Space For: the Well-Connected

Total Page:16

File Type:pdf, Size:1020Kb

Space For: the Well-Connected Space for: the well-connected BURROWS INDUSTRIAL ESTATE 1–3 BURROWS ROAD, ALEXANDRIA, NSW OVERVIEW 2 Opportunity Ideally situated for port and airport users, Burrows Industrial Estate offers functional warehouse+office units close to key transport infrastructure links in South Sydney. This estate currently has 6,049 sqm warehouse+office space available. ACCESS 3 PRINCES HIGHWAY The University of Sydney 309, 310 (via Central Station) 343 (via Central Station) CHALMERS STREET Train Station M20 (via Central Station) PHIL LIP ST Newtown REET Airport REGENT STREET CLEVELAND STREET DAN KS STREET Bus stops RAGLAN STREET E T R E GEORGE STREET ELIZABETH STREET S WYNDHAM STREET E K BOTANY ROAD IN R E ADE T M8 M8 Motorway V AR S P X09, X10 (via Central Station) T IL Y L A G E E LW I N E R A R U R O A O T D S Y G SWAN N SO I N ROAD K FO UN BOURKE STREET TA IN ERSKINEVILLE S T MCEVOY ST ENMORE RD TODMAN AVENUE MITCHELL ROAD EDGEWARE RD GREEN Perry 348 SYDNEY PARK ROAD SQUARE Zetland St Peters Park ED I NB HUNTLEY STREET URGH RD EASTERN DISTRIBUTOR MA ST PETERS RR IC T KV E ILL Sydney E EPS E R OM R T R OA Park SCOLLINS ST O D D AD A N O A EUSTON ROAD D R E R E U Alexandria E O U K I N N R R E ’ E CAMPBELL ROAD U V O O V A B A ANZAC PARADE BURROWS ROAD D G L 418 I N I BUS ROUTES H N C N S U HIGH STREET H SYDENHAM Y D T A CANAL ROAD M8 O W R ROUTE LOCATION GH HI S E HAYES NC Burrows Industrial Estate RI BURROWS ROAD ROAD 309 Port Botany to City P 348 310 Eastgardens to City RICKETTY ST GARDENERS ROAD 343 Kingsford to City Rosebery 343 348 Wolli Creek to Bondi Junction 309, 310 418 Burwood to Bondi Junction MASCOT X09 City to Banksmeadow (Express) RAINBOW STREET Eastlakes PO COWARD STREET TEMPE AIR RT DRIVE X10 Eastgardens to City (Express) m20 Botany to Gore Hill (Prepay only) Mascot BOTANY ROAD E PRINCES HIGHWAY V I R D TRAINS WOLLI S KING STREET S CREEK O R Airport and East Hills Line Sydney KING STREET C N C Airport ROBEY STREET R oo E ks H R T iv X09, X10 U BICYCLE er O M20 S Convenient cycle paths between the estate and South Sydney enables safe and easy DOMESTIC connections between the estate and CBD, TERMINAL RIVE Redfern station, and the inner west. LMES D SYDNEY AL HO NER AIRPORT GE LOCATION 4 Smart move Users enjoy excellent access to Sydney’s major road, air, port and rail connections. Located next to St Peters Interchange, the estate only 750 metres to the entrance of the M8 Motorway and 3.7 kilometres to the Eastern Distributor, providing efficient connections to Greater Sydney. A number of bus routes service the area and St Peters and Mascot train stations are located a short walk from the estate. CENTR ALLY CONNECTED 900M 3.7KM 10KM to Mascot to Eastern to Sydney Station Distributor CBD 750M 2.4KM Motorway 8.7KM to M8 to Sydney to Port Motorway Airport Botany WESTCONNEX 5 Existing M4 Motorway M4 Completed tunnel to/from M4 Homebush Existing M5 Motorway Completed tunnel M8 Motorway Under Construction M4-M5 link Sydney Gateway STAGE 1 M4 widening M4 tunnels Rozelle Complete Strathfield Haberfield Burwood Sydney CBD Future proofing Sydney Westconnex is the largest transport and Leichhardt urban renewal project in Australia, bringing major improvements to road infrastructure Camperdown and public transport to keep Sydney moving. Benefits: M4-M5 Link Opening 2023 + Easing road congestion + Bypass 42 sets of traffic lights from airport to Parramatta Alexandria + Double the capacity of the M5 corridor Rosebery + Better connections along the M4 and St Peters Interchange M5 Motorways Mascot + Quicker and more reliable trips between STAGE 2 New M8 west and south west Sydney. Complete SYDNEY Punchbowl M8 Kingsgrove GATEWAY Opening 2023 Sydney M5 Airport Beverly Hills Riverwood AMENITY 6 Food and beverage + The Grounds + COOH + Bread & Circus + Al Aseel Child care and early education + The Rocks Brewery + Alexandria Montessori Academy + No. 5 Restaurant and Bar Child Care Centre + Fratelli Fresh + Explore & Develop Alexandria + Crave Coffee Café – Early Learning Centre + Loveat Café. + Only About Children Alexandria + Story House Early Learning Alexandria + Huntley Street Early Learning Centre. Other amenity + SkyZone + Archie Brothers Cirque Electriq + Alexandria Homemaker Centre + Officeworks + Bunnings + Woolworths. Health and fitness + Crunch Fitness + Plus fitness 24/7 + 9 Degrees Bouldering Gym. KEY AREA STATISTICS – WITHIN 45 MINUTE DRIVE TIME 7 KEY AREA STATISTICS: 4.2m TOTAL POPULATION Dee Why Blacktown 1.6 m TOTAL HOUSEHOLDS $209.4bn TOTAL PURCHASING POWER Sydney Randwick Burrows TOTAL SPEND ON: Industrial Estate $5.1bn CLOTHING $ bn Sutherland 16.6 FOOD + BEVERAGE Campbelltown $4.0bn PERSONAL CARE Source: Esri and Michael Bauer Research All currency in Australian dollars. Source: Esri and Michael Bauer Research Esri, HERE, Garmin, USGS, NGA |Esri, HERE | Esri, HERE FEATURES 8 Unit 3 + 5,307 sqm quality warehouse with internal clearance up to 8.5m + 363 sqm modern office space over two floors + Access via on-grade roller shutter doors + Sprinkler system + Competitive rates available + Only short-term license available. SITE PLAN 9 Unit 9a 1 t i Unit 9 n h Truck Parking s U e e m c n e r e i f D w y t i n i r a u h c A c e s w e N O R Unit 8 Unit 4 L A N A Unit 2 Unit 3 C Unit5 Unit6 UUninitt77 B URRO WS R O A D FOR LEASE UNIT 3 PLAN 10 10/11 d 75.7 AREA SCHEDULE SQM Roa Warehouse 5,307.0 Roller Shutter Office s 362.7 8.0 w x 4.7 h 8 7 Total 6,049.0 9 6 Burrow Roller Shutter 4/5 7.6 w x 4.5 h 13.4 Unit 3 Stairs Stairs 6 1/2 Ofce Ofce 18. Canal Road Warehouse Amen Tea SITE PLAN not to scale 4 0 d 75.7 Stairs & 10/11 35. 71. Amen Landing Roa Roller Shutter Amen s 8.0 w x 4.7 h 8 7 Tea 9 6 Burrow Roller Shutter Fire Elec 4/5 7.6 w x 4.5 h Exit 13.4 Roller First oor Shutter 7.6 w x 4.5 h Unit 3 Stairs Stairs 6 1/2 Ofce Ofce 18. Canal Road Warehouse Amen Tea SITE PLAN not to scale 4 0 Ground oor Stairs & 35. 71. Amen Landing Amen FOR LEASE Tea Fire Elec Exit Roller First oor Shutter 7.6 w x 4.5 h Ground oor SERVICE 11 Manage Dedicated Building Managers provide on-site support for day-to-day operations, while Property and Asset Managers are available to discuss any lease queries, invoicing issues or modifications to tenancies. We give our customers the space they need to succeed by providing unparalleled service To ensureService our customers receive the best possible service, all of our estates have in-house property services teams that attend to customers’ operational needs and ensure maintenance and presentation standards are exceptional. Contact Jason Min Asset Manager T 02 9230 7195 M 0425 223 929 [email protected] Christina Nguyen Property Manager T 02 9230 7131 M 0415 148 887 [email protected] Goodman The Hayesbery 1–11 Hayes Road Rosebery NSW 2018 T 02 9230 7400 View this property online goodman.com/au This document has been prepared by Goodman Property Services (Aust) Pty Ltd ABN 40 088 981 793 for general information purposes only. Whilst every care has been taken in relation to its accuracy, no warranty of accuracy is given or implied. You should obtain your own independent advice before making any decisions about the property referred to in this document. Images contained in this document have been used to enable the customer to visualise the development concepts only, and are not intended to definitively represent the final product. August 2021.
Recommended publications
  • EIS/Pdmdp Chapter 8 Construction
    Roads and Maritime Services/Sydney Airport Corporation Limited Sydney Gateway Road Project Environmental Impact Statement/ Preliminary Draft Major Development Plan Chapter 8 Construction November 2019 Environmental Impact Statement / Preliminary Draft Major Development Plan Contents 8. Construction ........................................................................................................................................ 8.1 8.1 Overview .................................................................................................................................... 8.1 8.2 Indicative construction methodology ......................................................................................... 8.2 8.3 Construction program and timing ............................................................................................ 8.20 8.4 Construction ancillary facilities ................................................................................................ 8.25 8.5 Construction workforce and resources .................................................................................... 8.33 8.6 Transport and access .............................................................................................................. 8.34 8.7 Utility works .............................................................................................................................. 8.40 Tables Table 8.1 Indicative list of buildings and structures proposed for removal ........................................... 8.9 Table 8.2
    [Show full text]
  • Business Impact Assessment
    Roads and Maritime Services/Sydney Airport Corporation Limited Sydney Gateway Road Project Environmental Impact Statement/ Preliminary Draft Major Development Plan Technical Working Paper 12 Business Impact Assessment November 2019 Sydney Gateway road project – Road Technical Advisory and Environmental Advisory Services SYDNEY GATEWAY ROAD PROJECT: Technical Working Paper 12 – Business Impact Assessment Prepared for Roads and Maritime Services November 2019 Sydney Gateway road project – Road Technical Advisory and Environmental Advisory Services Sydney Gateway Road Project: Technical Working Paper 12 – Business Impact Assessment Document prepared by: HillPDA Pty Ltd ABN 5200 3963 755 Level 3, 234 George Street Sydney NSW 2000 GPO Box 2748 Sydney NSW 2001 T: +61 2 9252 8777 F: +61 2 9465 5598 E: [email protected] W: www.hillpda.com Report contact Elle Clouston Associate BRTP Hons 1A, Cert IV Human Resources MPIA, IAP2 [email protected] The information in this document is confidential to HillPDA Pty Ltd and should not be disclosed, used, or duplicated in whole or in part for any purpose other than the evaluation and exhibition by the Roads and Maritime Services of NSW for the purposes of this proposal. P18027 November 2019 Sydney Gateway road project – Road Technical Advisory and Environmental Advisory Services Sydney Gateway Road Project: Technical Working Paper 12 – Business Impact Assessment Contents 1.0 Introduction ................................................................................................ 1 1.1 Overview
    [Show full text]
  • Arcure Continues Its International Expansion by Equipping the Westconnex Motorway, Mega-Construction Site in Sydney
    Paris, the 11th of October 2019 Arcure continues its international expansion by equipping the WestConnex Motorway, mega-construction site in Sydney Specializing in artificial intelligence (AI) applied to image processing in the industrial world, Arcure has been selected by the consortium Lendlease Samsung Bouygues Joint Venture (LSBJV) to equip machines working on the WestConnex M4-M5 Link project in Sydney with Blaxtair®, the reference solution for pedestrian protection around industrial vehicles. « WestConnex is one of the largest road infrastructure projects in Australia. Having equipped industrial sites in the Greater Paris area and also supplied Blaxtair® pedestrian detection systems for mobile plant on parts of the London underground expansion project, we are proud to work on the safety element of this huge undertaking. This new collaboration on an infrastructure operation of this size testifies to the relevance of the Blaxtair® solution and has spurred us to actively seek further international projects and opportunities », Franck Gayraud, CEO and co-founder of Arcure. Blaxtair® is the result of a collaboration between Arcure and the CEA's (note to editors: in France, the CEA is the Alternative Energies and Atomic Energy Commission) research laboratories and is considered the industry-leading, embedded detection system. This innovative 3D camera detects obstacles around mobile plant and/or materials handling equipment. Thanks to AI, Blaxtair® differentiates between pedestrians in the designated detection zone and objects/obstacles, thus helping to avoid pedestrian collisions. Its unique technology will warn a driver in case of danger, avoiding unnecessary alarms and untimely stops. The adaptability and responsiveness offered by the Blaxtair® system allows mobile plant to be used with minimal risk to pedestrians on industrial sites with the most demanding operating conditions.
    [Show full text]
  • Westconnex New M5 Environmental Impact Statement
    15 Social and economic This chapter outlines the potential social and economic impacts associated with the project. A detailed social and economic impact assessment has been undertaken for the project and is included in Appendix M. The Secretary of the NSW Department of Planning and Environment (DP&E) has issued a set of environmental assessment requirements for the project; these are referred to as Secretary’s Environmental Assessment Requirements (SEARs). Table 15-1 sets out these requirements as they relate to social and economic matters, and identifies where they have been addressed in this environmental impact statement (EIS). Table 15-1 SEARs – social and economic SEAR Where addressed A description of the existing socio-economic environment. Section 15.2 Social and economic impacts to businesses and the community within Section 15.3 the vicinity of the proposal, with associated property acquisition, traffic, access, property, public domain and open space, and amenity and health related changes (including the broader regional impacts associated with the closure of the Alexandria landfill site should this be part of the proposal). An assessment of the impact of the proposal on community facilities, Section 15.3 including open space and recreational facilities. The assessment must include the use of existing facilities impacted by the proposal, and options and opportunities for the relocation and / or reconfiguration of the community facilities, both temporary and permanent. Impacts on directly affected properties and land uses, including impacts Section 15.3 related to access, land use, settlement and subsidence associated with tunnel excavation, property acquisition (including relocations and Chapter 13 (Land use and expenses for those properties acquired) and amenity related changes.
    [Show full text]
  • Sydney Gateway
    Sydney Gateway State Significant Infrastructure Scoping Report BLANK PAGE Sydney Gateway road project State Significant Infrastructure Scoping Report Roads and Maritime Services | November 2018 Prepared by the Gateway to Sydney Joint Venture (WSP Australia Pty Limited and GHD Pty Ltd) and Roads and Maritime Services Copyright: The concepts and information contained in this document are the property of NSW Roads and Maritime Services. Use or copying of this document in whole or in part without the written permission of NSW Roads and Maritime Services constitutes an infringement of copyright. Document controls Approval and authorisation Title Sydney Gateway road project State Significant Infrastructure Scoping Report Accepted on behalf of NSW Fraser Leishman, Roads and Maritime Services Project Director, Sydney Gateway by: Signed: Dated: 16-11-18 Executive summary Overview Sydney Gateway is part of a NSW and Australian Government initiative to improve road and freight rail transport through the important economic gateways of Sydney Airport and Port Botany. Sydney Gateway is comprised of two projects: · Sydney Gateway road project (the project) · Port Botany Rail Duplication – to duplicate a three kilometre section of the Port Botany freight rail line. NSW Roads and Maritime Services (Roads and Maritime) and Sydney Airport Corporation Limited propose to build the Sydney Gateway road project, to provide new direct high capacity road connections linking the Sydney motorway network with Sydney Kingsford Smith Airport (Sydney Airport). The location of Sydney Gateway, including the project, is shown on Figure 1.1. Roads and Maritime has formed the view that the project is likely to significantly affect the environment. On this basis, the project is declared to be State significant infrastructure under Division 5.2 of the NSW Environmental Planning & Assessment Act 1979 (EP&A Act), and needs approval from the NSW Minister for Planning.
    [Show full text]
  • Technical Paper 1 Traffic Report
    Technical Paper 1 Traffic report 1 WestConnex Updated Strategic Business Case Contents List of Tables ..................................................................................................................................................... 3 List of Figures .................................................................................................................................................... 4 Preface .............................................................................................................................................................. 6 Terminology ....................................................................................................................................................... 7 1 Executive summary .................................................................................................................................... 8 1.1 Background to this report ................................................................................................................... 8 1.2 Traffic methodology ........................................................................................................................... 9 1.3 Road network performance without WestConnex ........................................................................... 10 1.4 Traffic effects of WestConnex.......................................................................................................... 12 1.5 Traffic operations and influence on WestConnex design ...............................................................
    [Show full text]
  • Draft South District Plan
    Draft South District Plan co-creating a greater sydney November 2016 How to be involved This draft District Plan sets You can read the entire Before making a submission, out aspirations and proposals draft District Plan at please read our privacy for Greater Sydney’s South www.greater.sydney and send statement at District, which includes the feedback: www.greater.sydney/privacy local government areas of • via www.greater.sydney For more information Canterbury-Bankstown, visit www.greater.sydney Georges River and Sutherland. • by email: call us on 1800 617 681 It has been developed by the [email protected] Greater Sydney Commission. • by post: or email: Greater Sydney Commission [email protected] This draft District Plan is on Draft South District Plan formal public exhibition until PO Box 257, the end of March 2017, and will Parramatta NSW 2124 be finalised towards the end of 2017 to allow as many people as possible to provide input. This document was updated on 21 December 2016 to address typographical errors and production faults. A detailed list of the errata can be found at www.greater.sydney/content/publications Draft South District Plan Exhibition THIS SEPARATE DOCUMENT DOCUMENT Overview Draft District Maps Background Website Plan Material Dashboard Our vision — Towards our Greater Sydney 2056 Summary The requirements A compilation of Data and Reports How the A draft brochure of the legislative maps and spatial used to inform the draft District Plan is amendment to of the draft framework information used draft District Plan to be monitored update A Plan for District Plan to inform the draft Growing Sydney District Plan You can view these supporting components, as well as Our vision — Towards our Greater Sydney 2056, SOUTH DISTRICT our proposed 40-year vision for Greater Sydney, at www.greater.sydney.
    [Show full text]
  • Sydney Gateway
    Final Business Case Summary Sydney Gateway July 2019 July 2019 About this report Sydney Gateway is designed to increase transport capacity and connections between the Sydney transport network, Sydney Airport and Port Botany. It will do this by delivering new road and rail infrastructure. A motorway from St Peters to Mascot is proposed, together with road upgrades to provide improved access to Terminals 2 and 3 of Sydney Airport. The rail line between Mascot and Port Botany will be duplicated, with some realignment of the line and upgrading of existing rail infrastructure. The Business Case for Sydney Gateway was developed by (Roads and Maritime Services) Transport for NSW and submitted to the NSW Government in October 2018. This Business Case Evaluation Summary has been prepared by Infrastructure NSW, the NSW Government’s independent infrastructure advisory agency. Final Business Case Summary Page 1 Sydney Gateway July 2019 Strategic context Growth in population and the economy The Greater Sydney Commission’s Plan for Sydney1 describes a metropolis of three separate cities where residents of each city have easy access to jobs and services. The three cities are the Eastern Harbour City, Central River City and Western Parkland City. By 2031, the economic output of Sydney is expected to almost double and it will maintain its role as one of the economic capitals of Australia. The transport network currently services a population of 4.8 million making a total of 15.5 million multi-modal trips each day. By 2031, Sydney’s population is forecast to grow by around 1.6 million people and 0.7 million new jobs are forecast.
    [Show full text]
  • NSW Government Submission
    Inquiry into Economic Regulation of Airports NSW Government Submission NSW Transport Planning and Landside Access In March 2018, the NSW Government release ‘NSW Future Transport 2056’, a comprehensive strategy to ensure the way we travel is more personal, integrated, accessible, safe, reliable and sustainable. The associated Regional NSW Services and Infrastructure Plan outlines the NSW Government’s thinking on the big trends, issues, services and infrastructure needs which are now shaping, or will soon shape transport in regional NSW. This includes regional aviation, a key component of Transport for NSW’s future vision for the Hub and Spoke model of transport services in NSW that supports the visitor economy by enabling international and domestic visitation. Central to this is the importance of aviation for international, interstate and intrastate movements. Landside Access to Kingsford Smith Airport (Sydney Airport) The NSW Government is upgrading roads around Sydney Airport to help improve traffic flow around the airport and Port Botany. The upgrades are complementing Sydney Airport’s upgrades to its internal road network. The Sydney Airport precinct employs more than 12,000 people. Around half of these people live within public transport, walking or cycling distance of the Airport. Improvements to public transport, walking and cycling connections will improve access for staff and visitors alike. The NSW Government is currently progressing: • The Sydney Gateway project, including major new road linkages between the motorway network and the domestic and international terminals. • Airport Precinct road upgrade projects, with East Precinct works covering Wentworth Avenue, Botany Road, Mill Pond Road, Joyce Drive and General Holmes Drive, Mascot; West Precinct work, in the vicinity of Marsh Street, Arncliffe; and North Precinct work in the vicinity of O’Riordan Street, Mascot.
    [Show full text]
  • Sydney Gateway Road Project Environmental Impact St Atement / Pr Eliminary Dr A Major De Velopment Plan
    Representing the community’s interests in getting around on bikes in Sydney’s eastern suburbs Sydney Gateway Road Project Environmental Impact Statement / Preliminary Dra Major Development Plan 18 Dec 2019 BIKEast Incorporated www.bikeast.org.au Belinda Sco PO Box 1601 Planner Bondi Juncon NSW 1355 NSW Planning Portal Online [email protected] BIKEast is pleased to make a submission on the S ydney Gateway Road Project - - Environmental Impact Statement/Preliminary Dra Major Development Plan. We believe that providing and maintaining open and accessible space for the community is very important. We also believe safe, connuous, and connected bike routes will encourage more people to ride their bikes more oen – an outcome that is consistent with NSW and Local Government strategies to realise the considerable individual and public benefits of increasing the mode share of acve travel (walking or cycling). As such, BIKEast submits the following comments. ● We are pleased to see that the proposed replacement route provided is the most direct alternave to the connecon being removed. ● We are pleased to see menon for adding acve travel connecvity to Sydney’s network as outlined in NSW and Local Government strategy. However, we object to the Sydney Gateway project and propose that the project should not be approved, unl it is strongly aligned with current NSW Government policies and plans, to meet its stated goal “ making journeys from west and south-west Sydney to Sydney Airport, the M5, Eastern Distributor and Port Botany easier, faster and safer”, for all customers. Summary of issues 1. Missing walking and cycling integraon to surrounding acve travel network, in parcular from surrounding local areas to Sydney Airport, a major desnaon and employment centre for the local community.
    [Show full text]
  • AECOM to Design Sydney Gateway Road Project in Australia
    AECOM to design Sydney Gateway Road Project in Australia December 8, 2020 Creating a new connection from Sydney motorway network at St Peters interchange, to Sydney Airport, towards Port Botany and beyond LOS ANGELES--(BUSINESS WIRE)--Dec. 8, 2020-- AECOM (NYSE: ACM), the world’s premier infrastructure consulting firm, announced today that it has been selected to provide the civil engineering design for Sydney’s $2.6 billion Gateway Road Project, a new 5-kilometer, above ground, toll-free connection from the recently opened St Peters Interchange to Sydney airport, Port Botany and beyond. “The Sydney Gateway is the kind of large, complex and transformational project that suits AECOM and our ability to leverage the specialist technical skills from our global transportation business,” said Lara Poloni, AECOM’s president. “The project will divert up to 10,000 trucks from local streets by providing an alternative route and return local streets to the community. Importantly, Sydney Gateway will also make it easier and safer for pedestrians and cyclists to access the airport precinct and employment hub through the creation of approximately three kilometers of new shared pathways.” Completing this missing link in the Sydney motorway network will improve traffic flow around the airport and towards New South Wales’ busiest container port, taking thousands of large trucks off local streets and providing a more efficient and safer connection to the domestic and international terminals for visitors and workers. “The infrastructure pipeline in Sydney is very strong, and we are partnering with our clients to help deliver their projects through our innovative technical solutions and our commitment to digital engineering,” said Richard Barrett, AECOM’s chief executive, Australia New Zealand.
    [Show full text]
  • New M5 EIS Vol 1B Chapter 14 Visual Impacts
    14 Visual impacts and urban design This chapter provides an assessment of the urban design, landscape character and visual amenity implications associated with the project. The Technical working paper: Landscape character and visual impact and the Urban design report have been prepared, and are provided in Appendix K and Appendix L. This chapter provides a summary of those documents and an assessment of the potential impacts of the project. Table 14-1 sets out the Secretary’s Environmental Assessment Requirements (SEARs) as they relate to urban design, landscape character and visual amenity, and notes where these have been addressed in the environmental impact statement (EIS). Table 14-1 SEARs – urban design, landscape character and visual amenity SEARs Where addressed A consideration of the urban design and visual amenity implications of Potential impacts to visual the proposal, including supporting infrastructure, during construction amenity during the and operation. The assessment must identify urban design and construction and operation landscaping objectives to enhance the ventilation stacks, phase are provided in interchanges, tunnels, ‘cut and cover’ arrangements, consider resulting Sections 14.3.1 and 14.3.2. residual land and treatments, and demonstrate how the proposed hard and soft urban design elements of the proposal would be consistent Urban design and with the existing and desired future character of the area traversed landscaping objectives are affected by the proposal. provided in Section 14.1.3 and Sections 3.1 and 3.3 of Appendix L. Consideration of the existing and desired future character of the area is provided in Sections 14.1.1 and 14.3.2.
    [Show full text]