<<

to fillwithwater. order in top the at valve venting a and the valve, an additional ball valve must be fitted below foot a include not does line suction the If water. with filling external by or resistant be achieved with the aid of an ejector, a chemically nected to the siphon via a suction tubing. It can also with the aid of a hand-operated con- achieved is this cases, simple In liquid. with filled simultaneously and evacuated is line suction The est pointofthesuctionlineviaa T-piece. storage tank. The siphon is connected to the high the outside downwards leading line suction the to connected is which flange a with fitted is tank cal in thechemi- pipe The upperendoftheimmersion Principle ofoperation siphon lineabovethetank). vent or off (shut wear to due ruptures diaphragm the if tank storage the from leakages prevent to taken precautions and noted be must particular in The maximum inflow of diaphragm manually orautomatically. controlled be can siphon the in level liquid The inflow.with operates pump the and siphon this in here, at the highest point, as long accumulate as there is liquid then will line suction the in bubbles All width. nominal large with line suction the tor for gas bubbles (siphon) at the highest point of suction valve, it is advisable to install an accumula- place and a positive pressure builds up at the pump takes actually process siphoning this that ensure “overboard” and thus cause the liquid to siphon. To the suctionline is alsolimited,itusefultoinstall Moreover, since the suction “inflow”.lift of a with metering pump pump metering the supply to and below from liquids pollutant for tank a tap to sible concomitant regulations frequently make it impos- The new law on water resources management and General Part No.13333386 3-rod electrodeandlevelrelay onrequest. solenoid valve, non-return valve inthe vacuum line, ejector, with siphon the in control level Automatic medium byadeviceinsertedinthetankinfeed. splashing against protected is It here. connected is pump vacuum The top. the at connection ing tub - with valve venting the and housing siphon the of bottom the at located is connection screw The PVC. transparent of made is housing The Siphon - Hand-operated vacuumHand-operated pump Part No.13333387 pump mustpointdownwardsduringevacuation. prevents a backflow of entrained air. The tip of the located atthetipofpump. A is non-returnvalve tubing suction the fitting for nozzle hose The The PVCpumpisresistanttochemicalvapours. Hand-operated vacuumpump Siphon Ø49

500 MB 13304/ 11.11

Siphon & Vacuum Pump 11.11 Hand-operated pump vacuum Leakage probe Metering pump Suction line Immersion pipe Shutoff valve Shutoff or leakages prevent to valve venting Shutoff valve Shutoff Shutoff valve Shutoff Dirt trap PDS if required the siphoning process. The liquid in the siphon the siphoning process. as tank the into back drops pipe immersion and air streams in through the venting valve. vacuum pump is able to build density up and pump the vacuum height, required Tank vacuum. of the liquid must be carefully matched (D p = d x g x D h). if a leakage is indicated or shut off above the tank, within the range of the containment tank (solenoid valve). 6. Simply open the venting valve in order to stop 7. Siphoning can be resumed as long as the valve) (venting vented be must line suction The 8. Improved changes are always reserved without notice. Venting valve Venting Siphon Storage tank Storage with statutory tank containment Filling line Filling Tank venting valve venting Tank Connect the siphon and hand-operated Connect the siphon and hand-operated vacuum pump to the suction tubing. siphon. line and open the venting valve on the be to medium The pump. vacuum the of aid the fills also and pipe immersion the in rises metered the suction line. reached the required level in the siphon. now operational. Medium flows to the pump automatically. Installation example Installation 1. the suction the end of valve at 2. Close the shutoff 3. Draw air from the siphon and suction line with 4. Close the venting valve when the liquid has 5. Open the shutoff valve in the suction line. It is MB 1 33 04 / 2 MB 1 33 Siphon & Vacuum Pump