Customer Success Story: Market segment Hospital District Healthcare

New UPS and supercapacitor technology at the heart of hospital

Location: Background The most important reason TAYS, University Hospital, “The most important for the installation of The Pirkanmaa Hospital District Tampere supercapacitor UPSs was for reason for the (PSHP) worked with Eaton their ability to enable peak to install modern UPSs with Challenge: shaving for the generators and installation of supercapacitor technology Peak shaving towards emergency the grid. As a bonus, they also to ensure uninterruptible generators and grid supercapacitor UPSs provide traditional UPS support. operation of hospital imaging The power and back-up power Solution: devices. was their ability for requirements in hospitals have Three paralleled 300 kVA grown more critical alongside Supercapacitor UPSs peak shaving. As In the first phase of the project, Eaton Power Quality hospitals use of electric Results: a bonus they also Oy, which manufacturers UPS equipment and ICT. equipment in , delivered Continuation of operation is “At first, we had planned to provide traditional UPS one 300 kVA UPS with of paramount importance and use DRUPS devices, whereby supercapacitors into Pirkanmaa confidence in the functioning of support.” a diesel rotary generator Hospital District’s cardiology this technology is now proven. powers a UPS. However, Juhani Jauhiainen, hospital engineer, department. In the second Without the supercapacitors, the reduced maintenance Pirkanmaa Hospital District phase, two more UPSs of the this solution would not have from a supercapacitor UPS, been chosen. same capacity will be delivered combined with higher to the hospital. All three UPSs efficiency, convinced us to will then be connected take the opportunity that new in parallel. capacitor technology provides During the project, the in feeding the demanding load hospital also installed a further equipment.” Eaton 300 kVA UPS with “We trusted that a carefully supercapacitors to secure designed and manufactured uninterrupted operation of product would lead to a reliable the Computed Tomography solution. In addition, the (CT) scan in the emergency chance to replace traditional department. Consequently, lead batteries with new the hospital will have a total maintenance-free and longer- of 1.2 MVA power from the lasting technology contributed supercapacitor UPSs. to the decision.” Hospitals always have back-up Juhani Jauhiainen, hospital generators available; in this engineer, Pirkanmaa Hospital case, PSHP’s UPS system District. will be fed by three 1 MVA generators, if necessary. Challenge Solution Surgery in hospitals is Patient safety is everything. performed with the support of Beyond the large UPSs, CT, computer-based imaging there are imaging devices, devices. Open surgeries are elevators, security systems reduced all the time. This and other devices that need emphasizes the role of the UPS protection. In the past, UPS; if the surgeon’s operating the hospital’s imaging devices screen goes blank during were not even connected to surgery, it is impossible to the emergency generators continue. The UPS supplies because of the power surges the rated power of the CT that occur while doing devices. At the same time, imaging, which could have the supercapacitors supply jeopardized the entire electricity the current peaks of the CT supply from the generator. device imaging function and Consequently, this project has thus also help the emergency delivered a huge improvement, generator. “We are better able thanks to three large UPSs to implement grid protection with supercapacitors that are when we don’t need to take N + 1 connected, i.e. with into account those CT peaks,” redundancy planned into the says Jauhiainen. system. The most challenging in Eaton was chosen largely hospitals is to guarantee because of the hospital’s past the 24/7 operation. Not all experience with the company, activities require this, but so not to mention its heritage built many systems do, that all over 56 years of making UPSs activities need to be organized in Espoo (Finland). According on their basis. Hospitals have to Jauhiainen, “Eaton was operational processes that also chosen because of the staff needs to manage and reliability of its UPSs and the understand. This also means fact that their maintenance and that choice of the device needs technical support have always to be carefully considered, worked well and skillfully. There in order to obtain functional, has always been help available, manageable and practical when it was needed.” Results different electricity supplies, but it also has to be able to systems. Preventive maintenance as a Jauhiainen added that “It is maintain the operations using philosophy is very important The hospital’s 24/7 operation also important that there is a power from the generators. also poses challenges for high degree of domesticity in in hospitals. One cannot wait technical personnel in terms that the closer the supplier’s for failures before starting The Eaton Power Xpert 9395P of maintenance and testing. culture is to your own, the maintenance work. Advanced UPS with supercapacitors has The planning of controlled more confidence you have in planning is very important; been supplying the CT imaging one or two-hour breaks in the the supplier.” all service interruptions are for over a year now. agreed in advance so that hospital’s power supply has “We have positive experiences every member of the hospital to be done well in advance and have eagerly followed the team can be prepared for because of the reliance on IT operation of supercapacitors them. When the equipment equipment, which means that from the beginning of the is needed it must work. The breaks must be planned in installation. Because of the medical profession dictates that accordance with surgeries and cyclic nature of the load, we patients should not be exposed other operations. Above all, did not believe in battery power to hazardous situations and it the IT team must make sure in CT. Continuity of operations does not make allowances for there is no interruption of other is of paramount importance extraordinary circumstances, functions at the same time, for and the confidence in the such as should the whole example if there is a controlled functionality of this technology sub-region not have electricity power outage, there should be is now proven. Without a for days or even weeks. The no interruption to the heating or capacitor option, this solution hospital must prepare for these water supply at the same time. would not have been chosen,” situations, despite their rarity. said Juhani Jauhiainen. Of course, the hospital has

Eaton EMEA Headquarters Route de la Longeraie 7 1110 Morges, Switzerland Eaton.eu Follow us on social media to get the © 2019 Eaton Eaton is a registered trademark. latest product and support information. All Rights Reserved Publication No. CS153086EN All other trademarks are property February 2019 of their respective owners.