Florida Department of Transportation RON DESANTIS 1000 NW 111 Avenue KEVIN J

Total Page:16

File Type:pdf, Size:1020Kb

Florida Department of Transportation RON DESANTIS 1000 NW 111 Avenue KEVIN J Florida Department of Transportation RON DESANTIS 1000 NW 111 Avenue KEVIN J. THIBAULT, P.E. GOVERNOR Miami, FL 33172 SECRETARY ADDENDUM NO. 2 DATE: July 7, 2020 TO: PROPOSERS FROM: Suzanne Diaz Procurement Officer District Six RE: Proposal No.: DOT -RFP-21-6176SD FIN No.: 446829-1-72-01 Counties: Miami-Dade & Monroe Work Description: Availability-based Maintenance Services to the District Six Transportation Systems Management and Operations (TSM&O) Assets on Interstate 195 (I- 195) I. BELOW PLEASE FIND THE ANSWERS TO QUESTIONS RECEIVED FROM PROSPECTIVE PROPOSERS ON THIS PROJECT Questions Response 1. Can the Department provide the monthly system 1. Availability reports are attached. uptime/availability reports for I-195 ITS devices/assets during the past 12 months? 2. Can the Department provide the detailed history for the 2. Attached please see the requested maintenance trouble tickets with I-195 ITS devices/assets during the tickets past 12 months? www.fdot.gov 3. Section 5.2.3.3 Other Repairs that may need 3. The Contractor must refer to applicable sections diagnostic services states: of Exhibit A, Scope of Services, where the If a fiber is cut, it is the responsibility of the ITS Contractor's responsibilities for this type of incidents Maintenance contractor to provide a permanent repair to are described. replace from end-butt splice to end-butt splice. This is a The described scenario is highly unlikely to occur. very expensive repair that more than likely would have The Contractor must consider this when preparing been caused by a vehicle accident, vandalism, or a third- the Bid Price Proposal. party contractor working in the area. If the “at fault” individual or contractor cannot be found or they do not provide funding for the permanent repair, will the Department hold the ITS maintenance contractor responsible for the cost associated with this magnitude of a fiber replacement? 4. In Exhibit A page 5 it states, “The Contractor shall 4. The request could be accommodated if conditions submit all documentation specified in this Contract do not warrant a safe submittal of hard copies at that including but not limited to reports, plans, studies, time. dashboards, agendas, and meeting minutes for the Department’s review and approval as per the below requirements: • All submittals shall be sent to the Department staff (as specified by the Department) via email; • All submittals shall be uploaded into Operations Task Manager (OTM); • All submittals shall be saved in a network drive specified by the Department; and • Three (3) hard copies of all submittals shall be delivered to the Department. “ Since the health and well-being of our employees is of utmost importance and we are living in a virtual world based on the recent events with COVID-19, would the Department be willing to forgo the three hard copies delivered to the Department and allow the submittals to just be electronic via email, OTM and saved to the network drive? 5. In Section 7.3 Software it indicates what software the 5. The Department does not envision the need for contractor is responsible for procuring on this project. additional software other than what is described in However, there is a bullet that says “Other software as Section 7.3 for the performance of the work. requested by the Departmen.t” This is vague and depending on the software, it can be quite expensive to procure and may need multiple licenses. Would the Department please provide a clear list of all software required by the contractor for this project? 6. Under Section 1.1 (Asset Type Descriptions) in the 6. The location of the Hub Building is shown in the Scope of Services, Table 1.1-1 existing TSM&O Assets ITS as-built plans provided as an Appendix. on I-195 shows only one (1) Communication Hub Building as part of the assets to maintain by the awarded contractor under this RFP. Please confirm the location of this Hub Building is located just east of I-95 adjacent to I- 195/SR112. DOT -RFP-21-6176SD Page 2 of 5 ADDENDUM #2 July 07, 2020 7. Is the I-195 Hub located just south of SR-112 and West 7. Please refer to the Appendices provided with the of I-95 connected to the fiber backbone and does the RFP. As stated in Exhibit A, Scope of Services, the switch within this Hub Shelter have any available copper Contractor will not be responsible for maintenance of or fiber ports? the existing Layer 3 Hub switch. 8. Since it is the responsibility of the awarded contractor 8. The Contractor must be in possession of the to daily maintain both the ITS devices as well as the required licenses and certifications as set forth in the electrical components providing power to the ITS RFP and Exhibit A, Scope of Services. The elements, would the Department please verify that the Contractor shall be required to submit proof of all the prime contractor must possess a Florida Electrical required licenses and certifications along with the Contractor’s license or would a subcontractor be able to Technical Proposal. fulfill that qualification even though the subcontractor may not perform maintenance activities required on any of the ITS electrical components? 9. Two (2) of our key staff members have pre-planned 9. Oral Interviews will take place as indicated in the RFP. vacations August 15th – 23rd. Would the Department be amenable to holding interviews the week of August 10th or the week of August 20th in order for their participation? 10. Can the Department provide all OTM tickets and 10. Attached are the maintenance tickets for the last corresponding repairs on the Project corridor within the 12 months. last 12 months? 11. Can the Department provide all the invoice payments 11. The requested information will not assist the to current ITS Maintenance Contractor for the project Contractor in preparing the Technical and Price corridor within the last 12 months? Proposal for this contract. The requested information cannot be disclosed. 12. Can the Department provide all the penalties/fines 12. The requested information will not assist the assess to current ITS Maintenance Contractor for the Contractor in preparing the Technical and Price project corridor within the last 12 months? Proposal for this contract. The requested information cannot be disclosed. 13. Can the Department provide the names of the TRC 13. TRC members are as follows: for this Bid? - Sergio Bravo - Alejandro Motta - Paola Martinez 14. Can the Department Provide the name the nominated 14. The FDOT PM is Sergio Bravo. FDOT PM for this contract? 15. Can the Department advise who will be responsible to 15. The Contractor must refer to applicable sections do Utility Locating Services for the ITS infrastructure of Exhibit A, Scope of Services regarding associated to this contract. Contractor's responsibilities in this regard. 16. Can the Department provide the last provide the last 16. The requested information is not readily available report showing the warranty expiration date for available. the existing TSM&O Assets on I-195 included in this contract. DOT -RFP-21-6176SD Page 3 of 5 ADDENDUM #2 July 07, 2020 17. Can the Department confirm that the Contractor will 17. The Contractor must refer to applicable sections not bear the risk of loss (vandalism, theft, Acts of God, of Exhibit A, Scope of Services. third party damages, etc.) of the ITS equipment on the field? 18. As per section 5.10.3 of Exhibit A Scope of Services, 18. The Department's goal is for the system to “Contractor staff whose primary function is performing operate at or above the availability requirements. work associated with this Contract shall be located within The Contractor must determine the appropriate the geographic coverage area designated by the coverage area in order to meet the response Department”. Can the Department better clarify this requirements at all times during the term of the geographic coverage area, and if this requirement also Contract. applies to after regular working hours. 19. As per section 5.10.3.1 of Exhibit A Scope of 19. The Contract Project Manager will be on-site. Services, can the Department confirm that in addition to Additional staff members will not be based at the the Contract Project Manager we can have additional SunGuide TMC. supporting staff on-site located at the TMC? 20. RFP states that this contract can be renewed for 3 20. The Department does not envision the renewal additional years. Can the Department please clarify if the of the Contract at this time. option to extend the subcontract for 3 years will be mutually agreed upon between the Department and the Contractor? Will be the Contractor be entitled to increase the subcontract prices those 3 years? 21. Section 5.2.3.3.2 of Exhibit A Scope of Services 21. The Contractor must refer to applicable sections indicate that for third party damages Contractor will of Exhibit A, Scope of Services. provide pertinent information to the Department cost recovery. Can the Department confirm that the Department has property insurance for the TSM&O Assets on I-195 and Contractor repair works will be covered through such insurance for third party damages, theft, vandalism, etc. or otherwise can the Department clarify how those repairs will be compensated to Contractor?. 22. Can the Department please provide all the warranties 22. Please refer to Section 5.4.4 of Exhibit A, Scope related information for the project corridor site? Can the of Services, for Parts Repair Process and Warranty ITS maintenance contractor use the warranties? Tracking. 23. The Contract Scope and Price Proposal requires that 23.
Recommended publications
  • Miami Beach Intermodal Hubs Feasibility Study Final Report
    Miami Beach Intermodal Hubs Feasibility Study Miami Beach Miami Beach Intermodal Hubs FeasibilityIntermodal Study Hubs Feasibility Study Tasks 1 and 2 Partial Report February 2018 Prepared for November 2017 City of Miami Beach Transportation Department Prepared by Page | i Miami Beach Intermodal Hubs Feasibility Study Miami Beach Intermodal Hubs Feasibility Study Final Report Prepared for: City of Miami Beach Transportation Department Prepared by: February 2018 Miami Beach Intermodal Hubs Feasibility Study Miami Beach Intermodal Hubs Feasibility Study Table of Contents Section Page 1.0 Introduction ..................................................................................................................... 1 1.1 Overview of Intermodal Transit Centers ....................................................................... 1 1.2 Study Area ................................................................................................................... 2 2.0 Purpose and Need .......................................................................................................... 4 2.1 Project Purpose ........................................................................................................... 4 2.2 Need for the Project ..................................................................................................... 4 3.0 Study Background ........................................................................................................... 6 3.1 Relevant Studies .........................................................................................................
    [Show full text]
  • Toll Roads in the United States: History and Current Policy
    TOLL FACILITIES IN THE UNITED STATES Bridges - Roads - Tunnels - Ferries August 2009 Publication No: FHWA-PL-09-00021 Internet: http://www.fhwa.dot.gov/ohim/tollpage.htm Toll Roads in the United States: History and Current Policy History The early settlers who came to America found a land of dense wilderness, interlaced with creeks, rivers, and streams. Within this wilderness was an extensive network of trails, many of which were created by the migration of the buffalo and used by the Native American Indians as hunting and trading routes. These primitive trails were at first crooked and narrow. Over time, the trails were widened, straightened and improved by settlers for use by horse and wagons. These became some of the first roads in the new land. After the American Revolution, the National Government began to realize the importance of westward expansion and trade in the development of the new Nation. As a result, an era of road building began. This period was marked by the development of turnpike companies, our earliest toll roads in the United States. In 1792, the first turnpike was chartered and became known as the Philadelphia and Lancaster Turnpike in Pennsylvania. It was the first road in America covered with a layer of crushed stone. The boom in turnpike construction began, resulting in the incorporation of more than 50 turnpike companies in Connecticut, 67 in New York, and others in Massachusetts and around the country. A notable turnpike, the Boston-Newburyport Turnpike, was 32 miles long and cost approximately $12,500 per mile to construct. As the Nation grew, so did the need for improved roads.
    [Show full text]
  • The Patapsco Regional Greenway the Patapsco Regional Greenway
    THE PATAPSCO REGIONAL GREENWAY THE PATAPSCO REGIONAL GREENWAY ACKNOWLEDGEMENTS While the Patapsco Regional Greenway Concept Plan and Implementation Matrix is largely a community effort, the following individuals should be recognized for their input and contribution. Mary Catherine Cochran, Patapsco Heritage Greenway Dan Hudson, Maryland Department of Natural Resources Rob Dyke, Maryland Park Service Joe Vogelpohl, Maryland Park Service Eric Crawford, Friends of Patapsco Valley State Park and Mid-Atlantic Off-Road Enthusiasts (MORE) Ed Dixon, MORE Chris Eatough, Howard County Office of Transportation Tim Schneid, Baltimore Gas & Electric Pat McDougall, Baltimore County Recreation & Parks Molly Gallant, Baltimore City Recreation & Parks Nokomis Ford, Carroll County Department of Planning The Patapsco Regional Greenway 2 THE PATAPSCO REGIONAL GREENWAY TABLE OF CONTENTS 1 INTRODUCTION .................................................4 2 BENEFITS OF WALKING AND BICYCLING ...............14 3 EXISTING PLANS ...............................................18 4 TREATMENTS TOOLKIT .......................................22 5 GREENWAY MAPS .............................................26 6 IMPLEMENTATION MATRIX .................................88 7 FUNDING SOURCES ...........................................148 8 CONCLUSION ....................................................152 APPENDICES ........................................................154 Appendix A: Community Feedback .......................................155 Appendix B: Survey
    [Show full text]
  • Beach Corridor Preliminary Engineering Report
    Preliminary Engineering Report First Draft For the Beach Corridor Rapid Transit Project Project Development and Environment (PD&E) Study Prepared for: MIAMI-DADE DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS Prepared by: Parsons Corporation January 2020 DRAFT Preliminary Engineering Report Beach Corridor Rapid Transit Project Table of Contents PROJECT SUMMARY ................................................................................ 7 1.1. INTRODUCTION ............................................................................................................................... 7 1.2. STUDY AREA .................................................................................................................................... 7 1.3. PURPOSE & NEED ........................................................................................................................... 8 1.4. PROJECT CORRIDOR AND SUB-AREAS ..................................................................................... 10 1.5. PROJECT HISTORY ....................................................................................................................... 10 1.6. COMMITMENTS .............................................................................................................................. 11 1.7. LIST OF TECHNICAL DOCUMENTS ............................................................................................. 12 EXISTING CONDITIONS & ENVIRONMENTAL CONSIDERATIONS .... 14 2.1. INTRODUCTION ............................................................................................................................
    [Show full text]
  • Greater Downtown Miami Annual Residential Market Study Update
    Greater Downtown Miami Annual Residential Market Study Update Prepared for the Miami Downtown Development Authority (DDA) by Integra Realty Resources (IRR) February 2016 Greater Downtown Miami Annual Residential Market Study Update Prepared for the Miami Downtown Development Authority (DDA) by Integra Realty Resources (IRR) February 2016 For more information, please contact IRR-Miami/Palm Beach The Douglas Centre 2600 Douglas Road, Suite 801 Coral Gables, FL 33134 305-670-0001 [email protected] Contents 2 Key Q1 2016 Conclusions 5 Greater Downtown Miami Market Submarket Map 6 Greater Downtown Miami Condo Pipeline 7 Greater Downtown Miami Market Sizing 8 Greater Downtown Miami Market Condo Delivery and Absorption of Units 10 Current Selling Projects 11 Analysis of Resale 12 Current Resale vs. New Product Pricing $/SF 13 Presale Absorption 14 Currency Exchange and Purchasing Power 16 Submarket Analysis 21 Market Drivers 22 Major Market Comparison 23 Residential Rental Activity 26 Conventional Rental Market Supply 28 Land Prices Trends 30 Occupancy 31 Leverage Analysis 33 Conclusion 34 Condo Development Process Appendix Key Q1 2016 Conclusions Integra Realty Resources – Miami/Palm Beach (IRR-Miami) is pleased to present the following Residential Real Estate Market Study within the Miami Downtown Development Authority’s (Miami DDA) market area, defined as the Greater Downtown Miami market. This report updates IRR-Miami’s findings on the local residential real estate market through January 2016. Findings from this year’s annual study are outlined as follows: • New product preconstruction pricing responded to a slower 2015 selling season. Projects which were 80% or more sold-out by Q1-2015 raised prices on average 5%-15%, and projects which were less than 80% sold out dropped pricing or increased broker incentives, or both, to increase market Millicento share.
    [Show full text]
  • NW/NE 36Th Street Study Final Report, June 2007
    NW/NE 36th Street Study FINAL REPORT Prepared for: Miami-Dade County Metropolitan Planning Organization (Miami-Dade MPO) Prepared by: Kimley-Horn and Associates, Inc. Fort Lauderdale, Florida ©2007 Kimley-Horn and Associates, Inc. Work Order # GPC III-05 June 2007 NW/NE 36th Street Study EXECUTIVE SUMMARY Introduction NW/NE 36th Street is an important east-west mobility corridor in the City of Miami. The corridor is designated as SR 25 and US 27. This corridor and the adjacent areas have experienced unprecedented growth over the past few years, which is expected to continue over the next several years as large projects, such as Midtown Miami, become occupied. However, the positive aspects of redevelopment come with challenges as well. Maintaining mobility at an acceptable level is critical to the surrounding residential communities, employment areas, businesses, and activity centers. The objective of this study was to develop and evaluate mobility enhancement alternatives along the NW/NE 36th Street corridor in the study area bound by NW/NE 54th Street to the north, NW/NE 20th Street to the south, I-95 to the west, and Biscayne Bay to the east. The NW/NE 36th Street Study performs a review of existing and future traffic conditions and makes recommendations on how to enhance mobility in the study area. A primary purpose of this study was to evaluate the impact of increased demand on the area’s transportation network and to make recommendations on how to accommodate the increase in future traffic. Study Area The boundaries of the NW/NE 36th Street Study are defined as NW/NE 54th Street to the north, NW/NE 20th Street to the south, NW 7th Avenue/S.R.
    [Show full text]
  • Advancing Racial Equity Through Highway Reconstruction
    VANDERBILT LAW REVIEW ________________________________________________________________________ VOLUME 73 OCTOBER 2020 NUMBER 5 ________________________________________________________________________ ARTICLES “White Men’s Roads Through Black Men’s Homes”*: Advancing Racial Equity Through Highway Reconstruction Deborah N. Archer** Racial and economic segregation in urban communities is often understood as a natural consequence of poor choices by individuals. In reality, racially and economically segregated cities are the result of many factors, * “White men’s roads through black men’s homes” was the mantra of a coalition led by Reginald M. Booker and Sammie Abbott in opposition to highway development in Washington, D.C. See Harry Jaffe, The Insane Highway Plan that Would Have Bulldozed DC’s Most Charming Neighborhoods, WASHINGTONIAN (Oct. 21, 2015), https://www.washingtonian.com/2015/10/21/the- insane-highway-plan-that-would-have-bulldozed-washington-dcs-most-charming-neighborhoods/ [https://perma.cc/6YCR-PKKR] (discussing the campaign to halt the building of highways in Washington, D.C.). ** Associate Professor of Clinical Law and Co-Faculty Director of the Center on Race, Inequality, and the Law, New York University School of Law. I thank Rachel Barkow, Richard Buery, Audrey McFarlane, Michael Pinard, Russell Robinson, Sarah Schindler, Tony Thompson, Kele Williams, and Katrina Wyman for helpful comments on earlier drafts. I also appreciate the insights I received from participants of faculty workshops at Brooklyn Law School and the University of Miami School of Law and participants at the 2019 Clinical Law Review Workshop at NYU Law School. I am grateful to Nelson Castano, Anna Applebaum, Michael Milov-Cordoba, and Rachel Sommer for their research assistance and to Sarah Jaramillo for her constant support of my research.
    [Show full text]
  • Concept Report I
    TABLE OF CONTENTS EXECUTIVE SUMMARY ................................................................................................................................ ES-1 SECTION - 1 INTRODUCTION ................................................................................................................ 1-1 1.1 PROJECT CONCEPT DESCRIPTION ............................................................................................................. 1-1 1.2 PROJECT LOCATION AND LOGICAL TERMINI ............................................................................................ 1-2 SECTION - 2 PROJECT NEED ................................................................................................................. 2-1 2.1 PROJECT JUSTIFICATION ........................................................................................................................... 2-1 2.2 PROJECT OBJECTIVES ............................................................................................................................... 2-1 2.3 PURPOSE AND NEED ................................................................................................................................ 2-3 SECTION - 3 STUDY APPROACH AND SCHEDULE ............................................................................. 3-1 3.1 DESIGN CRITERIA ...................................................................................................................................... 3-1 3.2 CONSTRAINTS ..........................................................................................................................................
    [Show full text]
  • The Sandwich Local Comprehensive Plan Reflections & Directions
    Local Comprehensive Plan Town of Sandwich, MA LOCAL COMPREHENSIVE PLAN CONTRIBUTORS The Sandwich Local Comprehensive Plan Reflections & Directions Funding Sources The LCP Update project was made possible through a state grant from the Massachusetts Office of Transportation & Tourism received by the Cape Cod Canal Region Chamber of Commerce in cooperation with the Sandwich Chamber of Commerce, a grant from Barnstable County acting through the Cape Cod Economic Development Council, and the Town of Sandwich. Sandwich Local Planning Committee Robert Jensen, Chair Taylor White, Vice Chair Aleta Barton Kate Bavelock Tim Cooney Susan R. James Linell Grundman John G. Kennan Doug Lapp Trish Lubold Kevin O’Haire Marie Oliva Frank Pannorfi Glenn Paré David Sullivan Barbara Shaner Ralph Vitacco Sharon Gay, Grants Administrator, STG Consultants Sandwich Board of Selectmen Linell Grundman, Chair Frank Pannorfi John G. Kennan Randal Hunt Dana P. Barrette Tom Keyes, Past Chairman Sandwich Planning Board Amy Lipkind, Chair Taylor White, Vice-Chair Joseph Vaudo Daniel Marsters Ralph Vitacco Richard Claytor May 2009 Local Comprehensive Plan Town of Sandwich, MA Sandwich Town Departments George Dunham, Town Manager Doug Lapp, Assistant Town Manager Gregory M. Smith, Planning Director, Office of Planning and Development Marie Buckner, Director, Human Resources Susan Flynn, Tax Collector Doreen Guild, Town Accountant Donna Boardman, Building Commissioner Skip Tetreault, Buildings and Grounds, Sandwich School Department Rick Reino, Business Manager, Sandwich School Department George Russell, Chief, Fire Department Mike Miller, Chief, Police Department Craig Mayer, Town Treasurer John Johnson, Director of Golf, Sandwich Hollows Golf Course Richard Connor, Director, Sandwich Public Library Edward L. Childs, Principal Assessor, Assessor’s Office Janet Timmons, Director, Council on Aging Paul S.
    [Show full text]
  • Interchange Report CONTENTS NOTES Interstates Page Some Interchanges Are Complex
    Florida Department of Transportation Interchange Report CONTENTS NOTES Interstates Page Some interchanges are complex. I-4 2 This listing locates most I-10 3 interchanges at their centers or at I-110 5 the main cross road. It does not I-75 5 attempt to locate individual I-175 7 ramps. I-275 7 I-375 8 Not all of the expressways are I-95 8 operated by the Florida Department I-195 11 of Transportation (FDOT). Some are I-295 11 operated, all or in part, by I-395 12 expressway authorities. I-595 12 Expressways: Florida's Turnpike Page DEFINITIONS Florida's Turnpike Stub—SR-91 13 Florida's Turnpike & Extension—SR-91 and 821 13 Road ID and M.P. (mile point) are identifiers used internally by FDOT. Expressways: Southeast Page Cum. Miles (Cumulative Miles from Airport Expressway—SR-112 15 the start of the roadway) are Dolphin Expressway—SR-836 15 approximately the same as the Dolphin Expressway Extension, East-Bound—SR-836 16 numbers on the small green mile post signs along Interstate highways Dolphin Expressway Extension, West-Bound—SR-836 16 and many expressways. Don Shula Expressway—SR-874 16 Gratigny Parkway—SR-924 16 Road Number is the Interstate, US, Palmetto Expressway—SR-826 16 SR, or CR number (if any) of the cross road(s) at the interchange. Sawgrass Expressway—SR-869 17 Snapper Creek Expressway—SR-878 17 Road Name is the local name of the cross road(s) at the interchange. It Expressways: West-Central Page may be the same road shown with a Lee Roy Selmon-Crosstown Expressway—SR-618 18 Road Number, or it may be a different road.
    [Show full text]
  • Overall Corridor Report I-195 Corridor Planning Study
    OVERALL CORRIDOR REPORT I-195 CORRIDOR PLANNING STUDY I-95/NW 12TH AVENUE TO ALTON ROAD MIAMI-DADE COUNTY, FLORIDA FINANCIAL MANAGEMENT NUMBER: 440228-1-22-01 Prepared for: PREPARED BY: BCC ENGINEERING, LLC 6401 SW 87TH AVENUE, SUITE 200 MIAMI, FLORIDA 33173 PREPARED ON: JUNE 2020 REVISED: SEPTEMBER 2020 OVERALL CORRIDOR REPORT I-195 Corridor Planning Study Project Study Limits: I-95/NW 12th Avenue to Alton Road Miami-Dade County, Florida Financial Management Number: 440228-1-22-01 Prepared for: Prepared by: BCC Engineering, LLC 4901 NW 17th Way, Suite 506 Fort Lauderdale, FL 33309 September 2020 I-195 Corridor Planning Study | Overall Corridor Report Septmeber 2020 EXECUTIVE SUMMARY The purpose of the I-195 Corridor Planning Study (CPS) was to evaluate existing conditions and deficiencies, identify needs as well as develop and evaluate improvement concepts. Study interchanges were evaluated along with interchange influence areas, and ramp junctions to identify deficiencies focusing on recurring bottlenecks. From this review, a series of base Improvements were developed to address specific operational deficiencies and/or local issues raised by stakeholders as well as system improvement alternatives to address key study objectives related to improving system linkage, system capacity, accommodating future transportation demand, modal interrelationships, and provide better safety outcomes. The study also evaluated the feasibility of providing protected bicycle/pedestrian connections between the City of Miami Beach and the City of Miami. This overall corridor report (OCR) for the I-195 CPS, summarizes the efforts undertaken through data gathering, as well as a rigorous analysis of existing and future conditions within the study area to identify and evaluate alternatives that can be further developed in the next Project Development & Environment (PD&E) phase of the project.
    [Show full text]
  • Toll Facilities in the United States
    TOLL FACILITIES IN THE UNITED STATES Bridges - Roads - Tunnels - Ferries January 2016 Publication No: FHWA-PL-16-011 Internet: http://www.fhwa.dot.gov/policyinformation/tollpage/ LIST OF ABBREVIATIONS AND ACRONYMS Auth Authority Jct Junction Ave Avenue Mi Mile AVI Automatic Vehicle Identification Mtn Mountain Brdg Bridge NHS National Highway System BC British Columbia, Canada NS Nova Scotia, Canada Cnty County ON Ontario, Canada Co Company Pkwy Parkway Com Commission Rd Road Const Construction Rdway Roadway Corp Corporation Sec Section Dept Department Serv Service Dev Development SH State Highway Dist District St Street Dr Drive Sys System Env Environmental TEA-21 Transportation Equity Act for the st ETC Electronic Toll Collection 21 Century Expway Expressway TIRIS Texas Instruments Registration Ext Extension Identification System FHWA Federal Highway Administration Traf Traffic Hazmat Hazardous Materials Trans Transportation Hwy Highway Trnpke Turnpike Id Identification US United States Internatl International Veh Vehicle IS Interstate System Vet Veteran 4R Resurfacing, Restoring ISTEA Intermodal Surface Transportation Efficiency Act Rehabilitation, Reconstruction Toll Roads in the United States: History and Current Policy History The early settlers who came to America found a land of dense wilderness, interlaced with creeks, rivers, and streams. Within this wilderness was an extensive network of trails, many of which were created by the migration of the buffalo and used by the Native American Indians as hunting and trading routes. These primitive trails were at first crooked and narrow. Over time, the trails were widened, straightened and improved by settlers for use by horse and wagons. These became some of the first roads in the new land.
    [Show full text]