2019 Quarter 2 Methane Emission Monitoring Report

Total Page:16

File Type:pdf, Size:1020Kb

2019 Quarter 2 Methane Emission Monitoring Report August 12, 2019 Reference No. 11146097 Mr. Paul D'Amato Regional Director New York State Department of Environmental Conservation Region 8-Division of Air Resources 6274 Avon Lima Road Avon, NY 14414 Dear Mr. D’Amato: Re: Second Quarter Surface Monitoring at High Acres Landfill NYSDEC Permit ID No.: 8-9908-00162/00043 On the dates of June 18, 2019 and June 19, 2019, GHD conducted the Second Quarter Surface Scan Program for the Waste Management of New York, LLC (WMNY) - High Acres Landfill and Recycling Center (High Acres) facility located in Fairport, New York. The monitoring was conducted in accordance with the Revised Surface Emission Monitoring and Ambient Monitoring Work Plan (Work Plan), which was submitted to New York State Department of Environmental Conservation (NYSDEC) on March 2, 2018. As per Section 1.2 of the Work Plan, GHD used 200 parts per million (ppm) of methane as an enhanced monitoring level instead of the 500 ppm level noted in 40 CFR 60.753(d). GHD performed the calibration, evaluation, and monitoring using a Thermo Environmental Instruments Toxic Vapor Analyzer (TVA) 1000 flame ionization detector (FID) to determine surface methane levels. Attachment 1 contains the monitoring instrument performance evaluation and calibration documentation. The monitoring followed a serpentine pattern at 30-meter intervals, as required in 40 CFR Part 60 Subpart 60.753, and followed the pattern described in the Work Plan for the facility. Areas where visual observations indicated elevated concentrations of landfill gas, such as distressed vegetation and cracks or seeps in the cover, were monitored. While following the serpentine route, GHD monitored any penetrations they encountered along the serpentine path. During the surface scan, the following areas on the landfill were avoided for safety reasons, as stated under 40 CFR 60.753(d): • The new liner construction areas on the sloped region of Cell 11 (east side) and the Closed Landfill (east side) were unsafe to traverse • Grids T37 and U37 were avoided due to a concrete stock pile • Grids L21, L22, K25, K26, Y42, Y43 and Z43 were avoided due to safety concerns Figure 1 shows the areas described that could not be monitored during this quarterly period. All readings of 200 ppm or more above background were recorded as a monitored exceedance and the actions specified in paragraphs (i) through (v) below have been taken thus far. As long as the specified GHD 2055 Niagara Falls Boulevard Niagara Falls New York 14304 USA T 716 297 6150 F 716 297 2265 W www.ghd.com actions are taken, the exceedance is not a violation of the operational requirements of 40 CFR Part 60.753(d). i) The location of each monitored exceedance shall be marked and the location recorded. ii) Cover maintenance or adjustments to the vacuum of the adjacent wells to increase the gas collection in the vicinity of each exceedance shall be made and the location shall be re-monitored within 10 calendar days of detecting the exceedance. iii) If the re-monitoring of the location shows a second exceedance, additional corrective action shall be taken and the location shall be monitored again within 10 days of the second exceedance. If the re-monitoring shows a third exceedance for the same location, the action specified in paragraph (4)(v) below shall be taken, and no further monitoring of that location is required until the action specified in paragraph (4)(v) has been taken. iv) Any location that initially showed an exceedance but has a methane concentration less than 200 ppm methane above background at the 10-day re-monitoring specified in paragraph (4)(ii) or (iii) below shall be re-monitored one month from the initial exceedance. If the one-month re-monitoring shows a concentration less than 200 parts per million above background, no further monitoring of that location is required until the next quarterly monitoring period. If the one-month re-monitoring shows an exceedance, the actions specified in paragraph (4)(iii) or (v) shall be taken. v) For any location where monitored methane concentration equals or exceeds 200 parts per million above background three times within a quarterly period, a new well or other collection device shall be installed within 120 calendar days of the initial exceedance. An alternative remedy to the exceedance, such as upgrading the blower, header pipes or control device, and a corresponding timeline for installation may be submitted to the Administrator for approval. The following areas exhibited FID readings greater than 200 ppm above background during the second quarter of 2019: Date Grid Location Description Reading (ppm) 6/18/19 P47 HAGW1011 Ground Penetration 376 6/18/19 AI43 Grid AI43 Soil Area 289 6/18/19 T46 West GW-181 Ground Penetration 370 6/18/19 P39 HAGW0902 Ground Penetration 230 6/18/19 J48 HAGW1002 Ground Penetration 1,372 6/18/19 M47 HAGW1007 Ground Penetration 2,156 6/18/19 R49 Grid R49 Well Ground Penetration > 10,000 6/18/19 T48 West GW-182 Ground Penetration 3,167 6/18/19 T48 Grid T48 Well Ground Penetration 1,310 6/18/19 AB35 East GW-9 Ground Penetration 1,158 6/18/19 AC38 Grid AC38 Distressed Vegetation 791 GHD 11146097D'Amato-6 2 Date Grid Location Description Reading (ppm) 6/18/19 O39 West GW-70R Ground Penetration 1,431 6/18/19 L38 Riser Ground Penetration 3,510 6/18/19 J44 HAGW1003 Ground Penetration 3,410 6/19/19 AC42 East GW-14 Ground Penetration 436 6/19/19 Q28 West GW-64R Ground Penetration 567 6/19/19 O26 West GW-31R Ground Penetration 1,013 6/19/19 K33 West GW-68 Ground Penetration 674 6/19/19 L26 SC-01 Ground Penetration 4,261 6/19/19 N30 West GW-90 Ground Penetration 1,611 6/19/19 X29 West GW-136 Ground Penetration 5,436 Table 1 outlines the location of exceedances and the respective corrective actions taken. Pictures of the exceedance locations can be referenced in Attachment 2. A reading was taken at each grid location as shown in Table 2. There were no other exceedances of the 200 ppm above background limit observed at any of the grid points or ground penetrations on the High Acres Landfill during this quarterly period. The 1-month follow-up readings took place on July 18, 2019. All exceedance points displayed readings below the 200 ppm above background limit and are currently in compliance. GHD will perform the third quarter monitoring during August or September 2019. If you have any questions, please feel free to contact us at (716) 297-6150. Sincerely, GHD Steven D. Wilsey Bryan P. Szalda Principal Engineer SDW/BPS/cs/6 Encl. cc: Joe Picciotti (Harris Beach) GHD 11146097D'Amato-6 3 TOWN OF MACEDON TOWN OF PERINTON (MONROE COUNTY) (WAYNE COUNTY) 492.6 500 520 512.5 491.0 497.0 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 510 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 490 490 530.5 525.2 1893 529.1 F 490.64 06-19-19 UPWIND READING F 488.9 490 502.2 491.0 470 478.8 07-08-19500 UPWIND READING 500 506.3 500.9 526.8 520 G 498.7 G 490.0 498.7 490 493.1 07-18-19 UPWIND READING 480 530 1891 H 527.08 H 465.3 524.2 490 513.2 540 550 I 492.8 500 523.2 506.9 I 560 510 520 570 510 530 520 580 480.6J 540 J 590 HAGW-1003 HAGW-1002 550 479.4 600 560 510 505.1 WGW-68610 K 570 500 K 620 603.1 518.4 475.2 580 490 630 590 470 480.6 491.0 06-18-19 UPWIND480 READING L CELL 1 600 CELL 3 CELL 7 L 610 SC-01 CELL 5 GRID L38 RISER 490.9503.7 480 620 06-28-19CELL 12 UPWIND READING518.6 481.4 CELL 2 642.4 CELL 10 478.9 477.9 M 630 CELL 9 M 489.3 HAGW-1007 601.0 507.6 483.5 632.4 478.8 471.5 CELL 8 633.3 631.3 465.6 476.0 N 602.1 N 509.6 640.8 477.0 512.8 636.3 488.4 499.2 471.7 WGW-90 491.9 470 637.1 WGW-70R O 465.7 O 634.5 636.3 505.2 WGW-31R 500 643.2 601.2 510 490 600.7 P 636.5 HAGW-0902 HAGW-1011 603.9 P 633.9 470 644.4 504.0 466.0 636.4 590 580 600 CELL 11 Q 644.9 599.7 Q 570 500.8 CELL 7-OL 560 476.5 WGW-64R CELL 4 633.3 487.1 475.6 550 540 465.4 634.9 GRID R49 496.7 508.0 R 599.7 515.4 R 520 470 475.9 530 466.3 520 638.2 474.5 518.5 519.2 06-18-19 DOWNWIND479.2 READING S GRID T48 510 S 468.1 06-19-19 DOWNWIND READING 618.2 CELL 8-OL 500 640.6 T 06-28-19 DOWNWIND READING 640 WGW-181 T 640 531.9 CELL 6 520.3 637.8 530 515.4 645.0 510 640 WGW-182614.8 509.5 616.4 470 520 U 468.0 510.0 U 647.5 611.4 640 520.9 647.6 650 V 468.5 CELL 6-OL CELL 9-OL 640.2 660 V 465.5 640 CELL 10-OL 636.7 635.0 662.3 662.2 468.9 467.1 W 526.3W520 630 639.6 468.0 490 620 610 662.2 516.5 520 X 477.5 WGW-136 X510 481.9 641.1 513.3 478.7 642.7 521.5 469.2 639.5 512.6 480 497.1 590 500 Y 580 Y 468.8 570 619.4 515.2 560 505.7 Z 510.8 Z 550 651.3 492.3 540 CELL 11-OL 510 520 RIPRAP AA 510 AA 470.4 500 500 635.0 490 EGW-9 519.7 AB 471.0 AB 488.6 EGW-14 AC GRID AC38 520 AC 07-18-19 521.2 514.7 471.6 471.4 AD DOWNWIND480 AD 508.0 READING 480.5 AE AE 471.7 500.6 498.9 AF 500 AF 512.5 499.1 472.0 510.9 AG 509.6 AG 1887 AH 472.17 AH 514.8 AI AI 500.4 LEGEND: 472.0 GRID AI43 MONITORING EXCEEDANCE LOCATION 480 AJ 490 AJ 500 470 CONSTRUCTION/UNSAFE TO TRAVERSE 516.4 510 AK 521.0 468.7AK 518.4 520.5 MONITORING ROUTE 517.6 AL 472.0 AL BACKGROUND READING LOCATION AM 473.7 07-08-19 AM DOWNWIND 510.3 470 AN 471.9 474.5READING AN AO AO 11146097 N WASTE MANAGEMENT OF NEW YORK - HIGH ACRES LANDFILL FAIRPORT, NEW YORK Jul 24, 2019 0 200' 400' 800' Q2 2019 SURFACE EMISSION MONITORING GRID LOCATIONS FIGURE 1 CAD File: N:\US\Niagara Falls\Legacy\Drawings\11140000's\11146097-WM-HIGH ACRES-SEM\2019-Q2-TOWN\CADD\Drawings\Figures\111-46097-2019Q2TOWN-FIG001.dwg Page 1 of 1 Table 1 Description of Surface Monitoring Exceedances High Acres Landfill
Recommended publications
  • Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Figures 4.5-1 to 4.5
    r------------------------------------------- 1 I p M J B I R N L K H G F E D c A I I I I I Af'Jq AF20 AF54 AF72 32 AF52 AF18 I L-q L-10 L-15 D-6 -11 E-10 D-8 l I AF03 Af't;qAH44 AH60 AH63 AG70 AH65 AH7l AH47 AFS4 AF08 I N-ll H-3 FEED FEED FEED H-14 FEED FEED FEED M-12 C-11 2 I AF67 AH4q AH04 AG27 AG2<i' AG21 AG16 AG42 AF71 AF07 AF01 AG36 AH!5!5 3 I E-3 M-6 FEED M-3 FEED P-1 J-14 B-11 FEED D-3 FEED F-4 L-3 I AF67 AH5S AG56 Atflq AGsq AH2<1' AG48 AH30 AG68 AH08 AG60 AH30 AF55 I D-12 FEED F-2 FEED N-11 FEED F-14 FEED C-11 FEED B-11 FEED C-8 4 I AF12 AH57 AG43 AH38 AHtiJq AG12 AH24 AGfR AH25 AGil AG31 AH45 AF21 AGlM AH21 5 I H~4 FEED N-4 FEED H-7 FEED K~q FEED F-q FEED G-8 FEED C-4 FEED J-15 I AF50 AH72 AH22 AGS6 AH15 AGll.lAG64 AG41 AG52 AG88 AH18 AG65 AHIJ2 AH5q AF51 I F-5 FEED FEED F-3 FEED M-5 r+q G-14 o-q E-4 FEED K-3 FEED FEED K-5 6 I f:Fl7 AH73 AG24 AH28 AG82 AG71 AH14 AG18 AHil AG46 AG17 AH35 AG22 AH61 AF26 7 I E-8 FEED E-2 FEED G-6 G-4 FEED E-12 FEED J-4 J-6 FEED L-2 FEED E-5 I Af&q I qeo AF65 AG45 AtM0 AG57 AH33 AG32 AG16 AH01 AGI6 AG3<1' AH27 AG51 AG44 AG55 K-4 B-8 e-q B-6 FEED B-7 P-5 FEEC M-11 P-q FEED P-11 P-7 P-8 F-12 8 I AF47 AH68 AF23 AH41 AF1!5 AG62 AH26 AG03 AH23 AH32 AG28 AHsq AF3<1' q I L-U FEED E-14 FEED G-10 G-12 FEED L-4 FEED FEED L-14 FEED L-8 I ~~ AF66 AH66 AH10 AG67 AH37 AGJq AG68 AG3l AG63 AG05 AH08 AG5q AH17 AH67 AF41 I F-11 FEED FEED F-13 FEED L-12 M-7 J-2 D-7 D-11 FEED K-13 FEED FEED K-11 10 I AE33 AH!52 AG37 AH31 AG14 AH20 AF20 AH34 AG13 AH36 AG07 AH40 AG38 AH!53 AF27 I G-ll FEED N-12 FEED J-8 FEED K-7 FEED
    [Show full text]
  • 1St IRF Asia Regional Congress & Exhibition
    1st IRF Asia Regional Congress & Exhibition Bali, Indonesia November 17–19 , 2014 For Professionals. By Professionals. "Building the Trans-Asia Highway" Bali’s Mandara toll road Executive Summary International Road Federation Better Roads. Better World. 1 International Road Federation | Washington, D.C. ogether with the Ministry of Public Works Indonesia, we chose the theme “Building the Trans-Asia Highway” to bring new emphasis to a visionary project Tthat traces its roots back to 1959. This Congress brought the region’s stakeholders together to identify new and innovative resources to bridge the current financing gap, while also sharing case studies, best practices and new technologies that can all contribute to making the Trans-Asia Highway a reality. This Congress was a direct result of the IRF’s strategic vision to become the world’s leading industry knowledge platform to help countries everywhere progress towards safer, cleaner, more resilient and better connected transportation systems. The Congress was also a reflection of Indonesia’s rising global stature. Already the largest economy in Southeast Asia, Indonesia aims to be one of world’s leading economies, an achievement that will require the continued development of not just its own transportation network, but also that of its neighbors. Thank you for joining us in Bali for this landmark regional event. H.E. Eng. Abdullah A. Al-Mogbel IRF Chairman Minister of Transport, Kingdom of Saudi Arabia Indonesia Hosts the Region’s Premier Transportation Meeting Indonesia was the proud host to the 1st IRF Asia Regional Congress & Exhibition, a regional gathering of more than 700 transportation professionals from 52 countries — including Ministers, senior national and local government officials, academics, civil society organizations and industry leaders.
    [Show full text]
  • PPP Resources for Treasure Coast Businesses
    PPP Resources for Treasure Coast Businesses Nine Practical Steps 1. Find the The Laws • H.R. 748 = CARES Act; PPP = Sections 1101, 1102 and 1106 • 1101, 1102 = PPP definition • 1106 = Loan Forgiveness • H.R. 266 = PPP & HCE Act • H.R. 7010 = PPPFA 2. See what the agencies say 3. Google PPP FAQ… 48 as of this writing 4. Keep up with Interim Final Rules CARES Act - PPP Interim Final Rules • Google: 3245-AH34, SBA unless otherwise noted Federal 3245-AH35, 3245-AH36, RIN Register Page Effective Date 1st 3245-AH34 20811 4/15/20 2nd 3245-AH35 20817 4/15/20 etc. 3rd 3245-AH36 21747 4/20/20 4th 3245-AH37 23450 4/28/20 Treasury #1 1505-AC67 23917 4/30/20 AND 5th 3245-AH38 26321 5/4/20 6th 3245-AH39 26324 5/4/20 1505-AC67, 1505-AC69, 7th 3245-AH40 27287 5/8/20 8th 3245-AH41 29845 5/19/20 9th 3245-AH42 29842 5/19/20 etc. 10th 3245-AH43 29847 5/19/20 11th 3245-AH44 30835 5/21/20 12th 3245-AH45 31357 5/26/20 13th 3245-AH46 33004 5/28/20 Treasury #2 1505-AC69 33004 5/28/20 14th 3245-AH47 33010 5/28/20 15th 3245-AH48 pending publication 16th 3245-AH49 17th 3245-AH50 5. UH -OH… “We’re from the IRS and we’re here to help” IRS Notice 2020-32 • PPP says loan forgiveness is tax exempt, but… • Expenses paid by loan forgiveness are NON-DEDUCTIBLE. • Was this the legislative intent? • Congress chose not to address this issue in PPPFA.
    [Show full text]
  • International Society for Soil Mechanics and Geotechnical Engineering
    INTERNATIONAL SOCIETY FOR SOIL MECHANICS AND GEOTECHNICAL ENGINEERING This paper was downloaded from the Online Library of the International Society for Soil Mechanics and Geotechnical Engineering (ISSMGE). The library is available here: https://www.issmge.org/publications/online-library This is an open-access database that archives thousands of papers published under the Auspices of the ISSMGE and maintained by the Innovation and Development Committee of ISSMGE. Dynamic centrifuge model test for performance-based design of grid-form deep mixing walls supporting a tall building Junji Hamada & Tsuyoshi Honda Takenaka Research & Development Institute, Takenaka Corporation, Inzai, Chiba, Japan ABSTRACT Dynamic centrifuge model tests in the 50 g field were conducted to investigate a failure behavior of DMWs in liquefiable sand during large earthquakes. A miniature model of DMWs was made of soil-cement with an unconfined compressive strength of about 4,000 kPa in order to investigate the behavior/toughness of the DMWs after yield and failure on seismic performance. The DMWs model that support the superstructure’s weight of 206 kPa, the natural period of 0.6 second were set in a laminar shear box, and repeatedly tested by increasing the acceleration level of the input motion recorded at TAFT earthquakes. The relationship between shear stress and shear strain of the DMWs, namely the nonlinearity of the DMWs was investigated. No significant settlement of the structure was observed even if the normal and shear stresses in the DMWs were assumed to have locally reached the tensile or shear criteria of soil-cement. 1 INTRODUCTION potential for liquefaction mitigation. However, the local failures of the DMWs are not acceptable in the existing Grid-form DMWs (Deep cement Mixing Walls) which is method of allowable stress design.
    [Show full text]
  • Covers Cable Tray Straight Cover Number Selection
    Aluminum Covers Cable Tray Straight Cover Number Selection Tray Covers — Tray covers are available for all classes of tray. They should be installed where falling objects may damage cables or where vertical tray run is accessible by pedestrian or vehicular traffic. Cover mounting hardware must be ordered separately. Solid Covers — These covers provide maximum mechanical protection for cables with limited heat build up. Solid covers are available with or without flange. Flanged covers have 1/2” flange. Cover mounting hardware must be ordered separately. Ventilated Flanged Covers — This design offers excellent mechanical protection while allowing heat produced by cables to dissipate. Cover mounting hardware must be ordered separately. Peaked Flanged Covers — Peaked covers offer mechanical protection reduce pooling of liquids on the cover and accumulation of snow or ice. Peaked covers have 15° rise. Covers greater than 12" wide available in 72" and 3m lengths only. Cover mounting hardware must be ordered separately. T&B aluminum cable tray is composed of two distinct systems H-Style and U-Style. These systems are interchangeable. 100 Aluminum Covers Straight Cover Number Selection Cable Tray Straight Cover Number Selection (ABW-1-12)-SNC-72 Material Cover Series Width Cover Type Length ABW • Aluminum 1 • For tray series: AH04, AH14 06 • (6") SNC • Solid Non-Flanged Cover 72 • (72”) Accessory 2 • For tray series: AH06, AH24, AH34, AH44, 09 • (9") AH54, AH25, AH35, AH45, AH16, AH26 12 • (12") SFC • Solid Flanged Cover 144 • (12ft) 3 • For tray series: AH36, AH46, AH56, AH66 18 • (18") VFC • Ventilated Flanged Cover 3 • (3 m) AH27, AH2C7, AH37 24 • (24") 30 • (30") *PFC • Peaked Flanged Cover 36 • (36") * Peaked covers greater than 12” wide available in 72” and 3m lengths only.
    [Show full text]
  • Congressional Record United States Th of America PROCEEDINGS and DEBATES of the 105 CONGRESS, FIRST SESSION
    E PL UR UM IB N U U S Congressional Record United States th of America PROCEEDINGS AND DEBATES OF THE 105 CONGRESS, FIRST SESSION Vol. 143 WASHINGTON, TUESDAY, JANUARY 7, 1997 No. 1 House of Representatives This being the day fixed by the 20th The CLERK. Representatives-elect, Hunter Miller Sanchez Kim Packard Sherman amendment of the Constitution of the this is the day fixed by the 20th amend- Lantos Pelosi Stark United States, and Public Law 104±296 ment to the Constitution and Public Lewis Pombo Tauscher for the meeting of the Congress of the Law 104±296 for the meeting of the 105th Lofgren Radanovich Thomas United States, the Members-elect of Congress and, as the law directs, the Martinez Riggs Torres Matsui Rogan Waters the 105th Congress met in their Hall, Clerk of the House has prepared the of- McKeon Rohrabacher Waxman and at 12 noon were called to order by ficial roll of the Representatives-elect. Millender- Roybal-Allard Woolsey the Clerk of the House of Representa- Certificates of election covering 435 McDonald Royce tives, Hon. Robin H. Carle. seats in the 105th Congress have been COLORADO The Chaplain, Rev. James David received by the Clerk of the House, and Ford, D.D., offered the following pray- DeGette McInnis Schaffer the names of those persons whose cre- Hefley Schaefer Skaggs er: dentials show that they were regularly Oh, gracious God, from whom we CONNECTICUT elected as Representatives in accord- have come and to whom we belong, we ance with the laws of their respective DeLauro Johnson Maloney offer this prayer of thanksgiving and Gejdenson Kennelly Shays States or of the United States will be gratitude for all the blessings You have called.
    [Show full text]
  • Auction 14A Final Draft.Vp
    OUR STAFF Stephen Album Paul Montz Director of Islamic & Early Indian Numismatics Director of World Coins Steve has been serving the Paul joined the staff in January numismatic community since 2011. He attended UC Davis 1960. In 1976 he began dealing from 1975-80, earning bachelor's nearly exclusively in Islamic and and master's degrees in Indian coins. He has authored Agricultural Science & several books including the Management and Agronomy, Catalogue of California Trade respectively. He began working Tokens, Volumes I & II in 1972 in the numismatic field in the and 1974 respectively. 1977 saw 1970's. In 1981, he founded the release of his complete rewrite of Marsden's Olde World Numismatics in Chico, CA, a business he Numismata Orientalia Illustrata, a guide to Islamic ran for 30 years, focusing on A-Z world coins, before and Oriental coins with values. In 1993 he published merging with Stephen Album Rare Coins. He has put A Checklist of Islamic Coins, which now in its second out price lists for many years and has been a fixture edition is the standard for collectors of Islamic coins. at major shows since the 1980's. Paul is a life Mr. Album is currently a senior fellow at the member of the American Numismatic Association Worcester College, Oxford, England, and in this and is a member of other organizations. He has been position has authored three of the ten volumes of the a contributing editor for the Standard Catalog of Sylloge of Islamic Coins in the Ashmolean (Museum) World Coins since 1998. Paul brings experience in beginning in 1999.
    [Show full text]
  • Department of Defense General Services Administration
    Friday April 25, 1997 Part XLV Department of Defense General Services Administration National Aeronautics and Space Administration Federal Acquisition Regulation; Semiannual Regulatory Agenda federal register 22581 VerDate 14-MAR-97 10:16 Apr 25, 1997 Jkt 173997 PO 00000 Frm 00001 Fmt 4717 Sfmt 4717 E:\FR\FM\ADV88.043 25ap43 22582 Federal Register / Vol. 62, No. 80 / Friday, April 25, 1997 / Unified Agenda DEPARTMENT OF DEFENSE/GENERAL SERVICES ADMINISTRATION NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (FAR) FAR DEPARTMENT OF DEFENSE being developed by the Civilian Agency estimated and are not commitments to Acquisition Council and the Defense act on or by the dates shown. GENERAL SERVICES Acquisition Regulations Council in ADMINISTRATION compliance with Executive Order 12866 FOR FURTHER INFORMATION CONTACT: Ms. ``Regulatory Planning and Review.'' Beverly Fayson, FAR Secretariat, Room NATIONAL AERONAUTICS AND This agenda is being published to allow 4035, GS Building, Washington, DC SPACE ADMINISTRATION interested persons an opportunity to 20405, (202) 501-4755. participate in the rulemaking process. 48 CFR Ch. 1 SUPPLEMENTARY INFORMATION: DoD, GSA, The Federal Acquisition Regulation and NASA, under their several statutory Semiannual Regulatory Agenda (FAR) Secretariat has attempted to list authorities, jointly issue and maintain all regulations pending at the time of AGENCIES: Department of Defense (DoD), the FAR and prescribe the FAR system. General Services Administration (GSA), publication, except for minor and routine or repetitive actions; however, Revisions to the FAR are made through and National Aeronautics and Space periodic issuance of Federal Acquisition Administration (NASA). unanticipated requirements may result in the issuance of regulations that are Circulars (FACs). ACTION: Semiannual regulatory agenda.
    [Show full text]
  • Growing Together Articulates a Number of Proposals That Can Help the Region Exploit Its Huge Untapped Potential for Regional Economic Integration
    i Photo by Warren Field ii FOREWORD For the global economy, these are difficult times. The world is emerging from a crisis whose aftershocks continue to resonate – trapping some of the richest economies in recession and shaking the foundations of one of the world’s major currencies. Here at ESCAP, there are historical echoes. What is now the Economic and Social Commission for Asia and the Pacific was founded more than 60 years ago – also in the aftermath of a global crisis. The countries of Asia and the Pacific established their new Commission partly to assist them in rebuilding their economies as they came out of the yoke of colonialism and the Second World War. The newly established ECAFE, as ESCAP was called then, held a ministerial conference on regional economic cooperation in 1963 that resolved to set up the Asian Development Bank with the aim of assisting the countries in the region in rebuilding their economies. Fifty years later, the Asia-Pacific region is again at a crossroads, on this occasion seeking ways and means to sustain its dynamism in a dramatically changed global context in the aftermath of a global financial and economic crisis. An important change is the fact that, burdened by huge debts and global imbalances, the advanced economies of the West are no longer able to play the role of engines of growth for the Asia-Pacific region that they played in the past. Hence, the Asia-Pacific region has to look for new engines of growth. The secretariat of ESCAP has argued over the past few years that regional developmental challenges, such as poverty and wide disparities in social and physical infrastructure, can be turned into opportunities for sustaining growth in the future.
    [Show full text]
  • 1 EAPRS SCORING CODEBOOK Full P1
    1 EAPRS SCORING CODEBOOK Full p1, Abbreviated p45, Mini p57 Full scoring Section A1-6 – Paved trails Item Description Scoring Aa13 Trail condition 1=poor 2=fair 3=excellent Aa15 Trail cleanliness 1=not at all 2=somewhat 3=mostly to extremely Saa11 Trail presence 0=no 1=yes Saa62 Trail length, trichotomized and weighted 1= 0-0.5 miles 3=0.6-1 mile 5=1.1-highest Aa14 Trail width 1=<2ft 2=2-5ft 3=>5ft Aa16 Trail flatness 1=significant incline/decline 2=some incline/decline 3=completely flat Aa17 Trail continuity 0=no 1=yes Aa18 Trail clear from obstruction 1=not at all 2=somewhat 3=mostly to extremely Aa19 Trail coverage/shade 1=poor 2=fair 3=excellent Aa110 Trail dividing-line stripe 0=no 1=yes Scorea1, paved Max score 44. Condition and cleanliness multiplied by length, then summed with trail existence width, flatness, continuity, clear, coverage, dividing line. and surface scoresa1=sum(((aa13+aa15)*(saa11*saa62),aa14,aa16,aa17,aa18,aa19,aa110) Aa22 Signage visibility 1=not at all 2=somewhat 2 3=mostly to extremely Aa23 Signage condition 1=poor 2=fair 3=excellent Aa24 Signage content - uses 0=no 1=yes Aa25 Signage content – warnings 0=no 1=yes Aa26 Signage content – distances 0=no 1=yes Aa27 Signage content – trail name 0=no 1=yes Aa28 Signage colorful 0=no 1=yes Aa29 Signage trail map 0=no 1=yes Aa210 Signage distance markings 0=no 1=yes Aa211 Signage convergence 0=no 1=yes Scorea2, paved Sum of above items.
    [Show full text]
  • South Asia Subregional Economic Cooperation Tourism Development Plan
    ASIAN DEVELOPMENT BANK AND SOUTH ASIA SUBREGIONAL ECONOMIC COOPERATION TOURISM WORKING GROUP TOURISM RESOURCE CONSULTANTS LTD, NEW ZEALAND IN ASSOCIATION WITH METCON CONSULTANTS PTE LTD, NEPAL December 2004 SOUTH ASIA SUBREGIONAL ECONOMIC COOPERATION Photo Credits: Les Clark Lisa Choegyal Department of Tourism, Bhutan Department of Tourism, India Nepal Tourism Board © 2005 Asian Development Bank All rights reserved. This book was prepared by staff and consultants of the Asian Development Bank (ADB). The analyses and assessments contained herein do not necessarily reflect the views of the Asian Dvelopment Bank, or its Board of Directors, or the governments its members represent. ADB does not guarantee the accuracy of the data included in this publication and accepts no responsibility for any consequences of their use. The term “country,” as used in the context of ADB, refers to a member of ADB and does not imply any view on the part of ADB as to the member’s sovereignty or independent status. Asian Development Bank 6 ADB Avenue, Mandaluyong City 1550 Metro Manila, Philippines Tel (63-2) 632-4444 Fax (63-2) 636-2444 www.adb.org Asian Development Bank. 2004. South Asia Subregional Economic Cooperation Tourism Development Plan Publication Stock No. 111304 ii ABBREVIATIONS ABBREVIATIONS ABTO — Association of Bhutan Tour Operators ACAP — Annapurna Conservation Area Project ADF — Asian Development Fund ACT — Association for Conservation and Tourism ADB — Asian Development Bank ASEAN — Association of South East Asian Nations APETIT — Asia Pacific
    [Show full text]
  • Asian Highway Handbook
    ECONOMIC AND SOCIAL COMMISSION FOR ASIA AND THE PACIFIC ASIAN HIGHWAY HANDBOOK UNITED NATIONS New York, 2003 ST/ESCAP/2303 The Asian Highway Handbook was prepared under the direction of the Transport and Tourism Division of the United Nations Economic and Social Commission for Asia and the Pacific. The team of staff members of the Transport and Tourism Division who prepared the Handbook comprised: Fuyo Jenny Yamamoto, Tetsuo Miyairi, Madan B. Regmi, John R. Moon and Barry Cable. Inputs for the tourism- related parts were provided by an external consultant: Imtiaz Muqbil. The designations employed and the presentation of the material in this publication do not imply the expression of any opinion whatsoever on the part of the Secretariat of the United Nations concerning the legal status of any country, territory, city or area or of its authorities, or concerning the delimitation of its frontiers or boundaries. This publication has been issued without formal editing. CONTENTS I. INTRODUCTION TO THE ASIAN HIGHWAY………………. 1 1. Concept of the Asian Highway Network……………………………… 1 2. Identifying the Network………………………………………………. 2 3. Current status of the Asian Highway………………………………….. 3 4. Formalization of the Asian Highway Network……………………….. 7 5. Promotion of the Asian Highway……………………………………... 9 6. A Vision of the Future………………………………………………… 10 II. ASIAN HIGHWAY ROUTES IN MEMBER COUNTRIES…... 16 1. Afghanistan……………………………………………………………. 16 2. Armenia……………………………………………………………….. 19 3. Azerbaijan……………………………………………………………... 21 4. Bangladesh……………………………………………………………. 23 5. Bhutan…………………………………………………………………. 27 6. Cambodia……………………………………………………………… 29 7. China…………………………………………………………………... 32 8. Democratic People’s Republic of Korea……………………………… 36 9. Georgia………………………………………………………………... 38 10. India…………………………………………………………………… 41 11. Indonesia………………………………………………………………. 45 12. Islamic Republic of Iran………………………………………………. 49 13 Japan…………………………………………………………………..
    [Show full text]