Technical Paper 1 Traffic Report

Total Page:16

File Type:pdf, Size:1020Kb

Technical Paper 1 Traffic Report Technical Paper 1 Traffic report 1 WestConnex Updated Strategic Business Case Contents List of Tables ..................................................................................................................................................... 3 List of Figures .................................................................................................................................................... 4 Preface .............................................................................................................................................................. 6 Terminology ....................................................................................................................................................... 7 1 Executive summary .................................................................................................................................... 8 1.1 Background to this report ................................................................................................................... 8 1.2 Traffic methodology ........................................................................................................................... 9 1.3 Road network performance without WestConnex ........................................................................... 10 1.4 Traffic effects of WestConnex.......................................................................................................... 12 1.5 Traffic operations and influence on WestConnex design ................................................................ 18 1.6 Conclusion ....................................................................................................................................... 19 2 Introduction ............................................................................................................................................... 21 2.1 The purpose of this report ................................................................................................................ 21 2.2 Land use basis and base traffic growth (2014 to 2031) .................................................................. 21 2.2 Description of WestConnex ............................................................................................................. 22 2.3 WestConnex traffic objectives ......................................................................................................... 23 3 Methodology ............................................................................................................................................. 24 3.1 Broad approach to traffic modelling and assessment ..................................................................... 24 3.2 Traffic models .................................................................................................................................. 24 3.3 Key assumptions ............................................................................................................................. 26 3.4 Traffic scenarios modelled ............................................................................................................... 26 3.5 Treatment of induced traffic ............................................................................................................. 26 4 Existing and future network performance without WestConnex .............................................................. 27 4.1 Overview .......................................................................................................................................... 27 4.2 The 2012 network performance ....................................................................................................... 27 4.3 Future 2031 network performance without WestConnex ................................................................ 37 5 WestConnex traffic effects ....................................................................................................................... 50 5.1 Overview .......................................................................................................................................... 50 5.2 Network performance ...................................................................................................................... 50 5.3 Induced traffic .................................................................................................................................. 64 5.4 The effects of the Rozelle off-ramps ................................................................................................ 66 5.5 Network productivity from WestConnex .......................................................................................... 68 5.6 Conclusions ..................................................................................................................................... 69 1 WestConnex Updated Strategic Business Case 6 Traffic operations and influence on WestConnex .................................................................................... 70 6.1 Overview .......................................................................................................................................... 70 6.2 WestConnex sub-regions ................................................................................................................ 71 6.3 WestConnex traffic operations......................................................................................................... 72 6.4 WestConnex surface access operations ......................................................................................... 73 6.5 Measures to manage future traffic beyond 2031 ............................................................................. 77 6.6 Conclusions ..................................................................................................................................... 77 7 Traffic effects of the Western Harbour Tunnel on WestConnex .............................................................. 78 7.1 Overview .......................................................................................................................................... 78 7.2 Network performance ...................................................................................................................... 78 7.3 Traffic operations influence on project ............................................................................................. 81 7.4 Measures to manage future traffic beyond 2031 ............................................................................. 82 7.5 Conclusions ..................................................................................................................................... 82 2 WestConnex Updated Strategic Business Case List of Tables Table 1-1 Modelled Average Weekday Traffic (AWT) volumes on the Network without WestConnex (2031) 11 Table 1-2 Forecast Average Weekday volumes on the WestConnex in 2031 ................................................ 13 Table 1-3 VKT and VHT results of Motorway versus Surface Roads (rounded to the nearest thousands) .... 17 Table 4-1 Average Weekday Traffic (AWT) and peak (AM and PM) traffic volumes within the WestConnex Project Area Network (2012) ........................................................................................................................... 30 Table 4-2 Volume to Capacity ratio (V/C) estimates for selected Links (AM and PM peak hours, 2012) ....... 34 Table 4-3 Average speeds on selected roads on the WestConnex project area network (2012) ................... 36 Table 4-4 Increase in average weekday traffic volumes on roads most affected by congestion (total two-way) ......................................................................................................................................................................... 42 Table 4-5 Average weekday and peak hour (morning and afternoon) traffic volumes: ‘do minimum’ (2031) . 43 Table 4-6 Modelled average peak hour speeds on selected roads in 2012 and 2031 ................................... 46 Table 4-7 Volume to capacity ratio comparison on selected roads between existing 2012 and ‘do minimum’ 2031 ................................................................................................................................................................. 48 Table 5-1 Forecast average weekday traffic volumes in the mainline tunnels and ramps in 2031 ................. 51 Table 5-2 Change in morning peak and two-way average weekday traffic volumes on selected WestConnex project area network roads, 2031 .................................................................................................................... 52 Table 5-3 Change in average weekday heavy vehicle volumes on the WestConnex project area network ... 55 Table 5-4 Average speeds and volume to capacity ratios for selected links, 2031 morning peak ................. 58 Table 5-5 Induced trips on the 2031 surface road network, average weekday traffic ..................................... 65 Table 5-6 Induced trips on 2031 WestConnex tunnels and ramps. ................................................................ 65 Table 5-7 Change in Average Weekday traffic volumes on selected roads as a result of with and without the Rozelle off-ramps ............................................................................................................................................. 67 Table 5-8 Vehicle
Recommended publications
  • Installation of New and Extended Clearways on Windsor Road And
    Installation of new and extended clearways on Windsor Road and Church Street from Baulkham Hills to Parramatta Roads and Maritime Services | January 2018 The NSW Government is funding this project as part of its $121 million Clearways Program, which aims to reduce congestion and delays on Sydney’s roads. Roads and Maritime Services is installing new Clearways on Windsor Road and Church Street, Baulkham weekend and extended weekday clearways on Hills to Parramatta Windsor Road and Church Street from Old Northern Road, Baulkham Hills to Victoria Road, Parramatta in February 2018. We have included a map to show the location of the new clearways. Changes to the clearways will be operational from Monday 26 February 2018. Any vehicles parked in the clearways on or after these dates will risk being fined and towed. The new weekend and extended weekday clearway hours on Windsor Road are shown on the map. The new clearways will replace the existing ‘No Stopping’ and ‘No Parking’ restrictions on Church Street, between James Ruse Drive and Victoria Road, and the existing bus lanes on Church Street will continue to operate with no changes. What is a clearway? A clearway is a section of road where stopping and parking is not allowed during the times shown on the clearway sign. Clearways are put on key arterial roads where traffic is often heavy and congested. They help keep vehicles moving by making all lanes available to motorists. The only exception is the stopping of buses and taxis dropping off or picking up passengers as well as emergency vehicles.
    [Show full text]
  • New South Wales Class 1 Load Carrying Vehicle Operator’S Guide
    New South Wales Class 1 Load Carrying Vehicle Operator’s Guide Important: This Operator’s Guide is for three Notices separated by Part A, Part B and Part C. Please read sections carefully as separate conditions may apply. For enquiries about roads and restrictions listed in this document please contact Transport for NSW Road Access unit: [email protected] 27 October 2020 New South Wales Class 1 Load Carrying Vehicle Operator’s Guide Contents Purpose ................................................................................................................................................................... 4 Definitions ............................................................................................................................................................... 4 NSW Travel Zones .................................................................................................................................................... 5 Part A – NSW Class 1 Load Carrying Vehicles Notice ................................................................................................ 9 About the Notice ..................................................................................................................................................... 9 1: Travel Conditions ................................................................................................................................................. 9 1.1 Pilot and Escort Requirements ..........................................................................................................................
    [Show full text]
  • Space For: Easy Access
    Space for: easy access HARDSTAND 9–13 MCPHERSON STREET, BANKSMEADOW, NSW OVERVIEW 2 Opportunity 9–13 McPherson Street offers up to 25,620 sqm of hardstand for lease in South Sydney’s the popular industrial precinct of Banksmeadow. Strategically located within close proximity of Port Botany and Sydney Airport, the site is ideal for port and airport related users. VIEW FROM ABOVE 3 Sydney CBD Port Botany Freight Line Sydney Airport Beauchamp Road 9-13 McPherson Street Botany Road Foreshore Road Port Botany LOCATION 4 Access from major arterials Southern Cross Drive to 9–13 McPherson Street General Holmes Drive Sydney Airport Stephen Road W e n M5 East Freeway tw or Unrivalled th A General Holmes Drive v en access ue Botany Road 9–13 McPherson Street is ideally positioned only 1.2 km from Port Botany Container Terminal and 6.6 km from 9–13 McPherson Street Sydney Airport. The estate offers excellent access to McPherson Street Sydney arterial road network via the M5 Foreshore Road Motorway and Westconnex. A range of shops and services are available along the nearby Botany Road. To/from M5 Freeway To/from Southern Cross Drive Bumborah Point Road To/from Sydney International Container Terminal Port Botany To/from Sydney Airport Signalised intersection Military Rd CENTR ALLY CONNECTED 6.1KM 8.8KM to M5 to Westconnex 1.2KM Motorway 6.6KM to Port to Sydney Botany Airport y a 5 hw Q ig ue HAMENITY en S es t inc Pr l E na V Ca dra A an T 309 lex E Randwick A E G R N T I N S CANAL ROAD N N HARCOURT PARADE Coogee U A D D CHURCH R GARDENERS ROAD AVENUE
    [Show full text]
  • Sydney Harbour Bridge Other Names: the Coat Hanger Place ID: 105888 File No: 1/12/036/0065
    Australian Heritage Database Places for Decision Class : Historic Identification List: National Heritage List Name of Place: Sydney Harbour Bridge Other Names: The Coat Hanger Place ID: 105888 File No: 1/12/036/0065 Nomination Date: 30/01/2007 Principal Group: Road Transport Status Legal Status: 30/01/2007 - Nominated place Admin Status: 19/09/2005 - Under assessment by AHC--Australian place Assessment Recommendation: Place meets one or more NHL criteria Assessor's Comments: Other Assessments: National Trust of Australia (NSW) : Classified by National Trust Location Nearest Town: Dawes Point - Milsons Point Distance from town (km): Direction from town: Area (ha): 9 Address: Bradfield Hwy, Dawes Point - Milsons Point, NSW 2000 LGA: Sydney City NSW North Sydney City NSW Location/Boundaries: Bradfield Highway, Dawes Point in the south and Milsons Point in the north, comprising bridge, including pylons, part of the constructed approaches and parts of Bradfield and Dawes Point Parks, being the area entered in the NSW Heritage Register, listing number 00781, gazetted 25 June 1999, except those parts of this area north of the southern alignment of Fitzroy Street, Milsons Point or south of the northern alignment of Parbury Lane, Dawes Point. Assessor's Summary of Significance: The building of the Sydney Harbour Bridge was a major event in Australia's history, representing a pivotal step in the development of modern Sydney and one of Australia’s most important cities. The bridge is significant as a symbol of the aspirations of the nation, a focus for the optimistic forecast of a better future following the Great Depression. With the construction of the Sydney Harbour Bridge, Australia was felt to have truly joined the modern age, and the bridge was significant in fostering a sense of collective national pride in the achievement.
    [Show full text]
  • Sydney Water in 1788 Was the Little Stream That Wound Its Way from Near a Day Tour of the Water Supply Hyde Park Through the Centre of the Town Into Sydney Cove
    In the beginning Sydney’s first water supply from the time of its settlement Sydney Water in 1788 was the little stream that wound its way from near A day tour of the water supply Hyde Park through the centre of the town into Sydney Cove. It became known as the Tank Stream. By 1811 it dams south of Sydney was hardly fit for drinking. Water was then drawn from wells or carted from a creek running into Rushcutter’s Bay. The Tank Stream was still the main water supply until 1826. In this whole-day tour by car you will see the major dams, canals and pipelines that provide water to Sydney. Some of these works still in use were built around 1880. The round trip tour from Sydney is around 350 km., all on good roads and motorway. The tour is through attractive countryside south Engines at Botany Pumping Station (demolished) of Sydney, and there are good picnic areas and playgrounds at the dam sites. source of supply. In 1854 work started on the Botany Swamps Scheme, which began to deliver water in 1858. The Scheme included a series of dams feeding a pumping station near the present Sydney Airport. A few fragments of the pumping station building remain and can be seen Tank stream in 1840, from a water-colour by beside General Holmes Drive. Water was pumped to two J. Skinner Prout reservoirs, at Crown Street (still in use) and Paddington (not in use though its remains still exist). The ponds known as Lachlan Swamp (now Centennial Park) only 3 km.
    [Show full text]
  • Rozelle Campus M1
    Berry St HUNTLEYS POINT The Point Rd Bay Rd NORTH SYDNEY Burns Bay Rd Bay Burns NEUTRAL BAY Pacific Hwy Kurraba Rd WAVERTON Y A W Union St E G TA CREMORNE POINT OT CHURCH ST WHARF RD C Y A W EN RD GA LAVENDER GLOVER ST BAY CAMPBELL ST Rozelle Campus M1 FREDBERT ST MCMAHONS MILSONS POINT POINT KIRRIBILLI BALMAIN RD PERRY ST 0 100 m Sydney Harbour Sydney HarbourTunnel A40 Sydney Harbour Bridge Victoria Rd Montague St Lyons Rd Sydney RUSSELL LEA DRUMMOYNE Opera BALMAIN Hickson Rd House MILLERS POINT Beattie St Darling St BALMAIN EAST Cahill Expressway Darling St THE ROCKS The Hungry Mile A40 Mullens St SYDNEY ROZELLE Pirrama Rd Royal Victoria Rd Phillip St Botanical Macquarie St Western Distributor Gardens RODD University A4 Cahill Expressway POINT of Sydney Mrs Macquaries Rd (Rozelle) Clarence St Bowman St Sussex St George St Leichhardt Balmain Rd PYRMONT York St The Henley Marine Dr Park Western Distributor Domain M1 See Enlargement Elizabeth St Art Gallery Rd WOOLLOOMOOLOO Rozelle D The Crescent A4 o b Campus POTTS POINT ro y Perry St d Hyde P Balmain Rd LILYFIELD Pitt St d Park MacLeay St A4 Darling Dr Harbour St e Jubilee Cross City Tunnel College St Lilyfield Rd Park Eastern Distributor Cross City Tunnel A4 City West Link William St Darling Dr The Crescent The Glebe Point Rd Wentworth Fig St M1 Pyrmont Bridge Rd Wattle St Park Liverpool St Hawthorne Canal Harris St Oxford St Goulburn St Norton St FOREST Darling Dr Johnston St Moore St LODGE ULTIMO Darlinghurst VictoriaRd St Minogue Cres Wigram Rd HABERFIELD ANNANDALE GLEBE Campbell St Eastern Distributor Balmain Rd HAYMARKET Bay St University of Tasmania 0 250 500 1000 m Booth St Bridge Rd www.utas.edu.au Elizabeth St Foster St Tel: +61 2 8572 7995 (Rozelle Campus) Collins St SURRY LEICHHARDT Central HILLS Leichhardt St Station © Copyright Demap, February 2017 Lee St Ross St Broadway Flinders St PADDINGTON City Rd CHIPPENDALE CAMPERDOWN STRAWBERRY HILLS.
    [Show full text]
  • Initial Project Submissions
    M4 Extension M4 PART 3: INITIAL PROJECT SUBMISSIONS M4 Extension NSW GOVERNMENT SUBMISSION TO INFRASTRUCTURE AUSTRALIA TEMPLATE FOR SUMMARIES OF FURTHER PRIORITY PROJECTS JULY 2010 Project Summary (2 pages, excluding attachments) Initiative Name: M4 Extension Location (State/Region(or City)/ Locality): Sydney, NSW Name of Proponent Entity: Roads and Traffic Authority of NSW Contact (Name, Position, phone/e-mail): Paul Goldsmith General Manager, Motorway Projects Phone: 8588 5710 or 0413 368 241 [email protected] Project Description: • Provide a description of the initiative and the capability it will provide. The description needs to provide a concise, but clear description of the initiative’s scope. (approx 3 paragraphs) A motorway connection, mainly in tunnel, from the eastern end of the Western Freeway (M4) at North Strathfield to the western outskirts of the Sydney CBD and the road network near Sydney Airport. It would link M4 to the eastern section of the Sydney Orbital via the Cross City Tunnel and Sydney Harbour Bridge. The eastern section of the M4 (east of Parramatta) would be widened/upgraded. A twin tube tunnel is proposed from North Strathfield to just south of Campbell Road at St Peters with connections to the City West Link at Lilyfield/Rozelle and Parramatta Road/Broadway at Glebe/ Chippendale. A bus only connection at Parramatta Road, Haberfield is also possible. A further tunnel is proposed to connect Victoria Road near Gladesville Bridge to the main tunnel in the Leichhardt area. There is a proposed surface motorway link from just south of Campbell Road to the road network around Sydney Airport probably connecting to Canal Road and Qantas Drive (the latter subject to M5 East Expansion planning and Sydney Airport Corp Ltd agreement) with a potential link to M5 at Arncliffe.
    [Show full text]
  • Available Space Summary
    AVAILABLE SPACE SUMMARY FORD LAND COMPANY PROPERTY LISTINGS FOR JUNE 2021 SEVEN HILLS B2,22 Powers Road L1, 22 Powers Road I15, 22 Powers Road Warehouse Office Office Total sqm: 533.14 Total sqm: 163.5 Total sqm: 550 J3, 22 Powers Road M001 22 Powers Road A1, A2,A3, A4, 22 Powers Road Office Office Showroom Total sqm: 86.85 Total sqm: 1,528.5 - 3,194 Total sqm: 109 - 710 MoreMore DetailsDetails 2, 167 Prospect Highway 5, 167 Prospecy Highway 6A, 167 Porspect Highway Office & Warehouse Office Office & Warehouse Total sqm: 3,950 Total sqm: 416 Total sqm: 1,265,5 +61 2 9492 7800 FORDLAND.COM.AU AVAILABLE SPACE SUMMARY FORD LAND COMPANY PROPERTY LISTINGS FOR JUNE 2021 SEVEN HILLS 6 C&D, 167 Prospect Highway 18 Powers Road E1 & E2, 109 Station Road Warehouse Yard Showroom Total sqm: 2,121.9 Total sqm: 6,632 Total sqm: 510 - 1,280 MORE DETAILS +61 2 9492 7800 FORDLAND.COM.AU AVAILABLE SPACE SUMMARY FORD LAND COMPANY PROPERTY LISTINGS FOR JUNE 2021 LANE COVE F12, Woodcock Place F707, Woodcock Place F27, Woodcock Place Total sqm: 202.3 Total sqm: 325 Total sqm: 171.3 MORE DETAILS F701, Woodcock Place F705, Woodcock Place F33, Woodcock Place Total sqm: 97.9 Total sqm: 70.4 Total sqm: 397.5 MoreMore DetailsDetails G1B, 16 Mars Road G1, 16 Mars Road G4, 16 Mars Raod Total sqm: 1,079 Total sqm: 182.5 Total sqm: 1,588 +61 2 9492 7800 FORDLAND.COM.AU AVAILABLE SPACE SUMMARY FORD LAND COMPANY PROPERTY LISTINGS FOR JUNE 2021 NORTH SYDNEY H, 16 Mars Road Suite 7, 174 Pacific Highway Suite 103, 7-9 West Street Total sqm: 1014,5 Office Suite Office Suite Total sqm: 141 Total sqm: 163 AUBURN E, 290 Parramatta Road Unit 4, 199 Parramatta Road C, 290 Parramatta Road Office & Warehouse Bulky Goods Office & Warehouse Total sqm: 2,599 Total sqm: 1,376 Total sqm: 724.5 MoreMore DetailsDetails MORE DETAILS +61 2 9492 7800 FORDLAND.COM.AU.
    [Show full text]
  • Arcure Continues Its International Expansion by Equipping the Westconnex Motorway, Mega-Construction Site in Sydney
    Paris, the 11th of October 2019 Arcure continues its international expansion by equipping the WestConnex Motorway, mega-construction site in Sydney Specializing in artificial intelligence (AI) applied to image processing in the industrial world, Arcure has been selected by the consortium Lendlease Samsung Bouygues Joint Venture (LSBJV) to equip machines working on the WestConnex M4-M5 Link project in Sydney with Blaxtair®, the reference solution for pedestrian protection around industrial vehicles. « WestConnex is one of the largest road infrastructure projects in Australia. Having equipped industrial sites in the Greater Paris area and also supplied Blaxtair® pedestrian detection systems for mobile plant on parts of the London underground expansion project, we are proud to work on the safety element of this huge undertaking. This new collaboration on an infrastructure operation of this size testifies to the relevance of the Blaxtair® solution and has spurred us to actively seek further international projects and opportunities », Franck Gayraud, CEO and co-founder of Arcure. Blaxtair® is the result of a collaboration between Arcure and the CEA's (note to editors: in France, the CEA is the Alternative Energies and Atomic Energy Commission) research laboratories and is considered the industry-leading, embedded detection system. This innovative 3D camera detects obstacles around mobile plant and/or materials handling equipment. Thanks to AI, Blaxtair® differentiates between pedestrians in the designated detection zone and objects/obstacles, thus helping to avoid pedestrian collisions. Its unique technology will warn a driver in case of danger, avoiding unnecessary alarms and untimely stops. The adaptability and responsiveness offered by the Blaxtair® system allows mobile plant to be used with minimal risk to pedestrians on industrial sites with the most demanding operating conditions.
    [Show full text]
  • Westconnex New M5 Environmental Impact Statement
    15 Social and economic This chapter outlines the potential social and economic impacts associated with the project. A detailed social and economic impact assessment has been undertaken for the project and is included in Appendix M. The Secretary of the NSW Department of Planning and Environment (DP&E) has issued a set of environmental assessment requirements for the project; these are referred to as Secretary’s Environmental Assessment Requirements (SEARs). Table 15-1 sets out these requirements as they relate to social and economic matters, and identifies where they have been addressed in this environmental impact statement (EIS). Table 15-1 SEARs – social and economic SEAR Where addressed A description of the existing socio-economic environment. Section 15.2 Social and economic impacts to businesses and the community within Section 15.3 the vicinity of the proposal, with associated property acquisition, traffic, access, property, public domain and open space, and amenity and health related changes (including the broader regional impacts associated with the closure of the Alexandria landfill site should this be part of the proposal). An assessment of the impact of the proposal on community facilities, Section 15.3 including open space and recreational facilities. The assessment must include the use of existing facilities impacted by the proposal, and options and opportunities for the relocation and / or reconfiguration of the community facilities, both temporary and permanent. Impacts on directly affected properties and land uses, including impacts Section 15.3 related to access, land use, settlement and subsidence associated with tunnel excavation, property acquisition (including relocations and Chapter 13 (Land use and expenses for those properties acquired) and amenity related changes.
    [Show full text]
  • Temporary Construction Site: Victoria Road, Rozelle
    Community Update July 2018 Western Harbour Tunnel Temporary construction site: Victoria Road, Rozelle Western Harbour Tunnel is a The NSW Government has now major transport infrastructure A temporarily tunnelling site for Western Harbour Tunnel is released the proposed project project that makes it easier, proposed adjacent to Victoria reference design and there will faster and safer to get around Road, Rozelle. be extensive community and Sydney. This site is only needed stakeholder engagement over the temporarily and no major coming months. As Sydney continues to grow, our permanent facilities will be located transport challenge also increases We now want to hear what here. The site will be left clear for you think about the proposed and congestion impacts our future urban renewal. economy. reference design. Roads and Maritime recognises Your feedback will help us further While the NSW Government actively the importance of this site as refine the design before we seek manages Sydney’s daily traffic the home of the Balmain Tigers demands and major new public Leagues Club and will work with planning approval. transport initiatives are underway, it’s all parties concerned. There will be further extensive clear that even more must be done. community engagement once the Seaforth Spit Bridge Environmental Impact Statement Western Harbour Tunnel will provide is on public display. Northbridge a new motorway tunnel connection Balgowlah Heights Artarmon across Sydney Harbour between Seaforth Rozelle and the Warringah Freeway Spit Bridge near North Sydney. Northbridge Balgowlah Heights Artarmon It will form a new western bypass Lane Cove of the Sydney CBD, providing an Cammeray Ernest St alternative to the heavily congested St Leonards Mosman Falcon St Sydney Harbour Bridge, Western Lane Cove Crows Nest OFF Cremorne Distributor and Anzac Bridge.
    [Show full text]
  • Draft Draft Draft Draft Draft Draft
    M4 Motorway from Mays Hill to Prospect DRAFTBefore andDRAFT after opening ofDRAF the T M4 Motorway from Mays Hill to Prospect Sydney case studies in induced traffic growth Michelle E Zeibots Doctoral Candidate Institute for Sustainable Futures University of Technology, Sydney PO Box 123 Broadway NSW 2007 Australia [email protected] www.isf.uts.edu.au tel. +61-2-9209-4350 fax. +61-2-9209-4351 DRAFT WorkingDRAFT Paper DRAFT Sydney case studies in induced traffic growth 1 M4 Motorway from Mays Hill to Prospect The original version of this data set and commentary was completed in May 1997 and presented in two parts. These DRAFTwere: DRAFT DRAFT 1. Road traffic data for western Sydney sector arterials: Great Western Highway and M4 Motorway 1985 – 1995 2. Rail ticketing data and passenger journey estimates for the Western Sydney Rail Line 1985 – 1995 These have now been combined and are presented here as part of an ongoing series of case studies in induced traffic growth from the Sydney Metropolitan Region. In the first, report which focussed on road traffic volumes, an error was made. The location points of road traffic counting stations were incorrect. Although this error does not affect the general conclusions, details of some of the analysis presented in this version are different to that presented in the original papers listed above. Some data additions have also been made, and so the accompanying commentary has been expanded. Acknowledgements During the collation of this data Mr Barry Armstrong from the NSW Roads & Traffic Authority provided invaluable information on road data collection methods as well as problems with data integrity.
    [Show full text]