PROPOSED IMPROVEMENTS to INTERSTATE 59/INTERSTATE 20 Lauderdale County, Mississippi MDOT Project Number DB/IM-0059-03(099)/108158-301000
Total Page:16
File Type:pdf, Size:1020Kb
PROPOSED IMPROVEMENTS TO INTERSTATE 59/INTERSTATE 20 Lauderdale County, Mississippi MDOT Project Number DB/IM-0059-03(099)/108158-301000 DESIGN-BUILD PROJECT NOTICE OF INTENT The Mississippi Department of Transportation (MDOT) intends to solicit proposals from parties interested in providing design and construction services necessary to upgrade lighting within the approximate Meridian city limits, install Intelligent Transportation Systems (ITS) infrastructure, and to complete the widening, rehabilitation, or replacement of multiple existing bridges on Interstate 59/Interstate 20 in Lauderdale County in Mississippi. Modifications to the bridge or the roadway below may be required in order to provide adequate vertical clearance at certain locations. Other work included may involve bridge demolition, roadway design, hydro-demolition, girder replacement, joint replacement, installation of retaining wall systems, minor repairs, and associated roadway work. The Mississippi Transportation Commission (Commission) will use a two-step process to select a Design- Build team with which to execute a contract for this Project. The Request for Qualifications (RFQ) represents the first step in the process. The purpose of the RFQ is to solicit Statements of Qualifications (SOQs) from Responders interested in providing the requested services necessary to complete the Project. After evaluation and scoring of responsive SOQs, the Commission intends to short-list the most qualified Responders. The Short-listed Responders will be provided a Request for Proposals (RFP) and will be asked to submit a Volume 1 – Technical Proposal and a Volume 2 – Contract Price Proposal. A Design-Build team will then be selected for the Project utilizing the best-value selection method. This NOTICE OF INTENT is issued to allow potential Responders an opportunity to form Design-Build teams in anticipation of the issuance of the RFQ. No formal submittal is required at this time. The RFQ is anticipated to be issued via the MDOT Design-Build and Special Projects website (https://mdot.ms.gov/portal/design_build_projects) in fall 2020. .