National Power System Expansion Plan 2011 - 2030

Total Page:16

File Type:pdf, Size:1020Kb

National Power System Expansion Plan 2011 - 2030 National Transmission and Despatch Company Limited National Power System Expansion Plan 2011 - 2030 Final Report Main Report 504760-01-MR 2011 Prepared by SNC-Lavalin International Inc . in association with National Engineering Services Pakistan (PVT) Limited NOTICE This document contains the expression of the professional opinion of SNC-Lavalin Inc. (“SLI”) as to the matters set out herein, using its professional judgment and reasonable care. It is to be read in the context of the agreement dated October 4, 2010 (the “Agreement”) between SLI and National Thermal Despatch Company (the “Client”), and the methodology, procedures and techniques used, SLI’s assumptions, and the circumstances and constraints under which its mandate was performed. This document is written solely for the purpose stated in the Agreement, and for the sole and exclusive benefit of the Client, whose remedies are limited to those set out in the Agreement. This document is meant to be read as a whole, and sections or parts thereof should thus not be read or relied upon out of context. Unless expressly stated otherwise, assumptions, data and information supplied by, or gathered from other sources (including the Client, other consultants, testing laboratories and equipment suppliers, etc.) upon which SLI’s opinion as set out herein is based has not been verified by SLI; SLI makes no representation as to its accuracy and disclaims all liability with respect thereto. 504760 © 2011 SNC-Lavalin Inc. All rights reserved T&D Division Confidential National Power Systems Expansion Plan LIST OF ABBREVIATIONS AND DEFINITIONS Abbreviations: ADB Asian Development Bank AEDB Alternative Energy Development Board cct-km Circuit-kilometre Consultant SNC-Lavalin, Transmission and Distribution Group DISCO Distribution Company DSM Demand Side Management GDP Gross Domestic Product GENCO Generation Company HPP Hydel (or Hydro) Power Project HSFO High-Sulphur Furnace Oil HVAC High Voltage Alternating Current HVDC High Voltage Direct Current IEEE Institute of Electrical and Electronic Engineers kA Kilo-ampere KESC Karachi Electric Supply Company km Kilometre KPT Karachi Port Trust kV Kilovolt MMcfd Million cubic feet per day MOU Memorandum of Understanding MT Metric Tonnes MTOE Million Tons of Oil Equivalent MVA Mega volt-amperes MWh Megawatt-hour or 1,000 kilowatt-hours NEPRA National Electric Power Regulatory Authority NESPAK National Engineering Services Pakistan (Pvt) Limited NPP National Power Plan, prepared by Acres International Limited in 1994 NTDC National Transmission and Despatch Company OGDCL Oil and Gas Development Company Limited P.P. Power Project PAEC Pakistan Atomic Energy Commission PARCO Pak-Arab Refining Company PEPCO Pakistan Electric Power Company i National Power Systems Expansion Plan PPIB Private Power and Infrastructure Board PPL Pakistan Petroleum Limited PQA Port Qasim Authority PSO Pakistan State Oil PSS/E Power System Simulation RFO Residual Furnace Oil SIL Surge Impedance Load SNGPL Sui Northern Gas Pipeline Limited SSGCL Sui Southern Gas Company Limited SYPCO Generation planning software (System Production Costing) TAVANIR The Iranian Electric Utility WAPDA Water and Power Development Authority ii TABLE OF CONTENTS National Power System Expansion Plan TABLE OF CONTENTS 1 INTRODUCTION ...................................................................................................1-1 1.1 Objective of the National Power Systems Expansion Plan .........................................1-1 1.2 Scope of Work ............................................................................................................1-2 1.3 Structure of the report ................................................................................................1-2 2 POWER SECTOR ENVIRONMENT IN PAKISTAN ...............................................2-1 2.1 Economy and the Energy Sector ................................................................................2-1 2.2 Characteristics of the Energy Sector in Pakistan ........................................................2-1 2.3 The Current Power System ........................................................................................2-2 3 SYSTEM PLANNING CRITERIA ...........................................................................3-1 3.1 Introduction ................................................................................................................3-1 3.2 Economic and Financial Parameters ..........................................................................3-1 3.3 Generation Planning Criteria ......................................................................................3-2 3.4 Environmental Criteria ................................................................................................3-3 3.4.1 Thermal Generation Projects ...................................................................................3-3 3.4.2 Hydroelectric Generation Projects ...........................................................................3-4 3.4.3 Transmission Projects ..............................................................................................3-5 3.5 Transmission Planning Criteria ...................................................................................3-6 3.5.1 Contingency Conditions ...........................................................................................3-6 3.5.2 Component Loading .................................................................................................3-6 3.5.3 Voltage .....................................................................................................................3-7 3.6 Distribution Planning Criteria ......................................................................................3-7 3.6.1 System Voltage Criteria ...........................................................................................3-7 3.6.2 Equipment Thermal Loading Criteria ........................................................................3-8 3.7 Financial Planning Criteria ..........................................................................................3-8 4 POWER DEMAND.................................................................................................4-1 4.1 Introduction ................................................................................................................4-1 4.2 Issues related to the load forecast ..............................................................................4-1 4.2.1 Load Shedding .........................................................................................................4-1 4.2.2 Transmission and Distribution Losses ......................................................................4-2 4.2.3 System Load Factor .................................................................................................4-4 4.2.4 Load Characteristics ................................................................................................4-6 4.2.5 Demand Side Management ......................................................................................4-7 4.3 Approach and Methodology ........................................................................................4-7 4.3.1 General ....................................................................................................................4-7 4.3.2 Medium-Term Forecast ............................................................................................4-8 4.3.3 Long Term Forecast .................................................................................................4-9 4.4 Key Independent Variables ......................................................................................4 -10 4.4.1 Projections of Independent Variables .....................................................................4 -11 504760-01-MR i Main Report National Power System Expansion Plan 4.5 Load Forecasts ........................................................................................................4 -13 4.5.1 Sales Forecasts ....................................................................................................4 -13 4.5.2 Generation Forecast ..............................................................................................4 -15 4.5.3 Forecast with DSM ................................................................................................. 4-16 4.5.4 Summary of Forecasts ...........................................................................................4 -19 5 FUEL SUPPLY, PORT HANDLING AND FUEL PRICING ....................................5-1 5.1 Introduction ................................................................................................................5-1 5.2 Fuel Supply ................................................................................................................5-1 5.2.1 Natural Gas ..............................................................................................................5-1 5.2.2 Fuel Oil ....................................................................................................................5-5 5.2.3 Coal .........................................................................................................................5-6 5.3 Capacity of Ports and Fuel Logistics ...........................................................................5-7 5.4 Pricing of Fuels ..........................................................................................................5-9
Recommended publications
  • Public Sector Development Program
    2011-12 Public Sector Development Program Planning and Development Department Government of Balochistan Government of Balochistan Planning & Development Department Public Sector Development Programme 2011-12 (Original) June, 2011 PREFACE The PSDP 2010 – 11 has seen its completion in a satisfactory manner. Out of 961 schemes, 405 schemes have successfully been completed at an aggregated expenditure of Rs. Rs.10.180 billion. Resultantly, communications links will get more strengthened in addition to increase in the employment rate in the province. More specifically, 60 schemes of water sector will definitely reinforce other sectors attached to it such as livestock and forestry. The PSDP 2011-12 has a total outlay of Rs.31.35 billion having 1084 schemes. Of this Rs.31.35 billion, 47.4% has been allocated to 590 ongoing schemes. The strategy adopted in preparation of the PSDP 2011-12 focuses chiefly on infrastructural sectors. Education, health and potable safe drinking water have been paid due attention with a view to bring about positive increase in their representation in social indicators. Worth mentioning is the fact that involvement of the Elected Members of the Provincial Assembly has excessively been helpful in identification of schemes in the constituencies having followed a well thought criteria. This has ensured that no sector has remained dormant as far its development and allocation of funds is concerned. Feasibility studies will be undertaken during FY 2011-12, especially for construction of mega dams to utilize 6.00 MAF flood water, which goes unutilized each year. Besides, feasibility studies for exploration and exploitation of viable minerals in the province will also be carried out.
    [Show full text]
  • Water and Power Resources of West Pakistan
    Water and Power Resources PAKISTAN "& of WEST I1158 Public Disclosure Authorized A Study in Sector Planning g' c - J) A N D e XJ ~~~~~~~ S >>)~~~~~TM RHELA AS H M I R Public Disclosure Authorized VISLAMABA > 2 t \ . Public Disclosure Authorized C ,,'_ o / z 'N ~~VOLUME g,_ -THE MAIN REPORT \ < ,pre~lppared by a World Bank Study Group Headed by X f .,/ ~~~PIETER LIEFTINCK t i '_z ~~~A. ROBERT SADOVE Public Disclosure Authorized tt I ~~~~~~~~~Deputy Hlead S n THOMAS-4 C.CREYKE ~~~~< < /r~~~~~~~~~~~trigation and Agr-icultut-e WATER AND POWER RESOURCES OF WEST PAKISTAN A Study in Sector Planning Volume I: The Main Report $10.00 Volume II: The Development of Irrigation and Agriculture $12.50 Volume III: Background and Methodology $ 12.50 $28.50 the set Prepared by a World Bank Study Group Headed by Pieter Lieftinck; A. Robert Sadove, Deputy Head; Thomas C. Creyke, Irrigation and Agriculture. Without doubt, the greatest single co- ordinated development operation in which the World Bank has been involved is the massive program for development of the Indus Basin. This pioneering study is an integral part of that project and is unique both in its conceptualization and its compre- hensiveness. It demonstrates the feasibility of a new and more rigorous approach to resource planning and development and will serve as an indispensible model for engi- neers, economists, and planners for years to come. Focal points of the Study are the Indus River, which runs the length of west Paki- stan, several of its tributaries, and a huge natural underground reservoir.
    [Show full text]
  • Annual Plan 2010-2011
    ANNUAL PLAN 2010-11 PLANNING COMMISISON PLANNING AND DEVELOPMENT DIVISION GOVERNMENT OF PAKISTAN JUNE, 2010 CONTENTS Pages Foreword Executive Summary i Part-I Macroeconomic Framework 1 Chapter 1 Growth, Investment and Savings 3 2 Balance of Payments 11 3 Fiscal and Monetary Developments 21 4 Public Sector Development Programme 29 Part-II Overcoming Major Constraints 39 5 Water Resources Development 41 6 Energy Security 47 Part-III Human Resource Development 57 7 Education for Knowledge Society 59 7.1 School and College Education 59 7.2 Higher Education 62 7.3 Science and Technology 67 8 Employment 75 9 Population and Development 85 Part-IV Poverty Alleviation and Millennium Development Goals 91 10 Poverty Reduction 93 11 Health and Nutrition 101 11.1 Health 101 11.2 Nutrition 106 Part-V Main Features of Sectoral Programs 109 12 Agriculture Development 111 12.1 Agriculture Crops 111 12.2 Livestock, Poultry and Fisheries Development 119 13 Manufacturing and Minerals 125 14 Transport and Communication 133 15 Physical Planning and Housing 139 16 Information and Communication Technologies 147 16.1 Information Technology 147 16.2 Telecommunications 155 17 Women Empowerment and Social Welfare 159 17.1 Women Development and Empowerment 159 17.2 Social Welfare 162 18 Rural Development, Special Areas and Drought Recovery 165 Program 18.1 Rural Development 165 18.2 Special Areas 170 18.3 Drought Recovery Assistance Program 175 19 Environment and Sustainable Development 183 20 Mass Media, Culture, Sports, Tourism and Youth 187 20.1 Mass Media 187 20.2 Culture, Sports, Tourism and Youth 189 21 Good Governance 193 21.1 Reforms Programme 193 21.2 Monitoring and Evaluation 196 Foreword Foreword The National Economic Council (NEC) in its meeting held on 28th May, 2010 under the chairmanship of the Prime Minister, reviewed the performance of the economy during 2009-10 and approved the Annual Plan 2010-11.
    [Show full text]
  • Water Resources Development in Pakistan a Revisit of Past Studies
    World Water Day 22nd March, 2014 56 WATER RESOURCES DEVELOPMENT IN PAKISTAN A REVISIT OF PAST STUDIES By Engr. Abdul Khaliq Khan1 Abstract Three-fourths of the Earth’s surface is covered with water. Only 1% of the World’s water is usable, about 97% is salty sea water and 2% is frozen in glaciers and ice caps. All life on earth depends on water. Population is increasing and hence water availability per person is reducing. Civilizations have historically flourished around rivers and major waterways and for centuries these waterways have been a source of their livelihood. In modern times a remarkable irrigation network was developed by the British in the Indus river basin and at the time of partition the dividing line of the sub-continent disregarded not only the topography but also the irrigation boundaries of the then existing canal supply system. This created great challenges for the water resources development work in Pakistan. This paper discusses the importance of water and its role in the economic development of a country through increase in agricultural and industrial development. It traces the path as to how in Pakistan over the last 67 years various studies were carried out for the planning and development of water resources in the country. It discusses the steps that need to be taken today so that ample water is made available for our future generations for their survival. 1. INTRODUCTION All life on Earth depends on water, whether it is a plant in a desert, an animal in a wilderness, an insect in a rock crevice or a fish in a lake.
    [Show full text]
  • Pakistan Public Expenditure Management, Volume II
    Report No. 25665-PK PAKISTAN Public Expenditure Management Accelerated Development of Water Resources and Irrigated Agriculture VOLUME II January 28, 2004 Environment and Social Development Sector Unit Rural Development Sector Unit South Asia Region Document of the World Bank CURRENCY EQUIVALENTS Currency Unit = Pakistan Rupee US $1 = PKR 57.8 FISCAL YEAR July 1-June 30 ACRONYMS AND ABBREVIATIONS ADB Asian Development Bank MIS Management information system ADP Annual Development Plan MOWP Ministry of Water and Power AWB Area Water Board MTEF Medium Term Expenditure Framework BCM Billion cubic meters MTIP Medium Term Investment Plan CCA Canal command area NDP National Drainage Program DMP Drainage Master Plan NDS National Drainage System EFR Environmental Flow Requirement NSDS National System Drainage Study EIRR Economic internal rate of return NWFP North West Frontier Province FATA Federally Administered Tribal Areas NWP National Water Policy FGW Fresh groundwater OFWM On-farm water management FO Farmer organization O&M Operations and Maintenance GDP Gross development product PIDA Provincial Irrigation and Drainage Authority GIS Geographic Information System POE Panel of Experts GOP Government of Pakistan PRHS Pakistan Rural Household Survey HYV High yielding variety PSDP Public Sector Development Program IBIS Indus basin irrigation system PV Present Value IDA International Development Association RAP Revised Action Plan IPPs Independent Power Producers RBOD Right Bank Outfall Drain IRSA Indus River System Authority SCARP Salinity control
    [Show full text]
  • 1 (15Th Session) NATIONAL ASSEMBLY SECRETARIAT
    SHABIH 1182 (14) NA (S) PC-11 (SHABIH Folder) 1 (15th Session) NATIONAL ASSEMBLY SECRETARIAT ————— “QUESTIONS FOR ORAL ANSWERS AND THEIR REPLIES” to be asked at a sitting of the National Assembly to be held on Wednesday, the 22nd October, 2014 22. *Mr.junaid Akbar: (Deferred during 12th Session) Will the Minister for Water and Power on be pleased to state: (a) whether it is a fact that rules of NEPRA have been violated in awarding contract of Neelum-Jhelum Hydro Power Project; (b) if the answer to part (a) above is in the affirmative, whether there is any proposal under consideration of the Government to take necessary action against the responsibles thereof; if so, when it will be implemented? Minister for Water and Power (Khawaja Muhammad Asif): (a) It is clarified that National Electric Power Regulatory Authority (NEPRA) deals with Tariffs for generation, transmission and distribution of electric power and it does not deal with rules relating to awarding of the contracts. However, for awarding public sector contracts, PPRA rules are to be followed. In case of NJHEP, contract was awarded by strictly following PPRA rules for international bidding. (b) Not applicable. 84 *Mr. Nafeesa Inayatullah Khan Khattak: (Deferred during 14th Session) Minister for Industries and Production be pleased to state; (a) whether it is a fact that the Textile Sector posted a decline of nine percent in earnings Miring first nine months of the current fiscal year; if so, the reasons thereof; 2 (b) the factors in local market/elsewhere including the appreciation of Pakistani rupee that caused the low level of profitability in the Textile Sector; and (c) the steps taken by the Government to increase textile exports of the country? Transferred to Textile Industry Division for answer on Next Rota Day.
    [Show full text]
  • 10-35 Waterworldwaterday 22 March 2014Water and Anex Izharul
    World Water Day 22nd March, 2014 10 WATER ENERGY NEXUS By Dr. Izhar ul Haq1 SYNOPSIS Pakistan has on the average about 145 MAF of surface flows per annum. Out of this on average 103 MAF is diverted for irrigation at various barrages, 10 MAF is the system loss and 32 MAF goes down the last barrage into sea every year. Mangla and Tarbela two mega Dams were built as a part of the replacement works of the Indus Basin Plan. Their storage capacity has reduced due to sedimentation. There are about 100 small to medium dams on tributaries but their storage capacity is small. Pakistan has presently storage capacity of 10% of annual flows against 40% World average. Construction of Kalabagh Dam is stalled due to non consensus of the provinces. Diamer Basha Dam, having the approval of Council of Common Interest and Political Consensus, is ready for construction since 2008 and is still awaiting the financing arrangement for construction. These are only a couple of mega storage sites on main river Indus. Pakistan must build storage dams not only for food self sufficiency but also for cheap hydropower and flood mitigation. Pakistan has hydropower potential of 60,000 MW out of which it has exploited only 11%. The share of hydropower has reduced from 60% to 32% of the total power generated. The dependence on the imported fossil fuel (oil) has pushed the power tariff upwards. Pakistan has 18 small to medium hydel stations and only 3 stations greater than 1000 MW. The hydel power produced by Mangla and Tarbela has been the main stay in the economy of Pakistan.
    [Show full text]
  • Kadir Has University Graduate School of Science and Engineering
    KADIR HAS UNIVERSITY GRADUATE SCHOOL OF SCIENCE AND ENGINEERING AN EVALUATION OF ENERGY AND ELECTRICITY IN PAKISTAN GRADUATE THESIS MUHAMMAD JASIM HUMAIYUN February, 2016 Student’s Full Name Full Student’s Humaiyun Jasim Muhammad Ph.D. (or M.S. or M.A.) Thesis Thesis M.A.) or M.S. (or M.S 2016 20 11 ii APPENDIX B AN EVALUATION OF ENERGY AND ELECTRICITY IN PAKISTAN MUHAMMAD JASIM HUMAIYUN Submitted to the Graduate School of Science and Engineering in partial fulfillment of the requirements for the degree of Master of Science in INDUSTRIAL ENGINEERING KADIR HAS UNIVERSITY February, 2016 iii AN EVALUATION OF ENERGY AND ELECTRICITY IN PAKISTAN MUHAMMAD JASIM HUMAIYUN APPROVED BY: Prof.Dr. Volkan §. Ediger (Advisor) Dog. Dr. Aliiiiet Deniz YUCEKAYA (Co-advisor) Assoc. Prof. Dr. Zeki BOZKUb (Jury member) APPROVAL DATE: 7/April/2016 iv APPENDIX B APPENDIX B KADIR HAS UNIVERSITY GRADUATE SCHOOL OF SCIENCE AND ENGINEERING APP END IX C v APPENDIX B APP END ABSTRACT IX C EVALUATION OF ENERGY AND ELECTRICITY IN PAKISTAN Muhammad Jasim Humaiyun Master of Science in Industrial Engineering Advisor: Prof. Dr. Volkan Ş Ediger APP February, 2016 END IX C Pakistan is a developing country and it can only move forward once the energy sector is secure and self sufficient. Right from the beginning, the country has constantly faced energy shortages in all sectors due to incompetent policies and governence. This study frames the analysis of the current energy situation, with main focus on electricity. All the factors which are hampering the growth of the energy sector are identified and potential solutions are discussed.
    [Show full text]
  • Data Collection Survey on Infrastructure Improvement of Energy Sector in Islamic Republic of Pakistan
    ←ボックス隠してある Pakistan by Japan International Cooperation Agency (JICA) Data Collection Survey on Infrastructure Improvement of Energy Sector in Islamic Republic of Pakistan Data Collection Survey ←文字上 / 上から 70mm on Infrastructure Improvement of Energy Sector in Pakistan by Japan International Cooperation Agency (JICA) Final Report Final Report February 2014 February 2014 ←文字上 / 下から 70mm Japan International Cooperation Agency (JICA) Nippon Koei Co., Ltd. 4R JR 14-020 ←ボックス隠してある Pakistan by Japan International Cooperation Agency (JICA) Data Collection Survey on Infrastructure Improvement of Energy Sector in Islamic Republic of Pakistan Data Collection Survey ←文字上 / 上から 70mm on Infrastructure Improvement of Energy Sector in Pakistan by Japan International Cooperation Agency (JICA) Final Report Final Report February 2014 February 2014 ←文字上 / 下から 70mm Japan International Cooperation Agency (JICA) Nippon Koei Co., Ltd. 4R JR 14-020 Data Collection Survey on Infrastructure Improvement of Energy Sector in Pakistan Final Report Location Map Islamabad Capital Territory Punjab Province Islamic Republic of Pakistan Sindh Province Source: Prepared by the JICA Survey Team based on the map on http://www.freemap.jp/. February 2014 i Nippon Koei Co., Ltd. Data Collection Survey on Infrastructure Improvement of Energy Sector in Pakistan Final Report Summary Objectives and Scope of the Survey This survey aims to collect data and information in order to explore the possibility of cooperation with Japan for the improvement of the power sector in Pakistan. The scope of the survey is: Survey on Pakistan’s current power supply situation and review of its demand forecast; Survey on the power development policy, plan, and institution of the Government of Pakistan (GOP) and its related companies; Survey on the primary energy in Pakistan; Survey on transmission/distribution and grid connection; and Survey on activities of other donors and the private sector.
    [Show full text]
  • PAKISTAN WATER and POWER DEVELOPMENT AUTHORITY (April
    PAKISTAN WATER AND POWER DEVELOPMENT AUTHORITY (April 2011) April 2011 www.wapda.gov.pk PREFACE Energy and water are the prime movers of human life. Though deficient in oil and gas, Pakistan has abundant water and other energy sources like hydel power, coal, wind and solar power. The country situated between the Arabian Sea and the Himalayas, Hindukush and Karakoram Ranges has great political, economic and strategic importance. The total primary energy use in Pakistan amounted to 60 million tons of oil equivalent (mtoe) in 2006-07. The annual growth of primary energy supplies and their per capita availability during the last 10 years has increased by nearly 50%. The per capita availability now stands at 0.372 toe which is very low compared to 8 toe for USA for example. The World Bank estimates that worldwide electricity production in percentage for coal is 40, gas 19, nuclear 16, hydro 16 and oil 7. Pakistan meets its energy requirement around 41% by indigenous gas, 19% by oil, and 37% by hydro electricity. Coal and nuclear contribution to energy supply is limited to 0.16% and 2.84% respectively with a vast potential for growth. The Water and Power Development Authority (WAPDA) is vigorously carrying out feasibility studies and engineering designs for various hydropower projects with accumulative generation capacity of more than 25000 MW. Most of these studies are at an advance stage of completion. After the completion of these projects the installed capacity would rise to around 42000 MW by the end of the year 2020. Pakistan has been blessed with ample water resources but could store only 13% of the annual flow of its rivers.
    [Show full text]
  • A Sustainable Resolution to the Energy Crisis
    IPR INSTITUTE FOR POLICY REFORMSREFORMS REPORT April 2015 Putting Power Back on Track:Track: A Sustainable Resolution to the Energy Crisis Ashraf M. Hayat Summary DespiteDespite repeated commitmentscommitments expressed by governments to resolve the About The Author country'scountry’s energy crisis there hashas beenbeen nono improvementimprovement inin powerpower supply.supply. Ashraf M. Hayat is a former civil servant Successive governmentsgovernments have have not not comecome to to gripsgrips withwith the sector'ssector’s deepdeep and Executive Director IPR and Executive Director IPR structural, policy,policy, and governancegovernance challenges. TheyThey alsoalso havehave notnot taken the seeminglyseemingly simpler route of administrative measures to reducereduce lineline losses in DISCOs andand ease cash flowflow inin thethe sector.sector. This is the contextcontext ofof this IPRIPR ReportReport whosewhose objectivesobjectives are asas follows:follows: • Recommend waysways toto enhanceenhance powerpower supply supply in in the the shortshort termterm • Propose policiespolicies and and plansplans thatthat wouldwould place the power sector on a sustainable pathpath ofof growth About IPR While thethe report recommends severalseveral shortshort and medium term measures Institute forfor PolicyPolicy Reforms isis anan to enhanceenhance power supplysupply inin the country,country, it determinesdetermines thatthat probityprobity independent and non-partisannon-partisan thinkthink tank establishedestablished under SectionSection 4242 and
    [Show full text]
  • (Ppra) Contract Award Proforma
    ATTACHMENT – I (See regulation 2) PUBLIC PROCUREMENT REGULATORY AUTHORITY (PPRA) CONTRACT AWARD PROFORMA – I To Be Filled And Uploaded on PPRA Website In Respect of All Public Contracts of Works, Services and Goods Worth Fifty Million or More NAME OF THE ORGANIZATION Privatisation Commission__ FEDERAL / PROVINCIAL GOVT. Federal Government_________ TITLE OF CONTRACT Financial Advisory Services Agreement___ TENDER NUMBER TS398727E ______ BRIEF DESCRIPTION OF CONTRACT Divestment of Government of Pakistan shareholding in 425-525 MW CCPP Nandipur of NPGCL TENDER VALUE Approx. PKR 360 Million ___ ENGINEER’S ESTIMATE N/A_________________________ (for civil Works only) ESTIMATED COMPLETION PERIOD February, 2021 WHETHER THE PROCUREMENT WAS INCLUDED IN ANNUAL PROCUREMENT PLAN? _________ N/A _____________Yes / No ADVERTISEMENT : (i) PPRA Website____30-08-2019____ TS398727E _____Yes / No (Federal Agencies) (If yes give date and PPRA’s tender number) (ii) News Papers_Yes (List of Newspapers / Press at Annex – I) Yes / No (If yes give names of newspapers and dates) TENDER OPENED ON (DATE & TIME) _December 09, 2019 at 02:30 p.m._ NATURE OF PURCHASE_Both Local and/ International_ Local / International EXTENSION IN DUE DATE (If any)_____ No ____Yes / No -: 2 :- NUMBER OF TENDER DOCUMENTS SOLD 2 (Annex – II) (Attach list of Buyers) WHETHER QUALIFICATION CRITERIA WAS INCLUDED IN BIDDING/TENDER DOCUMENTS _Yes__Yes / No (Annex – III) (If yes enclose a copy). WHETHER BID EVALUATION CRITERIA WAS INCLUDED IN BIDDING/TENDER DOCUMENTS_ Yes __Yes / No (Annex – III) (If yes enclose a copy). WHICH METHOD OF PROCUREMENT WAS USED: - (Tick one) a) SINGLE STAGE – ONE ENVELOPE PROCEDURE ________ b) SINGLE STAGE - TWO ENVELOPE PROCEDURE. ________ c) TWO STAGE BIDDING PROCEDURE.
    [Show full text]