Vertical Bridge Clearances

Total Page:16

File Type:pdf, Size:1020Kb

Vertical Bridge Clearances Created: March 4, 2019 Vertical Bridge Clearances: This list contains bridges on the Primary Highway system only (two & three digit highway numbers). Only structures within the city boundaries that are the responsibility of Alberta Infrastructure and Transportation are included in this list. All other structures within city boundaries are not included. NOTE: This electronic service is meant to be a simplified guide to certain parts of the acts and regulations, and not a substitute for them. Alberta Infrastructure and Transportation, Transport Engineering Branch, is not responsible for any omissions in the following documents. It is the responsibility of the transporter to consult the regulations for the exact requirement before moving shipments. • Allowance shall be made for variations in road surface due to ice, dirt, etc. • Legal vertical height is 4.15 metres. • All dimensions are in metres. • Overhead signs are not included, but generally have 5.5 metres clearance. Clearances given are minimum available. Due to slope of the overpass and/or the roadway, this dimension may not be constant over the width of the roadway. Therefore, these structures are not to be used to measure the heights of loads. Vertical Bridge Clearances List: Highway Under Vertical Clearances 1 C. P. R. west of Lake Louise E 5.4 m W 5.4 m 1 Icefield Parkway at Lake Louise E 4.5 m W 4.5 m 1 Radium Junction at Castle Mountain E 5.2 m W 5.2 m 1 Local Road at Banff E 5.0 m W 5.0 m 1 Local Road at Harvey Heights E 5.2 m W 5.3 m 1 Local Road at Canmore Access E 5.3 m W 5.3 m 1 Local Road at Canmore Flyover E 5.4 m W 5.7 m 1 Local Road at Three Sisters Creek E 5.8 m W 5.9 m 1 Local Road at Three Sisters E 5.4 m W 5.2 m 1 Local Road at Lac Des Arcs E 5.2 m W 6.6 m 1 Hwy. 1X at Seebe E 5.3 m W 5.4 m 1 Hwy. 40 at Kananaskis E 5.7 m W 5.3 m 1 Local Road at Ozada Access E 5.7 m W 5.3 m 1 Local Road at Morley Access E 5.2 m W 5.3 m 1 Local Road at Jumping Pound E 5.2 m W 5.3 m teg005_2019a.docx Page 1 of 14 Created: March 4, 2019 Highway Under Vertical Clearances 1 Hwy. 22 at Cochrane Access E 5.1 m W 5.1 m 1 Local Road at Springbank Access E 5.2 m W 5.0 m 1 Old Banff Coach Rd (Hwy 563) west of Calgary E 5.0 m W 5.0 m 1 S-E Ramp of Hwy 201 (Stoney Trlai) over Hwy 1 E&W E 6.0 m W 6.0 m 1 N-W Ramp of Stoney Trail (Hwy 201) over Hwy 1 E&W E 6.1 m W 5.7 m 1 Ramp at Hwy 201 N-W Ramp of Stoney Trail over Wb-SB Ramp of H201 W 5.5 m 1 NB & SB Stoney Trail over Hwy 1 E & W E 7.1 m W 6.6 m 1 WB to H201 SB Ramp of WB Hwy 1 to SB Stoney Trail (Hwy 201) W 6.5 m 1 C. N. R. west of Hwy. 9 E 5.2 m W 5.2 m 1 Hwy 9, 9 km E of Chestermere E 5.5 m W 5.5 m 1 Hwy 873 near Brooks E 5.3 m W 5.3 m 1 Local Road at Brooks (new Flyover) E 5.5 m W 5.5 m 1 Minimum clearance through Medicine Hat E 5.4 m W 5.4 m 1A Hwy. 1 at Canmore E 6.1 m W 6.1 m 1A Hwy. 1 east of Calgary E 5.3 m W 5.3 m 2 Hwy. 3 west of Ft. McLeod N 6.2 m S 5.6 m 2 Hwy. 23 at High River N 5.4 m S 5.4 m 2 498 Ave east at High River N 5.4 m S 5.4 m 2 SH 547 (Aldersyde Interchange) N 5.4 m S 5.4 m 2 SH 552 at Dewinton N 5.3 m S 5.7 m 2 Hwy 2A at Dewinton N 5.4 m S 5.4 m 2 Deerfoot Trail and Anderson Road (see end of list) 2 Crossiron Mills Mall overpass N 5.4 m S 5.4 m 2 SH 566 at Balzac N 5.3 m S 5.4 m 2 Pedestrian Way at Airdrie N 6.6 m S 6.4 m 2 SH 567 at Airdrie N 5.3 m S 5.4 m 2 Hwy. 72 at Beiseker N 5.5 m S 5.6 m 2 Local Road at Crossfield N 5.4 m S 5.6 m 2 Local Road at Acme Interchange N 5.4 m S 5.4 m 2 SH 581at Carstairs N 5.4 m S 5.5 m 2 SH 582 at Didsbury N 5.3 m S 5.3 m 2 Hwy. 27at Olds N 5.2 m S 5.2 m 2 Hwy. 54 at Innisfail N 5.3 m S 5.2 m 2 South Innisfail Access N 5.4 m S 5.4 m teg005_2019a.docx Page 2 of 14 Created: March 4, 2019 Highway Under Vertical Clearances 2 Hwy. 42 at Penhold N 5.7 m S 5.3 m 2 McKenzie Road south of Red Deer N 5.5 m S 5.8 m 2 Hwy. 2A south of Red Deer (Gaetz Ave) N 5.4 m S 5.4 m 2 Collector Hwy. 2A south of Red Deer (Gaetz Ave) S 5.4 m 2 32nd Street at Red Deer N 6.0 m S 5.8 m 2 Hwy. 11 at Red Deer N 5.2 m S 5.2 m 2 Hwy. 11A at Red Deer N 5.4 m S 5.6 m 2 SH 597 at Blackfalds N 5.4 m S 5.6 m 2 Hwy. 2A north of Lacombe N 5.0 m S 5.9 m 2 Hwy. 2A at Morningside N 5.1 m S 5.2 m 2 Local Road at Wolfville N 5.4 m S 5.5 m 2 Local Road southwest of Meniak N 5.2 m S 5.1 m 2 Local Road at Meniak N 5.2 m S 5.2 m 2 SH 611 at Hobbema N 6.0 m S 5.7 m 2 Local Road at Louis Bull N 5.3 m S 5.2 m 2 Hwy. 13 at Wetaskiwin N 5.4 m S 5.2 m 2 Local Road at Mulhurst N 5.4 m S 5.4 m 2 SH. 616 west of Millet N 5.2 m S 5.3 m 2 Local Road northwest of Millet N 5.1 m S 5.1m 2 Local Road at Kavanagh N 5.2 m S 5.1 m 2 Hwy. 2A south of Leduc N 5.0 m S 5.1 m 2 Local Road north of Leduc N 5.5 m S 5.4 m 2 Airport Access at Nisku N 5.4 m S 5.5 m 2 Hwy. 19 at Nisku N 5.5 m S 5.5 m 2 41 Avenue South of Edmonton S 5.6 m 2 (Calgary Trail in Ellerslie Rd. N 5.9 m S 5.9 m Edmonton) 2 (NB Calgary Trail) 216 (NB to EB connector Anthony Hendy Dr) N 5.6 m 2 (SB Calgary Trail) 216 (NB CT to WB Anthony Hendy Dr.) S 5.4 m 2 (NB CT to WB 216 (EB Anthony Hendy Dr) W 5.4 m AHD) 2 (SB CT to EB 216 (SE Anthony Hendy) S 5.9 m AHD Ramp) 2 Hwy. 37 at St. Albert N 6.1 m S 5.8 m 2 Pedestrian Way at Peace River N 5.6 m S 5.6 m 2 Steel Bridge at Peace River E 5.9 m W 5.3 m 2 CNR west of Peace River E 5.3 m W 5.3 m teg005_2019a.docx Page 3 of 14 Created: March 4, 2019 Highway Under Vertical Clearances 2 Dunvegan Bridge on Hwy 2 over Peace River N 10.5m S 10.5m 2 Hwy. 43 north of Grande Prairie N 5.4 m S 5.6 m 2A Hwy. 2 south of Red Deer N 6.2 m S 6.2 m 2A C.N.R. south of Blackfalds N 5.2 m S 5.2 m 3 C.P.R. at Brocket E 5.3 m W 5.3 m 3 Hwy. 25 at Lethbridge E 5.5 m W 5.4 m 3 Hwy. 3A at Lethbridge E 5.5 m 3 Minimum clearance through Lethbridge E 5.3 m W 5.2 m 3A Hwy. 23 at Monarch E 7.1 m W 7.1 m 3A Hwy. 3 at Monarch W 5.3 m 3A Hwy. 3 at Coalhurst N 6.1 m 5 N Ramp to Hwy 3 Hwy 3 East at (Magrath Drive Interchange) N 5.4 West 6 C.P.R. south of Pincher Creek N 5.9 m S 5.9 m 10X Steel Bridges southeast of Drumheller 5.1 m 12 Hwy.
Recommended publications
  • Building for Lease
    FOR LEASE BUILDING 1625 100TH AVENUE NE CALGARY, ALBERTA L BUILDING L 257,580 SF DISCOVER Oxford Airport Business Park is a master-planned, flagship business park adjacent to Calgary International Airport that will be comprised of 4 million square feet of premier industrial, office, hotel and amenity retail space. The site is strategically located at the gateway to the airport with outstanding access to Country Hills Boulevard, Airport Trail Deerfoot Trail, and Stoney Trail. Construction is of the highest quality, featuring environmentally efficient design along with modern, functional features and appealing aesthetics. Contact: Dan Alexander – Director, Industrial Leasing | 403.206.6449 | [email protected] BUILDING SPECIFICATIONS Site Area: 13.26 acres Floor Slab: 7” reinforced with 25 kg/m3 steel fibers and 12,400 lb. pt. load Zoning: I-G – General Industrial Zoning Main Power Service: 2000A @ 347/600V, 3 Phase Building Size: 257,580 SF Lighting: LED c/w motion sensors Available Area: 257,580 SF Sprinklers: ESFR System Minimum Bay Size: 42,900 SF Trailer Parking: +/- 64 Typical Column Grid: 55’ X 40’ (60’ depth at staging bay) Lease Rate: Market Building Depth: 260’ Additional Rent: $3.60 PSF Ceiling Height: 32’ clear Available: August 2019 Loading Doors: • 36 dock doors c/w 40,000 lb pneumatic levelers • 2 ramped grade doors • 29 doors available in knock-out positions KEY DEVELOPMENT FEATURES • Brand new construction with state-of-the-art features • Dock and ramped grade loading • Large, medium and small bay configuration
    [Show full text]
  • Macleod Place +1 403 266 5544 5920 & 5940 Macleod Trail S CALGARY, AB
    CODY WATSON Associate Vice President 403 571 8760 [email protected] BRITTANY BLOCK Senior Associate 403 571 8756 [email protected] MATT LANNON Associate Vice President 403 571 8824 [email protected] FOR LEASE Colliers International 900, 335 8th Avenue SW Calgary, AB T2P 1C9 www.colliers.com/calgary Macleod Place +1 403 266 5544 5920 & 5940 Macleod Trail S CALGARY, AB Accelerating success. FOR LEASE | 5920 & 5940 Macleod Trail S, Calgary | AB Building Amenities Available Space On-site fitness facility includes showers and lockers OCCUPANCY MACLEOD PLACE I DATE *demisable to Suite 300 - 5,410 square feet 2,579 SF immediately Conference centre available for tenant use for no additional Suite 400 - 5,852 square feet immediately charge. > Large Room: 90 person Suite 460 - 2,138 square feet immediately occupancy Contiguous to > Kitchen area Fourth Floor - immediately 9,476 square feet Gaucho Brazilian Barbecue and The Daily Grind are located on the main floor of Macleod Place. Also within close priximity are restaurants such as Cultures, JOEY Chinook, Cravings Market Restaurant, Original Joe’s Restaurant & Bar, OCCUPANCY and Los Mariachis Mexican MACLEOD PLACE II Restaurant DATE Suite 202 - 3,133 square feet immediately Ample 90-minute free visitor parking available Suite 402 - 2,761 square feet immediately Suite 602 - 3,161 square feet immediately Suite 640 - 821 square feet immediately Quick and easy access to Macleod Trail, Glenmore Suite 700 - 12,089 square feet August 1, 2020 Trail, and close proximity to Deerfoot Trail Suite 800 - 12,082 square feet September 1, 2020 9-minute walk to the Chinook LRT ANNUAL NET RENT PARKING Market Rates Apply One (1) stall per 460 square feet Telus Fibre Optic enabled $110 per stall/month for surface OPERATING COSTS AND TAXES > $16.97 per square foot > $140per stall/month for covered [2019 estimated] > Hourly parking available for visitors Building Amenities > The on-site gym is fully-equipped with free weights, elliptical and treadmill machines, in addition to stationary bicycles and a squat rack.
    [Show full text]
  • A Preliminary Assessment of the Native Fish Stocks of Jasper National Park
    A Preliminary Assessment of the Native Fish Stocks of Jasper National Park David W. Mayhood Part 3 of a Fish Management Plan for Jasper National Park Freshwater Research Limited A Preliminary Assessment of the Native Fish Stocks of Jasper National Park David W. Mayhood FWR Freshwater Research Limited Calgary, Alberta Prepared for Canadian Parks Service Jasper National Park Jasper, Alberta Part 3 of a Fish Management Plan for Jasper National Park July 1992 Cover & Title Page. Alexander Bajkov’s drawings of bull trout from Jacques Lake, Jasper National Park (Bajkov 1927:334-335). Top: Bajkov’s Figure 2, captioned “Head of specimen of Salvelinus alpinus malma, [female], 500 mm. in length from Jaques [sic] Lake.” Bottom: Bajkov’s Figure 3, captioned “Head of specimen of Salvelinus alpinus malma, [male], 590 mm. in length, from Jaques [sic] Lake.” Although only sketches, Bajkov’s figures well illustrate the most characteristic features of this most characteristic Jasper native fish. These are: the terminal mouth cleft bisecting the anterior profile at its midpoint, the elongated head with tapered snout, flat skull, long lower jaw, and eyes placed high on the head (Cavender 1980:300-302; compare with Cavender’s Figure 3). The head structure of bull trout is well suited to an ambush-type predatory style, in which the charr rests on the bottom and watches for prey to pass over. ABSTRACT I conducted an extensive survey of published and unpublished documents to identify the native fish stocks of Jasper National Park, describe their original condition, determine if there is anything unusual or especially significant about them, assess their present condition, outline what is known of their biology and life history, and outline what measures should be taken to manage and protect them.
    [Show full text]
  • Field Trip Guide Soils and Landscapes of the Front Ranges
    1 Field Trip Guide Soils and Landscapes of the Front Ranges, Foothills, and Great Plains Canadian Society of Soil Science Annual Meeting, Banff, Alberta May 2014 Field trip leaders: Dan Pennock (U. of Saskatchewan) and Paul Sanborn (U. Northern British Columbia) Field Guide Compiled by: Dan and Lea Pennock This Guidebook could be referenced as: Pennock D. and L. Pennock. 2014. Soils and Landscapes of the Front Ranges, Foothills, and Great Plains. Field Trip Guide. Canadian Society of Soil Science Annual Meeting, Banff, Alberta May 2014. 18 p. 2 3 Banff Park In the fall of 1883, three Canadian Pacific Railway construction workers stumbled across a cave containing hot springs on the eastern slopes of Alberta's Rocky Mountains. From that humble beginning was born Banff National Park, Canada's first national park and the world's third. Spanning 6,641 square kilometres (2,564 square miles) of valleys, mountains, glaciers, forests, meadows and rivers, Banff National Park is one of the world's premier destination spots. In Banff’s early years, The Canadian Pacific Railway built the Banff Springs Hotel and Chateau Lake Louise, and attracted tourists through extensive advertising. In the early 20th century, roads were built in Banff, at times by war internees, and through Great Depression-era public works projects. Since the 1960s, park accommodations have been open all year, with annual tourism visits to Banff increasing to over 5 million in the 1990s. Millions more pass through the park on the Trans-Canada Highway. As Banff is one of the world's most visited national parks, the health of its ecosystem has been threatened.
    [Show full text]
  • Deerfoot Trail Study December 2020 Contents
    Deerfoot Trail Study December 2020 Contents Background and Fast Facts ...............................................04 Study Goals, Objectives and Outcomes .......................06 Study Phases and Timeline ...............................................08 Identifying Challenges .......................................................12 What We Heard, What We Did ..........................................14 Developing Improvement Options................................18 Option Packages ...................................................................20 Option Evaluation ................................................................32 Recommended Improvements .......................................36 A Phased Approach for Implementation .....................44 Next Steps ...............................................................................52 2 The City of Calgary & Alberta Transportation | Deerfoot Trail Study Introduction The City of Calgary and Alberta Transportation In addition to describing the recommended are pleased to present the final recommendations improvements to the Deerfoot Trail corridor, this of the Deerfoot Trail Study. document provides a general overview of the study The principal role of the Deerfoot Trail within The process which involved a comprehensive technical City of Calgary is to provide an efficient, reliable, and program and multiple engagement events with safe connection for motor vehicle traffic and goods key stakeholders and city residents. movement within, to, and from the city. These key
    [Show full text]
  • Highway 3: Transportation Mitigation for Wildlife and Connectivity in the Crown of the Continent Ecosystem
    Highway 3: Transportation Mitigation for Wildlife and Connectivity May 2010 Prepared with the: support of: Galvin Family Fund Kayak Foundation HIGHWAY 3: TRANSPORTATION MITIGATION FOR WILDLIFE AND CONNECTIVITY IN THE CROWN OF THE CONTINENT ECOSYSTEM Final Report May 2010 Prepared by: Anthony Clevenger, PhD Western Transportation Institute, Montana State University Clayton Apps, PhD, Aspen Wildlife Research Tracy Lee, MSc, Miistakis Institute, University of Calgary Mike Quinn, PhD, Miistakis Institute, University of Calgary Dale Paton, Graduate Student, University of Calgary Dave Poulton, LLB, LLM, Yellowstone to Yukon Conservation Initiative Robert Ament, M Sc, Western Transportation Institute, Montana State University TABLE OF CONTENTS List of Tables .....................................................................................................................................................iv List of Figures.....................................................................................................................................................v Executive Summary .........................................................................................................................................vi Introduction........................................................................................................................................................1 Background........................................................................................................................................................3
    [Show full text]
  • Copyrighted Material Not for Distribution Fidler in Context
    TABLE OF CONTENTS acknowledgements vii introduction Fidler in Context 1 first journal From York Factory to Buckingham House 43 second journal From Buckingham House to the Rocky Mountains 95 notes to the first journal 151 notes to the second journal 241 sources and references 321 index 351 COPYRIGHTED MATERIAL NOT FOR DISTRIBUTION FIDLER IN CONTEXT In July 1792 Peter Fidler, a young surveyor for the Hudson’s Bay Company, set out from York Factory to the company’s new outpost high on the North Saskatchewan River. He spent the winter of 1792‐93 with a group of Piikani hunting buffalo in the foothills SW of Calgary. These were remarkable journeys. The river brigade travelled more than 2000 km in 80 days, hauling heavy loads, moving upstream almost all the way. With the Piikani, Fidler witnessed hunts at sites that archaeologists have since studied intensively. On both trips his assignment was to map the fur-trade route from Hudson Bay to the Rocky Mountains. Fidler kept two journals, one for the river trip and one for his circuit with the Piikani. The freshness and immediacy of these journals are a great part of their appeal. They are filled with descriptions of regional landscapes, hunting and trading, Native and fur-trade cultures, all of them reflecting a young man’s sense of adventure as he crossed the continent. But there is noth- ing naive or spontaneous about these remarks. The journals are transcripts of his route survey, the first stages of a map to be sent to the company’s head office in London.
    [Show full text]
  • News Release
    News Release Schools assist 24 non-profit organizations throughout Central Alberta For immediate release – June 16, 2020 Red Deer Catholic Regional Schools spans across four counties (Clearwater County, Lacombe County, Mountain View County and Red Deer County) and operates 21 schools throughout Central Alberta. Each year our schools participate in a variety of activities that enhance our communities through responsible social action. We call it “social justice.” Social justice projects incorporate faith through servantship by giving back to the community. In addition to helping our school communities through a variety of school-wide projects and initiatives, our schools assisted the following organizations during the 2019-2020 school year: 1. Red Deer Food Bank Society 2. Sylvan Lake Food Bank Society 3. Blackfalds Food Bank 4. The Lord’s Food Bank 5. Mountain View Food Bank 6. Innisfail and Area Food Bank 7. The Mustard Seed 8. Safe Harbour Society 9. Central Alberta Humane Society 10. Central Alberta Children’s Advocacy Centre 11. Ronald McDonald House of Central Alberta 12. Pregnancy Care Centre 13. Terry Fox Foundation 14. Catholic Social Services 15. Red Deer Hospice Society (St. Joseph High School Grad Service Project) 16. Kerry Wood Nature Centre (École Secondaire Notre Dame High School Grad Service Project) 17. Bethany Sylvan Lake 18. Victoria Park Red Deer 19. Rocky Mountain House Hospital 20. Chalice Child News Release 21. THINKfast 22. St. Vincent de Paul Society 23. World Wildlife Fund 24. Movember Foundation Other meaningful
    [Show full text]
  • Alberta Association of Recreation Facility Personnel ANNUAL GENERAL MEETING MINUTES Tuesday April 26, 2016
    Alberta Association Of Recreation Facility Personnel ANNUAL GENERAL MEETING MINUTES Tuesday April 26, 2016 Attended by 129 Constituted members 1. Call to Order President Sandi Stewart (Lacombe) called the meeting to order at 10:15am on April 26, 2016 in Drumheller. Sandi introduced the board members of the Association that were in attendance and welcomed all members old and new who were attending the conference. We had 75 new attendees at conference. 2. Approval of the Agenda Motion by Russell Ferris (Red Deer): “That we accept the agenda as presented on page 1 of the Annual Report.” Second by Calvin Bennefield (Lacombe) Carried 3. Approval of the Minutes of the Annual General Meeting April 28, 2015 Motion by Willie Jurcevic (Calgary): “That we accept the minutes from the Annual General Meeting April 28, 2015 in Banff as presented on pages 2-7 of the Annual report.” Seconded by Allan King (Stettler) Carried 4. Business Arising from the Minutes There was no business arising for the minutes 5. Executive Reports as Circulated * President Sandi Stewart Lacombe * Treasurer Dawn Mercerau Camrose * Education Rep. Sonia Dodd Stettler * Associate Rep. Ryan Jones Calgary * Executive Director Stuart Ray Cochrane Motion by Chris McKenna (Blackfalds): “to accept as information the Executive Board Reports as presented on pages 12-23 of the 2015 Annual Report.” Seconded by Edith Martin (St Albert) Carried 6. New Business A. 2015 Financial Report Dawn Mercereau (Camrose) presented the financial report to the members for information. Motion by Dawn Mercereau (Camrose): “that the membership accepts as information the 2015 Financial Report as presented on Pages 24-28 of the 2015 Annual Report.” Seconded by Colleen Sparrow (Edmonton) Carried 1-Abstained B.
    [Show full text]
  • A Comprehensive Guide to the Alberta Oil Sands
    A COMPREHENSIVE GUIDE TO THE ALBERTA OIL SANDS UNDERSTANDING THE ENVIRONMENTAL AND HUMAN IMPACTS , EXPORT IMPLICATIONS , AND POLITICAL , ECONOMIC , AND INDUSTRY INFLUENCES Michelle Mech May 2011 (LAST REVISED MARCH 2012) A COMPREHENSIVE GUIDE TO THE ALBERTA OIL SANDS UNDERSTANDING THE ENVIRONMENTAL AND HUMAN IMPACTS , EXPORT IMPLICATIONS , AND POLITICAL , ECONOMIC , AND INDUSTRY INFLUENCES ABOUT THIS REPORT Just as an oil slick can spread far from its source, the implications of Oil Sands production have far reaching effects. Many people only read or hear about isolated aspects of these implications. Media stories often provide only a ‘window’ of information on one specific event and detailed reports commonly center around one particular facet. This paper brings together major points from a vast selection of reports, studies and research papers, books, documentaries, articles, and fact sheets relating to the Alberta Oil Sands. It is not inclusive. The objective of this document is to present sufficient information on the primary factors and repercussions involved with Oil Sands production and export so as to provide the reader with an overall picture of the scope and implications of Oil Sands current production and potential future development, without perusing vast volumes of publications. The content presents both basic facts, and those that would supplement a general knowledge base of the Oil Sands and this document can be utilized wholly or in part, to gain or complement a perspective of one or more particular aspect(s) associated with the Oil Sands. The substantial range of Oil Sands- related topics is covered in brevity in the summary. This paper discusses environmental, resource, and health concerns, reclamation, viable alternatives, crude oil pipelines, and carbon capture and storage.
    [Show full text]
  • Airport Trail Interchanges
    Page 1 of 6 Item # 7.2.1 Transportation Report to ISC: UNRESTRICTED Calgary Planning Commission CPC2019-0749 2019 June 20 Airport Trail Interchanges EXECUTIVE SUMMARY The Airport Trail Phase 2 program completes the Airport Trail corridor from Deerfoot Trail to Stoney Trail, supporting the unimpeded flow of goods and vehicles to and from the Calgary International Airport, the growing logistics business around the Airport, and development in the City’s Northeast communities. The program is funded in partnership by the Government of Canada ($50 million), the Government of Alberta ($27.7 million), the Calgary Airport Authority ($20 million, plus half the land costs) and the City ($20.65 million, plus half the land costs). The $153.35 million program includes the following projects: 1. Extension of tender-ready Airport Trail NE, from 36 Street to 60 Street NE (under Construction); 2. Construction of ring road access at Stoney Trail NE (southbound Stoney to westbound Airport Trail NE (in Preliminary Design); and 3. Construction of two grade – separated bridge structures and associated ramps at 19 Street NE and Barlow Trail NE, crossing over Airport Trail NE. This report provides an overview of the third project listed above. ADMINISTRATION RECOMMENDATION: That Calgary Planning Commission RECEIVE AND ACCEPT this report for information. PREVIOUS COUNCIL DIRECTION / POLICY On 2018 July 30 at the Combined Meeting of Council, Council approved a budget appropriation of $153.35 million to Program 859- Airport Trail Phase 2 (TT2018-0856). This followed previous Council direction: - 2012 December 03 – Council approved ‘Airport Trail Functional Planning Study’ (TT2012-0658). - 2014 May 26 – 2015 -2024 Investing in Mobility – Airport Trail was included as an unfunded transportation infrastructure project list (TT2014-0308).
    [Show full text]
  • National Trade Corridors Fund – Airport Trail Phase 2
    Item #7.1 Transportation Report to ISC: UNRESTRICTED SPC on Transportation and Transit TT2018-0856 2018 July 19 Page 1 of 4 National Trade Corridors Fund – Airport Trail Phase 2 EXECUTIVE SUMMARY On July 6, 2018, the Federal Government announced a commitment of $50 million towards funding Airport Trail – Phase 2 from the National Trade Corridors Fund. The project’s scope includes an extension of Airport Trail from 36th St to 60th St, construction of two new grade separated interchanges at 19th St and Barlow Tr., and construction of a southbound to westbound ramp at Stoney Trail and Airport Trail. Additional funding was committed by The Government of Alberta ($27.7 million). The Calgary Airport Authority will contribute $20 million through a previous agreement with The City. Airport Trail is planned as a vital east-west corridor in Calgary. The work under this project will complete the corridor from Deerfoot Trail to Stoney Trail, will support the unimpeded flow of goods and vehicles to and from the Airport, will support the growing logistics business around the Airport, and open up new areas for development in The City’s growing northeast. Approval for budget appropriation of the total project budget amount ($153.35 million) is being requested at this time for an amount of $38.15 million. This amount will allow administration to move forward with construction of the project and the outstanding land acquisition. ADMINISTRATION RECOMMENDATION: That the SPC on Transportation and Transit recommend that Council: 1. Approve the budget appropriation of $153.35 million to Program 859 – Airport Trail N.E.
    [Show full text]