Reports – None.

10. Old Business – None.

11. New Business – None.

12. Adjournment – The meeting was adjourned at 6:42 p.m.

Summary of Actions: 1. The PAC approved the April 26, 2021 Park Advisory Committee minutes. 2. The PAC approved a motion to recommend the Board of Directors approve the naming of Concord Hills Regional Park to Thurgood Marshall Regional Park – Home of the Port Chicago 50.

5

Page Left Blank Intentionally

ATTACHMENT 1

PARK ADVISORY COMMITTEE Meeting of June 28, 2021

TO: Parks Advisory Committee STAFF REPORT Debra Auker, Assistant General Manager/CFO, Finance & Management PREPARED BY: Services Michelle Strawson O’Hara, Assistant Finance Officer

SUBJECT: Presentation of the 2020 Comprehensive Annual Financial Report ATTACHMENTS: 2020 Comprehensive Annual Financial Report is located at https://www.ebparks.org/about/budget/default.htm#FinancialReport (A bound copy has been provided to the members of the PAC Finance Committee)

RECOMMENDATION

Debra Auker, Assistant General Manager/Chief Financial Officer and Michelle Strawson O’Hara, Assistant Finance Officer from the Finance & Management Services Division will present the 2020 Comprehensive Annual Financial Report (Report) for the East Bay Regional Park District (Park District) and requests that the Park Advisory Committee recommend acceptance to the Board of Directors.

DESCRIPTION

State law and Board policy calls for the Park District to undergo an independent audit of its financial statements on an annual basis. The Park District contracts with the Certified Public Accounting firm of Brown Armstrong Accountancy Corporation (Brown Armstrong) as the Park District’s independent auditor. They have completed their audit for the period ended December 31, 2020. Based on their review, Brown Armstrong’s Independent Auditor’s Report confirms that the Park District’s financial statements, in all material respects, fairly present the financial position of the Park District and are in conformance with generally accepted accounting principles. Furthermore, during fieldwork, Brown Armstrong found no material weaknesses in the Park District’s internal control structure. In other words, the Park District has received a “clean” audit opinion with no exceptions or qualifications expressed.

These financial reports are posted on the Park District website. A similar review of the financial reports was presented at the Board Finance Committee meeting on Friday, June 25, 2021. The final financial reports will be presented to the entire Board of Directors at the July 6, 2021 Board meeting.

Comprehensive Annual Financial Report

SUMMARY

The complete reconciliation of the 2020 fiscal year, as recorded in detail in this draft report, demonstrates the continuing effectiveness of the Park District’s sustainable financial approach and the strong support of the Board of Directors toward financial transparency and long-term planning. The Report records the continuing commitment of public funds to providing services through expenditures on land acquisition, development projects, employee wages and benefits, debt service on bonds, and all required and recommended governmental activities necessary to operate the Park District. These year-end financial results will be used as the basis for making recommendations to the Board of Directors for future budgets.

The Government-wide Statement of Net Position (page 31) displays the Park District’s total net position as of December 31, 2020. Net position totaled $885.6 million, which increased by $38.2 million in 2020 primarily due to an increase in capital assets, property tax revenue being greater than budgeted, and salaries and benefits savings due to staff vacancies.

For 2020, governmental funds had an overall decrease in fund balance while the net position of the proprietary fund increased. • General Fund ending fund balance increased $9.5 million (page 38). This is attributed to increased property tax revenue and interest income, as well as personnel and operating expenditures below budget. • Debt Service Fund ending fund balance decreased $7.4 million (page 38), due to lower debt service payments and related property tax levies. • Project Fund ending fund balance decreased $22.0 million (page 38), due to the use of bond proceeds during the year for acquisition and development project costs. • Non-major governmental funds decreased $0.9 million (page 39) and include special revenue funds and permanent funds established for legal endowments. • Proprietary (Internal Service) Fund net position increased $5.0 million (page 45) primarily due to an increase in funding for the Major Infrastructure Renovation and Replacement reserves.

DETAIL

The Financial Section of the Park District’s 2020 Comprehensive Annual Financial Report (Report) begins with the Independent Auditors’ Report (page 13), which expresses their opinion that: “the financial statements referred to above present fairly, in all material respects, the respective financial position of the governmental activities, each major fund, and the aggregate remaining fund information of the District as of December 31, 2020, and the respective changes in financial position and, where applicable, cash flows thereof for the year then ended in accordance with accounting principles generally accepted in the United States of America.”

Management’s Discussion and Analysis (MD&A) follows and includes financial highlights for the year (page 17), an overview of the financial statements (pages 18-19), and an analysis of the government-wide (pages 20-22) and the fund financial statements, as noted below (pages 22-24).

Summary Statement of Changes in Net Position Total Primary Government For the Years Ended December 31, 2019, and 2018 (in thousands) Governmental Activities % of Change From % 2020 % of Total 2019 Total Prior Year Change Revenues: Program Revenues Charges for services $ 17,423 8% $ 22,682 10% $ (5,259) -23% Operating grants and contributions 13,392 6% 4,593 2% 8,799 192% Capital grants and contributions 6,909 3% 3,094 1% 3,815 123% General Revenues General property tax 162,290 75% 151,754 66% 10,536 7% General obligation bond property tax 9,816 5% 38,675 17% (28,859) -75% Unrestricted interest 7,199 3% 10,337 4% (3,138) -30% Total revenues 217,029 100% 231,135 100% (14,107) -6% Expenses: Acquisition/Steward/Dev Division 28,586 16% 18,446 11% 10,140 55% Executive/Legislative Division 7,441 4% 6,877 4% 564 8% Finance/Management Services Division 18,327 10% 17,803 11% 524 3% Legal Division 2,547 1% 2,566 2% (19) -1% Operations Division 77,827 44% 79,503 47% (1,676) -2% Public Affairs Division 6,008 3% 5,407 3% 601 11% Public Safety Division 33,314 19% 31,861 19% 1,453 5% Interest on long-term debt 4,797 3% 5,851 3% (1,054) -18% Total expenses 178,847 100% 168,314 100% 10,533 6% Change in Net Position 38,182 62,821 $ (24,639) -39%

Net position, beginning 847,461 784,640 Net position, end of year $ 885,643 $ 847,461

Additionally, General Fund budget highlights are included (page 22-23), as are capital asset and debt administration summaries (pages 25-26). Finally, economic factors impacting the 2021 and 2022 budgets are briefly discussed (pages 26-27).

The Government-wide Statement of Net Position and Statement of Activities follow the MD&A. These government-wide statements are reported on the full accrual basis, unlike the Governmental Fund Balance Sheet and Statement of Revenues, Expenditures and Changes in Fund Balances, which are presented on the modified accrual basis. The major differences between full accrual and modified accrual are that full accrual recognizes revenues earned but unavailable, includes depreciation expense, and does not include capital asset and debt service principal costs as expenses. A detailed reconciliation between government-wide and governmental statements are included on pages 37 and 40-41 of the Report.

The Statement of Net Position (page 31) includes assets and liabilities not included on the Governmental Fund Balance Sheet, including:

• Capital assets (non-depreciable and depreciable net of depreciation) ($747.7 million) • Deferred outflows on advance refunding of Measure WW bonds ($2.3 million) • Deferred outflows related to Other Post-Employment Benefits (OPEB) ($4.4 million) • Deferred outflows related to pension liabilities ($34.5 million) • Interest payable on general obligation bonds ($1.8 million) • Compensated absences for governmental funds ($8.3 million) • Long-term debt outstanding ($153.4 million) • Pollution remediation obligation ($6.1 million) • Net OPEB liability ($9.6 million) • Net pension liability (net of pension asset) for the EBRPD and CalPERS pension plans ($128.2 million) • Deferred inflows related to OPEB & pension liabilities ($16.1 million)

Summary Statement of Net Position Total Primary Government As of December 31, 2019, and 2018 (in thousands) Governmental Activities Change From 2020 2019 Prior Year Asse ts: Current and other assets $ 456,912 $ 468,915 $ (12,003) Capital assets, net 747,743 727,188 20,555 Total assets 1,204,655 1,196,103 8,552

Deferred outflows of resources 41,147 35,876 5,271

Liabilities: Current and other liabilities 23,926 25,810 (1,884) Long-term liabilities 320,149 341,257 (21,108) Total liabilities 344,076 367,067 (22,991)

Deferred inflows of resources 16,084 17,451 (1,367)

Net Position: Net investment in capital assets 656,485 637,478 19,007 Restricted 107,741 108,183 (442) Unrestricted 121,417 101,800 19,617 Total net position $ 885,643 $ 847,461 $ 38,181

The Statement of Activities (page 32) provides revenue and expense information by function, demonstrating the subsidy each function received from general revenues (property tax and unrestricted interest income).

The governmental fund statements, which follow the government-wide statements, include General Fund, Debt Service Fund, Project Fund and Non-Major Funds (detailed information is presented in the Supplementary Information section of the Report).

General Fund ending fund balance, included in the governmental fund financial statements (page 38) increased $9.5 million. Comparison of significant items between 2020 and 2019 are as follows:

• General Fund revenues increased $2.4 million for a total of $170.9 million, compared to $168.5 million in 2019, with the largest increase attributed to property tax revenue ($10.3 million) net of decreases in charges for services ($7.0) and interest ($1.5). • General Fund expenditures totaled $139.1 million compared to $131.5 million in 2019, with the increase ($7.6 million) primarily due to negotiated wage increases, additional pension contributions and investments in major infrastructure renovation and replacement. • 2020 General Fund transfers out totaled $24.3 million and funded the following:

Projects $ 17.8 million Major Infrastructure Renovation and Replacement Fund $ 5.0 million Debt Service $ 1.5 million

Debt service fund balance, included in the governmental fund financial statements, (page 38) decreased $7.4 million in 2020, attributable to lower debt service payments and related property tax levies for Measure WW bond payments.

Project fund balance, included in the governmental fund financial statements (page 38) decreased $22.0 million to an ending fund balance of $93.5 million primarily due to several projects completed in 2020 including construction for San Francisco Bay Trail segments, the new Judge John Sutter Regional Shoreline park, a new underground coal mine exhibit at Black Diamond Mines Regional Preserve and a facility upgrade at Camp Arroyo.

Proprietary fund statements (pages 44-46) include internal service funds which are used to account for goods and services provided by the internal service departments to other Park District departments. Funds accounted for in this category include workers’ compensation, major infrastructure renovation and replacement, major equipment replacement, general liability, and employee benefits.

Fiduciary fund statements (pages 48-49) include information about the EBRPD Retirement Plans, in which the Park District has a fiduciary responsibility over these closed plans.

Notes to the Basic Financial Statements follow (pages 52-98), providing information about significant accounting policies, and details about cash and investments, capital assets, long term liabilities, fund equity, OPEB, and retirement plans and contribution status, as well as other items required to be disclosed.

Required Supplementary Information (RSI) is the next section of the Report, and includes the mandated General Fund budget to actual comparison (page 101), information related to the funding status of the Park District’s retirement plans (pages 102-108), and information related to the Park District’s OPEB liability and contributions (pages 109-110). As noted on the General Fund budget to actual comparison:

• General Fund revenue exceeded budget by $7.1 million. Of that amount, $4.6 million was the result of increased property tax revenue and $2.4 million the result of higher than anticipated interest earnings. • General Fund expenditures were less than final appropriations by $18.7 million, the majority of which was related to unexpended supplies ($2.8 million) due to reduction in programming and other supply purchases, unexpended services ($5.5 million) due to reduction in repair and maintenance work, bus transportation, and other delayed services resulting from the COVID-19 pandemic, and salary and benefits savings due to position vacancies ($9.9 million).

General Fund - Budget and Actual - Schedule of Revenues, Expenditures and Changes in Fund Balance

Original Actual Variance from Budget Final Budget Amounts Final Budget REVENUES Property taxes and assessments $ 154,500,000 $ 154,500,000 $ 159,120,918 $ 4,620,918 Charges for services 10,483,370 3,283,370 2,829,891 (453,479) Interest 2,550,000 2,550,000 4,971,994 2,421,994 Property usage 1,844,990 1,844,990 1,956,859 111,869 Interagency agreements and grants 339,220 339,220 323,635 (15,585) Miscellaneous 1,226,000 1,246,300 1,673,803 427,503 Total revenues 170,943,580 163,763,880 170,877,100 7,113,220

EXPENDITURES Current: Acquisition/Stewardship/Development Division 13,320,400 12,937,143 12,118,061 819,082 Executive/Legislative Division 9,109,220 9,102,825 7,842,392 1,260,433 Finance/Management Services Division 12,436,580 12,712,326 11,556,398 1,155,928 Legal Division 3,157,610 3,199,897 2,701,966 497,931 Operations Division 77,762,869 76,806,218 68,014,229 8,791,989 Public Affairs Division 6,267,319 6,326,669 5,301,886 1,024,783 Public Safety Division 35,390,990 32,971,342 28,414,691 4,556,651 Capital outlay 2,193,090 3,743,674 3,143,474 600,200 Total expenditures 159,638,078 157,800,094 139,093,097 18,706,997

REVENUES OVER EXPENDITURES 11,305,502 5,963,786 31,784,003 25,820,217

OTHER FINANCING SOURCES (USES) Sale of capital assets 175,000 175,000 138,708 (36,292) Transfers in 21,215 1,084,204 1,807,227 723,023 Transfers out (11,167,100) (24,270,988) (24,270,988) - Total other financing sources (uses) (10,970,885) (23,011,784) (22,325,053) 686,731

NET CHANGE IN FUND BALANCE $ 334,617 $ (17,047,998) 9,458,950 $ 26,506,948

Beginning of year 143,261,448 End of year $ 152,720,398

The Supplementary Information section (pages 112-136) contains details of non-major funds, budget to actual for other governmental funds, and details of internal service funds and fiduciary funds.

The Report closes with a statistical section, (pages 143-169) which includes multi-year comparisons of financial information, as well as information about our major revenue source, property tax, additional debt information, and Park District statistics.

Conclusion and Acknowledgements

The General Manager and Deputy General Manager have been of great assistance and have reviewed the year-end results with the auditors. The preparation and timely completion of the annual financial reports is a significant endeavor for the Finance Department staff members, especially Kimberly Balingit (Accounting Manager), Michelle Strawson O’Hara (Assistant Finance Officer), David Sumner (Audit Manager) and Connie Swisher (Confidential Secretary) who have contributed their time and attention to produce the Report. Other Park District staff have also responded cooperatively to the many questions and requests for detailed information that accompanies each audit.

This Report will be submitted for the Government Finance Officers Association Certificate of Achievement for Excellence in Financial Reporting and staff expects to receive acknowledgment similar to the awards received by the Park District for the past 20 consecutive years.

RECOMMENDATION

It is requested that the Park Advisory Committee upon completion of the staff presentation, recommend acceptance of the 2020 Comprehensive Annual Financial Report to the Board of Directors.

1. 2020 Comprehensive Annual Financial Report is located on Park District webpage at https://www.ebparks.org/about/budget/default.htm#FinancialReport

Page Left Blank Intentionally

ATTACHMENT 2

MEMORANDUM

DATE: June 28, 2021

TO: Park Advisory Committee

FROM: Katy Hornbeck, Grants Manager

SUBJECT: Grants Program Update

PAGES: 1

Grants Manager Katy Hornbeck will provide a presentation on the Grants Program.

BACKGROUND

The General Manager’s Office, Legislative Affairs staff and the Grants Department has been successful in promoting, influencing and securing grants funds for the Park District. The Park District’s Grants Department continues to be very active in applying for, securing, and managing grant contracts that provide funding for Park District projects. A summary of the grant program, grant highlights and challenges for 2021/22 will be reviewed.

Page Left Blank Intentionally

Active, Applied, Awarded, Close Out, or Pending Grants Exhibit 2a

GRANT FUNDS LOCATION PROJECT AGENCY PROGRAM AMOUNT ELIGIBLE FINAL EXP. STATUS DESCRIPTION Policing at Alameda Point for Alameda Shoreline Veteran's Administration 12-1- Bureau of Bureau of Veteran's 1 (Naval Station) 2017 Veteran's Affairs Affairs 797,987.00 12/1/2017 9/30/2021 ACTIVE Policing at Alameda Point National Fish & Cosco Busan Oil Spill Alameda Shoreline Encinal Beach Restoration and Wildlife Settlement - 2 (Naval Station) Public Access Foundation Recreational 200,000.00 9/30/2019 12/30/2020 CLOSE OUT Encinal Beach Restoration San Fransisco Bay Alameda Shoreline Encinal Beach Restoration and Restoration San Francisco Bay 3 (Naval Station) Public Access Authoirty Restoration Authority 450,000.00 7/1/2018 1/31/2022 CLOSE OUT Encinal Beach Restoration Arroyo Del Valle 4 Camp Repair Yurt, PW559 CalOES DR-4301 24,767.00 1/3/2017 2/14/2021 CLOSE OUT Replace Yurt Arroyo Del Valle 5 Camp Repair Pathway, PW860 CalOES DR-4301 19,218.00 1/3/2017 2/14/2021 CLOSE OUT Repair Pathway Ridge Trail in Fremont - Garin to Bay Area Ridge 6 Bay Area Ridge Trail Niles Canyon Trail Council Bay Area Ridge Trail 200,000.00 7/24/2019 12/31/2021 ACTIVE Build Ridge Trail National Fish & Bay Point Restoration and Public Wildlife San Francisco Bay Bay Point Improve Access 7 Bay Point Shoreline Access Foundation Estuary Fund 105,000.00 1/1/2020 12/30/2023 ACTIVE Restore Habitat Bay Point Restoration and Public CA Dept Parks & Land & Water Bay Point Improve Access 8 Bay Point Shoreline Access Rec Conservation Fund 750,000.00 6/14/2019 12/30/2020 CLOSE OUT Restore Habitat Bay Point Restoration and Public Contra Costa Bay Point Improve Access 9 Bay Point Shoreline Access County Contra Costa County 550,000.00 3/1/2017 12/31/2020 CLOSE OUT Restore Habitat Bay Point Restoration and Public Bay Point Improve Access 10 Bay Point Shoreline Access Delta Conservancy Prop 1 Water Bond 2,100,000.00 4/10/2019 12/31/2021 CLOSE OUT Restore Habitat CA Dept Parks & Habitat Conservation Bay Point Improve Access 11 Bay Point Shoreline Harrier Trail Improvements Rec Fund 200,000.00 7/1/2017 6/30/2022 CLOSE OUT Restore Habitat Contra Costa 12 Bay Point Shoreline Delta Trail County Contra Costa County 2,241,580.00 6/17/2008 12/31/2019 PENDING Delta Trail 13 Big Break Repair Big Break Trail CalOES DR-4301 51,919.00 1/4/2017 8/14/2019 CLOSE OUT Repair Big Break Trail Community and Economic Wetland Restoration and Enhancement Grant Wetland Restoration and 14 Big Break Observation Platform Delta Conservancy Program 500,000.00 1/1/2021 1/31/2023 PENDING Observation Platform Repair Sand Mine Openings. 15 Black Diamond PW656 CalOES DR-4301 78,836.00 1/3/2017 12/31/2021 CLOSE OUT Repair Sand Mine Openings Active, Applied, Awarded, Close Out, or Pending Grants Exhibit 3a

GRANT FUNDS LOCATION PROJECT AGENCY PROGRAM AMOUNT ELIGIBLE FINAL EXP. STATUS DESCRIPTION 16 Black Diamond Restore 3 Ponds, PW989 CalOES DR-4308 470,735.00 2/14/2017 4/1/2021 CLOSE OUT Restore 3 ponds 17 Briones Restore Trails and Park P, G & E PG&E Pipeline Fund 245,000.00 3/23/2017 12/31/2020 ACTIVE

18 Briones Repair Pine Tree Trail, PW1104 CalOES DR-4301 146,172.42 1/3/2017 2/14/2021 ACTIVE Repair Pine Tree Trail Replace existing culvert - Seaborg 19 Briones PW974 CalOES DR-4301 43,699.00 1/3/2017 2/14/2021 CLOSE OUT Install Culvert Repair Lafayette Ridge Trail, 20 Briones PW558 CalOES DR-4301 219,224.00 1/3/2017 2/14/2021 ACTIVE Repair Lafayette Ridge Trail Casey Property Restoration, CA Dept. Fish & Tres Vaqueros Casey Property Safety and 21 Byron Vernal Pools Safety and Security Game Settlement 190,700.00 3/1/2018 1/1/2021 ACTIVE Security Tres Vaqeros Settlement Acquisition and Restoration CA Dept Fish & Tres Vaqueros Casey Property Safety and 22 Byron Vernal Pools (CAMPOS) Game Settlement 100,000.00 10/1/2018 10/1/2021 PENDING Security

Environmental Brownfields Grant and 23 Concord Hills Concord Hills clean up Protection Agency Technical Assistance 300,000.00 7/1/2022 3/1/2025 PENDING Concord Hills clean up Replace Chemical Toilet and Wildlife Dock at South Shore (Channel Conservation Wildlife Conservation 24 Contra Loma Point) Board Board 250,000.00 1/11/2019 3/31/2021 ACTIVE Improve Facilities Replace Chemical Toilets and One Dock - Southshore and US Bureau of US Bureau of 25 Contra Loma Eastshore Reclamation Reclamation 350,000.00 10/1/2018 9/30/2022 ACTIVE Improve Facilities

Bureau of Reclamation, South US Bureau of 26 Contra Loma North-West Dock Replacement Central CA Office Reclamation 137,500.00 1/1/2019 1/1/2023 ACTIVE Improve Facilities San Fransisco Bay Coyote Hills Restoration and Restoration Improve Access and 27 Coyote Hills Park Public Access (design) Authoirty Measure AA 450,000.00 6/19/2020 9/30/2021 ACTIVE Habitat

Coyote Hills Restoration and CA Natural Improve Access and 28 Coyote Hills Park Public Access Resources Agency River Parkways 800,000.00 8/1/2019 12/31/2021 ACTIVE Habitat Coyote Hills Restoration and CA Department Improve Access and 29 Coyote Hills Park Public Access Fish & Wildlife Prop 1 Restoration 1,000,000.00 APPLIED Habitat Active, Applied, Awarded, Close Out, or Pending Grants Exhibit 3a

GRANT FUNDS LOCATION PROJECT AGENCY PROGRAM AMOUNT ELIGIBLE FINAL EXP. STATUS DESCRIPTION Coyote Hills Restoration and CA Coastal Climate Adaptation Improve Access and 30 Coyote Hills Park Public Access Conservancy Funds 1,000,000.00 10/1/2021 12/31/2023 APPLIED Habitat San Fransisco Bay Coyote Hills Restoration and Restoration Improve Access and 31 Coyote Hills Park Public Access (construction) Authoirty Measure AA 4,472,210.00 7/1/2021 12/31/2023 AWARDED Habitat San Francisco Bay Coyote Hills Restoration and Environmental Water Quality Improve Access and 32 Coyote Hills Park Public Access Protection Agency Improvement Fund 2,000,000.00 3/1/2021 9/1/2024 AWARDED Habitat Wildlife Coyote Hills Restoration and Conservation Riparian Habitat Improve Access and 33 Coyote Hills Park Public Access Board Conservation 500,000.00 PENDING Habitat Locally Operated 34 Crown Beach McKay Avenue Utilities State Parks program 2,500,000.00 APPLIED McKay Avenue Utilities Roddy Golf Grassland ECCC Habitat Wildlife Conservation 35 Deer Valley Management Conservancy Board 230,000.00 4/17/2020 12/31/2023 ACTIVE Deer Valley LUP Del Valle Infrastructure CA Dept Parks & State Parks, Various 36 Del Valle Improvements Rec Specified 4,000,000.00 10/1/2018 12/31/2020 ACTIVE Rennovate Water System Del Valle Infrastructure CA Dept Parks & State Parks, Various 37 Del Valle Improvements Rec Specified 1,000,000.00 10/1/2018 12/31/2020 ACTIVE Remodel Visitor Center Del Valle Visitor Center CA Dept Parks & Land & Water 38 Del Valle Rennovation Rec Conservation Fund 134,319.00 9/1/2019 6/30/2022 ACTIVE Remodel Visitor Center Repair Dog Run Landslide, 39 Del Valle PW634 CalOES DR-4301 500,000.00 1/3/2017 2/14/2021 ACTIVE Repair Dog Run Trail Replace Womens Replace Womens restroom with CA Dept Parks & Land & Water Restroom with Unisex 40 Del Valle Unisex Restroom Rec Conservation Fund 106,262.00 APPLIED Restroom Replace Womens Replace Womens Restroom with CA Dept Water Land & Water Restroom with Unisex 41 Del Valle Unisex Restroom Resources Conservation Fund 361,903.00 7/1/2021 12/31/2023 AWARDED Restroom Wildlife Replace Womens Replace Womens Restroom with Conservation Restroom with Unisex 42 Del Valle Unisex Restroom Board Public Access 300,000.00 1/1/2021 12/31/2023 AWARDED Restroom Repair Trail/Road Slope - 43 District Wide multiple sites, PW971 CalOES DR-4301 86,977.00 1/3/2017 2/14/2021 ACTIVE Hayward Shoreline Levees Active, Applied, Awarded, Close Out, or Pending Grants Exhibit 3a

GRANT FUNDS LOCATION PROJECT AGENCY PROGRAM AMOUNT ELIGIBLE FINAL EXP. STATUS DESCRIPTION CA Dept Parks & 44 District Wide Per Capita projects Rec Prop 68, Per Capita 1,500,000.00 7/1/2018 12/31/2023 AWARDED Tyler Staging Area CA Dept Parks & 45 District Wide Per Capita projects Rec Prop 68, Per Capita 1,500,000.00 7/1/2018 12/31/2023 AWARDED Improve Public Access Repair Other Three Ponds, PW859 (Horse Valley, Los Restore Horse Valley 46 District Wide Charros, Chaparral) CalOES DR-4301 52,345.00 1/3/2017 10/31/2021 ACTIVE Wetland Repair Trail/Road Slope - 47 District Wide multiple sites, PW971 CalOES DR-4301 200,000.00 1/3/2017 2/14/2021 ACTIVE Repair Lake Trail CA Dept Parks & 48 District Wide Per Capita projects Rec Prop 68, Per Capita 1,292,710.00 7/1/2018 12/31/2023 AWARDED Renovate Roberts Pool CA Dept Parks & Briones CXT restroom 49 District Wide Per Capita projects Rec Prop 68, Per Capita 300,000.00 7/1/2018 12/31/2023 AWARDED replacement Alameda County Acquisition of Akaline Soil and Surplus Property 50 District Wide Spearscale Habitat Alameda County Authority 50,000.00 3/20/2014 3/20/2021 ACTIVE Eddie Flat Acquisition Golden Eagle Study and Land Next Era Wind 51 District Wide Acquisition Power Next Era 52,000.00 6/27/2012 6/27/2019 ACTIVE Fitzpatrick-Campos Golden Eagle Study and Land Next Era Wind Byron Vernal Pools-Casey 52 District Wide Acquisition Power Next Era 25,000.00 6/27/2012 6/27/2019 ACTIVE Property Golden Eagle Study and Land Next Era Wind Vasco Hills Coelho 53 District Wide Acquisition Power Next Era 156,075.00 6/27/2012 6/27/2019 ACTIVE Machado Acq Golden Eagle Study and Land Next Era Wind Vasco Hills - Coelho 54 District Wide Acquisition Power Next Era 36,500.00 6/27/2012 6/27/2019 ACTIVE Machado Golden Eagle Study and Land Next Era Wind Deer Valley - Olesen 55 District Wide Acquisition Power Next Era 275,000.00 6/27/2012 6/27/2019 ACTIVE Acquisition Golden Eagle Study and Land Next Era Wind 56 District Wide Acquisition Power Next Era 259,250.00 6/27/2012 6/27/2019 ACTIVE Lucas Acquisition CA Invasive Plant 57 District Wide Spartina Eradiction 2019-2020 Council Coastal Conservancy 28,800.00 7/1/2019 3/31/2021 CLOSE OUT Spartina eradication Golden Eagle Study and Land Next Era Wind 58 District Wide Acquisition Power Next Era 358,050.34 6/27/2012 6/27/2019 ACTIVE Golden Eagle Acquisition Golden Eagle Study and Land Next Era Wind Next Era Golden Eagle 59 District Wide Acquisition Power Next Era 1,127,212.03 6/27/2012 6/27/2019 ACTIVE Research Active, Applied, Awarded, Close Out, or Pending Grants Exhibit 3a

GRANT FUNDS LOCATION PROJECT AGENCY PROGRAM AMOUNT ELIGIBLE FINAL EXP. STATUS DESCRIPTION West County Trail Maintenance Contra Costa Measure J, $10 Million 60 District Wide 2014 Transp. Auth. for EBRPD 480,000.00 2/18/2015 12/31/2021 ACTIVE Rehabilitate Four Trails Aquatic Adventure Camps 2019- CA Dept Water 61 District Wide 2020 Resources Water Safety Grants 10,500.00 7/5/2019 7/4/2022 ACTIVE Aquatic Adventure Camp

ECCC Habitat Science and Research 62 District Wide Small Mammal Burrow Mapping Conservancy Grant Program 5,502.00 1/1/2017 6/30/2019 ACTIVE Study Ground Squirrel Repair Trail/Road Slope - 63 District Wide multiple sites, PW971 CalOES DR-4301 892,178.00 1/3/2017 2/14/2021 ACTIVE Regrade Stream Trail Repair Trail/Road Slope - Repair Chabot to Garin 64 District Wide multiple sites, PW971 CalOES DR-4301 64,028.50 1/3/2017 2/14/2021 ACTIVE Trail Longhorn Fairy Shrimp and U.S. Dept. of Central Valley Longhorn Fairy Shrimp and 65 District Wide Vernal Pool Study Interior Conservation 121,692.00 6/14/2016 6/13/2021 ACTIVE Vernal Pool Study Repair 4 Small Projects 2017 66 District Wide Storm Damage, PW563 CalOES DR-4301 3,956.00 1/3/2017 8/14/2019 CLOSE OUT Repair 2017 Storm Damage Emergency Protective Measures Response to Storm 67 District Wide (Category B) CalOES DR-4301 244,792.00 1/3/2017 5/1/2018 CLOSE OUT Emergencies Remove Debris 2017 68 District Wide Debris Removal (Cat A) CalOES DR-4301 249,415.00 1/3/2017 9/30/2018 CLOSE OUT Storm 69 District Wide Replace Sand and Gravel CalOES DR-4301 36,675.00 1/3/2017 8/14/2019 CLOSE OUT Replace Sand and Gravel SF Bay Trail Vulnerability Conduct Vulunerability 70 District Wide Assessment CalTrans Adaptation Planning 370,000.00 10/1/2018 2/28/2021 ACTIVE Assessment Repair Other Three Ponds, PW859 (Horse Valley, Los 71 District Wide Charros, Chaparral) CalOES DR-4301 165,450.00 1/3/2017 10/31/2021 ACTIVE Repair Ponds Repair Culverts - 10 sites, PW- 72 District Wide 0973 CalOES DR-4301 889,179.00 1/3/2017 10/31/2021 ACTIVE Repair Culverts

73 District Wide Repair Slopes - 14 sites, PW1405 CalOES DR-4308 500,000.00 2/14/2017 4/1/2021 ACTIVE Repair Slopes West Contra Costa County Trail Contra Costa Measure J, $10 Million 74 District Wide Paving, Measure J 2018 Transp. Auth. for EBRPD 175,000.00 11/21/2018 11/14/2021 ACTIVE Replace Culverts West Contra Costa County Trail Contra Costa Measure J, $10 Million 75 District Wide Paving, Measure J 2018 Transp. Auth. for EBRPD 325,000.00 11/21/2018 11/14/2021 ACTIVE Rehabilitate Trails Repair Trail/Road Slope - Repair Trail and Road 76 District Wide multiple sites, PW971 CalOES DR-4301 877,131.50 1/3/2017 2/14/2021 ACTIVE Slope Active, Applied, Awarded, Close Out, or Pending Grants Exhibit 3a

GRANT FUNDS LOCATION PROJECT AGENCY PROGRAM AMOUNT ELIGIBLE FINAL EXP. STATUS DESCRIPTION Repair Big Bear Loop and East Repair Big Bear Loop and 77 District Wide Ridge Trail, PW557 CalOES DR-4301 80,503.00 1/3/2017 2/14/2021 ACTIVE East Ridge Trail Rehabilitate Trail - Lafayette- Contra Costa Measure J, $10 Million Rehabilitate Trail - 78 District Wide Moraga Trail Transp. Auth. for EBRPD 275,000.00 12/18/2019 12/18/2022 ACTIVE Lafayette Moraga Trail Repair Castle Rock and Mezue Repair Castle Rock & 79 District Wide Trail, PW776 CalOES DR-4308 80,096.00 2/14/2017 4/1/2021 ACTIVE Mezue Trail FEMA (Federal Emergency COVID-19 Emergency Response, Management FEMA Public 80 District Wide FEMA DR-4482 Agency) Assistance 1,075,239.00 1/20/2020 12/31/2021 ACTIVE COVID Response Contra Costa Measure J, $10 Million Rehabilitate Iron Horse 81 District Wide Rehabilitate Iron Horse Trail Transp. Auth. for EBRPD 225,000.00 12/18/2019 12/17/2022 ACTIVE Trail CA Division Surrendered and Boating & Abandoned Vessels 82 District Wide Remove Abandoned Boats Waterways Exchange (SAVE) 75,000.00 3/17/2020 6/30/2021 ACTIVE Remove Abandoned Boats CA Division Boating & Quagga Prevention 83 District Wide Quagga Prevention FY2019/2020 Waterways Grant 400,000.00 11/18/2019 11/17/2021 ACTIVE Quagga Mussel Response CA Division Boating & Quagga Prevention 84 District Wide Quagga Prevention FY2021/2022 Waterways Grant 400,000.00 PENDING Quagga Mussel Response Office of Justice Bullet Proof Vest 85 District Wide Bullet Proof Vest 2020 Programs Program 1,956.75 4/1/2020 2/1/2022 ACTIVE Bullet Proof Vests Regional Water Water Quality Monitoring 2019- Quality Control State Water Pollution 86 District Wide 2022 Board & Abatement Account 222,675.00 7/1/2019 6/30/2022 ACTIVE Water Quality Monitoring 2017 FEMA Disaster Recovery, 87 District Wide Admin Fee CalOES DR-4301 37,304.00 2/15/2018 8/14/2018 ACTIVE FEMA Admin. Fees Alameda County Acquisition of Akaline Soil and Surplus Property 88 District Wide Spearscale Habitat Alameda County Authority 766,340.65 3/20/2014 3/20/2021 ACTIVE Alkaline Habitat Funding Contra Costa County Trail Contra Costa Measure J, $10 Million Contra Costa County Trail 89 District Wide Maintenance, 2020 Transp. Auth. for EBRPD 500,000.00 APPLIED Maintenance, 2020 Active, Applied, Awarded, Close Out, or Pending Grants Exhibit 3a

GRANT FUNDS LOCATION PROJECT AGENCY PROGRAM AMOUNT ELIGIBLE FINAL EXP. STATUS DESCRIPTION

Bay Area Urban Areas 90 District Wide Helicopter Downlink Bay Area UASI Security Initiative 705,755.00 11/1/2021 12/31/2022 APPLIED Helicopter Downlink CA Dept Parks & Regional Parks 91 District Wide Regional Parks Program Rec Program 800,000.00 PENDING Regional Parks Program Environmental Environmental Enhancement & CA Natural Enhancement & Environmental 92 District Wide Mitigation Resources Agency Mitigation 500,000.00 PENDING Enhancement & Mitigation Wildlife Conservation 93 District Wide TBD Board Public Access 500,000.00 PENDING TBD CA Coastal 94 District Wide TBD Conservancy Explore the Coast 40,000.00 7/1/2021 2/1/2024 PENDING TBD

95 District Wide TBD trails planning project CalTrans Adaptation Planning 500,000.00 PENDING TBD trails planning project CA Dept Parks & Recreation Trail 96 District Wide TBD Rec Programs 1,000,000.00 PENDING TBD District Wide Trail Gap 97 District Wide District Wide Trail Gap Closures CalTrans BUILD 11,500,000.00 10/1/2020 10/1/2023 PENDING Closures CA Dept Parks & Habitat Conservation 98 District Wide TBD Rec Fund 200,000.00 7/1/2022 12/31/2024 PENDING TBD Altamont Landfill Altamont Landfill Open Space 99 Doolan Canyon Gosselin-Rollins Acquisition Open Space Commission 132,200.00 11/7/2017 12/31/2021 ACTIVE Gosselin-Rollins Acquisition East Contra Costa City of Pittsburg Redevelopment 100 Trails Agency City of Pittsburg City of Pittsburg 582,406.00 1/1/2019 12/31/2021 ACTIVE City of Pittsburg Trails Albany Beach, Golden Gate Field CA Coastal Priority Conservation Golden Gate Fields Bay 101 Eastshore Bay Trail Conservancy Area 750,000.00 7/23/2018 12/30/2020 CLOSE OUT Trail Golden Gate Fields Bay 102 Eastshore Bay Trail, Gilman to Buchanan ABAG Bay Trail 100,000.00 12/15/2017 12/31/2020 CLOSE OUT Trail Bay Area Air TFCA - Quality Transportation Fund Golden Gate Fields Bay 103 Eastshore Bay Trail, Gilman to Buchanan Management Dist for Clean Air 246,552.00 4/30/2018 1/1/2021 CLOSE OUT Trail CA Dept Parks & State Parks, Various Brickyard Cove 104 Eastshore Brickyard Cove Development Rec Specified 5,281,727.31 4/30/2014 12/31/2017 ACTIVE Development Active, Applied, Awarded, Close Out, or Pending Grants Exhibit 3a

GRANT FUNDS LOCATION PROJECT AGENCY PROGRAM AMOUNT ELIGIBLE FINAL EXP. STATUS DESCRIPTION Bay Friendly Landscape Brickyard Cove 105 Eastshore Bay Friendly Landscaping StopWaste.org Improvement Grant 5,000.00 8/1/2017 6/30/2021 ACTIVE Development National Fish & Albany Beach restoration and Wildlife San Francisco Bay 106 Eastshore public access Foundation Estuary Fund 101,500.00 1/1/2021 12/31/2023 ACTIVE Restore Albany Beach CA Coastal 107 Eastshore Albany Beach Restoration Conservancy Prop 1 Water Bond 520,000.00 4/17/2018 12/31/2020 CLOSE OUT Restore Albany Beach FEMA, Hazard Evnronmental Clearance 108 Fuelbreak Brushland Management CalOES Mitigation 45,136.00 5/12/2011 12/31/2024 ACTIVE Brushland Fuels Hazardous Fuels Reduction in Four Wildland Urban Interface CA Dept of 109 Fuelbreak Parks Forestry Fire Prevention Grant 50,000.00 12/1/2018 12/31/2021 ACTIVE Oakland PDM06

Oakland PDM06 - East Bay Hills FEMA, Hazard 110 Fuelbreak Fuels Management Project CalOES Mitigation 2,867,438.00 3/15/2015 6/30/2025 ACTIVE Oakland PDM06 Hazardous Fuels Reduction in Four Wildland Urban Interface CA Dept of 111 Fuelbreak Parks Forestry Fire Prevention Grant 700,000.00 12/1/2018 12/31/2021 ACTIVE Manage Brushland Fuels FEMA, Hazard 112 Fuelbreak Brushland Management CalOES Mitigation 3,530,160.00 5/12/2011 12/31/2024 ACTIVE Manage Brushland Fuels FEMA, Hazard Pre-Award Cost, FEMA 113 Fuelbreak Brushland Management CalOES Mitigation 425,896.98 5/12/2011 12/31/2024 ACTIVE Brushing Regional Forest and Fire Capacity CA Coastal Regional Fire and Reduce Fire Hazard and 114 Fuelbreak Grant Conservancy Forest Capacity 750,000.00 3/19/2020 12/31/2021 ACTIVE Restore Forest FEMA, Hazard FEMA Fuel Reduction 115 Fuelbreak Brushland Management CalOES Mitigation 46,260.02 5/12/2011 12/31/2024 ACTIVE Permitting DR-4569 Vegetation DR-4569 Vegetation Management Tilden and Management Tilden and Hazard Mitigation Claremont Canyon 116 Fuelbreak Claremont Canyon Connected CalOES Grant Program 3,215,070.00 APPLIED Connected DR-4558 Vegetation DR-4558 Vegetation Management Tilden and Management Tilden and Hazard Mitigation Claremont Canyon 117 Fuelbreak Claremont Canyon connected CalOES Grant Program 3,215,071.00 APPLIED connected Active, Applied, Awarded, Close Out, or Pending Grants Exhibit 3a

GRANT FUNDS LOCATION PROJECT AGENCY PROGRAM AMOUNT ELIGIBLE FINAL EXP. STATUS DESCRIPTION Diablo Fire Safe 118 Fuelbreak WUI Fuels Management Council Fire Safe Council 300,000.00 APPLIED WUI Fuels Management DR-4407 Vegetation DR-4407 Vegetation Management Tilden and Management Tilden and Hazard Mitigation Claremont Canyon 119 Fuelbreak Claremont Canyon Connected CalOES Grant Program 3,215,070.00 1/1/2020 12/31/2023 APPLIED Connected

Hazardous Fuels Reduction in Hazardous Fuels Reduction Seven Wildland-Urban Interface CA Dept of in Seven Wildland-Urban 120 Fuelbreak Parks Forestry Fire Prevention Grant 1,093,000.00 5/1/2020 5/1/2022 PENDING Interface Parks Bridge Replacement Dry Creek CA Dept Parks & Habitat Conservation 121 Garin Trail Rec Fund 200,000.00 7/1/2016 12/30/2020 CLOSE OUT Replace Five Bridges

Gateway Regional Operate Observation Platform Bay Area Bridge Bay Area Bridge Toll 122 Shoreline and BCDC Parking Lot Toll Authority Authority 71,910.98 7/1/2020 6/30/2025 ACTIVE Pier cleaner Gateway Regional Bay Area Bridge Bay Area Bridge Toll Operate the Bridge Yard 123 Shoreline Operate the Bridge Yard Building Toll Authority Authority 600,000.00 9/1/2017 6/30/2022 ACTIVE Building Gateway Regional BATA Capital Funding, West Bay Area Bridge Bay Area Bridge Toll Operate the Bridge Yard 124 Shoreline Overflow Toll Authority Authority 175,000.00 7/1/2019 12/31/2022 AWARDED Building Operate Observation Gateway Regional Operate Observation Platform Bay Area Bridge Bay Area Bridge Toll Platform and BCDC 125 Shoreline and BCDC Parking Lot Toll Authority Authority 1,488,089.02 7/1/2020 6/30/2025 ACTIVE Parking Lot Gateway Regional Bay Area Bridge 2021 Bridgeyard Capital 126 Shoreline 2021 Bridgeyard Capital request Toll Authority 2,000,000.00 PENDING request Mitigation for Outside Conduct Predator 127 Hayward Shoreline Predator Management Port of Oakland Agency 78,750.00 10/1/2019 10/31/2021 ACTIVE Management Hayward Area Shoreline Master Plan - STAFF Recreation and 128 Hayward Shoreline MATCH ONLY Park District Caltrans 0.00 10/1/2018 1/1/2021 ACTIVE Shoreline Master Plan San Fransisco Bay Hayward Shoreline Hayward Shoreline Restoration - Restoration San Francisco Bay Restoration - Planning 129 Hayward Shoreline Planning Phase Authoirty Restoration Authority 500,000.00 1/1/2021 AWARDED Phase U.S. Fish & Wildlife National Coastal Hayward Marsh 130 Hayward Shoreline Hayward Marsh Restoration Service Wetlands Program 1,000,000.00 PENDING Restoration Active, Applied, Awarded, Close Out, or Pending Grants Exhibit 3a

GRANT FUNDS LOCATION PROJECT AGENCY PROGRAM AMOUNT ELIGIBLE FINAL EXP. STATUS DESCRIPTION Redwood Canyon Golf Course, 131 Lake Chabot PW972 CalOES DR-4301 2,684,349.00 1/3/2017 5/31/2021 ACTIVE Restore Golf Course Repair Rocky Ridge Road - 132 Las Trampas PW715 CalOES DR-4301 155,376.00 1/3/2017 2/14/2021 CLOSE OUT Repair Rocky Ridge Road Alameda County Waste Bay Friendly Management Landscape 133 Martin Luther King, Jr. Tidewater Public Access Project Authority Improvement Grant 5,000.00 10/1/2018 12/31/2021 ACTIVE Improve Public Access Outdoor Recreation National Park Legacy Partnership 134 Martin Luther King, Jr. Tidewater Public Access Project Service (ORLP) 1,000,000.00 APPLIED Improve Public Access State Parks, Prop 68 Tidewater Public Access and CA Dept Parks & Statewide Parks 135 Martin Luther King, Jr. Restoration Rec Program 2,900,000.00 7/1/2020 12/31/2024 PENDING Improve Public Access Wildlife Conservation Wildlife Conservation Study Doolittle Trail 136 Martin Luther King, Jr. Doolittle Boat Launch Board Board 750,000.00 6/22/2020 12/31/2022 ACTIVE Section Alameda County Doolittle Bay Trail and Park Transportation Study Doolittle Trail 137 Martin Luther King, Jr. Improvements Project Commission 2018 CIP, ACTC 2,833,000.00 1/1/2019 12/31/2022 ACTIVE Section

Doolittle Bay Trail and Park CA Natural Study Doolittle Trail 138 Martin Luther King, Jr. Improvements Project Resources Agency Green Infrastructure 1,435,000.00 7/1/2020 12/31/2023 ACTIVE Section Doolittle Bay Trail and Park Study Doolittle Trail 139 Martin Luther King, Jr. Improvements Project CalTrans Active Tranportation 4,000,000.00 1/1/2019 2/28/2021 AWARDED Section Operate San Leandro Operate San Leandro Creek Creek Trail, Hegenberger 140 Martin Luther King, Jr. Trail, Hegenberger to 98th City of Oakland City of Oakland 1,456,660.00 1/1/2021 12/31/2024 ACTIVE to 98 CalTrans Mitigation 141 Martin Luther King, Jr. MLK Shorebird Sanctuary CalTrans Funds 775,000.00 AWARDED MLK Shorebird Sanctuary SF Bay trail - Martinez Bay 142 Martinez Shoreline SF Bay trail - Martinez Bay Trail ABAG Bay Trail 200,000.00 APPLIED Trail Metro. Transportation SF Bay Trail - Martinez Bay 143 Martinez Shoreline SF Bay Trail - Martinez Bay Trail Comission Active Tranportation 2,000,000.00 6/1/2021 3/31/2025 APPLIED Trail Active, Applied, Awarded, Close Out, or Pending Grants Exhibit 3a

GRANT FUNDS LOCATION PROJECT AGENCY PROGRAM AMOUNT ELIGIBLE FINAL EXP. STATUS DESCRIPTION San Fransisco Bay North Richmond Aquire North Richmond Restoration San Francisco Bay Aquire North Richmond 144 Wetlands Property Authoirty Restoration Authority 600,000.00 7/1/2021 12/31/2023 PENDING Property Plant Trees Along New Waste Waste Waste Management 145 Oyster Bay Management Building Management Inc. Mitigation 97,826.63 2/1/2011 11/2/2020 ACTIVE Turf Installation

Plant Trees Along New Waste Waste Waste Management Waste Mananagement Tree 146 Oyster Bay Management Building Management Inc. Mitigation 103,174.18 2/1/2011 11/2/2020 ACTIVE Maintenance at Oyster Bay CA Dept Parks & Habitat Conservation 147 Pleasanton Ridge Tyler Staging Area Rec Fund 200,000.00 7/1/2016 12/31/2021 ACTIVE Tyler Staging Area

148 Pleasanton Ridge Owen Ranch Restoration Moore Foundation Grant 150,000.00 10/1/2011 5/31/2022 ACTIVE Owen Ranch Restoration Tehan Canyon Emergency Tehan Canyon Emergency 149 Pleasanton Ridge Response CalOES DR-4301 9,648.81 1/3/2017 6/30/2017 CLOSE OUT Response CA Dept Parks & Point Isabel Lead 150 Point Isabel Point Isabel Lead Remediation Rec 2,000,000.00 7/1/2020 12/31/2023 PENDING Remediation 151 Point Molate Point Molate Bay Trail ABAG Bay Trail 150,000.00 APPLIED Extend Bay Trail Metro. Transportation Priority Conservation 152 Point Molate Point Molate Bay Trail Comission Area 1,000,000.00 7/1/2019 5/30/2022 AWARDED Extend Bay Trail

CA Natural 153 Point Molate Point Molate Bay Trail Resources Agency Trails and Greenways 1,200,000.00 6/1/2020 12/31/2022 AWARDED Extend Bay Trail CA Dept Parks & Recreation Trail 154 Point Molate Point Molate Bay Trail Rec Programs 900,000.00 7/1/2021 12/31/2022 AWARDED Extend Bay Trail Improve Water Trail 155 Point Pinole Pt. Pinole Water Trail Access ABAG Bay Area Water Trail 120,000.00 7/1/2021 12/31/2023 AWARDED Access

Wildlife Monarch Butterfly and Conservation Pollinator Rescue 156 Point Pinole Monarch Habitat Enhancement Board Program Funding 203,000.00 5/26/2020 12/31/2021 ACTIVE Remove Eucalyptus Saddlehorn Saddlehorn 157 Redwood Piedmont Stables Rennovation Foundation Foundation 100,000.00 3/31/2015 12/31/2020 ACTIVE Renovate Piedmont Stables CA Dept Parks & 158 Roberts Roberts Pool Renovation Rec Prop 68, RIRE 1,596,099.00 7/1/2019 12/31/2023 AWARDED Renovate Roberts Pool Active, Applied, Awarded, Close Out, or Pending Grants Exhibit 3a

GRANT FUNDS LOCATION PROJECT AGENCY PROGRAM AMOUNT ELIGIBLE FINAL EXP. STATUS DESCRIPTION

Nunn Marsh Creek Conservation Conservation 159 Round Valley Easement 3-year start up GBN Partners Easement Endowment 42,550.00 5/31/2018 5/31/2048 ACTIVE Monitor Nunn Property National Fish & Nunn Marsh Creek Preserve Wildlife Conservation 160 Round Valley Land Management Funding Foundation Easement Endowment 13,350.00 1/1/2022 12/31/2022 ACTIVE Monitor Nunn Property Bay Area Air TFCA - Quality Transportation Fund Develop Lone Tree Trail 161 San Pablo Bay Lone Tree Point Bay Trail Management Dist for Clean Air 138,669.00 7/1/2018 7/1/2020 ACTIVE and Shoreline

CA Natural Urban Greening, Develop Lone Tree Trail 162 San Pablo Bay Lone Tree Point Bay Trail Resources Agency Resources Agency 2,100,000.00 6/1/2018 12/31/2021 ACTIVE and Shoreline Contra Costa Develop Lone Tree Trail 163 San Pablo Bay Lone Tree Point Bay Trail Transp. Auth. Measure J Competitive 1,000,000.00 1/16/2019 1/16/2022 ACTIVE and Shoreline Priority Conservation Pinole Shores to Bayfront 164 San Pablo Bay Pinole Shores to Bayfront Park CalTrans Area 119,711.00 2/16/2017 4/30/2018 CLOSE OUT Park Metro. Transportation Active Transportation, Pinole Shores to Bayfront 165 San Pablo Bay Pinole Shores to Bayfront Park Comission MTC 4,000,000.00 2/16/2017 4/30/2018 CLOSE OUT Park

Union Pacific Union Pacific Railroad Pinole Shores to Bayfront 166 San Pablo Bay Pinole Shores to Bayfront Railroad Company Company 2,030,500.00 11/10/2016 12/31/2018 CLOSE OUT Park Outdoor CA Dept Parks & Environmental 167 Shadow Cliffs Shadow Cliffs Nature Pavillion Rec Education Facilities 434,713.00 7/1/2017 12/30/2024 ACTIVE Construct Nature Pavillion Sibley/ ClaremontCanyon/Hu McCosker Creek Restoration CalTrans Mitigation McCosker Creek 168 ckleberry and Public Access CalTrans Funds 2,240,000.00 1/20/2017 12/31/2019 ACTIVE Restoration Sibley/ ClaremontCanyon/Hu McCosker Creek Restoration CA Natural McCosker Creek 169 ckleberry and Public Access Resources Agency Urban Rivers 750,000.00 2/1/2018 12/31/2020 ACTIVE Restoration Sibley/ ClaremontCanyon/Hu McCosker Creek Restoration CA Dept Parks & State Parks, Various McCosker Creek 170 ckleberry and Public Access Rec Specified 3,880,000.00 7/1/2019 12/31/2021 ACTIVE Restoration Active, Applied, Awarded, Close Out, or Pending Grants Exhibit 3a

GRANT FUNDS LOCATION PROJECT AGENCY PROGRAM AMOUNT ELIGIBLE FINAL EXP. STATUS DESCRIPTION Sibley/ ClaremontCanyon/Hu McCosker Creek Restoration CA Natural McCosker Creek 171 ckleberry and Public Access Resources Agency River Parkways 500,000.00 1/1/2017 12/31/2021 ACTIVE Restoration Sibley/ ClaremontCanyon/Hu McCosker Creek Restoration CA Coastal McCosker Creek 172 ckleberry and Public Access Conservancy Prop 1 Water Bond 490,000.00 1/5/2019 3/1/2022 ACTIVE Restoration Sibley/ ClaremontCanyon/Hu McCosker Creek Restoration Environmental Environmental McCosker Creek 173 ckleberry and Public Access Protection Agency Protection Agency 1,509,268.00 9/16/2019 9/30/2023 ACTIVE Restoration Sibley/ ClaremontCanyon/Hu McCosker Creek Restoration CA Dept Parks & Habitat Conservation McCosker Creek 174 ckleberry and Public Access Rec Fund 200,000.00 7/1/2019 12/31/2023 ACTIVE Restoration Sibley/ Wildlife ClaremontCanyon/Hu McCosker Creek Restoration Conservation Wildlife Conservation McCosker Creek 175 ckleberry and Public Access Board Board, Habitat 500,000.00 5/28/2020 3/31/2024 ACTIVE Restoration Sibley/ ClaremontCanyon/Hu Install Open Botton Culvert, 176 ckleberry Improved Project CalOES DR-4308 27,085.00 2/1/2017 10/1/2020 CLOSE OUT Restore Creek Road

ECCC Habitat Science and Research 177 Vasco Hills Raptor Surveys, Smallwood Conservancy Grant Program 9,960.00 5/1/2018 12/31/2021 ACTIVE Study Raptor Surveys 178 Vasco Hills Repair Ponds, PW1108 CalOES DR-4301 363,035.00 1/31/2017 12/31/2020 CLOSE OUT Repair Ponds San Fransisco Bay McNabney Marsh Habitat Waterbird Regional McNabney Marsh Habitat Restoration Enhancement project 179 Preserve (Shell Marsh) Enhancement project (planning) Authoirty Measure AA 7,000,000.00 PENDING (planning)

Wildcat Repair Nimitz Way at Inspriation 180 Canyon/Alvarado Park Point, PW442 CalOES DR-4301 70,425.00 1/3/2017 2/14/2021 ACTIVE Repair Nimitz Way

TOTAL 152,001,956.12 Grants Funding Received in 2020 Exhibit 2b

CHECK CHECK LOCATION PROJECT PROGRAM AGENCY DATE AMOUNT Alameda County Albany Beach, Golden Gate Transportation 1 Eastshore Field Bay Trail Measure B Commission 1/9/2020 15,000.00 Spartina Eradiction 2019- 2 District Wide 2020 Coastal Conservancy CA Invasive Plant Council 1/13/2020 5,360.00 City of Pittsburg 3 East Contra Costa Trails Redevelopment Agency City of Pittsburg City of Pittsburg 1/16/2020 582,405.96 SF Bay Trail Vulnerability 4 District Wide Assessment Adaptation Planning CalTrans 1/21/2020 27,916.02

Policing at Alameda Point Alameda Shoreline for Veteran's Administration 5 (Naval Station) 12-1-2017 Bureau of Veteran's Affairs Bureau of Veteran's Affairs 1/23/2020 17,219.00 State Homeland Secuirty 6 District Wide P25 Helicoper Radios Grant Alameda County 1/29/2020 93,526.00 Spartina Eradiction 2019- 7 District Wide 2020 Coastal Conservancy CA Invasive Plant Council 1/31/2020 9,840.00 8 Fuelbreak Brushland Management FEMA, Hazard Mitigation CalOES 2/5/2020 445,384.00

West Contra Costa County Measure J, $10 Million for Contra Costa Transp. 9 District Wide Trail Paving, Measure J 2018 EBRPD Auth. 2/7/2020 325,000.00

Hazardous Fuels Reduction in Four Wildland Urban 10 Fuelbreak Interface Parks Fire Prevention Grant CA Dept of Forestry 2/11/2020 107,403.90 11 District Wide Debris Removal (Cat A) DR-4301 CalOES 2/12/2020 22,746.00 Emergency Protective 12 District Wide Measures (Category B) DR-4301 CalOES 2/13/2020 8,481.00 Grants Funding Received in 2020 Exhibit 3b

CHECK CHECK LOCATION PROJECT PROGRAM AGENCY DATE AMOUNT 2017 FEMA Disaster 13 District Wide Recovery, Admin Fee DR-4301 CalOES 2/13/2020 848.00 Alameda County Albany Beach, Golden Gate Transportation 14 Eastshore Field Bay Trail Measure B Commission 2/13/2020 35,000.00 Aquatic Adventure Camps CA Dept Water 15 District Wide 2019-2020 Water Safety Grants Resources 2/14/2020 3,328.30 16 District Wide Debris Removal (Cat A) DR-4301 CalOES 2/19/2020 90,985.00 Emergency Protective 17 District Wide Measures (Category B) DR-4301 CalOES 2/19/2020 33,925.00 2017 FEMA Disaster 18 District Wide Recovery, Admin Fee DR-4301 CalOES 2/19/2020 2,275.00

Big Break, Marsh Creek and Measure J, $10 Million for Contra Costa Transp. 19 East Contra Costa Trails DeAnza Trail Rehabilitation EBRPD Auth. 2/27/2020 252,376.00

Policing at Alameda Point Alameda Shoreline for Veteran's Administration 20 (Naval Station) 12-1-2017 Bureau of Veteran's Affairs Bureau of Veteran's Affairs 2/27/2020 17,219.00 2017 FEMA Disaster 21 District Wide Recovery, Admin Fee DR-4301 CalOES 2/27/2020 3,826.00 2017 FEMA Disaster 22 District Wide Recovery, Admin Fee DR-4301 CalOES 3/3/2020 9,924.00

Policing at Alameda Point Alameda Shoreline for Veteran's Administration 23 (Naval Station) 12-1-2017 Bureau of Veteran's Affairs Bureau of Veteran's Affairs 3/26/2020 17,219.00 Grants Funding Received in 2020 Exhibit 3b

CHECK CHECK LOCATION PROJECT PROGRAM AGENCY DATE AMOUNT Bay Point Restoration and 24 Bay Point Shoreline Public Access Contra Costa County Contra Costa County 3/31/2020 96,912.58 Feeder Trail #1 Bay Area Ridge Trail 25 Bay Area Ridge Trail Construction Bay Area Ridge Trail Council 4/2/2020 -6,450.30 North Orinda Shaded Fuel 26 Fuelbreak Break Governor's 45-day Plan CA Dept of Forestry 4/20/2020 296,364.26 Quagga Prevention 2017- CA Division Boating & 27 District Wide 2019 Quagga Prevention Grant Waterways 4/22/2020 91,269.57 Del Valle Infrastructure State Parks, Various 28 Del Valle Improvements Specified CA Dept Parks & Rec 4/22/2020 119,536.00

29 Bay Point Shoreline Harrier Trail Improvements Habitat Conservation Fund CA Dept Parks & Rec 4/22/2020 75,000.00 Quagga Prevention CA Division Boating & 30 District Wide FY2019/2020 Quagga Prevention Grant Waterways 4/23/2020 45,825.85

Hazardous Fuels Reduction in Four Wildland Urban 31 Fuelbreak Interface Parks Fire Prevention Grant CA Dept of Forestry 5/6/2020 70,009.17

Policing at Alameda Point Alameda Shoreline for Veteran's Administration 32 (Naval Station) 12-1-2017 Bureau of Veteran's Affairs Bureau of Veteran's Affairs 5/8/2020 17,219.00

Policing at Alameda Point Alameda Shoreline for Veteran's Administration 33 (Naval Station) 12-1-2017 Bureau of Veteran's Affairs Bureau of Veteran's Affairs 5/8/2020 17,219.00 Grants Funding Received in 2020 Exhibit 3b

CHECK CHECK LOCATION PROJECT PROGRAM AGENCY DATE AMOUNT Oakland PDM06 - East Bay Hills Fuels Management 34 Fuelbreak Project FEMA, Hazard Mitigation CalOES 5/19/2020 28,027.00 Oakland PDM06 - East Bay Hills Fuels Management 35 Fuelbreak Project FEMA, Hazard Mitigation CalOES 5/19/2020 165,618.00 Oakland PDM06 - East Bay Hills Fuels Management 36 Fuelbreak Project FEMA, Hazard Mitigation CalOES 6/3/2020 78,093.00 Crab Cove Visitor Center 2002 Prop 40 Cult & Hist CA Natural Resources 37 Crown Beach Expansion Endowment Agency 6/12/2020 6,682.50 38 Fuelbreak Brushland Management FEMA, Hazard Mitigation CalOES 6/16/2020 199,541.00 Crab Cove Visitor Center 2002 Prop 40 Cult & Hist CA Natural Resources 39 Crown Beach Expansion Endowment Agency 6/17/2020 19,799.51 Bridge Replacement Dry 40 Garin Creek Trail Habitat Conservation Fund CA Dept Parks & Rec 6/22/2020 74,020.00 Gateway Regional Gateway Park Platform 41 Shoreline Amenities Coastal Conservancy CA Coastal Conservancy 6/22/2020 1,136,459.00 Del Valle Infrastructure State Parks, Various 42 Del Valle Improvements Specified CA Dept Parks & Rec 6/25/2020 268,571.00

Policing at Alameda Point Alameda Shoreline for Veteran's Administration 43 (Naval Station) 12-1-2017 Bureau of Veteran's Affairs Bureau of Veteran's Affairs 6/30/2020 17,219.00

Policing at Alameda Point Alameda Shoreline for Veteran's Administration 44 (Naval Station) 12-1-2017 Bureau of Veteran's Affairs Bureau of Veteran's Affairs 7/6/2020 17,219.00 Grants Funding Received in 2020 Exhibit 3b

CHECK CHECK LOCATION PROJECT PROGRAM AGENCY DATE AMOUNT Del Valle Infrastructure State Parks, Various 45 Del Valle Improvements Specified CA Dept Parks & Rec 7/6/2020 702,528.00

Policing at Alameda Point Alameda Shoreline for Veteran's Administration 46 (Naval Station) 12-1-2017 Bureau of Veteran's Affairs Bureau of Veteran's Affairs 8/3/2020 17,219.00

Alameda Shoreline Encinal Beach Restoration San Francisco Bay San Fransisco Bay 47 (Naval Station) and Public Access Restoration Authority Restoration Authoirty 8/5/2020 30,888.43 SF Bay Trail Vulnerability 48 District Wide Assessment Adaptation Planning CalTrans 8/7/2020 124,853.03 Bay Point Restoration and 49 Bay Point Shoreline Public Access Contra Costa County Contra Costa County 8/18/2020 100,000.00

Policing at Alameda Point Alameda Shoreline for Veteran's Administration 50 (Naval Station) 12-1-2017 Bureau of Veteran's Affairs Bureau of Veteran's Affairs 8/24/2020 17,219.00

51 District Wide Bullet Proof Vest 2018 Bullet Proof Vest Program Office of Justice Programs 8/24/2020 1,139.50

52 Bay Point Shoreline Harrier Trail Improvements Habitat Conservation Fund CA Dept Parks & Rec 8/31/2020 35,001.00 Gateway Regional Operate the Bridge Yard Bay Area Bridge Toll Bay Area Bridge Toll 53 Shoreline Building Authority Authority 9/16/2020 150,000.00

Hazardous Fuels Reduction in Four Wildland Urban 54 Fuelbreak Interface Parks Fire Prevention Grant CA Dept of Forestry 10/15/2020 16,482.20 Grants Funding Received in 2020 Exhibit 3b

CHECK CHECK LOCATION PROJECT PROGRAM AGENCY DATE AMOUNT SF Bay Trail Vulnerability 55 District Wide Assessment Adaptation Planning CalTrans 10/16/2020 47,910.19 Alameda County Doolittle Bay Trail and Park Transportation 56 Martin Luther King, Jr. Improvements Project 2018 CIP, ACTC Commission 10/22/2020 37,872.46 Quagga Prevention CA Division Boating & 57 District Wide FY2019/2020 Quagga Prevention Grant Waterways 11/3/2020 40,490.18

Policing at Alameda Point Alameda Shoreline for Veteran's Administration 58 (Naval Station) 12-1-2017 Bureau of Veteran's Affairs Bureau of Veteran's Affairs 11/12/2020 17,220.00 Water Quality Monitoring State Water Pollution & Regional Water Quality 59 District Wide 2019-2022 Abatement Account Control Board 11/12/2020 74,225.00 Operate Observation Gateway Regional Platform and BCDC Parking Bay Area Bridge Toll Bay Area Bridge Toll 60 Shoreline Lot Authority Authority 11/18/2020 288,089.02 Operate Observation Gateway Regional Platform and BCDC Parking Bay Area Bridge Toll Bay Area Bridge Toll 61 Shoreline Lot Authority Authority 11/18/2020 71,910.98 Pinole Shores to Bayfront Metro. Transportation 62 San Pablo Bay Park Active Transportation, MTC Comission 11/20/2020 85,837.80

Policing at Alameda Point Alameda Shoreline for Veteran's Administration 63 (Naval Station) 12-1-2017 Bureau of Veteran's Affairs Bureau of Veteran's Affairs 11/23/2020 17,220.00 Grants Funding Received in 2020 Exhibit 3b

CHECK CHECK LOCATION PROJECT PROGRAM AGENCY DATE AMOUNT

Policing at Alameda Point Alameda Shoreline for Veteran's Administration 64 (Naval Station) 12-1-2017 Bureau of Veteran's Affairs Bureau of Veteran's Affairs 11/23/2020 17,220.00

Policing at Alameda Point Alameda Shoreline for Veteran's Administration 65 (Naval Station) 12-1-2017 Bureau of Veteran's Affairs Bureau of Veteran's Affairs 12/3/2020 18,080.00 Oakland PDM06 - East Bay Hills Fuels Management 66 Fuelbreak Project FEMA, Hazard Mitigation CalOES 12/4/2020 155,774.00 Oakland PDM06 - East Bay Hills Fuels Management 67 Fuelbreak Project FEMA, Hazard Mitigation CalOES 12/4/2020 105,326.00 68 Fuelbreak Brushland Management FEMA, Hazard Mitigation CalOES 12/21/2020 94,162.00

Hazardous Fuels Reduction in Four Wildland Urban 69 Fuelbreak Interface Parks Fire Prevention Grant CA Dept of Forestry 12/22/2020 11,625.87 Roddy Golf Grassland ECCC Habitat 70 Deer Valley Management Wildlife Conservation Board Conservancy 12/22/2020 34,378.39

Total Grants Funding Received: 7,274,033.37 FEMA Projects - 2017 Storm Damage Exhibit 2c

Grant Match Park Project Name Amount Est. Amount Est. Scope of Work Install Filter Fabric (20 SY); Install Rip Rap Keyway 17x2x2 (3 CY); Compact Anthony 1 Site 10: Brandon Trail Unclassified Fill (6 CY); Install Silt Fence and Burlap Wattle (35 LF); HMP: Install Chabot 97,459.06 6,091.19 Synthetic Erosion Control Jute Mesh and Seeding (18.7 SY) Install Filter Fabric (31 SY); Install Rip Rap Keyway (25x3x2 (11.7 CY); Compact Anthony 2 Site 11: Lost Ridge Trail Unclassified Fill (43 CY); Install Silt Fence and Burlap Wattle (45 LF); HMP: Install Chabot 97,459.06 6,091.19 Synthetic Erosion Control Jute Mesh and Seeding (71 SY) Anthony Install Filter Fabric (45 SY); Install Rip Rap Keyway 45x2x3 (12 CY); Install Rip Rap 3 Site 12: Columbine Trail Chabot 97,459.06 6,091.19 Above Keyway (36 CY); Install Silt Fence and Burlap Wattle (70 LF)

Location #1: Install Filter Fabric (20 SY); Install Rip Rap Keyway 17x2x2 (3 CY); Anthony 4 Site 4: Red Tail Trail Compact Unclassified Fill (6 CY). HMP: Install Jute Netting and Hydro-Seed (18.7 SY). Chabot Location #2: Install Filter Fabric (28 SY); Install Rip Rap on Slope (2.4 CY); Install Silt 97,459.06 6,091.19 Fence and Burlap Wattle (35 LF) Anthony Site 1: Replace 36-inch culvert (20 LF); Compact Fill 26x20x8 (77 CY); HMP: Install rip 5 Site 1: Big Bear Loop Chabot 40,251.50 2,515.72 rap (106 SY); Install Jute Mesh & Hydro-seed 20x26 (58 SY) 6 Big Break Big Break Trail 49,883.00 3,117.69 Remove and replace pavement 346 LF x 10 LF. 3-inch AC over 3-inches AB. Site #1: Old Homestead Pond, Install 553 CY unclassified material. Install Silt Fence (150 LF) HMP: Install Filter Fabric (41 SY); Install Rip Rap on Pond Side of Berm (60 CY); Install Jut Netting and Hydro-Seed (224 SY) Site #2: Corcoran Pond, Install 176 CY rip rap and 29 CY unclassified fill. Install Silt 3 Cattle Ponds in Black Fence (200 LF) HMP: Install Filter Fabric (41 SY); Install Rip Rap on Pond Side of Berm 7 Black Diamond Diamond (20 CY); Install Jut Netting and Hydro-Seed (250 SY) Site #3: Oil Canyon Pond, Install filter fabric 36 SY. Install 17 CY rip rap Keyway 1412x8x4 and 27 CY below toe 30x5x4 and 960 CY unclassified fill. Install Silt Fence (200 LF); HMP: Install Filter Fabric (123 SY); Install Rip Rap on Pond Side of Berm (53 550,000.00 34,375.00 CY); Install Jut Netting and Hydro-Seed (306 SY) Site 1: Oil Canyon Install AB 100x35x1 (38.9 CY); Install Articulate Ford 100x35 (3,500 SF); Install Silt 8 Black Diamond Culvert 148,196.50 9,262.28 Fence and Burlap Wattle (150 LF) FEMA Projects - 2017 Storm Damage Exhibit 3c

Grant Match Park Project Name Amount Est. Amount Est. Scope of Work Old Sand Mine/ 9 Black Diamond Nortonville Opening 78,836.00 4,927.25 Fill Three Areas with CLSM, 180 SY.

Black Diamond - Site #3 - Chaparral 10 Remove Soil and Spread on Site 81x5 (17.3 CY); Install Rip Rap (30 CY); Install Silt Clayton Ranch Spring 82,725.00 5,170.31 Fence and Burlap Wattle (100 LF) Install Erosion Control Measures; Install (2) 36-inch Culverts (60 LF); Install AB (15 11 Briones Pine Tree Trail CY); HMP: Install 6x3 Concrete Box Culvert (40 LF); Install (4) Concrete Head Wall 146,172.42 9,135.78 8x3x0.75 (11 CY) Each; Install Rip Rap Dispersion Pad (4 CY);

Install (5) Steel H-Piles 20-feet deep (30 LF); Install 4-inch Thick Pressure Treated Lagging 24x10 (240 SF); Install 18-inch HDPE Culvert (40 LF); Install Drainage System 12 Briones Site 1: Seaborg Trail Behind Wall: Filter Fabric (123 SY), 3/4-inch Drain Rock (38 CY), 4-inch Perforated PVC Pipe (34 KF) Compact AB for Trail Surface (37.8 CY); Install 3-foot High Steel Guardrail (24 LF); Install Silt Fence and Burlap Wattle (150 LF); HMP Upsize Culvert to 75,849.00 4,740.56 30-inch (40 LF); Install Rip Rap Dispersion Pad (8.5 CY); H&H Study Required

Site #1 (South): Install Rip Rap Keyway on Fabric 60x3x3 (20 CY); Compact Fill above Rip Rap 60x35x3.5 (140 CY); Install AB 60x5 (4.4 CY) 13 Briones Lafayette Ridge Trail Site #2 (North): Install Rip Rap Keyway in 3-Parts 50x3x3 (16.7 CY), 25x3x3 (8.3 CY) & 15x3x3 (5.0 CY); Compact Fill (152 CY); Install AB (5.6 CY) 219,224.00 13,701.50 Site #3: 23-Locations with Rip Rap Keyways and Unclassified Fill, see PW for details. Replace: Canvas Roof, Tub/Shower, Two Walls 40 LF each, Two Cabinets, Vinyl 14 Camp Arroyo Yurt 61,492.89 3,843.31 Flooring, Two Sinks, One Toilet. Site #1:Replace Decomposed Granite Path 129 LF. Site #2: Replace Decomposed 15 Camp Arroyo Pathway 19,218.00 1,201.13 Granite Path 348 LF. LOCATION 1: Install AB for Culvert Bedding (2.1 CY); Install 24-inch HDPE Culvert Site 07: Camp Arroyo 16 Camp Arroyo (24 LF); compact AB for Trail Surface (2.1 CY); Install Silt Fence and Burlap Wattle (30 Culvert 148,196.50 9,262.28 LF) FEMA Projects - 2017 Storm Damage Exhibit 3c

Grant Match Park Project Name Amount Est. Amount Est. Scope of Work LOCATION 2: Install Metal Hinges (16 EA): Remove and Replace Blocks (16 EA); HMP: 17 Camp Arroyo Site 07: Dumpster Install Sheet Metal Corner Braces (8 LF); Install Bollards (2 EA) Partially covered by 148,196.50 9,262.28 insurance. Claremont 18 Canyon Gelston Road 0.00 0.00 Install AB 17x86x3 ( 13.5 CY); Install AC 17x86x3.5 (16.2 CY) Site 18: Briones to Las Contra Costa Trampas Trail 19 Trails Near Moraga Way (3rd Street) 97,459.06 6,091.19 Install Rip Rap in Creek 30x30x2 (80 CY); Install Silt Fence and Burlap Wattle (35 LF) Location #1: Install Filter Fabric (29 SY); Install Rip Rap Keyway 16x3x3 (6.4 CY); Install Rip Rap on Slope 16x30x2.5 (53 CY); Compact Unclassified Fill on Trail (1.3 CY) Location #2: Install Filter Fabric 64 SY); Install Rip Rap Keyway 44x3x3 (17.6 CY); Install Rip Rap on Slope 44x19x5 (186 CY); Compact Unclassified Fill on Trail (9.8 CY) Contra Costa Site 17: Old Moraga Location #3: Install Filter Fabric (22 SY); Install Rip Rap Keyway 10x3x3 (4 CY); Install 20 Trails Ranch Trail Rip Rap on Slope 10x6x4 (11 CY); Compact Unclassified Fill on Trail (2.2 CY) Location #4: Install Filter Fabric (65 SY); Install Rip Rap Keyway 45x3x3 (18 CY); Install Rip Rap on Slope 45x15x2 (60 CY); Compact Unclassified Fill on Trail (10 CY) Install 97,459.06 6,091.19 Slit Fence and Burlap Wattle (200 LF) Install silt fence (75 LF); Install Geo-Textile (62 SY); Install 18-inch HDPE Culvert (35 Site #1 - Los Charros LF) Install Unclassified Fill (78 CY); ); Install AB 32x10x1.5 (18 CY); Install Burlap 21 Contra Loma Pond Wattle (75 LF) Consulting Fee for Environmental Permitting and Permitting Fees. HMP: 82,725.00 5,170.31 Install Concrete Head Wall 10x10; Install Fabric (12 SY) and Rip Rap Tail Wall (1.6 CY) Install Unclassified Fill (65 CY) Install Silt Fence and Burlap Wattle (300 LF) Install Silt Site #2 - Horse Valley 22 Deer Valley Fence 1,280 on either side of road (2,560 LF) HMP: Install Fabric (46 SY); Rip Rap on Pond 52,345.00 3,271.56 Pond Side (22 CY); Install Jute Netting and Hydro-Seed (27 SY)

23 Del Valle Dog-run Landslide 500,000.00 31,250.00 Install Shotcrete 82x30 (2,460 SF). Compact Unclassified Fill 82x30x1.5 (137 CY) Site 2: Castle Rock Excavate and Re-Compact Trail 15x80x4 (608 CY): Compact AB for Trail Surface (4 24 Diablo Foothills Single Track Trail 93,127.00 5,820.44 CY) FEMA Projects - 2017 Storm Damage Exhibit 3c

Grant Match Park Project Name Amount Est. Amount Est. Scope of Work Emergency Protective 25 District Wide Measures 244,792.00 15,299.50 District Wide Emergency Protective Measures 26 District Wide Debris Removal 249,415.00 15,588.44 Debris Removal District Wide

South Playground 27 District Wide Structure & Swim Beach 36,675.00 2,292.19 Install 646 tons of 3/8·inch gravel at Del Valle and 100 tons of sand at Temescal. Below Trail: Install Geo-Textile (164 SY); Install Rip Rap Keyway Below Trail 75x5x5 Site 2: Llama Lane 28 Garin (83 CY); Above Trail: Install (166 SY); Install Rip Rap Upslope (50 CY); Install AB (North Garin) 64,028.50 4,001.78 85x20x.33 (25 CY); Install Silt Fence and Burlap Wattle (130 LF) Site 07: Meyers Ranch Replace Selected Fill at Upstream Abutment 11x4x8 (13 CY); Permits; Project 29 Garin Trail 55,555.56 3,472.22 Management Install Rip Rap along SF Bay 26x4x3 (23.1 CY); Install AB 26x1x.25 (0.3 CY); HMP: 30 Hayward Site 3: Marsh Levee 81,541.57 5,096.35 Install Rip Rap 26x4x0.5 (9.2 CY)

Install AB Culvert Bedding (8.9 CY); Install 42-inch Culvert (40 LF); Install Concrete Bag Huckleberry Site 11: Lower Pinehurst 31 Head Wall (96 Bags); Compact AB for Trail Surface (2.9 CY); Replace Metal Trash Rack (Sibley) Culvert 27,086.00 1,692.88 4x4: Reset Rip Rap Outlet (4.1 CY); Install Silt Fence and Burlap Wattle (100 LF)

Replace 17 Treated Wood Bridges; Compact AB on Roads and Cart Paths (2,577.6 CY); Install Sub-Surface Drainage System (8,800 SY); Jettison Sediment from 4-inch Redwood Canyon Golf 32 Lake Chabot PVC Surface Drain Channels (6,922 LF) and Twin-Culverts (11 CY); Remove Sediment Course (40 Sites) (5,412 CY) Install Fairway Turf (48,400 SY), (29,040 SY), (16,236 SY) & (19,360 SY); Purchase 42,000 Range Balls; Replace 19 Irrigation Controllers; Replace 4-inch Irrigation 2,684,349.00 167,771.81 Piping at 3 Cart Crossings; Relocate Damaged Bridge; Remove 124 Trees Install Rip Rap Keyway (4.0 CY); Compact Unclassified Fill; Install Erosion Control; 33 Lake Chabot Site 01: Eastshore Trail 55,555.56 3,472.22 Permits; Project Management FEMA Projects - 2017 Storm Damage Exhibit 3c

Grant Match Park Project Name Amount Est. Amount Est. Scope of Work FACILITY 2, SITE 1, Cameron Loop Trail: Install Rip Rap Keyway (17 CY); Compact Slope Erosion Control; Permits; Project Management ($6,703) FACILITY 2, SITE 2; Cameron Loop Trail: Install Rip Rap Keyway (8 CY); Compact Slope; Permits; Project Management $ 4,350.29 Site 2: Cameron Loop FACILITY 2, SITE 3A; Cameron Loop Trail; Install Rip Rap Keyway (3 CY); Compact 34 Lake Chabot Trail Slope; Permits; Project Management $ 4,061.94 FACILITY 2, SITE 3B; Cameron Loop Trail; Install Rip Rap Keyway (3 CY); Compact Slope Erosion Control; Permits; Project Management $ 3,765.64 FACILITY 2, SITE 3C; Cameron Loop Trail; Install Rip Rap Keyway (8 CY); Compact 55,555.56 3,472.22 Slope; Permits; Project Management $ 4,061.94 Replace base rock, 213 CY. Remove and replace asphalt, 11 CY (3-inches thick by 16' x 35 Las Trampas Rocky Ridge Road 155,375.62 9,710.98 72'). Replace drop box (4'x4'6') and culvert (24" x 60').

36 Miller/Knox Model Railway Building 0.00 0.00 Insurance: Repair chain link fence (District Wide: Four Small Projects)

Install AB for Culvert Bedding (180 CY); Install 60-inch and 36-inch Culverts (60 LF); Morgan 37 Site 4: Finley Road Compact AB for Road Surface (20 CY); Install Rip Rap Head Wall (8.7 CY); Install Rip Territory Rap Tail Wall (8.7 CY); Install Silt Fence and Burlap Wattle (300 LF) HMP: Install Rip 148,196.50 9,262.28 Rap Head Wall 45x14x2 (54 CY); Install Rip Rap Tail Wall 45x14x2 (54 CY) Morgan Install Rip Rap Head Wall for Culvert (3.3 CY); Compact AB for Road Surface (5 CY); 38 Site 09: Bay Creek Trail Territory 55,555.56 3,472.22 Permits; Project Management Install 48-inch HDPE Culvert (26 LF); Install AB Around Pipe (30 CY); Install 3 H-Piles Pleasanton (21 LF each); Install 4-inch Thick Pressure Treated Lagging (18x7); Install 4-inch 39 Site 6: Tehan Canyon Ridge Perforated PVC Drainage System (28 LF); Compact AB for Road Surface (4.3 CY); 148,196.50 9,262.28 Install Silt Fence and burlap Wattle (60 LF) Pleasanton 40 Tehan Canyon Ridge 4,158.00 259.88 Emergency Response Performed by Roads and Trails in 2017. FEMA Projects - 2017 Storm Damage Exhibit 3c

Grant Match Park Project Name Amount Est. Amount Est. Scope of Work

Location #1 "Old Church": Install Filter Fabric (73 SY); Install Rip Rap Keyway 52x3x3 (21 CY); Install Rip Rap on Slope 52x25x2 (116 CY); Compact Unclassified Fill on Slope (116 CY); Compact Unclassified Fill for Lower Stream (18.5 CY); Compact AB 52x8x.033 (6.1 CY); Install AC (4.6 CY) Location #2: “Exposed Waterline”: Install Filter Fabric (44 SY); Install Rip Rap Keyway Site 14: Lower Stream 41 Redwood Park 28x3x3 (11.2 CY); Install Rip Rap on Slope 28x8x1.5 (14.9 CY) and Mill Trail Location #3 “Damaged Crib Wall”: Replace Log Crib Wall 40x25 with 8x8 Timbers Location #4 “Crib Wall Under Bridge”: Replace Log Crib Wall 20x10 with 8x8x Timbers Location #5 “Mill Trail”: Install Filter Fabric (76 SY); Install Rip Rap Keyway 54x3x3 (22 CY); Install Rip Rap on Slope 54x33x2 (158 CY); Compact Unclassified Fill 54x33x2 892,178.00 55,761.13 (158 CY); Install Silt Fence and Burlap Wattle (350 LF) LOCATION #1: Install Filter Fabric (12 SY); Install Rip Rap Keyway 8x2x2 (1.4 CY); Install Rip Rap Above Keyway 8x3x1.5 (5.3 CY): Compact Unclassified Fill Above Rip Site 13: Upper Stream Rap (11.4 CY); Compact AB for Trail (0.35 CY) 42 Redwood Park Trail LOCATION #2: Install Filter Fabric (36 SY); Install Rip Rap Keyway 34x2x2 (16 CY); Install Rip Rap Above Keyway 34x8x1.5 (18.1 CY); Install Silt Fence and Burlap Wattle 55,555.56 3,472.22 (40 LF) Site 14: Golden Spike 43 Redwood Park (Near Aweeka) 55,555.56 3,472.22 Compact Unclassified Fill (10 CY); Permits; Project Management Site 10: Golden Spike Disassemble and Reassemble Wing Walls (35 SF and 30 SF) and Head Wall (60 SF): 44 Redwood Park Crib Wall 55,555.56 3,472.22 Compact Unclassified Fill (16 CY)

Location #1: Install Filter Fabric (29 SY); Install Rip Rap Keyway 27x2x2 (4.8 CY); Install Rip Rap on Slope 27x4x1.75 (6 CY); HMP: Remove Soil from Creek (10 CY) 45 Redwood Park Site 16: Star Flower Trail Location #2: Install Filter Fabric (42 SY); Install Rip Rap Keyway 41x2x2 (7.3 CY); Install Rip Rap on Slope 41x2x1.75 (9.1 CY); Install Silt Fence and Burlap Wattle (70 LF); HMP: 97,459.06 6,091.19 Remove Soil from Creek (15.2 CY) FEMA Projects - 2017 Storm Damage Exhibit 3c

Grant Match Park Project Name Amount Est. Amount Est. Scope of Work Site 2: Replace Fill 42x10x5 (86 CY); Replace Trail Base 42x10x2 (3 CY); HMP: Install 46 Redwood Park Site 2: East Ridge Trail 24-inch HDPE Culvert (20 LF); Install 18-inch Rip Rap 10x20 (22 SY); Install Jute Mesh 40,251.50 2,515.72 and Hydro-Seed 50x16 (112 SY); Manzanita Picnic Area 47 Roberts Fence 0.00 0.00 Insurance: Remove tree and fix fence (District Wide: Four Small Insurance Projects) 48 Shadow Cliffs Site 13: Lake Trail 200,000.00 12,500.00 Install Timber Crib Wall in 5 Sections (300 LF), Regrade Trail (100 CY) 49 Shadow Cliffs Battery Shed 0.00 0.00 Insurance: Remove battery shed (District Wide: Four Small Projects) Toby Perry Site 6: Sobrante Ridge Compact Unclassified Fill (28 CY); Install Articulated Ford (28 SF)' Install Silt Fence and 50 Sobrante Ridge Trail 97,459.06 6,091.19 Burlap Wattle (15 LF) Excavate AC and Unstable Material, (15 CY); Save Existing Rip Rap (8 CY); Install Filter Fabric I Keyway 30x2x2 ( 32 SY); Replace Rip Rap and (8 CY) and Add Rip Rap (5 CY); 51 Tilden Site 7: Golf Course Road Compact Unclassified Fill (5.3 CY); Compact AB (2.7 CY); Install AC (1.3 CY): Install 97,459.06 6,091.19 Silt Fence (50 LF and Burlap Wattle (80 LF) Lifeguard Station at Lake 52 Tilden Anza 0.00 0.00 Insurance: Repair skylight on roof (District Wide: Four Small Projects) Site 5: Upper Packrat Install Rip Rap Keyway30x3x1 (3.34 CY); Compact Unclassified Fill (13.3 CY); Install AB 53 Tilden (TNA) Trail 55,555.56 3,472.22 for Trail Surface (1.1 CY); Permits; Project Management FEMA Projects - 2017 Storm Damage Exhibit 3c

Grant Match Park Project Name Amount Est. Amount Est. Scope of Work All Ponds Consulting for Environmental Permitting: Species Survey, Prepare Permit Applications (USACE 404, RWQCB 401 & WDR, USFWS, CDFW 1602) CEQA NOE, NEPA SE, Permitting Fees. Pond X1 (Pond 1) – Compact Unclassified Fill 16x10x3 (17.8 CY); 180 LF spillway Damage (Not Eligible); Install and Maintain Synthetic Erosion Control, Silt Fence (20 LF); Install Synthetic Erosion Control, Hay Bales, staked (20 LF); HMP: Install Filter Fabric (12 SY); Install Rip Rap (7 CY); Install Filter Fabric Jute Netting (12 SY); Install Hydro-Seed (12 SY) Pond X2 (Pond 2) – Not Eligible Pond X3 – Re-Set 10-inch Pipe; Compact Un-Classified Fill (20.4 CY); Install and Maintain Synthetic Erosion Control, Silt Fence (60 LF); Install Synthetic Erosion Control, Hay Bales, staked (60 LF); HMP: Install Filter Fabric (6 SY); Install Rip Rap (4.8 CY); Install Filter Fabric Vasco Hills Jute Netting (9.3 SY); Install Hydro-Seed (9.3 SY) Pond X4 – Install ¾-inch Gravel 54 8 Ponds in the Vasco /Byron Bedding (16.6 CY), Install 60-inch Culvert (20 LF) to Existing Culvert; Compact Un- Classified Fill (230 CY); Install Aggregate Road Base 15x16x0.5 (120 CF); Install and Maintain Synthetic Erosion Control, Silt Fence (100 LF); Install Synthetic Erosion Control, Hay Bales, staked (100 LF); HMP: Install Filter Fabric (38 SY); Install Rip Rap (46 CY) Pond X5 – Compact Un-Classified Fill 20x3x1 (2.2 CY); Install and Maintain Synthetic Erosion Control, Silt Fence (20 LF); Install Synthetic Erosion Control, Hay Bales, staked (20 LF) Pond X6 (Pond 3) – Compact Un-Classified Fill 10x10x1 (3.7 CY); Install and Maintain Synthetic Erosion Control, Silt Fence (25 LF); Install Synthetic Erosion Control, Hay Bales, staked (25 LF) Pond X7 (Pond 4) – Muck Out 24-inch 363,035.00 22,689.69 Culvert; Install and Maintain Synthetic Erosion Control, Silt Fence (20 LF); Install

LOCATION 1 (Trench Plates): Install AB for Culvert Bedding (1.7 CY): Connect 24- inch Culvert (25 LF) to Existing Culvert (100 LF); Compact AB for Trail Surface (100 CY) HMP: Install Concrete Head 4x4x0.67 (0.4 CY); Install Rip Rap Wing Walls (2) Wildcat Site 10: Wildcat Creek 2x4x1.5 (1.6 CY); 55 Canyon Trail (2 Locations) LOCATION 2 (Big Hole): Install Filter Fabric (17 SY); Install Rip Rap Keyway 13x2x2 (2.3 CY); Install Rip Rap on Slope 13x2x12 (9.8 CY): Install AB for Culvert Bedding (4.4 CY); Install 36-inch Culvert (30 LF); Install Silt Fence and Burlap Wattle (100 LF) HMP: Install Concrete Head Wall 8x8x0.67 (1.6 CY); Install Rip Rap Wing Walls (2) 2x8x4 148,196.50 9,262.28 (5.7 CY): Upsize Culvert to 48-inch (30 LF) H&H Study Required FEMA Projects - 2017 Storm Damage Exhibit 3c

Grant Match Park Project Name Amount Est. Amount Est. Scope of Work

LOCATION #1: Install Filter Fabric (19 SY): Install Rip Rap Keyway (15x2x2 (2.7 CY); Wildcat Install Rip Rap Above Keyway 15x5x2 (6.7 CY); Compact AB to Restore Trail (0.5 CY) 56 Site 12: Old Nimitz Way Canyon LOCATION #2: Install Filter Fabric (34 SY); Install Rip Rap Keyway 32x2x2 (5.7 CY); Install Rip Rap Above Keyway 32x8x1 (11.4 CY); Compact AB to Restore Trail (1.1 55,555.56 3,472.22 CY) Wildcat Nimitz Way at Slope Fill: 33x3x68, (125 CY); Jut Mesh: 68x33 (249 SY); Replace AC (7 CY) & Base (7 57 Canyon Inspiration Point 70,425.00 4,401.56 CY) 68x11. Wildcat Install Geo-Textile Fabric (72 SY); Install Rip Rap Keyway 30x4x8 (36 CY); Install Rip 58 Site 1: Mezue Trail Canyon 93,127.00 5,820.44 Rap Fill (176 CY); 59 TOTAL 9,524,596.50

Page Left Blank Intentionally

ATTACHMENT 3

PARK ADVISORY COMMITTEE Meeting of June 28, 2021

TO: Parks Advisory Committee STAFF REPORT Jeff Rasmussen, Assistant Finance Officer, Debra Auker, CFO/AGM and PREPARED BY: Matthew James, Administrative Analyst II of Finance and Management Services

SUBJECT: 2021 Measure CC, FF and WW Update ATTACHMENTS: • Exhibits #4, Measure CC • Exhibit #5a, Measure FF Commitment List • Exhibit #7a, Measure WW Appropriation • Exhibit #7c, Measure WW Status Report • Exhibit #7e, Measure WW Green Bonds

BACKGROUND

Staff will provide an informational update on the Measure CC, Measure FF and Measure WW funding programs. DESCRIPTION

The Park District’s capital finance system is complex. This presentation provides updates on several interrelated capital and operating funding programs, organized by funding source, to enable the review of public commitments, the progress towards delivery to date, and strategies for the coming years. The information, taken as a whole, provides the context for PAC discussion and staff compilation of the annual budget priorities for next fiscal year and beyond.

INFORMATIONAL

This is an informational item. Staff welcomes the Park Advisor Committee’s questions or comments.

I. MEASURE CC The Measure CC parcel tax sunset in 2020 after fifteen years. No additional revenue will be received. Measure CC tax receipts provided a minimum of $3.1 million per year in ongoing funding to support priority projects and operations in the Measure CC area from 2005 to 2020 base on the authority approved by voters in 2004. The extension of Measure CC, Measure FF, was passed by the voters in November 2018 with an unprecedented 85% approval rate following a two-year planning and public outreach effort. Although all tax revenue has been received, Measure CC will continue to spend down balances and closeout the program beyond 2021.

All Measure CC funds, with the exception of a few allocation areas, are appropriated and have been spent on projects as designated in the Project Commitment Schedule presented to voters. Much of the funding was for operational projects including covering the personnel costs for over 12 FTE staff positions. All these positions continue in 2021 and are funded by either Measure FF or the General Fund.

As required, the Measure CC Project Schedule has been reviewed annually, at which time recommendations are made to the Board regarding proposed appropriations or recommended adjustments to timing or approach deemed necessary to accommodate changing conditions or to meet funding limitations. This project schedule is brought to the Board at this workshop to provide an opportunity for the full Board to review and comment on any proposed changes for the coming year, prior to preparation of the required annual report for formal Board action.

As of June 30, 2020, all revenue from the Measure CC program, totaling $47,884,050, has been received by the Park District. All Park District staff positions funded by Measure CC have been moved to Measure FF or the General Fund. However, expenditures on fuels management and some capital projects will continue until the funding is expended.

A. Status of Projects/Completion of Projects The full Measure CC project list detail and preliminary 2021 Mid-year and 2022 budget proposals is included in as Exhibit 4: Measure CC Status Report (pp. 1-21). In summary:

1. Funding Status As of 2020, out of the total $46.7 million in project allocations on the Measure CC list, $46.7 million has been appropriated, of which approximately $41.9 million has been expended and $4.8 million remains unexpended.

2. Completed Projects The Park District has completed 57 of the 83 projects listed in the Measure CC Expenditure Plan at a total cost of $15.4 million.

3. Operational projects Eleven (11) current projects remain for “operational” funds that have funded staff expenses associated with parks, including the Crab Cove Visitor Center year-round

operation and McLaughlin/Eastshore State Park operations, maintenance and public safety. As noted above all positions are now funded by Measure FF or the General Fund. No new appropriations are proposed for operational projects; however, these projects are going through the project closure process and there will be closing adjustments proposed. The operational projects that will continue are related to fuels and vegetation management which will continue until the remaining balances are spent.

4. In-Progress Projects Fifteen (15) projects in the amount of $15.3 million are in progress and planned to be completed in the near future. Staff plans to bring forward any remaining appropriations and adjustments known, at the 2021 Mid-year budget process. Approximately $727,362 is proposed for mid-year appropriation and additional adjustments of $116,907.

Six major projects in progress include: expanding the Tidewater day use area at MLK, Jr., Gelston property demo and landslide repair at Claremont Canyon, improvements at Miller Knox including lagoon health and rail removal, building the Point Molate trail extension, funding for an interpretive center at Point Pinole, and the SF Bay-Doolittle trail section.

5. Reserve Fund At the 2015 Workshop the Board discussed the criteria, and suggested uses for the $4.7 million, 10% reserve. During 2015 & 2016 the Board approved appropriations of these funds as follows: a) $1,106,245 to the Atlas Road Bridge and Public Access project. b) $1 million for the Point Pinole Visitor Center, initial funding. c) $1.5 million to the Bay Trail, Doolittle Drive section, initial funding. d) $1,090,055 to the Albany Beach Public Access and Restoration, Golden Gate Trail.

Staff recommends that any remaining fund balance after operational projects are closed out and in-progress projects are adjusted be allocated to fuels and vegetation management projects within the Measure CC zone. This balance is estimated to be approximately $700,000.

V. MEASURE FF

The East Bay Regional Park District received more than the required two-thirds approval for Measure FF on the November 2018 ballot. Measure FF will continue the existing, voter- approved funding for Regional Parks in western Alameda and Contra Costa counties – without increasing taxes. Measure FF is the continuation of Measure CC as approved by over 85% of the voters within the Community Facilities District (CFD) boundary. Measure FF will generate over $3.3 million per year beginning in July 2020 for 20 years. The funding is committed to the following areas in accordance with the voter approved expenditure plan:

1. Public Safety and Wildfire Protection, 2. Environmental Conservation, Natural Habitat, Urban Creek and Shoreline Stewardship, 3. Improving Visitor Use Facilities and Public Access, 4. Environmental Education, 5. Green Transportation and Regional Trails, and 6. Staff for 11.59 Full-Time Equivalent (FTE) Positions

The Measure was placed on the ballot by a resolution of the Board of Directors on June 5, 2018 after many community meetings and stakeholder Advisory Committee Meetings that resulted in a detailed commitment list and expenditure plan that was approved by the voters as shown in Exhibit 5a: Measure FF Commitment List and Proposed Use of Funds (pp. 22-25).

Measure FF funds, with the exception of the 10% of proceeds reserved for unknown events and opportunities, are appropriated annually and spent on projects as designated in the Commitment List and Use of Funds schedule presented to voters. Because Measure FF revenues are generated annually, the authorized projects have been scheduled to be undertaken throughout the life of the measure.

The Project Schedule is reviewed annually, and recommendations are made to the Board regarding proposed appropriations for the coming year. These recommendations include adjustments to timing or approach that are determined to be necessary to accommodate changing conditions or to meet funding limitations. This schedule was brought to the Board at the workshops to provide an opportunity for the full Board to review and comment on the proposal for the coming year, prior to preparation of the required annual report for formal Board action and submittal of the CFD tax information to the counties.

Measure FF projects highlighted for proposed appropriation in 2022 include: • $60,000 for Green Transportation; $600,000 already appropriated to Point Molate and Doolittle Drive Bay Trails in 2020/2021 • $528,900 for Safe & Healthy Forests, Continued Sustainable Forest Management and $515,960 already appropriated in 2021 • $100,000 for MLK Jr, Visitor Use Improvements • $130,000 for Lake Temescal, Water Quality and Green Algae management, $160,000 already appropriated in 2020/2021

• $400,000 for Miller Knox, Keller Beach Renovation • $500,000 already appropriated to Crown Beach infrastructure improvements • $65,000 already appropriated for Point Isabel, Shoreline Stabilization and Habitat Preservation in 2021

It is important to note that the Measure FF provides for operational costs including over eleven FTE staff positions.

Measure FF Staffing Budgets 2022-2024 Park FTE's 2022 Budget 2023 Budget 2024 Budget Alameda Point 0.70 $110,025 $113,325 $116,725 Crown Beach 1.00 $143,314 $147,614 $152,042 Regional Trails 0.44 $96,161 $99,046 $102,017 Judge John Sutter 0.25 $33,156 $34,150 $33,175 Eastshore 1.75 $237,621 $244,750 $252,092 Miller/Knox 0.10 $12,640 $13,019 $13,410 MLK Jr. Shoreline 1.70 $248,251 $255,698 $263,369 Point Molate 0.60 $88,168 $90,813 $93,537 Point Pinole 1.25 $188,851 $194,516 $200,351 Safe Healthy Forests 2.50 $443,889 $457,205 $470,922 Sibley 0.30 $39,789 $40,983 $42,212 Water Resources 1.00 $151,513 $156,058 $160,740 Total: 11.59 $1,793,378 $1,847,177 $1,900,592

VII. MEASURE WW a. Initial Implementation and Bond Sales The first series of bonds issued under the Measure WW authority were issued in mid-2009, the second series in mid-2013 and the most recent series in late 2017. The 2017 $80 million series included $30 million in Certified Green Bonds. The previous $164 million in tax-exempt proceeds issued were sold at extremely low interest rates, with the 2017 series receiving a very competitive rate of 2.48%. The Park District also issued $44.55 million in refunding bonds, with $20 million as Certified Green Bonds, generating $7.1 million in debt service savings. This current refunding in combination with the previous debt re-structure and $20 million issue of Measure AA refunding bonds, has allowed the Park District to hold the combined 2020/21 debt service on both the AA and WW to $1.40 per $100,000 of assessed valuation (AV) and $6.00 per $100,000 the year before; well below the Park District’s $10 per $100,000 of AV commitment to voters. The 2021/22 tax rate Original WW Program Allocations by Metro is also expected to meet this benchmark; however, it will increase to accommodate a new bond issue and the 2021 bond debt service. South West 35% 32% b. Metropolitan Area Allocations The $375 million in Measure WW funding was allocated on the basis of the Metropolitan Diablo Area population balance as known in 2007. 33% The original program allocations, by percentage, are shown in the chart to the right. c. Measure WW Appropriations for Park District Projects $127.1 million in appropriations have been approved by the Board of Directors for WW Acquisition projects ($76.8 million) and WW Park District Development projects ($50.3 million). Details of these appropriations are included in Exhibit 7a: Measure WW Appropriations as of March 15,2021 (pp. 26-36). In addition, $40.0 million has been budgeted to the Land Acquisition “Designated Acquisitions” account, which is the holding account for projects in process that have not yet been transferred and received formal appropriations into separate project areas by the Board. Of the total appropriation of $127.1 million, $106.7 million has been expended on both acquisition and development projects to date, with the largest uses of WW being $6.8 million for the Atlas Road Bridge creating a new access to Point Pinole Regional Shoreline, $2.8 million for the Pinole Shores to Bay Front Park San Francisco Bay Trail, $3.3 million for the Big Break Delta Science Center, $4.1 million towards the purchase of the Roddy properties in Deer Valley, $3.5 million for the Robertson property at Pleasanton Ridge, $3.0 million for the GSA property at Crown Beach, and $3.6 million for Restoring McCosker Creek at Sibley.

The charts below display the Measure WW original targets and appropriations as of March 15, 2021, shown by metro area and by acquisition and development. At this stage of the measure, with only 34% of project allocations appropriated, it is premature to forecast a trend or to assign any significant meaning to the pattern of appropriations. Historically, acquisition opportunities in the Diablo area and the availability of matching funds from the East Contra Costa County Habitat Conservancy Plan (ECCC HCP) have contributed to the growth in the Diablo metro. This past year show growth in the West metro area due to the McCosker Creek Restoration and Encinal Beach projects. These metrics will continue to be brought to the Board in future reports.

Exhibit 7c: Measure WW Status Report (pp. 37-53) reflecting progress on the WW project descriptions presented to the voters in 2008. The report shows that six allocation areas have completed the majority of their commitments to voters. d. Measure WW Green Bond Reporting Projects eligible for Green Bond funding are selected based on their direct climate impact. Eligible projects must provide benefit in one of the following categories: land acquisition projects, both new properties and the expansion of existing parks; restoration of habitat for wildlife; shoreline protection against sea level rise; or establishment and improvement of trails for transportation. The District’s Green Bond Framework specifies that expenditures for recreational improvements such as boat launches, camping, visitor centers, parking and restrooms do not qualify for Green Bond funding.

The District has committed to annual reporting on use of proceeds until the Green Bonds are fully deployed, and to post its Green Bond reports as a voluntary disclosure on the Electronic Municipal Market Access (EMMA) website. The District has also committed to engage with the firm First Environment, to serve as a third-party validator, to provide an assurance that that District is conforming with Post-Issuance Requirements of the Climate Bonds Standard, and that nominated projects continue align with the Green Bond Framework. The District’s Green Bond reporting will provide an accounting for expenditures made to-date and will quantify the carbon sequestered or other climate benefit already obtained or expected to be obtained from the project following completion.

Green Bond spending in 2019 was $9.3 million, or 31% of the total $30 million issuance. Summarized 2019 expenditures by green Project Type are provided in the table below. Total Green Bond expenditures through December 31, 2019 were $19.4 million, or 65% of the original $30 million. Exhibit 7e: 2019 Green Bonds Report (pp. 54-63) lists the projects that utilized Green Bonds in 2019.

2019 Green Bond Category Expenditure Acquisition $1,383,610 Habitat $863,713 Sea Level $120,324 Trails $6,979,960 Grand Total $9,347,607

E. Measure WW Cash Flow The Park District has issued $244.4 million in Measure WW bonds to date. At this time, Measure WW appropriations, to Park District as well as Local Grant projects, total $248.3 million. The review and appropriation of funding to additional local grant contracts is expected to add approximately $60,324 to this amount for a total appropriated amount of $248.4 million. These appropriations are commitments of the Park District and the Measure WW program to reimburse local agencies and this Park District with bond funds for eligible expenditures.

These contractual promises (appropriations) of Measure WW funds exceed the $244.4 million of current bond sale proceeds. However, this is not an immediate concern because, of these appropriated amounts, only $215.1 million has actually been expended or reimbursed to local agencies, leaving a sufficient balance in the fund to pay anticipated expenses and reimbursements for the next year. The tables below reflect the past ten years of spending on the Measure WW program.

F. Measure WW Interest, Reserve, and Balance

Measure WW proceeds are invested with the trustee and earning interest; as of 12/31/2020 Approximately $4.3 million in interest has been earned. $1.2 million has been appropriated for projects in the Diablo Metro area, and $200,000 has been allocated for bond administration fees.

Interest: The Board of Directors requested, during the establishment of Measure WW, that interest earned be allocated first to offset any changes in metro-area balance determined by the 2010 Census. Population information was received and compiled in 2011, and metro-area population balances did change as follows:

Increase in Population Decrease in Population • Diablo Metro has increased by • South Metro has decreased by 0.3% 1.2% (from 32.9% to 34.1%) (from 27.8% to 27.5%) • West Metro has decreased by 0.9% (from 39.2% to 38.3%) When applied to the full WW program, the 1.2% increase in population in Diablo Metro represents a total dollar increase of $4.1 million in that metropolitan sector. Given the low current rate of interest earnings, the Board agreed that the full balance of interest earned to- date, and for the foreseeable future, be allocated to the Diablo Metro area until the new target is met, or until the 2020 Census provides an updated target. This allocation will supersede and make unnecessary the prior practice under Measure AA of apportioning interest by the Metro Area percentages on an annual basis. The alternative strategy available, to reduce the previously established allocations in South and West Metro areas below those approved by the voters in 2008, was not deemed prudent or feasible.

Metro areas will be rebalanced based on the results of the 2020 U.S. Census.

G. Reserve Measure WW includes a provision for a 7% or $26.25 million reserve that was not specifically committed by project, park, metro area or acquisition/development. $20.8 million remains in this general allocation available for unanticipated future project needs and opportunities. In 2015, these reserves were utilized for the first time for the following Board approved appropriations: • $1,500,000 for the Point Pinole Atlas Road Bridge project (2015) • $857,540 for the Restore Dotson Family Marsh at Point Pinole (2015) • $1,600,333 for the San Francisco Bay Trail, Pinole Shores to Bay Front Park project (2016) • $200,000 for bond related administrative fees (2016) • $1,000,000 for San Francisco Bay Trail connection behind Golden Gate Fields (2018)

During discussion by the Board at the 2015 Workshops, staff received guidance regarding the character of projects that the Board might consider for future use of the WW Reserve funds

as follows: • Use only for BIG projects (subject to definition) • Use to complete major projects • Set a minimum $ amount ($2 million?) • Consider Metro Area balance • Consider Demand • Should be high profile projects • Use for/consider as matching funds (grants) • Use for public access There was no consensus at the Workshop on establishing a formal policy; however, staff was asked to return to the Board to discuss specific proposals and alternatives that staff finds consistent with the Board’s guidance before a request for a formal appropriation is made.

Important projects that may qualify for the future use of Measure WW Reserves include additional funding for Garms Staging Area at Pleasanton Ridge and development of the GSA property at Crown Beach. Staff will return to the Board at a future date to discuss these possible uses of Measure WW Reserves which has a current balance of $20.8 million.

H. Measure WW Balance The District-wide Measure WW funding remaining available in the overall program, less appropriated funds, but inclusive of the reserve, totals $250.5 million. Measure WW allocations are established by the expenditure plan adopted in 2008; however, the Board reserves the ability to modify the plan, apply the reserves, transfer funds between allocation areas and/or adjust the balance between acquisition and development uses.

Just as in Measure AA, the initial spending plan for Measure WW allocates seventy five percent (75%) of the project funding to park and open space acquisition projects (Acquisition), and twenty five percent (25%) to park, recreation and resource projects (Development). However, unlike Measure AA, under Measure WW the Board reserves the ability to modify the plan, apply the reserves, transfer funds between allocation areas and/or adjust the balance between acquisition and development uses. To date the Board has approved the use of Acquisition funds for the following Development projects:

• $120,000, San Francisco Bay Trail Improvements at Pinole Shores to Bay Front Park • $862,071, Iron Horse Trail Improvements at Dublin/Pleasanton BART to Santa Rita • $400,000, Build East Bay Greenway, Coliseum BART to 85th • $392,684, Restore Albany Beach at McLaughlin Eastshore State Park • $2,505,911 Build Golden Gate Fields Bay Trail at McLaughlin Eastshore State Park • $2,400,000 McCosker Creek Restoration at Sibley Volcanic Preserve

Consideration for the Board in using Acquisition funds for future Development projects include:

• Lack of availability of land acquisition targets in the area. Often in heavily urbanized areas,

particularly along the shoreline, the availability of viable parks and open space properties is limited. Examples include Bay Water Trail sites at Point Pinole and Bay Point, wetland restorations and public access at McLaughlin Eastshore State Park or MLK Jr. Regional Shoreline. • Availability of permanent easements. Often land rights for trails can be acquired from existing rights of way or by permanent recorded easements. The District also utilized long-term operating agreements, leases and license agreements with other agencies such as cities, counties, water and flood control districts, etc. at little or no cost. Examples include extension of the Iron Horse Trail along the Walnut Creek Channel, the East Bay Greenway or the Marsh Creek Trail. While these agreements do provide access, they should not be considered permanent. • Land Banked properties with priority development or restoration. The Park District has land banked properties, many acquired using outside funding. The Park District may have a strong need to open or restore these existing land banked properties, especially when they were acquired with donations or grant funds. Examples may include the donated Patterson property at Coyote Hills and Concord Naval Weapons Station property.

MEASURE WW: REMAINING BALANCES

Total Available Available Metro Area Available Acq Dev Diablo $74,889,584 $56,325,598 $18,563,986 REMAINING UN-APPROPRIATED South $70,653,397 $56,555,600 $14,097,797 ALLOCATION West $81,249,037 $67,965,468 $13,283,569 Total $226,792,018 $180,846,666 $45,945,352

Total Available Available Metro Area Available Acq Interest Dev Interest Interest Diablo $2,907,693 UN-APPROPRIATED INTEREST South - - - *Fund 337 interest earned for 2020: $854,064.93 based on West - - - interest income as of 12/31/2020 Total $2,907,693

Total Total Total Metro Area Available Available Available Acq Dev Diablo $77,797,277 $58,506,368 $19,290,909 TOTAL UN-APPROPRIATED South $70,653,397 $56,555,600 $14,097,797 West $81,249,037 $67,965,468 $13,283,569 Total $229,699,711 $183,027,436 $46,672,275 DISTRICT WIDE CONTINGENCY $20,853,481 - 7% RESERVE

TOTAL AMOUNT REMAINING $250,553,192 IN MEASURE WW

Measure CC Status Report Exhibit 4 As of 3/15/2021

Project Summary Spending Summary

Measure CC Voter Approved Projects: 83 Total Project Funding Provided Completed Projects: 57 by Measure CC (2005-2020): $46,732,141 On Track: 26 -Projects: 15 Total Measure CC Expenditure: -Operations: 11 $41,932,936

1 Remaining Funds: Completed $4,785,813 Projects In-Progress 18% 10% Projects $15,394,308 $15,276,486

13%

Operational 69% 90% Projects (on track) Measure CC Expenditure: $16,178,260 $41,932,936 Measure CC Status Report Exhibit 4

Projected End Total CC Remaining 2021 Mid-Year Park & Trail Project Description Amount using Budget Balance Adjustment Actuals CC Line Number CC Line

Completed Projects Redwood Provide a new coat of paint for the 1 2 50,000 - - - Regional Park Piedmont Stables. Redwood Renovate the Piedmont Stables – 2 3 33,300 - - - Regional Park Residence. Installation of automatic fire sprinkler Tilden Regional 3 4 system for the protection of Tilden’s 66,600 - - - Park historic merry-go-round. Eastshore State Construct the Bay Trail Extension

2 4 7 100,000 25,436 - - Park around Golden Gate Fields. Support operations of the Zoo, a regional facility that operates 5 Oakland Zoo 9 1,500,000 - - - openspace contiguous to Anthony Chabot Regional Park. Pt. Isabel Convert three chemical toilets to vault 6 Regional 10 100,000 2,862 - 2,862 toilets. Shoreline Open and operate Crab Cove Visitor Robert Crown Center for an added three months 7 Memorial State 11 1,458,000 94,217 (94,217) (219,081) each year to provide year-round Beach service. Robert Crown Repave McKay Street, replace water 8 Memorial State 12 700,000 - - - line and demolition of federal buildings. Beach Measure CC Status Report Exhibit 4

Projected End Total CC Remaining 2021 Mid-Year Park & Trail Project Description Amount using Budget Balance Adjustment Actuals CC Line Number CC Line

Completed Projects

Robert Crown Replace 94 deteriorating wood tables 9 Memorial State 13 with tables that are better able to 100,000 959 - 959 Beach withstand the salty environment.

Tilden Regional Construct a weather-tight enclosure 10 14 200,000 - - - Park for Tilden’s historic merry-go-round.

Tilden Nature 11 15 Replace roofs on two barn buildings. 16,650 - - -

3 Area

Sewer for Tilden’s Environmental Tilden Nature Education Center, headquarters for 12 16 575,000 (19,428) - (19,428) Area the area's interpretive programs, and the historic Little Farm.

Promote the regeneration of native Tilden Regional 13 17 trees by assessing and removing 200,000 972 - 972 Park hazardous, invasive species.

Wildcat Canyon Installation of an emergency phone at 14 18 11,660 869 - 869 Regional Park the Staging Area. Measure CC Status Report Exhibit 4

Projected End Total CC Remaining 2021 Mid-Year Park & Trail Project Description Amount using Budget Balance Adjustment Actuals CC Line Number CC Line

Completed Projects

Claremont Implementation of a four-year research 15 Canyon Regional 20 project for Alameda Whipsnake habitat 120,000 - - - Preserve enhancement.

Martin Luther King Jr. Retrofitting of boat launch ramp at 16 22 44,400 - - - Regional Doolittle for ADA accessibility. Shoreline

4 Miller/Knox Renovate 79 family and group picnic 17 Regional 23 tables, as well as barbecues and 50,000 281 - 281 Shoreline drinking fountains. Continuation of a park-wide eucalyptus Point Pinole grove thinning and sprout control 18 Regional 24 559,860 (758) - - program for the benefit of local Shoreline habitats.

Pt. Isabel Implement a preventative maintenance 19 Regional 25 program for the shoreline path and 39,960 - - - Shoreline both parking areas. Measure CC Status Report Exhibit 4

Projected End Total CC Remaining 2021 Mid-Year Park & Trail Project Description Amount using Allocation Balance Adjustment Actuals CC Line Number CC Line

Completed Projects

Roberts Implement a preventative maintenance 20 Regional 27 program on all paved trails and parking 63,936 - - - Recreation Area areas.

Roberts Renovate family and group picnic 21 Regional 28 tables, barbecues, and drinking 33,300 - - - Recreation Area fountains. 5 Roberts Repair and overlay pavement on 22 Regional 29 46,886 - - - internal paths and service trails. Recreation Area

Addition of two new picnic sites at the Temescal north end, with the intention of 23 30 35,000 11 - 11 Recreation Area helping the overload of group picnics currently at the south end.

Tilden Regional Installation of ADA accessible ramp to 24 31 5,550 - - - Park Big Leaf Restroom and picnic area.

Exhibit completion and lighting finish at Tilden Nature 25 32 the Environmental Education Center 70,000 - - - Area (EEC). Measure CC Status Report Exhibit 4

Projected End Total CC Remaining 2021 Mid-Year Park & Trail Project Description Amount using Allocation Balance Adjustment Actuals CC Line Number CC Line

Completed Projects Retrofitting at the Environmental Tilden Nature 26 33 Education Center (EEC) for ADA 30,000 - - - Area accessibility. Tilden Nature Upgrade of electrical services at 27 34 55,674 - - - Area Tilden’s Little Farm. Following East Bay Hills’ CEQA, Anthony Chabot thinning of trees and/or removal of 28 Vegetation 35 1,063,650 736 - 736 excessive fuels within 250 acres of Management

6 eucalyptus groves.

Miller/Knox Repair ramps and renovate restrooms 29 Regional 38 at Railroad Museum and Park Office to 150,000 164 - 164 Shoreline improve ADA access to building.

Connect Chabot Stable to nearby Anthony Chabot 30 41 municipal sewer to eliminate 124,320 - - - Regional Park pumpouts, installation of valut toilets.

Move funding: Trasfer to Line #64, Tilden Nature Tilden Nature Area to restore habitat, 31 42 418,400 - - - Area remove debris and silt between dam and bridge, and rebuild silt dam. Measure CC Status Report Exhibit 4

Projected End Total CC Remaining 2021 Mid-Year Park & Trail Project Description Amount using Allocation Balance Adjustment Actuals CC Line Number CC Line

Completed Projects

Renovate family and group picnic Kennedy Grove 32 43 tables, barbecues, and drinking 62,160 26 - 26 Recreation Area fountains.

Kennedy Grove Repair and repave pathways within the 33 44 39,960 - - - Recreation Area recreation area.

7 Miller/Knox Implement a pavement management 34 Regional 45 program for all park roads, paved trails 39,960 - - - Shoreline and parking lots. Robert Sibley Volcanic Implement the Pallid Manzanita 35 47 46,620 - - - Regional Management Plan. Preserve

Roberts Correct drainage and 36 Regional 48 upgrade/renovate the ball field’s 31,080 - - - Recreation Area irrigation system. Measure CC Status Report Exhibit 4

Projected End Total CC Remaining 2021 Mid-Year Park & Trail Project Description Amount using Allocation Balance Adjustment Actuals CC Line Number CC Line

Completed Projects Installation of three flush toilets, in Wildcat Canyon addition to the installation of a lift 37 49 500,000 - - - Regional Park station that will connect to the replaced sewer line.

Wildcat Canyon Implementation of a watershed 38 50 488,400 - - - Regional Park sediment study.

Replace four Bort Meadow chemical

8 Anthony Chabot toilets with vault, ADA accessible 39 51 50,000 - - - Regional Park toilets to reduce maintenance costs, as well as improve customer convenience.

Undertake a study to seek information on the permitting, environmental Martin Luther compliance and design options for King Jr. 40 53 construction of the trail around the 450,000 - - - Regional west shore of San Leandro Bay along Shoreline Doolittle Drive. Operate if constructed. Pt. Pinole Replace old playground structure with 41 Regional 56 140,000 1,158 - 1,158 newer, safer ADA accessible structure. Shoreline Measure CC Status Report Exhibit 4

Projected End Total CC Remaining 2021 Mid-Year Park & Trail Project Description Amount using Allocation Balance Adjustment Actuals CC Line Number CC Line

Completed Projects Robert Sibley Complete removal of non-native Volcanic 42 58 eucalyptus suckers, pine seedlings, and 259,245 (2,485) - (2,485) Regional broom in the Sibley Triangle Preserve

Temescal 43 60 Sealcoat of all parking areas. 12,787 - - - Recreation Area

Transfer funds from Line #42 - Brooks 9 Island to Line #64 - Tilden Nature Tilden Nature Area. Modifiy Project Description: 44 64 132,090 - - - Area Restoration of pond habitat, remove Debris and Silt between Dam and Bridge, and Rebuild Silt Dam.

Extend the waterline to the Staging Wildcat Canyon 45 65 Area for a drinking fountain and fire 16,660 - - - Regional Park hydrant. Measure CC Status Report Exhibit 4

Projected End Total CC Remaining 2021 Mid-Year Park & Trail Project Description Amount using Allocation Balance Adjustment Actuals CC Line Number CC Line

Completed Projects

Replace 10 chemical toilets with vault toilets to reduce pumping cost and Anthony Chabot 46 66 improve visitor convenience. This 150,000 1,400 (1,400) - Regional Park project excludes the Bort Meadow toilets in project CC Line #51.

Extend and Operate the Bay Trail 47 Point Molate 67 north to Point Molate and Point San 500,000 - - -

10 Pablo. Solve the problem of at-surface Redwood waterline: Stream Trail between Tres 48 68 26,646 - - - Regional Park Sendas and the main line vault at Old Fern Hut. Habitat enhancement and shoreline Richmond 49 69 restoration of wetlands in the vicinity 974,000 - - - Wetlands of Point Pinole.

Tilden Regional Replace 14 chemical toilets with vault 50 70 199,800 (249) 249 - Park toilets.

Operate Triangle Park if received from 51 Alameda Point 71 the Naval Air Station redevelopment 525,000 - - - project. (.5 mile south side trail) Measure CC Status Report Exhibit 4

Projected End Total CC Remaining 2021 Mid-Year Park & Trail Project Description Amount using Allocation Balance Adjustment Actuals CC Line Number CC Line

Completed Projects

Tilden Regional Renovate the Brooks and Buckeye 52 74 40,000 - - - Park LUP/EIR picnic area rehabilitation plan.

Add four more flush restrooms in main Miller/Knox park area to eliminate long waiting 53 Regional 75 256,453 9,480 - 9,480 lines for restroom for customer Shoreline convenience.

11 Clark-Boas Access -- Restore trailhead Wildcat Canyon area, improve access from El Sobrante 54 77 100,000 - - - Regional Park and Richmond and add restroom to Alvarado Staging Area.

Wildcat Canyon Gravel 2.5 miles of trail for all season 55 78 135,000 1,731 - 1,731 Regional Park use.

Point Pinole 56 Regional RF1 Atlas Road Bridge and Public Access 1,106,245 - - - Shoreline

Albany Beach 57 Public Access RF 4 Build Golden Gate Trail 1,090,055 - - - and Restoration

TOTAL 15,394,308 117,382 (95,368) (221,745) Measure CC Status Report Exhibit 4

Projected End Total CC Remaining 2021 Mid-Year Park & Trail Project Description Amount using Budget Balance Adjustment Actuals CC Line Number CC Line Operational Projects

Retain consultant(s) to work with staff and the Hills Emergency Forum to prepare the required environmental East Bay Hills documents necessary to comply with Fire Hazard 1 1 the Natural Environmental Protection 1,175,000 113,312 - - Reduction Plan Act (NEPA) and the EIR Environmental Quality Act (CEQA) to complete the Fire Hazard Reduction

12 Plan for the East Bay Hills.

Manage vegetation for fuels reduction in coordination with the protection and enhancement of wildlife habitat in Anthony Chabot fuel break areas to provide defensible 2 and Lake Chabot 5 space near structures and meet the 1,475,000 16,481 - - Regional Parks Hills Emergency Forum 8' flame length standard. Manage exotic plant species and promote fire resistant natives to reduce the risk of wildfires. Measure CC Status Report Exhibit 4

Projected End Total CC Remaining 2021 Mid-Year Park & Trail Project Description Amount using Budget Balance Adjustment Actuals CC Line Number CC Line

Operational Projects

Manage vegetation for fuels reduction in coordination with the protection Claremont and enhancement of wildlife habitat in Canyon and fuel break areas to provide defensible 3 Sibley Volcanic 6 space near structures and meet the 1,175,000 103,193 - - Regional Hills Emergency Forum 8' flame length Preserves standard. Manage exotic plant species and promote fire resistant natives to 13 reduce the risk of wildfires.

Operation of 8.5 miles of East Bay shoreline from the foot of the Bay Bridge in Oakland through to Richmond via policing, fire response, resource protection, trail patrol, trash pickup, and maintenance. This project Eastshore State 4 8 is a result of negotiations with the 6,007,500 42,482 - - Park State Parks for joint operations and an agreement by EBRPD to cover operating costs. The project requires $50,000 in annual revenue from concessions, interest and trust fund principal. Measure CC Status Report Exhibit 4

Projected End Total CC Remaining 2021 Mid-Year Park & Trail Project Description Amount using Budget Balance Adjustment Actuals

Operational Projects

Manage vegetation for fuels reduction in coordination with the protection Wildcat and enhancement of wildlife habitat in Canyon/Alvarad fuel break areas to provide defensible 5 19 1,660,000 116,703 - - o & Tilden space near structures and meet the Regional Parks Hills Emergency Forum 8' flame length standard. Manage exotic plant species

14 and promote fire resistant natives.

Robert Sibley Removal of Red Gum eucalyptus and Volcanic freeze damaged eucalyptus along the 6 26 131,680 120,605 - - Regional western boundary, south of the staging Preserve area. Manage vegetation for fuels reduction in coordination with the protection and enhancement of wildlife habitat in Redwood fuel break areas to provide defensible Regional Park, 7 39 space near structures and meet the 1,082,600 245,085 - - Leona Regional Hills Emergency Forum 8' flame length Open Space standard. Manage exotic plant species and promote fire resistant natives to reduce the risk of wildfires. Measure CC Status Report Exhibit 4

Projected End Total CC Remaining 2021 Mid-Year Park & Trail Project Description Amount using Allocation Balance Adjustment Actuals CC Line Number CC Line

Operational Projects

Manage vegetation for fuels reduction in coordination with the protection and enhancement of wildlife habitat in fuel break areas to provide defensible Wildcat Canyon 8 40 space near structures and meet the 1,622,580 688,978 - - Regional Park Hills Emergency Forum 8' flame length standard. Manage exotic plant species

15 and promote fire resistant natives to reduce the risk of wildfires.

Having completed construction of a small staging area and installation of interpretive panels at Fish Ranch Road Robert Sibley and trail links to existing Sibley trails; Volcanic to match State Parks grant, continue 9 59 600,000 7,549 - - Regional trail improvements, installation of Preserve interpretive panel and trail brushing throughout Sibley, into Huckleberry. Open and operate the land banked former Stone Property. Measure CC Status Report Exhibit 4

Projected End Total CC Remaining 2021 Mid-Year Park & Trail Project Description Amount using Allocation Balance Adjustment Actuals CC Line Number CC Line

Operational Projects

Fund continued operation of Crab Cove Visitor Center at Crown Beach and existing Bay Trail along Triangle 10 Alameda Point 72 Park at Alameda Point and operate 473,900 56,359 - - two miles of additional Bay Trail if completed as part of the base conversion process Alameda Point. 16 Giant Marsh Restoration -- Cleanup, Point Pinole monitoring and management of the 11 Regional 73 marsh at the south end of Point Pinole: 775,000 13,592 (19,030) - Shoreline provide matching funds for future grant opportunities.

TOTAL 16,178,260 1,524,339 (19,030) - Measure CC Status Report Exhibit 4

Total CC Remaining 2021 Mid-Year Remaining to Park & Trail Project Description Allocation Balance Adjustment Appropriate CC Line Number CC Line

In-Progress Projects Martin Luther Marsh cleanup at Damon Slough/San King Jr. 1 21 Leandro Bay, habitat enhancement for 70,000 13,428 - - Regional the Clapper Rail and spartina control. Shoreline

Move funding: Transfer funds to Line Martin Luther #37 MLK Jr. - Tidewater Phase III King Jr. (Flexi-Van) project because "Fence the 2 36 23,320 - - - Regional boundary of the Oakland Sports Field 17 Shoreline to control cars" was completed using other funds.

Undertake Phase II and III of public Martin Luther access improvements, as well as King Jr. 3 37 operate the Tidewater Boating Center 5,696,120 65,190 - - Regional use area in concert with the Oakland Shoreline Strokes Boathouse.

Point Pinole Restoration of 100 acres of grasslands 4 Regional 46 193,740 14,213 - - and sensitive plant species’ habitat. Shoreline Measure CC Status Report Exhibit 4

Total CC Remaining 2021 Mid-Year Remaining to Park & Trail Project Description Budget Balance Adjustment Appropriate CC Line Number CC Line

In-Progress Projects

Remove Park Office building and. septic system to protect nearby creek and to clear the area for potential Claremont future trail access. Repair landslide, if 5 Canyon Regional 52 feasible, for access to future trail 418,060 239,452 - - Preserve system with North to South and East to West connections in a route that is compatible with protection of 18 species. Maintain until stable.

Point Pinole Extend and operate the Bay Trail at 6 Regional 54 726,500 96,793 - - Point Pinole. Shoreline Point Pinole Enhancement of wetland areas for 7 Regional 55 201,930 3,360 - - black rail habitat. (i.e. remove iceplant) Shoreline

Regrade/re-route and improve Stream Redwood 8 57 Trail to protect creek, eliminate soil 542,400 112,831 - - Regional Park erosion and continuing winter damage. Measure CC Status Report Exhibit 4

Total CC Remaining 2021 Mid-Year Remaining to Park & Trail Project Description Budget Balance Adjustment Appropriate CC Line Number CC Line

In-Progress Projects

New Bay Trail segment around West County Wastewater facility connecting Wildcat Canyon Wildcat Creek Trail to San Pablo 9 to Point Pinole 61 885,550 97,949 33,882 - Creek and Point Pinole to the Trail Richmond Parkway – approximately one mile. 19

Examine alternatives to keep the park's lagoon healthy and provide public Miller/Knox access to water. Coordinate project 10 Regional 62 with over all park renovation to be 372,960 225,671 - - Shoreline completed in the fall of 2015 and conditions set in the Land Use Plan currently under development. Measure CC Status Report Exhibit 4

Total CC Remaining 2021 Mid-Year Remaining to Park & Trail Project Description Budget Balance Adjustment Appropriate CC Line Number CC Line

In-Progress Projects

Removal of tracks and fencing, as well as the re-grade of the railroad right-of- way to provide public access from the Miller/Knox park to the bay, and to Keller Beach. 11 Regional 63 Also, implement a major renovation of 2,179,000 182,065 665,544 - Shoreline meadow areas consisting of verticut, topdress, seed and extended irrigation.

20 (Remaining appropriations on hold until litigation resolved.)

Richmond Shoreline Restoration -- Removal of industrial debris, cleanup and enhancement of shoreline habitat and improvement of shoreline protection to prevent pollution into 12 Point Molate 76 the Bay at shoreline parks in Richmond 1,350,000 779,596 27,936 - from Point Isabel Regional Shoreline in the south to Point Pinole Regional Shoreline in the north. Remaining funds to be used for Point Molate Bay Trail. Measure CC Status Report Exhibit 4

Total CC Remaining 2021 Mid-Year Remaining to Park & Trail Project Description Budget Balance Adjustment Appropriate CC Line Number CC Line

In-Progress Projects Administrative Consulting Firm to Prepare 13 79 116,907 32,590 - (116,907) Fees Engineering Report

Point Pinole 14 Regional RF2 Develop Visitor Center 1,000,000 888,538 - - Shoreline

Martin Luther King Jr. 15 RF3 Study Doolittle Trail Section 1,500,000 277,728 - -

21 Regional Shoreline TOTAL 15,276,486 3,029,404 727,362 (116,907) Measure FF Commitment List and Proposed Use of Funds: 2021 Exhibit 5a

Total Previously Remaining Location Commitment 2022 Budget Allocation Appropriated Funds Line # Increase park and public safety personnel to operate a new regional 1 Alameda Point park. Protect seasonal wetlands, Breakwater Beach shoreline and $2,950,000 $106,780 $110,025 $2,733,195 Reduce storm erosion for improved creek water quality and natural habitat. Upgrade visitor use facilities. Increase recreational trail 2 Anthony Chabot access and provide for trail safety structural improvements. $215,000 $0 $0 $215,000 Develop sea level rise interpretation with educational programming. Continue year-round Visitor Center services through staffing. 3 Crown Beach Improve San Francisco Bay health by upgrading the beach-front storm water drainage system. Expand park and improve visitor use facilities. $4,225,000 $639,140 $143,314 $3,442,546 Provide regional trail connectivity for commuters and safe routes to school, specifically in disadvantaged communities and along the San

22 Francisco Bay Trail. Expand and maintain parkland trails to increase Green access while preventing erosion for protection of sensitive, natural 4 Transportation / habitats. Increase public safety patrol to enforce trail use ordinances Regional Trails in protection of wildlife. Explore potential to enter into partnership with transportation provider to increase park access. $4,300,000 $693,360 $156,161 $3,450,479 Enhance tidal and intertidal habitat to provide for shoreline protection through use of natural systems. Convert existing paved lands to natural landscape. Increase public access to the San 5 Judge John Sutter Francisco Bay Trail and newly constructed Bay Bridge bike path. Provide for park personnel to develop, operate and maintain future park facilities. $1,400,000 $32,190 $33,156 $1,334,654 Repair erosion of urban creek streambank for improved water 6 Kennedy Grove quality, habitat and trail access. $150,000 $0 $0 $150,000 Upgrade marina facilities for boating and fishing access, safety and 7 Lake Chabot experience. $400,000 $0 $0 $400,000 Measure FF Commitment List and Proposed Use of Funds: 2021 Exhibit 5a

Total Previously Remaining Location Commitment 2022 Budget Allocation Appropriated Funds Line # Reduce erosion and sediment build up to improve water quality of 8 Leona Canyon creek through trail maintenance and stewardship efforts. $40,000 $0 $0 $40,000 Provide for shoreline and natural habitat protection across the State McLaughlin Park and . Expand park personnel for increased wildlife 9 Eastshore State conservation. Provide for protection and monitoring of burrowing Park owl habitat. Improve visitor use facilities. $6,835,000 $230,700 $241,621 $6,362,679 Provide for shoreline protection and sea level rise adaptation using natural systems. Increase park staffing and upgrade Keller Beach 10 Miller/Knox visitor experience. Enhance drought tolerant landscape through stewardship improvements, such as removal of French broom and other invasive plants. $1,040,000 $12,880 $413,266 $613,854

23 Develop nature-based flood protection for shoreline and facilities in anticipation of sea level rise. Improve marsh habitat for endangered Ridgway's rail. Improve visitor experience with facility upgrades, and 11 MLK Jr. Shoreline increased park and public safety personnel. Provide for expanded educational and recreational programming to serve the surrounding communities. $6,905,000 $241,020 $348,251 $6,315,729 Enhance conservation and stewardship efforts. Provide for youth 12 Oakland Zoo engagement. $2,000,000 $100,000 $100,000 $1,800,000 Stabilize banks of Hoffman Channel for shoreline protection, improved visitor access and healthier San Francisco Bay water quality. 13 Point Isabel Provide for conservation for endangered Ridgway's rail habitat and environmental maintenance. $600,000 $65,000 $0 $535,000 Provide for park and public safety personnel to develop, operate and 14 Point Molate maintain future park facilities and the San Francisco Bay Trail. $2,350,000 $235,600 $88,168 $2,026,232 Measure FF Commitment List and Proposed Use of Funds: 2021 Exhibit 5a

Total Previously Remaining Location Commitment 2022 Budget Allocation Appropriated Funds Line # Provide for shoreline protection through natural systems at Dotson Family Marsh. Enhance habitat of native grasses and other species. 15 Point Pinole Improve visitor use facilities and San Francisco Bay water access. Increase educational and recreational programming to serve the surrounding communities. $3,450,000 $183,350 $188,851 $3,077,799 Expand partnership with Save the Redwoods League for ongoing redwood conservation. Increase interpretation of redwood natural 16 Redwood history. Provide for creek restoration and erosion control for visitor safety and watershed health. $160,000 $0 $0 $160,000 Expand partnership with Save the Redwoods League for ongoing 17 Roberts redwood conservation. Increase interpretation of redwood natural history. $60,000 $0 $0 $60,000 Continue sustainable forest management practices consistent with

24 the approved Wildfire Hazard Reduction and Resource Management Safe Healthy Plan to lessen the potential for wildland urban interface wildfire. 18 Forests Develop a redwood forest management plan. Provide for stewardship of natural vegetation to improve forest health. $14,200,000 $515,960 $528,889 $13,155,151 Enrich natural habitat for threatened pallid manzanita and other Sibley/Huckleberry/ vegetation with increased stewardship efforts. Upgrade the Bay Area 19 Claremont Ridge Trail for improved watershed health and trail safety. Increase park personnel. $1,125,000 $38,630 $54,789 $1,031,581 Enrich natural habitat for threatened pallid manzanita and other 20 Sobrante Ridge vegetation through stewardship efforts. $75,000 $0 $0 $75,000 Improve water quality, habitat and recreational swimming experience at Lake Temescal with efforts such as dredging. Provide for erosion 21 Temescal control to benefit watershed health and recreational trail safety. $1,500,000 $100,000 $0 $1,400,000 Measure FF Commitment List and Proposed Use of Funds: 2021 Exhibit 5a

Total Previously Remaining Location Commitment 2022 Budget Allocation Appropriated Funds Line # Restore recreational trails for erosion control and sensitive habitat protection. Improve access and pedestrian safety at the Brazil Room and Botanical Garden Visitor Center. Begin design planning for park- 22 Tilden wide improvements at visitor use facilities such as the Environmental Education Center, Little Farm and Botanical Garden Visitor Center. $200,000 $0 $0 $200,000 Improve water quality across parklands with stewardship efforts for watershed protection and preservation of shorelines, marshes, lakes, riparian areas and urban creeks. Manage harmful algae blooms for Water Resources - improved visitor and wildlife health. Increase water supply in 23 Regional preparation for climate related weather events with facilities such as rainwater collection systems. Install additional water bottle filling stations throughout region.

25 $4,800,000 $207,100 $281,513 $4,311,387 Improve protection of Wildcat Creek watershed by mitigating 24 Wildcat Canyon erosion. Enhance and restore natural habitat throughout park. Increase ADA trail access and safety for visitors. $150,000 $0 $0 $150,000 25 10% Contingency 10% Contingency TOTAL $6,870,000 $0 $0 $6,870,000 TOTAL: $66,000,000 $3,401,710 $2,688,004 $59,910,286 Measure WW Appropriations as of March 15th, 2021 Exhibit 7a

Location Project Description Meas WW Budget Total Exp Net Avail DEVELOPMENT PROJECTS 1 Alameda Point 518300 Restore Encinal Beach 521,286 139,531 381,755 2 Alamo Canal Trail 540901 Alamo Canal Trail Feasibility 144,931 144,931 - 3 Ardenwood Center 147700 Upgrade Electrical System 650,000 623,926 26,074 4 Bay Point Shoreline 175300 Improve Access & Restore Habitat 900,000 752,838 147,162 5 Bay Ridge Trail 148100 Expand Staging Area 345,748 - 345,748 6 Bay Ridge Trail 149100 Construct Feeder Ridge Trail 1 25,900 25,900 - 7 Bay Ridge Trail 155300 Build Ridge Trail 700,000 222,587 477,413 8 Bay Trail 131300 Develop Lonetree Trail 797,928 898,795 (100,867) 9 Bay Trail 147100 Construct Pinole Shores 1,120,909 1,120,909 - 10 Bay Trail 148000 Restore Breuner (Dotson) Marsh 835,900 835,900 - 11 Bay Trail 148500 Build Carquinez Scenic Trail 1,071,946 1,063,969 7,977 12 Bay Trail 539700 Construct Vehicular Bridge 406,245 406,245 - 13 Bay Trail 157600 Develop Martinez Bay Trail 285,000 131,743 153,257 14 Bay Trail 523000 Develop Oakland Shore Bay Trail 200,000 50 199,950 15 Bay Trail 532000 Monitor Dotson Marsh 670,000 85,286 584,714 26 16 Bay Water Trail 518000 Improve Access & Protection 727,936 727,936 - 17 Bay Water Trail 148600 Build Golden Gate Fields Trail 647,064 - 647,064 18 Bay Water Trail 527500 Improve Water Trail Access 500,000 106,932 393,068 19 Big Break 104803 Delta Science Center 2,420,000 2,420,000 - 20 Black Diamond 145900 Replace Main Stairs 900,000 900,000 - 21 Briones 503100 Study Road Access Alignment 48,960 48,960 - 22 Concord Hills (CNWS) 511300 Complete Land Use Plan 417,375 417,375 - 23 Coyote Hills/Linear Park 147800 Replace Visitor Center 150,000 134,917 15,083 24 Coyote Hills/Linear Park 154800 Improve Access And Habitat 300,000 300,000 - 25 Crockett Hills 523200 Conduct Access Study 62,227 62,227 - 26 Crown Beach 154200 Develop McKay Ave 532,200 124,180 408,020 27 Crown Beach 508300 Restore Resource 50,014 50,014 - 28 Crown Beach 518600 Expand Visitor Center 450,000 466,556 (16,556) 29 Crown Beach 531400 Develop McKay Master Plan 300,000 6,269 293,731 30 Crown Beach 547700 Replace Sand 80,000 80,000 - 31 Delta Access 104803 Delta Science Center 687,962 687,962 - 32 Delta Recreation 104803 Delta Science Center 857,507 857,507 - 33 Delta Trail 175300 Improve Access & Restore Habitat 221,691 - 221,691 Measure WW Appropriations as of March 15th, 2021 Exhibit 7a

Location Project Description Meas WW Budget Total Exp Net Avail DEVELOPMENT PROJECTS 34 Delta Trail 530200 Establish Restoration 1,883 4,258 (2,375) 35 Delta Trail 531100 Develop Orwood Delta Trail 25,000 13,745 11,255 36 District Wide 147100 Construct Pinole Shores 1,600,333 1,600,333 - 37 District Wide 148000 Restore Breuner (Dotson) Marsh 854,732 854,732 - 38 District Wide 148600 Build Golden Gate Fields Trail 1,000,000 1,000,000 - 39 District Wide 524200 Submit Fees For Reimbursement 200,000 204,332 (19,370) 40 District Wide 532000 Monitor Dotson Marsh 2,808 - 2,808 41 District Wide 539700 Construct Vehicular Bridge 1,500,000 1,498,811 1,189 42 Dunsmuir Heights 140700 Build Dunsmuir to Chabot Trail 450,000 135,051 314,949 43 East Bay Greenway Trail 505700 Build Trail Coliseum to 85th 180,000 180,000 - 44 Hayward Shoreline 147900 Dredge Ponds and Repair Levees 1,264,942 973,436 291,506 45 Hayward Shoreline 136501 Repair Levee 10,058 - 10,058 46 Hayward Shoreline 160500 Restore Hayward Marsh 787,322 276,189 511,133 47 Iron Horse Regional Trail 155400 Build Trail, March Dr to Benica 150,000 14,943 135,057 48 Iron Horse Regional Trail 147401 IHT Feasibility Study-Dub BART 300,000 300,000 - 27 49 Judge John Sutter Regional Shoreline 526500 Plan and Develop Park 450,000 287,329 162,671 50 Las Trampas 152300 Replace Water Tank 665,000 281,781 383,219 51 Las Trampas 522700 Prepare LUPA 51,783 51,783 - 52 Marsh Creek Trail 156800 Develop Marsh Creek Trail 275,000 189,375 85,625 53 Martin Luther King Jr 503800 Study Bay Trail at Tidewater 25,000 19,419 5,581 54 Martin Luther King Jr 154300 Develop Tidewater Day Use Area 250,000 - 250,000 55 McLaughlin Eastshore Park 148600 Build Golden Gate Fields Trail 1,227,900 1,227,900 - 56 McLaughlin Eastshore Park 571500 Restore Albany Beach 1,472,100 1,472,100 57 Mission Peak 148100 Expand Staging Area 900,000 366,362 533,638 58 North Richmond Wetlands 148000 Restore Breuner (Dotson) Marsh 450,000 450,000 - 59 Oakland Shoreline 519600 Study Bike/Ped Trail 100,000 100,000 - 60 Oakland Shoreline 526100 Develop Crowley Trail Segment 100,000 216 99,784 61 Oyster Bay 152100 Design Bicycle Skills Area 50,000 37,192 12,808 62 Oyster Bay 142400 Develop Access and Picnic Area 350,000 184,382 165,618 63 Pleasanton Ridge 134600 Construct Garms Staging Area 200,000 - 200,000 64 Pleasanton Ridge 151800 Build Tyler Staging Area 468,100 196,117 271,983 65 Pleasanton Ridge 521100 Build Staging and Parking Area 100,000 100,000 - 66 Point Molate 154000 Extend Bay Trail 333,500 342,166 (8,666) Measure WW Appropriations as of March 15th, 2021 Exhibit 7a

Location Project Description Meas WW Budget Total Exp Net Avail DEVELOPMENT PROJECTS 67 Point Pinole 146700 Develop Interpretive Center 200,000 199,949 51 68 Point Pinole 539700 Construct Vehicular Bridge 4,940,000 4,940,000 - 69 Redwood 510700 Fund Science Camp 1,000,000 1,000,000 - 70 Redwood 215601 Aweeka 35,000 29,268 5,732 71 Roberts 159400 Renovate Pool 1,350,000 439,292 910,708 72 Round Valley 172300 Build Bridge 158,767 158,767 0 73 Sibley/Claremont Canyon/Huckleberry 150800 Restore McCosker Creek 500,000 110,753 389,247 74 Sunol 135800 Improve Visitor Center 563,537 472,524 91,013 75 Sunol 531300 Renovate Campground 100,000 - 100,000 76 Sunol/Ohlone Wilderness 504100 Dredge and Restore Pond 100,000 - 100,000 77 Tassajara Creek Trail 154500 Develop Trail To Mt. Diablo 150,000 19,878 130,122 78 Tilden 113601 Sewer & Phone Connection 189,431 189,431 - 79 Tilden 173800 Renovate Visitor Center 100,000 25,745 74,255 80 Tilden 173900 Replace EEC 485,000 111,581 373,419 81 Tilden 527800 Conduct Feasibility Study 200,000 157,798 42,202 28 82 Urban Creeks 150800 Restore McCosker Creek 3,150,000 - 3,150,000 83 Urban Creeks 173000 Remove Creek Culvert 55,483 55,483 - 84 Urban Creeks 572200 Remove Debris and Silt 635,942 660,137 (24,195) 85 Urban Creeks 158400 Remove Crossing at Brook Road 250,000 324 249,676 86 Urban Creeks 523300 Restore Urban Creeks 1,600,000 512,771 1,087,229 87 Vargas Plateau 142300 Improve Public Access 256,681 256,681 - 88 Vargas Plateau 156700 Build Vehicle Turn-Around 32,699 32,699 - 89 Vargas Plateau 520500 Improve Vargas Road 413,133 413,133 - Development Project Total 50,289,863 35,991,615 14,283,211 Measure WW Appropriations as of March 15th, 2021 Exhibit 7a

Location Project Description Meas WW Budget Total Exp Net Avail ACQUISITION PROJECTS 1 Anthony Chabot 249100 Gruenfeldt 596,033 596,033 - 2 Anthony Chabot 249101 Gruenfeldt 72,000 82,922 (10,922) 3 Bay Area Ridge Trail 210100 APN Investments 854,761 854,761 - 4 Bay Area Ridge Trail 210101 APN Investments 54,000 46,800 7,200 5 Bay Area Ridge Trail 218500 Acquisition-Richmond Hill 10,000 6,001 4,000 6 Bay Area Ridge Trail 219500 Acquisition-Melzer 15,000 10,989 4,011 7 Bay Area Ridge Trail 219600 Gillrie 1,030,237 1,030,237 - 8 Bay Area Ridge Trail 219601 Gillrie 83,060 831 82,229 9 Bay Area Ridge Trail 243800 Barra LP 15,000 10,006 4,994 10 Bay Area Ridge Trail 250600 Almond Ranch-JMLT 957,763 957,763 - 11 Bay Point Shoreline 248400 McAvoy Yacht Harbor 713 713 - 12 Bay Point Shoreline 530200 Establish Restoration 438,117 9,594 428,523 13 Bay Water Trail 148600 Build Golden Gate Fields Trail 1,163,057 1,000,000 163,057 14 Bay Water Trail 175300 Improve Access Restore Habitat-Acq 225,620 - 225,620 15 Bay Water Trail 237200 Acquisition-Suisun Properties 10,000 7,574 2,426 29 16 Calaveras Ridge Trail 243100 Wiedemann Ranch Inc 2,080,513 2,080,513 - 17 Calaveras Ridge Trail 243101 Wiedemann Ranch Inc 60,676 60,676 - 18 Black Diamond 214700 ANG/Eastern Development Corp 962,320 962,320 - 19 Black Diamond 214701 ANG/Eastern Development Corp 134,200 59,109 75,091 20 Black Diamond 219100 Save Mt Diablo-Irish Canyon 60,403 60,403 - 21 Black Diamond 219101 Save Mt Diablo-Irish Canyon 7,548 7,548 - 22 Black Diamond 231900 Acquisition-Plog Property 25,000 10,441 14,559 23 Black Diamond 234400 Antioch Unif Sch Dist/Moller 163,345 163,345 - 24 Black Diamond 234401 Antioch Unif Sch Dist/Moller 236,000 44,529 191,471 25 Black Diamond 235200 Barron 671,985 671,985 - 26 Black Diamond 235201 Barron 80,000 10,204 69,796 27 Black Diamond 235400 Austin-Thomas 517,374 517,374 - 28 Black Diamond 235401 Austin-Thomas 107,500 30,043 77,457 29 Black Diamond 236100 Affinito 271,089 271,089 - 30 Black Diamond 236101 Affinito 75,000 465 74,535 31 Black Diamond 237600 Riley 65,000 52,498 12,502 32 Black Diamond 238800 Save Mount Diablo-Thomas North 110,745 110,745 - 33 Black Diamond 238801 Save Mount Diablo-Thomas North 52,500 52,500 - Measure WW Appropriations as of March 15th, 2021 Exhibit 7a

Location Project Description Meas WW Budget Total Exp Net Avail ACQUISITION PROJECTS 34 Black Diamond 239600 SMD-Nortonville 10,000 10,000 - 35 Black Diamond 239700 Acquisition-Torres 10,000 5,639 4,361 36 Black Diamond 244100 City of Antioch 10,000 10,000 - 37 Black Diamond 244400 Good Chance Management 23,501 23,181 320 38 Black Diamond 245300 Suncrest Homes 538 538 - 39 Black Diamond-Round Valley Tr 208600 Kuhn 1,106 1,106 - 40 Briones 159900 Renovate Campground and Staging 100,000 100,000 - 41 Briones 217700 Remington Ranch 715,436 715,436 - 42 Briones 217701 Remington Ranch 61,500 8,441 53,059 43 Briones 218900 Acquisition-Thomas 13,488 13,488 - 44 Briones 238500 Svenhards Partnership 10,453 10,453 - 45 Briones 241700 Griffin-Phillips 13,088 13,088 - 46 Briones 248200 Acquisition-Carino Mallari 719 719 - 47 Briones 251700 Alhambra Creek Ranch 10,000 1,333 8,667 48 Briones-Mt Diablo Trail 217400 Haji-Briones to Mt Diablo 399,216 399,216 - 30 49 Byron Vernal Pools 216800 Souza III 923,641 923,641 - 50 Byron Vernal Pools 216801 Souza III 61,500 61,500 - 51 Byron Vernal Pools 216900 Souza Granny's Quarter 570,923 570,923 - 52 Byron Vernal Pools 216901 Souza Granny's Quarter 1,359 1,359 - 53 Byron Vernal Pools 218200 Martin Vasco Caves 1,666,265 1,666,265 - 54 Byron Vernal Pools 218201 Martin Vasco Caves 20,500 20,500 - 55 Byron Vernal Pools 243900 Coast Capital Income LLC 50,000 43,520 6,480 56 Byron Vernal Pools 244200 Fitzpatrick-Campos 11,815 11,815 - 57 Byron Vernal Pools 244201 Fitzpatrick-Campos 100,875 14,232 86,643 58 Byron Vernal Pools 245400 Casey 11,541 11,541 - 59 Calaveras Ridge Trail 242700 Burton 79,803 79,803 - 60 Calaveras Ridge Trail 244600 Weidemann Ranch Ag Lot 1 1,084 1,084 - 61 Carquinez Strait 219200 TXI-Pacific Custom Materials 1,232,503 1,232,503 - 62 Carquinez Strait 219201 TXI-Pacific Custom Materials 99,584 99,584 - 63 Carquinez Strait 219202 TXI-Pacific Custom Materials 344,981 344,981 - 64 Carquinez Strait 239000 Acquisition-Robinson 35,000 31,205 3,795 65 Clayton Ranch 241300 Clayton Radio LLC 72,486 72,486 - 66 Clayton Ranch 241301 Clayton Radio LLC 322,563 322,563 - Measure WW Appropriations as of March 15th, 2021 Exhibit 7a

Location Project Description Meas WW Budget Total Exp Net Avail ACQUISITION PROJECTS 67 Clayton Ranch 245500 Moita 220,000 194,329 25,671 68 Concord Hills (CNWS) 160000 Develop Concord Hills 100,000 - 100,000 69 Concord Hills (CNWS) 217900 Land Waste Management 1,201,395 1,201,395 - 70 Concord Hills (CNWS) 217901 Land Waste Management 59,000 46,903 12,097 71 Concord Hills (CNWS) 240700 USA-Concord Naval Weapons Sta 653,173 732,352 (79,179) 72 Concord Hills (CNWS) 240701 USA-Concord Naval Weapons Sta 250,000 47,860 202,140 73 Concord Hills (CNWS) 247300 Acquisition-We Care Society Property 25,000 10,009 14,991 74 Concord Hills (CNWS) 250800 Phillips 66 10,000 317 9,683 75 Concord Naval/Blk Diamond Trl 238600 Alaimo 54,584 54,584 - 76 Concord Naval/Blk Diamond Trl 238601 Alaimo 10,800 10,800 - 77 Coyote Hills/Linear Park 247000 Patterson Church 427,679 427,679 - 78 Coyote Hills/Linear Park 247001 Patterson Church 5,800 - 5,800 79 Coyote Hills/Linear Park 250300 Caltrans 60,000 20,225 39,775 80 Crockett Hills 158000 Replace Well 850,000 - 850,000 81 Crockett Hills 217200 Scrimgeour 1,008,313 1,008,313 - 31 82 Crockett Hills 217201 Scrimgeour 1,270 1,270 - 83 Crockett Hills 243300 SLC Rodeo 3,423 3,423 - 84 Crockett Hills 243301 SLC Rodeo 25,000 - 25,000 85 Crown Beach 235300 USA-GSA 2,935,852 2,935,852 - 86 Crown Beach 245900 McKay CA State 13,367 13,367 - 87 Deer Valley 160300 Develop Public Access 100,000 - 100,000 88 Deer Valley 208700 Roddy J 35,548 35,548 - 89 Deer Valley 234800 Roddy Ranch 3,130,521 3,130,521 - 90 Deer Valley 234801 Roddy Ranch 151,500 151,500 - 91 Deer Valley 236800 Li Fan 39,240 39,240 - 92 Deer Valley 236801 Li Fan 15,000 15,000 - 93 Deer Valley 241100 Smith 560,481 560,481 - 94 Deer Valley 241101 Smith 77,900 50,436 27,464 95 Deer Valley 242200 Acquisition-Roberts 10,000 1,469 8,531 96 Deer Valley 243000 Sean McCauley Investments 21,928 21,928 - 97 Deer Valley 245100 SMD-Hanson 190,853 190,853 - 98 Deer Valley 245101 SMD-Hanson 66,500 29,872 36,628 99 Deer Valley 247400 Roddy Home Ranch 568,650 568,650 - Measure WW Appropriations as of March 15th, 2021 Exhibit 7a

Location Project Description Meas WW Budget Total Exp Net Avail ACQUISITION PROJECTS 100 Deer Valley 247401 Roddy Home Ranch 6,000 - 6,000 101 Deer Valley 247600 Roddy Tour Way 271,640 271,640 - 102 Deer Valley 247601 Roddy Tour Way 34,500 - 34,500 103 Deer Valley 248100 Roddy Cell Easement 163,752 163,752 - 104 Deer Valley 248101 Roddy Cell Easement 9,130 - 9,130 105 Deer Valley 248700 Olesen 242,797 2,242,797 - 106 Deer Valley 248701 Olesen 78,000 - 78,000 107 Deer Valley 248800 Lucas 92,275 92,275 - 108 Deer Valley 248801 Lucas 83,000 23,896 59,105 109 Deer Valley 249400 Oak Hill Park Co 2 20,000 16,035 3,965 110 Delta Access 251500 Bautista 10,000 405 9,595 111 Delta Access 215800 Ronald Nunn Family Ltd 626,951 626,951 - 112 Delta Access 215801 Ronald Nunn Family Ltd 27,000 18,213 8,787 113 Delta Access 241400 Aginson Prime 82,203 82,203 - 114 Delta Access 241401 Aginson Prime 28,700 28,700 - 32 115 Doolan Canyon 215300 Acquisition-Doolan/Tassajara 25,000 22,809 2,192 116 Doolan Canyon 233900 Schmitz Property 2,415,254 2,415,254 - 117 Doolan Canyon 233901 Schmitz Property 55,600 47,679 7,921 118 Doolan Canyon 242800 Gosselin-Rollins 254,400 219,148 35,252 119 Doolan Canyon 249200 Grove 1,041,124 1,041,124 - 120 Doolan Canyon 249201 Grove 217,500 - 217,500 121 Doolan Canyon 250200 City of Livermore 10,000 - 10,000 122 Dry Creek/Pioneer 239400 Masonic Homes of California 20,000 16,173 3,827 123 Dublin Hills 229800 Acquisition-Nielsen 5,000 - 5,000 124 Dublin Hills 250400 Northern Calif Laborers Union 17,550 11,542 6,008 125 Dublin Hills 250401 Northern Calif Laborers Union 213,000 - 213,000 126 Dunsmuir Heights 215500 Chabot Dunsmuir 1,900,000 1,900,000 - 127 East Bay Greenway Trail 505700 Build Trail Coliseum to 85th 400,000 400,000 - 128 Garin 208000 Hayward 1900 / Stonebrae 20,999 20,999 - 129 Garin 208001 Hayward 1900 / Stonebrae 62,600 17,319 45,281 130 Garin 218300 Gonsalves 6,679 6,679 - 131 Garin 236500 Acquisition-Carden 10,000 5,779 4,221 132 Garin 239400 Masonic Homes of California 5,000 - 5,000 Measure WW Appropriations as of March 15th, 2021 Exhibit 7a

Location Project Description Meas WW Budget Total Exp Net Avail ACQUISITION PROJECTS 133 Garin 244800 Alameda County 87,876 87,876 - 134 Garin 244801 Alameda County 63,625 51,345 12,280 135 Garin 251300 Chouinard Winery 13,000 14,518 (1,518) 136 Garin to Mission Peak Trail 233800 Louie etal Mission 965,638 965,638 - 137 Garin 251301 Chouinard Winery 42,750 - 42,750 138 Hayward Shoreline 236300 City of Hayward 1,459,156 1,459,156 - 139 Hayward Shoreline 236301 City of Hayward 200,000 1,443 198,557 140 Hayward Shoreline 245600 Russell City Energy 18,489 18,489 - 141 Hayward Shoreline 245601 Russell City Energy 14,500 - 14,500 142 Iron Horse Regional Trail 147400 IHT Feasibility Stdy-DubBART/StaRta 5,861 5,862 (0) 143 Iron Horse Regional Trail 147401 IHT Feasibility Stdy-DubBART/StaRta 856,209 855,660 549 144 Iron Horse Regional Trail 218600 Borel 65,000 60,515 4,485 145 Judge John Sutter Regional Shoreline 208900 Oakland Army Base/Eastshore 100,000 22,695 77,305 146 Las Trampas 206100 Elworthy Property 22,345 22,345 - 147 Las Trampas 206101 Elworthy Property 47,950 47,950 - 33 148 Las Trampas 217500 Bollinger Cyn Rd to Las Trampas 76,456 76,456 - 149 Las Trampas 235900 Acquisition-Gatti 15,000 9,147 5,853 150 Las Trampas 236000 Acquisition-Smith/Gherini 1,552,200 1,553,435 (1,235) 151 Las Trampas 236001 Smith/Gherini 101,800 - 101,800 152 Las Trampas 238100 Acquisition-Murray 20,000 12,394 7,606 153 Las Trampas 238200 Acquisition-Livermore 10,000 2,435 7,565 154 Las Trampas 238300 Acquisition-Maxedon 10,000 2,503 7,497 155 Las Trampas 240500 Long 8,100 8,100 - 156 Las Trampas 240501 Long 29,500 22,083 7,417 157 Las Trampas 242400 Acquisition-Alamo Diamond 20,000 11,312 8,688 158 Las Trampas 243500 Lothamer 1,874,070 1,874,070 - 159 Las Trampas 243501 Lothamer 88,100 85,352 2,748 160 Las Trampas 243700 Heilig 804,280 804,280 - 161 Las Trampas 243701 Heilig 48,800 - 48,800 162 Las Trampas 245200 SF Prebytery 2,194 2,194 - 163 Las Trampas 248300 Acquisition-Turre 10,000 1,474 8,526 164 Las Trampas 249000 Ponderosa Homes 8,526 8,526 - 165 Las Trampas 249001 Ponderosa Homes 111,000 30,000 81,000 Measure WW Appropriations as of March 15th, 2021 Exhibit 7a

Location Project Description Meas WW Budget Total Exp Net Avail ACQUISITION PROJECTS 166 Las Trampas 249800 Symon 284,497 284,497 - 167 Las Trampas 249801 Symon 18,750 - 18,750 168 Leona Open Space 218400 Acquisition-Mbanugo 20,000 16,442 3,558 169 Leona Open Space 237400 Yee-O'Hanneson Road 114,314 114,314 - 170 Leona Open Space 237401 Yee-O'Hanneson Road 29,300 14,743 14,557 171 Leona Open Space 247800 Acquisition-Ridgemont 3,541 3,541 - 172 Leona Open Space 247801 Ridgemont 50,000 36,461 13,540 173 Leona Open Space 249700 Genera 4,394 4,394 - 174 McLaughlin Eastshore Park 148600 Build Golden Gate Fields Trail 1,210,094 - 1,210,094 175 McLaughlin Eastshore Park 218800 MEC Land Holdings Inc 2,476,767 2,475,947 820 176 McLaughlin Eastshore Park 571500 Restore Albany Beach 392,684 392,684 - 177 Mission Peak 219000 Acquisition-Wool Family 9,632 9,632 - 178 Mission Peak 251200 Wool Ranch 506,000 13,495 492,505 179 Mission Peak 251200 Wool Ranch 18,000 - 18,000 180 North Richmond Wetlands 241000 Crader 39,066 39,066 - 34 181 North Richmond Wetlands 241001 Crader 10,750 8,749 2,001 182 Pleasanton Ridge 205800 Schuhart II Pleasanton Ridge 78,101 78,101 - 183 Pleasanton Ridge 217600 Golftec Development Group LLC 669,026 669,026 - 184 Pleasanton Ridge 219400 Castleridge 1,259,562 1,259,562 - 185 Pleasanton Ridge 219401 Castleridge 37,800 19,393 18,407 186 Pleasanton Ridge 232200 Robertson Property 3,524,190 3,524,190 - 187 Pleasanton Ridge 232201 Robertson Property 57,500 22,781 34,719 188 Pleasanton Ridge 233501 Tyler Ranch/Roberts/King 229,000 116,645 112,355 189 Pleasanton Ridge 233502 Tyler Ranch/Roberts/King 1,658,000 1,658,000 - 190 Pleasanton Ridge 235500 Sweningsen 170,120 170,120 - 191 Pleasanton Ridge 235700 Owen 2,020,224 2,020,224 - 192 Pleasanton Ridge 235701 Owen 65,000 46,199 18,801 193 Pleasanton Ridge 237100 Zwissig 38,024 38,024 - 194 Pleasanton Ridge 237700 Lester 15,000 12,216 2,784 195 Pleasanton Ridge 238400 Acquisition-Yunus 6,422 6,422 - 196 Pleasanton Ridge 239300 Eliasen Edge LP 11,407 11,407 - 197 Pleasanton Ridge 241200 Acquisition-Montgomery 15,000 7,591 7,409 198 Pleasanton Ridge 244300 Glenn 1,836,416 1,836,416 - Measure WW Appropriations as of March 15th, 2021 Exhibit 7a

Location Project Description Meas WW Budget Total Exp Net Avail ACQUISITION PROJECTS 199 Point Molate 206600 Radke Martinez Shoreline 23,710 23,710 - 200 Point Molate 229000 Acquisition-Red Rock Island 5,000 1,945 3,055 201 Point Pinole 217300 Giant/Atlas Rds. 19,669 19,669 - 202 Point Pinole 236600 Acquisition-Murray Parkway 20,700 20,200 500 203 Point Pinole 239800 Acquisition-PG&E Goodrick Ave. 17,599 17,599 - 204 Point Pinole 239900 SLC Goodrick Avenue 8,332 8,332 - 205 Point Pinole 240100 SPB Pipeline Goodrick Avenue 28,802 28,802 - 206 Point Pinole 240200 UPRR Goodrick Avenue 22,037 22,037 - 207 Point Pinole 240300 EBRPD Goodrick Avenue 41,291 41,291 - 208 Point Pinole 240900 Richmond Rod & Gun Club 17,406 17,406 - 209 Point Pinole 246900 O'Neil Property 2,027,863 2,027,863 - 210 Point Pinole 246901 O'Neil Property 24,910 - 24,910 211 Rancho Pinole 235100 Muir Heritage/Fernandez 4,691 4,691 - 212 Rancho Pinole 235800 Besphil & Co, Et Al 929,025 929,025 - 213 Rancho Pinole 248900 Oak Hills Park Co 88,000 49,057 38,943 35 214 Rancho Pinole 249900 Awenius 15,000 8,282 6,718 215 Redwood 215600 Aweeka 722,492 722,492 - 216 Redwood 215601 Aweeka 46,000 46,000 - 217 Redwood 233100 Albanese-Lorimer Property 1,611,461 1,611,461 - 218 Redwood 233101 Albanese-Lorimer Property 90,000 - 90,000 219 Redwood 246100 Exchange Rights Kenilworth 5,908 5,908 - 220 Round Valley 249300 Heiser 1,020,311 1,020,311 - 221 Round Valley 249301 Heiser 107,500 192 107,308 222 San Francisco Bay Trail 147100 Construct Pinole Shores 120,000 123,957 (3,957) 223 San Francisco Bay Trail 148600 Build Golden Gate Fields Trail 1,342,854 819,123 523,731 224 San Francisco Bay Trail 218800 MEC Land Holdings Inc 671,897 701,506 (29,609) 225 San Francisco Bay Trail 218801 MEC Land Holdings Bay Trail 150 150 - 226 San Francisco Bay Trail 226500 Mt. Zion Enterprises Inc. 99,000 88,172 10,828 227 San Francisco Bay Trail 240800 BNSF DornanDrive Bay Trail 236,913 172,912 64,001 228 San Francisco Bay Trail 243600 Silveira Bay Trail 10,000 1,193 8,807 229 San Francisco Bay Trail 246200 UPRR Easement Pinole 10,000 - 10,000 230 San Francisco Bay Trail 246300 UPRR Easement Nejedly 10,000 - 10,000 231 San Francisco Bay Trail 246400 UPRR License at TXI 10,000 - 10,000 Measure WW Appropriations as of March 15th, 2021 Exhibit 7a

Location Project Description Meas WW Budget Total Exp Net Avail ACQUISITION PROJECTS 232 San Francisco Bay Trail 246500 UPRR License LoneTree 10,000 - 233 San Pablo Bay 218000 Rich Property 18,000 14,884 3,116 234 San Pablo Bay 246800 City Of Pinole Easement 3,548 3,548 - 235 Sibley/Claremont Canyon/Huckleberry 216200 McCosker/Indian Valley 2,000 2,000 - 236 Sibley/Claremont Canyon/Huckleberry 231100 Wilder 15,000 2,967 12,033 237 Sibley/Claremont Canyon/Huckleberry 247100 SJ Management 25,000 15,606 9,395 238 Sunol/Ohlone Wilderness 244000 Rowell 17,265 17,265 - 239 Sunol/Ohlone Wilderness 244001 Rowell 219,000 97,295 121,705 240 Tassajara Creek Trail 238700 Shapell 4,759 4,759 - 241 Tassajara Creek Trail 238701 Shapell 42,633 42,633 - 242 Tassajara Creek Trail 239500 Acquisition-Morphis 2,162 2,162 - 243 Tassajara Creek Trail 247500 USA Army 10,000 2,475 7,525 244 Urban Creeks 215500 Chabot Dunsmuir LP 24,395 24,395 - 245 Vargas Plateau 218100 Rose 385,156 385,156 - 246 Vargas Plateau 218101 Rose 76,564 76,564 - 36 247 Vargas Plateau 220500 BBG KRG Inc. 35,000 14,407 20,593 248 Vargas Plateau 236200 Hartkopf 59,500 58,262 1,238 249 Vargas Plateau 246000 Vieux 10,000 128 9,872 250 Vasco Caves 237500 Vaquero Farms Inc 245,850 245,850 - 251 Vasco Hills 237501 Vaquero Farms Inc 142,250 142,250 - 252 Wildcat Canyon/Alvarado 236900 FRB Inc 770,925 770,925 - 253 Wildcat Canyon/Alvarado 236901 FRB Inc 127,000 73,480 53,520 254 Wildcat Creek Trail 246700 UPRR Rights Over Creek 10,000 - 10,000 Acquisition Project Subtotal 76,825,992 70,676,576 7,471,382

TOTAL FROM MEASURE WW FUND SOURCE 127,115,855 106,668,191 21,754,593 Measure WW Status Report Exhibit 7c a/o March 15th 2021

Possible Challenges, Not Started, In Planning, In Progress, Complete

# Allocation Area Description

$6.5 million to protect wildlife habitat. - Create regional recreation opportunities on San Francisco Bay. 1 Alameda Point WW Bond - Extend the Bay Trail around Alameda Point in cooperation with City of Alameda. - Restore shoreline areas including beach and dune grass habitat. Acquistion Development Allocation $4,300,000 $2,250,000 Budgeted $0 $521,286 Available $4,300,000 $1,728,714 $630,000 to complete the key bicycle, pedestrian and equestrian trail connection across the 580-680 interchange 2 Alamo Canal WW Bond creating the first trail connection linking the communities of Dublin and Pleasanton. Acquistion Development Allocation $0 $150,000 Budgeted $0 $144,931 Available $0 $5,069 $2 million to acquire last remaining open space to establish final park boundaries. 3 A. Chabot WW Bond - Buffer sensitive wildlife habitats - Create new access for all users. Acquistion Development Allocation $2,025,000 $0 Budgeted $668,033 $0 Available $1,356,967 $0 $2.2 million to improve facilities and increase opportunities 4 Ardenwood WW Bond for school classes and families to experience early California life at the historic Ardenwood Farm. Acquistion Development Allocation $0 $2,250,000 Budgeted $0 $650,000 Available $0 $1,600,000

$1.6 million to expand and restore wetlands to enhance habitat for Delta Smelt and other species. 5 Bay Point WW Bond - Provide water access to the Pittsburg/Bay Point shoreline - Establish the starting point of the Great Delta Trail project linking the East Bay to the Delta and Central Valley

Acquistion Development Allocation $675,000 $900,000 Budgeted $713 $900,000 Available $674,287 $0

37 Measure WW Status Report Exhibit 7c a/o March 15th 2021

Possible Challenges, Not Started, In Planning, In Progress, Complete

# Allocation Area Description

$12.3 million to connect urban communities to shoreline access and wildlife viewing opportunities. - Complete the 86 mile Bay Trail along the East Bay 6 Bay Trail WW Bond shoreline. - Acquire and develop trail links to close the remaining gaps between Martinez and Fremont.

Acquistion Development Allocation $7,158,000 $5,140,000 Budgeted $2,520,814 $5,387,928 Available $4,637,186 -$247,928 $5.9 million to establish safe and environmentally sound launch sites, wildlife viewing, camping, and other facilities to support the new Bay Water Trail. 7 Bay Water Tr WW Bond - Provide places for kayakers, canoers, and other small boats to travel the length of the East Bay shoreline and ultimately circumnavigate the Bay. Acquistion Development Allocation $4,015,000 $1,875,000 Budgeted $1,398,677 $1,875,000 Available $2,616,323 $0 $2.6 million to enhance delta shoreline access. - Expand interpretative/educational opportunities for East Contra Costa County schools and families to experience the 8 Big Break Sh WW Bond Delta in a natural setting. - Protect and enhance habitat for the threatened California Black Rail and Giant Garter Snake. - Restore coastal prairie grassland. Acquistion Development Allocation $180,000 $2,420,000 Budgeted $0 $2,420,000 Available $180,000 $0 $4.5 million to complete the underground trail and Mining Museum. 9 Black Diamond WW Bond - Preserve important open space. - Enhance wetland and riparian habitat in partnership with the East Contra Costa County Habitat Conservation Plan. Acquistion Development Allocation $3,600,000 $900,000 Budgeted $3,594,048 $900,000 Available $5,952 $0

38 Measure WW Status Report Exhibit 7c a/o March 15th 2021

Possible Challenges, Not Started, In Planning, In Progress, Complete

# Allocation Area Description

$7.8 million to preserve additional ridge top and hillside open space surrounding and near the park in partnership with other agencies. 10 Briones WW Bond - Improve Alhambra Valley and Buckeye Ranch access. - Develop staging area and trail connections for all users. - Renovate picnic areas and group camps. Acquistion Development Allocation $4,950,000 $2,835,000 Budgeted $1,323,900 $48,960 Available $3,626,100 $2,786,040 $3 million to acquire rare vernal pool habitat and wetlands near Byron. - Expand, preserve, protect and interpret rare species 11 Byron Vernal Pools WW Bond including Tiger Salamander, Fairy Shrimp and vernal pool flowers in partnership with the East Contra Costa County Habitat Conservation Plan Acquistion Development Allocation $2,700,000 $270,000 Budgeted $1,731,654 $0 Available $968,346 $270,000

$11.3 million to acquire open space and park corridor and construct this trail for all users connecting six regional parks 12 Calaveras Rdg WW Bond along the I-680 corridor serving all communities from Sunol to the Carquinez Strait.

Acquistion Development Allocation $9,000,000 $2,323,000 Budgeted $2,222,075 $0 Available $6,777,925 $2,323,000 $4.1 million to complete the shoreline scenic corridor between Martinez and Crockett. - Expand outdoor recreation opportunities. 13 Carquinez Strait WW Bond - Preserve shoreline areas. - Connect park trails for all users from historic Port Costa to the San Francisco Bay and Ridge Trails. Acquistion Development Allocation $3,600,000 $450,000 Budgeted $1,712,068 $0 Available $1,887,932 $450,000

39 Measure WW Status Report Exhibit 7c a/o March 15th 2021

Possible Challenges, Not Started, In Planning, In Progress, Complete

# Allocation Area Description

$2 million to preserve open space - complete this critical wildlife corridor for Alameda Whipsnake, Red Legged Frog and rare plants between Mt. Diablo and Black Diamond Mines Regional Preserve in 14 Clayton Ranch WW Bond partnership with the East Contra Costa County Habitat Conservation Plan. - Provide initial staging and new trail opportunities for all users. Acquistion Development Allocation $1,800,000 $225,000 Budgeted $615,049 $0 Available $1,184,951 $225,000

$16 million to work in partnership with Concord and the National Park Service to acquire, restore and develop a major new regional park in on the inland portion of former Concord Naval Weapons Station. - Protect open space and wildlife habitat for Tiger 15 Concord Naval WW Bond Salamander, Red Legged Frog and restore Mt. Diablo Creek. - Develop regional recreation facilities including picnic areas, trails for all users, parking and camp sites. - Provide interpretive opportunities in partnership with NPS to provide services in the area.

Acquistion Development Allocation $11,000,000 $4,950,000 Budgeted $2,363,952 $417,375 Available $8,636,048 $4,532,625 $8.1 million to acquire remaining lands adjacent to Coyote Hills. - Complete park boundaries and preserve sensitive riparian wildlife habitat. - Restore and expand existing marsh complex to include seasonal wetlands, coastal prairie grassland and reduce cattails. -Enhance habitat for Salt Marsh Harvest Mouse, and 16 Coyote Hills WW Bond California Black Rail. - Replace the aging visitor center with a state of the art facility to interpret the significant cultural and natural resources of the area. - Add family camping opportunities at the reclaimed Dumbarton Quarry site. - Provide trail links to the Don Edwards Wildlife Refuge and Bay Trail. Acquistion Development Allocation $4,500,000 $3,600,000

40 Measure WW Status Report Exhibit 7c a/o March 15th 2021

Possible Challenges, Not Started, In Planning, In Progress, Complete

# Allocation Area Description

Budgeted $1,343,479 $450,000 Available $3,156,521 $3,150,000 $4 million to acquire scenic open space to expand this park near the West County communities of Crockett, Hercules and Rodeo. 17 Crockett Hills WW Bond - Build new public access, trails for all users and camp sites easily accessible from Highway 4 and the Cummings Skyway. Acquistion Development Allocation $3,600,000 $450,000 Budgeted $1,038,006 $62,227 Available $2,561,994 $387,773 $6.5 million to replace and expand the Crab Cove interpretive center, currently located in an outdated military building. - Expand and restore the popular Alameda Beach to 18 Crown Beach WW Bond increase space for beach recreation and protect the shoreline. - Acquire appropriate surplus federal property if it becomes available. Acquistion Development Allocation $3,600,000 $2,880,000 Budgeted $2,949,219 $1,412,214 Available $650,781 $1,467,786

$3.6 million to establish a new park near the communities of Brentwood and Oakley. - When matched with funding from the East Contra Costa County Habitat Conservation Plan, the park will preserve a 19 Deer Valley WW Bond regional wildlife corridor for San Joaquin Kit Fox, Tiger Salamander, and other threatened species between Los Vaqueros and Black Diamond. - Preservation of the rural ranching history of the area.

Acquistion Development Allocation $5,892,250 $900,000 Budgeted $5,970,322 $0 Available -$78,072 $900,000 $5 million to open a new regional park on the Delta providing swimming, boating, fishing, picnicking and camping close to East Contra Costa communities. 20 Delta Access WW Bond - Work with federal and state agencies to provide both Delta recreation and wildlife habitat for threatened California Black Rail, Giant Garter Snake and migratory waterfowl. Acquistion Development

41 Measure WW Status Report Exhibit 7c a/o March 15th 2021

Possible Challenges, Not Started, In Planning, In Progress, Complete

# Allocation Area Description

Allocation $2,535,916 $1,350,000 Budgeted $774,854 $687,962 Available $1,761,062 $662,038 $1 million for new public access, trails, family camping and 21 Delta Recreation WW Bond picnicking in the Delta on or near Jersey Island and the San Joaquin River. Acquistion Development Allocation $0 $1,000,000 Budgeted $0 $857,507 Available $0 $142,493 $4.1 million to provide new trails for all users, connecting the communities of Bay Point, Pittsburg, Antioch, and 22 Delta Trail WW bond Oakley to the shoreline. Work with State and local agencies to develop the Great Delta Trail, improving urban access to fishing and boating in the Delta. Acquistion Development Allocation $2,700,000 $1,350,000 Budgeted $438,117 $248,574 Available $2,261,883 $1,101,426 $7.2 million to preserve open space and habitat in central Contra Costa County adjacent to Mt. Diablo State Park, 23 Diablo Foothills WW Bond complete renovation of picnic areas, play areas, and trail access improvements for all users. Acquistion Development Allocation $6,300,000 $900,000 Budgeted $0 $0 Available $6,300,000 $900,000

$5.7 million to acquire land for a new park preserving the last major undeveloped expanse of the Tassajara Hills north of the communities of Dublin and Pleasanton. Restore 24 Doolan Canyon/Tassajara Hills WW Bond grassland and seasonal wetland habitat for Tiger Salamanders, Golden Eagles, Prairie Falcons and other species. Provide public access, and scenic resources, and trails for all users.

Acquistion Development Allocation $5,000,000 $675,000 Budgeted $4,018,878 $0 Available $981,122 $675,000

42 Measure WW Status Report Exhibit 7c a/o March 15th 2021

Possible Challenges, Not Started, In Planning, In Progress, Complete

# Allocation Area Description

$6.7 million to acquire and preserve scenic ridge lands in the Union City Hills along Walpert Ridge. 25 Dry Creek WW Bond - Complete the renovation of the historic Meyers Estate and garden for intimate community gatherings. - Complete multi-use Ridge Trail connections.

Acquistion Development Allocation $5,800,000 $900,000 Budgeted $20,000 $0 Available $5,780,000 $900,000 $4.7 million to complete this new park along the ridgelines in the scenic West Dublin hills. - Preserve wildlife corridor 26 Dublin Hills WW Bond - Connect community residents to regional trails for all users. - Restore ponds enhance riparian habitats and grasslands. Acquistion Development Allocation $4,500,000 $225,000 Budgeted $235,550 $0 Available $4,264,450 $225,000 $2.3 million to acquire and construct an urban open space and multi use trail corridor connecting Oakland and San 27 Dunsmuir Hts WW Bond Leandro neighborhoods to Anthony Chabot park through the Dunsmuir Heights area. Acquistion Development Allocation $1,900,000 $450,000 Budgeted $1,900,000 $450,000 Available $0 $0 $400,000 to partner with local cities to secure public use of 28 EB Greenway Tr WW Bond this abandoned rail right of way to serve urban residents from Oakland to Fremont. Acquistion Development Allocation $400,000 $180,000 Budgeted $400,000 $180,000 Available $0 $0

$27 million to expand and restore this eight-mile-long urban shoreline park adjacent to the East Bay communities of Oakland, Berkeley, Emeryville, Albany, and Richmond. -Consistent with the Eastshore State Park General Plan 29 Eastshore SP WW Bond -Develop access improvements. -Restore upland and wetland areas to enhance wildlife habitat. -Complete Eastshore segments of the Bay Trail.

Acquistion Development

43 Measure WW Status Report Exhibit 7c a/o March 15th 2021

Possible Challenges, Not Started, In Planning, In Progress, Complete

# Allocation Area Description

Allocation $24,300,000 $2,700,000 Budgeted $4,079,545 $2,700,000 Available $20,220,455 $0 $2.9 million to acquire and protect scenic ridges. - Protect wildlife habitat adjacent to Union City, Fremont 30 Garin WW Bond and Hayward communities. - Expand park trail system to improve recreational opportunities and connect to the Ridge Trail. Acquistion Development Allocation $2,700,000 $225,000 Budgeted $312,529 $0 Available $2,387,471 $225,000

$2 million to Acquire and construct trail connecting Garin 31 Garin-Plsntn Rdg WW Bond Park to Pleasanton Ridge for hiking, biking and equestrian use.

Acquistion Development Allocation $1,800,000 $225,000 Budgeted $0 $0 Available $1,800,000 $225,000

$5.4 million to establish a new regional shoreline park as a bicycle trail hub connecting the new Bay Bridge bicycle access to the East Bay and the Bay Trail in cooperation with other agencies. This intermodal node will including: 32 Gateway Shoreline - Parking - Promenade - Fishing access - Landscape improvements - Facilities to interpret the natural and historic resources of this site

Acquistion Development Allocation $4,500,000 $900,000 Budgeted $100,000 $450,000 Available $4,400,000 $450,000

44 Measure WW Status Report Exhibit 7c a/o March 15th 2021

Possible Challenges, Not Started, In Planning, In Progress, Complete

# Allocation Area Description

$4.5 million to restore and protect shoreline bird habitat. - Strengthen and repair levees along this shoreline to address climate change impacts. - Improve public trail access. 33 Hayward Shr WW Bond - Cooperate on shoreline interpretive improvements with other state and local agencies. - Dredge channels to improve water circulation. - Enhance habitat on islands for endangered Least Terns. Acquistion Development Allocation $1,800,000 $2,700,000 Budgeted $1,692,145 $2,062,322 Available $107,855 $637,678 $1.4 million to complete southern trail corridor between Las 34 IHT to Mt Diablo Tr Bond Trampas, Sycamore Valley and Mount Diablo. Acquistion Development Allocation $900,000 $450,000 Budgeted $0 $0 Available $900,000 $450,000 $2.2 million to complete extensions to north to Concord 35 Iron Horse Tr WW Bond and south to Pleasanton of this 28-mile long urban bicycle trail. Acquistion Development Allocation $1,350,000 $1,200,000 Budgeted $927,071 $450,000 Available $422,929 $750,000 $1.8 million to preserve hillside areas, connect trails and add 36 Lake Chabot WW Bond public access along the western park boundary. Acquistion Development Allocation $1,800,000 $0 Budgeted $0 $0 Available $1,800,000 $0 $8.3 million to establish interpretive visitor contact station and indoor meeting space to serve the increasing population in the San Ramon Valley. 37 Las Trampas WW Bond - Develop access for all users to recently acquired properties in the Lafayette, Moraga and San Ramon Valley areas including staging, trails, and camping areas. Acquistion Development Allocation $5,175,000 $3,150,000 Budgeted $5,163,568 $716,783 Available $11,432 $2,433,217

45 Measure WW Status Report Exhibit 7c a/o March 15th 2021

Possible Challenges, Not Started, In Planning, In Progress, Complete

# Allocation Area Description

$2.5 million to acquire remaining land to complete park and 38 Leona Open Space improve public access.

Acquistion Development Allocation $2,500,000 $0 Budgeted $221,549 $0 Available $2,278,451 $0

$900,000 to complete the Marsh Creek Trail connecting the 39 Marsh Creek Tr WW Bond Brentwood area through the new State Historic Park at Cowell Ranch to Round Valley Regional Preserve.

Acquistion Development Allocation $450,000 $450,000 Budgeted $0 $275,000 Available $450,000 $175,000

$12.3 million to expand existing public use, shoreline access 40 MLK Jr Shr WW Bond and Bay Trail improvements at the Tidewater and Shoreline Center areas of the Martin Luther King Jr. Shoreline.

Acquistion Development Allocation $9,450,000 $2,870,000 Budgeted $0 $275,000 Available $9,450,000 $2,595,000

$5.4 million to expand ridgeline corridor on Mission Ridge. 41 Mission Peak WW Bond - Improve trails and staging areas including Stanford Avenue.

Acquistion Development Allocation $4,500,000 $900,000 Budgeted $533,632 $900,000 Available $3,966,368 $0

46 Measure WW Status Report Exhibit 7c a/o March 15th 2021

Possible Challenges, Not Started, In Planning, In Progress, Complete

# Allocation Area Description

$8.1 million to expand wildlife corridors in partnership with the East Contra Costa Habitat Conservation Plan. 42 Morgan Terr WW Bond - Provide trails for all users and additional access to the ridge lands south of Mt. Diablo.

Acquistion Development Allocation $6,135,917 $900,000 Budgeted $0 $0 Available $6,135,917 $900,000 $3.6 million to preserve San Pablo and Wildcat Creek Marshes and their creek deltas to protect and restore the two largest remaining marsh areas along the North Contra Costa Shoreline. 43 N.Richmond Shr WW Bond - Connect the trail corridor from the north Richmond Wetlands to Point Pinole. - Develop appropriate public access for wildlife viewing and education programs. Acquistion Development Allocation $3,200,000 $450,000 Budgeted $49,816 $450,000 Available $3,150,184 $0

$720,000 to join with the City of Oakland and community 44 Oak Knoll-Ridge Tr WW Bond groups to create trail connections between the Oak Knoll redevelopment project and the Leona Heights Open Space.

Acquistion Development Allocation $450,000 $270,000 Budgeted $0 $0 Available $450,000 $270,000 $10.8 million to join with Oakland to develop new access for urban residents to the Oakland Shoreline. - Clean up and restore marshes to benefit nesting birds - Improve water circulation through dredging 45 Oakland Shoreline - Construct improvements on shoreline sites along the Bay Trail from San Leandro Bay, through the Oakland Estuary, and north to connect to Gateway Shoreline Park. - Assist with the City's Estuary Plan trail and access projects, including public use facilities. Acquistion Development Allocation $9,000,000 $1,800,000 Budgeted $0 $200,000 Available $9,000,000 $1,600,000

47 Measure WW Status Report Exhibit 7c a/o March 15th 2021

Possible Challenges, Not Started, In Planning, In Progress, Complete

# Allocation Area Description

$7.4 million to Expand Alameda County's largest wilderness park. - Preserve park wilderness values. - Protect wildlife habitat and high mountain ridge resources. 46 Ohlone WW Bond - Develop trail loops and expand public access and camping opportunities. - Restore failing ponds to support Tiger Salamander and Red Legged Frog populations.

Acquistion Development Allocation $7,200,000 $225,000 Budgeted $236,265 $100,000 Available $6,963,735 $125,000 $2.1 million to complete the development of this 200 acre urban shoreline park and Bay Trail connection by working with the City of San Leandro to provide recycled water for the irrigation of new turf meadows. 47 Oyster Bay WW Bond - Construct picnic areas - Play areas - Parking - Restrooms - Landscaping Acquistion Development Allocation $270,000 $1,800,000 Budgeted $0 $400,000 Available $270,000 $1,400,000 $13.7 million to acquire park land on scenic Pleasanton and Sunol ridges; Devaney Canyon - Complete bicycle loop trail system - Construct parking 48 Pleasanton Ridge WW Bond -Staging areas - Access - Picnic - Camping - Visitor facilities Acquistion Development Allocation $11,700,000 $2,025,000 Budgeted $11,690,791 $768,100 Available $9,209 $1,256,900

48 Measure WW Status Report Exhibit 7c a/o March 15th 2021

Possible Challenges, Not Started, In Planning, In Progress, Complete

# Allocation Area Description

$7.5 million to develop new Atlas Road access to the park with: - Parking - Picnic areas - Meadows - Play areas 49 Point Pinole WW Bond - Environmental maintenance facility - New interpretive center The center will provide an introduction to the rich natural and cultural resources found at this site. - Complete park boundary and wetland restoration. - Enhance and restore wetland and coastal prairie habitats. Acquistion Development Allocation $2,400,000 $5,140,000 Budgeted $2,228,610 $5,140,000 Available $171,390 $0

$4.5 million to acquire and restore shoreline. - Complete Bay Trail spur north of the Richmond/San Rafael 50 Pt San Pablo Pen WW Bond Bridge. - Provide new public access to this scenic north bay shoreline.

Acquistion Development Allocation $4,000,000 $450,000 Budgeted $28,710 $333,500 Available $3,971,290 $116,500 $4.5 million to complete the development of this regional recreation area by providing: - New turf meadows 51 Quarry Lakes WW Bond - Picnic and play areas - Restrooms - Landscaping - Complete park boundaries in this urban recreation area. Acquistion Development Allocation $2,700,000 $1,800,000 Budgeted $0 $0 Available $2,700,000 $1,800,000

$3.2 million to preserve open space in West Contra Costa County and establish a new park. - Acquire land and provide access for all users in 52 Rancho Pinole WW Bond cooperation with Muir Heritage land trust to connect the Ridge Trail to Crockett Hills, Franklin Ridge and West County communities.

49 Measure WW Status Report Exhibit 7c a/o March 15th 2021

Possible Challenges, Not Started, In Planning, In Progress, Complete

# Allocation Area Description

Acquistion Development Allocation $2,700,000 $450,000 Budgeted $1,036,716 $0 Available $1,663,284 $450,000 $5.2 million to acquire and restore Redwood Creek to protect rare native trout habitat. - Cooperate with the City of Oakland and Chabot Space and Science Center to support youth camping and facilities to 53 Redwood interpret the historic and natural features of the East Bay's only native redwoods. - Enhance Serpentine prairie for rare plants, improve Whipsnake habitat and rare Manzanita groves. Acquistion Development Allocation $2,700,000 $2,500,000 Budgeted $2,475,861 $1,035,000 Available $224,139 $1,465,000 $12.7 million to acquire and construct trail corridor segments to close gaps in the existing 25 mile long East Bay 54 Ridge Trail WW Bond Ridge Trail alignment. - Provide a continuous trail connection through 16 regional parks from Martinez to Fremont. Acquistion Development Allocation $11,450,000 $1,240,000 Budgeted $3,985,459 $1,071,648 Available $7,464,541 $168,352 $1.4 million to update existing pool and facilities to better 55 Roberts WW Bond accommodate regional swimming meets and events. Acquistion Development Allocation $0 $1,350,000 Budgeted $0 $1,350,000 Available $0 $0 $7.2 million to expand park to protect this unique pristine valley. - Acquire lands in cooperation with the East Contra Costa County Habitat Conservation Plan. 56 Round Valley WW Bond - Expand trail access for all users - Staging, picnic and camping opportunities. - Connect trail corridors to adjacent State Parks and to Morgan Territory Regional Preserve. - Improve grasslands for Kit Fox and Golden Eagle habitat. Acquistion Development Allocation $5,235,917 $900,000 Budgeted $1,127,811 $158,767 Available $4,108,106 $741,233

50 Measure WW Status Report Exhibit 7c a/o March 15th 2021

Possible Challenges, Not Started, In Planning, In Progress, Complete

# Allocation Area Description

$855,000 to acquire and restore the scenic San Pablo Bay shoreline. - Provide access and wildlife viewing to bayside natural 57 San Pablo Bay WW Bond resources. - Provide Bay Trail amenities to enhance public use of the bay shoreline. Acquistion Development Allocation $630,000 $225,000 Budgeted $21,548 $0 Available $608,452 $225,000

$5.9 million to acquire additional open space south of Sibley Regional Preserve between Oakland, Orinda and Moraga. - Expand trails including connection to Lake Temescal. 58 Sibley/Huckleberry WW - Construct new trailhead. - Develop new camping opportunities. - Restore ponds and riparian habitat.

Acquistion Development Allocation $5,400,000 $500,000 Budgeted $42,000 $500,000 Available $5,358,000 $0 $5 million to expand wilderness area to protect Alameda Creek watershed. - Preserve wildlife habitat. 59 Sunol WW Bond - Remove barriers to Steelhead migration. - Renovate and/or replace the aging visitor center. - Picnic and campground facilities. Acquistion Development Allocation $3,600,000 $1,350,000 Budgeted $0 $663,537 Available $3,600,000 $686,463

$925,000 to acquire lands to complete open space 60 Sycamore Valley WW Bond boundaries and trail connections to Mt. Diablo. - Enhance Red Legged Frog habitat.

Acquistion Development Allocation $900,000 $25,000 Budgeted $0 $0 Available $900,000 $25,000

51 Measure WW Status Report Exhibit 7c a/o March 15th 2021

Possible Challenges, Not Started, In Planning, In Progress, Complete

# Allocation Area Description

$875,000 to acquire and develop regional trail connecting Tassajara Creek in Dublin to Mt. Diablo. 61 Tassajara Creek Trail WW - Cooperate with the Dublin, San Ramon and Contra Costa County to complete this trail.

Acquistion Development Allocation $450,000 $450,000 Budgeted $59,553 $150,000 Available $390,447 $300,000 $2 million to renovate and/or expand Tilden Park's visitor facilities at the Botanic Garden and Environmental 62 Tilden Park WW Bond Education Center for public interpretive programs, lectures and research. Acquistion Development Allocation $0 $2,040,000 Budgeted $0 $974,431 Available $0 $1,065,569

$8 million to work with community organizations to restore 63 Urban Creeks WW Bond urban creeks and acquire creek easements, such as BART-to- Bay and other urban creek projects.

Acquistion Development Allocation $3,095,658 $4,944,342 Budgeted $24,395 $5,691,425 Available $3,071,263 -$747,083 $7.6 million to expand park and develop access. - Construct parking - Picnic areas - Trails for all users - Camp sites at this new park 64 Vargas Plateau WW Bond - Preserve Alameda Creek watershed - Extend the Ridge Trail - Connect the park to Fremont and Sunol - Protect hillside vistas and open space east of Fremont and south of Niles Canyon - Restore wetlands and enhance grasslands Acquistion Development Allocation $5,649,000 $2,000,000 Budgeted $566,220 $702,513 Available $5,082,780 $1,297,487

52 Measure WW Status Report Exhibit 7c a/o March 15th 2021

Possible Challenges, Not Started, In Planning, In Progress, Complete

# Allocation Area Description

$ 4.7 million to expand the preserve to protect unique natural and cultural resources in partnership with the East Contra Costa County Habitat Conservation Plan. 65 Vasco Caves WW Bond - Improve habitat for Kit Fox, Golden Eagles and enhance wetlands. - Provide suitable public access parking and visitor facilities. Acquistion Development Allocation $4,500,000 $225,000 Budgeted $2,074,865 $0 Available $2,425,135 $225,000

$900,000 to expand park boundaries along the San Pablo 66 Wildcat Canyon WW Bond Ridge. - Improve access to park for all users.

Acquistion Development Allocation $900,000 $0 Budgeted $897,925 $0 Available $2,075 $0 $900,000 to work with the City of Richmond and Contra Costa County to safely re-open the Wildcat Creek Trail 67 Wildcat Creek Trail WW crossing under the Richmond Parkway and to connect north Richmond communities to the bay shoreline. Acquistion Development Allocation $450,000 $450,000 Budgeted $10,000 $0 Available $440,000 $450,000 $1,000,000; Golden Gate Fields Trail $1,500,000; Atlas Road Bridge 68 WW Dist Wide Contingency $857,540; Dotson Family Marsh $1,600,333; Construct Pinole Shores $200,000; Bond Fees Acquistion Development Allocation $19,358,513 $6,652,841 Budgeted $0 $5,157,873 Available $19,358,513 $1,494,968

TOTAL Acquistion Development Allocation $277,031,171 $97,730,183 Budgeted $76,825,992 $50,289,864 Available $200,205,179 $47,440,319

53

East Bay Regional Park District

2019 Green Bonds Report

$30 million in Measure WW Green Bonds issued 2019 Green BondReport November 2017

54

Exhibit 7e

Introduction This report provides a detailed accounting of the Park District’s Measure WW Green Bond funds for calendar year 2019. The report also quantifies current and expected future benefits of projects undertaken with Green Bond funds.

Overview of EBRPD Mission and Sustainability Goals The East Bay Regional Park District provides a diversified open space land and water system of 73 parks, preserving and protecting over 124,909 acres of parkland in the ‐‐ including 150+ miles of active transportation trails, 55 miles of shoreline, 54,000 acres of grasslands, 45,000 acres of woodlands, and 2,500 acres of wetlands ‐‐ all of which perform an increasingly critical role in sequestering carbon, reducing carbon emissions, protecting wildlife, and mitigating climate change effects. The District’s Green Bond program is the natural extension of the District’s long‐stated mission to preserve a rich heritage of natural and cultural resources.

Overview of the Park District’s Green Bonds 2019 Green BondReport In November 2017, the District issued $30 million in Measure WW Green Bonds, to be used for green Project Types, as described below:

Project Type Green Bond Project Type Description

55 Property acquired for inclusion in parks owned and managed by the District. This activity generally maintains land Acquisition in its natural condition, providing carbon sequestration as well as preventing the higher climate impacts of development. Other land is acquired to create wildlife corridors. Habitat Projects that improve habitat for plants and animals. Sea Level Project that improve the shore land to mitigate or respond to rising sea‐levels. Creation of bicycle and pedestrian trails, providing alternatives to the use of automobiles and thereby helping to Trails reduce greenhouse gases.

Summary of 2019 Green Bond Expenditures Green Bond spending in 2019 was $9.347 million, or 31% of the total $30 million issuance. Summarized 2019 expenditures by green Project Type are provided in the table below. Total Green Bond expenditures through December 31, 2019 were $19.4 million, or 65% of the original $30 million.

Category 2019 Green Bond Expenditure

Acquisition $1,383,610 Exhibit 7e Habitat $863,713 Sea Level $120,324 Trails $6,979,960 Grand Total $9,347,607

Green Bond Framework The District’s Green Bond Framework aligns with Green Bond Principals and includes four core components: Use of proceeds, Process for project evaluation and selection, Management of Green Bond proceeds, and Reporting. This report addresses each component.

Use of Proceeds Projects eligible for Green Bond funding are selected based on their direct climate impact. Eligible projects must provide benefit in one of the following categories: land acquisition projects, both new properties and the expansion of existing parks; restoration of habitat for wildlife; shoreline protection against sea level rise; or establishment and improvement of trails for transportation. The District’s Green Bond Framework specifies that expenditures for recreational improvements such as boat launches, camping, visitor centers, parking and restrooms do not qualify for Green Bond funding.

Project Evaluation and Selection 2019 Green BondReport Voters’ approval of the District’s $500 million Measure WW Bond in 2008 included allocation of bond funds to specific projects. With the 2017 Measure WW Green Bond issuance, an additional layer of tracking and reporting was developed in the four Green Bond categories: Acquisition, Habitat, Sea Level, and Trails. Existing projects were reviewed by project management staff to determine Green Bond‐ eligibility, based on the Green Bond Framework criteria. All new Measure WW eligible projects are evaluated for green‐bond eligibility 56 based on the Green Bond Framework, prior to being established in the financial software system.

Management of Proceeds Green Bond proceeds, held by US Bank as Trustee, were invested as authorized under the Fiscal Agent Agreement, consistent with the District’s Investment Policy. The District advances funds for project expenditures from its own monies. Quarterly, the District seeks reimbursement from the Trustee for project expenditures. As described in the section above, Green Bond eligible projects have been identified in the District’s financial system and can be tracked by category type (Acquisition, Habitat, Sea Level, and Trails). Financial reports developed for Green Bond expenditure tracking are used for Trustee reimbursements. As part of the bond requisition format, the District’s Chief Finance Officer certifies expenditures as eligible for reimbursement per the Green Bond Framework criteria.

Reporting The District has committed to annual reporting on use of proceeds until the Green Bonds are fully deployed, and to post its Green Bond reports as a voluntary disclosure on the Electronic Municipal Market Access (EMMA) website. The District has also committed to engage with the firm First Environment, to serve as a third‐party validator, to provide an assurance that that District is conforming with Post‐ Exhibit 7e Issuance Requirements of the Climate Bonds Standard, and that nominated projects continue align with the Green Bond Framework. The District’s Green Bond reporting will provide an accounting for expenditures made to‐date and will quantify the carbon sequestered or other climate benefit already obtained or expected to be obtained from the project following completion.

2019 Projects In‐Progress Using Green Bond Funds

The projects included in this section utilized Green Bond funds in 2019 and are not yet completed. Project completion percentage is reported based on the total project budget. * negative values are coding corrections from prior year. Green Bond expenditures over the life of the project will be a positive value 2019 Green BondReport 57 Exhibit 7e

2019 Completed Projects Using Green Bond Funding

This table summarizes the projects that were completed in 2019 using green bond funds. The following pages provide a detailed description of each completed project, the environmental and social benefits, as well as annual expected carbon sequestration value (when applicable).

Percent Total Expenditure 2019 Green Bond Total Project complete % Exp. from Project Name / Description Location Green Bond Type Through Expenditure Budget based on GB 12/31/2019 budget Olesen Deer Valley Acquisition 242,797 1,157,547 1,160,500 100% 21% Restore Dotson (Breuner) Marsh Point Pinole Sea Level 63,152 13,384,536 13,384,536 100% 16% 2019 Green BondReport Fitzpatrick‐Campos Byron Vernal Pools Acquisition 9,133 562,915 562,915 100% 2% Ponderosa Homes Las Trampas Acquisition 5,734 8,526 8,526 100% 38%

58

Exhibit 7e

Olesen, Deer Valley Project Environmental Social Green Bond type Area Benefits Benefits

120 Protect wildlife Improves Acquisition acres habitat public access

Green Bond Expenditures in 2019: $242,797 Green Bond Expenditures in total: $242,797 Total Project Budget: $1,160,500

Description of project significance: • Prevent further fragmentation of upper Briones Valley and the surrounding 2019 Green BondReport ridgelines into rural ranchettes • Serves to further protect surrounding habitat and open space values. • Provides foraging and nesting habitat for raptors 59 • Preserves existing Briones Valley floor landscape

Expected carbon sequestration value: 120 acres of grassland rangeland = approximately 149 tons of CO2 sequestered annually.

Exhibit 7e

Restore Dotson (Breuner) Marsh, Point Pinole Project Environmental Social Green Bond Area Benefits Benefits type Wildlife 9.24 Restore wetland viewing, Sea level acres habitat hiking, dog walking

Green Bond Expenditures in 2019: $63,152 Green Bond Expenditures in total: $727,354 Total Project Budget: $13,384,536

Description of restoration significance: 2019 Green BondReport

 Protects wetlands habitat by building the durable boardwalks across tidally inundated wetlands.  60 Boardwalks will cross over tidal marsh and sloughs and provide views of wetland habitat and wildlife.  Restore high quality habitat for federally endangered Ridgeways rail and Saltmarsh harvest mouse

Expected carbon sequestration value: 9.24 acres of salt marsh wetland = approximately 39 tons of CO2 sequestered annually.

Exhibit 7e

Fitzpatrick‐Campos, Byron Vernal Pools Project Environmental Social Green Bond type Area Benefits Benefits Improves 80 Protect public Acquisition acres wildlife habitat access

Green Bond Expenditures in 2019: $9,133 Green Bond Expenditures in total: $9,133 Total Project Budget: $562,915

Description of restoration significance: 2019 Green BondReport  East Contra Costa County Habitat Conservation Plan designated this a priority acquisition because closes a gap in the Vasco Road area wildlife corridor, enhances potential conservation and habitat values, and prevents

61 future development of the site.  The “Vasco Corridor” is surrounded by conservation easement areas to the north and east. The area is primarily characterized by open space, rural residences, and unimproved agricultural land. Grasslands support habitat for red‐legged frog, San Joaquin Kit Fox, and the burrowing owl.

Expected carbon sequestration value: 80 acres of grassland rangeland = 99 tons of CO2 sequestered annually.

Exhibit 7e

Ponderosa Homes (Podva Property), Las Trampas Project Environmental Social Green Bond type Area Benefits Benefits Protect wildlife Public 96 acres Acquisition habitat access Green Bond Expenditures in 2019: $5,734 Green Bond Expenditures in total: $8,526 Total Project Budget: $8,526

Description of project significance:

• Protect land from development.

• The riparian corridor protection of land and trail will provide new access to Las 2019 Green BondReport Tampas Wilderness Regional Preserve near Danville and San Ramon. The property will also round out the eastern boundary of Las Trampas Wilderness in southern Danville. 62 Expected carbon sequestration value: 96 acres of grassland rangeland = approximately 119 tons of CO2 sequestered annually. Exhibit 7e

For further information:

2019 Green BondReport East Bay Regional Park District website: http://www.ebparks.org/

East Bay Parks’ Economic Analysis Impact Report: https://www.ebparks.org/civicax/filebank/blobdload.aspx?BlobID=29202 63 East Bay Parks’ Carbon Sequestration Study: http://www.ebparks.org/civicax/filebank/blobdload.aspx?blobid=30277

East Contra Costa County Habitat Conservation District Annual Report 2017: http://www.co.contra‐ costa.ca.us/depart/cd/water/HCP/documents/Annual%20Reports%20and%20YIRs/2017_Annual%20Report.pdf

East Bay Parks’ Trails for Transportation: https://www.ebparks.org/parks/trails/default.htm

East Bay Parks’ Climate Change Strategy: http://www.ebparks.org/civicax/filebank/blobdload.aspx?blobid=28056

Moody’s Investors Service Aaa Bond Rating for East Bay Parks: https://www.moodys.com/research/Moodys‐assigns‐Aaa‐to‐ EBRPD‐CAs‐800M‐2017A‐GOs‐Election‐‐PR_904292232

Exhibit 7e

ATTACHMENT 4

PARK ADVISORY COMMITTEE 2021 WORK PLAN

JAN 25 FEB 22 MAR 22 APR 26 MAY 24 JUN 28 JULY 26 SEP 27 OCT 25 NOV 22 DEC 10

Director Director Director Director Director Director Director Director Director Director Rosario Corbett Lane Coffey Lane Wieskamp Coffey Echols Rosario Waespi

Economic and Year in Review Introduction of Tree Mortality Capital Projects CAFR (R) – Trails Update Trails Working Parkland 2022 Proposed Social Impact of (I) – Victor New General update (I) – update (I) – Auker (I) – Dougan Group update Dedications (R) Budget (R) – Holiday Dinner Park Manager (I) – Theile, Pfuehler Goorjian (I) – Holt – Reeves Auker 20 Improvement Roddy Ranch Sabrina Grants Update East Contra 2

1 Projects (I) – Golf Course Landreth Championing Concord Hills (I) – Hornbeck Costa County Mountain Bike, Review Clayton Ranch

PARK ADVISORY COMMITTEE COMMITTEE ADVISORY PARK Pfuehler, Scoping and Community Regional Park Habitat E-Bikes and Volunteer LUP (I) - Holt Baldinger Input (I) – Holt Strategy for Health and Naming Measure CC Conservation Scooters in Program (I) – Inclusive Wellness (I) – Selection (R) – Budget and Plan / Natural Other Kassebaum, Environmentally Legislative and Dog Use Policy Community Schirmer, Holt, Reiff Spending Plan Community Jurisdictions (I) Bletz Preferred Governmental update (I) – Engagement (I) Pfuehler (I) – Conservation - Dougan Purchasing (I) – Priorities (I) – Johnson, Love – Baldinger, Rasmussen Plan 2021 PAC Auker, Pfuehler, Pfuehler, (HCP/NCCP) Wildfire Goals (R) – Spaulding Baldinger RFP Annual Johnson Measure FF update (I) – Protection / Rickard, Report for 2020 Budget and Kelchner, Climate Change Pfuehler Review of 2021 Work Plan (I) - Johnson, Shoreline Spending Plan Reeves impacts (I) – Roddy Ranch

(R) – Rickard, Schirmer Adaptation Plan (I) – Thiele, Graul, McKay/GSA Golf Course Pfuehler (I) – Holt, Rasmussen Police Update Holt Property – Park Alatorre (I) - Ciaburro Crown Beach Alternatives/ Measure WW Diversity, Equity Scoping and Selection of Review (I) PAC Mission and Inclusion Input (I) – Holt Preferred – Rasmussen Statement internal review Alternative (R) Review (R) – (I) - Dudney – Willis WORK PLAN Rickard, Pfuehler Southern Las Trampas LUP (R) – Holt

Exec. Comm. Finance Exec. Comm. Finance Subcommittee Subcommittee Subcommittee Subcommittee 2021 Work Plan CAFR (R) - Goals 2021 (R) 2021 Budget (R) – Pfuehler, Auker – Pfuehler, (R) – Auker Rickard Rickard

Revised 6.22.2021

ATTACHMENT 5

PARK ADVISORY COMMITTEE 2021 Status of Recommendations

The following is a record of items, which have come from the PAC during the year beginning January 1, 2021.

1. The PAC recommended moving forward the 2021 PAC Goals to the Board of Directors for approval.

(January 12, 2021)

STATUS: The Board voted to approve the 2021 Park Advisory Committee Goals.

(Resolution No.: 2021-01-005)

2. The PAC approved a motion to recommend the Board of Directors approval of the naming of former Concord Naval Weapons Stations: Concord Hills Regional Park to Thurgood Marshall Regional Park – Home of the Port Chicago 50.

(April 26, 2021)

STATUS: The Board voted to adopt “Thurgood Marshall Regional Park – Home of the Port Chicago 50,” for the Future Regional Park at the Former Concord Naval Weapons Station: Concord Hills Regional Park.

(Resolution No.: 2021-06-148)

Page Left Blank Intentionally

ATTACHMENT 6

ARTICLES & CORRESPONDENCE

Page Left Blank Intentionally

The Oaklandside The Oaklandside. Journalism for Oakland. POSTED INARTS & COMMUNITY

John Sutter’s lifetime of environmental activism shaped Oakland’s landscape Friends and colleagues remember Judge John Sutter, who tirelessly advocated for the preservation of open space and parklands. by C.J. Hirschfield May 25, 2021

John Sutter spent more than six decades working for environmental causes in Oakland and the East Bay. Credit: Courtesy East Bay Regional Parks District

For the last 32 years, you pretty much knew where John Sutter would be every Thursday morning. Starting at 7 a.m., he gathered with friends at the Garden Center in Lakeside Park for a meeting of the convivial Lake Merritt Breakfast Club. Dedicated to ensuring the vibrancy and health of Oakland’s downtown aquatic wildlife refuge and the park that surrounds it, this was the perfect place for a man who devoted most of his life to advocating for environmental stewardship and public access to open space. Each breakfast club meeting began with a hearty chorus of “Oh What a Beautiful Morning,” which is a great way to start the day in Oakland.

Sutter served on the Oakland City Council from 1971 to 1982, as Alameda County Superior Court Judge from 1982 to 1996, and on the East Bay Regional Park District board from 1998 to 2018. He was a graduate of Oakland High School, Harvard, and Stanford Law School. Following military service, Sutter served as an Alameda County deputy district attorney. But no matter where he worked, he was constantly advocating for the environment and outdoors. In 1961, he worked to save Oakland’s Snow Park and helped found the group today known as Greenbelt Alliance, which concerns itself with the loss of open space to urban sprawl.

Sutter’s resume is long and impressive, but so are the friendships and the alliances he built over his life.

The honorable Judge John Sutter passed away the week of May 10 at the age of 92, just seven months after a 22-acre regional shoreline park was dedicated in his honor, and just a few weeks after the death of Ellie, his wife of 65 years. Last weekend, at the Judge John Sutter Regional Shoreline, a project he proposed in 1967 for public recreation and access, there were bicyclists, walkers, runners and dog walkers, a sight he would no doubt have enjoyed. From an observation deck supported by pilings that once held up the original eastern span of the Bay Bridge, visitors can watch sailboats, wildlife, people fishing, all with a spectacular panoramic view of the bay.

In October, at the dedication of the park he’d envisioned and shepherded for over half a century, the ever-humble Sutter had something so important to say that he repeated it twice: “I’d like to thank the guys and gals in hard hats that helped make this happen,” he said, honoring not just the political bigwigs, but also the people who actually provided the project’s labor.

As some of his close friends and colleagues remembered him, that was Sutter: “minimal spectacle, maximal effect.”

What follows are remembrances of longtime Oakland activists and residents who knew him well. Their words have been edited for length and clarity.

Naomi Schiff, Coalition of Advocates for Lake Merritt

“I liked something John said when the Sierra Club gave him the David Brower Award in 2019: He said that he had been fortunate to live a long time—you have to live a long time, because it takes so many years to get these projects done. Minimal spectacle, maximal effect. I remember when the regional parks district made a video of John as he was retiring from the board. We were at Martin Luther King Jr. Regional Shoreline Park, and John kept changing his position, against the wishes of the videographer, who was striving for the best lighting. John finally said he didn’t want the Alameda shoreline—private houses with boat slips—as his backdrop, insisting that the background show the parkland. Minimal spectacle, maximal effect.”

Dick Spees, member of the Oakland City Council from 1979 to 1982

“Then-Mayor Lionel Wilson concluded that the Oakland Zoo, rated ‘the worst zoo in America’ by Parade Magazine, had to go. When Lionel was out of town, John and I arranged to get additional funding for the attraction, and it was voted through. Lionel didn’t speak to either of us for about six weeks. John was a very strong progressive, but very conservative on finances. He was a great friend and colleague, and we have lost a very great leader.”

Jerry Brown, former governor and mayor of Oakland from 1999 to 2007

“John was a good man and a tireless advocate for Oakland. After years of serving on the bench, he took up an activist’s life and fought for years to preserve the character and beauty of Oakland. He tangled with the powers that be—even me—but he stuck to his guns and the city and the whole East Bay is the better for it.”

John Sutter at a meeting of the Lake Merritt Breakfast Club wearing one of the group’s badges. Credit: Courtesy of Billy Wilkes

Michael Colbruno, port commissioner who served with Sutter on the Chabot Space and Science Center Board

“I can’t think of anyone in the history of Oakland who served in so many capacities. When John found out where I lived, he asked if I heard cars on the nearby I-580 freeway; I answered yes, but that it wasn’t that bad. ‘You sleep better at night without trucks, and that’s because of me,’ he delighted in saying, pointing out that he chaired the committee that prevented large trucks from operating on I- 580 through the Oakland hills. I credit a lot of my advocacy for a cleaner, greener port to him. In his own quiet way, he stood so firmly and spoke with such moral authority—not from ego, but from experience.”

Marge Gibson Haskell, member of the Oakland City Council from 1979-1992

“When I was on the council there was a crazy issue—people wanted to run the intersection of highways 24 and 13 through Temescal Park—which would have killed the park. John, East Bay Regional Parks District board member Harlan Kessel and I vowed that it would only happen over our dead bodies. We prevailed—big time—and we still have the park. Oh, and John was also the only person who could nit-pick the city budget better than me.”

Wilson Riles, Jr., member of the Oakland City Council from 1979-1992

“John was one of the reasons I was able to be on the council—he even shared his campaign office with me; a great gift. At that time, there had been a real shift because of Chairman Bobby Seale’s 1973 campaign for mayor. A lot more people of color registered to vote as liberal democrats, like John was. It wasn’t about personality with John. He was a policy wonk who stuck to what was right, and was kind of a mentor to me in a lot of ways. Back then, we used to say that there was a red phone on the desk of Mayor Lionel Wilson that went right through to at the Tribune. Local politics was very much controlled by the business community, who saw John as an irritant rather than a threat, because at that time he was often the only vote against them.”

C.J. HIRSCHFIELD C.J. Hirschfield recently retired after 17 years as Executive Director of Children’s Fairyland, where she was charged with the overall operation of the nation’s first storybook theme park. Prior to that, she served as an executive in the cable television industry, where she produced two regular series and ran San Francisco’s public access channel. She penned a weekly column for the Piedmont Post for 13 years, wrote regularly for Oakland Local, and has contributed to KQED’s Perspectives series. She now writes for EatDrinkFilms and Splash Pad News. She holds a degree in Film and Broadcasting from Stanford University.

Page Left Blank Intentionally

Park at former East Bay weapons site could be named for Black Supreme Court justice Thurgood Marshall defended the Port Chicago 50 while a civil rights lawyer By SHOMIK MUKHERJEE | [email protected] | PUBLISHED: May 11, 2021 at 5:58 a.m. | UPDATED: May 11, 2021 at 8:10 a.m. A cyclist rides his bike past the area designated to become a park during the Concord Regional Park Conveyance/Port Chicago 75th Anniversary event held at the former Concord Naval Weapons Station in Concord, Calif., on Saturday, July 13, 2019. (Jose Carlos Fajardo/Bay Area News Group) CONCORD — A large regional park planned at the former naval weapons station could be named after the Black civil rights lawyer and Supreme Court Justice Thurgood Marshall, who defended U.S. Navy servicemen in the 1940s after they were punished for protesting unsafe labor conditions. It would be the first park in Contra Costa County named for a Black person.

The Navy transferred most of 2,500-acre parkland to the East Bay Regional Park District in 2019 — one step in a much larger land-transfer process for the former weapons site. Originally named the Concord Hills Regional Park, the site could be given the official name “Thurgood Marshall Regional Park – Home of the Port Chicago 50” if adopted by the park district’s board of directors. An executive committee will meet Tuesday afternoon, where it could make a formal recommendation to the board for the new name.

“Staff supports a name that continues to educate the public about the deadly Port Chicago explosion, the bravery of the fifty men [who] took a stand against unsafe and unjust conditions, and the key role that the disaster and mutiny trial the played in the desegregation of the U.S. armed forces,” the committee’s agenda report says. Park officials had already intended to build a visitor center at the park commemorating the Port Chicago explosion of 1944, which killed 320 sailors and servicemen who were loading a heavy load of munitions onto a cargo vessel when it detonated.

In the disaster’s aftermath, the servicemen at the port — the majority of whom were Black, because the military was racially segregated during World War II — said their leadership had not been trained to oversee the handling of dangerous munitions. They refused to load more munitions until safer working conditions were established.

In retaliation, the Navy convicted 50 protesters of mutiny and sentenced them to 15 years in prison and hard labor. Marshall, then chief counsel of the National Association for the Advancement of Colored People, appealed their convictions with a strong legal defense. Among his key arguments, Marshall pointed out that the Navy’s segregation policies ensured that Black men exclusively were expected to carry out the dangerous job of loading munitions. The men were eventually freed after the war, and Marshall’s advocacy ultimately led to desegregation of the military.

Part of the former Concord Naval Weapons Station, which includes 2,300 acres of open space land. (Steven Joseph/East Bay Regional Parks District) “Designation of this park as “Thurgood Marshall – Home of the Port Chicago 50” honors the bravery of the fifty men who organized to protest return to work orders and challenged the U.S. government,” says the staff report in Tuesday’s meeting agenda. “Without their bravery, the story of Port Chicago would not be known, and the advocacy of Thurgood Marshall would never come to be.

Marshall went on to become the first African-American Supreme Court justice.

When consulted by park district staff, residents broadly agreed with the idea of recognizing the the Port Chicago explosion. They also expressed interest in Native American park names. In the agenda report, park district staff recommend “potential programs” to highlight indigenous culture.

Park district staff did not provide comment by deadline on when the regional park in Concord is expected to open.

About two dozen labor, military and Black advocacy organizations have endorsed the name change, while a Change.org petition supporting the new name has received 890 signatures. The petition also calls for neighboring parks to be renamed after the Chupcan people, who are native to Concord. Victoria Adams, the president of the NAACP’s east Contra Costa County chapter, said in an interview that it was important to name the park after Marshall in remembrance of the “heroes who were brave enough to stand up for what is right.”

“It’s OK that our history is remembered along with everyone else’s,” Adams said. “And it’s OK that we have institutions named after people who have done important things — their stories need to be told.”

TUESDAY, MAY 4, 2021 East Bay Municipal Utility District declares Stage 1 drought BY EMMA TAILA | STAFF LAST UPDATED 1 DAY AGO

Jonathan Gross under CC BY-SA 2.0

The East Bay Municipal Utilities District, or EBMUD, Board of Directors declared a Stage 1 drought April 27, indicating a water shortage that has implications for both Bay Area residents and plant life.

The declaration followed the death of hundreds of acres of trees in the East Bay Regional Park District, which started in October, partially caused by the second- driest year of rainfall on record in the region.

“California is sort of a droughty place, and so with that Mediterranean climate it is sort of a regular period of seasonal drought, but what’s been happening lately are these large, wide-scale single and multi-year droughts,” said Jodi Axelson, campus assistant cooperative extension specialist in the department of environmental science, policy and management. “The combined effect of hotter temperatures with moisture stress is putting trees under novel stress, causing tree mortality.”

Axelson noted that drought can weaken trees to diseases or pests that would normally be manageable, but under extreme stress, can lead to death. She said climate change and forest management practices both played roles in last year’s wildfire season.

The declaration gives EBMUD the ability to obtain supplemental water from other sources and request residents to voluntarily decrease their water usage, according to EBMUD spokesperson Andrea Pook.

“EBMUD’s reservoir system is 69% full. This is enough to get through the next few years, but we will need customers to use water wisely so we can stretch supplies,” said EBMUD director Andy Katz in an email. “Most Berkeley residents are very efficient with their water use, so we’re asking residents to keep conserving.” Katz added that the goal of these conservation efforts is to reduce water consumption by 10% and that the board will reassess conditions in the future. Depending on prevailing conditions, the board could lift the drought declaration or declare a further stage in 2022, according to Katz.

The last drought began in 2013 and became a Stage 4 Critical Drought in 2015, according to EBMUD.

“We need to be managing these forests with recognition of what their historical structures used to look like before we got good at suppressing fires,” Axelson said. “It’s complex, and there’s no silver bullets in this era of rapid change. It’s the way we interact and behave and the choices we make in our ecosystems.”

Katz noted that EBMUD is encouraging residents to save water by fixing leaks, washing full loads of laundry and using water only when rinsing while washing their hands. Axelson also recommended that residents plant native, drought-tolerant species and take steps to understand the signs of ecological stress on nearby plants.

Contact Emma Taila at [email protected] and follow her on Twitter at @emmataila

Mass tree death in East Bay parks raises alarm ahead of fire season

Drought is the likely culprit in the first die-back pattern researchers have seen in the Bay Area.

By Eden Teller May 2, 2021, 6 a.m.

Crews noticed a die-back of trees across East Bay Regional Parks in October 2020. Credit: US Forest Service, Pacific Southwest Research Station

A broad pattern of tree deaths across the East Bay Regional Park District has raised alarms for the park’s fire risk management team as the Bay Area enters an extreme drought and a high-risk fire season.

Around 1,000 acres of trees, from invasive eucalyptus and acacias to native pines and bay laurels, are dead or dying, according to the park district. That includes around 62 acres in Tilden, which is 2,079 acres total, and 624 acres in Anthony Chabot, which is 5,067. EBRPD totals 124,909 acres.

Researchers are posting updates on the Bay Area tree die-back “It’s bigger than the park district. It’s really a regional issue” affecting woodland throughout Alameda and Contra Costa counties and starting to affect areas in Marin and San Mateo counties, said Aileen Theile, EBRPD’s fire chief. And as a dry summer approaches, she added, “it’s quickly going to become a public safety issue.”

Park staff noticed the tree death and die-back in October 2020 while doing standard fire reduction and vegetation care in various areas of the parks. The increase in dead wood is “right in the middle of the wildland-urban interface,” which is particularly worrying for fire management, Theile said.

A map of tree mortality in the East Bay. Credit: East Bay Regional Park District After noticing the tree damage last fall, EBRPD surveyed the parks from a helicopter to estimate its extent. It’s easy for visitors to the parks to spot the die-back: “All they really have to do is look up and east,” Theile said.

Crews have been hard at work everywhere from along Grizzly Peak Boulevard to the Brazil Building and Reinhardt Redwood Regional Park, removing low-hanging dead branches, clearing dead foliage and checking in with the Bay Area Air Quality Management District to burn the detritus quickly while conditions allow. In mid-May, there will also be a small prescribed burn in Tilden of an area that the park district has been monitoring and maintaining for years, Theile said.

“It’s obviously a dynamic and evolving situation, and we have a lot more to learn [but] doing nothing is not an option,” Theile said.

The EBRPD will use funds from Measures CC and FF (which voters passed in November 2018 to protect against wildfires, restore natural areas and maintain public access in regional parks) to tackle the costs of tree removal and continue surveillance and action against wildfire danger. Staff plan to ask the board of directors to approve a bid for funding from CalFire, FEMA and the Coastal Conservancy. “It’s not one and done, it’s constant maintenance,” Thiele said during an April 26 committee meeting. A table documenting tree mortality shown during an April 26 EBRPD committee meeting. Credit: East Bay Regional Park District

The wide variety of species that are struggling or dying, plus recent weather conditions and the geographic distribution of the die-backs, point to drought stress as a root cause, according to Natalie van Doorn, a research urban ecologist, and Susan Frankel, a plant pathologist, both at the US Forest Service’s Pacific Southwest Research Station in Albany. The stress of drought makes trees more susceptible to pathogens and parasites, such as two fungi that researchers have seen damaging many of the acacia in the recent die-off, van Doorn and Frankel said via email.

Since “problems of this type do not respect property boundaries, and resources are scarce,” multiple local, regional, state and federal organizations are working together to untangle this problem, van Doorn and Frankel said, including the USDA Forest Service, the UC Berkeley Forest Pathology and Mycology Lab, Cal Fire and EBRPD. Even small organizations like the Friends of Sausal Creek and Friends of Joaquin Miller Park are helping raise awareness and reporting patches of dead trees, they added. Drought has caused problems for forests in California before. From 2012 to 2015, a severe drought in the Sierra Nevada killed 140 million trees, mostly conifers, van Doorn and Frankel said. Climate change-fueled heat waves magnified the impact of that drought and others across the state, according to climate researchers. However, the die-back noticed last fall is the first time researchers have seen a pattern of mortality and die-back in the Bay Area, the pair wrote.

Land managers and researchers have found damaged and dying trees across the East Bay, like these ones in Oakland, since October 2020. Credit: US Forest Service, Pacific Southwest Research Station

Some people use the terms “die-back” and “die-off” interchangeably, but distinguishing between trees that appear dead versus trees that are actually dead is surprisingly difficult, and the term “die-back” acknowledges that some of the trees may recover, van Doorn and Frankel said. Eucalyptus and acacia in particular are known to vigorously re-sprout after damage.

“The extent and severity of the die-back and die-off of trees in the Bay Area has not been fully documented yet, so it is difficult to compare to other die-off events. It may be that some of the trees recover, since the roots may not be dead,” van Doorn and Frankel wrote.

EBRPD’s work to manage the die-back shouldn’t affect visitors to Tilden or the district’s other parks unless high wind or other heightened fire danger events force the district to close a park, Theile said. And though the park may be closed, staff are still working to protect the land and the people living nearby.

This story was updated at 12:15 p.m. on May 4 to include a map of areas affected by the die- back, a list of acres impacted by park and more information from an EBRPD committee meeting.

Page Left Blank Intentionally

Help your dog “Be a Pup Pro” on East Bay trails By Ned MacKay 4 days ago Posters at park trailheads help remind visitors to follow the rules for dog behavior. CONTRA COSTA COUNTY, CA — The other day we were sitting on a bench eating lunch at Sibley Volcanic Regional Preserve, when another hiker with two big, friendly dogs came past on the trail.

One of the dogs saw us and made a beeline for the food. My reflexes were fast enough that I covered our lunch just in time. Won by a nose.

Its owner called the dog back and all was well. But it did remind us of some dog-related rules of the road.

The park district has a “Be A Pup Pro” campaign under way. You’ve probably seen the posters at trailheads.

Basic themes The campaign has three basic themes:

• Bag it and bin it. Everyone is supposed to pick up after their pet has done its business. Deposit the waste in a trashcan. Please don’t just leave it trailside for someone else to deal with. • Leash your dog in designated areas. Such as parking lots, trailheads, picnic areas, paved trails, etc. Note also that dogs are not allowed at swim beaches or in some places that are wildlife sanctuaries. One example is Round Valley south of Brentwood, where dogs are prohibited because the park is habitat for the rare and endangered San Joaquin kit fox. Tilden Nature Area near Berkeley (just the nature area, not the entire park) is off-limits for dogs, too. Elsewhere, watch for signs indicating where dogs are prohibited or must be leashed. • Keep your dog safe. Leash your dog around cattle and horses. Some horses can be skittish with dogs, resulting in unsafe conditions for everyone. In general, dogs are allowed off-leash in the regional parks, once you are away from the trailheads, as long as the dog is under voice control, which means it will return to its owner when called.

If a dog starts chasing wildlife or cattle, or has uninvited interactions with other park visitors (see above), the dog has to be put back on leash.

Your pet’s needs Be considerate of your pet’s needs. As the weather gets warmer, dogs can become overheated. After all, they are wearing permanent fur coats. And their main method of regulating their body temperature is by panting.

So carry enough water for Fido as well as for yourself. There are plenty of lightweight dog water dishes on the market, or you can use a one-gallon plastic zip bag.

Remember, too, that pavement can get very hot in the sun. And sharp, rocky surfaces are hard on paws.

There are special rules for dogs at Point Isabel Regional Shoreline in Richmond. Dogs are okay off-leash in the park. But carry a six-foot maximum leash and keep your dog on-leash in parking lots and on streets. Dogs must be under voice control and within your sight at all times. Clean up your dog’s waste and put it in the trashcans. Leash your pet if it shows aggressive behavior. Prevent your pet from digging or damaging the landscape.

In all the regional parks, anyone who walks or exercises a dog for a fee, or who walks more than three personal dogs, has to obtain and carry a revocable annual permit. For information on the dog permit program, call 510-690-6508. For more information on dog rules in the regional parks, check out the website, www.ebparks.org.

East Bay Regional Park District is a very dog-friendly agency. And a little common sense and common courtesy goes a long way towards assuring a pleasant park experience for dog owners and non-owners alike.

Drone crashes into bald eagles nest in East Bay park tree Officials are investigating to determine if an eaglet was harmed By JOSEPH GEHA | [email protected] | Bay Area News Group PUBLISHED: April 27, 2021 at 1:49 p.m. | UPDATED: April 28, 2021 at 3:19 p.m.

FREMONT, CA – APRIL 27: A bald eagle takes flight from a nest at Ardenwood Historic Farm in Fremont, Calif., on Tuesday, April 27, 2021. East Bay Regional Park District officials and the California Department of Fish and Wildlife are investigating an incident where someone apparently crashed a drone into the nest. (Anda Chu/Bay Area News Group)

FREMONT — A drone apparently crashed into an eagles nest in a eucalyptus tree in Ardenwood Historic Park, displacing the majestic birds from their perch at least temporarily, officials said Tuesday.

But the bald eagles may not be gone for long. A park naturalist and a Bay Area News Group photographer witnessed one of them return to the nest for a minute or so late Tuesday afternoon before soaring off.

FREMONT, CA – APRIL 27: A bald eagle flies off from a nest at Ardenwood Historic Farm in Fremont, Calif., on Tuesday, April 27, 2021. East Bay Regional Park District officials and the California Department of Fish and Wildlife are investigating an incident where someone apparently crashed a drone into the nest. (Anda Chu/Bay Area News Group)

Authorities from the East Bay Regional Park District and the U.S. Fish and Wildlife Service, as well as the California Department of Fish and Wildlife, are investigating the incident and trying to determine whether there was an eaglet in the nest when the drone crashed, and if so whether it was killed or injured, park district spokesperson Dave Mason said.

“It appears the drone crashed into the nest,” Mason said, noting that parts of the device were found in the nest. Mason said park neighbors or visitors alerted the district on Monday about the drone in the nest, although no one seems to know when the crash happened and who was responsible.

“We understand this is upsetting to the community. It’s upsetting to the district as well, as stewards of the environment and wildlife,” Mason said.

He said the two adult eagles first nested in the park last year, according to park district naturalists and biologists who monitor Ardenwood’s animals. The eagles had been displaying nesting behavior again recently and, prior to the one eagle’s brief visit Monday afternoon, they were last spotted in the nest by park staff on April 19, Mason said.

“They may have abandoned the nest, but obviously we’re investigating the situation to see what has actually taken place in that nest high up in the tree. Only time will tell if they come back, once the drone is removed,” Mason said.

Park staff said the nest is located in a eucalyptus tree grove along the park’s northern boundary, which adjoins a residential area.

“Drones are not allowed in (East Bay Regional Park District) parks for many reasons, including disturbing or potentially harming wildlife. This is a potentially very sad example,” Mason said.

Marie Susa, a bird enthusiast and photographer from Half Moon Bay, said the incident is “heartbreaking.”

Susa speculated that the person responsible was trying to take a close-up photo of the eagles.

“Let them grow and let the population grow here instead of people just having to get that image and post to social media,” Susa said Tuesday in an interview. She noted that many bird enthusiasts know to only take photos from the ground at a distance and not disturb the animals.

“Social media is not more important than having bald eagles repopulate in the Bay Area,” she said.

Bald eagles, while no longer considered endangered, are still a protected species under multiple federal laws, including the Bald and Golden Eagle Protection Act. That law says people must not “molest or disturb” the eagles and any violations could result in civil and criminal penalties, according to the U.S. Fish and Wildlife Service. The agency’s bald eagle management guidelines say if the birds are agitated by human activities, they may “inadequately construct or repair their nest, may expend energy defending the nest rather than tending to their young, or may abandon the nest altogether.”

Staff photographer Anda Chu contributed to this report.

Proposed Niles Canyon Trail would link Sunol and Fremont Aims to create bike, pedestrian access while preserving historic water, rail infrastructure by Julia Baum / Pleasanton Weekly Uploaded: Mon, Apr 26, 2021, 2:41 pm 9

The proposed 5.8-mile Niles Canyon Trail would run from east Fremont to unincorporated Sunol, as seen on this map from Alameda County Public Works Agency. (Courtesy image) Tri-Valley residents may one day be able to travel on foot or bike through Niles Canyon on a nearly six-mile proposed trail that would link the eastern end of Fremont and the unincorporated community of Sunol -- which Alameda County officials also said would ''preserve the historic water and rail infrastructure within Niles Canyon."

In a public update on the project last month, officials said, "Improving access in the canyon is a gateway to open space for Alameda County residents."

Rick Yeung of the Alameda County Public Works Agency, which has also partnered with the Public Utilities Commission and the East Bay Regional Park District for the project, told the Weekly that development of the 5.8-mile bicycle and pedestrian connection will use a combination of new trail sections, portions of the former Sunol Aqueduct, and existing railways for a route running from the Niles District in Fremont to Sunol.

"Much of Phase 1 from Niles to Palomares Road uses existing roadways for the trail," Yeung said. "Phase 2, which is from Palomares Road to the Niles Canyon Railway Yard near Brightside, re-purposes the aqueduct as a trail for about 25% of the route. About 70% of Phase 3 from the Niles Canyon Railway Yard to Sunol requires the construction of new trail."

Yeung said planners may need to secure an easement to cross private property, "which would require payment for the full market value of the land," though a private landowner is not required to grant an easement.

The area in question is small, but Yeung said, "If this becomes an issue, the project will need to adjust the trail's location, which may increase construction cost and complexity."

With some parts of the proposed trail adjacent to the Niles Canyon Railway or Highway 84, or near steep slopes, features like retaining walls and a pedestrian bridge at Palomares Road will need to be built. Parts of the aqueduct will also get a layer of asphalt on the top surface, as well as a second concrete exterior wall and handrail for pedestrians.

Visitor parking at the existing Niles Plaza parking facility and the Alameda Creek Staging Area would be linked to the trail, along with a new parking area at Palomares Road and the future EBRPD Tyler Staging Area.

Because of "a significant increase in people experiencing homelessness within Niles Canyon over the last decade," Yeung said "unfortunately, this has led to illicit activity including the disposal of waste and toxic substances such as spray paint," and will require cleaning the canyon.

However, Yeung said officials believe the trail's development "will create 'eyes on the canyon' that will help to prevent encampments and illegal waste disposal."

"It is difficult to predict the number of trail users," Yeung said. "However, when looking at other regional trails in the Bay Area, we anticipate a peak of about 400 people on a nice weekend day."

According to Yeung, the entire trail "exceeds $100 million to complete," with the first phase at a total development cost of about $29 million. The Alameda County Transportation Commission, Alameda County, Metropolitan Transportation Commission, and city of Fremont have all provided funding for the project.

A source of construction funds has not been identified yet, but Yeung said "a project of this scale will likely receive a combination of funds from local, state, and federal sources."

The county is currently developing an environmental impact report; a scope session will be held in the early summer and open for public comment. To learn more about the project, visit www.nilescanyontrail.org.

Apr 23, 2021 The Trailblazers When Oakland native made history as the first female United States vice president, we felt a deep measure of hometown pride. Her momentous achievement inspired us to pay tribute to other remarkable women from our region who have also broken new ground in different ways. We dedicate this special edition of Diablo to these phenomenal women who never cease to amaze us—and whom we’re privileged to call our neighbors. ------Guiding Our Open Spaces SABRINA LANDRETH EBRPD GENERAL MANAGER

The East Bay Regional Park District (EBRPD) is one of the region’s treasures, with some 125,000 acres of open space spread among 73 parks. So when Sabrina Landreth was named the Park District’s general manager, it was big news for several reasons.

One, she is the first woman to hold this position in the EBRPD’s 87-year history. And two, she succeeds the legendary Robert Doyle, who retired as general manager after a 47-year career with the Park District.

Landreth, who has deep roots in the Bay Area, built her career in local government; most recently, she served as city administrator in Oakland, directing operations for the city’s 25 departments and some 5,000 employees. Now, she comes to her new job at a critical time, when the EBRPD faces pressing issues that include wildfire threats and financial concerns stemming from the pandemic.

“I think the District can be the best local government agency in the country,” she says. “That’s one of the reasons I answered the call to come here. The District is ... uniquely situated to play a leadership role in helping to solve these problems.”

------

Page Left Blank Intentionally

Bay Area native pushes for East Bay parks to observe Juneteenth By Julian Glover Tuesday, April 20, 2021 OAKLAND, Calif. (KGO) -- He used his paintbrush to raise awareness about the movement for Black lives last June, now Deonta Allen is using his voice to push for the annual observance of Juneteenth throughout East Bay Regional Parks.

Allen fondly remembers Richmond's annual Juneteenth parade as a kid -- full of life, joy, happiness-full of freedom.

"I'm leaning on everyone in the community for this right now. Where there's people, there's power," said Allen.

Allen, an artist and East Bay Regional Parks employee, understands the power of the people.

He led the charge to paint "Black Lives Matter" in front of Richmond City Hall last year.

Now he's launched a change.org petition with more than 1,300 signatures urging the East Bay Regional Park District to make Juneteenth and observed holiday.

Each year Juneteenth, (a combination of the words June and 19th), is a commemoration of the abolition of slavery.

June 19th,1865 is the day Black Americans in Galveston, Texas finally learned of their freedom, two years after President Lincoln signed the Emancipation Proclamation.

"The history of Black people in general is such a significant part of American history. It's only right for it to be held at the same significance as other holidays," said Allen.

The petition requests Juneteenth be observed as a paid holiday for park employees (like Fourth of July and 13 other holidays), provide free admission and permits for the day throughout the district's 73 parks, and calls for the creation of educational programming for the public surrounding the day.

In a statement, East Bay Regional Parks District Spokesperson David Mason said the following:

"The Park District is committed to Diversity, Equity, and Inclusion and received a request from its employee labor organization, AFSCME Local 2428, at the April 6, 2021 board meeting, for Juneteenth to be a paid District Holiday. Modifications to Park District paid holidays are addressed through the District's labor negotiations process which covers holidays, wages, and compensation. The Park District Board of Directors is currently in labor negotiations with AFSCME Local 2428."

From San Francisco to Richmond, the Bay Area has a rich tradition of locally organized Juneteenth celebrations.

James Taylor, a political science professor at the University of San Francisco, called San Francisco's annual celebration one of longest running and oldest Juneteenth celebrations in the country.

The day commemorating freedom is increasingly being recognized by local governments and businesses.

In 2020 Santa Clara County made Juneteenth a paid holiday for employees as more Silicon Valley companies like Twitter did the same following protest over the police killing of George Floyd.

On the campaign trail last September, former President floated the idea of making Juneteenth a national holiday.

"This is sort of a two edged sword," said Taylor.

Taylor is skeptical of Juneteenth being made a national holiday.

"We can actually take something as specific as Juneteenth that is very specifically about African American abolition, and it will turn into something more safe, something popular," he said.

Taylor stressed he's in support of a national recognition for the abolition of slavery, but fears the importance of the day could be diminished if the focus isn't kept local.

He points to Dr. Martin Luther King's legacy being flattened to his famous 'I Have a Dream Speech' and confusion over King's birthday, often conflated with the annual observance of his birthday on third Monday of January.

Allen hopes this is the first step to wider community-based celebrations and remembrances.

"Let's celebrate freedom for everyone," he said. "I want you to reflect - that's what I'm hoping people do."

East Bay Parks debuts newly renovated Del Valle visitor center Swimming, family camping also now open at some local EBRPD venues by Cierra Bailey / Pleasanton Weekly Uploaded: Mon, Jun 7, 2021, 4:50 pm Last month's ribbon- cutting ceremony marked the official opening of the facility and the public is now able to visit. (Photo courtesy of EBRPD)

Del Valle Regional Park celebrated the completion of its newly renovated visitor center with a ribbon-cutting ceremony, featuring guest speakers and small group tours of the new space in Livermore.

The newly renovated visitors center at Del Valle features several interactive activities, including a sand exhibit to build hills and valleys. (Photo courtesy of EBRPD) The visitor center is now home to state-of-the-art, interactive exhibits, according to the East Bay Regional Park District. The educational experiences offered in English and Spanish include an immersive game that allows players to control the water level of the lake and an oak tree exhibit that replicates the outdoors and displays models of wildlife commonly found in the area. Visitors can also measure their own wingspan against a bald eagle painted on the wall. The $1.9 million renovation project received federal, state and private funding, including $272,000 from the Regional Parks Foundation. EBRPD officials said that $520,000 of the funding went toward the exhibits.

The project was completed in April but had been in the works for more than two years with design beginning in September 2018 and construction starting in January 2020. However, due to COVID-19 shutdowns and multiple closures due to red flag fire warnings, completion of the construction was delayed.

EBRPD General Manager Sabrina Landreth and Board Director Ayn Wieskamp, whose representative ward includes Livermore, shared remarks during the ribbon-cutting event along with Zone 7 Water Agency Board President Olivia Sanwong.

Other guest speakers included supervising naturalist Ashley Grenier, interpretive and recreation services manager Ira Bletz, Livermore City Councilmember Brittni Kiick and Sayeh Ahmari, communications coordinator for Alameda County Supervisor David Haubert whose district includes Del Valle.

"Del Valle is an important part of our city and community as it's one of the major sources of water -- not just for this region but for the entire state of California -- so, caring for that facility is important beyond just recreation," Kiick told the Weekly.

"What's so great about the visitors center that they created is that it provides educational opportunities specifically about water and why water is so valuable to our ecosystem and our life here in the Tri-Valley but in really creative and engaging ways," she said, adding that her two children attended the event with her and were able to try some of the interactive activities.

The ceremony marked the official opening of the facility and the public is now able to visit. Masking and social distancing requirements are still in place.

Swimming and family camping are also open again at Del Valle. Officials said that capacity for swimming is determined by the number of cars let into the park per day but the number of occupants in each car is not counted.

As for family camping, visitors are required to bring in all of their own water and RV tanks must be full as construction is still underway on the park's water system. Group camping remains closed at this time.

Nearby Shadow Cliffs Regional Recreation Area in Pleasanton will be closed for swimming through the end of the year due to low water levels.

For more information and the latest updates about EBRPD camping facilities, visit ebparks.org/activities/camping.

Danville: Townwide Bicycle Master Plan geared toward creating more bike- friendly community Council to review draft of plan during study session by Ryan J. Degan / Danville San Ramon Uploaded: Mon, Jun 7, 2021, 4:24 pm 0

Cycling in Danville is set to be the main topic of conversation during the Town Council's study session on Tuesday morning when town staff will review the draft Townwide Bicycle Master Plan, which is geared toward making Danville a more bike-friendly place.

The Danville Town Council is scheduled to review a draft of its Bicycle Master Plan on Tuesday. (Image courtesy the town of Danville)

An aspect of the town's capital improvement program, town staff say the Townwide Bicycle Master Plan is a guide for identifying and prioritizing bicycle infrastructure improvements and policies in Danville. During Tuesday's meeting, they will present about the plan and seek additional feedback from the council on how it can best be implemented in Danville.

"The Draft BMP provides a detailed listing of potential bicycle programs and policy that support and encourage a culture of bicycling in Danville, and equally, initiatives to enhance bicycle safety through the five 'Es' -- Engineering, Encouragement, Education, Enforcement and Evaluation," Danville transportation manager Andrew Dillard wrote in a staff report to the council.

The recommendations in the draft Bicycle Master Plan includes a wide range of projects that include installing high-visibility crosswalk and improved lighting on the Iron Horse Regional Trail, a bridge overcrossing at the Sycamore Valley Road/Camino Ramon intersection, and creating buffered bicycle lanes and high-visibility pavement markings on San Ramon Valley Boulevard (south), to name a few.

Other program proposals include the incorporation of bicycle parking and end-of-trip facilities at town facilities, the development of a "Bicycle Wayfinding Program," the deployment of a bicycle traffic enforcement program and the formation of a town- appointed Bicycle Advisory Committee

After Tuesday's review, town staff have recommended the final plan be presented to the council during its regular meeting on July 6.

The Danville Town Council's study session on the draft Townwide Bicycle Master Plan is set to be held virtually at 11 a.m. Tuesday (June 8).

Interested residents can view the meeting via video teleconferencing app Zoom using Webinar ID 817 8764 6992.

In other business

* In anticipation of the upcoming June 15 termination of the Blueprint for a Safer Economy, the council is also set to review its meeting format and start time for future gatherings.

* During a special meeting prior to the start of its study session, the council plans to interview applicants and consider appointing members to various openings on its municipal advisory committees and commissions.

That special meeting is slated to start at 8 a.m. on Tuesday and can likewise be viewed on the town's Zoom account by following the link on the meeting's agenda.

Park It: Concord Navy site renamed for Justice Marshall New moniker also pays tribute to Black sailors killed in, or court-martialed after, Port Chicago disaster By NED MACKAY | East Bay Regional Park District PUBLISHED: June 6, 2021 at 5:00 a.m. | UPDATED: June 7, 2021 at 11:41 a.m. Jose Carlos Fajardo/staff archives

A bunker is seen previously at the former Concord Naval Weapons Station, which East Bay Regional Park District officials on June 1 renamed “Thurgood Marshall Regional Park — Home of the Port Chicago 50.” “Thurgood Marshall Regional Park — Home of the Port Chicago 50” is now the name of the new East Bay Regional Park District open space at the site of the former Concord Naval Weapons Station.

The park district’s Board of Directors at their June 1 meeting unanimously approved the name in honor of the young African American sailors serving in the U.S. Navy during World War II whot stood up to the military’s racially discriminatory policies of the day. It also recognizes Thurgood Marshall, who was an attorney for the NAACP at the time and supported the Black sailors during their court-martial proceedings. He later became the first Black member of the U.S. Supreme Court. This is the first regional park in Contra Costa County to be named after an African American. The U.S. military was segregated during World War II, and Black sailors who enlisted were often relegated to especially dangerous assignments such as loading munitions onto ships by hand. One such loading point was the Port Chicago Naval Magazine. Work was around the clock, often rushed, with few if any safety precautions. On July 17, 1944, two vessels loaded with ammunition at Port Chicago exploded with a force felt as far away as San Francisco, killing 320 men, mostly teenagers, and wounding 390 others. The explosion accounted for a quarter of all African American deaths during the war.

Surviving Black sailors were ordered to return to work loading munitions not long after the explosion. Many refused. Fifty of them were charged with mutiny and ultimately discharged dishonorably. The Port Chicago 50 wrote to Thurgood Marshall, as he was the NAACP’s lead counsel, requesting that he attend their trial. Marshall did so. Afterward he wrote articles and gave public speeches, charging that the Navy was “on trial for its whole vicious policy toward Negroes.” His campaign to expose racism in the trial of the Port Chicago 50 ultimately led to the desegregation of the military and was a precursor to the broader civil rights movement. President Harry Truman issued an executive order on July 26, 1948, that desegregated the U.S. armed forces. Despite years of advocacy by elected officials and community organizations, though, the Port Chicago 50 have never been exonerated.

The U.S. Navy and National Park Service officially transferred 2,500 acres of open space to the park district in 2019 after a two-decade process brought about by the decommissioning of the Concord Naval Weapons Station in the 1990s. After road improvements and other upgrades, district officials plan to open a portion of the expansive park south of Bailey Road within the next two to three years.

Juneteenth: In commemoration of Juneteenth, the park district is partnering with Outdoor Afro and local business leaders by waiving regional park entry fees on Juneteenth, June 19. Juneteenth is an annual recognition of the 250,000 enslaved Black Americans in Texas who learned of their freedom 2½ years after President issued the Emancipation Proclamation on Jan. 1, 1863, outlawing slavery in Texas and the other Confederate states. According to the online encyclopedia Wikipedia, enforcement of the proclamation depended on the arrival of Union Army troops. At the end of the Civil War there were few Union troops in Texas. On June 19, 1865, Union Army Gen. Gordon Granger issued General Order No. 3 in Galveston, proclaiming freedom from slavery in Texas. Juneteenth is now either a state or ceremonial holiday in all states except Hawaii and the Dakotas.

Outdoor Afro is a national nonprofit organization that encourages Black connections and leadership in nature. For Juneteenth, the organization is encouraging 50,000 people nationwide to reflect on what freedom means in America by spending 2½ hours in nature — in a nearby park, forest or beach — to recognize the 2½ years of freedom denied in the 1860s.

“We are thrilled that many local business leaders have joined this commemoration by providing their employees a day off work to reflect on what freedom means to them, and we are grateful for the park district offering this free day in the parks,” said Rue Mapp, founder and CEO of Outdoor Afro.

“The park district is honored to commemorate Juneteenth with this day in nature to remember those who lost 2½ years of their freedom, by eliminating park entry fees so that all who choose to may participate by spending a day in the East Bay regional parks,” said Dee Rosario, the district’s president of its Board of Directors.

The Regional Parks Foundation, the district’s nonprofit partner, is also partnering with Outdoor Afro by providing free family memberships to eliminate barriers to those in need so that they can enjoy the full benefits of nature and their regional parks all year long. You can learn more about Juneteenth and Outdoor Afro at its website, OutdoorAfro.com/Juneteenth2021.

Marsh Drive Bridge Replacement Construction begins Monday, June 7 By Press Release 5 days ago Marsh Drive Bridge CONCORD, CA (June 2, 2021) – Contra Costa County Public Works starts construction of the Marsh Drive Bridge Replacement Project starting on Monday, June 7, 2021 through January 2023, barring unforeseen circumstances.

Work will occur between 7:00 am-4:00 pm, Monday-Friday, weather permitting. Work will take place on Marsh Drive, approximately 0.2 miles west of Solano Avenue. The area takes place in both unincorporated Contra Costa County and the City of Concord.

There will be restrictions to minimize impacts during commute hours. Because of this, the speed limit through the work area will be 25 mph during construction. Drivers should expect delays.

The project will include reconstruction of approximately 1,000 feet of Marsh Drive near the bridge. They will also install a retaining wall and make channel improvements. Work includes updating utilities including water, electric power, and communication facilities. Work includes replacing the existing bridge with a new concrete bridge in a slightly shifted alignment to the north in stages built to current standards.

The new bridge will include a 10-foot-wide separated bike and pedestrian facility.

Funding for this project is provided by Federal Highway Bridge Program Funds, Local Road Funds, Contra Costa County Flood Control District Zone 3B Funds, Pacific Gas & Electric Funds, Contra Costa Water District Funds, and East Bay Regional Park District Funds.

Additional project information, including construction schedule, is available at www.contracosta.ca.gov/marshdrivebridge

Page Left Blank Intentionally

Milkweed planted in California to help monarch butterflies Published 2 days ago Monarch butterflies to return to California A conservation group is planting more than 30,000 milkweed plants in California in the hope of giving Western monarch butterflies new places to breed. SAN FRANCISCO - A conservation group is planting more than 30,000 milkweed plants in California in the hope of giving Western monarch butterflies new places to breed. The reported Monday that the River Partners group has joined with others and the California Department of Fish and Wildlife on the plantings along the Sacramento, Feather and Kern rivers.

The plants are seen as critical because the orange-and-black butterflies lay their eggs on them. Their caterpillars also eat them.

The butterflies head south from the Pacific Northwest to California each winter. Earlier this year, researchers said an annual winter count recorded fewer than 2,000 of the butterflies — a massive decline.

"There couldn’t be a more critical time to be doing this," said restoration biologist Francis Ulep of River Partners.

Scientists have said the butterflies are at critically low levels in western states because of destruction to their milkweed habitat along their migratory route as housing expands and use of pesticides and herbicides increases. Thousands of monarch butterflies cluster on eucalyptus tree limbs at Ardenwood Historic Farm in Fremont, California, USA on 27 January 2018. (Photo by Yichuan Cao/NurPhoto via Getty Images)

Page Left Blank Intentionally

Park It: New group taking over farming at Fremont’s Ardenwood Dig Deep to continue program at East Bay parks site that had operated from mid-’80s till 2020 By NED MACKAY | East Bay Regional Park District PUBLISHED: May 30, 2021 at 5:00 a.m. | UPDATED: May 31, 2021 at 6:20 a.m.

Aric Crabb/staff archives

A farm worker plows a field with a tractor at the East Bay Regional Park District’s Ardenwood Historic Farm in Fremont, where a new organization has been granted a five-year lease to engage in organic heritage farming. Dig Deep Farms, a nonprofit program of the Alameda County Deputy Sheriffs’ Activities League, has been granted a five-year lease to engage in organic heritage farming at the East Bay Regional Park District’s Ardenwood Historic Farm in Fremont. Dig Deep will continue a farming program at Ardenwood that had been operated by J.E. Perry Farms since the mid-1980s. Perry Farms’ tenure ended when the owner retired in 2020.

“The lease is an important step to continue the historical farming at Ardenwood and provide the public, especially youngsters, an opportunity to learn about the history of science and agriculture and what life was like in the late 1800s and early 1900s, said Ayn Wieskamp, who represents Fremont on the park district’s board of directors. “The farming operation provides the mechanical labor that produces all of the traditional heritage fruits and vegetables, all of which helps educate visitors about the history of agriculture in the region.”

Ardenwood is a 205-acre working farm owned by the city and operated by the park district. The original owner was George Patterson, a ’49er who found wealth in the farm fields instead of the gold fields. The property includes a beautiful Victorian mansion and elaborate gardens. Interpretive staff and volunteers guide visitors through the mansion, demonstrate historical farming practices and chores and bring to life the world of a prosperous, early 20th century farming estate. Ardenwood receives more than 120,000 visitors annually.

Dig Deep Farms uses traditional farming methods and has years of organic farming experience, says Alameda County Supervisor Richard Valle. Its methods minimize waste and maximize nutrient-rich soil and produce. Dig Deep is expected to begin site preparations in June, with the first crop harvest in late summer or early fall.

Ardenwood Historic Farm is now open, but entry is permitted only with advance registration. Hours are 11 a.m. to 4 p.m. Wednesdays through Fridays and 10 a.m. to 4 p.m. on weekends. You can obtain more information and register up to two weeks in advance by phoning 888-327-2757, option 2 (from 10 a.m. to 3 p.m. Mondays through Fridays), or you can register online at ebparks.org. Each group should be from just one household, please. While you are at the website, by all means take the district’s 2021 Community Survey. Your responses help the park district to improve and expand its services. The survey is one of the series of displays at the top left of the website home page. It’s available in English, Spanish, Chinese and Korean. To fill it out, go to ebparks.org/Survey2021. Swimming: The swim beaches at Del Valle Regional Park south of Livermore are reopening as of Memorial Day weekend. This is the first time since 2019 that the lake is offering swimming. Due to COVID-19 restrictions, the park is operating at 50% capacity with two caveats: please bring your own drinking water because the park’s water system is undergoing construction, and mosquito repellant is advisable since it’s mosquito season. Safety tips: It looks like we are in for another extremely hot, dry summer. So here are a few safety tips: • Be sure to carry plenty of water for yourself and your dog if you’ll have one with you. Once you’re away from the trailheads and picnic areas, there are no sources of potable water. • Protect yourself from the sun. Apply sunscreen and wear wide-brimmed headgear. Nothing ruins a pleasant outing faster than a sunburn. • Take along a park map. Maps can be downloaded from the park district website or obtained at trailhead information panels. Keep track of where you are so that if there’s a problem, you can tell the rangers via cell phone where to find you. • Smoking, including vaping, is prohibited in the regional parks. • Be extremely careful with fire. Barbecuing is allowed only in the established barbecue stands. Be sure that the coals are completely extinguished, then dispose of them only in the existing stand or pit, or the concrete receptacles designed for that purpose. Don’t dump coals in garbage cans or refuse bins. During extreme weather conditions, all open flames may be prohibited. • The emergency number in the regional parks is 911 or 510-881-1121. For nonemergency business, call 510-881-1833.

Mine exhibit opens at Black Diamond Mines Regional Preserve

Photo by Jake Menez Members of the East Bay Regional Park District Board tour the mine exhibit at Black Diamond Mines Regional Park.

Photo by Jake Menez Antioch Mayor Pro Tem Monica Wilson attended the ribbon cutting ceremony for the new interactive mine exhibit at Black Diamond Mines Regional Park. The crowd praised the spring weather, enjoying the sunshine and gentle breeze as they gathered to attend the ribbon cutting ceremony for a new interactive exhibit at Black Diamond Mines Regional Park.

A ribbon cutting ceremony was held this week for a new interactive exhibit at Black Diamond Mines Regional Park in Antioch.

The dedication, initially postponed due to COVID-19, was, by their own admission, the first time much of the park’s staff had seen each other in person in over a year and their excitement was not hidden. The immersive re-creation of an authentic 20th century coal mine has been several years in the making — so many that those involved cannot recall when the idea first came to them — and the ceremony featured speakers that included Antioch Mayor Pro Tem Monica Wilson as well as representatives who spoke on behalf of Assemblyman Tim Grayson and Congressman Mark DeSaulnier.

The project is the brainchild of former East Bay Regional Park District General Manager Bob Doyle, who retired from the post at the end of 2020, and is estimated to have cost roughly $1.3 million to complete. Much of the funding was achieved through donations from the Regional Parks Foundation and Marathon Petroleum Corp, in addition to a grant from the Wayne and Gladys Valley Foundation, one of the East Bay’s major philanthropic institutions.

Doyle stressed the authenticity of the mine. “In 1977, we went underground with a small group of people and the exhibit is taken from the exact pictures that were taken at that time.” Doyle explained. “It was important to maintain the integrity of the mine work and recognize the hard, hard life that those early Contra Costa workers had here. Pretty amazing.”

The first thing guests of the exhibit will notice is the darkness that pervades the mine shaft. Black Diamond was active as a coal mine from 1865 until 1908 and the equipment used by the exhibit is period accurate, meaning the miners lit their way with headlamps made of candles that gave off a dim light. The next thing one might notice is that the simulated shaft, built inside of a real shaft from Black Diamond’s later use as a sand mine, is filled with the sounds of workers speaking and equipment chipping away in search of coal. Colin Coffey, park district board vice president, proudly pointed out that the audio used in the mines features voices that speak in both Welsch and Welsch- accented English, as would have been accurate to the period. The audio was recorded overseas to ensure the realism.

Black Diamond Mines Regional Park plays host to thousands of visitors each year, including an average of about 200 field trips annually. The inclusion of the immersive mine shaft attraction provides just one more way for visitors to have what Coffey calls “an authentic experience, rich in history.” When asked what he looks forward to most about the new exhibit, Coffey responded without hesitation, “The chance to share it with the public and really show more about this piece of Contra Costa’s legacy.”

For more information about Black Diamond Mines and other East Bay regional parks, visit https://www.ebparks.org.

Editorial: Congress must act on California wildfire prevention funding In California, wildfires burned 4.5 million acres in 2020, including five of the six biggest wildfires in state history By MERCURY NEWS & EDITORIAL BOARDS | PUBLISHED: May 26, 2021 at 5:30 a.m. | UPDATED: May 26, 2021 at 5:36 a.m.

Damage from the 2020 CZU Lightning Complex Fire is seen at Big Basin Redwoods State Park in Boulder Creek, Calif., Thursday, April 22, 2021. (AP Photo/Nic Coury)

If you want an idea of just how dysfunctional Congress is today, take a look at its record on wildfire prevention.

It’s inconceivable that Congress has largely failed to act on one of the West’s most pressing issues. California’s senators and representatives must not let another year pass without making a serious investment in wildfire prevention.

In 2020, nearly 26,000 wildfires burned 9.5 million acres in the Western states of Alaska, , California, Colorado, Idaho, Montana, New Mexico, Nevada, Oregon, Utah, Washington and Wyoming. And 75% (7.1 million acres) of the acreage burned was on federal land.

In California, wildfires burned 4.5 million acres in 2020, including five of the six biggest wildfires in state history. The fires killed 31 people and destroyed 10,000 homes and buildings. The total economic toll on California was estimated at $10.5 billion, and that doesn’t include the $2.5 billion the state spent fighting the wildfires.

Yet Congress still hasn’t reached out a hand to help.

The federal government has a lot to answer for, given that it owns nearly 58% of California’s 33 million acres of forest. The state itself owns just 3%. The remainder is owned by private individuals, companies and Native American groups.

In 2018, the U.S. Forest Service reported that 99% of its forest lands were at a high risk of dangerous wildfires, but it was utilizing controlled burns to reduce the fire risk on only 1% of its lands. The inaction stems from disagreement on the best course of action.

President Trump didn’t help matters when, during his 2020 campaign, he said, “I see again the forest fires are starting. … you gotta clean your floors, you gotta clean your forests — there are many, many years of leaves and broken trees and they’re like, like, so flammable, you touch them and it goes up. Maybe we’re just going to have to make them pay for it because they don’t listen to us.”

And while fire experts roundly dismissed Trump’s approach, Democrats were split on the merits of using prescribed fires to preemptively burn off excess vegetation that can fuel massive wildfires.

But four key senators — , D-Calif., Ron Wyden, D-Ore., Maria Cantwell, D-Wash and Joe Manchin, D-W.Va. — joined forces last week to introduce legislation that would increase the number of prescribed burns and give states more flexibility to regulate controlled burns in winter months.

The bill would give a total of $600 million to the Department of Agriculture and Department of Interior to reclassify federal firefighters as permanent workers, allowing them to work on prescribed fire projects. It also eliminates the overtime pay cap for federal firefighters that has made it difficult for federal agencies to hire a technically skilled, year-around workforce with the expertise to help prevent and extinguish wildfires.

The legislation, coupled with Gov. Gavin Newsom’s $2 billion proposal for additional helicopters, engines and firefighting equipment, is essential for reducing the threat of wildfires.

So far this year there have been 2,504 wildfires statewide, up from 1,534 wildfires in the same time period in 2020.

Congress and the California Legislature should pass their respective prevention measures to give the state a fighting chance to slow the spread of wildfires.