Haringey Council

Borough Investment Plan

September 2010

www.haringey.gov.uk SEPTEMBER 2010

CONTENTS

THE BOROUGH INVESTMENT PLAN Page

1 Introduction 2

CONTEXT

2 A place of strategic opportunity and local need 3

3 Policy context 13

INVESTMENT AND PARTNERSHIPS

4 An investment opportunity – investing for the future 17

5 Shared principles of investment and partnerships 18

PRIORITIES

6 Thematic priorities 22

6.1 Building balanced communities – reducing east–west polarisation 23 6.2 Maximising the supply of new housing to meet housing needs 23 6.3 Improving the existing housing stock – estate renewal and regeneration 25 6.4 Improving supported housing provision 31 6.5 Ensuring sustainability 34 6.6 Economic development and regeneration 36

7 Spatial priorities - A place-making approach to transformation 40

7.1 A place making approach to transformation 40 7.2 Haringey Heartlands / 41 7.3 Tottenham 44 7.3.1 46 7.3.2 Tottenham (A10 / A1010) Corridor / Wider Tottenham 49 7.4 Significant developments along the Borough Boundary 53

IMPLEMENTATION

8 Development capacity and desired outputs 55

9 Investment analysis 57 9.1 Homes and Communities Agency 57 9.2 Wider regeneration 57 9.3 Registered Providers 58 9.4 Local Authority 58 9.5 Strategic delivery vehicles 58 9.6 Estate based regeneration 59 9.7 Preferred investor status 60 9.8 Devolved Delivery 60

GOVERNANCE AND MONITORING

10 Governance arrangements 61

11 Monitoring and review 62

12 Risk management 62

APPENDICES 1 SEPTEMBER 2010 THE BOROUGH INVESTMENT PLAN

1 Introduction

The Haringey Borough Investment Plan (BIP) is part of Haringey Council’s Single Conversation with the Homes and Communities Agency (HCA). It provides a strategic framework detailing partner priorities and principles of investment to deliver the vision for Haringey of ‘a place for diverse communities that people are proud to belong to’.

The Haringey BIP is underpinned by local, sub regional, and national strategies and provides a structure for future investment from the HCA and other partners that are integrated with all aspects of regeneration and growth. This comprehensive investment approach will ensure the delivery of a sustained regeneration of the borough creating places where people want to live and work.

The BIP will provide a long term coherent plan for determining investment. The Plan covers the period 2011 to 2014.

The Haringey BIP will: -

• set the local and strategic context for future investment in housing and regeneration • set out spatial priorities and lay the foundations for a place making approach to the transformation of Haringey • outline the key thematic priorities that reflect the borough’s housing need • examine previous, current and planned investment in housing and regeneration • establish a robust commercial, economic and financial business case for new delivery and investment models maximising the borough’s potential and increasing Value for Money (VFM) • estimate the funding and investment gap and set out the principles of future co- investment in housing and regeneration • outline how Haringey Council will work in partnership with partners to achieve VFM and show how Transforming Haringey will play a key role in future governance arrangements • set out the key principles to monitor and review the Plan, ensuring it remains a living document.

The Haringey BIP has been developed in partnership with the HCA and Transforming Haringey. Its emphasis lies in the need to bring together public and private sector organisations to work towards the council’s priorities of delivering: -

• A cleaner, greener Haringey • A safer Haringey • A healthy, caring Haringey • A thriving Haringey • High quality, efficient services

2 SEPTEMBER 2010 CONTEXT

Summary of key points: - • The population is expected to grow by 15% by 2026 • Nearly 50% of the population is Black or a minority ethnic group • Haringey is the 6th most deprived London Borough with the 9th highest migrant population • There is a distinct East/West divide in relation to socio-economic status and housing tenure • Over 50% of unemployed residents have not worked in the past 2 years • In 2005 there were 20,000 households on the housing waiting list • There is a housing target of 1,115 dwellings between 2008-2011

2 A place of strategic opportunity and local need

Haringey is at the heart of the sub region, strategically located between the London--Bedford and London-Stansted-Cambridge-Peterborough growth areas with strong transport links to the City, West End and airports. The eastern side of the borough is bounded by the Lee Valley, linking Haringey to the Olympic regeneration area around Stratford to the south, and the strategic employment and growth areas of the Upper Lee to the north.

Figure 1: key diagram 2008

Haringey’s urban fabric is marked by the history of its development from a series of rural settlements to the complex inner city of today. The pattern of older village centres and open spaces is still visible, and shapes the context in which new developments sit. The borough stretches from the prosperous neighbourhood of in the west to Tottenham in the east and contains six main centres. Wood Green is a Metropolitan Centre in the London Plan – one of eleven in London. Tottenham High Road, , Green Lanes, and West Green Road are classified as District Centres.

3 SEPTEMBER 2010

Figure 2: Town Centres in North London

Population and demographics

Haringey is home to over 225,500 (2009 Mid Year Estimates) people living in an area of 30 square kilometres. The population is projected to grow by over 15% to more than 260,000 by 20261.

This population is relatively transient and marked by high levels of migrant arrival: between 2002 and 2009 68,410 people have registered for national insurance numbers in Haringey, whose previous address was overseas. This is the 7th highest in the country and the 6th highest in London. Nearly 50% of the population (and three quarters of young people) are from black and minority ethnic groups, the 6th highest proportion in London. Over 190 languages are spoken in the borough; with almost half of all pupils in Haringey speaking English as an additional language.

Haringey has a young population with a high birth rate. The borough will experience particularly high growth in school numbers up to 2021. In many parts of the borough the percentage of surplus school reception places is already less than 5%. Nevertheless, the most common household type is two or more adults with no children. Over 7% of households are lone parent households.

In 2009, it was estimated there were 21,200 people aged 65+, making up approximately 9.4% of the total population.2 This proportion has declined slightly, from 9.6% in 2001, a pattern consistent with London as a whole, where the population has declined over the same period from 12.3% to 11.5%. Male life expectancy in Haringey’s wards varies from 78.2 years in to 71.3 years in Tottenham Green.

1 LDF Core Strategy 2011-2026 2 2006 Mid-Year Population Estimates, Projecting Older People Population Information (POPPI)

4 SEPTEMBER 2010

Figure 3: Male life expectancy in Haringey Wards, 2003-2007

Environment and infrastructure

At present the borough is relatively well served by north-south routes, but movement east-west is often difficult, particularly by public transport. This is one aspect of the degree of severance between the eastern and western parts of the borough, which is clearly delineated by the East Coast Main Line, and reflected in the polarisation of socio-economic indicators in Haringey.

A network of parks, open space, wildlife sites and Green Belt is one of Haringey's strengths. 27% of the land area of Haringey is green spaces and areas of water. Eight parks were managed to Green Flag Award standard in 2007/08. The borough has numerous natural and historical assets. It includes part of the Lee Valley Regional Park, which is Green Belt, areas of Metropolitan Open Land, including Alexandra Park and Ecologically Valuable Sites of Metropolitan Importance. The borough contains 28 conservation areas and over 350 listed buildings.

Climate change and energy infrastructure

Haringey is the sixth lowest emitter of per-capita carbon emissions nationally, at 4.3 tonnes per annum. This broadly reflects the high incidence of deprivation in the borough, leading to relatively low car ownership, a high incidence of fuel poverty and low emissions from the business sector. The majority of emissions (52%) are from energy use in the home.

Decentralised energy has been identified as the single most effective measure in reducing greenhouse gas emissions in the borough. The Core Strategy includes a map of potential decentralised energy hubs and heat network areas, as shown in Fig. 4. Additional work is currently underway with the London Development Agency producing a detailed heat map of the borough as part of the London Heat Map. This map further builds on the evidence base and will facilitate decentralised energy development in Haringey.

5 SEPTEMBER 2010

Figure 4: Potential decentralised energy hubs in Haringey, Core Strategy 2011 - 2026

Economy

In 2006 there were approximately 61,000 jobs in Haringey (excluding self-employment) - an increase of 13.4% since 1996. This is comparable to growth in Great Britain overall (13.8%) but slightly lower than the overall growth rate for London (14.1%). 10.9% of Haringey’s residents work within the borough, 36.3% work elsewhere in London and 2% work elsewhere in the south east.

By 2016 it is estimated that approximately 350,000 new London jobs will have been created within one hour’s commuting time of Haringey. These include the new job opportunities being created at Stratford City and the Olympic Park, accessible by rail in 15 minutes from Tottenham Hale.

Haringey's economy is dominated by small businesses - 90% of businesses employ 10 or less people. The major sectors of employment in Haringey are public administration, education and health (28%) and distribution, hotels and restaurants (including retail) (26%). Manufacturing and construction account for 12% of all employment.3 Between 1996 and 2006 employment in other services and, to a lesser extent banking, finance and insurance grew significantly. The annual average growth rate for other services employment was over two and a half times that for the sector in London. While banking, finance and insurance - which has been growing in London and the wider economy - represents 18% of employment in the borough, this sector remains poorly represented in Haringey, particularly compared to London. Manufacturing activities are continuing to decline in the borough at a faster rate than in London or Great Britain.4

3 Core Strategy 2011-2026

4 2009 Haringey Employment Study - Update

6 SEPTEMBER 2010

Deprivation and unemployment

Historically, Haringey has been considered an outer London borough, but large parts of the borough have the social and economic characteristics of inner London. Haringey is both socially and economically polarised, with high levels of deprivation in eastern parts of the borough and relative affluence in the west.

Based on the Office for National Statistics (composite) Index of Multiple Deprivation Score 2007, Haringey is the 5th most deprived local authority among the 33 and the 18th most deprived in & Wales out of a total of 354 local authorities. Nearly 65,000 people (almost 30% of Haringey's residents), live in the 43 Super Output Areas in the borough that are amongst the 10% most deprived in England. In March 2008, 33.9% of Haringey primary school pupils and 36.6% of secondary pupils were eligible for free school meals.

Figure 5: Map of the indices of deprivation 2007 rank of IMD Haringey super output areas (SOA’s)

In July 2010, 6% of Haringey’s working age residents were claiming Job Seekers Allowance, far higher than the London (4%) and national (3.5%) claim rates. Haringey’s economy is restructuring and is losing jobs in declining sectors at a faster rate than elsewhere.

Economic activity rates have fluctuated since 1996 in a way that does not follow the pattern for London as a whole. Economic activity rates have remained consistently below and unemployment rates have remained consistently above those for London since 1996, though the gap has narrowed since the 1990s. Over 50% of unemployed Haringey residents have not worked for over two years or have never worked. Weekly wages in Haringey are consistently much lower than the average.

7 SEPTEMBER 2010

Figure 6: A map of the amount of JSA job claimants in the borough

Fuel Poverty

The east-west polarisation demonstrated by the spatial statistics on deprivation and unemployment is also reflected by the estimated incidence of fuel poverty across the borough, demonstrated in Figure 7 below.

Figure 7: Fuel poverty in North London. Map courtesy of the Centre for Sustainable Energy.

Housing

Housing investment is critical to tackling Haringey’s problems of deprivation, and in particular concentrations of deprivation in certain areas of the borough. In the latest Place survey, 26% of local residents consider affordable decent homes to be the most

8 SEPTEMBER 2010 important thing in making somewhere a good place to live, while 17% think that it is the thing that most needs improving in the local area.

Tenure: Housing provision and tenure patterns closely mirror the wider social and economic east/west polarisation. The following table shows the tenure mix within the east and west of the borough.

East West Tenure No. % No. % Owner Occupation 23,843 41 18,397 55 Social Rented Sector (All) 21,943 37 5,947 18 Private Rented 10,488 18 8,069 24 Other 2,470 4 1,013 3 All households 58,744 100 33,246 100 Table 1: Tenure mix within the East/West of the Borough

The concentration of owner occupation is in the west (55%) with 41% in the east. The outright number and proportion of social housing is significantly lower in the west (18%) than in the east (37%). Such an imbalance in tenure mix can have a detrimental effect on the sustainability of local communities.

In recognition of the different patterns of need for private and affordable housing, Haringey’s planning policies require different balances of smaller and family sized homes according to the tenure. The recommended size mixes are:

Affordable Private housing Size of home housing size size mix mix 1 bed 19% 37% 2 bed 26% 30% 3 bed 27% 22% 4 bed plus 28% 11% Table 2: Recommended family home sizes in comparison to tenure

In addition, the high volume of temporary housing in the poorer parts of the borough has contributed to population transience and concentrations of vulnerable people. This has a negative impact upon other services such as education, health and social services in these areas.

Price and affordability: House prices within Haringey vary significantly, and again show an east / west split with average prices in the west being substantially higher than those in the east. The average prices in Tottenham (east) is about a third lower than the borough average while in Muswell Hill (west) it is over a quarter higher than the average.

While the recession and banking crisis saw average house prices fall during 2007/08, the long-term trend is for prices to increase. Average house prices rose by 6.8% from February 2009 to February 2010 to £318,645, significantly higher than increases in both inflation and wages over the same period. These trends are similar across Greater London as a whole, and when compared with neighbouring local authority areas Haringey shows an average price in the middle of the range.

Survey results for household incomes in Haringey estimate the average gross income at £33,301 per annum, making average house prices more than nine times average earnings. The highest average incomes (over £50,000 per annum) are found in Highgate, Muswell Hill, Fortis Green and Alexandra, all in the west, whilst the lowest 9 SEPTEMBER 2010 average incomes (under £20,000 per annum) are found in the east in the areas of Northumberland Park, Tottenham Green, and Tottenham Hale.

Tighter lending criteria for mortgages has led to typical deposits of around 20% to access the mortgage market. This has led to many people being priced out of the market due to their inability to obtain a mortgage with deposits for an average house in Haringey at around £65,000.

Housing needs: A combination of tenure imbalance, affordability pressures and a perception that Haringey does not offer the housing options to meet people’s aspirations (52.3% of households planning to move outside the borough in the next 2 years expect to buy their own home) has resulted in a number of considerable housing policy challenges: -

• in 2005 there were almost 20,000 households on the housing register • in 2007/8, 1,488 households joined the housing register, while only 868 households secured a permanent social rented home • an estimated 20.9% of households are living in unsuitable housing, with the main reason being overcrowding – 15% of social housing tenants are overcrowded • in July 2010 there were 3,434 households living in temporary accommodation in Haringey, of which 802 are in emergency accommodation • Haringey’s 2007 Housing Needs Assessment estimated a requirement for an additional 4,865 affordable dwellings per annum for the next five years – above the inner London average

Figure 8: Haringey’s affordable housing requirement 2007-2012

• housing demands identify acute need for family homes (3+ bedrooms) and housing for larger families who have specific cultural and social requirements • housing need particularly affects BME households, with 40% of Black African and Asian households living in unsuitable accommodation • a survey of council stock concluded that at March 2008, 42% of Council stock did not meet Decent Homes standards

• domestic properties contribute 50% of all CO2 emissions in Haringey • Haringey is seeing increased demand for supported housing provision for people with dementia, learning disabilities, autism and aspergers, mental health needs, physical disabilities and people with substance misuse problems

Meeting these needs is a key priority for Haringey: improving the quality and quantum of housing available in all tenures, especially affordable housing, is central to the transformation of the borough’s neighbourhoods.

10 SEPTEMBER 2010

Housing targets: Maximising the supply and availability of housing, particularly affordable housing, is a key priority in both Haringey’s community strategy and housing strategy. On the basis of the borough’s housing capacity, the London Plan sets a target of 680 additional homes per year.

Haringey has exceeded this target and delivered 784 net additional homes on average each year from 2005/6 to 2007/8. The housing trajectory shows that Haringey can exceed this target every year from 2007/8 to 2016/17, although the difficulties presented by the recession threaten to undermine this delivery.

Haringey and the Mayor of London have agreed a borough target of 1,115 affordable dwellings (372 per annum) to be provided over a 3 year period (2008-11). This exceeds the existing LAA target of 1,020, and reflects Haringey’s commitment to working with the Mayor to meet the housing needs of both the borough and the capital as a whole. However, there are major challenges to achieving this.

In line with the London Plan, Haringey applies an affordable housing target of 50% on all residential developments with a capacity for 10 or more homes. As a starting point for negotiation, the Council will seek to achieve a borough wide target that 70% of affordable housing provision should be social rented and 30% intermediate housing, in line with the London Plan.

In most cases, the proportion of affordable housing will be calculated by number of habitable rooms rather than units. The precise mix on individual sites will have regard to issues such as the existing proportion of social rented housing in the ward, the suitability of the site for family housing and individual site costs and viability.

Pipeline and land capacity

In March 2007, there were 2,699 units in the development pipeline, comprising sites with unimplemented planning permissions and sites where development was underway. The majority of housing supply (78%) is on large sites (over 0.5 ha.).5

Haringey has agreed its Strategic Housing Land Availability Assessment with the GLA, identifying capacity for 9,210 homes between 2011 and 2021, or 921 per year on average. This capacity is made up of: -

Element Total units 2011 – 2021 Average units per year Major sites (identified) 5,313 531 Small sites (assumed) 3,610 361 Non-self contained 0 0 Vacancies returned to use 280 28 Total 9,203 920 Table 3: Summarising the Strategic Land Availability Assessment capacity

London Housing Strategy Much of the land available for residential development in London is in public sector ownership … This needs to come forward in a way that can deliver the housing targets in this strategy. There is also the potential to provide new homes on existing housing estates and other public land.

Haringey has a portfolio of development land in council ownership, and is keen to ensure that these assets secure the best possible regeneration outcomes for local places and local people. Given that much of the Council owned development land is in

5 Housing SPD (2008)

11 SEPTEMBER 2010 the east of the borough and the aspiration to create mixed communities through private housing in these locations, the Council’s policy is to seek market prices for the disposal of its surplus land assets, while ensuring affordable housing provision through Section 106 agreements. The Council will explore how the development of affordable housing can be promoted on both public and private sites in the west of the borough.

Planning performance

Key to the continued success of meeting Haringey’s Housing Provision Target is the Council’s performance as local planning authority in determining planning applications. While this ‘turnaround’ time is good (78% of major applications determined in 13 weeks – see table below), the economic downturn has significantly reduced the number of planning applications being submitted.

Total Determined Number for % Applications Government Business within NI 157 determined Target Target number of 2008/09 weeks 1,879 78% *60% 82% 13 81% **65% 85% 8 89% ***80% 90% 8 * NI 157a ** NI 157b *** NI 157c

Table 4: Planning Applications determined by the Council 2008/09

12 SEPTEMBER 2010

3 Policy Context

London Housing Strategy

In the 2010 London Housing Strategy the Mayor sets out his vision for housing in London to: -

• Raise aspirations and promote opportunity: by producing more affordable homes, particularly for families, and by increasing opportunities for home ownership through the new First Steps housing programme; • Improve homes and transform neighbourhoods: by improving design quality, by greening homes, by promoting successful, strong and mixed communities and by tackling empty homes; • Maximise delivery and optimise value for money: by creating a new architecture for delivery, by developing new investment models and by promoting new delivery mechanisms.

The Council pays full regard to this Strategy when making decisions about the provision of housing in the borough.

Sustainable Community Strategy

The 2007-2016 Haringey Community Strategy’s core vision for the borough is that it should be “a place for diverse communities that people are proud to belong to.” A key strand of this strategy is the drive for ‘more and improved housing’, and a commitment to increase the supply of affordable housing, reduce overcrowding and improve the housing stock. This sits alongside an emphasis on tackling poverty and disadvantage, protecting those on the lowest incomes and those who are the most vulnerable, and extending opportunities for lifelong learning, work, training and education.

The Sustainable Community Strategy is supported by a range of complimentary strategies and policy documents, which set out how the council will structure its services, work in partnership with stakeholders and make key decisions over future development and investment opportunities to deliver continued improvements and value for money. The following strategies and policy documents are central to the successful transformation of Haringey: -

• Local Development Framework • Regeneration Strategy • Greenest Borough Strategy • Housing Strategy

Local Development Framework

Haringey’s emerging Core Strategy 2011-2026 will replace Haringey’s Unitary Development Plan (UDP) 2006 as the spatial framework for the development of new housing and the wider transformation of the borough. This Strategy is at the ‘pre- submission’ public consultation stage with final adoption planned for 2011. The Core Strategy is the spatial planning expression of the Sustainable Communities Strategy. Its vision is:

‘To ensure Haringey is a place for diverse communities that people are proud to belong to in the coming years, all agencies will work together to enable people to be at the heart of change and to improve their quality of life in an environmentally, economically and socially sustainable way.’ 13 SEPTEMBER 2010

By placing housing development at the centre of the Council’s plans for Haringey’s transformation, the Core Strategy seeks to manage “development with people at the heart of change by delivering new homes and new jobs, in locations supported by employment and social infrastructure.”

The Core Strategy addresses the strategic and local development needs including housing, employment, retail and leisure and community provision. By meshing with the Community Strategy and other corporate and service plans, it covers both the spatial aspects of place shaping and the physical aspects of location and land use. It aims to ensure places are attractive, sustainable and successful and contribute to social inclusion, economic prosperity and environmental quality.

The Core Strategy guides the content of the other Development Plan Documents (Sites Allocation, Development Management and North London Waste Plan). Through the Core Strategy the Council is planning to prepare Area Action Plans for Tottenham Hale, Tottenham High Road Corridor, Northumberland Park, Seven Sisters and Wood Green/Haringey Heartlands.

Development Plan Documents (DPD)

Sites Allocation DPD: This sets out the details of sites for future development to meet the housing, employment, retail, education, health and leisure needs of the borough over the 15 years of the Core Strategy. The majority of the sites identified in the DPD are housing sites that will deliver the borough’s future housing target.

Development Management DPD: This sets out the detailed planning policies to deliver the strategic spatial policy objectives of the Core Strategy. It will assist in influencing, developing and determining development proposals submitted to the Council. It aims to ensure that future developments meet the aspirations of the Council, landowners, investors and local communities in delivering sustainable buildings, energy efficiency and quality design and environment. This is being progressed in tandem with the Sites Allocation DPD.

Area Action Plans - Five areas of the borough are proposed for Area Action Plans: -

• Tottenham Hale • Wood Green/Haringey Heartlands • Tottenham High Road Corridor • Northumberland Park • Seven Sisters.

The first two are the areas already designated to accommodate the greatest growth. The other three are newly identified areas for focused action to promote growth (albeit of a lesser scale) and regeneration proposals.

The AAPs will provide a framework for reviewing the wider neighbourhoods and set a clear vision and aspirations for their development and regeneration. These Plans will allocate land-uses and detailed planning policies that will deliver place shaping, a mix of uses to meet future community needs for services and infrastructure and a high quality sustainable environment. Consideration is also being given to preparing Investment and Delivery Strategies for each of these areas as an alternative to formal AAPs to provide a more focused approach to engaging with local communities and encouraging investment.

14 SEPTEMBER 2010

Regeneration strategy

The Regeneration Strategy puts People, Places and Prosperity at the heart of regeneration in Haringey. The Strategy has three key priorities: -

• Unlock the potential of Haringey residents through increasing skill levels and raising employment so that they can contribute to and benefit from being part of one of the most successful cities in the world • Transform Haringey into a place in which more people want to live and invest by using the opportunity of major sites and key locations to create positive change • Develop a 21st century business economy that offers opportunities for sustainable employment and enterprise, to help make Haringey a place people want to work, visit and invest in

By using its assets and strategic influence the Council can encourage and support all stakeholders to become more active in the long term regeneration of the borough.

Greenest borough strategy

Developed by the Haringey Strategic Partnership, with a clear vision to “work together to tackle climate change and secure a clean, safe and environmentally sustainable future for everyone living, working, visiting or studying in Haringey”, the Greenest Borough Strategy 2008/18 seeks to reduce borough-wide carbon dioxide emissions by 40% by 2020. This is referred to as the 40:20 target. This vision is underpinned by the following seven priorities: -

• Improving the urban environment • Protecting the natural environment • Managing environmental resources efficiently • Leading by example • Ensuring sustainable design and construction • Promoting sustainable travel • Raising awareness and involvement

Over half of CO2 emissions in the borough come from the domestic sector. Decentralised energy has been identified as the most significant single measure that will contribute to meeting the Council’s CO2 emissions reduction targets.

Housing strategy

The Council’s Housing Strategy 2009/19 outlines the main housing issues that affect the borough. These are: -

• high cost of market housing • high levels of housing need • a shortage of settled affordable housing • high levels of homelessness and temporary accommodation • some areas are characterised by poor housing conditions • problems associated with multiple deprivation parts of the borough • a shortage of affordable family sized housing

In setting out how the Council can overcome these problems, the Housing Strategy aims to “create neighbourhoods that people choose to live in with a balance of different types of homes which offer quality, affordability and sustainability for current and future generations”. 15 SEPTEMBER 2010

In seeking to achieve this aim, the Housing Strategy sets out five main priorities: -

• meet housing need through mixed communities which provide opportunities for residents (the right balance of homes, housing supply and making the most of existing housing, strengthening links between housing and other services) • ensure housing in the borough is well managed, of high quality, and sustainable (improving standards of decency, design, and energy efficiency) • provide people with the support and advice they need (enabling residents to make the most of housing opportunities in the borough through early intervention, advice and support which is accessible, of high quality, and responsive to individual needs); and • make all homes in the borough a part of neighbourhoods of choice (creating well-designed, attractive, clean and safe public spaces where there is a real sense of belonging and pride) • contribute to creating the Greenest Borough (encouraging developers, landlords and home owners to adopt the highest possible standards in energy efficiency, sustainable design and construction)

As well as complimenting other corporate strategies, the Council’s Housing Strategy encompasses and supports a range of more specific strategies and policies aimed at tackling the housing challenges facing the borough: -

• Homelessness Strategy – adopted 2008 • Affordable Warmth Strategy – adopted 2009 • Move-On Strategy – adopted 2010 • Overcrowding and Under-Occupation Strategy – to be completed 2010 • Rough Sleepers Strategy – adopted 2010 • Older People’s Housing Strategy – to be completed 2011 • Private Sector Housing Strategy – to be completed 2011

Figure 9: A diagram showing the internal relationships between strategies

16 SEPTEMBER 2010 INVESTMENT AND PARTNERSHIPS

Summary of Key Points:

• Public and private investment is crucial for sustainable development • Investment in key sites include; o Tottenham Hotspur FC o Tottenham Gyratory System o Town Hall • Inclusive partnership agreement with developing registered providers • Innovative housing solutions will include – Haringey Development Vehicle, strengthen existing partnership working

4 An investment opportunity - investing for the future

Underpinning the Council’s approach to investment is the principle, set out in the 2007- 16 Community Strategy, of ‘People at the heart of change’. As an area of strategic opportunity and local need, the Council and its partners are committed to attract the investment needed to improve the quality of life for existing as well as new residents and businesses. The scale of the challenge is substantial as earlier sections have shown. The Council and the Strategic Partnership are committed to meet those challenges.

A combination of public and private sector investment is crucial for sustainable regeneration. When the economy was stronger, private sector investment could see an effective return from many schemes in the borough. Major private investment is still happening and the proposed Tottenham Hotspur FC development should provide a major catalyst for further private investment in Tottenham as well as being a major benefit for local businesses.

Public sector investment is also vitally important both to provide the infrastructure needed associated with new development (it is often the case that the full cost of this infrastructure cannot be borne solely through s106 agreements) and to support the provision of affordable homes to ensure a balanced community and help meet local housing needs.

The Council’s investment programme, obviously substantially constrained in the short- term, is still supporting major regeneration schemes. The environmental transformation that the Tottenham Hale Gyratory Scheme will bring for Tottenham should not be under-estimated and the Council, HCA, TfL and LDA are jointly funding this to underpin future private and public sector investment in new homes and jobs.

In the centre of the borough, in Hornsey, the Council is re-investing a major land sale receipt towards the restoration of Hornsey Town Hall to create a new community and enterprise hub. The asset will be passed to the Hornsey Town Hall Creative Trust to spearhead the restoration. The Council is also investigating the potential benefits of a special purpose ’Haringey Delivery Vehicle’ to undertake new development using Council-owned land as a catalyst for regeneration.

The Council has a good track record of working with private and public sector partners to secure sustainable regeneration. It appreciates the strong support the HCA has provided for recent schemes in the borough and looks forward to that continuing on schemes in the future as outlined in this BIP. 17 SEPTEMBER 2010

5 Shared principles of investment and partnership

The Council works closely with a range of partners to co-ordinate and maximise inward investment into the borough. Due to the increasing pressures on public funding, the Council and its partners will be required to strengthen this shared approach and develop innovative solutions to future housing and regeneration initiatives rather than relying on the traditional approach of grant aid.

Haringey Strategic Partnership: Haringey Strategic Partnership (HSP) is the Local Strategic Partnership for the London Borough of Haringey. It brings together the public, private, voluntary and community sectors to work in partnership to improve the quality of life for all who live, work in, and visit Haringey. It sets the overall context for the borough within which this Plan is framed and will hold a key governance role.

Transforming Haringey: A high level group chaired by the Greater London Authority (GLA) consisting of the key partners involved in delivering sustainable regeneration to Haringey. Partners include the Council, the London Development Agency, and the Homes and Communities Agency and meet regularly to discuss and agree delivery and investment programmes.

Homes and Communities Agency (HCA): The HCA vision for the Region is to create opportunities for people by improving their access to high quality accommodation across tenures, transforming the physical fabric of communities, and by helping to build the basis for economic prosperity.

The HCA’s priorities for London are to: -

• partner with the boroughs, the private sector and the affordable housing sector to deliver well-designed homes that people can afford and wish to live in • support boroughs in the effective delivery of the Decent Homes programme and tackling growing waiting lists for social rented housing • work with partners to support housing delivery through the development of brownfield sites • support delivery of the Thames Gateway and the London 2012 Olympics

The BIP will be used as a mechanism to channel HCA investment into specific schemes and programmes which adhere to either spatial or thematic priorities through a commissioning approach. Any HCA investment must ensure high quality standards in line with the HCA’s minimum standards on design and sustainability and provide employment and training for local people.

Homes for Haringey: Homes for Haringey ALMO was established in April 2006 to manage Haringey’s housing stock of 21,000 properties. The ALMO achieved two star status in May 2007 and in January 2008 the government awarded £198.5m to Haringey’s Decent Homes programme. The latest performance figures for 2009/2010 show Homes for Haringey has exceeded its target of reducing non decency to 30% with the actual position as at March 2010 showing that 27% of the stock remains non decent. The Council has recently introduced a new ALMO Client Team within the Strategic and Community Housing Service with a remit of working with the ALMO to ensure it continues to provide an excellent housing management service whilst delivering improved Value for Money. A key focus of this work will remain the delivery of the Decent Homes programme.

Registered Providers: There are more than 60 housing associations managing over 12,000 properties in the borough. Three housing associations, London & Quadrant Housing Trust (1,917 units), Metropolitan Housing Trust (1,565) and Circle 33 (1,401) 18 SEPTEMBER 2010 own and manage over 40% of the housing association stock in the borough, with many others managing only a small number of units. The Council believes that such fragmented ownership does not represent the most efficient way of managing the borough’s social housing stock, and is currently working with local registered providers to develop an approach to stock rationalisation.

We recently replaced the long standing Preferred Partnership Agreement which existed between the Council and a small number of housing associations with an all inclusive Partnership Agreement setting out the principles for effective and constructive partnership working. This is supported by the RP/Developers forum to improve collaboration further and is underpinned by regular liaison meetings with all registered providers (Registered Providers Development Group).

North London Sub Region: The Council is an active member of the North London Housing Sub-Region which was established in 2003. It is made up of 6 local authorities (Barnet, Camden, Enfield, Haringey, and ), and is the second largest sub-region within London, home to 1.36 million people.

The sub-region is a formal partnership designed to deliver efficiencies and savings in the procurement and commissioning of services and to maximise existing resources/attract additional funding, promoting ‘added value’ in the way these are used.

Six key priority areas have been identified to help focus the work of the sub-region: -

• Increasing the supply of permanent affordable housing • Meeting the needs of homeless households • Tackling overcrowding and providing much needed larger family-sized homes • Promoting mobility and choice • Contributing to the development of balanced and sustainable communities • Improving the quality of all housing

The sub-region has a strong track record in the delivery of affordable housing, and significant capacity for further development. Many of these opportunities are located in well established communities, supported by good infrastructure and services. Investment requirements for affordable housing are comparable to other parts of London (including East London/Thames Gateway). The sub-region is therefore well placed to attract and secure significant levels of funding, and will continue to lobby for further resources.

The North London sub region is planned to deliver 66,500 new homes by 2016/17, over 22% of the capital’s housing growth, as identified in the revised London Plan of 2008. Securing the investment and infrastructure Haringey needs will be essential to achieving these targets – both because of the borough’s position at the centre of the sub region and because many of the key growth points are located in Haringey.

19 SEPTEMBER 2010

Figure 10: Housing growth and transport investments in North London to 2017

North London Strategic Alliance: Haringey Council, along with the boroughs of Barnet, Enfield, Waltham Forest and public, private and voluntary organisations work together as part of the North London Strategic Alliance (NLSA). The NLSA seeks to raise the profile of North London and increase public and private sector investment into the sub-region to address the following issues: -

• Coordinating housing growth with social and transport infrastructure; • Supporting the outer London economy, including promoting the role of town centres; • Increasing access to employment through skills development and training; and • Promoting a vision for the Upper Lee.

Through the NLSA, the boroughs of Haringey, Enfield and Waltham Forest together with the London Development Agency and the Greater London Authority have worked to develop a new vision that can guide the future of the area over a 20-30 year period. The vision seeks make better use of assets including Upper Lee Valley and Central Leeside by reversing economic decline, improving internal and external transport, promoting sustainability and making better use of urban land.

The NLSA appointed GVA Grimley to advise on housing delivery across North London (comprising the boroughs of Barnet, Enfield, Hackney, Haringey, Redbridge and Waltham Forest) focussing on the potential of smaller sites (0.25ha to 2ha).

The purpose of the study was to identify and gain a better understanding of this capacity, identify barriers to delivery and make recommendations on how these can be overcome in order to achieve the following objectives: -

• Encourage co-ordinated development activity where possible across the six boroughs • Support and inform borough and public agencies in their role in delivering spatial development and growth; and • Ensure that North London has a strong offer in respect to public sector funding opportunities and investment from the private sector

20 SEPTEMBER 2010

GVA Grimley selected 10 representative sites across the region to investigate in more detail in order to identify site specific/localised barriers to delivery. Three sites from Haringey were included in the study: -

• 341 – 379 seven Sisters Road • Gourley Place, ; and • Magistrates Court, Lordship Lane

21 SEPTEMBER 2010 PRIORITIES

6 Thematic priorities

Summary of Key Points: • Overcome the socio-economic polarisation between East and West • Retrofitting existing stock – estate renewal and improvement • Improving and supporting supported housing provision • Utilising innovative sustainable technologies to reduce fuel bills for tenants

Haringey’s thematic priorities are based on those set out in the Sustainable Communities Strategy and Housing Strategy 2009 – 2019. The following have the greatest relevance to the BIP.

BIP Thematic BIP Action Links to Sustainable Links to Housing Strategy Priority Community Strategy Building balanced • Tailored package of • People at the heart • Meet Housing Need through communities – development of change mixed communities reducing east/west opportunities • Healthier people • Make all homes in the borough a polarisation with a better quality part of neighbourhoods of choice of life • Ensure all housing in the borough is well managed and of high quality and sustainability Maximising the • Registered provider • People at the heart • Meet Housing Need through supply of new new build of change mixed communities housing to meet • Council new build • Healthier people • Make all homes in the borough a housing needs • High quality design with a better quality part of neighbourhoods of choice • Dwelling size mix of life • Ensure all housing in the borough • An environmentally is well managed and of high sustainable future quality and sustainability • Contribute to creating the Greenest Borough Improving the • Decent Homes • People at the heart • Meet Housing Need through existing housing • Empty Homes of change mixed communities stock - estate • Estate Regeneration • Healthier people • Ensure all housing in the borough renewal and • Tackling with a better quality is well managed and of high regeneration Homelessness of life quality and sustainability • Overcrowding / • Provide people with the support under occupation and advice they need • Make all homes in the borough a part of neighbourhoods of choice Improving supported • Older people • Healthier people • Provide people with the support housing provision • Vulnerable people with a better quality and advice they need • Young people of life Ensuring • Publicly funded • An environmentally • Contribute to creating the sustainability homes to achieve at sustainable future Greenest Borough least the minimum level 3 of the Code for Sustainable Homes • All projects to deliver high standards of sustainability Economic • Supporting business • Economic vitality • Provide people with the support Development and opportunities and prosperity for and advice they need Regeneration • Providing space for all • Contribute to creating the SMEs Greenest Borough • Tackling worklessness • Heritage led regeneration Table 5: Thematic priorities in Haringey

22 SEPTEMBER 2010

6.1 Building balanced communities – reducing east–west polarisation

The key driver of this priority is the socio-economic polarisation between east and west. The main strategic objectives of Haringey’s plans for transformation are consequently the need to overcome physical severance between east and west by strengthening the heart of the borough between , Wood Green and Hornsey, and the need to comprehensively regenerate Tottenham and the surrounding areas. Haringey’s transformation will be driven largely by delivery of its major strategic projects around Tottenham in the east, Haringey Heartlands in the centre, and the Tottenham (A10/A1010) Corridor stretching through the borough to Central Leeside in the north east.

On a wider scale, the Council will seek to use its planning powers to further redress the socio economic imbalance by promoting the development of affordable housing in the west of the borough while seeking to provide more market housing in the east.

The major regeneration schemes at the Heartlands and at Tottenham Hale in the East will provide sustainable mixed communities through a balance of tenures and have a positive impact on land values. While it is inevitable that these developments will provide a significant number of affordable homes, particularly in response to the continued suppression in the housing market, the Council must maintain a clear commitment towards tackling the lack of affordable housing in the West of the borough if the east/west polarisation is not to be exacerbated.

It is proposed that a “tailored package” approach is developed across a pool of agreed sites across the borough. These would individually require a wide range of investment, reflecting in part the divergence of land values, but would on average be consistent with a benchmark of value for money. Delivery would be by a panel of participating housing associations and other suitable delivery agents. Such an innovative approach could be a model for other authorities and the HCA where affluent and poorer communities housing are geographically polarised. The Council will work through the Borough Investment Plan process to look at how an east-west tailored package might be developed.

6.2 Maximising the supply of new housing to meet housing needs

Delivering new affordable housing: With over 19,000 people on the Council’s housing register and a net increase of more than 500 each year, the need for good quality affordable housing in Haringey is high. The last Housing Needs Assessment (2007) estimated a requirement for an additional 4,865 affordable units per annum between 2007 and 2012, yet delivery has fallen well short of this. The Council is making excellent progress in offering choice to those in housing need and is seeing the number of people in temporary accommodation fall. However, if this is to continue, the number of units available in the affordable housing sector must increase.

As an indication of need in the borough, the Homes and Communities Agency has invested more than £139 million in Haringey since 2007 to support the delivery of affordable housing and related infrastructure. The majority of this investment has been targeted on providing new housing. The following table shows the total take up of HCA allocations between 2007 and 2010 and the number of units developed/improved.

23 SEPTEMBER 2010

Year Units (Built/Improved) HCA Allocation (£)

2007/08 423 35,442,813

2008/09 507 45,944,545

2009/10 563 57,623,734

Total 1,493 139,011,092 Table 6: HCA allocations 2007-10

2007 – 2008 2008 – 2009 2009 – 2010 Product Grant take Grant take Grant take Units Units Units up (£) up (£) up (£) Homebuy New 133 6,942,742 206 12,806,830 112 5,816,064 build Social Rent 256 25,800,447 220 30,773,623 277 41,280,244 Intermediate 3 144,000 21 1,362,000 161 9,710,000 Rent Rent Re- - - 5 319,653 11 725,426 improvement Rehab Works 9 816,255 3 290,000 - -

Right to Acquire 5 80,000 3 48,000 - -

Social Homebuy - - 1 16,000 1 16,000 Temporary 17 1,659,369 - - 1 76,000 Social Housing Miscellaneous - - 48‡ 328,439 - -

Total 423 35,442,813 507 45,944,545 563 57,623,734

‡ Repairs to existing tenanted stock – street properties Table 7: Products funded by the HCA

High quality design: is a key element in achieving sustainable communities by: -

• creating safe environments; • making best use of a site responding to its setting and context; • minimising the use of resources through sustainable design and construction; and • making developments accessible to everyone.

Design and environmental considerations are fundamental to Haringey’s approach to place shaping. Haringey Council and key partners have a three stage approach to securing design and environmental excellence.

Stage one sets out the broad design and sustainability standards.

Stage two applies these standards to the individual characteristics of each growth area and is articulated through the relevant Supplementary Planning Document.

Stage three utilises a partnership approach with developers and their architects that draws together the input of the Commission for Architecture and the Built Environment (CABE), Design for London and local interest in preparing individual schemes.

Additionally, all affordable housing should be ‘tenure-blind’, fully integrated with market housing, and evenly ‘pepper-potted’ across the site or in the case of flats, in small clusters within a block. Affordable homes must meet the Code for Sustainable Homes

24 SEPTEMBER 2010

level 3 as a minimum, and must meet or exceed the Homes and Communities Agency’s (HCA) Design and Quality Standards.

Case Study: Village scheme represents a design led approach to regeneration and is based on a CABE Exemplar project, Hammarby, Sjostad in Stockholm, a high density residential and mixed use development built on contaminated brownfield land in the centre of Stockholm. Haringey has worked jointly with the Lee Valley Estates on the production of the Hale Village Design Code, which will help deliver the vision expressed in the Tottenham Hale Urban Centre Masterplan. The design code seeks to establish a level of quality that both the developer and local authority agree upon and which forms part of the section 106 agreement for the development. The identification of character areas is a key component of the Hale Village Design Code and an approach that Haringey will seek to replicate in its other strategic development areas.

6.3 Improving the existing housing stock – estate renewal and regeneration

Many of Haringey’s larger estates have already benefited from earlier regeneration funding such as Estate Action, Single Regeneration Budget, the New Deal for Communities and the Council’s own Capital Programme. These include: , Northumberland Park, , Chettle Court, Edgecot Grove, Suffolk Rd, Tiverton, Vincent Square and Commerce Rd.

The works focussed primarily on external renewals such as window/roof replacement, major environmental improvements and security measures, including the provision of a number of concierge schemes. Apart from removal of walkways and some housing association new build at Broadwater Farm, none of the above incorporated major estate remodelling.

In 2000 the Council transferred an out of borough estate to a new landlord in return for the properties receiving significant investment. The driver for this was not only to secure investment but also stock rationalisation. A successful partnership with London & Quadrant Housing Trust resulted in the transfer, demolition and major new build development at the Denmark Road and Goulding Court estates.

More recent regeneration activity has centred on the Seven Sisters New Deal for Communities area. In 2007 we completed a major transformation of the Suffolk Road estate joint funded from NDC and the Housing Capital Programme. Major works have also been carried out at the Tiverton Estate combining New Deal for Communities and Decent Homes funding.

Decent Homes The Decent Homes Programme is the main remaining source of funding for external/internal renewal works on estates. The programme has already enabled us to carry out major improvements to larger estates in the west of the borough for example at Campsbourne which previously did not receive any regeneration funding, being outside of designated areas.

In March 2008 42% of Council stock did not meet the Decent Homes standard. In the same year, the Government awarded Homes for Haringey £198.5million to improve its housing stock through a five year Decent Homes programme.

As at March 2010, 3,756 tenanted homes have been brought up to the Decent Homes standard. The programme is on time and within budget, and has high levels of resident satisfaction averaging 96% across the first two years of the programme.

25 SEPTEMBER 2010

Year one (2008/09): The ALMO spent £28m on Decent Homes investments, bringing a total of 1,554 tenanted homes up to the Decent Homes Standard. In addition, works were carried out to 367 leasehold properties. At the end of year one of the programme the level of non decency was 36%.

Year two (2009/10): With a total budget of £40.47m the projection at the outset of the year was to return 2,000 tenanted and 600 leasehold properties to decency. Through effective planning and contract management, Homes for Haringey exceeded these expectations bringing 2,201 tenanted and 647 leasehold units up to the decent homes standard at a cost of £38.78m. At the end of year two of the programme the level of non decency was 27.5%, exceeding the 30% target agreed with CLG.

Year three (2010/11): With a total budget of £33.5m, we anticipate bringing a further 2,000 tenanted homes up to the Decent Homes standard and works are currently progressing on site. Our target for the end of Year 3 is to reduce the level of non decency to 20%.

One of our aims is to ensure that the Decent Homes programme has a lasting legacy which can support and help deliver wider objectives which will benefit our residents. This includes working closely with our partners to expand opportunities for local employment initiatives.

In April 2009, Homes for Haringey organised a construction related jobs fair which was attended by more than 400 people. The objectives of the day were to highlight employment and training opportunities for local people within the construction industry and to provide support in accessing them.

Our constructor partners actively seek to employ local contractors and labour, and 20 apprenticeships have been established. The partners have also agreed to take on work experience placements. The aim is that around 20% of the jobs created by the Decent Homes programme will go to local people.

In addition, our Decent Homes partners have brought three disused community centres back into use which they are using as their local office base, alongside newly provided community facilities.

With years four and five of the decent homes programme still remaining, one of our key actions in the coming year is the development of a post decent homes investment plan in partnership with our customers and partners. This will consider life cycle costs, links to revenue programmes and the 30-year Business Plan. The Council would like to use the Borough Investment Plan process to look at how the many benefits derived from our successful Decent Homes programme can be maintained until all housing stock in the borough meets the decency standard.

Proposed Estate Regeneration Schemes Notwithstanding the Decent Homes investment programme, the Council recognises that there may be parts of the stock where a more fundamental appraisal and approach is required. Potential interventions could range from occasional disposal of unsustainable stock, selective demolition and estate remodelling to address fundamental flaws in layout and design, partial redevelopment of the least sustainable and attractive estate archetypes through to comprehensive estate renewal. This analysis would need to combine asset management appraisals with an assessment of the sustainability of each place.

26 SEPTEMBER 2010

Haringey wishes to develop a coherent, cohesive vision for estate renewal that adopts a “total place” approach to long-term sustainability. Together with our partners including Homes for Haringey we aim to develop a package of effective estate interventions that can link to and build upon our existing successful programmes such as Decent Homes.

A number of opportunities have been identified for the provision of additional housing supply through the conversion of ‘hidden homes’ – redundant and disused areas within and between Council homes and buildings, as well as small scale infill on Council owned land.

Hostels redevelopment and de-conversion A number of properties have been identified as sustainable but in need of upgrading. Surveys have been completed and an internal bid submitted for capital resources to fund the works. If unsuccessful in achieving a capital allocation then options of leasing to housing associations to bring up to standard with HCA grant and/or selective disposal with ring fenced use of the receipts for improvement and retention of the remaining hostels may be recommended.

Hostels to be Retained and Improved include: -

• 2 & 4 Bedford Road N15 4HA • 1 Birchington Road N8 8HR • Allan Barclay Close, 1-3 High Road N15 6LW • Park Court, 1-6 Northumberland Park N17 OTP • 19 Princes Avenue N10 3LS • 9, 32 and 39 Queens Avenue N10 3PE • 6-69 Russell Road N15 5LT • 10 Talbot Road N15 4DH

A further six hostels and two adjoining flats are planned for de-conversion during 2010/11: -

• 2 Crouch Hall Road N8 8HU • Lansdowne Road N17 OLL • 142 & 144 Lordship Lane N17 7QS • 33 Muswell Avenue N10 2EB • Parkland Road N22 6ST

External grant of £754,000 has been made available from the Regional Housing Pot to contribute towards funding these works.

Short Life Accommodation In past years a number of Council owned street properties were let on licences to housing associations and co-operatives where there was a justified case. However, given the present extreme need for family-sized accommodation, and as part of the HRA stock asset review to optimise the use of the Council’s properties (where the original decision to licence is no longer applicable) these properties are now being brought back into the permanent HRA stock with vacant possession.

All properties will be refurbished to Decent Homes standard and re-let on secure tenancies to families from the Housing Register. To date, 61 properties have been identified. Where detailed surveys reveal that funding is required beyond Haringey’s available resources other options are being considered such as leasing to RSLs for use as temporary accommodation for Haringey nominees.

27 SEPTEMBER 2010

Brunel Walk/Turner Avenue The Council has commissioned NPS consultants to carry out an options appraisal of the Brunel Walk hostels that will also examine the potential for using the site to help regenerate the Turner Avenue Flats. The aim is to release the capital potential within the hostel accommodation to demolish the properties and provide new affordable housing on the site. The Council hopes to retain ownership of the stock and use the new properties to open up potential on the wider Turner Avenue estate by allowing selective demolition and new build. In redeveloping the entire estate in an innovative private/public partnership it is hoped that additional affordable housing and housing for sale can be developed in consultation with local residents. The development site sits in the Broadwater Farm/Laurence Road/St Ann’s hospital area identified in the Core Strategy as having potential for a decentralised energy network which would further benefit the development and local people.

156 152 144

BM 13.04m

LB

WEST G12R.5EmEN ROAD 11.9m

1 5

1

3

9 2 1 2

7 1 2 1 2 5

1 o t

7 1 1

D PH

A

O

R

R 2 to 56

A

M

L

E TURNER AVENUE

2

5 1 2

3 El Sub Sta t o t o

5 1

2

5 1

5

3

t

o

8

3

s

k

r o

W

4 6

3 3

Posts

2

3

1

3

8

3 2 0 7

5 3 B

2 ru

3

9 n

2 e

3 l

6 W

2

4 a

2 lk

5 2 3

2 9

0

2 7 2 2

9 6

1 1 1

2

8 1

7 1

5 1

6 o t 1

9

6

o t

1 7 26 112 98

84

7

SEAF 0 5 O 7 RD ROAD 56 Figure 11: A current plan of the Brunel Walk/Turner Avenue Estate

Brunel Walk/Turner Avenue Estate Regeneration (Phase I) Quantum of Investment £3.43m to demolish and re-build Brunel Walk

Outputs Delivered – Direct & Minimum 14 new CSH Level 3 homes: Indirect • 12 social rented units (to be retained in council ownership) • 2 open market units

The project provides value for money by ensuring that: • The elements of the design are continually reviewed • Transparency through the process • Clearly defined project processes and business plan • Engagement with the local community/stakeholders • Efficient and effective management of procurement process Approach/Structure to Single phase development project managed by the Council Delivery Physical Steps to be • Secure internal /external funding Undertaken • Assess preferred delivery partner Delivery Milestones Complete Options Appraisal – May 2010

Link to Haringey Thematic This project contributes to: - Priorities and Wider • Increasing permanent affordable housing Corporate Context • Seek to promote stable communities through regeneration. • Addresses East/West Polarisation • Improving the housing stock under Decent Homes by 2011 • Contributes to achieving the affordable housing targets as set out in the Mayors London Plan • Promotes sustainability • Decentralised energy.

Table 8: Summary of the Brunel Walk/Turner Avenue Estate regeneration project 28 SEPTEMBER 2010

Empty homes

Haringey is a recognised leader in tackling the blight of empty properties, and has a multi-disciplinary team dedicated to achieving substantial reductions in empty homes. Our approach aims to get privately-owned properties occupied and has offered grants for repairs and improvements to bring them back into use. Ongoing survey work has identified 1,450 empty properties, of which around 350 have been prioritised as eyesores. The owners are identified, contacted and offered grant support to bring their properties back into use – failing which enforcement action is taken. This proactive combination of repairs grants, Compulsory Purchase Orders (CPO’s) and Enforced Sales has brought over 56 units back into use following grants, enforced sales and CPO action in the last year.

Empty properties are spread across the borough and a partnership initiative working on an annual programme budget, rather than individual property viability would allow properties in both the east and west areas to become permanent affordable homes.

Haringey will continue to work with its partners providing support to scale up the existing empty homes programme through capital funding and capacity support for CPOs, offering Haringey’s experience as a leader in this area as an opportunity for the HCA to learn transferable lessons.

Existing and new partners support and advice will also be utilised in finding a legal route for disposal of enforced sales properties to a housing association or dedicated SPV, rather than going to auction. This could create a pipeline of larger family homes for affordable housing, especially in the west of the borough. At present, Haringey’s legal officers believe that auction is the only acceptable way to demonstrate that the best price has been secured for the property owner. If successful, this would further help Haringey Council to reduce the number of households in temporary accommodation and reduce polarisation between the east and west of the borough.

Tackling homelessness

London Housing Strategy

The number of households in temporary accommodation should be halved by 2010.

The number of accredited landlords will increase significantly, at least doubling by the end of 2011. The private rented sector will play a key role in housing homeless and vulnerable households, where it provides high quality housing management and reasonable security of tenure and support is available where needed.

Given the myriad housing problems that Londoners can encounter and the range and complexity of housing options available to them, it is essential that there is open and easy access to good quality housing advice across the capital. Many boroughs successfully achieve this by providing a one stop shop, encompassing their homelessness functions, private sector landlord/tenant advice, the provision of information about different tenure options – including private renting and low cost home ownership – as well as advice and support for people under occupying social rented homes who may wish to move.

With over 19,000 people on Haringey’s housing register, and nearly 3,500 in temporary accommodation, the council recognises that new social housing supply cannot meet the backlog of demand that has built up. This makes it all the more imperative that people are given access to the full range of housing options and support services available, especially through early intervention to prevent them becoming homeless in the first place. 29 SEPTEMBER 2010

Haringey’s Homelessness Strategy 2008-11 provides the policy framework for effective partnership working and the delivery of efficiently managed and co-ordinated advice, housing and support services for people who are homeless or at risk of becoming homeless. This is a multi-agency strategy that promotes a partnership approach to preventing homelessness through early and effective intervention, as well as commitments to improving the quality and supply of housing stock. It sets out nine key objectives: -

• Actively support and promote a partnership approach to preventing homelessness • Invest in early intervention and effective homelessness prevention • Increase the supply of affordable homes • Encourage choice and independence • Halve, by March 2010, the number of homeless households in temporary accommodation • Improve the quality and suitability of temporary accommodation • Work proactively to safeguard children and vulnerable adults • Improve customer service, involvement and satisfaction • Ensure that policies and procedures are fair, transparent and widely understood.

Haringey was chosen as one of three areas in the country to pilot area-based action planning, with the Council and local housing associations working together to tackle and prevent homelessness, and support Haringey’s efforts to halve its use of temporary accommodation.

With an emphasis on housing options, homelessness prevention, early intervention and effective joint working, Haringey’s Strategic and Community Housing Services have been reorganised to create separate Housing Advice and Housing Options teams, and a Private Sector Lettings Team.

This comprehensive service includes: -

• A dedicated housing options service where clients are given alternative options at an early stage to prevent their homelessness • Home Connections – Haringey Council’s Choice Based Lettings scheme • The private sector lettings team - works with private landlords who are willing to provide assured short-hold tenancies (ASTs) to applicants. The team matches prospective tenants with properties and provides a comprehensive lettings process to ensure the use of fair tenancy agreements and that rents are affordable • A major emergency accommodation reduction project with the ambitious target of reducing numbers in emergency accommodation from 802 to 200 by March 2010. • Liaison with Housing Association partners to procure direct lettings in the private sector for potentially homeless clients

Haringey could seek to learn from the experience of Local Space in Newham and Hackney, by partnering with a housing association that could acquire homes in the market for use as quality temporary accommodation, financed from a combination of HCA grant and borrowing on the secure income stream provided by housing benefit. Once the acquisition loan has been paid off the homes can transfer to permanent social housing.

30 SEPTEMBER 2010

Overcrowding and under-occupation

London Housing Strategy: The level of severe overcrowding in the social rented sector should be halved, and the number of social rented households under occupying by two or more bedrooms reduced by two thirds, by 2016.

Overcrowding is the single biggest reason for living in unsuitable housing in Haringey, affecting over 8,000 households, overwhelmingly in the social rented sector. At the same time more than 17,000 households are under-occupying, defined as having more than one spare bedroom.6 Tackling the twin issues of overcrowding and under- occupation have been identified as priorities in the Council’s Housing Strategy and Homelessness Strategy. The publication of ‘Overcrowding in social housing a London action plan’ has highlighted further the issues and identifies three key areas: -

• prioritising action on overcrowding and under occupation • identify overcrowding and under occupied households • tackling under occupation

The council will work in partnership to enable the report to become embedded within its own strategies.

Through Haringey Council’s Overcrowding Pathfinder work Haringey is actively developing a range of solutions to problems of overcrowding, including a recent programme deconverting decommissioned temporary housing hostels into larger family units for social rent. Using Haringey’s own resources and some grant from the Mayor’s Targeted Funding Stream, nine former hostels have been converted since 2006 and are now providing permanent affordable housing for families. A further 8 hostels and two adjoining flats are planned for deconversion during 2009/10 and 2010/11.

London Housing Strategy: The Mayor has set a target for a two thirds reduction by 2016 in the 64,000 social renting households with two or more bedrooms above the bedroom standard.

The Council is developing a borough-wide approach to overcrowding and under- occupation in the social sector, in close partnership with support services, Homes for Haringey and housing associations. The Council is working to encourage tenants to downsize in order to maximise opportunities to match households to appropriate sized homes.

6.4 Improving supported housing provision

Older People The population of the borough is ageing rapidly and there is a need for greater choice and freedom to allow older vulnerable people to continue living independently in their own home.

In 2005, the Council commissioned a study to look at the long term housing and support needs of Haringey’s older people. The study concluded a potential shortfall of 350 extra care units to meet existing and emerging need through to 2013. There are currently only 60 units of extra care provision in the borough.

There are almost 1,700 sheltered housing places in Haringey provided by the Council and housing associations.7 In response to changing needs profiles, Haringey plans to

6 Haringey Housing Needs Assessment 2005

7 Older People’s Needs Assessment, August 2009 31 SEPTEMBER 2010

reduce this number and increase the amount of extra care provided, as this enables older people to lead more independent lives in the community.8

With the support of HCA capital funding two new schemes at Highgate and Hornsey are currently under development and due for completion in 2011. Both of these schemes will provide 40 additional units of extra care, and when taken with the existing 60 units, all of the borough’s extra care provision of 140 units will be located in the west of the borough.

While the concentration of extra care provision in the west is consistent with the high number of residents aged 65 years old and over living in that part of the borough, it is seen as directly disadvantaging the older BME population who live predominately in the east of the borough and whose population is set to rise significantly over the next five years. Consequently, the Council is keen to explore all available opportunities for the provision of additional units of extra care in the east of the borough.

New schemes must be developed with certain criteria in mind: -

• in areas very close to main shopping, community and recreational centres • access arrangements in terms of paving, lighting, street scene etc • new development including retail, recreation and transport links will need to be fully accessible and attractive facilities for older people, including older residents with significant long term conditions • partnership working – We are currently canvassing views of the boroughs older residents on how to improve their quality of life with Age Concern and a key Housing Association Provider. The research will highlight services and facilities needed to enable them to remain active and involved citizens

Haringey’s Adult Services, Strategic and Community Housing Services and Asset Management teams are working in close collaboration to secure additional extra care provision. Their options appraisal recommended that Protheroe House is suitable for an extra care facility with capacity for up to 40 units and in November 2009, Cabinet agreed that “subject to formal consultation with the tenants and completion of a detailed financial appraisal, Protheroe House be closed and the site redeveloped as a mixed tenure ‘extra care’ supported housing scheme.”

The Council recently commissioned a feasibility study for this scheme and is engaged in ongoing consultation with residents. Cabinet will make a decision in November 2010.

Vulnerable people

Mental Health: Haringey’s new Joint Mental Health Strategy for Adults 2010-2013 includes two key priorities concerned with developing the housing options for people with significant mental health needs. These are: -

• Work with service users in residential settings to move on to supported and general needs housing and establish step-down flats, as well as ensuring that the housing needs of service users with mental health problems are included in the Borough Capital Investment Plan; and • Work with the new Supporting People Mental Health Providers in re-modelling services to ensure move-on to independent living, developing strong community and social networks.

8 Assessment of Older People’s Needs in Haringey, August 2009

32 SEPTEMBER 2010

These priorities need to be considered within a context that Haringey has the 6th highest prevalence of residents needing secondary mental health care out of 30 London NHS primary care trust and the 3rd highest prevalence in London of residents needing inpatient hospital care. Haringey also has one of the highest hospital admission rates for residents with complex mental illnesses such as schizophrenia.

To meet strategic priorities and to address this high level of need, we are seeking to reshape our existing supply of supported housing to develop small clusters (no more than five) self contained studios that will either form part of planned general needs housing developments or through conversion of existing residential street properties. In total we want to develop 60 supported flats using this model.

As with our approach to extra care development we will be carrying out market research with residents who have mental health needs to determine what other community facilities and services they would want offered to support their well being and active citizenship.

Much of the borough’s existing supply of accommodation designated for people with mental health needs is not fit for purpose in that it fails the Decent Homes standard (much of the existing supply only offers shared kitchen and bathroom facilities) and is not DDA compliant with poor accessibility for disabled residents. Therefore, there is an urgent need to address these challenges through our investment programme.

Learning Disabilities and Autism: Haringey is experiencing growing need for housing related support services for people with varied needs. On average there are over twenty young people with learning disability and a further eight people with autism that are in need of support. In addition there are an equivalent number of vulnerable people who are need of independent living arrangements. Due to improved health care an increasing number of people with learning disability survive into older age. There is therefore an expectation of a marked increase in the number of people with learning disability and dementia and specialist independent housing schemes are also required for this group of people.

This is in addition to the 198 adults with learning disabilities who are currently accommodated in residential care. Haringey is reviewing all of its residential care services for adults with mental health issues, learning disabilities and physical disabilities to provide more independent living schemes which provide more choice and control.

We continue to work with the Autism Steering Group and the Learning Disability Partnership Board to identify suitable development sites within the Borough. Furthermore the learning Disability partnership is also working closely to support the borough’s main providers of residential care services to remodel their services to improve more independent living schemes.

Whereas the Partnership already has in place effective relationship with the private sector that it will utilise to develop some of the new specialist housing needed, there will be a need for some social housing capital investment to support this programme. In total we envisage seeking investment to develop 25 specialist one and two bedroom self contained units that will all conform to the life time home standard.

Young people: Haringey recognises the need to provide specialist accommodation for vulnerable young people, to prevent them slipping into homelessness and other social problems. The Council is actively seeking new and improved ways of meeting these needs and reducing dependence on temporary accommodation.

33 SEPTEMBER 2010

Christian Action Housing Association proposes to develop a new, specially designed Foyer on the site of the old Rosecroft sheltered housing block. The Foyer would provide 40 units of accommodation for young people, including teenage parents, 16-17 year olds and those to whom the Council has a responsibility as a result of leaving care. The Foyer will provide supported accommodation together with education, employment and training provision as part of an integrated support planning process. As part of this development, bids will also be made through the HCA to procure secure social housing move on accommodation, to prevent the facility from silting up and to provide young people with incentive to secure low paid work or work based learning opportunities, such as apprenticeships.

Consideration is also being given to include a foyer scheme at the Tottenham Hotspur stadium development that could link into employment and training opportunities provided through, or in partnership with, the football club. Planning permission is being sought by Tottenham Hotspur for the provision of the stadium and retail area with outline planning permission for the residential element of the development. The council will work in partnership with Tottenham Hotspur and local registered providers to work up a more detailed housing proposal prior to planning permission being sought for this phase of the development.

6.5 Ensuring sustainability

Haringey Council signed the Nottingham Declaration in December 2006, and adopted a Greenest Borough Strategy in July 2008.

Core policies state that all development in Haringey should ‘protect and enhance the environment and operate in a sustainable and environmentally friendly manner’. Environmental issues are a fundamental consideration underpinning both the Tottenham Hale Masterplan and Haringey Heartlands Framework, and are fed-through at each phase of every development scheme.

The Council is taking the opportunity to improve the water environment at Tottenham Hale through the application of sustainability principles and flood mitigation measures. This requires working closely with partners such as Thames Water, the Environment Agency, Natural England, Lee Valley Regional Park as well as local interest groups, such as the Lee Valley Bat Group. Similar challenges face Haringey Heartlands, and solutions will be custom-designed to specifically suit new developments, creating and improving a sustainable urban environment, and utilising suitable empathetic green technologies for resource savings and waste reduction.

Issues for addressing the impact on the local environment include: -

• Flood risk: Working closely with the Environment Agency, Thames Water and emergency planners the Council has commissioned a Flood Management Strategy from Halcrow. In addition, a Strategic Flood Risk Assessment has been commissioned by the North London Waste DPD consortium for the North London Waste Plan. This covers the seven north London boroughs, and will address borough-wide hydrological issues.

• Sustainable Urban Drainage (SUDs): Working with Thames Water, the Council will encourage the use of SUDs to avoid wasting water and overloading drainage systems. This will include the use of green or brown roofs, especially on taller buildings, in order to encourage biodiversity and slow the effect of heavy rainfall.

• Water supply and sewerage: Working with Thames Water, Haringey Council will encourage the incorporation of water conservation methods, which minimise the

34 SEPTEMBER 2010

effect of new development on the water supply and the demands placed upon sewerage handling facilities.

• Biodiversity: The council is working closely with Natural England and the Environment Agency on improvements to existing open spaces, the water environment and natural habitats. The use of grey roofs to encourage rare bird species such as the Black Redstart, and green roofs to support invertebrates will be encouraged.

• Waste: Working with the North London Waste Authority, London Waste and with advice from London Remade, the Council will encourage the closure of the materials procurement and usage loop for demolition and construction and the use of local facilities and markets to minimise transportation miles. Wherever possible, building materials will be reused/reclaimed/recycled.

• Decentralised and Renewable Energy: Haringey’s vision is to deliver decentralised energy infrastructure across the borough and the Greenest Borough Strategy launched in 2008 commits the council to implementing decentralised and renewable energy (priority 5) and to reducing CO2 emissions from the domestic and private sector and our own corporate operations (priority 3). Hale Village already has a CHP plant, and Haringey is seeking LDA support for its ambitious decentralised energy plans to launch similar projects at other strategic developments in the borough.

Green Homes: Based on a programme of works carried out to similar properties in a neighbouring borough we have identified a package of works that costs around £35,000 per property including all leaseholder costs. This would bring the properties up to the Decent Homes standard and secure an energy rating improvement from Band E to Band B, saving 2,676kg of CO2 (50-70%) per property each year. The works would be delivered with residents in situ throughout.

These works could be delivered either as a capital works contract or as a PFI style solution with an underwritten maintenance and lifecycle cost for 15 years, which is an attractive proposition given the new technologies involved. Soft market testing indicates that there is considerable private sector interest in this approach.

SHESP – Social Housing Energy Savings Programme, the HCA have confirmed an allocation of £1.415m of SHEPS funding to insulate 1,886 hard to treat cavity walls. Works are currently on site and are being delivered through the Decent Homes contractors.

Solid Wall Insulation: There is a need to improve energy/environmental performance of existing, solid wall social housing stock. Properties not properly insulated lose up to one third of the heat through the walls, roof and floors. This means that out of every three pounds you spend on insulation, one pound is being lost. Properly insulating properties will mean that less energy is lost; therefore less is needed to maintain the same temperature levels within the property.

CESP – Community Energy Savings Programme. Homes for Haringey will be working with the Council and British Gas to deliver £3.5m of Solid Wall insulation measures targeted in the Northumberland Park Super Output area.

35 SEPTEMBER 2010

6.6 Economic development and regeneration

Supporting business opportunities

Haringey has the oldest industrial/warehousing stock in the sub-region, and while market activity indicates reasonable demand for small and medium sized industrial units in the borough this is expected to wane as stock becomes more obsolete.

The 2009 Haringey Employment Study Update concluded that in order to attract new business to Haringey we will require an additional 13,800m2 gross of comparison goods floor space and an additional 10,194m2 net of convenience goods floor space by 2016.

Providing business space for SMEs

Under the Urban Centres for City Growth Programme Haringey has delivered a package of nine projects with a total value of £5.16m focused on providing new and improved business space for small and medium enterprises in the east of the borough. The Council directly managed delivery of two commercial redevelopment projects: -

• Rangemoor Road Industrial Estate Project (Project value £807,000): o A partnership with Enfield Council to carry out improvements to five Upper Industrial Estates o Funded through the European Union, ERDF, the London Development Agency and Haringey Council o It is now let to an organisation assisting local people, in receipt of incapacity benefits, to return to employment

• Stoneleigh Road (Project value £1.58m): o A surplus Council depot site was redeveloped to provide a new commercial office building in the heart of Tottenham town centre o Occupied now by Haringey Law Centre which provides free legal advice to local residents and business, and a training organisation providing vocational qualifications

Tackling worklessness – The Haringey Guarantee

The Council is working with Homes for Haringey and social housing providers to connect residents to opportunities in training and employment through the Haringey Guarantee and other local providers. This includes ensuring that housing advice services and homelessness services are closely linked with employment and skills support. The Haringey Guarantee is the Council’s flagship employer-led scheme for engaging with residents who are furthest away from the labour market, offering them clear pathways into work. Our approach has attracted widespread acclaim and the programme has been rolled out across the borough.

The Council also commits to working with contractors to help residents benefit from employment opportunities arising from their work in the borough through applying its Employment Code of Practice and Employment Training Protocol.

From September 2006 to March 2010 there were over 2,300 residents engaged and registered on the Haringey Guarantee programme with 420 residents helped into sustained employment.

36 SEPTEMBER 2010

Job training and skills programmes

The large-scale investment in Tottenham and Haringey Heartlands will create significant numbers of construction jobs. This presents the opportunity for investment to also address social and economic development priorities in neighbourhoods within the borough characterised by high levels of worklessness.

There are a number of models that can be employed to help maximise the impact of major development schemes to help achieve local strategic outcomes, and to most benefit local neighbourhoods. Best practice examples of these models in London include CHEP+ (Camden Housing and Employment Project) and the Kings Cross Training initiative. A key component of the King’s Cross Training Initiative is that it includes an employer-led training and recruitment service, and a similar scheme could be set up as a core part of the proposed Haringey developments.

With the support of partners such as LDA, Jobcentre Plus and the Skills Funding Agency, there are a number of public funding pots that could be accessed to provide match support for an initiative, and help de-risk the involvement of the private sector. The support of the industry body – Construction Skills (the former Construction Industry Training Board) – could also be accessed to create the ‘Skills Academy’ model that would ensure delivery of innovative training techniques, implementation of national quality standards, and the sharing of best practice. Ensuring that developers are made aware of the public sector expectations from the outset will, however, be a critical element of establishing a successful labour and training scheme aligned to the Borough Investment Plan.

Heritage-led regeneration

The Council’s Physical Regeneration team has been successfully awarded numerous grant funding streams to support various heritage and conservation projects. These include the Townscape Heritage Initiative of the Heritage Lottery Fund, ’s Partnership Schemes in Conservation Areas (PsiCA) scheme, European Regional Development Fund and Housing Corporation grant. Much of this grant funding has supported historic building improvements in deprived town centres within Haringey’s conservation areas.

We are about to commence work on site in early 2010 on two heritage-led regeneration grant funded schemes in Bruce Grove town centre on Tottenham High Road: -

• Tottenham High Road Partnership Schemes in Conservation Areas (PsiCA) funded in partnership with English Heritage, Properties 467-477 and 482-488 High Road N17. Funding deadline 31 March 2012 • Third and final phase of Bruce Grove Townscape Heritage Initiative (THI) funded in partnership with Heritage Lottery Fund, Properties 512, 518, 520, 522, 524-528 High Road N17. Funding deadline 30 June 2010

The Council has also secured initial funding PsiCA for Myddleton Road N22. This is currently at feasibility and development stage in consultation with the Myddleton Rd Strategy Group. Funding deadline 31 March 2014.

PSICA is concerned with regenerating Haringey’s historic heritage and will deliver specialist refurbishment work to a prescribed group of buildings in conservation areas along Tottenham High Road and Myddleton Road. The scheme enables Haringey Council to support the heritage-related costs associated with the preservation and enhancement of conservation areas through building improvements. The work will include restoring building exteriors to their original designs.

37 SEPTEMBER 2010

In addition to the proposed PSICA projects, the Bruce Grove Townscape Heritage Initiative (THI) is on-going and runs until June 2010. This Heritage Lottery Fund (HLF) funded programme intends to address the under-use of buildings and the erosion of heritage quality in areas of conservation importance, increasing people’s sense of pride and confidence in these local areas, and creating a catalyst for further regeneration.

Environmental-led regeneration – Lordship Recreation Ground

Lordship Recreation Ground is a District Park in a central location in Haringey and our regeneration plans for the park will demonstrate how natural open spaces can flourish within a dense urban setting. We are working with local community groups to restore and enhance this key open space. As well as delivering environmental sustainability, this project will support economic competitiveness through the development of environmental technology, skills and eco-jobs. The principal outcomes of the restoration scheme include: -

• Substantial community involvement in the development, construction and future management of the Park • A major new resource for schools and community use for environmental education • 2 new eco-build facilities, the City Farm and Environmental Centre and the opened up • A significantly increased number of users from 50,000 per annum to 355,000 • Refurbishment of the Shell Theatre and Lordship Lane Toilet Block building, the historic entrance on Lordship Lane and the Model Traffic Area. • A new bicycle track for community use • Extensive landscaping works including the park and the grounds of the Broadwater Community Centre. • Creation of a new, free to use major visitor attraction in the borough • Creation of a legacy of future jobs in managing and maintaining the site

Encouraging Enterprise

The current funding stream for Enterprise Support ceases on March 2011, with the coalition government in place, future funding is uncertain. The services predominantly funded at present are aimed at nurturing small businesses focussing on entrepreneurial talent of young people.

North London Business (NLB) presently has a contract with LDA to attract new business into the borough and are being paid for every new job created. As the Inward Investment Agency for North London, NLB will be at the fore front in delivering future work to attract new and larger businesses.

The current government sees the private sector as the solution for the raised unemployment levels in the public service sector cuts. It will be making money available from Local Enterprise Partnerships between local businesses and Local Authorities. Haringey is currently planning how to best make use of the partnership.

The scale of the strategic developments in Tottenham and the Heartlands presents Haringey with serious demands on the Council’s resources and capacity. But the strategic regional importance of these projects also makes their successful delivery critical to both the HCA and the Mayor of London.

Through investment in affordable housing and improving the infrastructure and services within Haringey we hope to attract new businesses and their employees into the area

38 SEPTEMBER 2010 and retain what we have already. Providing good quality accommodation and office space will act as a catalyst to employment opportunities within the borough.

Our experience is that planning and urban design alone will not generate new small businesses or retain entrepreneurial talent. New start-up small businesses require capital investment and streamlined services that support them through the initial red- tape of business start up. Good new infrastructure – such as good quality commercial premises – will only be of benefit to existing and growing businesses that have established their products and markets and need the facilities to expand. Proposals include: -

• A comprehensive training and re-skilling programme for staff in the Urban Environment directorate, to improve skills in major project management and particularly environmental design, construction and retrofitting. • Secondment programmes for HCA and other agencies staff, to boost Haringey’s capacity (especially during staff absences for training) and foster knowledge transfer. • Related to the empty homes programme, the HCA could boost LBH capacity and expertise in expanding its CPO programme to bring sites forward.

39 SEPTEMBER 2010

7 Spatial Priorities

Summary of Key Points: • The three major regeneration areas are:- o Wood Green / Haringey Heartlands o Tottenham Hale o Wider Tottenham (A10/A1010 • Over 80% of new homes are to be delivered in Tottenham Hale and Haringey Heartlands (over the next ten years) • Services and infrastructure will be supported in areas of development • Partnership working with local boroughs will enable further development:- o Central Leeside, Seven Sisters Corridor, Manor House

7.1 A place-making approach to transformation

Haringey’s approach to improving the quality of life in the borough is rooted in place- making: integrating investment and service provision combined with a strong vision of how these interact to shape the borough. Haringey is a network of distinct places and the Council’s approach to investment seeks to reinforce their distinctive characters, while reducing inequalities between them.

Haringey Council’s Spatial or Place Making approach is to: -

• focus growth in areas that can support higher density development; • promote better place shaping through high quality design of buildings and spaces, ensuring a mix of uses and supporting infrastructure; and • create sustainable places.

Three areas of the borough – Tottenham Hale and Wider Tottenham (A10/A1010) in the East and Wood Green/Haringey Heartlands in the West, – present major opportunities for regeneration and development. They are identified in the London Plan as an Opportunity Area and Area for Intensification respectively. Other areas with the potential for change are also identified in the Council’s UDP.

Figure 12: A Map of Haringey’s major strategic development areas

40 SEPTEMBER 2010

Over 80% of the new homes to be delivered in the next ten years will be in Tottenham Hale and Haringey Heartlands. They have the potential to deliver homes over and above the borough’s housing target, but also require major investment in supporting infrastructure including transport, utilities, education, health facilities and open space. Some of that investment is already programmed but more is needed to capitalise fully on the opportunities both areas offer.

The council’s policy framework to guide development in these areas is set out in: -

• Haringey Heartlands Development Framework; • Tottenham Hale Urban Centre Masterplan; • Wood Green Town Centre Spatial Plan.

This planning framework is being supplemented by a detailed study of the Tottenham A10/A1010 corridor that, together with the other masterplan documents, will feed into proposed new Investment and Delivery Strategies for each place-making area.

The policy framework is consistent with the London Plan, the Mayor’s Draft Housing Strategy, the North London Development and Investment Framework and the emerging vision for the Upper Lee Valley.

A site trajectory list and investment profile for each Place Shaping area for the period 2011 – 2014 is shown at Appendix 1, and for the period 2014 and beyond at Appendix 2.

7.2 Haringey Heartlands / Wood Green

Haringey Heartlands is a phased development to create a high quality mixed use quarter in the centre of the borough. Positioned between Wood Green Metropolitan Centre and Hornsey Town Centre, Heartlands can provide a significant number of new homes, improved employment uses and new open space. Capitalising on good public transport accessibility, as referenced in the ‘Passenger Transport Accessibility Levels report’, the London Plan designates Heartlands as an Area of Intensification with proposals for the creation of approximately 1,500 jobs and 1,700 homes. The first major infrastructure project, the critical spine road through the eastern utilities land, was completed in March 2008, using £5m from the Community Infrastructure Fund. A new secondary school is under construction and due to open in September 2010. A map showing the location of the housing trajectory sites across Haringey Heartlands/Wood Green for the period 2011 – 14 is shown at Appendix 3.

Phase 1, New River Village, is completed and provides 622 homes demonstrating the vision of contemporary high density living with attractive public and private spaces. It links well to both Hornsey and Wood Green centres.

Phase 2 is at the planning application stage with the ‘Clarendon Square’ scheme proposed by National Grid Property and the London Development Agency. They are proposing around 1,100 homes together with retail and commercial space. This scheme will transform the central area of Heartlands but major investment is first needed to clear the site for redevelopment given that it is an operational gas site together with a small industrial estate. The major cost of this is impacting on the ability of the scheme to deliver any affordable homes. What needs to be explored is the potential for this cost not to have to be borne solely by the Clarendon Square development as otherwise it means the scheme can only deliver a very small number of affordable homes. This is not a sustainable position.

The council & the London Development Agency currently own 19% of this development site and the Council is selling its freehold interest to the LDA. If current proposals are 41 SEPTEMBER 2010 enacted regarding the future of the LDA, this means that, before any development commences on this site, the LDA’s ownership interest could transfer to the HCA. The Council is keen to explore ways of recycling any disposal receipts into securing more affordable homes in this scheme particularly recognising that this site is a major opportunity to provide affordable homes closer to the west of the borough to help redress the major east/west social imbalance.

Phase 3 of the Heartlands scheme is Hornsey Depot where the Council is close to agreeing terms to sell the site to Sainsbury’s for a new food store and up to 230 homes. At pre-application stage, this scheme should come forward from 2012.

Heartlands also has a growing cultural quarter with its centrepiece being the Chocolate Factory, where more than 80 artists’ studios and small business units form a vibrant, creative enterprise hub, the largest in North London. Haringey/Wood Green is one of ten Creative Hubs in the LDA’s Creative London programme. This northern part of the Heartlands area also includes other cultural, business and community space and forms Phase 4 of the Heartlands programme. This part of the area will maintain its employment focus but investment in the public realm (strengthening links to local transport and strategic open space) and some smaller scale opportunities for residential development will bring further life to the area. As stated above, the new High School nearing completion will provide additional secondary school capacity but further investment has to be identified to expand the local Primary School to provide the pupil places needed with the housing growth that is taking place.

The main East Coast Rail line passes north-south through the Heartlands area and major investment is planned by Network Rail with a Thameslink maintenance depot. This will bring additional jobs. The visual impact on the surrounding area is being minimised through close working between Network Rail and the Council.

The Council is working closely with the Primary Care Trust on the healthcare implications of the population growth in Heartlands. The PCT is severely constrained financially and, while sufficient capacity exists in GP accommodation to cater for the planned population, investment is needed in the quality of healthcare premises to maximise service efficiency and in linked community health services to reduce pressure on secondary healthcare capacity.

Dovetailing with the Heartlands Development Framework, the Wood Green Town Centre Spatial Plan aims to improve the quality of the urban environment and the retail offer in the town centre. The potential to establish the town centre as a ‘Business Improvement District’ is being investigated to strengthen the public-private sector partnership approach to investing in improvements here. There are also site redevelopment opportunities here being created through the council rationalising its service delivery, e.g. at Station Road.

42 SEPTEMBER 2010

Figure 13: Haringey Heartlands development sites and projects

Just to the west of Heartlands, Alexandra Palace and Park are iconic sub regional landmarks in Haringey. Both could play an important and complimentary role in the regeneration of Heartlands and Wood Green. Major investment here could strengthen cultural, leisure and recreational activities for local people as well as attract more tourists and visitors from the South-East and beyond. While there is limited opportunity for new development because of heritage listing, the Palace has considerable potential to boost its range of leisure and cultural attractions and provide additional creative industry space.

Considerable investment is needed in both the internal and external fabric of the Palace to preserve its historic value and to restore economic viability. Additional cultural, leisure and tourist activities in both the Palace and the Park could create many jobs. Much of this investment is being sought from the private sector. The challenge is to develop a package of proposals that protect and enhance the heritage of the Palace and Park while also providing an adequate private sector return.

Investment Priorities for Haringey Heartlands: -

• Increase primary school capacity by 2 forms of entry (£8m.) • Invest in primary healthcare premises (£1m. +) • Recycle public sector equity investment (£5m.) back into the Clarendon Square development to provide more affordable homes (in addition to Social Housing Grant) • Secure private sector investment at Alexandra Palace (£10m. +) 43 SEPTEMBER 2010

• Public realm investment to improve links to public transport facilities, strategic open space and ensure a comprehensive area upgrade complementing the new development (£2m.).

Haringey Heartlands (Wood Green and wider area)

Quantum of Investment • £16m. plus Social Housing Grant (for up to 800 affordable homes) and private sector investment in new development (including at Alexandra Palace) • £300m.+ private sector investment • S106 contributions (totalling £8m.) being sought from Clarendon Square development Outputs Delivered – Direct & • Over 1,600 new homes Indirect • Sufficient primary school places to serve planned new developments • Improved primary healthcare capacity to serve the planned population • Strengthened Metropolitan Town Centre with increased footfall and new attractions • Approx. 400 new jobs plus over 60 apprenticeship opportunities • Increased proportion of residents using sustainable transport modes • New local open spaces and improved links to strategic open space making it more attractive and usable • New train maintenance depot Approach/Structure to Delivery • 4 phase scheme (Phase 1 is completed) delivered as individual development packages geared to landowner/scheme requirements • Overall co-ordination by Council • Potential is being examined of including Phase 4 in a ‘Haringey Delivery Vehicle’ (e.g. Asset-Backed Vehicle) including LDA assets Physical Steps to be • NGP/LDA to select developer partner for Clarendon Square Undertaken • Assess ‘Haringey Delivery Vehicle’ options • Complete Council land sale of Hornsey Depot to Sainsbury’s Delivery Milestones • Phase 2 (Clarendon Square) – planning permission end 2010; secure developer partner 2011; site preparation works start 2012; construction start 2014 • Phase 3 (Hornsey Depot) – planning permission 2011; construction start 2013 • Phase 4 – (N. of Coburg Road) – viability assessment to determine phase scope 2012 Link to Haringey Thematic • Building balanced communities Priorities and Wider Corporate • Maximise supply of new housing Context • Sustainability • Economic development & regeneration • Decentralised Energy. The development site is specifically identified in the Core Strategy as having potential for a decentralised energy network. Table 9: A summary of the Haringey Heartlands Regeneration Project

7.3 Tottenham

Tottenham is one of the most deprived areas in both London and the country. It ranks way below the London average and experiences greater levels of deprivation than the three Olympic Boroughs.

The area needs, and has the potential for, significant regeneration investment to arrest the cycle of decline and improve the existing urban fabric. Continuing investment is vital to improve the high proportion of social housing in the area to the Decent Homes standard. Major investment is also underway on new developments, e.g. Hale Village, and the huge investment by Tottenham Hotspur FC in a new stadium together with new homes, offices; hotel and retail space will be a dynamic catalyst to the area’s transformation. 44 SEPTEMBER 2010

Investment is happening and this is laying the foundation for further growth and rejuvenation. With a number of significant development opportunities across wider Tottenham, work is focusing on delivering a clear spatial vision that incorporates each element and establishes a network of vibrant, sustainable places. Work is starting on integrating this work at Tottenham Hale and the A10/1010 Corridor into a new Investment and Delivery Strategy to provide a detailed programme management tool

Although Tottenham is well served by public transport, the area does not present itself well to visitors. It can be difficult for residents and businesses to move around within Tottenham with the one-way Gyratory system dominating the street scene. Reverting the Gyratory system to two-way traffic flow and, at the same time, improving bus, pedestrian and cyclist movement is a top priority for the Council. It will release the potential for growth. Safeguarding the allocated funding for this scheme is crucial as well as identifying how the current £1.505m. funding gap (caused by the nationally- imposed Growth Fund reduction for 2010-11) will be bridged.

Tottenham lies immediately west of the waterways and green spaces of the Lee Valley yet this major benefit is under-utilised because of poor physical links. The two-way Gyratory Scheme will help this but more attractive, safer links are needed across the Liverpool Street-Stansted rail line to promote greater use of this strategic open space.

While Tottenham faces enormous challenges, the potential of the area is equally enormous. Significant changes are already happening that will benefit existing residents and businesses as well as attracting new. Additional public sector investment though is needed to release sites for development and promote the viability of private sector investment in additional new homes.

Figure 14: Regenerating Tottenham: strategic development sites and infrastructure projects

45 SEPTEMBER 2010

7.3.1 Tottenham Hale

Transforming Tottenham Hale is one of London’s biggest place-making schemes. It includes delivering a new town centre, major residential development and re-vitalising the area around Seven Sisters. The Masterplan was approved as an SPD in 2006. With the potential to provide around 3,000 new homes over the next 10 years, development is already underway on the Hale Village site with the considerable financial support from the HCA now bearing fruit with renewed private sector investment interest. The next phases of growth at Ashley Road and Hale Wharf are being planned. Potential redevelopment of the Retail Park to promote both retail and residential uses is an option for the longer-term and the role of the industrial area in the south of Tottenham is also under review to assess the potential for mixed uses there.

Figure 15: A plan showing the Tottenham Hale key sites and projects

A map showing the location of the housing trajectory sites at Tottenham Hale for the period 2011 – 14 is shown at Appendix 4.

Tottenham Hale Gyratory and Station Square

The existing gyratory system creates an environmentally degraded and fractured environment for residents and visitors. It impacts adversely on the experience and perception of the area. Changing this back to two-way traffic flow with the associated environmental improvements for pedestrians, cyclists and public transport passengers is essential to realise the potential of the area. From a relatively low base, it will help generate rising values to bolster the viability of planned developments and

46 SEPTEMBER 2010 generate prosperity across the area. The scheme will also create a new public square and transport interchange at .

This project is led by Transport for London, in partnership with the Council, the HCA and the LDA. A funding package for this scheme is in place but this is under pressure from budget changes. This infrastructure improvement is a key element in delivering new development in the wider area and the partners are working closely to seek to maintain the funding and bridge the current funding gap of £1.505m. (a 4% funding gap).

Repayment of part of this scheme cost from new development in the area is being considered as part of the Council’s possible Community Infrastructure Levy system.

Detailed design is at an advanced stage and advance utility works are due to begin in 2010. The main Gyratory works are scheduled to run from mid 2012 to 2014.

Improving East-West Links

To complement the new road system, a stronger link from Tottenham High Road is planned that will provide a more attractive east-west route for pedestrians and cyclists from Tottenham High Road to the Lee Valley Regional Park. The route will form an integral part of the developments at Greater Ashley Road and Hale Village, bridging the rail lines and culminating in a bridge across the Lee River to Hale Waterside. This route will be created incrementally as it is linked to the implementation of individual developments and additional investment will be required in particular to fund the bridge works.

This is an important route for existing residents to access the strategic open space in the Lee Valley and it will also strengthen the pedestrian and cyclist links from the new developments at Hale Village and Hale Waterside to the wider Tottenham area for journeys to schools, healthcare, shops and jobs.

Hale Village

This major mixed use development is the critical first stage in the transformation of Tottenham Hale. It is helping to create the catalytic conditions for major neighbouring developments at Greater Ashley Road and Hale Wharf.

The development itself creates a new village of around 1,100 mixed tenure homes including 542 affordable homes, student accommodation, a hotel, retail and commercial space. The first phase of student accommodation is occupied and the affordable homes and office space are under construction.

The development is led by Lee Valley Estates with Newlon Housing Trust as the housing association partner. The market downturn has required substantial additional investment by the HCA to support the first phases of the scheme. This critical investment is now paying dividends as private sector investment interest is being secured for the market housing in the scheme with the purchase by Bellway Homes of two plots that will provide 140 private homes.

The terms of the s106 agreement are being re-negotiated to re-profile the funding obligations that contribute to supporting new infrastructure, including £3.5m. to the Gyratory Scheme. This is being facilitated by the HCA offering to extend the term of its loan on the scheme to support the timely payment of this s106 funding given the Gyratory Scheme’s key importance.

47 SEPTEMBER 2010

Continuing the close working between the developer, Haringey Council and the HCA will remain key to maintaining progress at Hale Village.

As the development progresses and individual plot sales are completed, the HCA should recoup its £7m. equity investment. The Council is keen to discuss with the HCA ways in which this sum can be used as a rolling investment fund to support the implementation of other key projects in the borough, e.g. Greater Ashley Road/Marsh Lane or Haringey Heartlands.

Greater Ashley Road

Lying immediately north-west of Tottenham Hale Station, the redevelopment of industrial and commercial sites at Ashley Road has the potential to create up to 1,200 high quality private and affordable homes in a park-side setting and in a highly accessible location. A Masterplan is being prepared following wide-ranging public consultation on development options. This plan will balance the development of new homes with the retention and improvement of some existing employment space to ensure a balanced mixed use scheme. Investment is needed to create additional primary school capacity to match planned population growth.

The release of the current operational Council depot site for new homes at the northern end of Ashley Road by relocating it to Marsh Lane is a key element in the potential early release of land for new housing. The Marsh Lane relocation though (see below) is facing a substantial funding shortage that is delaying this next phase of regeneration in Tottenham Hale.

The Council is working with private landowners of other potential redevelopment sites to encourage proposals to come forward. Compulsory acquisition of some sites may be required to ensure a comprehensive approach but the investment here will seek to focus on the private sector with the public sector acting in a facilitating capacity. The Council’s work on assessing the possible format for a ‘Haringey Delivery Vehicle’ involving public and private sector partners will include consideration of the most viable way to promote development of the Ashley Road sites.

A Development and Infrastructure Delivery Plan will be developed by the end of 2010 through close collaboration between the Council, HCA, TfL and LDA and in consultation with other stakeholders. A flexible and co-ordinated funding framework from the Council, HCA and other public agencies is needed to provide the supporting infrastructure required to underpin this next phase of growth at Tottenham Hale.

Marsh Lane

This site was acquired by the Council using Growth Fund money to provide a new operational Council street services depot and state of the art recycling facility in an established industrial area. This would relocate the existing depot on Ashley Road and free that site for residential development as part of the Ashley Road proposals. The sale of that site will contribute to the cost of the new and vastly improved depot. This scheme could also accommodate, and be the further catalyst for on sites nearby, a cluster of green industries in accordance with the Upper Lee Valley economic study.

The new depot is therefore a key that will help unlock a significant part of the Ashley Road scheme. It should receive planning consent in autumn 2010.

A funding package has been developed including external funding bids and a significant contribution from prudential borrowing by the Council predicated on the

48 SEPTEMBER 2010

value to be realised from the Greater Ashley Road scheme. However, a shortfall still remains. Investment support could enable this scheme to come to fruition and thereby release the regeneration potential of Ashley Road as well as being a catalyst for new jobs.

Hale Waterside

This site will accommodate around 300 affordable and private homes (2011-2014) together with waterside employment, leisure and amenity opportunities. It is jointly owned by British Waterways and Lee Valley Estates. A planning application for a mixed tenure development is expected to come forward in 2011. A linear site alongside the River Lee, this scheme offers the potential for a dynamic, vibrant, mixed use waterside environment offering superb views across the open space of the Lee Valley.

7.3.2 Tottenham (A10/A1010) Corridor / Wider Tottenham:

There are a series of major, high profile development sites on the High Road that will spearhead development and be a catalyst for wider regeneration across Tottenham. The emerging cultural and leisure quarter around Tottenham Green, the renewed retail offer at Wards Corner, and the proposed new stadium and sports hub at Tottenham Hotspur Football Club further north on the High Road, will be central to transforming the attractiveness of Tottenham – which in turn will help ensure the success and financial viability of the major housing developments around the Hale.

A map showing the location of the housing trajectory sites across Wider Tottenham for the period 2011 – 14 is shown at Appendix 5.

Tottenham Green Cultural Quarter

Tottenham Green area already provides a hub of educational, leisure and art and cultural amenities and a variety of opportunities exist in the area to enhance and complement these facilities. To shape and integrate the education, culture and leisure led place making in Tottenham Green, a planning and design framework is being developed by a widely-based stakeholder group which includes the College of Haringey, Enfield and North-East London (CHENEL) and the new Arts Centre. The framework will identify and set the scale of opportunities for development including residential uses in the area and a timetable for implementation.

Tottenham Hotspur FC stadium redevelopment

Tottenham Hotspur Football Club (THFC) proposes a new 56,000-seater stadium just north of their current ground, along with a new public square, a retail superstore, 200 homes, a hotel and primary healthcare space. The council and THFC are currently investigating a decentralised energy network on the site, with heat provided by a natural gas CHP engine and biomass boiler. Together these measures are estimated to reduce emissions from the site by 21%. This scheme has the potential to spearhead the transformation and revitalisation of this deprived area and will play a key place shaping role in the regeneration of the wider Tottenham area. The proposed replacement of the existing stadium is phased so that Tottenham Hotspur can continue playing on the site during construction – maintaining the economic benefits that the club brings to the area throughout. The new stadium is included in the plans for England’s bid to host the 2018 World Cup Finals.

49 SEPTEMBER 2010

Figure 16: A digital drawing of the proposed Tottenham Hotspur Stadium

A revised planning application was submitted in May 2010 to overcome design and listed building objections. HCA grant support for the affordable homes in the scheme will be needed, and the scope for special needs and supported housing is also being examined. CPO powers may be required to complete site assembly. The housing element of the scheme is necessarily the last phase in 2014-16.

Demolition on part of the site has now started to ensure rapid progress when planning permission is granted (by the end of 2010).

Wards Corner

Wards Corner is a strategically important site at the junction of Seven Sisters Road and Tottenham High Road, directly above Seven Sisters Underground station. The Council is keen to use the potential of this site to raise the profile of wider Tottenham by accelerating social, economic and environmental improvements across the area.

The scheme includes ground-floor retail space with 197 affordable and private units above, together with a new public square to the High Road. Following discussions with local traders and stakeholders, the plan proposes to re-provide the Seven Sisters market. The current proposals for comprehensive redevelopment of the site include: -

• public realm improvements, especially to the Tottenham High Road frontage • improved entrances to Seven Sisters Tube Station • a variety of new shops and restaurants on West Green Road, Tottenham High Road and Seven Sisters Road aimed at High Street names and independent businesses • new family homes on Suffield Road • new apartments arranged in ten blocks around a roof garden above the shops. • 197 homes and approximately 3,700sqm of commercial space.

The development site boarders on the St Ann’s Hospital/Lawrence Road/Broadwater Farm decentralised energy network area identified in the Core Strategy, and as such the feasibility of implementing a network will be investigated.

50 SEPTEMBER 2010

Figure 17: A plan of the Wards Corner development site

Lawrence Road

Lawrence Road lies between West Green Road and Clyde Road, to the north of the West Green Road shopping centre. Close to Tottenham Hale and Seven Sisters the site is currently in employment use albeit with a high proportion of vacant floor space. The Lawrence Road Planning Brief SPD sets out the Council’s vision for Lawrence Road to make the area a place where people want to live work and visit, by promoting mixed-use development, improving the quality of the environment and ensuring sustainable development.

An application by Galliard Homes is currently under consideration and would provide over 800 new homes over two phases. The first phase could start in 2011 to provide around 400 affordable units.

The Lawrence Road development site has been identified as a potential decentralised energy network hub, with the further possibility of connection to a future network centred on the nearby Broadwater Farm Estate.

Investment Priorities for Tottenham: - • Bridge the 4% funding gap for Tottenham Hale Gyratory Scheme (£1.505m.) & maintain other funding allocations (£34m.) • Identify full funding to bridge the funding gap for the Marsh Lane Depot • Station capacity upgrades linked to the Tottenham Hotspur FC scheme (£10m. +) • Social Housing Grant to support up to 1,100 new affordable homes • Increase primary school capacity by 2 forms of entry (£8m.) • Create a primary healthcare ‘hub’ as part of the Tottenham Hotspur scheme (£10m. +) • Create a new public park in the A10/1010 Corridor (£1.5m.) linked to redevelopment of adjoining site • Invest in creating the Tottenham Green Cultural Quarter with improved education & community facilities and transformed public realm (£3m.) • Construct the east-west pedestrian/cyclist link between Tottenham High Road and (£5m.+)

51 SEPTEMBER 2010

Tottenham Regeneration

Quantum of Investment • £83m. plus Social Housing Grant (for up to 1,100 affordable homes) • £1,000m.+ private sector investment

Outputs Delivered – Direct & • Over 2,000 new homes including up to 1,100 affordable homes Indirect (in addition to 542 affordable homes at Hale Village) • Improve homes to Decent Homes standard • International football stadium • Sufficient primary school places to serve planned new developments • New primary healthcare ‘hub’ at THFC and improved services at linked satellites healthcare centres to serve the planned population • Improved traffic flow and bus service reliability within Tottenham • New jobs plus over 200 apprenticeship opportunities • Increased proportion of residents using sustainable transport modes • Improved further education facilities • New and improved cultural facilities • New industrial space to foster growth of a ‘Green Industries’ cluster • New Council street services operational depot • New public open space • Improved local open spaces and improved links to strategic open space making it more attractive and usable • Contribution to decentralised energy in the Borough Approach/Structure to Delivery • Specific schemes delivered via individual development packages geared to landowner/scheme requirements • Ashley Road sites being considered to be part of a ‘Haringey Delivery Vehicle’ (e.g. Asset Backed Vehicle) • Potential Tottenham Green Partnership • Overall co-ordination by Council Physical Steps to be • Let Gyratory Scheme construction contract Spring 2012 Undertaken • Development Agreement to underpin CPO action for THFC scheme – and the same may also be required at Gtr. Ashley Road • Select developer partner, if appropriate, for ‘Haringey Delivery Vehicle’ • Identify relocation sites to release private sector sites at Ashley Road, e.g. Murphy’s office & yard, and secure landowner commitments • Establish Tottenham Green Cultural Quarter Partnership with CHENEL, LDA, Newlon Housing Trust and private landowners Delivery Milestones • Development at Tottenham Town Hall starts 2010 • Ashley Road Delivery Plan end 2010 • Construction start on private homes at Hale Village 2011 • THFC scheme construction starts 2011 • Haringey Delivery Vehicle established 2012 (as appropriate) • Marsh lane Depot completed 2013 • Phase 1 Ashley Road development starts 2013 • New public open space in A10/A1010 corridor 2014 • Gyratory scheme completed Spring 2014 • Hale Village bridge over rail lines 2015

Link to Haringey Thematic • East/West polarisation Priorities and Wider Corporate • Maximise supply of new housing Context • Sustainability • Economic development & regeneration Table 10: A table to summarise the regeneration of Tottenham

52 SEPTEMBER 2010

7.4 Significant development along the borough boundary

Central Leeside: An Area Action Plan is being prepared by Enfield Council for the Central Leeside Area. Initially the AAP was being prepared jointly with Haringey Council as an area of Northumberland Park was included in the Plan. However, Haringey Council is no longer formally working with Enfield Council on this Plan as no agreement can be reached on the distribution of uses within the plan. The area includes 130 hectares of industrial estate land and part of it is designated as a Strategic Employment Location within the London Plan.

The area has suffered from a long period of structural decline in manufacturing in London. Several programmes have attempted to halt this trend, including substantial investment from the European Union. Some resurgent activity has been generated such as the new Coca-Cola plant on the Eley Estate and new retail uses have been introduced with Ikea’s landmark store opening in 2005. The area sits along the axis between the 2012 Olympics Park and legacy developments to the South and to the growth corridor to Cambridge to the North. A significant residential community already exists in the area, on the fringes of employment land and in established communities to the West of the area. Significant opportunities for housing growth do exist in the area, primarily to the outer ring around the core industrial and

Figure 18: Central Leeside

employment areas between the railway lines and reservoirs. A settled vision and plan is needed to successfully safeguard and realise the area’s potential. A feasibility study for a decentralised energy network centred on the Upper Lee Valley is being planned by a partnership between the London Development Agency, North London Strategic Alliance and the boroughs Haringey, Barnet, Enfield and Waltham Forest. The ambition is for the network to provide low carbon energy to local homes and businesses to support the sustainable economic development of the area.

Seven Sister Corridor Joining Up Growth: The Study covers the strategically important location in North London at the junction of the London Boroughs of Hackney, Haringey and Islington. It is within the designated growth area in close

53 SEPTEMBER 2010

proximity to the 2012 Olympic Park. The Study has sought to define the key characteristics of the area around Seven Sisters Road, identifying the key development sites, the scale of development projects and the investment needed to support them. The major initiatives include Woodberry Down Master plan (promoting 4,664 new homes, new city academy, community facilities and commercial floor space), Wards Corner/ and Area Action Plan (provide intensification of a range of uses for the area west of Finsbury Park Station).

Woodberry Down, Hackney: A major regeneration area in London Borough of Hackney adjacent to the borough boundary and Seven Sisters area.

Manor House: Haringey Council is working with Hackney Council to prepare an Area Action Plan for the around Manor House station. The AAP is at very early stage of preparation and Haringey Council is keen to ensure that future development options would also support and enhance the areas along the borough boundary in particular accessibility and linkages to recreation and leisure uses from the residential areas in the two boroughs.

.

54 SEPTEMBER 2010

IMPLEMENTATION

Summary of Key Points: • Planned output of over 3,800 new homes (2011-2014) • Linked public sector investment of over £380m. in social, community and transport infrastructure • HCA investment required of more than £209m. including the recycling of potential equity investment receipts • Private sector investment potential of £1.06bn.

The previous sections provide a detailed analysis of the Council’s priorities and proposed housing and regeneration programmes across the borough. They also set out the important multi agency partnership approach to delivering sustainable communities. The following sections consider the planned outputs against the likely investments required, highlighting gaps in funding and outlining the interventions needed from key partners.

8 Development capacity, planned outputs and projected costs

There has been significant public and private sector investment in Haringey over the last three years. But in a borough with extensive areas of deprivation much more is needed. Recent public sector investment includes £214m invested by the Council in 12 school projects delivering improvements and new capacity and over £139m invested by the HCA to deliver housing and public realm improvements.

828 homes were built in the borough in 2008/9 and over 1,000 homes are currently under construction or are due to start before the end of 2010. Particularly given the current economic climate, this represents a welcome level of development compared with the strategic target of 680 new homes a year.

Site No. of Planned Homes Completion Hale Village, Tottenham Hale, N17 682 2012 Tottenham Town Hall, Tottenham Green 109 2012 1-13 Herbert Road, Tottenham Green 18 2011 Plevna Day Nursery, Plevna Crescent N15 16 2011 Park Tavern, Park Road Tottenham N17 34 2011 Hesta Annex, White Hart Lane Tottenham N17 13 2010 658-660 High Road Tottenham N17 27 2011 Prince of Wales PH, 612 High Road, Tottenham N17 20 2011 624 High Road, Tottenham N17 54 2012 Aneurin Bevan House, N11 37 2011 R/O 242-274 Hermitage Road N14 20 2010 Total 1,030 Table 11: Homes currently under construction

Substantial public sector investment is needed in 2011/14 but clearly this is facing major difficulties in the current economic climate: -

• planned Council capital investment of over £350m. 2010-13 in housing, schools, social care and environmental improvements; • investment by NHS Haringey in improved healthcare facilities; • £32m. investment 2010-14 by TfL, LDA and the Council in the Tottenham Hale Gyratory and Bus Station scheme. 55 SEPTEMBER 2010

The sites from the housing trajectory list for the period 2011 – 14 have been assessed against the Council’s prioritisation criteria (Appendix 6) with individual site appraisal sheets shown at Appendix 7.

It is recognised that HCA investment for 2011 onwards will be heavily constrained and will be subject to project and investment appraisals as part of the Local Investment Agreement.

In developing a delivery plan, the Council is focusing on those sites that are most advanced in terms of site preparation, infrastructure and planning, or in terms of estate regeneration and remodelling, those areas that deliver maximum value for money while meeting customer needs and expectations. The investment required to progress these schemes are shown in the table below.

Investment Period 2011-14 Priority Area Outputs HCA Private Total £m £m £m

• Over 760 new homes (380+ affordable) • Improved services/ facilities • New ‘green’ industrial Tottenham Hale 42 220 262 space • Improved traffic and pedestrian flow around current ‘Gyratory’ • New bus interchange and public square

• Over 1400 new homes created (700+ affordable) • International football stadium Wider Tottenham 80 600 680 • Improved services within the area –education, health, infrastructure

• Over 1,600 new homes Wood (800+ affordable) Green/Haringey 87 240 327 • A new town square Heartlands/Hornsey • New food store TOTAL 209 1,060 1,269 TABLE 11: Projected outputs and investment requirements

Part of the investment sought for Clarendon Square in Haringey Heartlands is to ‘recycle’ existing HCA & LDA equity investment in land at Heartlands and at Hale Village (when realised) to support the delivery of affordable homes. This is required because of the high ‘upfront’ costs that need to be incurred to make the National Grid land at Clarendon Square available for development. Securing affordable homes as part of this development is vital to supporting the objective of building balanced communities and reducing east-west polarisation.

Combined with the linked planned investment by the Council and other parts of the public sector of over £380m., total public and private sector investment that will deliver new homes, supporting infrastructure and build sustainable communities is estimated at £1.65bn.

56 SEPTEMBER 2010

9 Investment analysis

With increasing pressure on national and local budgets, the key to achieving the housing and regeneration plans in Haringey lies in the ability of all partners to deliver innovative solutions and provide greater value for money. This requires strong collaborative working.

9.1 Homes and Communities Agency

Whilst acknowledging a change in government funding priorities, the table below shows HCA investment in terms of average grant per property over the past three years for social rented and intermediate units.

Allocation Average Tenure Units (£) (£) Social Rent 753 97,854,314 129,953 Intermediate (Rent & LCHO) 636 36,781,636 57,833 Table 12: Average HCA grant per property 2007-2010

Based on the development capacity of the place shaping areas between 2011 and 2014, the level of anticipated HCA investment is shown below based on a range of grant assumptions (i.e. the average of the previous three years, 5% below this level, 10% below etc). Efficiency savings are anticipated through improved methods of working and the introduction of new delivery vehicles although it is hard to quantify the exact extent of these savings.

Grant Grant Grant Grant Grant Place required at required required required required making Product Units previous (less 5%) (less 10%) (less 15%) (less 20%) area rates (£) (£) (£) (£) (£) Wood Social Rent 562 73,033,586 69,381,907 65,730,227 62,078,548 58,426,869 Green / Haringey Intermediate 241 13,937,753 13,240,865 12,543,978 11,847,090 11,150,202 Heartlands 34,957,357 33,209,489 31,461,621 29,713,753 27,965,886 Tottenham Social Rent 269 Hale Intermediate 115 6,650,795 6,318,255 5,985,716 5,653,176 5,320,636

67,315,654 63,949,871 60,584,089 57,218,306 53,852,523 Wider Social Rent 518 Tottenham Intermediate 222 12,838,926 12,196,980 11,555,033 10,913,087 10,271,141

Total units 1927

HCA investment required 208,734,071 198,297,367 187,860,664 177,423,960 166,987,257 Table13: Levels of anticipated HCA investment for BIP priority areas

Additional HCA investment is required in the Clarendon Square (Heartlands) scheme to deliver an acceptable proportion of affordable homes.

For its part, the Council will continue to explore ways in which it can support delivery of the affordable housing programme through the innovative use of its own assets, capital programme and prudential borrowing.

9.2 Wider regeneration

Other public and private sector partners play a vital role in funding, enabling and delivering economic and social regeneration schemes in the borough and the council will work with all stakeholders to maximise financial support through the principles of shared investment.

57 SEPTEMBER 2010

9.3 Registered Providers

In its document “Building Better Lives” published in September 2009, the Audit Commission promotes the role of registered providers in contributing to “a good strategic housing function that can add to the wider well-being of an area by helping to make a place where people want to live with good quality housing from which they can select a type and tenure appropriate to their needs, aspirations and means”.

In Haringey, the relationship between registered providers and the Council is a strong one that has contributed to significant levels of investment and development in the borough in recent years. The continued engagement of registered providers is essential if the Council is to achieve its target of delivering 340 new affordable homes per year.

To help achieve this, the Council hosts a very successful Developers Forum four times a year, with the aim of bringing together all partners, including the HCA, to discuss localised delivery issues and develop a joined up approach to overcome potential barriers. The future of this Forum will play a key role in developing Haringey’s strategic delivery options to bring forward additional homes in the borough.

9.4 Local authority

Ultimately councils may have to assume that the HCA will be unable to provide grant and prepare to better utilise local (public & private sector) and council assets. To this end, the Council is currently undertaking a comprehensive audit of its HRA land and property assets. This will assess the potential to release assets at nil value or ring fence the capital receipt to support future developments and/or other housing priorities such as decent homes and estate regeneration (see also section 10.4 ~ Strategic Delivery Vehicle). Any such proposals will, however, have a knock on effect on other Council priorities which may rely, in part, on HRA capital receipts. Consequently an HRA Disposals Policy is required that will enable decisions to be made in light of all competing priorities and will place local decision making at the heart of the process. It is proposed that the Disposals Policy be developed in consultation with Transforming Haringey and other interested stakeholders.

The Council is keen to explore the opportunities afforded under the Local Authority New Build scheme, and again, in acknowledging a reduction in available grant, will explore innovative solutions through the use of its own assets and partnerships to develop proposals further.

9.5 Strategic delivery vehicle

Haringey’s strategic sites present various challenges in delivering successful development. The Council owns 5 areas of land that play a key role in regeneration schemes: -

• Olympia Trading Estate (Clarendon Square) • Ashley Road Depot, site at Ashley Road south and Hale Road properties (Greater Ashley Road) • Hornsey Town Hall and adjoining land (Hornsey Town Hall scheme) • Civic Centre site, Wood Green (Heartlands/Wood Green) • Trading Estate (Tottenham Hotspur FC scheme).

58 SEPTEMBER 2010

Some of these (together with other smaller sites) are being looked at for possible transfer to a Strategic Delivery Vehicle. With the aid of a £48,000 grant from the HCA, the Council has commissioned King Sturge to carry out an options appraisal of the delivery vehicles which may be appropriate to achieve Haringey’s regeneration objectives.

The brief presented to King Sturge is all inclusive, with nothing ruled in and nothing ruled out. The Council is particularly keen to explore the opportunities presented by placing all of its land and property assets (residential and commercial), including all related management functions, into an asset-backed special purpose vehicle (SPV) to lead the regeneration of key areas. We are also keen to explore the prospect for other public sector organisations, such as the health service, to place its land and property assets into the vehicle, thereby creating a larger public sector investment portfolio.

By working with the private sector, this approach can provide the development skills and capacity needed, and the commercial acumen required to develop complex sites. It can also provide access to a mix of public and private funding and development finance and the opportunity for the public sector to share in, and recycle, the upside return from the value generated in the area.

The Council is working with the HCA to look at the feasibility of establishing a special purpose vehicle, and whether there are potential benefits for Haringey from participation in the HCA’s Public Land Initiative.

When the options appraisal is completed, a decision will be taken whether to produce an Outline Business Case in respect of the preferred option(s).

9.6 Estate based regeneration

While it is envisaged that in the longer term the strategic delivery vehicle will provide the means by which the majority of major investment in housing, infrastructure and regeneration is managed within the borough, it is pragmatic to assume that this venture will take a number of years to be established. In the meantime, the Council is seeking to develop an estate based regeneration strategy based on the principles of Total Place that seeks to align capital investment for regeneration and housing in an area to create maximum impact. The principles of this approach can equally be applied to the strategic delivery vehicle.

The new estate based regeneration strategy will aim to be self financing, and take as its starting point the potential for significant reductions in public subsidy through the use of land and capital assets on individual estates, so that HRA capital potential can be unlocked and used to lever in additional private sector funding without recourse to the Council’s wider capital programme.

Such an approach requires a detailed assessment of the investment required on each estate, not only to bring the properties up to the decent homes standard, but also in terms of any potential new build required to meet housing need and related environmental/infrastructure costs. Against this cost will be the potential value of surplus land and property assets on the estate, with such an approach potentially releasing enough capital to attract inward investment from the private sector or a registered provider.

59 SEPTEMBER 2010

9.7 Preferred investor status

Central to our estate based regeneration approach is the potential for the Council to achieve Preferred Investor Status with the HCA. This would mean that the Council could bid for HCA funding through the NAHP in the same way that registered providers can. By doing this the Council, in partnership with Homes for Haringey and/or the private sector, could begin a programme of council new build across its priority estates. To maintain viability and present the opportunity of a surplus to re- invest, the Council would need to develop its own land and build houses for shared ownership and outright sale in addition to its core business of social rented units. Such an approach is considered an appropriate way forward for Brunel Walk/Turner Avenue, with the surplus hostels at Brunel Walk and surplus land at Turner Avenue being used to release capital potential to remodel the whole estate and provide additional council housing.

9.8 Devolved delivery

Under current public funding arrangements, the HCA is responsible for the allocation of 81% of the housing pot in London and 100% of allocations on new housing development schemes. There is no certainty on funding levels within boroughs, with allocations being made to individual registered providers on the basis of the HCA’s funding criteria. Should schemes be delayed or fail, the HCA will move its funding around the Capital often with no consultation with the original borough. This limits the influence that boroughs have on housing provision in their area.

Devolved Delivery Agreements would fundamentally change this investment landscape. They would: -

• give boroughs certainty over a three year funding period; • enable boroughs to move that money flexibly across different types of investment and substitute schemes; • ensure that boroughs play a lead role in negotiations on investment from the start of the process; and • enable boroughs to take the key investment decisions for their local area.

In exchange for agreeing a set of broad outcomes with the Mayor and the London Board, boroughs would be given greater autonomy over investment decisions, certainty on a given level of resources and the flexibility to commit those resources in the way that best suits local circumstances.

The London Housing Strategy will provide the basis for the “deal” between central government and the Mayor, with the Borough Investment Plan setting the local framework under which devolved delivery will operate. Local investment agreements will act as the ‘gateway’ to devolved delivery, with Devolved Delivery Agreements empowering boroughs in their place-making and regeneration roles. They will also enable boroughs to contribute more to housing delivery; delivering more affordable housing to meet London’s needs, in particular social rented housing.

60 SEPTEMBER 2010 IMPLEMENTATION, GOVERNANCE AND MONITORING

10 Governance arrangements

The Borough Investment Plan is a borough wide ‘road map’ towards becoming a council we are all proud of, and consequently the Haringey Strategic Partnership will act as key sponsor to ensure a joined up approach. The following structure shows how the implementation of the plan will be reported and governed.

Governance and Delivery Structure

Haringey Strategic

Partnership

Transforming Haringey

Regeneration Programme Board

Area Delivery Area Delivery Area Delivery (Haringey (Tottenham Hale) (Wider Tottenham) Heartlands/Wood Green)

Fig 19: A diagram to show how the Investment Plan will be implemented

The Transforming Haringey Officer Group, which brings together high level representation form the Council, the Greater London Authority, the London Development Agency, Transport for London and the Homes and Community Agency, will be instrumental in shaping and supporting the proposals set out in the Plan and for ensuring it remains a living document.

At a borough level, the Plan will be monitored by a newly formed Housing & Regeneration Board which will bring together representatives from key council departments (e.g. strategic and community housing, planning services, property services, supporting people and Homes for Haringey), the HCA and external partners including registered providers.

The governance structure will be further sub divided into four Area delivery boards. Three of the boards will be responsible for the three place making areas identified within the Plan (Haringey Heartlands/Wood Green, Tottenham, Hale and Wider Tottenham) with the fourth having responsibility for the remaining areas of Haringey.

Details are still being agreed with partners, and it is envisaged that the Governance and Delivery structure will be developed in detail as part of the local investment agreement. 61 SEPTEMBER 2010

11 Monitoring and review

The monitoring and progress review of the BIP will be undertaken through Transforming Haringey and further supported by annual performance updates to Haringey Strategic Partnership board. Each Area Delivery Group will be expected to provide regular performance updates to the Regeneration Stream Board with the BIP being reviewed by Transforming Haringey on a quarterly basis.

12 Risk management

Partners have worked diligently to reduce the delivery risk, however the following risks have been identified that could affect the integrity of the BIP:

• Economic environment – The national and regional economy could have an impact on deliverability. This risk will be mitigated through the regular reviews by Transforming Haringey and adjusting the targets accordingly.

• Lack of financial resources - The Plan identifies the current levels of HCA and public investment and commitments up to 2014. The remaining investment highlighted is indicative. Actual financial resources available for public bodies are dependent on the next Comprehensive Spending Review (CSR) period. The annual monitoring and review of the BIP will help to ensure that investment figures are updated in light of policy changes.

• Stakeholder acceptance – This risk will be mitigated through close partnership working and the role of Transforming Haringey.

62

Appendix 1

Trajectory list – Housing Investment Profile 2011 to 2014

HOUSING INVESTMENT PROFILE BY PLACE SHAPING AREA (2011 - 2014) PC - Practical Completion SOS - Key Start on site Plg. - Planning HA - Housing Association HRA - Housing Revenue Account R.P - Registered Provider Plg. Current Development No. of BIP Investment Ref Address Perm. Land Ownership Investment - Required Commitment Position units Priority Ranking (Y/N) Wood Green / Haringey Heartlands 2011/2012 2012/2013 2013/2014 Council (GF) / Land Agreement heads of 1 Hornsey Depot, Haringey Heartlands Phase2 N 230 2012-14 Highest Sainsbury's terms agreed Clarendon Square, Haringey Heartlands National Grid / Council Outline plg. appln. March 2 N 1,100 2011/2012 Highest Phase 3 (GF) / LDA 2009 3 13-27 Station Road N22 N Council (General Fund) Discussions ongoing 20 2012-14 Medium

4 Station Road car park, N22 N Council (General Fund) Discussions ongoing 15 2012-2013 Medium Report to CAB 09/10 for 5 Lymington Avenue N22 6LU (sites A&B) N Council (General Fund) 42 2011/2012 High disposal 6 673 Lordship Lane N22 5LA Y Private Full Planning 28 2011/2012 High Housing In discussions with 7 Areilla and BT site, Watsons Road N22 7TZ Y 60 2011/2012 High Group developer to build out Royal Free 8 Coppetts Wood Hospital Y Planning granted 55 2011/2012 High NHS Trust 9 Hornsey Town Hall Y Council Planning granted 123 2011/2012 High

1,673

Green Lanes & Surrounding Area Arena Business Centre, Seven Sisters Road, 10 Y Unknown SOS 04/10 PC 10/11 54 2011/2012 Medium N4 1NY 11 308 West Green Road, West Green, N15 3QR Y Notting Hill HT Full Planning, possibly sale 43 2011/2012 High

97 West Green/Seven Sisters & Surrounding

Areas Planning application to be 12 Wards Corner, High Road N15 N Private / Council 197 2012-14 High re-submitted 13 Lawrence Road (Phase 1), N15 4EJ N Private Pre-planning discussions 414 2012/2013 High

14 Lawrence Road (Phase 2), N15 4EG N Private Pre-planning discussions 386 2013/2014 Medium 15 Somerset Road, N17 9EJ N Council (HRA) Pre-planning discussions 11 2013/2014 High

16 97-99 Phillip Lane, Tottenham Green N15 4JR Y Private CPO- Full planning 12 2011/2012 Medium

17 Brunel Walk/ Turner Avenue N Council (HRA) / Private Viability Appraisal 150 2012/2013 High

1,170

Tottenham Hale & Surrounding Area Former Play area, Tottenham Green (beside Planning Brief- Re- 18 Y Council (HRA) 22 2011/2012 High Monument Way), Saltram Cl. N17 marketed- HOT agreed Dependent on depot 19 Ashley Road Depot N Council (General Fund) 300 2013-14 High relocation to Marsh Lane Pre-planning appln. 20 Tottenham Hale Island Site (West) N Private / Council 90 2012/2013 High discussions British Waterways / Lee Pre-planning appln. 21 Hale Waterside N 300 2013-14 High Valley Est. discussions 22 Tynemouth House, Tynemouth Road N15 4AT N Private 20 2011/2012 Medium

23 193-197 Broad Lane, N15 N Private Planning Submitted 29 2011/2012 Medium 761

Northumberland Park & Surrounding Area Private- Neg with 24 High Rd 686 & 700-702 N17 0AE Y Full Planning 16 2011/2012 High Newlon HT 25 Selby Site (Adjoins Bull Lane) N Council (General Fund) 114 2013/2014 Medium

130

Bruce Grove & Surrounding Area

26 596-606 High Road, N17 Y Private Mixed use/residential 39 2011/2012 Medium 39

TOTALS Total units all tenures 3,870 Total units - affordable 1,927 Average units per year over 3 years (2011 - 2014) 1,290

Appendix 2

Trajectory list – Investment Profile 2014 Onwards

HOUSING INVESTMENT PROFILE BY PLACE SHAPING AREA (2014+)

BIP Plg. Current Anticipated SHLAA No. of Investment Ref Address UDP Site HDV Perm. Land Ownership Development Develpt. Site units Priority (Y/N) Position Timescale Ranking Wood Green / Haringey Heartlands Land North of Coburg Road, Haringey Feasibility to be 1 Y Y N Council (GF) / Private 350 2014+ High Heartlands Phase 4 assessed Aneurin Bevan House, Bounds Green, N11 SOS 04/10 PC 2 Y N Family Mosaic HA 37 2014+ High 2QA 11/11 3 Myddleton Road (South), N22 8LP Y N Private 31 2014+ High Feasibility being 4 Civic Centre, High Road N22 Y Y N Council (General Fund) 198 2014+ High assessed 616 Green Lanes & Surrounding Area 5 Westerfield Car Pak N 39 2014+ Medium 6 341-379 Seven Sisters Road, N15 6RD Y N Council / Private 45 2014+ Medium Feasibility to be 7 St. Anne's Hospital N NHS assessed – requires 600 2014+ High hospital relocation 684 West Green/Seven Sisters & Surrounding

Area 8 Apex House, Seven Sisters Road N15 5PQ Y N Council (General Fund) 197 2014+ High 9 Gourley Place, Seven Sisters Y N Council (General Fund) 60 2014+ Medium 257 Tottenham Hale & Surrounding Area Council (HRA) / BP Oil / Ashley Road Master 10 Ashley Road (West) Y N 528 2014+ High Murphys /CSJF Plan Ashley Road Master 11 Welbourne Centre, Chesnut Road Y N Council (General Fund) 20 2014+ Medium Plan 12 Tottenham Hale Island Site (East) Y N Private / Council Ashley Road M.P. 90 2016+ High Network Rail / TfL / Council Ashley Road Master 13 Tottenham Hale Station Y N 191 2016+ Medium (GF) Plan 14 Stamford House Stamford Road N15 4PU Y Council (HRA) 50 2014+ High 879 Northumberland Park & Surrounding Area Planning appln. Tottenham Hotspur Stadium & adjoining being considered 15 Y N THFC / Council / Private 200 2014-16 Highest land N17 0AP by Planning Cttee. 30 Sept. 2010 200 Bruce Grove & Surrounding Area 16 624 High Road, Tottenham, N17 N Private- Neg with One Hsg SOS 09/10 54 2014+ Medium 54

Total units all tenures 2,690 Total units affordable (@ 50%) 1,345

Appendix 3

Place shaping map 2011-2014

Wood Green/ Haringey Heartlands

8

7 6 4 3

5

2

1

9

This product includes mapping data licenced from Ordnance Survey with the permission of the Controller of Her Majesty's Stationery Office Crown Copyright 2010 LBH. All rights reserved. Licence no. 100019199

PLACE SHAPING AREA

WOOD GREEN/HARINGEY HEARTLANDS

Appendix 4

Place shaping map 2011-2014

Tottenham Hale

19

20 21 18 23

22

This product includes mapping data licenced from Ordnance Survey with the permission of the Controller of Her Majesty's Stationery Office Crown Copyright 2010 LBH. All rights reserved. Licence no. 100019199

PLACE SHAPING AREA TOTTENHAM HALE

Appendix 5

Place shaping map 2011-2014

Wider Tottenham

25

24

26

15 16

13 11 14

17 12

10

This product includes mapping data licenced from Ordnance Survey with the permission of the Controller of Her Majesty's Stationery Office Crown Copyright 2010 LBH. All rights reserved. Licence no. 100019199

PLACE SHAPING AREA WIDER TOTTENHAM

Appendix 6

Council's prioritisation criteria assessment sheet

Prioritisation Criteria Scheme name and description: Local Place Shaping Area : Achievable? Notes Y N Deliverability Start on site before 2014?

Above 50 Affordable Housing Units provided?

What pump priming / Grant / infrastructure are needed within the next 5 years? Is the project ready to start? (Viability/ planning permission / land owner agreed) Strategic Fit Does it deliver national / regional targets?

Does it deliver HCA national or regional priorities? Does it deliver the priorities in the Community Strategy / Corporate Plans? Does it deliver strategic objectives as agreed by Transforming Haringey? Wider benefits of the project Is the scheme a catalyst for regeneration?

Are there Transport/ Green transport benefits

Provision of social infrastructure?

Does it unlock another site (provide a vital link) Value for Money Does the project offer value for money?

Does the project alleviate east/ west polarisation, are key place shaping areas covered? Are the councils thematic priorities covered? Total Ticks

Key deliverables and outputs of project Number of Homes Total: Affordable: Percentage: Economic Development:

Total number of new jobs Total:

Key deliverables and outputs of project Number of Homes Total: Affordable: Percentage: Economic Development:

Total number of new jobs Total:

Summary Achievability score (Y ticks) = Affordable homes provided? = Number of jobs provided? = Total investment needed? =

Appendix 7

Individual site appraisals

(Indicative boundary lines only)

(All mapping data licensed from Ordnance Survey with the permission of the Controller of Her Majesty’s Stationary Office Crown Copyright 2010. All rights reserved License no. 100019199) 50 115 230 TBC TBC TBC 70/30

Phase 2 2012-2014 2012-2014

homes homes homes London Plan Area of Intensification Area of Intensification Plan London Community Strategy balanced in promoting Key site community Tenure split Tenure Wood Green / Haringey Heartlands Heartlands / Haringey Green Wood Hornsey Depot, Haringey Heartlands Heartlands Haringey Depot, Hornsey

% of affordable Permanent jobs Total number of Total number Apprenticeships Apprenticeships ƒ ƒ ƒ No. of affordable Construction jobs Rent/Intermediate Rent/Intermediate Mixed use scheme with new Mixed scheme with homes use new and foodstore Site name Time frame Strategic links Additional notes notes Additional Housing allocation Economic benefits Economic Place shaping area area shaping Place

o

C

P T

1 e

0

m

g s

6

5

a

k

.

r

r

s

0

a

k

o

3

7

r

6

G

H

o

s W

P

k

W

r

o

5

W

s 6

t NE a LA

l SS F O

CR

e

n

n

F

a

m

D L

2

.

r

s

6 T

s

2 r

3 o

1 to r

W

9

C

5

7 5

H

9

2 s ANE t OSS L s

CR o

P

3

5

T 9

m 4

6 . E

5 E

2

s k R

10 9 r T 12 o

8

14 e S

4 W

s

t r

o l i H ery Office Crown Copyright 2010 LBH. All rights reserved. rights Crown 100019199 Licenceno. ery All Office Copyright 2010 LBH.

e u

9

t c

e 0

o G a

n

c I

i

h

u

f

W

f

H

o

e

E

r

O

C

S

a O

8 L

2

b

l a

C W

t u

5 E

S

S

E

L

L

1 E

7 S

8

O

t

o

M

p

e e

g

l

d

r

e

t

n

c

i n

i

D

t

n

a

h

l

s

e

i

e

e

c

C

3 V

T

n

u

o

9

2

C

7

2

5

2

3

2

D

A

1

O r

6

e

t

R

l

e

1

h

S

2

S

E

L

I M

2a

7

1 t

o House p kville e ac

7 S 24 y

D 1 to

r

l i

m

a

c u

1

t

n .

3

r

m

u

1 7

o

5 o

2 .

1

M

C 0

3

1

5 3

1

m

4

5 r

.

e

t

7

3 l

b

l 1

a 2

e

t u

AD h

E RO S S N 6 M LTO S E 2 B MYDD 56 54

6 e 0

D m s 0 u A 2

RO .

4 Station Majesty's Her of Controller the permission of Ordnance licenced the from data Surveymapping includes product with This

1

1 N o 8 o D

7 t TO 5

1 L

2

E o

D H 8

t

5 D

Y A

M

y t 1

o

e e l

2 k

s

RO

d

o

0

k

u

r

r

1 E

b A o

r b 2

K 2

m a

W 4 PO e

g O

l

P

R 2a

E

B

B

L M Ref: 1 50 550 TBC TBC TBC 1,100 70/30

tructure – requires or financial support support or financial Phase 3 2011-2012 2011-2012

homes homes homes London Plan Area of Intensification Area of Intensification Plan London Community Strategy balanced in promoting Key site community Tenure split Tenure Wood Green / Haringey Heartlands Heartlands / Haringey Green Wood

% of affordable Permanent jobs Total number of Total number Apprenticeships Apprenticeships ƒ ƒ ƒ

Clarendon Square, HaringeyHeartlands No. of affordable Construction jobs Social/Intermediate Social/Intermediate

scheme. use mixed Residential-led due to high land cost of Constraint operational gas infras public sect additional homes affordable to deliver Site name Time frame Strategic links Additional Notes Notes Additional

Housing allocation Economic benefits

Place shaping area area shaping Place

K

R

A u

2 P

o 1

2 4

C 9 7 3

m

3 2 2

a

1 3 0 1

o 9

t

h 0

t D 4 1

r

2 1

5 8 A 2 o

4 1 O

w 3 9

n 1 R

e S

3 P

E 1 7m

7 23.7

o Y BM t

3

5 A o

t

1 M

1

6

E

2

U 4

2 N E

1 8 9

0

2 4 3

2 V

3 3

A

1

E

H

D

T R 2

K 3

Y

R 2

D E 2

A 1 S

P 3

r k N A

r R 3 a

O 5 a H

O

C

P

R

1 E

D

A

2 N y O

8 R

12 K

e R

A

P

r O Y E

7 S N

o R O

9 T t H

5 1 5

s 1 0 S 2

9

i 1

t l 9 N

o

u

D t E

1 28

M 7 V

A 8

1

A

O 4

3

2

3 R

R 30

1 N

12

R 3

8 3 e

1 E m

s

o 6 1 V

t 4

.

u 1 4 0

5 4 0 L

o 4 7

1 1

2 4

H 3

A

a

M

j m

o 4 0

. D

3

1 5

3

2 0 m

0 A

M O

U

B R

6

m 3 N

1

6 6 1 . O

2 90 52 D

2

7 3 N 78 E

6 R 6 m

5 A

8

m 5 8 . 9 1 L

56 5

.0 3 C

2 4

1

a 2 6

2 3

y

M r 2m 8

B 24.1 3

M o

B t

3 4 c

1

a

F

3 D 3 1

A

9

5 O

3

2 1

R

to 36

9 30 K

5

1

O

7

1

5 0 O 5 1

R

B

y

7 a

3 t

r

S

o

t

b

c

u

a

t S

a CL

l S 0

5

F

E

b

t

u

o

S

p 9

l

E

e

D

2 5

2 7 ery Office Crown Copyright 2010 LBH. rights All reserved. Licence no. 100019199 70

60 to

8

n

o

i

t 3

3 3

a

t

S

r

o D 9 A e

H o O d t s y

i l

r

1 ld R o

A o t K

n H

c

1 h 1 O

o a s

J 13 O

e

a 4 F

R

c

0

B G a

l 2

P

n

r

e

t

t

i B

1

1

D

A

O

2

R

G

R x

o U

D B B

OA l

O R o

r

t C E SO n

IL o

S C

4 2 D OA E R SO SIL

r

w

T

L

e

t

a

t

s

E

l

a

s

i

r

t

k

s

r u

o 1

d

n

I

W

a

i

p

m a t

y 9 l

S 5

e

O

c b u

a 2

l

S

l

P

E

r

e

h

s

i

f k

n

g

a

n

T

i

K

m

8

. 3

D 2 OA

e R e

s

N c

i

O u

u e

D o

N l c

E S H

t

R i

A a 1 l

L u B

C d

P F

n

2 o d

C r

5 B

a 5 7 l 3 F l 1

9 s 89 k a o r t

83 M

1 o W 6 1

D 1 A 6 8

6 3 to

t 1

O 5 7

o

R p

e

G

D

R

U

B O

C dy l 7 s 5 D L B a 7 A S i O rd r 7 a t R W

s RN

u g

e E

r T d

s S

e u

n E t

u R

I B

b W

a C

o

L

t

o

s H

a C

i

E

p

m

y

l

O

B

W

s

t

s r

o

w

s

T

P k

n L

k a a t

T

T

S

b

u

S

t

l

o

E

p e

This product includes mapping data licenced from Ordnance Survey with the permission the of Controller Her of Majesty's Station

D

k

n

a

T

m

7

. 4 2 er Riv w

Ne B

P F y B Bd rd Wa Ref: 2

20 50 10 TBC TBC TBC 70/30

obs j

London Plan Area of Intensification Area of Intensification Plan London Heartlands Framework Area

homes homes homes ƒ ƒ Tenure split Tenure % of affordable Permanent Total number of Total number Apprenticeships Apprenticeships No. of affordable Construction jobs Social/Intermediate Social/Intermediate Site name 13-27 Station Road, N22 Time frame 2012-2014 Strategic links Additional Notes Council-owned site Housing allocation Economic benefits Place shaping area area shaping Place Heartlands / Haringey Green Wood

1

2 c 1

4 4

2

4

4 1 2

7 b

7

1 3

1 k

9 k

8

6

n

4

4

n

a 7

E 7 a 1

G 9

A B B

2 S 5 S PA

DY n R 6 ee r

r s A e

G t

H l d B

oo n e C

W tio rt) h T ta o S S nsp

ra b

n T

do u l

n 2 0

(Lo 3

C

m

H

6

.

P 5

94 2

196 1

2 0 8 7 19

1

1 4 1 12 t 2 2 o 3 1

6

21 t 0 o

2

2 5 1

1

ery Office Crown Copyright 2010 LBH. All rights reserved. rights Crown 100019199 Licenceno. ery All Office Copyright 2010 LBH. a

t D

l A

S E

O

b R

a t

u H

S S

IG

H b

u

S

l

E 1

3

t

m o

2 s

4

3 t

. 1 2

l

i s

7

s

1

c

o

e

3

n

P

c

i

u

f

f

o

O C

p

m

a R

2

e 9

y

s

s

e

l

u

e

e

h

c

o

i

s

s

f

H

f H

u 3

A P

O 1

o

l

i

H

c

n

y

u

e

l

o

h

C

s

A H 3

3 P A

W

D A

O 3

R 5

N 3

1

O I

T AD

A RO T T

D AN S A B

6 RA 4

B

o

t RO

D

8

A K

3

O

R 2

t a R

A

t e

S o r

P s p

N a

u

e u

R t

O o 4

D E S 1

S H

y

T V t

s

i n A e

u D r

RI u t

W B

n A

m e

m O

8

C o

0 R 1

C

o D

t

0 N

2 A L

K Station Majesty's Her of Controller the permission of Ordnance licenced the from data Surveymapping includes product with This

R

A

1

5

6 P

D 1

A 8 s

O e 4 c

R i f

f a

S t

O

l c S

i i

c n

b

h

n e

u

c

u c

a

S

t

e

o n

t

l

S e

y

C

E l

d b Ref: 3 8 15 50 TBC TBC TBC

homes homes homes Adjoins Heartlands Framework Area Area Framework Heartlands Adjoins London Plan Plan London Tenure split Tenure

% of affordable Permanent jobs Total number of Total number Apprenticeships Apprenticeships ƒ ƒ No. of affordable Construction jobs Social/Intermediate 70/30 70/30 Social/Intermediate Council-owned site Site name Station Road car park, N22 Time frame 2012-2013 Strategic links Additional Notes Notes Additional Housing allocation Economic benefits Place shaping area area shaping Place Heartlands / Haringey Green Wood

.

P 5

6 94 2

19 1

20 8 7 19

1

a

t

S

1 b 4 1 2 t

u 1 2 2 o 3

1 S

6

1 t 0

l 2 o

2

2 E 5 1

1

a t

l AD

S E

O

b R

a t

u H

S S IG

H b

u

S

l

E 1

3

t

m o

2 s

4 3

t

. 1 2

l

s i

7 s

1

c

o

e

3

n

P

c

i

u

f

f

o

O C

mp

a R

2

e 9

y

s

s

e

l

u

e

e

h

c o

ery Office Crown Copyright 2010 LBH. All rights reserved. Licence no. 100019199 no. Licence reserved. rights All 2010 LBH. Crown Copyright Office ery i

s

s

f

H

H f

u 3 A

P 1

O

o

l

i

H

c

y

n

u

e

l o

S h

C

s

N

A

O

S

H T 3

3 P A

W

D A

O 3

R 5

N

O I

T AD

A RO T T

D AN S A B

6 RA 4

O B

o

t

R

D

8

A

K 3

O

R 2

t a R

A

t

e

S o r

P Station Her of Majesty's the Controller of permission the with

s p

N a

u

e u

R t O o

4

D E S 1

S H

y

t

T V

s i

I n

A e

u D r

R u t

W B

n A

m e

m O

8

C o

0 R 1

C

o D

t

0 N

2 A L

K

R

A

1

P 5 6

D 1

A 8 s

O e 4 c R i

f

f a

S t

O

l c S

N i

i

c n

O b

h n e

S u c

u c

a

S t

e

T n

o

l t

S e

A y

C

E l

d b i

W a o

t s

u

P

e

S

S

x

l R

s b e

f

E

e s u

o

c 2 e

S l i

l 4 3

l f

l 5 f d

a 1

E d

O i H

o

l t

i M

c 0

2 n

1 5

u

9 o

0 Ordnance Survey licenced from data includes mapping product This

C 4 6

50 3 6

6

1

4 o 4 t

6

5

1 E

D 38 A

L

S

G a

N I t

R l S

4 E

26 b 0 u Ref: 4

42 50 21 TBC TBC TBC 70/30

homes homes homes Community Strategy London Plan Plan London Tenure split Tenure

% of affordable Permanent jobs Total number of Total number Apprenticeships Apprenticeships ƒ ƒ Lymington Avenue N22 6LU (sites A&B) 6LU N22 Avenue Lymington No. of affordable Construction jobs Social/Intermediate Social/Intermediate Site name Time frame 2011-2012 Strategic links Additional Notes Notes Additional Housing allocation Economic benefits Place shaping area area shaping Place Heartlands / Haringey Green Wood

6 9 h 1 2 c r 7 D

1

m u 9 A 4 1

0 1

h O 3

8 . C R 5 8 1

1 s 4 3 9 ' 2 1 H 2

k l l

M C r

D 1 a

B E a 1

A E H

M 1 O 4 B

T R St S

e E 7

E 2 g 2

b N

a

9 D

r W 2 N A a Y 1 c O 5 i L R 9

V 0 4 G 5 Y 8 R 7 4 5 1 4 2 U 5

B 6 4 5

4 5 4

2 4 3 C R E S E C N

T 3 4

Y 4

E a

L t 1

H S 4

S y 2 A b e 8 4 m r 3 0 0 3 u r t 1 6 4 B S 2 2 2 n 6 2 F

l A e 4 6

E 6 9 1 n C 3 o 37 3 0 ti ty 1 a i 6 3 lv n 6 t u

s a m

7 6

o S

3 5 P m 4 9 3

o B 2 C 3 5 3 F 1 3

t 3 3 3

7 s 1

o

3 6

P 0 5

9 3

8 8 h

2 g k

9 i n

2 H a

7 B

2

e s

8 6

u B

2 2 e n

C

e

E 4 g

t

e

5 2 a T eryOffice Crown Copyright2010 All LBH. rights reserved. Licence10001919 no.

o v

U 2 P

c 2 A

N 3

2 e 6 2 v

E 2 o 5 1

2 0 V 8 D

A 2 D A 1

1 1 2

6 9 N 8 7

RO 1 1 1 O 6

1

T 7

RY 1 4

G 6

U 5

N 4 1

I B 1 6

8 1 2 6 M

4 2 1

Y 3

1 8 L 6 9 1 1 5 0 0 1

1 0 m 7

8 7

3 .

7 0

to 6

k 2

6 n

a

9 2 B 4 2 7

9

1

1 D 1 o h A

t g

i O

7 R H 8 9 4 D

A e H

g 8 1

7 O G

1

8 I

0 a R 2 H

K P

k t R m

o

n

5 6 7

A 8 a

6

B

P 7

4 . 8

3

L 1 E 7 2 O

N 8 e M d B 9 si 3 p a e h

C

5

8

9

6 s

w 1

9 e

7 M

6 r 9 9 e

b

7 1 m

3 0 A 1 0

13

5 e

6 v

A 4

1 n

o

1 t

3 g

n i

m

y

1

D L 1

A 1 m

O 0 .

R 1 4 2

M 6

A

H 3 L 6 E

P

3

2 1 s

w Station Her Majesty's of Controller the of permission the with Survey Ordnance from licenced data mapping includes product This e 8 l M 7 e z 2 0 a 8 8 H

4 m

8 9

.

0 3 3 2 1 86

0 Ref: 5 28 50 14 TBC TBC TBC

673 Lordship Lane N22 5LA N22 5LA Lane 673 Lordship homes homes homes Community Strategy London Plan Plan London Tenure split split Tenure

% of affordable Permanent jobs Total number of Total number Apprenticeships Apprenticeships ƒ ƒ No. of affordable Construction jobs Social/Intermediate 70/30 70/30 Social/Intermediate

Site name Time frame 2011-2012 Strategic links Additional Notes Notes Additional Housing allocation Economic benefits Place shaping area area shaping Place Heartlands / Haringey Green Wood

m 1

6 1

8 5 .

4 6 9 3 9 3

8

1 7 4 1

7 D 5

1 1 10 A 4 O 1

2 y

R

R d

C B E

4 B d

r 6

a

6 M 1

5 0

O

W 1 D

A 8 O O

R 7

BE C 0 M 4

O 31

O 2

1

C 7

E 9 5

U

N

6 E V 3

5 y 2

3 r

ge A r

Su

6 E

5 2 8

6 L

5

L 8

E

S 21

O

6 M

5

9 1

7 8

7

ne 13 E

U

o 1 ph 6

ele ge N

T an E

h V

c 7 1

x 6

E A

Y

x E

6 L E

ery Crown Office Copyright rights reserved. 2010 LBH. All Licenceno. 100019199

6 R

1 l

e O

T

5 M

ce 6 rra 2

e 1 T 5

4 le 5 mp Te

63 1 D

m 6 A 3 5 o O 7 . t R

0 1

67 T

2 N E E

C 5

N IN 6 A b V

4

L u

l 6

7

C

P 3 I

H

0

6

S 1

6

D

e 1

R

6 c 6 e a

7 rr s

O 5 e

u T

L t o n

o lta

H u 4

6 j S 4

7 a

r

1 9

2

u

8

1

4

1 S 5

2 7

t

o 1

1 3 t

9 o

1

2 1

2

1 6

2

1

9 4 3

4

e

r

a

u

1

3 8

8 6

6 q

1

8

3 S 7

3

m t

o

7

t

1 n

5 1

8 .

3

e

2

1

1 2

1

8 c 7

2 4

1

t 7

o

n

1 2 3

1 7 i

M

6 6

B V

1

3

0

1

2

9

6 1

7

6

8

t

o

7 1 2

2 6 t o

S 7 N 0 A m B 3 L T 3 A EN .

ST SC 1

2

2 RE 5

C 2

8

7

6 14 1

This product includes data mapping licenced Ordnance from Survey the permission with Controller the of of Her Majesty's Station 7

24

1

7 9 1 9 NT Ref: 6

60 60 100 TBC TBC TBC 70/30

Community Strategy London Plan Plan London

homes homes homes ƒ ƒ Tenure split split Tenure % of affordable Permanent jobs Areilla and BT site, Watsons Road N22 N22 Road Watsons site, and BT Areilla Total number of Total number Apprenticeships Apprenticeships No. of affordable Construction jobs Social/Intermediate Social/Intermediate

Site name Time frame 2011-2012 Strategic links Additional Notes Notes Additional Housing allocation Economic benefits Place shaping area area shaping Place Heartlands / Haringey Green Wood

23 E n

n 234 e

e 36

2 m

c d

2 s

4

r 3

s t

40 . 1

s a

e 2

1 r

VI o G e 3

g P C Geor King den l Gar moria OAD Me H R

HIG

l

s

a

r

i

t

r

a

s

e

o

y

o

s

s

W

e

m

P l

u

e

e

e

h

c

o

i

s

s

f

H

M

H

f

u A

D P

O

o

A l

i

H

c

O

y n m

R u e

0

l

o .

S h

6

C

s

3 N

A

O

S

T

2 A

m 4

.19 5 7 W BM 3

D A O R

N E

s E ' h

l c R D e r

a G A

u

h O h c S R

i D C

D eryCrown Office Copyright rights 2010 reserved. All LBH. Licence 100019199 no. A M K

O

t N R

t R

S U A

t

e

a S o r

t P

s p

O a

S N

u

e u

3

R t B O o

t

o e

D E S

S H

5 s

T V

s u

A

u o

RI H

W B

s

g

n

i

d

i

r

n

7

e

e

r

G

1 D 6 A

RO

a

S t m

N S

5 b

. O u

7 S

a

S t

3 T

l

S

E b

WA a

t

u

S

S

l

s

b

E

e

u

c

S

i

f

1 l f

7 E

O

l

i

c

n

u o 0 C 4 56 50

4

D 4

A

O

R

E

D 38 A

L

S

G N I

R 2

2 6 3

5 9

1 D

1 4

4 A

2

O

7 R

7 E

3 D

A

L

S

G

N

y I a

R 2

t

r

y

r

S

o 5

t 2

o

t

b

c

c u

a D

a

S

F

A

l F

E 3 1 O

R 7

D

1 N

d

l A 1

n 9 e This product includes data mapping licenced Ordnance from Survey permissionwith the the Controller of Her of Majesty's Station

o L

d b

a s

7 1 '

l a l o

l l l 2 R

g s a h e E

48 g

n c H

a n B

2 i

E

S h

0 R

M

f

c

i y

o U

r

M

a C

h 32

t

c D

m A

O 2 i

r 4 S R

r Y

u R

R

P E h B

R

A 1 C W

10 3 Fif l di fiditb Ref: 7 55 38 21 TBC TBC TBC 70/30

Community Strategy London Plan Plan London

Coppetts Wood Hospital Hospital Wood Coppetts

homes homes homes ƒ ƒ Tenure split split Tenure % of affordable Permanent jobs Total number of Total number Apprenticeships Apprenticeships No. of affordable Construction jobs

Site name Time frame 2011-2012 Strategic links Additional Notes Additional Housing allocation Economic benefits Place shaping area area shaping Place Heartlands / Haringey Green Wood

WA

S

2

N

2

9

I

2 7

2 5 T

2 4

2 3 R

2

1 A

2

M

2

8

2

6 3 10 6 02 0

104 1 l l 08

a 1 H 110 96 88 80 1 9 114 00 2 84 S 9 86 7 N 4 8 I 9 9 8 0 8 n T 2 74

K d

o 76

k i

R L n

t

c

u

i a

A A

l o

e

w

l

r

i r

M l a

W l Bo c ro Const an G

d LB B a H

dy e

H R

Un

COPPETTS ROAD d

m 6

7 . 4 6

M

t B

s

o

t

P

m s

o

7

.

P

3

d

6

o o

1 1

ery Office Crown Copyright 2010 LBH. All rights reserved. Licence no. 100019199 no. Licence reserved. rights All LBH. 2010 Copyright Crown Office ery

6

W 0

to 2

s 1

l

t t

4 3 a

t e

7 i

p

p s

p 162 to 176

o o H 10 C

d n P U W

rrace

y Te 4

berr 1

5 3 3 w t o

1 2

Stra 3

1

4

8

y h

5

C

1

6

1 3 3 2 5

319 1 4 T

N

E 1

C 3

S 6

E

R

C

R l

o E

I

o

8

S

3

h

1 c 9

2 O 2

S 3

1

d

l

9 n

e 2

i

o 2

f

i l

o i n

t

v

e

7

1 a

e 0 2

r 2

P 4

G

5

9

2

ck

a

r

T

2

4 1

5

0

2 2 1 2

o t

4

2 8

5

t o

This product includes mapping data licenced from Ordnance Survey with the permission of the Controller of Her Majesty's Station Majesty's Her of Controller the of permission the with Survey Ordnance from licenced data mapping includes product This

p e D 251 to 289

243 249

4 6

82

6 6 Fif l di fiditb Ref: 8 3 4 123 TBC TBC TBC 70/30

Hornsey Town Hall Town Hornsey English Heritage Heritage English Community Strategy London Plan Plan London

homes homes homes ƒ ƒ ƒ Tenure split split Tenure % of affordable Permanent jobs Total number of Total number Apprenticeships Apprenticeships No. of affordable Construction jobs Social/Intermediate

The residential component of this scheme of this scheme component The residential support to development is enabling the listed of restoration the financially hub for enterprise a creative as Hall Town the community. Site name Time frame Within 2011-2014 Strategic links Additional Notes Notes Additional Housing allocation Economic benefits Place shaping area area shaping Place Heartlands / Haringey Green Wood

.35 E 43

BM 4

4

3

1

RK

A

b

l P a

t u

E

S S Y

E

G

N

I R

A 6

H

0

3

c

i

n

i l 2 1

5

C 3 7 5 NS DE AR 2 G 3 Y

IV 100019199 no. Licence reserved. rights All 2010 LBH. Crown Copyright Office ery

y

r

a 1

r 2

m

b

8

i

.

4

L 4

3

B 6

L

l

l

a

H V

A

6

n X 1 I

L 1

w E 3

F o

T

s

C

P

1 2

y

r e

4

S y g 1 N r Station Her of Majesty's the Controller of permission the with

r E D e

u R

A g

S G r Y u LE 4

ER 2 S H 4 10 AT K H

R

A

P 1 a 8

N 4

2 4 1 12

O n

T F

48 5 c S 7 E 126

W 1 k 30 n 1 a

B 3 3 8b 38c

150

54 1

m

e

0

.

s l

2 l 3 i

1 0 u 5 H

48 o

h

1

4 c H 4

5

o c

y

t

k m a 1 .47 4 n 0 6 w 5

a BM

d l

r 6

B 4 e

1 1 p

k 4

a e

k 7 ha

c

o w

38 n C o

r k l

o 3 r

6 34 a a

T

C P

B

B

r e t l e h S

32 1 This product includes mapping data licenced from Ordnance Ordnance Survey licenced from data includes mapping product This m 28 5

3

7

. 4 2

e m

4

m

Y

5 A d 4 W D A 3 O R

B E 6 H T .

a 0

. H

8

k

5

P

4

n

4

a

B

M

B m

r t l e e h

S 1

. 1

3 5

t o

3

9 7

9

1 4

3

1 3 4 1 to 5 Ref: 9

54 50 27 TBC TBC TBC 70/30

N4 1NY N4 1NY Community Strategy London Plan Plan London

homes homes homes ƒ ƒ Tenure split split Tenure % of affordable Permanent jobs Total number of Total number Apprenticeships Apprenticeships No. of affordable Construction jobs Social/Intermediate Social/Intermediate Arena Business Centre, Seven Sisters road road Sisters Seven Centre, Business Arena Site name Time frame Within 2011-2012 Strategic links Additional Notes Notes Additional Housing allocation Economic benefits Place shaping area area shaping Place Lanes - Green Tottenham Wider

7

A

2 D

K 1 A 8

4

O 5

2 a

7

7

7

1 1

a

5

s

t

s

3 o

BM 16.89m P 1 2

4

14 5

7

24 1 D

A

O 1

IELD ROAD 3

ASHF R

E

9

G

6

1

1

A

1 2 9

T I

4 3

4 7 M 1

6

R 0

6 7

E

k

n H

a T

4

m

0

.

8

a

t 1

l 7

S

6 E

1

b

u S ery Office Crown Copyright 2010 LBH. All rights rights Crowneryreserved. Copyright All Office Licence2010 LBH. 100019199 no.

M

1

A

5

4

k

4 n 2

1

a

A

T

3

1

2

1

1

B

5

P

M

2

B

e

2

o t t

1

a

t

s

s

1 k

0

1 r 1

E

o

t o

l

6

a

W

i

r

s

t

s

a

e

r

s

e

n

t

n

e

n

u

i

r

e

s

A

D d

u

C

B

n

I

r

E

2 e

d

a

s

3

u

r C

98 6

5 This product includes licenced data mapping from Ordnance Her of Controller of the Surveypermission with the Station Majesty's

4 1

R

y C 94

d 2

B 12

d

r

a W 0 12 70

82 Ref: 10

43 43 100 TBC TBC TBC 70/30

Community Strategy London Plan Plan London

homes homes homes ƒ ƒ Tenure split split Tenure % of affordable Permanent jobs Total number of Total number Apprenticeships Apprenticeships No. of affordable Construction jobs Social/Intermediate Social/Intermediate

Site name Site name Road, West Green 308 West Green Time frame 2011-2012 Strategic links Additional Notes Notes Additional Housing allocation Economic benefits Place shaping area area shaping Place Lanes - Green Tottenham Wider

8

8

2

0

9

2

m

1 2 2m

. 7.6 9 1

7 BM

2

1

4

1

9

2 2 3 9 1

3 m

1 95

. 2 7

1 2 B 0 2

9 0 F 9

7 3

9

2

0 3

4 301 0

3

3 3

0

a

0 t a

3 1

l

6 5

S

E 0

e y

b r

e 3

s Surg u

u

o S

H

7 n

l 30

o

o

o i

h t

c 09 3 a

S t

S

D

A

O

m

4

. R

7

1 N 5

14 31 E

E 317 ery Office Crown Copyright 2010 rights All LBH. reserved. Licence no. 10001919

R

b

a

l

t

G

u

E

S 319 S T

S 321 E

1

t

o 13 W

1 1 1

325

1 3

30

3 2

2 1 2

7 4

3

e

s

e

u

s

o

u

o H

e

r H

n

r

e

n s v o 3

1

w o

h B

t

a

D

y

C

L

a T

D M

A

O D

l

m l R A

2

7 a

M O 6 .

H 7

A R

H 1

3 A T

G 3 2 1a

S

N N

3

A E

4

4 L C

4 1

N

I 5

3 V 14

1 3 3

5 3 1

8 D OA 1

M R e 2

A 4 H 6 m ibrary

S s L R 0

E .

V u

A 8

C o

1

7

2 1 H

5

m

a

h

s

r

y e

1 d 1

1

v 1

6 R 3 B

5

7

a

C d

r en

C Gre

1 est a W

4 1 W

1 2 1 ool 4 ch 6 y S 8 Primar

This product includes mapping data licenced from Ordnance Survey with the permission of the Controller of Her Majesty's Station Majesty's Her of Controller the of permission the with Survey Ordnance from licenced data mapping includes product This

4 m

5 3 .

1 8 2

a 1

1m

7

3 8.

2

2 t 2 1

5 a 7 t 1 n 9

S s

e

M

a 2 l

b c l

u B

i n

S i

l V E Ref: 11

50 98 197 TBC TBC TBC 70/30 Community Strategy London Plan Plan London

homes homes homes ƒ ƒ Tenure split split Tenure % of affordable Permanent jobs Total number of Total number Apprenticeships Apprenticeships No. of affordable Construction jobs Social/Intermediate Social/Intermediate re-submitted to be application Planning decision of original review judicial following permission. to grant Site name Site name N15 High Road Corner, Wards Time frame 2012-2014 Strategic links Additional Notes Notes Additional Housing allocation Economic benefits Economic Place shaping area area shaping Place Sisters Seven - W.Green/ Tottenham Wider

c

r

l

l

u

a

h

H

C

e

e

s e

s

e

s

u

u

s

u o

2 o

u o

e 1

H 200 84

H

o

H

s

a

a H 2 i

e 18 u

8 n h 18

e 6

h

s

y

m

e

a

o

l

s

l

p

l

u

t

r

u

m

e

o

o

o

a

H n

o

E

S H

e H S

H 206 H

a 212

V

l

n

2 r 24 e 2 i 22 n 2 h

20 A

c

A

a

R

E

C A

R R E T

N E

E

r

e

t

l

e

D

A O R h H G I

H y

S

a

w

b

u

S

m

m

7

4

B

.

.

C

0

1

T

1

1

s

m

B

2

C

.

T

1

m 5 7 . 1 1

M

1 B

r

e t l e h S ) T

L (

n

o i

t

a

t

S

s

r

e

t

s i S

n e v e

S

B

1 6 C 2 59

2

T

2

1 5 2

3 ery CrownOffice Copyright 2010 All rights reserved. LBH. Licence no. 100019199

6

2 s

2

9 4

2 C

o t

7 2

4 k 2 P 4 n 1 a 3 to 18 7 to 12 1 to 6 B

6 s 6 5

e 0 c

a i 2

f

6 f

t r u o

C

e l o c a e

O S

8 l i

8 r

m

c

e

8

t

n

1

. l

1

u

b 8

e a

0 2

o h

1 0

C

S

a

1

t

7

S

1

7 b

D u S

A

l

3

m

E

2 6

5

O t

.

o 7 1

R 1 7

1

8

0 N 1

2

E

E 9 0 2 7 R 7

2 2 9 7 G 4 6 2 6 T 4 1 3m 6 S 8 1 9

OAD 1. 2 R TON E

2 HOUGH 30 1

9 20 8

M 7

W 8 B 0 7

7 0

3 0

4

a D A O R

D L E I FF U 2 6 S

2

1 3

6

2

1 1 4

a

3

3

3 2 3

3 1

7

9

6

3

4 AD

7 O R 1 7

8 2 to 1 4 7

3 9

6

D

D A

A 7 O

8

6

O R

3

8 R

S 7

9

R 8

N 2

9 3

E 54 E

9 2 4 4 T

a

E

3a 1a 4 34 2 S 2 I

R 2 m

12 4 8

S . G 2 0

2a 1 0

1 N t

T B o

L

g E

S e

n D

A c O

R This product includes mapping data licenced Ordnance from Survey the permission with Controllerthe of of Her Majesty's Station D V L i

E I i F R E T t E S E f

W r f 3

o E

W 1 O S S

4 6

4 4 2 3

4

3

7

8 7 3 6

4 5 ce k ffi r O

g a

m n rti Ref: 12 50 414 207 TBC TBC TBC

Sisters Sisters Community Strategy London Plan Plan London

(Phase 1 / 2 indicative areas) (Phase 1 / 2 indicative homes homes homes ƒ ƒ Lawrence Road (Phase1) N15 4EJ (Phase1) N15 4EJ Lawrence Road Tenure split split Tenure Wider Tottenham - W.Green/ Seven - W.Green/ Seven Wider Tottenham % of affordable Permanent jobs Total number of Total number Apprenticeships Apprenticeships No. of affordable Construction jobs Social/Intermediate 70/30 70/30 Social/Intermediate

Site name Time frame 2012-2013 Strategic links Additional Notes Notes Additional Housing allocation Economic benefits Place shaping area area shaping Place

110 9

1 4

2

24 3 a

7 AD a D RO 30 WOO

LLING 116 2 CO 3

37

3 116a 1 8

1

3 118

7 118a 1 120

D 120a

R

A

Y 2 122

E

C e u

N 2a q 12

E

s s

R

o

k r

W

M 124 o A

L s

W 124a

k

r o

1 126

1 2 6 W a

1

1

6

d 80 ery Crown Office Copyright 2010 LBH. rights All reserved. Licence 10001919 no.

2

s 7

k

r a

t l 0

o 7

48 S

to B

30 E

b

C B

u

W

L T S

o 68

t 1

8 0

5 5

t o

1 1 56a 3 52

1

9

5

1 t

o

1 0 6 3

a

y

a 8 r

8 3

2 t o

9

3 o

t

c

a F

28 e

s

y

u

r

6 d

9 o

o

s

n

t h

D s

OA r

a

c e

e

e

R y

E r

r n

C 6 h

7 t a

EN i

s p

R n s W a

A F

B

e e

L u

Z C

B C

W

T

y

r

o

t

c

a

8

3

F

1

d

4

n 5

u

o

r

g

y a l ctory P a

a F

t

S

b

u

m

S

4

l 6

3 0

E

.

3

1 4 4

7

4 M

1a 1 B

1 49

This product includes mapping data licenced Ordnance from Survey with the permission the of Controller Her of Majesty's Station

6

4

1 2

13 e

51 2 Ref: 13 50 386 193 TBC TBC TBC

Sisters Sisters Community Strategy London Plan Plan London

(Phase 1 / 2 indicative areas) (Phase 1 / 2 indicative homes homes homes ƒ ƒ Tenure split Tenure Lawrence Road (Phase2) N15 4EG (Phase2) N15 4EG Lawrence Road Wider Tottenham - W.Green/ Seven - W.Green/ Seven Wider Tottenham % of affordable Permanent jobs Total number of Total number Apprenticeships Apprenticeships No. of affordable Construction jobs Social/Intermediate 70/30 70/30 Social/Intermediate

Site name Time frame 2013-2014 Strategic links Additional Notes Notes Additional Housing allocation Economic benefits Place shaping area area shaping Place

110 9

1 4

2

24 3 a

7 AD a D RO 30 WOO

LLING 116 2 CO 3

37

3 116a 1 8

1

3 118

7 118a 1 120

D 120a

R

A

Y 2 122

E

C e u

N 2a q 12

E

s s

R

o

k r

W

M 124 o A

L s

W 124a

k

r o

1 126

1 2 6 W a

1

1

6

d 80 ery Crown Office Copyright 2010 LBH. rights All reserved. Licence 10001919 no.

2

s 7

k

r a

t l 0

o 7

48 S

to B

30 E

b

C B

u

W

L T S

o 68

t 1

8 0

5 5

t o

1 1 56a 3 52

1

9

5

1 t

o

1 0 6 3

a

y

a 8 r

8 3

2 t o

9

3 o

t

c

a F

28 e

s

y

u

r

6 d

9 o

o

s

n

t h

D s

OA r

a

c e

e

e

R y

E r

r n

C 6 h

7 t a

EN i

s p

R n s W a

A F

B

e e

L u

Z C

B C

W

T

y

r

o

t

c

a

8

3

F

1

d

4

n 5

u

o

r

g

y a l ctory P a

a F

t

S

b

u

m

S

4

l 6

3 0

E

.

3

1 4 4

7

4 M

1a 1 B

1 49

This product includes mapping data licenced Ordnance from Survey with the permission the of Controller Her of Majesty's Station

6

4

1 2

13 e

51 2 Ref: 14 6 11 50 TBC TBC TBC 70/30 tory Scheme will tory Scheme Sisters Sisters Community Strategy London Plan Plan London (Indicative area shown) shown) area (Indicative

Somerset Road, N17 9EJ N17 9EJ Somerset Road,

homes homes homes ƒ ƒ Tenure split split Tenure Wider Tottenham - W.Green/ Seven - W.Green/ Seven Wider Tottenham % of affordable Permanent jobs Total number of Total number Apprenticeships Apprenticeships No. of affordable Construction jobs

Tottenham Hale Gyra site of this development support Site name Time frame Within 2011-2014 Strategic links Additional Notes Notes Additional Housing allocation Economic benefits Economic Place shaping area area shaping Place

1

1 9

S E 0 0 8

0

2 K S

N

O

A

L

B

5 C 1 9

9

4

0 7 R 9 I

1

N

6

2

A

2

5 O

F

T

8

8

5

L

3

2

I

4

5

0

5

o

M t

o

5

t

6 9

6

A

0

6 4

D o

5

t o

t

H

A 1

2 6

O 6

R H Y C AINB T ST OAD U R

N

S

E

H

C

2

7

5 6

Y

8 8 9 8

8

7 0 5 2

4 A

2 7

W

7 6

T

s 7

8 t 8 9 N

s 1

3 d

o

e

e n

E

P

6

u s

2 o

r o

4 u

M r e

o

o g t

h

U y t

1 H

a

l o

N

r P

P O ery Office Crown Copyright 2010 rights LBH. All reserved. Licence no. 100019199

M

l

n

o

e

E

o

e

f

r

h

o

c

G

m

S

C e

1 6

6 h

6 . T 11 1

1 use

Ho

chool

Y S

A W

M n

T e F O e R r C G Y

R he B T

3

2

D 2

A

b

u

O 2 e

l u

C R g

o

T g

d

r a

a

Y

e

l E g a n E y

S S

R

E

t

r

u

o k

C

s '

n

o

s r d r a n y e

R M

a P

O

r

6 1

o t

1 S

a C

n 52

e 3

c o i

i 366

l t

y

r

o

a t

e

P k

g

S r

r a

u P

S

r a

3 C

76 372

D

OA R

GH I

H

s

R

C C

P

H

m

P

8 y d B

d . r a

W

m 0

c

i

m 7 1 26

. 3

s

n

7 h

i

s

. 3 3 l g 4

i 4

o

1

1

r

C

H

1

r e C t l e h S

328

4 1

5

t o

4 1 9

m 7 . 5

1

m

3 1

4 6

D 3

1 to 22 .

A

2

7

8

1 3 3 9 1 1

O

t o 5 Apartments 3

riston M R

au 8

L 8

5

m

3 3

This product includes mapping data licenced from Ordnance Survey with the permission of the Controller of Her Majesty's Station

B

9

5 . S 6

3 5 3

6

R 3

1

9 3 9 A M 4 B 0 L 1 E S I D E E

C LO S E m

4 P

6

3

.

A

b

l a

6

o

t u p

R t E

1

r

S H S P

D u

M

H o 3

8 b 3

a B

C P u

l

y

C

r a Ref: 15 6 12 50 TBC TBC TBC

4JR Sisters Sisters Community Strategy London Plan Plan London

homes homes homes ƒ ƒ Tenure split Tenure Wider Tottenham - W.Green/ Seven - W.Green/ Seven Wider Tottenham % of affordable Permanent jobs Total number of Total number Apprenticeships Apprenticeships No. of affordable Construction jobs 97-99 Phillip Lane, Tottenham Green N15 Social/Intermediate 70/30 70/30 Social/Intermediate

Site name Time frame Within 2011-2012 Strategic links Additional Notes Notes Additional Housing allocation Economic benefits Place shaping area area shaping Place

m C 7 .

6 18 1

B E

C 7 T 9 D

8 Y 2 6

2 L 1 6 1 C

14 m

2 .

m 12

8

5

.

1 7

6 m 1 4 1 7 1 3 . 7

ONS 5 8

m ANS 1 1 1 9 1 J 2 7 1 M 8 AD

. O

R B

7 7 1 9

M AD

y r O e g r u S R

B SONS

JAN 4

7

2

0

2

2

1 7

2 7 8 7

8

9

8

2 1 3

1

8

2

9 6 6 4

8 m

8

1

.

5

1

2 4

9

7

ery Office Crown Copyright 2010 LBH. All rights reserved. Licence no. 100019199 no. Licence reserved. rights All LBH. 2010 Crown Copyright ery Office

6 9

2

1

1

0

R 3 y

5

d C

1

B 5

10

d el

r ot a H

105a

D W

4 A 37

1 104 107 O 1 0

9 9

R 9 E B

1

L

N t

D o

A 9

O E

L LAC

P O E

STOW P

I

W

L

2 I X 1

5 0

H

O 1

2

2 L

P

2

6 1

1 0 114

3 e

1

1 u

5 q 3 s

4 3 o

7

y r

1 M

e

0 0

a

g 5

3 7

t r

2

S

u

S

b

u

S

l 2 E

1

6 4 0 7 9

10 1

14 E 4

4 S

6

m

m

6 8 O

2 7 .

1 .

L 5

6 7

1 4

1

1

8 C

1 1

M

O 30 U N R

T

P E

L

E A

S D

A 1 N

T 1 H

2

R 7 A O T A 1 D

3 t

o 4

6

A

5 0 O

7 2 7

E

1 0

R

1

1

W

1

7

E 1

R

t

o

2

9

6

3 I

1

1

2

t 9

D

o

6 A

1

3

o 5 t

o

6 t

1

F

Y t o 4

4 1

6

5

1

1

L

t o

6 3

1 7 1

t o C

6 2 2

5 8

6

1

E

S

O

a L

e Station Her Majesty's of Controller the of permission the with Ordnance Survey from licenced data mapping includes product This

t

c

C S

a

l 1 b

E

P

u

t

C o

S e

l

N 3

g

r 1

E 6

E

o 3 0

e

3 R 9

1

G

W A

if l fi d itb d i 1 L 10

2 8 m m 6 Ref: 16 50 75 150 TBC TBC TBC hase of ‘Right to Sisters Sisters Community Strategy London Plan Plan London

homes homes homes ƒ ƒ Tenure split Tenure Wider Tottenham - W.Green/ Seven - W.Green/ Seven Wider Tottenham % of affordable Permanent jobs Total number of Total number Apprenticeships Apprenticeships No. of affordable Construction jobs Social/Intermediate 70/30 70/30 Social/Intermediate

Estate regeneration scheme involving of new net gain but partial demolition homes. Requires purc homes. Buy’ leasehold Site name Site name Avenue / Turner Walk Brunel Time frame 2012-2013 Strategic links Additional Notes Notes Additional Housing allocation Economic benefits Place shaping area area shaping Place

1

A

5

t .

Y o

2

54 t

22 1 8

1 r

6

E

1

o

u t

C

o 5

N

a 1

122 C

E

1

D

3 A

R n

O

R

N

O o T W K R t I

24 K 1 l

A r

L

a

0 4

D

7 4 h 9

A

a O o

4 R

2

1 8

t

R

A

1

M C E A

R 1

B

1

9 8

6 9

12 1

1 2 6 a

9 m 7 7

0 0

. 1

2 1

4

1

1 1

t 7

o

1

1

6 t

o

t

o

1

6

2 B

3 54

C

B

T L

9

7 1

0

5

m t

o

1

1 7

3 9

. 7

1

s k 1 or W

6

1 5

2

7 m

5 6

5

.

0

1

y 1

H

r 3

1 9 P o

t 5

2

c 7 a

F 5

ery Crown Office Copyright rights reserved. 2010 All LBH. Licence 100019199 no.

s

1

5

a w

1 t

2

S

e

9

b

M

u

t

S

r

l e E 0 5

7 1

53 to 83 b

r a

2 D

5 T 6

1

A 6 6 O R

1 R

1

8 9

1 C

7 N 3

1 Y

k L l

a S

2

1

0 O W 8

l R

e

2

n 2 3

u 1

r 9

4 B 2

8

2

3

2

4

7 8

2

m

0

4

0

.

3

t 5 2

o

1

1 5

4

4

M

1

B

D

2

2

A 7

E 5

D

U O

A

N

R

E

2 O

2

V 8 N 6

6 R

3 A

5 E

8 4 4 m D 9

o 9

3

E R

t 2

5

1

9

. 9 R

E

6 2

R

4

2 4

N O

1 1

G

R s F

t T

U

s 3 A 3 o 2

T

0 S E

P

m E

S 3

.

1

W 1

t

2

o

1

3

6 1

7

5

2

2

5

6 1

3 1 1

35 1 0

8 4 3

3 3 This product includes mapping licenced data Ordnance from Survey permission with the the Controller of Her of Majesty's Station

6

5

1

D A

O R

R A M L

E 1

1

5 1

0

1

5

6 7

1 2

1 2 5 7 0

6

2

1 Ref: 17 22 50 11 TBC TBC tory Scheme will Community Strategy London Plan Plan London

homes homes homes ƒ ƒ Tenure split split Tenure % of affordable Permanent jobs TBC Total number of Total number Apprenticeships Apprenticeships No. of affordable Construction jobs Social/Intermediate 70/30 70/30 Social/Intermediate

Tottenham Hale Gyra site of this development support Site name Site name Green Tottenham Saltram Close, Time frame Within 2011-2012 Strategic links Additional Notes Notes Additional Housing allocation Economic benefits Place shaping area area shaping Place Hale Tottenham

7

2

1 m

8

4

.

4

8 3

6

9

8 6 1

0

3

hts reserved. Licence no. 100019199 Licence no. reserved. hts 4

g

4 e

r 3

t 9 9 1

2

n 1

3 3

e

e 1 5 1

r a c

t 3

3 2

y

n

D a

e

l

c

A P

y 2 O 6

a 0 7 8 l

2 2 2

R

P

D E

V ri All LBH. 2010 ht S

I

A

g

R

K O ri D

N a

R D

py

t

l L A S E

I

E

F

B b

5

4

u R

Y 6

4 5 R 9 E

B 4 6

I N S 9

I 0

6

5

2

4 A A

2 T 5

4 F S

4

8 5

5

0

31 Crown Co Office

3 E

y 4 V

32 I

21 R

D Y AINB 22

ST D

AD 's Stationer

O 1 L

R 1 y

E I est j

2 C 1 F

1 L

R U

2 E

P

2 5 P

7 33 7

37 O 65

39 34 C Y 8 9

8 8 0 5 3 2 A 4

4 40 7 8 5 o 49 8 5 t 8 W

T 51 50

7 8

9 1 N 3 d 9 2 n 5 5

E

u o

M r 60 g

U y

ermission of the Controller of Her Ma Her of Controller the of ermission

a l p

N P

O E 3 S 4

M O

with the L

y

l

n

C

o

e

E

o

e

f

M

r

h

o

A

c

G

R

S

C

e

T

h

L T ouse A

hool H S en Sc

3

2

8

C 4

UL 22

8 3 7

4

e

u C L

O

S Ordnance from data Surve licenced E

g G

7

R

3

E g o E N

W

g A

Y in

a 6 n 2

pp

y

S

6 1

1

k 0

r

a

P

a

r

1

a C

352 roduct includes ma 366 p 1

0

This

k

r

a P

m

s

r r

s

h a

o D

o

c

f

r

r C A

e 8

u

C b

O

R

h

h

R d 8

C

g a

i

e s

t H

i

H C

l T

n

l

P H

a R

U P Ref: 18

Ref: 19 L

1 S

h t a

P

s

m

k 2

r

. Site name Ashley Road Depot

o 8 8

6 W 1

Place shaping area Tottenham Hale

Y

A

W a

167 t

S D

1

6 A

1 b

to E Time frame 2013-2014 u

S M

l

R

E E

T

A

162 W ƒ London Plan Opportunity Area

W E

I

V

K

R A P Strategic links ƒ Community Strategy

D

2 k

A c

0

a

1 r

O T

e

R l

ery Office. © Crown Copyright 2010 LBH. All rights reserved. Licence number 100019 All number rights Copyright reserved. Licence 2010 LBH. Office.ery Crown © Total number of

c

y C W 306

E

I

9 t homes 9 V

o

K p e R

A D

No. of affordable

P

l

i 3 0 1

c 153 n

5

9

u homes o

4 Housing allocation C 9 % of affordable

50

m 5

. homes 8

Tenure split

D

A

O

R

Y

E

L

H Social/Intermediate 70/30 S A

6

8

k

r

a

P

e n a L

n w o

D Construction jobs

4 8 TBC

Apprenticeships

1 Economic benefits 8 TBC

Permanent jobs

t TBC

D o

5

A 7 p

O e

R D

l i

W c

E

I

n k

V u

r o

K

a C R

1 P

A

m e

P

5

n

M

a

3

.

B

L

9

m

7

n

.

8

w

8

2 o

D B

L Requires existing operational depot to be

This product includes mapping data licensed from Ordnance Survey with the permission of the Controller of Her majesty's Station of the Controller the permission majesty's of Her with Survey Ordnance data licensedThis product includes from mapping

a

3

7 relocated to Council-owned site at Marsh

3 7

S Additional Notes Lane – full funding still to be identified. ' 1 B

6 e

C t

1 i

T a

t

S

S

y t

b Tottenham Hale Gyratory Scheme will

l

i

u

8 n E

6 S

e

1

m m

7

3 A 0 3

. support development of this site 9

c

i

M v D B i

A

C

O

R

W 3

6

9 E

4 I V

1 B

K

C

m R

A T 8 . P

m B 8

5 C .

T 8

2

6

1 5

3 8 6

7 Ref: 20

Ashley House Site name Tottenham Hale Island Site (West)

El Sub Sta

1 Place shaping area Tottenham Hale D 8.3m A O

R

Y 1 E 3 L

H

S 2 A Time frame 2012-2013 181 1 to T 95 H 1 E H H A LE A R L O E AD 165

to 2 ƒ London Plan Opportunity Area 9 9 17 ƒ Community Strategy Strategic links

3 3 TOTTENHAM HALE ƒ Tottenham Hale Urban Centre AD RO SS RO Masterplan H C El Sub Sta Image House Depot

5 Total number of 1 PH D N ROA 90 STATIO H homes A L E

40 3 2 o 1 G

t

A o

R No. of affordable 8

6

D E 3 45

N S Housing allocation homes n Court % of affordable

8.5m 50

3 homes

2

E H t

ALE o

GA 8 R AL DENS 6 H Tenure split

E

0

3

o t

8 H 1

T TCBs Social/Intermediate 70/30

8.1m 8.5m Construction jobs

8 TBC CR

E Apprenticeships

2 N A Economic benefits TBC L

D

A 7

9

1 O

o

t R 9

Permanent jobs 3

B 9 8 1 159 1 TBC 151

7.6m

1 2 2 2

1

9 Works 1 Tottenham Hale Gyratory Scheme will

9

8

1

7

8 support development of this site. 1 Additional Notes

3 Development likely to be undertaken in phases linked with land ownership

7.8m 7

7

1 This product includes mapping data licenced from Ordnance Survey with the permission of the Controller of Her Majesty's Stationery Office Crown Copyright 2010 LBH. All rights reserved. Licence no. 100019199

50 300 150 TBC TBC TBC 70/30

Tottenham Hale Urban Centre Hale Urban Tottenham Masterplan Community Strategy London Plan Opportunity Area Plan Opportunity London homes homes homes

Tenure split split Tenure ƒ ƒ ƒ % of affordable Permanent jobs Total number of Total number Apprenticeships Apprenticeships No. of affordable Construction jobs Tottenham Hale Gyratory Scheme Tottenham Hale will Scheme Gyratory site of this development support Site name Hale Waterside Time frame 2013-2014 Strategic links Additional Notes Notes Additional Housing allocation Economic benefits Place shaping area area shaping Place Hale Tottenham

i

r

e

v

i

D

e

e

L

r

o

a

e

L

r r e v i i R e

W

y

r

n

o

s

a

m

g

n i p o l S

e n li e ip P d

n

u

o

r

G

s

t

r

o

p

S

s

a

t

S

g b

i u v

a S

l N

E

e reserved. rights Crownery Licence 100019199 no. All Copyright Office 2010 LBH.

y

e r

n L

o

s

r

f

a

r

e

m

a v

i g

h n

i R

p

W

o

l

S e l

a H d

8 e

h

S

r

e

b

m i

m T

0

.

9

7

6

t

o

T 5

y

r

n

o

s

a

m

g

n

n

i

p

o i o

l

s S

r

e

v

i

D

e

e

2 L

r

1 y

o

b r

n

o a

s

e

a

L

m

1a

r g

n

e

i

p

v

m i o l

R 6 S

. 8 S

f

r

a

D h A

O W

R

e

D l

A

s

k a

c E

o

L

M H

m Her of Station Majesty's Controller Ordnance licencedfrom the data Survey permissionThis includes mapping product of with the

L a

h

L

n m

I

e

t

t

s 2

M o d

r T .

a

l

l

o 0 B

s l o l B 1

o

B s

n

C n

s C

n

k s l C r

o a

B

P

s

r l

a s C o

n B

C

s Ref: 21 20 50 10 TBC TBC TBC

4AT Community Strategy London Plan Plan London

homes homes homes ƒ ƒ Tenure split Tenure % of affordable Permanent jobs Total number of Total number Apprenticeships Apprenticeships No. of affordable Construction jobs Tynemouth House, Tynemouth Road N15 House, Tynemouth Tynemouth Social/Intermediate 70/30 70/30 Social/Intermediate

Site name Time frame 2011-2012 Strategic links Additional Notes Notes Additional Housing allocation Economic benefits Economic Place shaping area area shaping Place Hale Tottenham

2

9 6

2

t

o

1

0 8

2

1

5 0

2 1 2

7 4 12

1

22

32 3 1

3 0 1

46

m 4

9

7 .

8 AD

O a

e 1 o 2

2

R 9 i 2

ILL 1 s

2 T M

N h

8 A

3 u

1 B

p

o

3

3 o

m 5

H

S B

1 9

.

L

8

8 4

1 1 3

9 9 4 3 1 a

4

3 1

to 9 OAD m 1

L R 2 L 0

NTI . A 3

8

e

a

i

s

h

u 4 W 3 D

p

o

P

A 100019199 no. Licence reserved. rights All LBH. 2010 Copyright Crown Office ery

o

4 H 1 b

5

1

O

S

R

B

H

6 L

1

T

2

1 1 7

s U 8

k

r O

o PO

M

W s

B E

e C

g

N T

a

r

Y 50a

a T G 2 to

m

3

.

8

m

0

.

9 E

N

1 h

A

4 t e

3

u L s

7 o

u 6 4a 4 2a 2

D

o 8 m 1

8 14 A e 2 H

e n

r 40 t O

y 50

n T R

e B

C

h

t

l 4 VER ROAD 2 NO

a HA

1 1 1

e 7 6 7

1

1 a

3 H 3 a 5

1 9

2

1 1

2 t

E o 3

0 8 1

V

4 1

I

5 1

R 6 1

2

D 2 t o 1

4

D L

2

E

I 5

1

F 6

6

2 F

6

U TENBY CLOSE D

5 1

1

1

a

1

0

2 7 se

9

u o

2 5

t h

8 o

3 o t 1

e

1

r

3

a

1

e

c W

3

a

2 o

2

9 t

r

o 1 r

7

t

0

3

e 1

8

0

8 T

7 o h This product includes mapping data licenced from Ordnance Survey with the permission of the Controller of Her Majesty's Station Majesty's Her of Controller the of permission the with Survey Ordnance from licenced data mapping includes product This

t

7 t a

o

9

8

u 4 t

8

o 7

5 8 m E a

IV t

R 8

e 6 S

n

b y

u

b T

a

S

l

t

6 u

l

E 5

S

S 1

m

E 1

0 o

3

t

.

1

5

1 6 1 7 1

t o

1 Ref: 22

29 50 15 TBC TBC TBC 70/30 Community Strategy London Plan Plan London

homes homes homes ƒ ƒ Tenure split split Tenure % of affordable Permanent jobs Total number of Total number Apprenticeships Apprenticeships No. of affordable Construction jobs

Tottenham Hale Gyratory Scheme Tottenham Hale will Scheme Gyratory site of this development support Site name Site name N15 Broad Lane, 193-197 Time frame 2011-2012 Strategic links Additional Notes Notes Additional Housing allocation Economic benefits Place shaping area area shaping Place Hale Tottenham

m

a

5

.

E

8

P

m

l

a

i

T

h

a

t

T

n

e

e

t

O

R t

1

D

o

T

A

T

O

a

t R

9 S

b

u N

S

l O

E I

T

A

T

S

e

s

u

o

H

1 2 e

D g a

A

m I O R

E 8 L A 3

1 H

H P

ery Office Crown Copyright 2010 LBH. All rights reserved. Licence no. 100019199 Licence no. reserved. rights All 2010 LBH. Copyright Crown Office ery

t

o

p

e D

51

m E AL

H 3 E 3 H

5 T

.

8

m

1

. 8

29

m

6

.

7

s m

8 E B

N . A

L

D

A

C O

7 R

B

1

9

T 3

t o

1 9 7

1

9

1

9 8 1

7 8

LE 1

5

7 1

3 7 7 HA 7 1 1 32 to

THE 32 to 86 86

s

1 7

k 1

r

o W DENS E GAR 9

HAL 5 1

9

7

1 o 5

t

6 S

1

5 1

D N

9 2

2

A

o

1

1 2

t E

8

O 1 D

1

1 R

R 8

1

S

A t o

8 2 5

S

t 1 G 3

r

0 O u

E

R o

L 0

C

4 C

A

o

t n

H H

1 e

G r I r

a 9 H

4 1

W 3

1 6

0 4 1

1 1

6

o

t

1

9

3

2

1

1 6

S 1

EN 4

1 D 1

2

C AD R

6 A H

2 G

O

P E 1

L 0 R A

H

E

9

0 Station Her Majesty's of Controller the of permission the with Ordnance Survey from licenced data mapping includes product This

1 1

3

1 o

t 1 AP

1

1 9

C

1

1 1

127

5 4 o

9 t

3

6 6

5 1 8

1 2

2

1 7 1 2 t

1 3 o

y 0

a 1 2 1

3 m

5 2 6

w 1

0

b 0

.

D

u

8

S A

O

R 0 Ref: 23

8 16 50 TBC TBC TBC 70/30 area area Community Strategy London Plan Plan London

homes homes homes ƒ ƒ Tenure split split Tenure % of affordable Northumberland Park and surrounding surrounding Park and Northumberland Permanent jobs Total number of Total number Apprenticeships Apprenticeships No. of affordable Construction jobs

Tottenham Hale Gyratory Scheme Tottenham Hale will Scheme Gyratory site of this development support Site name Site name N17 0AE &700 – 702 686 High Road Time frame 2011-2012 Strategic links Additional Notes Notes Additional

Housing allocation Economic benefits

Place shaping area area shaping Place

3

O

1

R 9

Y

E

L M 0

2

2 7 11 8 O

R 4

1 B 1

3

D

A

O

R

9 1 2 1

7 E 9 L

5

1 Y 1

G

4 R 1

LANCASTER CLOSE A

86

4 7

3 87 W 1 9

E 8 F

6 8

2 o

N 5 1

t 2

8 9

A

1

L

D

A

O

R

L L

E

B

K 7 P M A

e C

R

s

A u

t 2

o P

8

C H

1

a

l

d

r

a

r 5 o 7

o

t

0

c 7 e

6 1

8

o t n 6 K 7

5 2 o

6 4 C

7

e

2

2 eryOffice Crown Copyright 2010 rights LBH. All reserved. Licence10001919 no.

P g

a

C

t o

s

s 3

1

a

1

9

P

6

e e o

t l

D

s y

4

s

6 u A g

a t r

t s

4 o O

S A o H R e P

0 g b ra Ga

4 u

2 s S Y

e l E E

b L m

C o

a

t

P OM o

H

S

P R C

b B u

H 684 t

S

P

73 o

2 l p

E

726 e

7 D

m 2

2 4 4 .

1 1

M

B b

692 4 678 to 682 6 0 696 8 76a C 0 8

7 69 694 690 686 6 684a

P 702 T C B ' s 710 704

676

m

m 0 7

0 . D A . O R

H G I 1 H

1

m

m

7

7

.

.

0

0

1

1

m

9

.

0

5 6 8 9 8 6

3

5

7

8 1 6 6

3

7 6

o

t

9 6 6 7 6 6 5 6 6

6 9 7

6 9 5 6 9 1

6

9 3

m

7

0 1

7 0

3 a 7 0

3

h

t

h

c s

n

i

r

t

e

u

t

p

t

h

a

o 7 0

7 C

B

T

1 e

e s

r

r t 2

t

t r

n

n

1

o

e

D e

C p

s

m

A

S C

t

r

9 . s

o

l

1

e p l

1

n RO

S

a

o

t

H

R R

S

l

A

e

p

D

t

k

This product includes mapping data licenced from Ordnance Survey with the permission of the Controller of Her Majesty's Station a

E

o

n

7

h

a

6 p C C 9

9 T e

1

9 D

0

D

A

O

R

H

C R Ref: 24

50 57 114 TBC TBC TBC 70/30 areas areas Community Strategy London Plan Plan London

homes homes homes ƒ ƒ Tenure split Tenure % of affordable Northumberland Park and surrounding surrounding and Park Northumberland Permanent jobs Total number of Total number Apprenticeships Apprenticeships No. of affordable Construction jobs Social/Intermediate Social/Intermediate

Release of site linked with Haringey- Release of site linked with in Enfield. owned site Site name Bull Lane) (Adjoins Selby Site Time frame 2013-2014 Strategic links Additional Notes Notes Additional Housing allocation Economic benefits Economic Place shaping area area shaping Place

h 5 to 24

e 14 r

a 36

f 26 to

e W D 38 to 48

LGAR VENUE 4 TRAFA FALGAR A

6 TRA

AVENUE

y

d

1

t

o B 1

1

1 3

t

o

2

B 3

2

5

t

o

3

L 5

3 7 t

o

4 & 7

t e

s s

n

u

o h

Co

e r o

r a

o W

B

2 to 12 a

t to 36

38 to 48 26

S

b

u

S

l

ery Office Crown Copyright 2010 LBH. All rights reserved. Licence no. Licence100019199 no. reserved. rights All Crown 2010 LBH. ery Office Copyright E SELBY ROAD

s AD t SELBY RO

r

u

o

7

1 C 7

1 s 5

i

2

n 1 9

n e 2 4

T

& 1 3

l

l n

a

o

i l

b i

1

t v

e a

N P

8

y

t

i

n

e

e

u

r

r

t

t

m

n

n

e

m

e

o

C

4

C

C

1

y

b

l

E e

1 1 U

S 3 2

N

e E

d h

Playgroun V T

T A

1

N 4 1 K

3

E t

o A

C 1

O S 7 E R C

S

F 1 Y 8 F B

L 4

A 2

D

2

0

t

o

2

3

1

9

2

4

t

o

2 6

3 0

2

3

3

This product includes mapping data licenced from Ordnance Survey with the permission of the Controller of Her of Station Majesty's Controller of the permission Ordnance from the Survey with licenced data product includes This mapping

1

8

7

d

l

4

3

e

i

F

g

n

i

y

a

l P Ref: 25

39 50 20 TBC TBC TBC 70/30

Community Strategy London Plan Plan London

homes homes homes ƒ ƒ Tenure split split Tenure % of affordable Permanent jobs Total number of Total number Apprenticeships Apprenticeships No. of affordable Construction jobs

Site name Site name N17 Road High 596 – 606 Time frame 2011-2012 Strategic links Additional Notes Notes Additional Housing allocation Economic benefits Place shaping area area shaping Place areas and surrounding Grove Bruce

t

2

9

c

n

e

S

C

E

r

o

y

S

i

a

l

n

O

P

u

L

J

C

S

'

Y

R

A

7 M

1 20

3

4

T

o

m t

8

S

8

7 .

3 1

9

1 A L O I B N

O R D 0 A Silver Industrial Estate

1 1

2

4 B

4

C

3 T 1 7 2 1

5

1

4 2 3

t o

H

4 4

1 0 P

s

e

t

e

a

c

4 t

i

s

1

f

f

4

4

E

2 l

O

a

)

i

t

r

e

t

u

n

s

n

u

e

e

d

v

n

m

a

H

I

e

t

n

r

P

S

R

r

N e

v b d

e l

E i 8

l n u

v 3

S a

E 10001919 reserved. Licence rights no. All Crown2010 LBH. Copyrightery Office S

l E 2

o n

I R

(

G d

G n

u

D o r

N

G

A l

4 7

L a

9

i r

T b

7

t u

6 u

l

o

0 3

O B

C 2

628 l

C 4

a

'

e

e c

S s 2 i

r g

n

d d t

i n

r l

l a

n a

a El

o

R h

e Y

c

C S

d ub Sta

x

C

n

E

a

b

l e

o n 2 a

8 r

o J

6 e

24 h b

1

i p

4

L e 2 1 l

614f e T

s ' B C

T m

e

d 0

4 4 . 614a

1

1

B

1 '

6

6 H

L

g

1 s

4

n P

1 e

d

i t

6 s

n

e

u

e

e

i r

00 e o

6 t

r

n

F H 2 M

612 608 60 e

C

e 610 D s A 598 i 59 r

4 p

r

e

t

n

m

E

5

.

m

0 D a

A

O 1 h

R

H W n G I H e

t O

t o R

100 to 123 T

9 9 M

5

1

17 10 9

5 to 186 0 to 123 5 3 9 R

175 to 1 5 5 86 60 O

to 5

68 F

3

1

o

t

s 1

' E

B

C

T

s

r

e R

b

m

a

h

C

m

e

1 r

i

.

h

0

s

n 1

B o y v

e 5

D 5

r 4

F 7 7

e 5

g

r m

5 2

7

5 5 3

u .

0

7 1

d S M 5 71 B

n 7

5

u 6 1

8

5

9

o 5 5

5

3

r o t t 1

t 1 g

8

8

y e

8

9 1 3 5

a 5

c

l

t t

t 1 o 5

o

o 5

P w

9

9 t

6

a

r

8

9

9

4

F a u 5 7 6

5

t

o

n

C

e

b

a

c 5 This product includes mapping data licenced from Ordnance Survey with the permission of the Controller of Her Majesty's Station of Controller the of permission the Ordnance licenced with Survey from data includes mapping product This

6 7 i 5 a

l 4 3 8

t o l 4 7

5 3

t o

8 5

4 i 5 4

k 5

3 o

2 9

t B M 2 3 o

9

t n

F

a

B

8

8

7 7 6

16 0

1 d Ref: 26