Ground Transport Plan
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Conference Facilities
Adelaide Manor Conference Facilities Ph: 08 8349 4999 Fax: 08 8349 4631 [email protected] www.adelaidemanor.com.au Conference Rooms Thank you for your enquiry regarding the conference facilities at the Adelaide Manor. The Adelaide Manor has been an integral part of the northern suburbs since its establishment in 1985 providing accommodation, function facilities, licensed restaurant and a bar on site, complimentary off street parking, outdoor swimming pool and spa and free WiFi. Centrally located in Adelaide’s northern suburbs approximately 10 minutes from the CBD, the property is easily accessible from any direction with entrances off both Main North Road and Port Wakefield Road. The property boasts a range of features designed to ensure your event is effortless, effective and enjoyable. Our dedicated and experienced hospitality staff can tailor a package to suit your specific conference requirements. The conference rooms include the Manor Room and the Board Room, which are located on the ground floor and have been completely refurbished allowing ample natural light to filter through the large windows with French doors opening poolside. Our head chef has created a selection of breakfast, lunch, dinner and light snack options to cater for every occasion. Should you require further information or have any queries, please do not hesitate to contact us. Kind Regards, Cherie Olsen Function Co-Ordinator Adelaide Manor T: (08) 8349 4999 F: (08) 8349 4631 E: [email protected] Adelaide Manor │ 574 Main North Rd │ Gepps Cross │ South Australia │ 5094 T: 08 8349 4999 F: 08 8349 4631 E: [email protected] ABN 33102 857 385 - 002 The Board Room is perfect for smaller gatherings, measuring 49m2 it provides a private space for intimate meetings. -
Falls Prevention Service Directory
Falls Prevention Service Directory Central Adelaide Local Health Network June 2012 Welcome to the fifth edition for the Central Adelaide Local Health Network. The Falls Prevention Service Directory has become a must-have resource for health professionals working with older adults who are at risk of falls. Linking individuals to the right services is easier with maps, common referral forms, clear criteria for referral, a decision making tool and alphabetic listings. Central Adelaide Local Health Network primary health services The Central Adelaide Local Health Network (CALHN) provides care for around 420,000 people living in the central metropolitan area of Adelaide as well as providing a number of state-wide services, and services to those in regional areas. More than 3,000 skilled staff provide high quality client care, education, research and health promoting services. The Central Adelaide Local Health Network (CALHN) provides a range of acute and sub acute health services for people of all ages and covers 19 Statistical Local Areas and 10 Local Government Areas and includes the following: > Royal Adelaide Hospital > The Queen Elizabeth Hospital > Hampstead Rehabilitation Centre > St Margaret’s Rehabilitation Hospital > Ambulatory and Primary Health Care (including Super Clinics) > Sub-Acute > Mental Health Services (under the governance of the Adelaide Metro Mental Health Directorate) We are working hard to build a healthy future for South Australia by striving towards our three strategic goals of better health, better care and better services. What is ‘falls prevention’? Falls represent a common and significant problem, especially in our elderly population. Approximately 30% of community-dwelling older persons fall in Australia each year, resulting in significant mortality and morbidity, as well as increased fear of falling and restriction in physical activity. -
Adelaide Industrial Market
RESEARCH Population Growth Aust: 1.6% SA: 0.8% Infrastructure—North to Lonsdale— an additional 3,000m² of As at December 2018 South Corridor advance manufacturing space which will increase the manufacturing capacity by Economic Growth The North to South Corridor is starting to 250% and create jobs for up to an Aust: 1.8% SA: 1.8% come together with the majority of additional 100 workers. projects completed. Current projects March 18 to March 19 underway are the Darlington Upgrade The unemployment rate in SA currently Unemployment Rate and Northern Connector, with expected stands at 5.9%, which is 0.7% higher completion in late 2019. The remaining than the national average as of June Aust: 5.2% SA: 5.9% sections that are yet to commence are 2019 (seasonally adjusted). This figure As at June 2019 the River Torrens to Anzac Highway and has improved from 7.3% in April 2017. “Anzac Highway to Darlington”. On Moving forward, this downward trend is Infrastructure Spending completion, the 78-kilometre North-South likely to continue as a number of major SA State Budget Corridor will reduce travel times by projects in the defence and providing a continuous non-stop manufacturing sectors come online. 2019/20: $11.9 billion carriageway from Gawler to Old Engineering Noarlunga. Furthermore, it will also Low cost of capital will Construction improve access to some of the key benefit the property market Aust: -13.5% SA: 7.8% industrial areas such as Edinburgh Parks in the Outer North. Evidence from sales transactions during March 18 to March 19 CY 2018 suggested that the low cost of Manufacturing is back capital and the abolition of stamp duty had a positive impact on the number of The closure of the 122.5ha General transactions for industrial properties Motors Holden (GMH) site in Elizabeth above $5 million. -
16131 New Connections 6 Ƒ R.Indd
ISSUE 6 WINTER 2010 onwards and upwards The Glenelg tramline is realising its potential as part of a rejuvenated public transport network for Adelaide following the realisation of two major milestones on its journey coast to coast. > Gallipoli Underpass see page 7. Project Director, Manuel Delgado said a sense of history came with seeing the fi rst trams run between the city and the Adelaide inside this issue Entertainment Centre. “We had a great response during the Adelaide > coast to coast light rail Entertainment Centre’s open day earlier this year > glenelg tram overpass when more than 2,500 people took the chance to ride on the extended tramline for the fi rst time. > gallipoli underpass “Since the start of timetabled services, on the 22nd > south road superway of March this year, we’ve had a steady increase in patronage and usage of the Park and Ride facility. > northern expressway “We’ve also seen the trams service a big concert like Lady GaGa and Asian Champions League > rail revitalisation football at Hindmarsh Stadium, which is great.” > seaford rail extension see page 6 www.infrastructure.sa.gov.au Winter 2010 1 by Hook contents We’ve all been horrifi ed by deaths rail revitalisation and serious injuries p11 on our roads in gawler the fi rst half of 2010 and we all have a responsibility to address the issue. northern p8-9 Delivering a road safety benefi t is a key strategy expressway behind all of the major projects underway in and around Adelaide. rail revitalisation dry creek Often road safety is among the primary p12 rail car depot motivators for building new or improved roads. -
Traffic Impact Assessment
APPENDIX Q9 Traffic impact assessment See attached Traffic Impact Assessment Report prepared by Arup. Olympic Dam Expansion Draft Environmental Impact Statement 2009 Appendix Q 165 BHP Billiton Olympic Dam Expansion Environmental Impact Statement Traffic Impact Assessment BHP Billiton Olympic Dam Expansion Environmental Impact Statement Traffic Impact Assessment October 2008 Arup This report takes into account the Arup Pty Ltd ABN 18 000 966 165 particular instructions and requirements of our client. It is not intended for and should not be relied upon by any third party and no Arup responsibility is undertaken to any third Level 17 1 Nicholson Street, party Melbourne VIC 3000 Tel +61 3 9668 5500 Fax +61 3 9663 1546 www.arup.com Job number 085200/01 BHP Billiton Olympic Dam Expansion Environmental Impact Statement Traffic Impact Assessment Contents Page Executive Summary i 1 Introduction 1 2 Existing Conditions 5 2.1 Road Network 5 2.2 Road Classification, Responsibilities and Policies 5 2.3 Road Environment 7 2.4 Traffic Data 13 2.5 Baseline Traffic Flows 19 2.6 Future Road Network Improvements 21 2.7 Rail Network 23 2.8 Rail Operations 25 2.9 Crash Analysis 26 3 Proposed Olympic Dam Expansion 32 3.1 Overview 32 3.2 Olympic Dam Site Expansion Heavy Vehicles AADT 33 3.3 Ancillary Traffic AADT 39 3.4 Total AADT 43 3.5 Traffic Movements Between Townships and Olympic Dam 54 3.6 Road Link Level of Service - Impact 60 3.7 Key Intersections, Peak Hour Traffic and Impacts 64 3.8 Over-Dimensional Load Movements and Impacts 66 3.9 Road Safety 81 -
Martin Gordon [PDF 359KB]
The Federal Redistribution 2011 South Australia • t; Public Suggestion Number 1 Martin Gordon 8 pages 86 Companion Crescent Flynn ACT 2615 [email protected] 02-62589372 The Redistribution Committee for South Australia Dear Members, Redistribution of Federal Electoral Boundaries in South Australia I have a whole of state redistribution proposal for South Australia. The population differences between the 11 existing divisions are not significantly out of kilter with the current average enrolment and tolerances. Comparatively minor changes I suggest are necessary to bring all the divisions within tolerance in 2015. The nature ofthe changes I have proposed are consistent with economics, social and regional community of interests; communications and travel within the divisions; physical features and existing boundaries. I have provided comments in relation to each division and have compiled the changes into a table which demonstrates they are all well within tolerances in 2015. Grey The existing division is slightly below average enrolment at 100,095 electors. It is growing at nearly the state average electors growth over the next four years (4.02% versus 4.09%). I have proposed no change to the boundaries and the projected enrolments for 2015 will remain at 104,118 or 99.39% of projected average enrolment at that time. Both adjoining divisions of Wakefield and Barker are above quota and any changes to their boundaries can be applied to remedy elector shortfalls in other divisions. Barker The existing division is well above quota and its growth rate is also above the state wide average (4.41 % versus 4.09%), and shedding several thousand electors to Wakefield between Gawler and the Barossa, the principal localities are Lyndoch and Sandy Creek. -
Buckland Park – Traffic Impact Assessment
Buckland Park Traffic Impact Assessment 1 April 2009 Walker Corporation Parsons Brinckerhoff Australia Pty Limited ABN 80 078 004 798 Level 16 1 King William Street 101 Pirie Street Adelaide SA 5000 GPO Box 398 Adelaide SA 5001 Australia Telephone +61 8 8405 4300 Facsimile +61 8 8405 4301 Email [email protected] 08-0875-04-2112592A NCSI Certified Quality System ISO 9001, ISO 14001, AS/NZS4801 ©Parsons Brinckerhoff Australia Pty Limited (PB) [2009]. Copyright in the drawings, information and data recorded in this document (the information) is the property of PB. This document and the information are solely for the use of the authorised recipient and this document may not be used, copied or reproduced in whole or part for any purpose other than that for which it was supplied by PB. PB makes no representation, undertakes no duty and accepts no responsibility to any third party who may use or rely upon this document or the information. Author: Gordon Benham, Sharon Billinger, Daniel Keller ......................... Signed: ..................................................................................................... Reviewer: S Lewis ......................................................................................... Signed: ..................................................................................................... Approved by: G Benham .................................................................................... Signed: .................................................................................................... -
Northern Connector FACT SHEET July 2008
northern connector FACT SHEET July 2008 Involved at this early stage are a wide range The planning study will include an economic Have your of government agencies, local businesses and analysis and identify relevant environmental community bodies that need to understand issues and outline an approach for design and and comment on the proposal and to raise construction. It will also provide the framework say about a any issues about it. for an environmental impact assessment to be developed throughout this year. Since the announcement in March 2008 a major project range of activities have occurred, including: The project route is expected to be confirmed > feedback on design based on traffic needs by the end of 2009. Five months ago the Minister for Transport, and engineering Patrick Conlon announced a study into a > desktop research on similar projects Where is the project? new road and rail transport corridor in the > drop-in forums held at Globe Derby Park The planning study area will investigate area west of Port Wakefield Road – the and St Kilda a 17 km corridor from north of the Brown Northern Connector. > shopping centre displays at Hollywood Road/Port Wakefield Road intersection through to the connection of the Port River This fact sheet sets out additional Plaza and Virginia Expressway and South Road. information about the project and identifies > meeting and planning with emergency the opportunities for the community to services experts This includes a section of approximately be involved in the planning process that > field surveys that look at geography, 1 km width on the western side of is underway. -
Justification and Benefits of the Northern Expressway and Port Wakefield Road Upgrade
northernexpressway environmental report B Part B. Need for the Proposal and Consideration of Alternatives 4. Justifi cation and benefi ts of the Northern Expressway and Port Wakefi eld Road Upgrade 4-1 5. Alternative routes considered and the selected route 5-1 6. Economic and fi nancial assessment 6-1 Northern Expressway Environmental Report 4 Justification and benefits of the Northern Expressway and Port Wakefield Road Upgrade 4.1 Introduction The proposed Northern Expressway and Port Wakefield Road Upgrade will provide significant State and regional benefits, in particular by improving access to Adelaide for freight transport via the Sturt Highway, including freight for export from key areas such as the Barossa Valley wine producing area and the Riverland wine and citrus producing area. Together with the Port River Expressway, it will provide a high standard link between the Sturt Highway at Gawler and the Port of Adelaide, South Australia’s main shipping port. It will remove much heavy freight traffic from Main North Road, Angle Vale Road and Heaslip Road, lessening congestion and improving safety for urban traffic in the northern suburbs. 4.1.1 Background Part A outlined the various studies undertaken that justify the need for the Northern Expressway. For example, the Strategic Planning Study by SKM in 1998 concluded that there was a need to provide additional capacity for traffic movement from the outer northern suburbs, and that it is significantly more cost effective to develop a new route on the fringe of the northern urban area than to upgrade the existing Main North Road through northern metropolitan Adelaide. -
SA Speed Survey Results 2008 Road Type Speed Limit Street Suburb
SA Speed Survey Results 2008 Percentage Number of all of Percentage vehicles Vehicles Average of all exceeding Passing Speed of vehicles the speed during the all exceeding limit by Speed week of vehicles the speed more than Road Type Limit Street Suburb/Town sampling (km/h) limit 10km/h Adelaide local 50 Gilbertson Road Seacliff Park 3227 51.9 62.8 17.5 Adelaide local 50 Coorara Avenue Payneham South 18229 51.2 58.3 10.7 Adelaide local 50 Bermudez Crescent Paralowie 8342 49.8 50.5 10.1 Adelaide local 50 Hambledon Road Campbelltown 13400 49.8 49.4 8.9 Adelaide local 50 Main Street Beverley 6332 48.1 44.1 10.3 Adelaide local 50 Vincent Road Smithfield Plains 1541 46.1 36.1 9.3 Adelaide local 50 Northcote Street Kilburn 7988 45.1 29.0 5.1 Adelaide local 50 Charles Road Beverley 5462 41.8 20.9 4.3 Adelaide local 50 Adelaide Street Maylands 2873 42.1 20.8 2.2 Adelaide local 50 London Drive Salisbury East 7469 37.6 20.0 3.7 Adelaide local 50 Commercial Street Marleston 5349 38.6 19.1 3.2 Adelaide local 50 Archer Street North Adelaide 15525 43.2 18.6 1.5 Adelaide local 50 North Esplanade Glenelg North 11603 40.7 14.7 1.8 Adelaide local 50 Olive Avenue Broadview 2604 39.5 9.2 1.1 Adelaide local 50 Bowyer Street Rosewater 3375 37.4 5.6 0.7 Adelaide local 50 Andrew Avenue Salisbury East 1541 36.9 2.3 0.1 Adelaide local 50 Farrell Street Glenelg South 2231 33.5 2.2 0.2 Adelaide local 50 George Street Adelaide 6372 28.4 0.6 0.0 Adelaide collector 50 Scenic Way Hackham 7665 53.7 68.5 23.6 Adelaide collector 50 Perry Barr Road Hallett Cove 13996 51.3 -
36 Air Quality
Northern Expressway Environmental Report 36 Air quality 36.1 Introduction This section describes the existing air quality conditions, examines the potential effects of the Port Wakefield Road Upgrade on these conditions and recommends adoption of the management measures identified in Part D, Section 21. An air quality assessment was undertaken to determine the effects of Port Wakefield Road Upgrade on the existing air quality of the study area and to determine if any air quality criteria and guidelines would be exceeded in the future at any sensitive receptors. Refer to Part D, Section 21 for information on the legislative and policy requirements, existing environment air quality criteria, modelling methodology, and construction effects and mitigation measures. 36.2 Effects of the project on the existing environment 36.2.1 Sensitive receptors Inspection of the alignment of the proposed Port Wakefield Road Upgrade was made to identify sensitive receptors close to the roadway. The results are provided for the four major sections of the proposed upgrade: • Section 1: Salisbury Highway to Ryans Road • Section 2: Ryans Road to Bolivar Road • Section 3: Bolivar Road to Burton Road • Section 4: Burton Road to Northern Expressway connection. Section 1: Salisbury Highway to Ryans Road There are no sensitive receptors close to the roadway between Port Wakefield Road and Globe Derby Park. The land to the west of the road is wetlands or salt crystallisation pans. The land to the east of the road is mostly wetlands apart from the new residential estate of Mawson Lakes. No existing houses in Mawson Lakes are within 200 m of the road and future houses will be at least 100 m from the roadway. -
224F Bus Time Schedule & Line Route
224F bus time schedule & line map 224F City View In Website Mode The 224F bus line (City) has 2 routes. For regular weekdays, their operation hours are: (1) City: 6:41 AM - 9:02 AM (2) Elizabeth: 2:47 PM - 5:27 PM Use the Moovit App to ƒnd the closest 224F bus station near you and ƒnd out when is the next 224F bus arriving. Direction: City 224F bus Time Schedule 86 stops City Route Timetable: VIEW LINE SCHEDULE Sunday Not Operational Monday 6:41 AM - 9:02 AM Zone C Elizabeth Interchange Bus Access, Elizabeth Tuesday 6:41 AM - 9:02 AM Zone D Elizabeth City Centre - North West side Wednesday 6:41 AM - 9:02 AM Oxenham Drive, Elizabeth Thursday 6:41 AM - 9:02 AM Stop 63 Philip Hwy - East side Friday 6:41 AM - 9:02 AM 7 Philip Highway, Elizabeth Saturday Not Operational Stop 62 Philip Hwy - South East side 29 Philip Highway, Elizabeth Stop 61 Philip Hwy - South East side 224F bus Info Stop 60 Philip Hwy - South East side Direction: City 1 Deverill Street, Elizabeth Stops: 86 Trip Duration: 92 min Stop 59 Philip Hwy - South East side Line Summary: Zone C Elizabeth Interchange, Zone Phillip Highway, Elizabeth D Elizabeth City Centre - North West side, Stop 63 Philip Hwy - East side, Stop 62 Philip Hwy - South Stop 58 Philip Hwy - South East side East side, Stop 61 Philip Hwy - South East side, Stop 149 Philip Highway, Elizabeth 60 Philip Hwy - South East side, Stop 59 Philip Hwy - South East side, Stop 58 Philip Hwy - South East side, Stop 57 Hogarth Rd - North side Stop 57 Hogarth Rd - North side, Stop 56A Hogarth 109 Hogarth Road, Elizabeth