Aviation Board Meeting

Total Page:16

File Type:pdf, Size:1020Kb

Aviation Board Meeting Aviation Board Meeting April 02, 2020 Call to Order & Introductions Approve Consent Agenda February 11, 2020 Board Meeting Minutes Public Comments Limited to 2 Minutes per Speaker OREGON DEPARTMENT OF AVIATION Directors Update April 2, 2020 (503)378-4880 3040 25TH STREET, SALEM, OR 97302 WWW.OREGON.GOV/AVIATION ORAVIATION ODA Office operations • Teleworking/On-site staff Office open, by appointment only Minimum of two staff in office majority of staff are teleworking no end date, planning for this to continue until end of April • New staff Andrea Abrahamson– Fiscal Analyst, started Monday the 30th Anthony Beach – State Airports Manager, starts April 13 Hiring two summer temporary helpers for landscaping • Mary B. Baby boy, born 3/16 on maternity leave until mid-June Impact of Fuel tax revenue reduction Expecting significant decrease in fuel tax revenues, amount and duration unknown. March fuel tax #’s available mid-May. April #’s available mid-June, and will be the litmus test for how low they will go. We are guessing about 50% drop in March, and a 90% drop in April. Beyond April is difficult to estimate, depends on when distancing measures are relaxed, and how soon airlines resume prior schedules. 86% of annual operating revenue comes from the fuel tax 5% of revenue from aircraft registration 3.5% of revenue from leases 5.5% from fuel flowage, tie-down, special use, inspections, etc. These funds pay for agency operation as well as the grants programs. Annual operating cost (excluding grants and PMP) about $2.5M. Federal assistance for airports From the $2T CARE Act passed by Congress last week 1) $50B to airlines, $10B to airports 2) Of the $10B, $7.4B goes to the commercial service airports, $2B for AIP eligible projects, $500M for waiver of local match on 2020 grants, $56M for Essential Air Service, and $100M for NPIAS GA airports. 3) Of the $100M for GA airports, the amount will be a 100% grant, for any purpose airport revenues can be used for (i.e. operating costs), amount will be “based on the categories published in the most recent NPIAS (urban, regional, local, remote/emergency), reflecting the percentage of the aggregate published eligible development costs for each such category, then dividing the allocated funds evenly among the eligible airports in each category, rounding up to the nearest thousand dollars”.(With about 2800 NPIAS GA Airports, the average would be $36,000 each.) 4) OR has 12 Urban, 12 Regional, 27 Local and 39 remote/emergency airports State owned – 1 Urban, 1 Regional, 8 local and 1 remote that are NPIAS eligible. 1) Legislation also suspended the Aviation Excise taxes through December 31, 2020. These taxes go into the Aviation Trust Fund, and until recently were generating about $43M/day. Funds the FAA operations, F&E, R&D, EAS, AIP grants. Loss of taxes will have an impact on the 2021 grants. Short term Financials Current cash balance as of 4/1/20 $12.8M Ops $769K, A/C registration $841K, PMP $979K, ASAP $10.2M Enough cash in Ops for ~4 months of expenses Encumbered/committed $6.2M COAR $2.2M SOAR $2.3M ROAR $500K PMP $752K 10% match on FAA Siletz Bay and Condon $150K ?? 10% match on System plan $25K ?? Misc. existing contracts $300K We will need to go to E-Board in mid-May to request approval to transfer funds from the restricted accounts to operating account. Cost Containment efforts PMP 2020 may be postponed (15 airports in southern OR) $1M SOAR 2019 projects postponed $1.46M Pacific City, Toledo, Aurora, Cape Blanco Cascade Locks, Mulino Prospect runway reconstruction $1.5M Mulino water improvements $500K Spring Special Grant cycle cancelled 100th anniversary activities cancelled Hiring freeze (one vacant operations position) Travel freeze (other than in-state maintenance) Projects we are moving forward with Siletz Bay taxiway rehab (90-100% Federal) $562,795 Condon runway rehab (90-100% federal) $907,076 COAR 2019 (23 projects) 100% ODA $2,300,000 PMP 2019 (valley and coastal airports) $751,879 Design work on Aurora, Chiloquin & Mulino obstruction removal Design work on Cottage Grove & Independence fence installation Design on Prospect runway rehab Goal is to have projects ready to bid if pop-up discretionary federal funds become available. QUESTIONS? (503)378-4880 3040 25TH STREET, SALEM, OR 97302 WWW.OREGON.GOV/AVIATION ORAVIATION Finance & Admin Division Update Finance & Admin Division Update Fuel Tax Revenue Overview 6 Month Forecast – Our Original Forecast Before Reduction % Program Revenue Current Forecast TOTAL FUEL TAX REVENUE From Fuel Tax Operations 876,843 66% PMP 617,847 100% COAR 1,154,983 100% ROAR 577,492 100% SOAR 577,492 100% ASAP Program Total 2,309,967 100% Fuel Tax Total 3,804,657 Finance & Admin Division Update Effect of Reduction in Jet Fuel Tax Revenue over 6 months Gallons sold in March will hit our revenue at the end of May Current Forecast 25% Reduction 50% Reduction 75% Reduction Operations $ 876,843 $ 657,632 $ 438,422 $ 219,211 PMP $ 617,847 $ 463,385 $ 308,923 $ 154,462 COAR $ 1,154,983 $ 866,238 $ 577,492 $ 288,746 ROAR $ 577,492 $ 433,119 $ 288,746 $ 144,373 SOAR $ 577,492 $ 433,119 $ 288,746 $ 144,373 ASAP Program Total $ 2,309,967 $ 1,732,475 $ 1,154,983 $ 577,492 Fuel Tax Total $ 3,804,657 $ 2,853,492 $1,902,328 $ 951,164 Finance & Admin Division Update State Limitations & Cash Balances as of April 1, 2020 Expenditures Available Remaining Airport or Program Limitation to Date Limitation Encumbrances Cash Balances Operations $ 5,078,638 $ 1,794,368 $ 3,284,270 $ 58,473 $ 768,734 Aircraft Registration 166,975 49,076 117,899 116,623 840,763 Pavement Maintenance 2,288,530 810,604 1,477,926 752,736 979,360 ASAP 9,305,361 633,267 8,672,094 4,935,173 10,238,553 TOTAL $ 16,839,504 $ 3,287,314 $ 13,552,190 $ 5,863,005 $ 12,827,410 State Disparity Study Update Keen Independent Research Oregon Department of Aviation Oregon Statewide Airport DBE Disparity Study Annette Humm Keen, Principal David Keen, Principal Keen Independent Research LLC 701 N. 1st Street Phoenix, Arizona 85004 303-385-8515 [email protected] [email protected] Oregon Airport Management Association Board Teleconference April 2, 2020 Presentation to ODA Board 1. Purpose of the study 2. Study schedule 3. Contract data collection from individual airports 4. Availability survey 5. Other study progress 6. Opportunities for public participation 19 1. Purpose of the study ODA and local airports must implement the Federal DBE Program, per 49 CFR Part 26 Program applies to FAA-funded contracts Disparity study provides information to help ODA and each local airport: Set overall goals for DBE participation on FAA-funded contracts Consider whether they can achieve overall DBE goals solely through neutral means If need to use DBE contract goals, assess the specific race/ethnic/gender groups eligible for that program component USDOT instructed agencies to conduct disparity studies after 2005 Ninth Circuit decision in Western States Paving v. WSDOT FAA is requiring states to perform disparity studies and funding those studies (Port of Portland previously conducted a disparity study) 20 2. Study schedule Start AnnounceCollect study Startcontract to publicin-depth data Launchfrominterviews airports availability survey Perform disparity analysisPrepare information forPresent goalsObtain preliminary Preparefeedback results final report ³ ³ ³ ³ ³ ³ ³ ³ ³ ³ Sept. Oct. Nov. Dec. Jan. Feb. Mar. Apr. May June July Aug. Sept. Oct. Nov. Dec. Jan. Feb. 2019 2020 2021 21 3a. Contract data for individual airports FAA-funded contracts awarded Oct. 1, 2014 – Sept. 30, 2019 Awards, including funding source, amount, type of work Information about prime contractors Information about subcontractors (names, dollars, types of work) General information about how contracts are awarded Any application of DBE contract goals 22 3b. 100% of airports provided contract data Airport name Airport name 1 Bend Municipal Airport 25 Bandon State Airport 2 Creswell Hobby Field Airport 26 Salem McNary Field Airport 3 Seaside Municipal Airport 27 Lake County Airport (Lakeview) 4 Chiloquin State Airport 28 Mulino State Airport 5 Condon State Pauling Field Airport 29 Ontario Municipal Airport 6 Independence State Airport 30 Newport Municipal Airport 7 Siletz Bay State Airport 31 Roseburg Regional Airport 8 Joseph State Airport 32 Madras Municipal Airport 9 Cottage Grove State Airport 33 Baker City Municipal Airport 10 Lebanon State Airport 34 Corvallis Municipal Airport 11 Florence Municipal Airport 35 La Grande/Union County Airport 12 Burns Municipal Airport 36 Eugene Airport Mahlon Sweet Field 13 Grants Pass Airport 37 Southwest OR Regional Airport 14 Gold Beach Municipal Airport 38 Lexington Airport 15 Klamath Falls Airport 39 Ken Jernstedt Airfield (Hood River) 16 Tillamook Airport 40 Illinois Valley Airport 17 McDermitt State Airport 41 Ashland Municipal Airport 18 Grant County Regional Airport Ogilvie Field (John Day) 42 Eastern Oregon Regional Airport - Pendleton 19 Redmond Municipal Airport (Roberts Field) 43 Scappoose Industrial Airpark 20 Rogue Valley International 44 McMinnville Municipal Airport 21 Prineville Airport 45 Albany Municipal Airport 22 Columbia Gorge Regional Airport (Dalles) 46 Astoria Regional Airport 23 Christmas Valley Airport 47 Hermiston Municipal Airport 24 Aurora State Airport 48 Brookings Airport 23 4. Availability surveys now being conducted 24 5. Other study progress Analyzed distribution of contract dollars by location of contracts and by types of work Continued in-depth personal
Recommended publications
  • (Asos) Implementation Plan
    AUTOMATED SURFACE OBSERVING SYSTEM (ASOS) IMPLEMENTATION PLAN VAISALA CEILOMETER - CL31 November 14, 2008 U.S. Department of Commerce National Oceanic and Atmospheric Administration National Weather Service / Office of Operational Systems/Observing Systems Branch National Weather Service / Office of Science and Technology/Development Branch Table of Contents Section Page Executive Summary............................................................................ iii 1.0 Introduction ............................................................................... 1 1.1 Background.......................................................................... 1 1.2 Purpose................................................................................. 2 1.3 Scope.................................................................................... 2 1.4 Applicable Documents......................................................... 2 1.5 Points of Contact.................................................................. 4 2.0 Pre-Operational Implementation Activities ............................ 6 3.0 Operational Implementation Planning Activities ................... 6 3.1 Planning/Decision Activities ............................................... 7 3.2 Logistic Support Activities .................................................. 11 3.3 Configuration Management (CM) Activities....................... 12 3.4 Operational Support Activities ............................................ 12 4.0 Operational Implementation (OI) Activities .........................
    [Show full text]
  • Safetaxi Americas Coverage List – 21S5 Cycle
    SafeTaxi Americas Coverage List – 21S5 Cycle Brazil Acre Identifier Airport Name City State SBCZ Cruzeiro do Sul International Airport Cruzeiro do Sul AC SBRB Plácido de Castro Airport Rio Branco AC Alagoas Identifier Airport Name City State SBMO Zumbi dos Palmares International Airport Maceió AL Amazonas Identifier Airport Name City State SBEG Eduardo Gomes International Airport Manaus AM SBMN Ponta Pelada Military Airport Manaus AM SBTF Tefé Airport Tefé AM SBTT Tabatinga International Airport Tabatinga AM SBUA São Gabriel da Cachoeira Airport São Gabriel da Cachoeira AM Amapá Identifier Airport Name City State SBMQ Alberto Alcolumbre International Airport Macapá AP Bahia Identifier Airport Name City State SBIL Bahia-Jorge Amado Airport Ilhéus BA SBLP Bom Jesus da Lapa Airport Bom Jesus da Lapa BA SBPS Porto Seguro Airport Porto Seguro BA SBSV Deputado Luís Eduardo Magalhães International Airport Salvador BA SBTC Hotéis Transamérica Airport Una BA SBUF Paulo Afonso Airport Paulo Afonso BA SBVC Vitória da Conquista/Glauber de Andrade Rocha Vitória da Conquista BA Ceará Identifier Airport Name City State SBAC Aracati/Aeroporto Regional de Aracati Aracati CE SBFZ Pinto Martins International Airport Fortaleza CE SBJE Comandante Ariston Pessoa Cruz CE SBJU Orlando Bezerra de Menezes Airport Juazeiro do Norte CE Distrito Federal Identifier Airport Name City State SBBR Presidente Juscelino Kubitschek International Airport Brasília DF Espírito Santo Identifier Airport Name City State SBVT Eurico de Aguiar Salles Airport Vitória ES *Denotes
    [Show full text]
  • State Land Use Board of Appeals
    BEFORE THE LAND USE BOARD OF APPEALS OF THE STATE OF OREGON JOSEPH SCHAEFER, CITY OF AURORA, CITY OF WILSONVILLE, 1000 FRIENDS OF OREGON, and FRIENDS OF FRENCH PRAIRIE, Petitioners, and CLACKAMAS COUNTY, Intervenor-Petitioner, v. OREGON STATE AVIATION BOARD and OREGON DEPARTMENT OF AVIATION, Respondents, and AURORA AIRPORT IMPROVEMENT ASSOCIATION, BRUCE BENNETT, WILSON CONSTRUCTION COMPANY INC., TED MILLAR, TLM HOLDINGS, LLC, ANTHONY ALAN HELBLING, and WILSONVILLE CHAMBER OF COMMERCE, Intervenor-Respondents. LUBA Nos. 2019-123/127/129/130 PETITIONER CITY OF WILSONVILLE’S PETITION FOR REVIEW September 21, 2020 Counsel appear on the following page. Joseph Schaefer Lucinda D. Jackson 15140 Park Ave NE Rachel E. Bertoni Aurora OR 97002 Oregon Department of Justice 503.819.4764 1162 Court St NE Petitioner Salem OR 97301 503.947.4530 Sara Kendrick Attorney for Respondents Kendrick Law, LLC 317 Court St NE Ste 203 Eric S. Postma Salem OR 97301 Bittner & Hahs PC 503.369.8323 4949 SW Meadows Rd Ste 260 Attorney for Petitioner Lake Oswego OR 97035 City of Aurora 503.228.5626 Attorney for Intervenor-Respondent Andrew Mulkey Wilsonville Chamber of Commerce Rural Lands Staff Attorney 1000 Friends of Oregon Wendie L. Kellington 133 SW 2nd Ave Ste 201 Kellington Law Group Portland OR 97204 PO Box 159 503.497.1000 x138 Lake Oswego OR 97034 Attorney for Petitioners 1000 Friends 503.636.0069 of Oregon and Friends of Attorney for remaining French Prairie Intervenor-Respondents Stephen L. Madkour Scott A. Norris Nathan Boderman Marion County Legal Counsel County Counsel PO Box 14500 Clackamas County Salem OR 97309 2051 Kaen Rd 503.588.5220 Oregon City OR 97045 Attorney for Amicus Curiae 503.655.8362 Marion County Attorneys for Intervenor-Petitioner Clackamas County Page i 1 TABLE OF CONTENTS 2 I.
    [Show full text]
  • INTRODUCTION Airport Master Plan Update Aurora State Airport
    Chapter One: INTRODUCTION Airport Master Plan Update Aurora State Airport This update to the 2000 Airport Master Plan was undertaken to assess the role of the Aurora State Airport (Airport), evaluate the Airport's capabilities, forecast future aeronautical activity for the next 20 years, and plan for the timely development of any new or expanded Airport facilities needed to accommodate future aviation activity. The owner and operator of the Airport, the Oregon Department of Aviation (ODA), obtained and matched a grant from the Federal Aviation Administration (FAA) to fund this study. ODA has organized a Planning Advisory Committee (PAC), representing Airport users and neighbors, to participate in the planning process. In addition to six PAC meetings, public involvement in the master plan update includes a website to disseminate information and gather comments and questions, and five open houses for the general public. The purpose of this first draft chapter of the Airport Master Plan Update (Plan) is threefold: • to summarize major issues that the Plan should address • to identify goals for the planning process and for the future development of the Airport • to determine the Airport’s current and future role within the system of airports GOALS Goals for the master plan update were a subject of the first PAC meeting held on July 22, 2010. The common themes of PAC members’ statements have been synthesized and are presented below. The goals are divided between two categories – goals for the planning process and goals for the master plan itself. Planning Process Goals The goals for the planning process should guide the conduct of the ODA, ODA’s consultants, and the PAC throughout the development of the master plan update.
    [Show full text]
  • Chapter 10, Oregon Aviation Plan V6.0
    10. RECOMMENDED PLAN This update to Oregon Aviation Plan (OAP v6.0) has taken a comprehensive look at how the system is performing based on current conditions. This evaluation identified various actions and projects that are recommended to improve the performance of the Oregon airport system. The process for how the recommendations were developed are summarized in this chapter. 10.1 Review of FAA ASSET Roles for Oregon Airports The National Plan of Integrated Airport Systems (NPIAS) is a document used by the Federal Aviation Administration (FAA). The NPIAS includes airports in the United States that are open to the public and that are eligible for federal funding. Fifty-seven of the publicly-owned airports in Oregon are included in the NPIAS. This section compares roles assigned by the FAA to study airports to their current state airport roles. There are 3,340 existing or proposed airports in the United States that are included in the NPIAS1; 382 of these airports have scheduled commercial airline service. Commercial airports are classified as “Primary” airports, and commercial airports in the United States are further defined by the FAA as Large, Medium, Small, and Non- Hub airports. The hub assignments are based on the number of enplanements accommodated at each commercial airport. The remaining 2,958 landing facilities (which include airports, seaplane bases, and heliports) are referred to as “Nonprimary” airports; the nonprimary airports mainly consist of the nation’s general aviation airports. However, within the Nonprimary category, 127 of the airports are “Nonprimary Commercial Service” airports. Nonprimary commercial service airports always have less than 10,000 annual passenger enplanements.
    [Show full text]
  • Special Minimums
    M1 A ALTERNATE MINS A 21196 INSTRUMENT APPROACH PROCEDURE CHARTS A IFR ALTERNATE AIRPORT MINIMUMS Standard alternate minimums for non-precision approaches and approaches with vertical guidance [NDB, VOR, LOC, TACAN, LDA, SDF, VOR/DME, ASR, RNAV (GPS) or RNAV (RNP)] are 800-2. Standard alternate minimums for precision approaches (ILS, PAR, or GLS) are 600-2. Airports within this geographical area that require alternate minimums other than standard or alternate minimums with restrictions are listed below. NA - means alternate minimums are not authorized due to unmonitored facility, absence of weather reporting service, or lack of adequate navigation coverage. Civil pilots see FAR 91. IFR Alternate Minimums: Ceiling and Visibility Minimums not applicable to USA/USN/USAF. Pilots must review the IFR Alternate Minimums Notes for alternate airfield suitability. NAME ALTERNATE MINIMUMS NAME ALTERNATE MINIMUMS ALBANY, OR BAKER CITY, OR ALBANY MUNI (S12)……….VOR/DME or GPS-A BAKER CITY NA except for operators with approved weather MUNI (BKE)……………….….RNAV (GPS) Rwy 131 reporting service. VOR-A23 VOR/DME Rwy 1345 ARLINGTON, WA 1Categories A, B, 900-2; Category C, 1200-3; ARLINGTON Category D, 1400-3. MUNI (AWO)………………...RNAV (GPS) Rwy 34 2NA when local weather not available. NA when local weather not available. 3Categories A, B, 1900-2; Categories C, D, Category D, 800-2½. 1900-3. 09 SEP 2021 to 07 OCT 4Category D, 900-2¾. ASTORIA, OR 5NA when control zone not in effect. ASTORIA RGNL (AST)…………………..RNAV (GPS) Rwy 81 BELLINGHAM, WA RNAV (GPS) Rwy 262 BELLINGHAM VOR Rwy 813 INTL (BLI) ……………………ILS or LOC Rwy 161 1Category C, 1100-3; Category D, 1200-3.
    [Show full text]
  • Troutdale Airport Master Plan Shaping Our Future Planning Advisory Committee Final Report June 2016
    TROUTDALE AIRPORT MASTER PLAN SHAPING OUR FUTURE PLANNING ADVISORY COMMITTEE FINAL REPORT JUNE 2016 May 11, 2016 Port of Portland Executive Director, Troutdale Airport: Shaping Our Future was a complete airport master plan process that went above and beyond. While the master plan followed many of the traditional steps characteristic of an airport master plan, it also explored a broader range of issues important to the Port, City and greater region. Before the process began, the Port of Portland recognized that Troutdale Airport was a valued community asset on an unsustainable path. At the same time, the Port identified a local community need for increased economic opportunities. This master plan process was exceptional in that it not only addressed the airport resources required to continue serving aviation needs, it also evaluated how Troutdale Airport could sustainably serve local community needs as a whole for the next 20 years. The Port of Portland invited a group of 23 stakeholders – representing diverse values of economic, environmental and social sustainability – to create a project advisory committee (PAC) charged with providing input and recommendations for the master plan process. From the spring of 2014 to the spring of 2016, I worked with these outstanding individuals and the Port to develop our recommendations on the Troutdale Airport Master Plan. As a PAC, we were given the opportunity to provide input on planning documents and engage in rigorous discussion about Troutdale Airport’s role in the future. Our recommendations were also informed by community input collected from stakeholder meetings and public involvement activities prior to key project milestones.
    [Show full text]
  • CWACT) Executive Committee Thursday, April 11, 2019 4:00 – 5:00 Pm Oregon Cascades West, Albany Office
    Cascades West Area Commission on Transportation (CWACT) Executive Committee Thursday, April 11, 2019 4:00 – 5:00 pm Oregon Cascades West, Albany Office AGENDA 1. 4:00 Welcome and Introductions Chair Jaramillo 2. 4:05 Agenda Review Chair 3. 4:10 Approve Minutes from November 16, 2018 and Chair February 14, 2019 Meetings (Attachment A and B) ACTION: Approval of meeting minutes 4. 4:15 CWACT Membership Staff Full Commission Membership Approved by OCWCOG Board on March 21st. Private Sector Appointments TAC Membership Recruitment ACTION: Information Only 5. 4:30 April 25th CWACT Full Commission Agenda Review Staff ACTION: Discuss and provide approval for next meeting agenda items 6. 4:40 Other Business All 2018-2019 COAR Grant Project List Approved (Attachment C) ODOT Update on ADA Program ACTION: Information Only 7. 5:00 Adjournment Chair The Cascades West COG facilities are accessible to persons with disabilities. If you will need any special accommodations to attend the meeting contact Emma Chavez at least 24 hours prior to the meeting. She can be reached at 541-967-8551 (TTY/TTD 711) Attachment A Cascades West Area Commission on Transportation (CWACT) Executive Committee Thursday, November 16, 2018 Albany COG Office 1400 Queen Ave SE, Albany DRAFT MINUTES Attendance: John Huestis, Roger Nyquist, Annabelle Jaramillo, Bill Bain, Doug Hunt, and Barbara Bull Members Absent: Bob Elliott Alternates: James Feldman Staff Present: Phil Warnock, and Tarah Campi 1. Call to Order The Chair, Linn County Commissioner Roger Nyquist, called the meeting to order at 9:34 am. Introductions were conducted. 2. Agenda Review There were no changes to the agenda.
    [Show full text]
  • OREGON AVIATION PLAN Economic Impact Statement
    OREGON AVIATION PLAN Economic Impact Statement 2014 for NPIAS Airports Photo courtesy of City of Redmond Municipal Airport OREGON AVIATION PLAN Economic Impact Statement 2014 for NPIAS Airports The 2014 Oregon Aviation Plan Economic Impact Other modes of transportation cannot compete Study (2014 OAP EIS) is presented by the Oregon with aviation’s ability to move people and products Department of Aviation (ODA) and addresses the to where they are most needed safely, quickly and OVERVIEW economic contribution of aviation by Federal Avia- efficiently. Airports are a key component of the tion Administration (FAA) National Plan of Integrat- state’s infrastructure, allowing Oregon businesses ed Airport Systems (NPIAS) airports to the Oregon to do business at a global scale, creating econom- state economy, updating the most recent study, ic growth and opportunity that reaches far outside which was completed in 2007. the airport property. Airports are a key asset to Oregon commerce, Economic impacts of airports include on-airport providing transportation, employment and real economic activities, as well as spending off-airport estate for commercial and industrial develop- by visiting air travelers and those employed by ment, in addition to being infrastructure essential on-airport businesses. This executive summary to emergency response, medical evacuation, fire presents totals for the state and the five state protection and freight transport. NPIAS airports regions as defined by the Oregon Department of contribute more than $8.7 billion to the Oregon Transportation (ODOT). The economic impact of economy annually and provide Oregon businesses individual airport studies and the methodology and residents with just in time shipments of the used to complete the analysis are presented in the goods that keeping Oregon’s businesses moving.
    [Show full text]
  • Final Documents/Your Two Cents—August 2015
    Final Documents/Your Two Cents—August 2015 This list includes Federal Register (FR) publications such as rules, Advisory Circulars (ACs), policy statements and related material of interest to ARSA members. The date shown is the date of FR publication or other official release. For proposals opened for public comment, see documents highlighted in red in this issue. Those documents represent your chance to provide input on rules and policies that will affect you. Agencies must provide the public notice and an opportunity for comment before their rules or policies change. Your input matters. Comments should be received before the indicated due date; however, agencies often consider comments they receive before drafting of the final document begins. Hyperlinks provided in blue text take you to the full document. If this link is broken, go to http://www.regulation.gov. In the keyword or ID field, type “FAA” followed by the docket number. August 3, 2015 Articles FAA Proposes Civil Penalties Against Two Companies for Alleged Hazardous Materials Violations The U.S. Department of Transportation’s Federal Aviation Administration (FAA) proposes civil penalties of $69,000 and $63,000 against two companies for allegedly violating Hazardous Materials Regulations. Rules AD: Airbus Model A318, A319, and A320 series airplanes - radome assembly Published 08/03/2015 Docket #: FAA-2015-18535 Effective date 09/08/2015 We are issuing this AD to detect and correct cracks in the radome assembly, which could result in the radome (or pieces) separating from the airplane and striking the tail, consequently reducing the controllability of the airplane. AD: Airbus Model A319 series airplanes; Model A320-211, -212, -214, -231, -232, and -233 airplanes; and Model A321 series airplanes - waste water service panel Published 08/03/2015 Docket #: FAA- 2015-18564 Effective date 09/08/2015 This AD requires modification of the potable water service panel and waste water service panel, including doing applicable related investigative and corrective actions.
    [Show full text]
  • Future Role of Hillsboro Airport Chapter Two Port of Portland
    PORT OF PORTLAND Chapter Two FUTURE ROLE OF HILLSBORO AIRPORT CHAPTER TWO PORT OF PORTLAND FUTUREFUTURE ROLEROLE OFOF HILLSBOROHILLSBORO AIRPORTAIRPORT The purpose of this chapter of the Airport Master Plan is to analyze the feasibility of alternative roles for Hillsboro Airport within the context of the Portland metropolitan system of airports and State of Oregon system of airports. This analysis provides a foundation for the Port of Portland to determine, specifically and ideally, what Hillsboro Airport's role should be through 2025. This involves considering the probability and viability of supporting scheduled commercial air service and/or air cargo activity at Hillsboro Airport. HILLSBORO AIRPORT'S EXISTING ROLE The role for Hillsboro Airport is defined within both state and federal aviation plans. At the national level, Hillsboro Airport is defined as a reliever airport in the Federal Aviation Administration's (FAA) National Plan of Integrated Airport Systems (NPIAS). Reliever airports are specially designated general aviation airports intended to reduce congestion at large commercial service airports. This reliever role is usually accomplished, not by accommodating commercial flights, but by providing an attractive option for the myriad of non-commercial, general aviation aircraft operations that urban areas generate. Hillsboro Airport is classified as a reliever for Portland International Airport (PDX). In this role, Hillsboro Airport is intended to preserve capacity at PDX by offering an alternative operating area for general
    [Show full text]
  • Aurora State Airport Constrained Operations Runway Justification Study
    AURORA STATE AIRPORT – CONSTRAINED OPERATIONS RUNWAY JUSTIFICATION STUDY AURORA STATE AIRPORT CONSTRAINED OPERATIONS RUNWAY JUSTIFICATION STUDY DRAFT AURORA STATE AIRPORT – CONSTRAINED OPERATIONS RUNWAY JUSTIFICATION STUDY EXECUTIVE SUMMARY DRAFT AURORA STATE AIRPORT – CONSTRAINED OPERATIONS RUNWAY JUSTIFICATION STUDY EXECUTIVE SUMMARY The purpose of this study is to review the current runway length requirements and activity at the Aurora State Airport compared to the assumptions made in the approved 2012 Airport Master Plan to consider if the eligibility threshold for a runway extension has been met. An analysis of aviation activity at the Airport has identified 349 based aircraft. 10.8% of the aircraft based at the Airport are jet aircraft. The Air Traffic Control Tower (ATCT) began collecting data in October 2015 and has identified 48,459 Airport operations in 2016 and 58,597 Airport operations in 2017. The confirmed TAF numbers are 44,292 and 54,999 respectively. FAA Traffic Flow Management Systems Counts (TFMSC) operations data presented by Aircraft Design Group identified at least 860 annual operations by C and D aircraft on average from 2009 to 2018. Additional analysis of the TFMSC data indicates there have been 599 average annual operations by aircraft requiring 5,901 feet or more of runway length. However, the majority of these operations (70%) are conducted by aircraft that require 6,000 feet or more of runway during given conditions. On average there are 415 annual operations per year by aircraft that require 6,000 feet or more of runway. A constrained operations Airport user survey was distributed as part of this study. The survey identified 645 constrained annual operations from a variety of aircraft and aircraft operators.
    [Show full text]