Foreword ...... 2 1 Introduction ...... 4 2 Progress Since Publication ...... 5 2.1 Completed schemes ...... 5 2.2 New schemes ...... 5 2.3 Schemes re-profiled ...... 7 2.4 Modified schemes...... 7 3 Updated National Transport Finance Plan Programme ...... 9 3.1 Delivery and timescales ...... 9 4 Funding ...... 10 4.1 Overview ...... 10 4.2 European Structural Funds ...... 11 Annex A - NTFP Completed Schemes (2015 – 2017) ...... 13 Annex B – Delivery schedule ...... 15 Annex C – Projects that will seek funding under the European Regional Development Fund programmes in ...... 36 Road schemes ...... 36 Rail ...... 38

1 National Transport Finance Plan 2017 Update

Foreword

I am pleased with the progress we have made to deliver an ambitious programme of transport improvements as set out in the National Transport Finance Plan published in 2015. We have already delivered a number of schemes including: Metro Phase 1 commitments; the upgrade to the A55 Tunnels; Section 3 of the A465 Brynmawr to Tredegar dualling: Eastern Bay Road Link (Queensgate to Ocean Way) as well as packages of smaller scale measures such as improving accessibility to stations.

My intention is to review the National Transport Finance Plan on an annual basis. This update is the first review and describes what we have achieved, new initiatives we have taken on board, and how the programme over the next three years is going to be delivered.

The Plan, whilst not a policy document, sets out how we propose to deliver the outcomes described in our Wales Transport Strategy.

As in the case of the 2015 Plan, the programme over the next three years is an ambitious one and includes important interventions such as the roll out of the metro concept to and to Bay and the Western Valleys.

There is a clear shift to undertaking smaller more affordable interventions that can still achieve a big impact and target more communities such as the pinch point programme to tackle road congestion and improve bus service reliability.

Sustainable forms of travel are also prominent in our programme targeting new railway stations, improvements to bus and rail services and promoting walking and cycling and integrated transport solutions.

2 National Transport Finance Plan 2017 Update

The financial envelope within which we have to deliver our Plan remains challenging. I am confident however the investments we propose will lead to a step change to our transport system.

Ken Skates AM Cabinet Secretary for Economy and Transport

3 National Transport Finance Plan 2017 Update

1 Introduction

The National Transport Finance Plan was published in July 2015. It sets out in more detail how we propose to deliver the outcomes set out in the Wales Transport Strategy from 2015 and beyond. The Plan includes all transport interventions financed by the .

This National Transport Finance Plan 2017 Update provides information on progress since publication and provides a revised programme for the next three years and beyond. This Plan also sets out:

 The timescale for financing and delivering the schemes undertaken by the Welsh Government;

 The estimated expenditure required to deliver the schemes;

 The likely sources of financing to allow delivery to take place.

This Plan is not a policy document nor does it seek to prioritise schemes to be taken forward. Some of our projects are being delivered, some are under construction and others are under development.

4 National Transport Finance Plan 2017 Update

2 Progress Since Publication

2.1 Completed schemes

Since publication of the National Transport Finance Plan in 2015 a number of schemes have been completed including the A55 Tunnels, Section 3 of the A465 Brynmawr to Tredegar dualling, Eastern Bay Link (Queensgate to Ocean Way) and Metro Phase 1 schemes. A list of the completed schemes is set out in Annex A.

2.2 New schemes

There are an additional 26 schemes that have been included in the transport programme since its publication:

New schemes included as part of the 17/18 budget agreement:

 Additional funding for Safer Routes to Schools programme and school transport.

 Feasibility study into reopening Carmarthen to railway line.

 Feasibility into a national cycleway.

 Ports infrastructure fund.

New schemes included as part of the 18/19 and 19/20 budget agreement:

 Further work to explore possible extensions to the Metro network, including connecting Maerdy and Rhondda Fach.

 Exploration of the case and need for additional strategic hubs as part of the work of the Ministerial Taskforce for the .

 Progress the Rhondda Tunnels study.

 Development of the strategic outline business case for the Swansea Bay and Western Valleys Metro proposal.

 Third Menai Bridge crossing - funding to support the design and development of a third crossing.

5 National Transport Finance Plan 2017 Update

 Electric charging points.

 Cleddau bridge – cost of removing the tolls.

 Upgrading the TrawsCymru network from bus to coach.

 National transport infrastructure for north-south links – dualling where possible and particular focus on A487 and A470.

New schemes agreed, resulting from NTFP 2015 delivery:

 Local Transport Network Fund.

 Active Travel.

 Pinchpoint programme:

o North/South Improvements (overtaking opportunities) A487 & A470 (includes Mid Wales overtaking opportunities).

o A483 Wrexham Bypass Junctions 3-6 Improvement.

o A5/A483 South of Wrexham Bypass to English Border Improvement.

o A470 Corridor Coryton to Taff's Well Improvements.

o A470 Corridor Taff's Well to Merthyr Improvements.

o M4 J32 to J35 Corridor.

o M4 J35 to J49 Corridor.

 Deliver the vision as set out in the ‘Moving Forward – Our Vision for North Wales and North East Wales Metro’, March 2017.

 Wrexham Area Improvement Fund.

Port Development.

 Improvements to the A40 (2 plus 1 schemes).

6 National Transport Finance Plan 2017 Update

 Five Mile Lane – Feasibility study to explore options from Sycamore Cross to Junction 34.

 Eastern Bay Link Phase 2 - Studies to identify options for improving connectivity in South East of .

 Cardiff and Vale Coastal Sustainable Transport Strategy.

 New railway station at Bow Street.

 New railway station at .

 Cardiff Integrated Transport Hub Package.

2.3 Schemes re-profiled

In order to prioritise schemes within the NTFP Update so as to align with the budget available over the 3 year period, the following schemes have been reprofiled:

 R25/26 – the trunking and de-trunking programme.

2.4 Modified schemes

In addition, there are also schemes which are now included as part of other projects or programmes:

 R29 – identification of a programme of improvements on the highway network is now being taken forward via R27 – pinchpoint and overtaking opportunities programme.

 R27b - M4 Port Talbot Junction 41 – assess outcome of the trial and determine the way forward – now taken forward under the Junction 35 to Junction 49 M4 Study (R27h).

 R27c - A55 Menai Crossing – now part of the Third Menai Crossing project (R19).

 BCT 5 – Implement the responses to the recommendations arising from the Bus Policy Advisory Group Review in 2014 – now taken forward under other interventions, including BCT 7.

7 National Transport Finance Plan 2017 Update

 CCRM9 - identification of operational constraints, CCRM11 - improving access to non-rail served communities, CCRM12 – city centre connectivity, CCRM12b – Newport rapid transit, CCRM13 – park and ride, CCRM14 – travel information, CCRM15 – Maesteg branch, CCRM16 – enhanced intermodal facilities – are all now included in the south east Wales Metro development and delivery (CCRM10).

 Rl11/12 on rail development has been rationalised into one intervention - Rl11.

 Rl16/17 – North East Wales railway improvement schemes being taken forward under Moving North Wales Forward – Our Vision for North Wales and North East Wales Metro, March 2017 (NEW 16).

 RI9 - Cardiff Central Station – Develop business case subject to necessary consents. Taken forward through Cardiff Integrated Transport Hub Package (NEW 18).

 RS2 and RS2d – franchise and procurement is being taken forward together with the development of the south east Wales Metro development and delivery (CCRM10).

 P1 - Develop a Memorandum of Understanding with the ports sector in Wales setting out how the Welsh Government and ports sector will work together – has been superseded by P2.

 CCRM7 Smart Ticketing - initial feasibility studies of implementing smart ticketing ‘Pay as you Go’ product – being delivered through IT2.

 CCRM7a Smart Ticketing, implement smart ticketing ‘Pay as you Go’ product – being delivered through IT2.

 BCT14 and 14a – delivered through BCT12 (includes delivery of Local Transport Network Fund).

 IT4 and IT4a – options to improve sustainable access to Deeside and improvement programme being taken forward under Moving North Wales Forward – Our Vision for North Wales and North East Wales Metro, March 2017 (NEW 16).

8 National Transport Finance Plan 2017 Update

3 Updated National Transport Finance Plan Programme

3.1 Delivery and timescales

The National Transport Finance Plan 2017 Update schemes are a combination of revenue and capital initiatives. These range from scheme specific to others where further investigatory/development work is required.

A delivery schedule setting out the National Transport Finance Plan’s schemes is set out in Annex B. The delivery schedule reflects the current assumptions about the delivery profile of each scheme and these may be subject to change, recognising the statutory processes that must be completed and the need to be responsive to changing circumstances.

The delivery schedule will continue to be reviewed and updated as the delivery profile for specific schemes becomes clearer.

9 National Transport Finance Plan 2017 Update

4 Funding

4.1 Overview

We are focused on ensuring value for money and driving efficiency in all transport schemes.

The schemes set out in this NTFP 2017 Update, will be delivered by drawing on a number of funding sources, but principally Welsh Government transport department capital and revenue budgets.

The total cost of schemes included in the interim NTFP (from 2017/18 to 2019/20) is £2.7billion against a budget of £2.33billion. Any shortfall will be bridged by using other match funding sources, such as European Regional Development Funding (ERDF) and will also be managed by re-profiling schemes, where necessary.

Table 4.1 below sets out the indicative spending profile over the remaining Plan period. Schemes yet to be developed will be taken forward subject to a robust business case analysis demonstrating value for money and future discussions on budget settlements. The programme will be regularly reviewed and updated as scheme development progresses.

Table 4.1 National Transport Finance Plan Update 2017 (2017-2020) £m – Indicative Capital and Revenue Spend

2017-18 2018-19 2019-20 3 year total Transport Revenue 334 308 275 917 Spend Transport Capital 348 658 781 1,786 Spend Total 682 966 1,056 2,703

10 National Transport Finance Plan 2017 Update

Table 4.2 below sets out the Welsh Government Transport Department Capital and Revenue budget. This excludes ERDF funding of up to £160million to 2023 and £125million of Department for Transport funding (towards the ).

Table 4.2 National Transport Finance Plan Update 2017 (2017-2020) £m – Welsh Government Transport Department Capital and Revenue Budget*

2017-18 2018-19 2019-20 3 year total WG Transport 334 299 278 911 Revenue Budget WG Transport 324 315 384 1,023 Capital Budget Central WG funding for 24 150 231 405 M4 Total 682 765 892 2339 *This excludes ERDF, Department for Transport and other match funding sources

4.2 European Structural Funds

Our key strategic transport routes and hubs are reflected in the Trans-European Transport Network (TEN-T1) - the EU policy designed to promote cohesion, interconnection and interoperability of national transport systems through the application of common standards (see Figure 4.3).

1 http://ec.europa.eu/transport/themes/infrastructure/index_en.htm

11 National Transport Finance Plan 2017 Update

Figure 4.3: Trans-European Transport Network (TEN-T)

Annex C includes detail of projects that we will seek to part fund from the 2014-2020 European Regional Development Fund programmes in Wales.

12 National Transport Finance Plan 2017 Update

Annex A - NTFP Completed Schemes (2015 – 2017)

NTFP Ref Intervention Description (as listed in National Transport Finance Plan, 2015) R6 Junction 33 M4 west / A4232 south dedicated slip road R7 A55 Safe Havens / Emergency Crossovers R27d A55 Tunnels R5 Improvements under construction - A465 Brynmawr to Tredegar (Section 3 of the Heads of the Valley dualling) R13 Eastern Bay Link: Queensgate to Ocean Way, Cardiff RI3 Ebbw Valley Railway Line Improvements: Line extension, line speed improvements and new station to/at Ebbw Vale Town. CCRM4a METRO Phase 1 - Station (Phase 2) CCRM4b METRO Phase 1 - Bus Station - Design and Site Preparation CCRM5 METRO Phase 1 - Bus Priority Corridor Improvements IRE4 Develop a regional transport model for South East Wales AT4 METRO Phase 1 - Active Travel - Deliver active travel routes in Cardiff, Newport, Merthyr and Bridgend AT1a Ensure the Active Travel (Wales) Act 2013 is delivered by: Considering the Existing Route Maps for approval when submitted in 2015 Rl1a Mid Tier Access for All Programme: Station accessibility improvements at , Llandaf, Ystrad Mynach, Machynlleth and Chirk railway stations. RI2 Station Improvement Programme (NSIP+): station improvements at Aberystwyth, Llandudno, Rhyl, Ystrad Mynach, and Port Talbot Parkway; easy access installation programme for small stations across Wales to provide wheelchair access by use of on-train ramps. RI7 Contribute to ’s Long Term Planning Process and the development of an ambitious Welsh Route Study RS4 Evaluate rail service enhancements identified in Network Rail's Welsh Route Study 2015 and other Long-Term Planning Process studies that may be required in CP6, including:- Service frequency enhancement on Marches line i.e. half hourly to Shrewsbury (hourly Cardiff to Bangor/Holyhead); Train lengthening on selected Marches Line services between Cardiff and Manchester; Service frequency enhancement Wrexham- following the redoubling, extension of TransPennine Express services and / or new services to Liverpool. RS1c Manage the current franchise including: A review of currently proposed service enhancements. RS2a Establish the policy framework within which the franchise will be let RS2b Identify appropriate service frequencies and identify any additional services that should be included, taking into consideration further infrastructure investment by Welsh Government, Network Rail and other parties. RS2c Develop commercial strategy, informed by modelling work

13 National Transport Finance Plan 2017 Update

NTFP Ref Intervention Description (as listed in National Transport Finance Plan, 2015) BCT9 Evaluate pilots in Ceredigion and the Vale of Glamorgan to inform development of longer term approach to supporting community transport BCT10 Evaluate the effectiveness of Bwcabus and similar schemes and use that evidence to inform future approach to demand-led transport services, particularly in rural areas. RS3 Identify opportunities to develop rail services serving Wales delivered via Department for Transport managed English services and influence the related franchising processes. CCRM8 Complete the transport planning work that will confirm the appropriate mix of public transport modes that should be developed for each corridor, enable the development of specific business cases and underpin long term Metro delivery, including consideration of light rail and other options. CCRM10 METRO Phase2 - Cardiff & Valley Lines Improvements: Investigate improvements to the existing valley rail lines to boost performance. Proposed delivery of recommended solution. Investigations to look first at: CCRM10a METRO Phase 2 - - investigations/feasibility studies.

CCRM10b METRO Phase 2 - - investigations/feasibility studies.

CCRM10c METRO Phase 2 - Bay/City Lines - investigations/feasibility studies.

CCRM10e METRO Phase 2 - Treherbert//Merthyr Line - investigations/feasibility studies. RI6 North-South Wales Journey Time/capacity improvement project. Funded through Welsh Government. (Includes Broad Oak Level Crossing).

F1 Implement the recommendations of the Freight Task and Finish Group.

C1 Revise the Travel Behaviour Code supported by the Children’s commissioner.

14 National Transport Finance Plan 2017 Update Annex B – Delivery schedule

Ref National Transport Finance Plan Intervention progress since July 2015 Delivery Period December 2017 Intervention 2017/ 2018/ 2019/ Description 18 19 20 SCHEMES UNDER CONSTRUCTION R10 Improvements to A465 Gilwern to Construction work began in Dec 2014 and will Brynmawr (Section 2 of the Heads of the continue until the end of 2019. Valley dualling). R6 Junction 33 M4 west / A4232 South dedicated slip road - completed, north dedicated slip road to be constructed. R9 Tunnels safety improvements Under construction. R16 A483 / A489 Newtown bypass Under construction. R14 Improvements to Five Mile Lane, Vale of Scheme being delivered by the Vale of Glamorgan. Glamorgan Council using Welsh Government funding. Contract awarded. RI5 Ebbw Valley Line Frequency Network Rail delivery plans are currently under Enhancements (part of Phase 1 Metro): review. Redoubling 7 miles of track between Cross Keys and Aberbeeg; Line Speed Improvements; New Platforms at Newbridge and Llanhilleth; Signalling and Structure Infrastructure Improvements. R21 M4 Junction 28 Under construction. ROADS Maintenance and operation of the Trunk and Motorway network R1 Enable the day to day safe, efficient and Continued roll out of maintenance and minor effective operation of the trunk and improvement. motorway network through regular inspection and maintenance, supported by appropriate enforcement and other

15

National Transport Finance Plan 2017 Update

Ref National Transport Finance Plan Intervention progress since July 2015 Delivery Period December 2017 Intervention 2017/ 2018/ 2019/ Description 18 19 20 specific services including winter service. R30 Intelligent Transport Systems (ITS) and New CCTV back office system installed for innovative technical solutions will reliability to view images. New ICT network continue to be investigated and rolled out firewalls and hardware to protect against at locations on the network that will cybersecurity attacks. Updates planned for new provide benefits to the public, freight and launch of www.trafficwales.com website. Ongoing those managing the network. technology refresh of roadside equipment. R31 Measures to reduce our energy All Wales lantern upgrade programme started and consumption such as low energy lighting Central management control systems rollout and innovative techniques to manage the across Wales. network will be rolled out where specific business cases allow. R32 Explore, and where practicable, apply Exploration of options ongoing. measures to improve air quality in Air Quality Management Areas (AQMA) which relate to the WG network. R33 Continue to deliver prioritised programme Ongoing. for Noise Action Planning Priority Areas. NEW Cleddau Bridge - remove the tolls by 1 2020. Road Safety R2 Deliver the actions set out in the Road Safe Routes in Communities - grant funding Safety Framework for Wales (Safe allocated for delivery of improvement schemes. Routes in Communities). Deliver the actions set out in the Road Safe Routes in Communities - specific schools Safety Framework for Wales (Safe funding - grant funding allocated for delivery of Routes in Communities - schools specific improvement schemes. funding).

16

National Transport Finance Plan 2017 Update

Ref National Transport Finance Plan Intervention progress since July 2015 Delivery Period December 2017 Intervention 2017/ 2018/ 2019/ Description 18 19 20 Deliver the actions set out in the Road Road Safety Capital - grant funding allocated for Safety Framework for Wales (Road delivery of improvement schemes. Safety Capital). R4 Deliver a programme of road safety Ongoing with delivery programmes. improvements outside schools on the . Road Schemes to be Constructed R8 A new section of motorway south of Draft Orders, an Environmental Statement and Newport and complementary measures Associated Reporting were published in March including; reclassification of the existing 2016. Public Inquiry commenced in February M4 between Magor and Castleton, an 2017. Awaiting outcome. M48-B4245 link and cycling and walking friendly infrastructure. R11 Improvements to A465 from A470 to Scheme to be progressed via a Public-Private Hirwaun (Section 6 of the Heads of the Partnership (PPP) using the Mutual Investment Valley dualling) & Dowlais Top to A470 Model (MIM). (Section 5 of the Heads of the Valley dualling). R15 Improvements to the A40 - Llanddewi Carillion PLC has been appointed to design & Velfrey to Penblewin build the scheme. Public Exhibitions and consultation undertaken. Outline design & detailed Environmental Impact Assessment ongoing. Draft Orders anticipated to be published in March 2018. NEW Improvements to the A40 (2 plus 1 Mechanisms for delivery are currently being 2 schemes) considered.

17

National Transport Finance Plan 2017 Update

Ref National Transport Finance Plan Intervention progress since July 2015 Delivery Period December 2017 Intervention 2017/ 2018/ 2019/ Description 18 19 20 R17 A487 Caernarfon to Bontnewydd bypass Draft Orders, an Environmental Statement and Associated Reporting were published in August/September 2016. Considering inspector’s report following inquiry. R18 A55 Junctions 15 and 16 Improvements Carillion appointed as ECI Contractor in September 2017. ERDF funding secured for the scheme. R19 Improvements to the A55 Crossing of the Key stage 2 consultants appointed. Public Menai consultation planned for December 2017. Announcement of preferred route in May 2018. R20 A55 Abergwyngregyn to Tai'r Meibion Advanced drainage scheme completed in August 2017. Draft Orders published in August/September 2017. Objection period ends 18 October 2017. Decision will then be taken on whether a PLI is required. ERDF funding secured. R22 Develop the currently protected route to Carry out a WelTAG appraisal in relation to the deliver a combined bypass of Llandeilo scheme, to confirm if a bypass is still required or if and Ffairfach alternative solutions can be implemented. R23 A487 Dyfi Bridge Draft Orders, an Environmental Statement and Associated Reports were published in August/September 2017. Considering responses to published orders. Road Schemes to be developed NEW Five Mile Lane - Explore options from WelTAG stages 1 and 2 to determine preferred 3 Sycamore Cross to Junction 34 option to be completed by March 2018. Economic study commenced. NEW Eastern Bay Link Phase 2 Studies to identify options for improving 4 connectivity in South East of Cardiff.

18

National Transport Finance Plan 2017 Update

Ref National Transport Finance Plan Intervention progress since July 2015 Delivery Period December 2017 Intervention 2017/ 2018/ 2019/ Description 18 19 20 R24 Develop a scheme for improvements to Public consultation on two route options held the A494/A55/A548 Deeside Corridor. between March and June 2017. Cabinet Secretary announced the Red Option as the preferred route on 26 September 2017. Next stage is to procure an employer's agent and ECI contractor to progress to the next stage of design development and statutory procedures. R24a Develop a scheme for improvements to Ongoing with procuring employers designer. the A494/A55/A548 Deeside Corridor - Design development and preparation of River Dee Bridge. Environmental Statement and draft Orders to commence in early 2018. R28a Engage with the UK Government and Ongoing dialogue with key partners on the partners in to progress the English side of the border to seek agreement to following scheme: A483 Pant to move forward with improvements. Llanymynech (cross border scheme). R28b Engage with the UK Government and Ongoing dialogue with key partners on the partners in England to progress the English side of the border to seek agreement to following scheme: A458 Buttington Cross move forward with improvements. to Wollaston Cross (cross border scheme). Pinch point and overtaking opportunity programme R27a A55 resilience improvements study Short term measures being introduced to improve resilience. Next stage is to develop medium/ long term measures. R27b North/South Improvements (overtaking Possible sites identified and design work is opportunities) A487 & A470. ongoing. R27c A483 Wrexham Bypass Junctions 3-6 Major infrastructure improvements to upgrade Improvement. junctions 3-6 and additional lane to increase capacity between these junctions. Short list of

19

National Transport Finance Plan 2017 Update

Ref National Transport Finance Plan Intervention progress since July 2015 Delivery Period December 2017 Intervention 2017/ 2018/ 2019/ Description 18 19 20 options identified. Next stage is to confirm best option. R27d A5/A483 South of Wrexham Bypass to Major infrastructure improvements to increase English Border Improvement. junction capacities and reduce congestion and dual current single carriageway sections up to border with England. Ties in with anticipated English A5 dualling over border to Shrewsbury. Ongoing dialogue with key partners to agree next steps. R27e A470 Corridor Coryton to Taff's Well Possible solutions considered and shortlist of Improvements. options identified. R27f A470 Corridor Taff's Well to Merthyr Possible solutions considered and shortlist of Improvements. options identified. R27g M4 J32 to J35 Corridor. Possible solutions considered and shortlist of options identified. R27h M4 J35 to J49 Corridor. Ongoing with study to identify issues and possible solutions. Supporting improvements to the county road network R3 Develop proposals for a Wales Local Transport Fund has been allocated to Infrastructure Investment Plan capital- support schemes identified. funded grant to support strategic regional transport improvements, which would include improvements to the local road network and access to employment. FREIGHT Capitalise on freight opportunities F2 Keep opportunities to enable uptake of Ongoing. rail freight and short sea shipping under review.

20

National Transport Finance Plan 2017 Update

Ref National Transport Finance Plan Intervention progress since July 2015 Delivery Period December 2017 Intervention 2017/ 2018/ 2019/ Description 18 19 20 F3 Continue to support Rail Freight Ongoing. infrastructure development through the provision of Freight Facilities Grants. F4 Continue to support Modal Shift (Road to Ongoing. Rail) by providing MSRS grant support. ACTIVE TRAVEL Implementing the Active Travel (Wales) Act AT1b Ensure the Active Travel (Wales) Act Integrated Network Maps to be considered for 2013 is delivered – Integrated Network approval. Maps. AT1c Ensure the Active Travel (Wales) Act Delivered through other programmes. 2013 is delivered – active travel schemes. AT2 Delivering the actions set out in the Active Ongoing. Travel Action Plan. AT3 Work with partners to deliver a Work is taking place as part of Rural programme of improvements to the Development Programme funded project, not and that within Transport. contribute to the objectives of the Active Travel Act. NEW Feasibility on a National Cycleway. Ongoing. 5 NEW Cardiff and Vale Coastal Sustainable Identification of transport solutions. 6 Transport Package – developing an integrated transport package. NEW Rhondda Tunnels. Ongoing with feasibility work. 7

21

National Transport Finance Plan 2017 Update

Ref National Transport Finance Plan Intervention progress since July 2015 Delivery Period December 2017 Intervention 2017/ 2018/ 2019/ Description 18 19 20 RAIL Access for All Programme Rl13 CP5 Access for All Programme: Station Consideration being given to transfer the funding accessibility improvements at: Llanelli, from the Taffs Wells project to Cadaxton. Barry, Treforrest, Taffs Well, and Treherbert. Rl14 CP5 Access for All Programme: Funding being sought to update delivery options Undertake feasibility studies/delivery for Flint. options report for improved access at: Flint, Pengam and Cadoxton stations. From 16/17 develop additional accessibility projects. Service Frequency Enhancements RI4 Maesteg Branch Frequency Studies on-going. Enhancements including improved service frequency - Develop to GRIP4 report. New Stations NEW Bow Street Station Bow Street Station was successful in obtaining 8 New Stations Funding in July 2017. Ongoing with design work. Identify a programme of future rail improvements NEW Llanwern Station Business case for the proposal is currently being 9 developed. RI8 Develop assessment criteria and, using Ongoing. those criteria, a prioritised list of station improvement proposals to draw down funding from relevant HLOS specific funds (as rail is non-devolved).

22

National Transport Finance Plan 2017 Update

Ref National Transport Finance Plan Intervention progress since July 2015 Delivery Period December 2017 Intervention 2017/ 2018/ 2019/ Description 18 19 20 RI10 To take forward the following stations for Assessment work being undertaken. further stage 2 assessment by end 2018: - South East Wales: Ely Mill/Victoria Park, Llanwern, Newport Road/Rover Way and St Mellons; - South : Cockett, Landore, St Clears; - North Wales: Deeside Industrial Park/Northern Gateway, North Wrexham, South Wrexham, Llangefni; - Mid Wales: Carno. To take forward a further round of new station proposals for Stage 2 Assessment in 2018.

23

National Transport Finance Plan 2017 Update

Ref National Transport Finance Plan Intervention progress since July 2015 Delivery Period December 2017 Intervention 2017/ 2018/ 2019/ Description 18 19 20 Rl11/ Work with the Department for Transport Ongoing. 12 to develop the rail infrastructure enhancement schemes identified by the Secretary of State for Transport and the Chancellor in the 2017 Autumn Budget:

 station improvements at Cardiff Central Station and Swansea;  improvements between Cardiff and Severn Tunnel Junction Relief Lines;  improvements to journey times between Swansea and Cardiff, and between South Wales, Bristol and London;  improvements to journey times and capacity on the North Wales Main Line;  improvements to journey times and capacity on the Wrexham – Bidston line. Rl15 User Worked Crossing Project is nearing completion. closures - Close 8 crossings in Talerddig area. RS5 We will investigate opportunities to Persons of Reduced Mobility programme modernise rail rolling stock. developed and agreed for Class 150 and Class 158 stock. Additional PRM compliant rolling stock being acquired. Further modernisation being taken forward in next franchise.

24

National Transport Finance Plan 2017 Update

Ref National Transport Finance Plan Intervention progress since July 2015 Delivery Period December 2017 Intervention 2017/ 2018/ 2019/ Description 18 19 20 NEW Feasibility study into reopening Feasibility studies ongoing. Report will be 10 Carmarthen to Aberystwyth railway line. published in the new year. NEW Wrexham Area Improvement Fund. Ongoing with identifying possible improvements. 11 Franchise Management RS1a Manage the current franchise including: Continuing to manage existing contract to high Ensuring the contract is managed standard, generating passenger benefits over and effectively. above contractual responsibilities while maintaining compliance and performance. RS1b Manage the current franchise including: Additional services introduced in May 2015. Both Introduction of new services on the have been successful in delivering additional Cambrian Main Line and Heart of Wales passenger journeys and the Cambrian services in Line. particular have exceeded forecasts for number of journeys. RS1d Engage with rail industry partners, Ongoing working with stakeholders to promote stakeholders, and passengers to help the railway in Wales and ensure safety and develop and promote rail services security for passengers and staff. including safety and security.

BUS & COMMUNITY TRANSPORT Funding Public Transport Services BCT1 Continue to provide funding to support The Welsh Government continues to allocate socially necessary services. discretionary funding to local authorities under the Bus Services Support Grant to help local authorities to support the bus and community transport networks.

25

National Transport Finance Plan 2017 Update

Ref National Transport Finance Plan Intervention progress since July 2015 Delivery Period December 2017 Intervention 2017/ 2018/ 2019/ Description 18 19 20 BCT2 To provide Bus Services Support Grant The Welsh Government is identifying key (BSSG) allocations which should strategic services which might particularly benefit complement not replace local authorities' from targeted funding, especially to tackle own budgets for supporting bus and congestion, pollution and journey times at peak community transport services. The 2018 travelling hours. consultation on the Welsh Government's proposals for a sustainable bus network will inform any review of how to better target BSSG allocations. Local authorities will be expected to match-fund any BSSG awards. BCT2 The Welsh Government will review the Each yearly distribution of funds under BSSG is a formula used to allocate funding agreed with the local authorities. Funding under allocations to local authorities under the BSSG scheme reflect rurality and the BSSG if presented with a case by rural particular challenges facing bus operators and local authorities. passengers in rural areas. BCT2 The 2018 consultation on the Welsh The Welsh Government continues to allocate b Government's proposals for a sustainable funding to local authorities under the BSSG to bus network will inform any review of how help local authorities to support the bus and to better target BSSG allocations. community transport networks. See BCT12. BCT2 The 2018 consultation on the Welsh The Welsh Government continues to allocate c Government's proposals for a sustainable funding to local authorities under the BSSG to bus network will inform any review of how help local authorities to support the bus and to better target BSSG allocations. community transport networks. See BCT12. BCT8 Develop a policy statement on Accessible Transport Objectives to be published accessibility of bus services which will be December 2017. used to inform standards and funding obligations. It will cover:

26

National Transport Finance Plan 2017 Update

Ref National Transport Finance Plan Intervention progress since July 2015 Delivery Period December 2017 Intervention 2017/ 2018/ 2019/ Description 18 19 20 BCT8 Accessible bi-lingual information including Included in the Voluntary Welsh Bus Quality a on buses Standard for local bus services linked to payments of BSSG. BCT8 Training for drivers. Accessible Transport Objectives to be published b December 2017. BCT8 Infrastructure See BCT12 c BCT8 Rollout of orange wallet scheme. Accessible Transport Objectives to be published d December 2017. BCT9 Explore opportunities to introduce more Ongoing. e affordable fares for unemployed people and people on low incomes. Concessionary Travel BCT3 Continue to provide a concessionary Consultation launched 10 October 2017. fares scheme for older people, disabled people and seriously injured service personnel and veterans. BCT4 Deliver Young Persons' Discounted Bus Consultation launched 10 October 2017. Travel Scheme 16 - 18 year olds.

Management of Long Distance Services BCT6 Implement greater central management Measures are being progressively implemented to of TrawsCymru services and determine if secure greater control over the network by the there is a viable business case to TrawsCymru Network Manager. A Strategic introduce new TrawsCymru services Management Board has been established to oversee high-level recommendations to the Cabinet Secretary, supported by officials.

27

National Transport Finance Plan 2017 Update

Ref National Transport Finance Plan Intervention progress since July 2015 Delivery Period December 2017 Intervention 2017/ 2018/ 2019/ Description 18 19 20 NEW Upgrading the TrawsCymru network from Ongoing with purchasing new fleet. 11 bus to coach.

Improving Service Quality BCT7 Produce A Voluntary All Wales Bus Ongoing. Quality Standard for bus and community transport services in partnership with local authorities, operators and users. BCT7 Availability of accessible bi-lingual Ongoing. Local authorities and bus operators in a information. receipt of Welsh Government funding are required to meet at least the Welsh Government's own Welsh language standards. BCT7 A fares policy that is easy to understand Currently, competition and legal constraints do b not allow the Welsh Government to stipulate fares. Local authorities are able to stipulate maximum fares within a statutory bus Quality Partnership Scheme. BCT7 Customer care / satisfaction The Welsh Government has commissioned a bus c passenger survey being undertaken by Bus Users Cymru and Transport Focus. Specific actions will follow consideration of that report. We continue to fund Bus Users Cymru to handle complaints and assist passengers raise such matters with bus operators. BCT7 Access for disabled people Allocations agreed with local authorities under the d BSSG scheme must support the requirements of the Equality Act and the essential requirement that bus services are accessible for disabled people.

28

National Transport Finance Plan 2017 Update

Ref National Transport Finance Plan Intervention progress since July 2015 Delivery Period December 2017 Intervention 2017/ 2018/ 2019/ Description 18 19 20 BCT7 Personal safety at passenger waiting Allocations agreed with local authorities under the e facilities and on vehicles. BSSG scheme must support services which have been assessed for personal safety.

BCT7 Preparation of All Wales bus Allocations agreed with local authorities under the f infrastructure and information design BSSG scheme must support the requirements of guidance. the Equality Act and the essential requirement that bus services are accessible for disabled people, but also improve the appeal of bus services to all existing and potential passengers. Planning Future Investments BCT1 Work with local authorities and bus The Welsh Government has launched the new 2 operators to identify congestion and pinch Local Transport Network Fund in 2017-18 which points on the network that impact on bus supports bus based schemes that will deliver reliability and punctuality and ensure that improvements to bus journeys and passenger solutions are integrated into wider facilities. The fund will run for four years with a highway improvements programme. total of £15m being made available. Engagement with Traffic Commissioner BCT1 Develop a voluntary concordat with Officials are implementing with partners in local 1 Confederation of Passenger Transport, government and the bus industry a series of other operators and Traffic recommendations contained in the first report of Commissioner. the Traffic Commissioner for Wales. Improving accessibility BCT1 Work with community transport providers The Community Transport Association has been 3 to develop car club schemes in areas asked to identify a range of communities most where people have difficulty in accessing likely to benefit from car club schemes. Once that employment opportunities and services is to hand, options for funding will be identified.

29

National Transport Finance Plan 2017 Update

Ref National Transport Finance Plan Intervention progress since July 2015 Delivery Period December 2017 Intervention 2017/ 2018/ 2019/ Description 18 19 20 MEETING THE NEEDS OF EVERYONE BB1 Keep implementation of the Blue Badge The Blue Badge Scheme was subject to review Scheme under review. by a Task & Finish Group resulting in a report with 13 recommendations. Most of the recommendations have been implemented and a number are subject to ongoing monitoring. The outstanding actions with respect to enforcement are proving more challenging and alternative work programmes are being explored. INFORMATION AND TRANSPORT CHOICES Improving marketing and information ITC1 Review travel planning interventions We are considering travel plan interventions to funded by the Welsh Government to support the well-being of future generations and ensure that they are focused and targeted deliver Prosperity for All. appropriately. ITC2 Determine a way forward and approach We are considering travel plan interventions to to delivering personalised travel planning. support the well-being of future generations and deliver Prosperity for All.

PORTS Ports Future Planning P2 To work with the Welsh Ports Group to We are working with the Welsh Ports Group to develop Welsh Ports Guidance develop guidance and a relationship management framework for Welsh Government in the sector. NEW Ports Infrastructure Fund Ports Grants have been allocated for 2017/18. 12 NEW Holyhead Port Development To develop a business case for delivery of the 13 Port Masterplan.

30

National Transport Finance Plan 2017 Update

Ref National Transport Finance Plan Intervention progress since July 2015 Delivery Period December 2017 Intervention 2017/ 2018/ 2019/ Description 18 19 20 AIRPORTS National Connectivity A1 Manage funding for the delivery of two Ongoing support for the operation and delivery of return services a day between a twice daily (Monday - Friday) air service Airport and . between Cardiff and Anglesey. International Connectivity A2 We will continue to work with Cardiff Ongoing relationship with Cardiff Airport to Airport and airlines to improve encourage route development. international connectivity to promote Wales as a destination for business and We continue to explore opportunities to improve leisure, including taking forward surface access at the airport. measures to improve surface access to the airport. INTEGRATED TRANSPORT AND METRO NEW Heads of the Valleys - connecting Ongoing. Proposals being developed. See R19a 14 strategic hubs South Wales Metro Phase 1 RI9a METRO Phase 1 Station Improvement Allocation has been awarded to the Regional Programme - Line of route: Cardiff to Transport Authority to progress park and ride Merthyr Tydfil. Range of station improvements in the Metro area. Delivered improvements (inc. accessibility) and through LTF (reference IT1). Park & Ride improvements at all stations on route. Improvements to and Radyr stations and park and ride facility at Radyr station, delivered by Welsh Government are near to completion. South Wales Metro Phase 2 CCR South Wales Metro Phase 2 - Procurement of the Wales and Borders Rail M10 Significantly improved rail infrastructure service and an Operator Developer Partner for and services on the Core Valleys Lines, the Metro is nearing completion.

31

National Transport Finance Plan 2017 Update

Ref National Transport Finance Plan Intervention progress since July 2015 Delivery Period December 2017 Intervention 2017/ 2018/ 2019/ Description 18 19 20 suited to a rapidly growing urban area. The aspiration is for clean (electrified) “turn up and go” services. South Wales Metro - Future Phases CCR METRO Phase 3 - City Centre, City Line The procurement of the Operator and M17 and Penarth Line improvements and Bay Development Partner requires bidders to submit a Line extension proposal for the South Wales Metro that is extendable. Extension proposals not included as Ebbw Valley Line Frequency (Phase 2) - part of Metro Phase 2 will be for the bidders, City Dualling to Pye Corner; New Deal, or private developers for Metro Phase 3. platforms at R & PC; Abertillery spur and station; Crumlin station; Newport West station. Undertake feasibility studies, development of business case and delivery of recommended solution/option. NEW Further work to explore possible Further work to explore possible extensions being 15 extensions to the South Wales Metro considered. network, including connecting Maerdy and Rhondda Fach. North East Wales Metro NEW Deliver the vision as set out in the Moving A programme of improvements being delivered 16 North Wales Forward – Our Vision for based on targeting key employment hubs. North Wales and North East Wales Metro, March 2017. Swansea Bay and Western Valleys Metro proposal NEW We will fund the development of the Funding has been allocated to undertake initial 17 strategic outline case for the Swansea feasibility study. Further studies planned. Bay and Western Valleys Metro proposal.

32

National Transport Finance Plan 2017 Update

Ref National Transport Finance Plan Intervention progress since July 2015 Delivery Period December 2017 Intervention 2017/ 2018/ 2019/ Description 18 19 20 Improving Integration between transport modes and transport services NEW Cardiff Integrated Transport Hub Working with partners to develop a business 18 Package. case. IT2 During 2018 the Welsh Government will It is intended that BSSG allocations will support consult on a range of proposals aimed at an integrated ticketing pilot within the south creating a sustainable bus network, Wales Metro area. including options for integrated ticketing. IT2a Pilot integrated ticketing approaches in It is intended that BSSG allocations will support specific locations and use evidence to an integrated ticketing pilot within the south inform wider roll out Wales Metro area.

IT2b Continue to develop integrated multi It is intended that BSSG allocations will support modal multi operator ticketing All Wales an integrated ticketing pilot within the south Entitlement Card Wales Metro area.

IT6 Working with local authorities and Delivered through other programmes including Network Rail, identify a network of multi Metro and IT1. modal transport interchanges, park and ride and park and share hubs and develop a programme to implement. Improving public transport links to key sites and services IT1 Make grant funding available to local Grant funding to Local Authorities through Local authorities for transport, including Transport Fund - See also BCT 12. schemes that will help to improve access to employment sites, road safety schemes and schemes that will deliver the Welsh Government’s wider priorities.

33

National Transport Finance Plan 2017 Update

Ref National Transport Finance Plan Intervention progress since July 2015 Delivery Period December 2017 Intervention 2017/ 2018/ 2019/ Description 18 19 20 IT3 Review opportunities already identified by Opportunities in EZs and GZs have been others to improve access between and to/ identified and some EZ funding has been from Enterprise Zones and Local Growth provided to support transport scheme Zones, and working with others, identify development and implementation across Wales. further opportunities. Develop and deliver Funding amount is on case-by-case basis and an improvement programme or support varies year-to-year. others to do this. IT5 Through the Welsh Government’s Ongoing with discussion to mitigate of impact and Nuclear Programme Board, engage with maximise legacy. the developer and local authorities across the region to understand and deliver transport needs of people goods and services associated with the Wylfa Newydd development. IT7 Work with Local Health Board, Wales Ongoing. Ambulance Services Trust, Community Health Councils, local government, the bus industry and the Community Transport Associations to deliver action plans setting out measures for improving access to healthcare. INNOVATION, RESEARCH AND DEVELOPMENT Data management IRE1 Work with partners to develop an open Business Case development ongoing. datastore that brings together the transport data held for Wales into a spatial database capable of handling ‘big data’

34

National Transport Finance Plan 2017 Update

Ref National Transport Finance Plan Intervention progress since July 2015 Delivery Period December 2017 Intervention 2017/ 2018/ 2019/ Description 18 19 20 Evidence to justify investments IRE2 Develop standard processes to ensure Ongoing. a appropriate input in the: Identification of the need for and design of modelling or assessment work. IRE2 Develop standard processes to ensure Ongoing. b appropriate input in the: Checking the output of any work commissioned to provide assurance it is up to standard. IRE3 Publish revised WelTAG. WelTAG to be published in 2017. Supporting innovation TI1 Support innovation and the rollout of new Budget identified for introduction of electric technology, particularly where it can lead charging points. to development of safe and efficacious modes of transport.

35

National Transport Finance Plan 2017 Update Annex C – Projects that will seek funding under the European Regional Development Fund programmes in Wales

Road schemes

NTFP Ref R15 New R18 R20 A40 Llanddewi A55 A55 Junctions 15 Velfrey to A40 Improvement Abergwyngregyn to Scheme name and 16 Penblewin Schemes Tai’r Meibion Improvements improvements improvements Timing Short term Medium term Short term Short term Area National / West Wales West Wales North Wales North Wales regional • 2.km of new highway to the • Design and north of the village Construction of of Llanddewi grade separated • Widening of a Velfrey • 2.5km of junctions at 2.1km length of dual improved highway Junctions 15 and carriageway trunk west of Ffynnon 10.8km of improved 16 on the A55. road to modern dual Wood • Improved (2+1 configuration) The project carriageway Scheme facilities for non- highway between St includes new slip standards, closing description motorised travel Clears and roads and an the existing gaps in via new cycle Haverfordwest. under bridge at the central reserve tracks and new Llanfairfechan and numerous field bridleway, with a and a new over and private accesses means of crossing bridge and slip joining the A55. the new highway roads at either over or Dwygyfylchi. beneath.

36

National Transport Finance Plan 2017 Update

NTFP Ref R15 New R18 R20 Addresses road safety and The programme will improves Addresses deliver improvements Address journey time accessibility to the journey time Rationale from the to the journey time, reliability and Haven Waterway reliability on a evidence reliability and safety improve resilience on Enterprise Zone TEN-T Core on the A40 (Ten-T a TEN-T Core Route. and employment Route. Core Route). sites on a Ten-T Core Route. Welsh Welsh Lead organisation Welsh Government Welsh Government Government Government A contractor(s) will Procured Early Procured Early be appointed to Delivery partners Contractor Contractor design and construct Involvement Involvement the works. Indicative Total £35m £49m £40m £22m Project Cost Welsh Welsh Match funding Welsh Government Welsh Government Government Government Preferred Route 2010 End 2018 N/A Announced Appoint Aug-2015 Mid 2018 May 2015 Apr-2015 Employer's Agent Strategic Outline Jun-2014 Early 2019 N/A Case Environmental Impact March 2016 to Summer 2016 End 2020 Assessment (ES & Sept 2017 SIAA) Appoint Early Appoint Design and Contractor Dec-2015 N/A Feb 2016 Build Contractor - Involvement Jan 2016 Contractor Outline Business Summer 2016 Early 2020 N/A Case

37

National Transport Finance Plan 2017 Update

NTFP Ref R15 New R18 R20 Publish Draft Mar-2018 Early 2020 Mar-2017 Jan-2017 Orders Possible Public Apr-2017 Mid 2020 Sept 2017 2017 Inquiry Full Business Case Summer 2017 Mar-2019 Jan-2017

Scheme start Autumn 2017 End 2020 Oct-2020 Autumn 2018 Scheme Autumn 2020 Mid 2023 Aug-2022 Mid 2020 Completion

Rail

NTFP Ref RI9a RI2 RI5 CCRM10 CCRM10 CCRM10 CCRM10 CCRM10 CCRM10 CCRM10 CCRM17 Metro National Metro Phase Station Phase 1- South South South South South South 1 - South South Improve Ebbw Wales Wales Wales Wales Wales Wales Llandaf Wales Wales Intervention ment Vale Line Metro Metro Metro Metro Metro Metro and Metro Metro - name Program Frequenc Phase 2 - Phase 2 - Phase 2 - Phase 2 Phase 2 - Phase 2 - Radyr Phase 2 - Future me y Treherber Aberdare Merthyr Rhymney Taffs Well Coryton station Cardiff Bay Phases (Phase Enhance t Line Line Line Line Depot Line improv 2) ment ements Short/ Short/ Short/ Short/ Short/ Short/ Short/ Short Short Short Medium Timing medium medium medium medium medium medium medium term term term term term term term term term term term West South South South South South Area national / Wales South East South East South East South East South East East East East East East regional and the Wales Wales Wales Wales Wales Wales Wales Wales Wales Wales Valleys

38

National Transport Finance Plan 2017 Update

NTFP Ref RI9a RI2 RI5 CCRM10 CCRM10 CCRM10 CCRM10 CCRM10 CCRM10 CCRM10 CCRM17 Provision of infrastruct ure to facilitate frequency enhance ments Trackwork Llandaf (dualling twin track, Improve f and line additional railway Radyr between Trackwor Trackwor Trackwork Trackwork Site platforms, stations Trackwork station Crosskey k passing k passing passing passing clearance level and twin track, Extensions improv s and loops, loops, loops, loops, and boarding, Scheme their additional to the ements Aberbeeg additional additional additional additional rehabilitatio short description integrati platforms, Valleys and , and platforms, platforms, platforms, platforms, n, road and extension on with level Lines Radyr additional level level level level rail access beyond Bay other boarding park platforms boarding boarding boarding boarding works station, transpor and at additional t modes ride. Newbridg intermediat e and e station Llanhilleth ), Extension of platforms to 6 car length.

39

National Transport Finance Plan 2017 Update

NTFP Ref RI9a RI2 RI5 CCRM10 CCRM10 CCRM10 CCRM10 CCRM10 CCRM10 CCRM10 CCRM17 Service Service Service frequency frequency frequency Service increased increased increased frequency to at least to at least to at least increased 4 tph with 4 tph with 4 tph with to at least additional additional additional 4 tph with capacity capacity capacity additional on on on capacity currently currently Improvi currently on Improvin overcrow overcrow ng Ability to overcrowd currently g ded ded Fit with accessi enhance ed overcrowd Servce accessi sections. sections. Rehabilitatio Metro bility frequency sections. ed frequency Service bility 10% 10% n of objectives and from the 10% sections. enhanceme frequency and journey journey contaminate and Rationale from attracti current journey 10% nt, short enhanceme attractiv time time d site for extending the evidence veness one train time journey extension nt and eness to reduction reduction Core public to per hour reductions time and potential for encoura s and s and Valleys transport encour to two and 25% reductions additional extension ge 25% 25% Lines accessibilit age trains per increase and 25% station modal increase increase y modal hour. in increase in shift in in shift passenger passenger passenge passenge demand demand r demand r demand based on based on based on based on underlying underlying underlyin underlyin growth growth and g growth g growth and service and and service enhancem service service enhancem ent. enhance enhance ent. ment. ment. Welsh Welsh Welsh Welsh Welsh Welsh Welsh Welsh Welsh Welsh Welsh Governm Governm Governme Governme Governme Lead Government Governmen Governmen Govern Govern Governm ent/ ent/ nt/ nt/ nt/ organisation / Transport t/ Transport t/ Transport ment ment ent Transport Transport Transport Transport for Wales for Wales for Wales for Wales for Wales for Wales for Wales Procur Network Network Procured Procured Procured Procured Procured Procured Procured Delivery ed Rail/Pro Rail Operator Operator Operator Operator Operator Operator Operator TBC partners Contra cured /Procured Developer Developer Developer Developer Developer Developer Developer ctor contract Contracto Partner Partner Partner Partner Partner and Partner and Partner and

40

National Transport Finance Plan 2017 Update

NTFP Ref RI9a RI2 RI5 CCRM10 CCRM10 CCRM10 CCRM10 CCRM10 CCRM10 CCRM10 CCRM17 or r and and and and Infrastructur Infrastructu Infrastructu Infrastruct Infrastruct Infrastruct Infrastructu e Delivery re Delivery re Delivery ure ure ure re Delivery Partners Partners Partners Delivery Delivery Delivery Partners Partners Partners Partners Indicative total £5m £24m £39m c. £30m c. £30m c. £30m c. £30m c. £30m c. £30m c. £30m TBC project cost Welsh Welsh Welsh Welsh Welsh Welsh Welsh Welsh Governme Welsh Welsh Welsh Governm Governm Governme Governme Government Governmen Governmen nt/ UK Match funding Govern Govern Governm ent/ UK ent/ UK nt/ UK nt/ UK / UK Dept. t/ UK Dept. t/ UK Dept. Dept. for ment ment ent Dept. for Dept. for Dept. for Dept. for for for for Transport/ Transport Transport Transport Transport Transport Transport Transport City Deal Appoint delivery agent/ 2013 2014 2018 2018 2018 2018 2018 2018 2018 TBC partner (pre- procurement) Transport and Works Act (if applicable) N/A N/A N/A 2018 2018 2018 2018 2018 2018 2018 TBC permission procedure Completion of design (includes 2013 2018 2019 2019 2019 2019 2019 2019 2019 TBC Feasibility Studies) Strategic Outline Case (includes 2018 2018 2018 2018 2018 2018 2018 2018 TBC Feasibility Studies, and initial CBA)

41

National Transport Finance Plan 2017 Update

NTFP Ref RI9a RI2 RI5 CCRM10 CCRM10 CCRM10 CCRM10 CCRM10 CCRM10 CCRM10 CCRM17 Full business case (includes final CBA, 2013 2018 2018 2018 2018 2018 2018 2018 2018 TBC permissions, and procurement) Environmental Impact N/A 2013 TBC 2018 2018 2018 2018 2018 2018 2018 TBC Assessment (ES & SIAA) Scheme start under 2015 2014 2020 2020 2020 2020 2020 2020 2020 TBC on site review Scheme under physical 2017 2017 2022 2022 2022 2022 2022 2022 2022 2022 review completion under Operational use 2017 2017 2023 2023 2023 2023 2023 2023 2023 2023 review

42