MBTA > Riding the T > Events

Total Page:16

File Type:pdf, Size:1020Kb

MBTA > Riding the T > Events The MBTA is proud to host thousands of Marathon Day spectators and runners every year as they travel throughout Boston. To make traveling around the city easier on race day, there is a special Marathon viewing map with distances to the race course from transit stations and the MBTA is offering unlimited travel tickets for Marathon Day on the Framingham/Worcester Commuter Rail Line. The Boston Marathon will be run on Monday, April 17, 2017, and before and after the race transit service will run on rush-hour schedules. Pre-marathon activities are also scheduled on Saturday, April 15, and Sunday, April 16 so the MBTA will be adjusting various bus routes in and around Copley Square to circumvent street closings. In addition, on Marathon Day, various bus routes will be detoured and Copley Square Station will be closed. Due to an increase in customers using the MBTA on Marathon Day, bikes are not allowed on any MBTA vehicles on Monday, April 17. Please note, backpacks, coolers, cans, bottles and large items are not permitted at the marathon. We appreciate your cooperation and wish all runners a good day. Subway Temporary Green Line Station Closures (10 a.m. - approximately 6 p.m.) For the safety of our customers, Copley Station will be closed for the entire day on April 17, 2017. Customers may use Arlington (all branches), Prudential (E Branch), or Hynes Convention Center (B, C, and D Branches) instead, or Back Bay on the Orange Line. The following above-ground Green Line stations will be closed between 10 a.m. and approximately 6 p.m. on Marathon Monday: South Street (B Branch) Kent Street (C Branch) St. Mary's Street (C Branch) The Red Line, Orange Line, and Blue Line, Green, and Silver Line will operate a regular weekday schedule with rush-hour levels of service before and after the race. Commuter Rail The Commuter Rail will operate a regular weekday schedule, with two additional trains on the Framingham/Worcester Line to support additional crowds. The schedules for these trains are below, and other Commuter Rail Schedules are available here. All bikes, including folding bikes, will be prohibited on-board trains on Monday, April 17. Additionally, bikes will not be permitted on the Framingham/Worcester Line on Sunday, April 16, after 8:00 p.m. OUTBOUND To Ashland To Wellesley Square Departing South 9:10 a.m. 11:30 a.m. Station Back Bay 9:16 a.m. 11:36 a.m. Yawkey 9:21 a.m. 11:41 a.m. Wellesley Farms 9:35 a.m. 11:55 a.m. Wellesley Hills 9:38 a.m. 11:58 a.m. Wellesley Square 9:41 a.m. 12:01 p.m. Natick 9:46 a.m. West Natick 9:51 a.m. Framingham 9:54 a.m. Arrive at Ashland 10 a.m. INBOUND To South Station To South To South Station Station Departing 10:10 a.m. 10:40 a.m. Ashland Framingham 10:21 a.m. 10:51 a.m. West Natick 10:26 a.m. 10:56 a.m. Natick 10:32 a.m. 11:02 a.m. Wellesley Square 10:38 a.m. 11:08 a.m. 12:30 p.m. Wellesley Hills 10:43 a.m. 11:13 a.m. 12:34 p.m. Wellesley Farms 10:47 a.m. 11:17 a.m. 12:38 p.m. Auburndale 10:53 a.m. 11:23 a.m. 12:43 p.m. West Newton 10:57 a.m. 11:27 a.m. 12:48 p.m. Newtonvile 11:02 a.m. 11:32 a.m. 12:52 p.m. Yawkey L 11:12 a.m. L 11:42 a.m. L 1:02 p.m. Back Bay L 11:17 a.m. L 11:47 a.m. L 1:07 p.m. Arrive at South 11:22 a.m. 11:52 a.m. 1:12 p.m. Station Bus Several Marathon-related events will take place during the weekend prior to Marathon Monday, which will affect some bus routes. Bus routes affected by Marathon-related events are listed below. Saturday, April 15, 2017 Boylston Street will be closed all day. Routes 9, 39, and 55 will be detoured from Boylston Street. Route 9 Will terminate at Back Bay Station at Dartmouth Street. There will be no service to Huntington Ave, Ring Road, Boylston Street, or Arlington Street, between Boylston and Stuart Streets. Bus stop connections can be made at Back Bay Station or Arlington and Isabella Street. Route 39 Inbound connections can be made at Back Bay Station and Clarendon Street or Huntington and Mass Ave. Outbound connections can be made at Back Bay Station or Huntington Ave and Evans Way. Route 55 Inbound: Will not serve Boylston Street between Dalton and Arlington Streets. Inbound bus stop connections can be made at Boylston and Saint Cecilia's Streets or at Saint James. Outbound: Outbound service is not impacted and will run its regular route. During the Boston Athletic Association 5K, some roads will be closed from approximately 5:00 am to 12:00 pm. The Route 43 will be detoured during this time. Route 43 Will terminate at Tremont and Stuart Streets from approximately 5 a.m. to 12 p.m. with no service to Charles Street, Charles Street South, Beacon Street, Park Street, Tremont Street,Park Street Station, or Boylston Street Station. Bus stop connections can be made at Tremont and Stuart Streets or at 285 Tremont Street. Sunday, April 16, 2017 Boylston Street will be closed all day. Routes 9, 39, and 55 will be detoured from Boylston Street. Route 9 Will terminate at Back Bay Station at Dartmouth Street. There will be no service to Huntington Avenue, Ring Road, Boylston Street, or Arlington Street between Boylston and Stuart Streets. Bus stop connections can be made at Back Bay Station or Arlington and Isabella Streets. Route 39 Inbound bus stop connections can be made at Back Bay Station and Clarendon Street or Huntington and Massachusetts Avenues. Outbound bus stop connections can be made at Back Bay Station and Clarendon Street or Huntington Avenue and Evans Way. Route 55 Inbound: Will not service Boylston Street between Dalton and Arlington Streets. Inbound bus stop connections can be made at Boylston and Saint Cecilia's Streets or at Saint James Avenue. Outbound: Outbound service is not impacted and will run its regular route. Monday, April 17, 2017 - Patriot's Day/Marathon Monday Buses and trackless trolleys will operate a weekday schedule unless specifically noted below. Some bus routes will be detoured due to the Marathon and other Patriots' Day race events. The approximate time for most street closures is 8 a.m. through 6:30 p.m. There will be no bus service to Cleveland Circle Station (Green Line C branch),Reservoir Station (Green Line D branch), the Kenmore Square area, Brookline Avenue, Boylston Street, or the Copley Square area. There will be no service to Huntington Avenue (westbound/outbound) from St. James Street to Massachusetts Avenue. From the start of service until approximately 10:30 a.m., there will be no service to Temple Place, Charles Street, Beacon Street, or Tremont Street (Boston Common). The following routes will be rerouted at certain times during Marathon Monday to prevent disruption to the race or other Patriots' Day events: Route 8, 19,60, and 65: During the Marathon,there is no service on Brookline Ave between Park Drive and Kenmore. Buses willterminate at Fenway Station (Green Line D branch) on Park Drive near theintersection with Boylston Street and Brookline Ave. Outboundconnections can be made at Brookline Avenue and Pilgrim Road. Inbound connections can be made at Brookline Avenue and Fenway. Routes 9 and 10: Buses terminate at Back Bay Station. Connections can be made at Back Bay Station on Dartmouth Street. Route 39: Omitting Copley Square for the entirety of Marathon Monday. Connections can be made on Clarendon Street. Route 43: Omitting Charles Street between the Public Garden and the Common. Connections can be made at the State Transportation Building. Route 47: Central Square, Cambridge to Albany Street. The Inbound trip terminates at Granite Street and Memorial Drive. The Outbound trip terminates at the Old Sears building. There will be no service between Brookline Avenue and the BU Bridge. Inbound connections can be made at Granite and Brookline in Cambridge. Outbound connections can be made at Brookline Avenue and the Fenway in Boston. Route 52: Service will run in two segments: Watertown Yard to Centre St. at Ward St. (just north of Commonwealth Ave) and Newton Center to Dedham Mall. There will be no service between Ward St. and Newton Center. Route 55: No service. Route 57: Buses will terminate at Commonwealth Ave and Blandford Street. There will be no service to Kenmore Station. Outbound connections can be made at Commonwealth Avenue and Sherborn Street. Inbound connections can be made at Commonwealth Avenue and Blandford Street. Route 59: Service will run in two segments: Watertown Sq. to Newtonville and Newton Highlands to Needham Junction. There will be no service on Walnut Street between Newton Highlands and Newtonville Avenue. Route 62 and 76:Due to the Patriots’ Day Parade, the Lexington Center stop is omitted between 12 p.m. and 5 p.m. Route 66: Service will run in two segments: Harvard to Union Sq (Allston), and Brookline Village to Dudley. There will be no service on Harvard Street between Brookline Village and Union Square in Allston. Route 86: Buses will terminate at Chestnut Hill Ave at Winship St. There will be no service between Cleveland Circle/Reservoir and Chestnut Hill Avenue at Winship Street.
Recommended publications
  • CHAPTER 2 Progress Since the Last PMT
    CHAPTER 2 Progress Since the Last PMT The 2003 PMT outlined the actions needed to bring the MBTA transit system into a state of good repair (SGR). It evaluated and prioritized a number of specific enhancement and expansion projects proposed to improve the system and better serve the regional mobility needs of Commonwealth residents. In the inter- vening years, the MBTA has funded and implemented many of the 2003 PMT priorities. The transit improvements highlighted in this chapter have been accomplished in spite of the unsus- tainable condition of the Authority’s present financial structure. A 2009 report issued by the MBTA Advisory Board1 effectively summarized the Authority’s financial dilemma: For the past several years the MBTA has only balanced its budgets by restructuring debt liquidat- ing cash reserves, selling land, and other one-time actions. Today, with credit markets frozen, cash reserves depleted and the real estate market at a stand still, the MBTA has used up these options. This recession has laid bare the fact that the MBTA is mired in a structural, on-going deficit that threatens its viability. In 2000 the MBTA was re-born with the passage of the Forward Funding legislation.This legislation dedicated 20% of all sales taxes collected state-wide to the MBTA. It also transferred over $3.3 billion in Commonwealth debt from the State’s books to the T’s books. In essence, the MBTA was born broke. Throughout the 1990’s the Massachusetts sales tax grew at an average of 6.5% per year. This decade the sales tax has barely averaged 1% annual growth.
    [Show full text]
  • Final Environmental Impact Report
    July 24, 2015 Matthew A. Beaton, Secretary Executive Office of Energy & Environmental Affairs Attention: MEPA Office – Holly Johnson, MEPA #14590 100 Cambridge Street, Suite 900 Boston, MA 02114 RE: The Station at Riverside, MEPA #14590 Dear Secretary Beaton: The Metropolitan Area Planning Council (MAPC) regularly reviews proposals deemed to have regional impacts. The Council reviews proposed projects for consistency with MetroFuture, the regional policy plan for the Boston metropolitan area, the Commonwealth’s Sustainable Development Principles, the GreenDOT initiative, consistency with Complete Streets policies and design approaches, as well as impacts on the environment. BH Normandy Riverside, the Proponent, proposes to redevelop an MBTA property at Riverside Station on Grove Street in Newton, off Exit 22 of Interstate 95 (Route 128). Since the Draft Environmental Impact Report (DEIR) filing in 2011, the proposed project has been downsized, but still is a significant development project in Greater Boston. The current proposal is for a mixed-use redevelopment in and around the current parking lot for the MBTA’s Riverside Station, the western terminus of the MBTA Green Line "D" Branch light rail line. The project site is defined as the 22.35 acres owned by the MBTA, which currently consists of the MBTA rail yard operations, a Green Line maintenance facility, a bus terminal facility, and surface parking. A 9.38-acre parcel will be leased to the Proponent for redevelopment. An Intermodal Commuter Facility (ICF) will be constructed on approximately 2.11 acres and will be operated by the MBTA. The MBTA will continue its operations on the remaining approximately 10.86 acres.
    [Show full text]
  • MIT Kendall Square
    Ridership and Service Statistics Thirteenth Edition 2010 Massachusetts Bay Transportation Authority MBTA Service and Infrastructure Profile July 2010 MBTA Service District Cities and Towns 175 Size in Square Miles 3,244 Population (2000 Census) 4,663,565 Typical Weekday Ridership (FY 2010) By Line Unlinked Red Line 241,603 Orange Line 184,961 Blue Line 57,273 Total Heavy Rail 483,837 Total Green Line (Light Rail & Trolley) 236,096 Bus (includes Silver Line) 361,676 Silver Line SL1 & SL2* 14,940 Silver Line SL4 & SL5** 15,086 Trackless Trolley 12,364 Total Bus and Trackless Trolley 374,040 TOTAL MBTA-Provided Urban Service 1,093,973 System Unlinked MBTA - Provided Urban Service 1,093,973 Commuter Rail Boardings (Inbound + Outbound) 132,720 Contracted Bus 2,603 Water Transportation 4,372 THE RIDE Paratransit Trips Delivered 6,773 TOTAL ALL MODES UNLINKED 1,240,441 Notes: Unlinked trips are the number of passengers who board public transportation vehicles. Passengers are counted each time they board vehicles no matter how many vehicles they use to travel from their origin to their destination. * Average weekday ridership taken from 2009 CTPS surveys for Silver Line SL1 & SL2. ** SL4 service began in October 2009. Ridership represents a partial year of operation. File: CH 01 p02-7 - MBTA Service and Infrastructure Profile Jul10 1 Annual Ridership (FY 2010) Unlinked Trips by Mode Heavy Rail - Red Line 74,445,042 Total Heavy Rail - Orange Line 54,596,634 Heavy Rail Heavy Rail - Blue Line 17,876,009 146,917,685 Light Rail (includes Mattapan-Ashmont Trolley) 75,916,005 Bus (includes Silver Line) 108,088,300 Total Rubber Tire Trackless Trolley 3,438,160 111,526,460 TOTAL Subway & Bus/Trackless Trolley 334,360,150 Commuter Rail 36,930,089 THE RIDE Paratransit 2,095,932 Ferry (ex.
    [Show full text]
  • Fiscal and Management Control Board Transportation Board Room June 25, 2018 12:30 P.M
    MBTA Logo, Charles D. Baker, Governor, Karyn E. Polito, Lieutenant Governor, Stephanie Pollack, MassDOT Secretary & CEO, Luis Manuel Ramírez, General Manager & CEO, MassDOT logo Fiscal and Management Control Board Transportation Board Room June 25, 2018 12:30 p.m. MEETING MINUTES Present: Director Steven Poftak, Director Brian Lang and Director Monica Tibbits-Nutt Quorum Present: Yes Others Present: Secretary Stephanie Pollack, MassDOT Director Joe Sullivan (departed at 1:34 p.m.) Luis Ramirez, Jeffrey Gonneville, Marie Breen, Owen Kane, Mike Abramo, Nathan Peyton, David Abdoo, Jackie Goddard, Evan Rowe, Scott Hamwey, Jessica Casey, Beth Larkin, Heather Hume, Laurel Paget-Seekins, Kat Benesh, Dan Grabauskus and David Scorey At the call of Vice Chair Poftak, a meeting of the Fiscal and Management Control Board (Board) was called to order at 12:36 p.m. at the State Transportation Building, Transportation Board Room, 10 Park Plaza, Boston, Massachusetts. Vice Chair Poftak opened up the public comment period for items appearing on the agenda. The first speaker Richard Prone, MBTA’s Duxbury Advisory Board Representative, commented on the addition of commuter rail evening trains. Massachusetts Bay Transportation Authority Ten Park Plaza, Suite 4510, Boston, MA 02116 www.mbta.com Next, Louise Baxter, from TRU, read testimony of behalf of the TRU, relative to AFC 2.0 and the Better Bus project. Lastly, Marilyn McNabb commented on the Ride’s transition to Transdev. Next, was the approval of the meeting minutes of June 11, 2018. On motion duly made and seconded, it was: VOTED: to approve the minutes of June 11, 2018. Director Tibbits-Nutt abstained from voting.
    [Show full text]
  • Citi Frozen Fenway 2014 Faqs WHAT FANS NEED to KNOW
    Citi Frozen Fenway 2014 FAQs WHAT FANS NEED TO KNOW What time will gates open for games on Dec 28, 31; Jan. 2, 4, 7, 8, 9, and 11? Fenway Park gates will open one hour prior to the start of the games. December 28: gates will open at 5:30 p.m. December 31: gates will open at 9:15 a.m. January 2: gates will open at 2:30 p.m. January 4: gates will open at 3:00 p.m. January 7: gates will open at 3:00 p.m. January 8: gates will open at 12:30 p.m. January 9: gates will open at 6:30 p.m. January 11: gates will open at 2:00 p.m. What time will gates open on the two Community Skating and Sledding days on December 29 and January 1? Fenway Park gates will open at 8:30 a.m., a half hour before the first Community Skating and Sledding time. Patrons with tickets to one of the Community Skating and Sledding days are asked to arrive 30 minutes before their scheduled time. Session times are indicated on all tickets. What time will gates open for New Year’s Eve at Fenway Park on December 31? Gate E will open at 4:30 p.m., a half hour before the first New Year’s Eve skating time. Patrons with tickets to one of the New Year’s Eve skating sessions may enter anytime after 4:30 p.m. Designated skating sessions are indicated on all tickets. Will ice skates be provided at the ballpark for the community skating days and New Year’s Eve event? Skates will not be provided at Fenway Park.
    [Show full text]
  • Building a Better T in the Era of Covid-19
    Building a Better T in the Era of Covid-19 MBTA Advisory Board September 17, 2020 General Manager Steve Poftak 1 Agenda 1. Capital Project Updates 2. Ridership Update 3. Ride Safer 4. Crowding 5. Current Service and Service Planning 2 Capital Project Updates 3 Surges Complete | May – August 2020 Leveraged low ridership while restrictions are in place due to COVID-19 directives May June July August D Branch (Riverside to Kenmore) Two 9-Day Closures C Branch (Cleveland Circle to Kenmore) E Branch (Heath to Symphony) Track & Signal Improvements, Fenway Portal Flood 28-Day Full Closure 28-Day Full Closure Protection, Brookline Hills TOD Track & Intersection Upgrades Track & Intersection Upgrades D 6/6 – 6/14 D 6/20 – 6/28 C 7/5 – 8/1 E 8/2 – 8/29 Blue Line (Airport to Bowdoin) Red Line (Braintree to Quincy) 14-Day Closure Harbor Tunnel Infrastructure Upgrades On-call Track 2, South Shore Garages, Track Modernization BL 5/18 – 5/31 RL 6/18 -7/1 4 Shuttle buses replaced service Ridership Update 5 Weekday Ridership by Line and Mode - Indexed to Week of 2/24 3/17: Restaurants and 110 bars closed, gatherings Baseline: limited to 25 people Average weekday from 2/24-2/28 100 MBTA service reduced Sources: 90 3/24: Non-essential Faregate counts for businesses closed subway lines, APC for 80 buses, manual counts at terminals for Commuter Rail, RIDE 70 vendor reports 6/22: Phase 2.2 – MBTA 6/8: Phase 2.1 60 increases service Notes: Recent data preliminary 50 5/18-6/1: Blue Line closed for 40 accelerated construction Estimated % of baseline ridership
    [Show full text]
  • Transit Capacity Evaluation
    Riverside Redevelopment - Transportation Impact and Access Study (TIAS) Revised 2020-02-13 Transit Capacity Evaluation Because the project site will be integrated with the existing transit station, public transit plays an important role in how people will get to and from the site. As such, an in-depth analysis of the existing transit system and its ability to accommodate future passenger demands was prepared. This section contains the following information: › Methodolgy › Existing MBTA Green (D) Line Capacity o Planned MBTA Green Line (D) Improvements › Existing MBTA Bus Service Capacity › Current and Future Transit Operations › Projected Ridership and Distribution of Project Generated Transit Trips › Future Transit Service Capacity Analysis Methodolgy In an effort to understand the potential for additional ridership, available capacity was estimated on transit lines that could be utilized for access to and from the site. For this study, the MBTA Green Line rapid transit (subway) line and the MBTA Route 558 bus service were evaluated for project impacts on passenger capacity. The capacity analysis results in a comparison of the expected demand for transit to the planned capacity of the service. Thus, for the subway and bus lines, we first identify the service segments that are expected to be used by riders generated by the proposed development project. For each service, we identify the peak passenger load point – the service segment that is most crowded, based on existing ridership, by time of day (for buses it’s by trip; for subway, it’s by 30-minute service period). These passenger loads are compared against the service’s capacity.
    [Show full text]
  • Master Plan for Planned Development Area No. 115
    HARVARD university Master Plan for Planned Development Area No. 115 Submitted Pursuant to Article 80 of the Boston Zoning Code Harvard Enterprise Research Campus SubmiƩ ed to: Boston Redevelopment Authority d/b/a the Boston Planning & Development Agency SubmiƩ ed by: Harvard University With Technical Assistance From: DLA Piper Reed Hilderbrand VHB WSP ALLSTON CAMPUS December 2017 Master Plan for Planned Development Area No. 115 Submitted Pursuant to Article 80 of the Boston Zoning Code Harvard Enterprise Research Campus Submitted to: Boston Redevelopment Authority d/b/a the Boston Planning and Development Agency Submitted by: Harvard University With Technical Assistance From: DLA Piper Reed Hilderbrand VHB WSP December 2017 Table of Contents Page 1.0 Introduction ........................................................................................................................................ 1 2.0 Relationship to Framework Plan .................................................................................................... 2 3.0 PDA Area Description ........................................................................................................................ 2 4.0 The Proposed Project ........................................................................................................................ 2 5.0 Planning Objectives and Character of Development .................................................................... 4 6.0 Project Benefits ...............................................................................................................................
    [Show full text]
  • Guide to Soft Landing & Living
    GUIDE TO SOFT LANDING & LIVING Babson’s Unofficial Guide for International Students and Partners 2021-2022 Edition INTRODUCTION - - - - - - - - We welcome you to the Babson family. This new stage in your life will be very exciting. But we also know uprooting your life is pretty disruptive and settling somewhere new can be very overwhelming and stressful. We understand, we have walked down that lane. We are here to help. This is why we have gathered information from the experience of other international students and partners, as well as locals, to help you plan and transition to your new life in Boston and at Babson. We have also shared some tips and recommendations to make your life easier and fun while you are here. 2 This guide was started by alumni Peter Rovick (MBA ‘09), was updated by grad partner Erica Jornales (Partner of MBA ’19), and has been updated ever since by grad students and partners. This year we have been working on including information that will speak to single students, to couples, and to families, as we know your needs in some cases might be different. We hope you find this guide helpful and in the future help keep it up to date for other generations. If you have a thought or advice to share please send it to [email protected]. Disclaimer: This document is not officially endorsed by Babson College. “ Change is hard at first, messy in the middle and gorgeous at the end. -Robin Sharma ” 3 Table of Contents INTRODUCTION .................................................................................................................................................................................................................. 2 BEFORE YOU TRAVEL AND FIRST DAYS ....................................................................................................................................................................
    [Show full text]
  • Changes to Transit Service in the MBTA District 1964-Present
    Changes to Transit Service in the MBTA district 1964-2021 By Jonathan Belcher with thanks to Richard Barber and Thomas J. Humphrey Compilation of this data would not have been possible without the information and input provided by Mr. Barber and Mr. Humphrey. Sources of data used in compiling this information include public timetables, maps, newspaper articles, MBTA press releases, Department of Public Utilities records, and MBTA records. Thanks also to Tadd Anderson, Charles Bahne, Alan Castaline, George Chiasson, Bradley Clarke, Robert Hussey, Scott Moore, Edward Ramsdell, George Sanborn, David Sindel, James Teed, and George Zeiba for additional comments and information. Thomas J. Humphrey’s original 1974 research on the origin and development of the MBTA bus network is now available here and has been updated through August 2020: http://www.transithistory.org/roster/MBTABUSDEV.pdf August 29, 2021 Version Discussion of changes is broken down into seven sections: 1) MBTA bus routes inherited from the MTA 2) MBTA bus routes inherited from the Eastern Mass. St. Ry. Co. Norwood Area Quincy Area Lynn Area Melrose Area Lowell Area Lawrence Area Brockton Area 3) MBTA bus routes inherited from the Middlesex and Boston St. Ry. Co 4) MBTA bus routes inherited from Service Bus Lines and Brush Hill Transportation 5) MBTA bus routes initiated by the MBTA 1964-present ROLLSIGN 3 5b) Silver Line bus rapid transit service 6) Private carrier transit and commuter bus routes within or to the MBTA district 7) The Suburban Transportation (mini-bus) Program 8) Rail routes 4 ROLLSIGN Changes in MBTA Bus Routes 1964-present Section 1) MBTA bus routes inherited from the MTA The Massachusetts Bay Transportation Authority (MBTA) succeeded the Metropolitan Transit Authority (MTA) on August 3, 1964.
    [Show full text]
  • CIVIC AGENDA Right by the “Grove”—The Brick Patio- • TUE, FEB
    FEBRUARY WWW.FENWAYNEWS.ORG 2021 FREE COVERING THE FENWAY, AUDUBON CIRCLE, KENMORE SQUARE, UPPER BACK BAY, PRUDENTIAL, LONGWOOD, AND MISSION HILL SINCE 1974 • VOLUME 47, NUMBER 2 • JANUARY 29 - FEBRUARY 26, 2021 FCDC Looks Set to Develop 72 Burbank Project BY ALISON PULTINAS original 32, and all will be income-restricted $1.8 million. The presentation BPDA THE OF COURTESY RENDERING EMBARC he small parking lot at 72 Burbank in perpetuity for households at or below 60 to the Trust estimated the total Street in the East Fens—owned by percent of the area median income (AMI). development cost as $15,117,028. Forest Properties (also known as The reduction in units translated into more Burbank Terrace is also Parkside Tower LLC)—could see units of larger dimensions. The unit mix is in line for low-income tax- a construction start this year. It would be now 8 studios, 7 one-bedroom apartments, credit funding from the state’s T and 12 two-bedrooms. Forest had proposed Department of Housing and Fenway CDC’s version of a proposal already approved for compact apartments. The CDC 13 studios, 12 one-bedrooms, and 7 two- Community Development and Forest Properties signed a purchase-and- bedrooms. (DHCD) winter competition. sale agreement in December; final transactions However, some aspects of the project Although applications were due are expected later this year. have not changed. The units will remain January 21, the CDC won approval When Attorney Marc LaCasse presented rentals and are still undersized, officially in November 2020 through the Forest Properties’ original plan to the Zoning meeting the BPDA’s special compact-living department’s pre-application Board of Appeal on June 25, 2019, the project, standards.
    [Show full text]
  • Improving Pedestrian and Bicyclist Access to Selected Transit Stations
    Improving Pedestrian and Bicyclist Access to Selected Transit Stations A report produced by the Central Transportation Planning Staff for the Massachusetts Highway Department and the Massachusetts Bay Transportation Authority Improving Pedestrian and Bicyclist Access to Selected Transit Stations Author Lourenço Dantas Contributors Kenneth Dumas Heather Ostertog Karl Quackenbush Graphics and Photography Kenneth Dumas Cover Design Jane M. Gillis The preparation of this document was supported by the Massachusetts Highway Department, Massachusetts Bay Transportation Authority, and Federal Highway Administration through MassHighway Agreements SPR 33097 and 3C PL 33101 and MBTA contracts. Central Transportation Planning Staff Directed by the Boston Region Metropolitan Planning Organization. The MPO is composed of state and regional agencies and authorities, and local governments. September 2005 ABSTRACT This study identifies relatively low-cost, quick-implementation measures that can significantly improve pedestrian and bicyclist access at six locations in the Massachusetts Bay Transportation Authority system: Ayer Station (commuter rail); Boston College Branch (B Line) stops, Boston College Station to Chestnut Hill Avenue (Green Line); Cleveland Circle and Reservoir stops (Green Line, C and D); Forest Hills Station (Orange Line, commuter rail, and bus); Malden Center Station (Orange Line, commuter rail, and bus); and Mansfield Station (commuter rail and bus). Detailed in the report are improvements to both station property and surrounding areas that would eliminate hazards for bicyclists and pedestrians, increase ease of access to the station from surrounding neighborhoods for those users, or otherwise enhance the attractiveness of the station for access by foot or bicycle. The report also includes a summary that describes the types of issues encountered and provides general recommendations.
    [Show full text]