The Lane Cove Tunnel

Total Page:16

File Type:pdf, Size:1020Kb

The Lane Cove Tunnel The Lane Cove Tunnel The Lane Cove Tunnel improves local Air quality monitoring air quality by reducing traffic volumes on Epping Road. These air quality improvements Monitors in the Lane Cove Tunnel measure extend several hundred metres either side pollutant levels along the length of the tunnel. of Epping Road. Air quality is also measured in the ventilation buildings. The tunnel operator carries out routine testing of the air quality in the tunnel. How is air quality managed The air quality standards for the Lane Inside the Lane Cove Tunnel in the Lane Cove Tunnel? Cove Tunnel project were set down in the Air quality in the tunnel is managed with former Minister for Planning’s Conditions of The Lane Cove Tunnel is a 3.6 km twin two ventilation buildings: one at the western Approval. Air quality data is available to the tunnel motorway under Epping Road that end, in the Lane Cove West Industrial Park public on the tunnel operator’s website at links the M2 Motorway at North Ryde in Sirius Road; and one at the eastern end, connectormotorways.com.au with the Gore Hill Freeway at Artarmon. in the Artarmon industrial area, between The Lane Cove Tunnel delivers a number the western end of Marsden Street and the of benefits including quicker travel times Pacific Highway. The ventilation buildings between the north-west and the city, are connected to exhaust points that are provision of a direct link to the Sydney located at various points in the tunnel. Orbital Network and a route that bypasses Fresh air is drawn into the tunnel via the five sets of traffic lights, both east and portals (tunnel entrances and exits) and westbound, along Epping Road. an intake located at 130-132 Epping Road, Lane Cove. Strategically positioned jet fans along with the movements of vehicles assist with the flow of air. 7.
Recommended publications
  • Executive Summary
    Macquarie Park Traffic Study Final Report EXECUTIVE SUMMARY Background City of Ryde (CoR) is currently in the process of amending and translating its Local Environment Plan (LEP), DCP and Public Domain Plan (PDP) for Macquarie Park, in recognition of the significant growth potential of the area. With over 2,000,000m2 in commercial floor space expected, including significant expansion of Macquarie Park Shopping Centre and Macquarie University, there is a need to ensure that there is sufficient transport infrastructure for access to, from and within the area. CoR has initiated both a traffic study and a pedestrian movement study for Macquarie Park to consider the needs and effects of the proposed LEP, defined as LEP2008. This report is for the traffic study component and covers: . the establishment of a base year (2007) Paramics micro-simulation model to be used as the basis for the assessment of traffic network options out to year 2031; . using the Paramics model, developing an understanding of the traffic situation that would arise in 2031 if no changes to the current road network or LEP were made; . presenting and understanding the likely traffic patterns in 2031 to, from and within Macquarie Park and importantly how the growth between 2007 and 2031 will evolve in particular parts of Macquarie Park; . developing a case for a target public transport mode split for the area, given likely rail and bus improvements mixed with an emphasis on workplace travel plans and parking management, and hence determining what discounting of traffic demand would be reasonable to apply; . developing and testing “local” network options and connections within Macquarie Park; .
    [Show full text]
  • Property Portfolio June 2007 Contents
    PROPERTY PORTFOLIO JUNE 2007 CONTENTS INVESTMENT PORTFOLIO Commercial Summary Table 6 NSW 8 VIC 12 Industrial Summary Table 6 NSW 14 VIC 20 QLD 26 SA 30 WA 31 DEVELOPMENT PORTFOLIO Residential NSW 33 VIC 37 QLD 41 WA 44 Commercial & Industrial NSW 48 VIC 51 QLD 54 SA/WA 56 2 AUSTRALAND PROPERTY PORTFOLIO JUNE 2007 3 Dear reader, It is with pleasure that Australand provides this Property Portfolio update for the 2007 year. Since the 2006 report, Australand has had a busy year with our pipeline of residential, commercial and industrial development properties growing strongly. Recent highlights included: • Launch of the first stage of our Port Coogee development in Western Australia, an 87 ha development on the Cockburn coast consisting of a 300 pen marina, marina lots, apartments, residential lots and a large commercial precinct. • Our total pipeline of Commercial and Industrial projects increasing to over $1bn, the launch of our sixth wholesale property fund whilst our Investment Property portfolio has grown to over $1.5bn. • In Sydney, construction of the fifth office tower within the Rhodes Corporate Park along with the second stage of the highly successful Freshwater Place commercial tower at Southbank in Melbourne. Details of these and many other new and existing development projects continue to enhance Australand’s reputation as a premier fully-integrated property developer. As announced recently, Australand will shortly be welcoming Bob Johnston as its new Managing Director. Bob will join Australand in August this year. At the same time the Group has farewelled Brendan Crotty who for 17 years as Managing Director has guided Australand from a $300m market capitalised residential developer to a $2bn plus fully diversified property business.
    [Show full text]
  • Strategic Review of the Westconnex Proposal: Final Report
    Strategic Review of the WestConnex Proposal Final Report City of Sydney February 2015 140511-Final Report_150409 This report has been prepared for City of Sydney. SGS Economics and Planning has taken all due care in the preparation of this report. However, SGS and its associated consultants are not liable to any person or entity for any damage or loss that has occurred, or may occur, in relation to that person or entity taking or not taking action in respect of any representation, statement, opinion or advice referred to herein. SGS Economics and Planning Pty Ltd ACN 007 437 729 www.sgsep.com.au Offices in Canberra, Hobart, Melbourne and Sydney 140511-Final Report_150409 TABLE OF CONTENTS EXECUTIVE SUMMARY 1 1 INTRODUCTION 4 2 THE ECONOMIC AND TRANSPORT CONTEXT 5 2.1 Introduction 5 2.2 Recent employment growth 5 2.1 Historic population growth and distribution 7 2.1 Transport movements over time 8 2.2 Planning response to date 13 2.3 Significant future infrastructure 14 2.4 Key observations 14 3 ABOUT WESTCONNEX 16 3.1 Introduction 16 3.2 Project history 16 Original route (2012) 16 Updated WestConnex Route (2013) 18 Updated WestConnex Route (2014) 19 3.3 WestConnex Policy Alignment 21 3.4 Summary 23 4 STRATEGIC ASSESSMENT OF WESTCONNEX 24 4.1 Introduction 24 4.2 Strong population growth in Western Sydney with employment growth in Sydney’s East 24 Origin-destination evidence 24 Journey to work – to Sydney CBD 25 Journey to work – to Global Economic Corridor (GEC) 27 Journey to work – to Eastern Sydney 28 Journey to work – from Eastern Sydney 29 Employment type 30 Corridor growth 31 4.3 Urban renewal along Parramatta Road 32 4.4 The economic stimulus of WestConnex 34 4.5 The cost, benefits and risks of WestConnex 35 NSW Auditor-General Review (2014) 36 4.6 Summary of findings 37 5 STRATEGIC ALTERNATIVES TO WESTCONNEX 39 5.1 Introduction 39 5.2 Strategic alternatives 40 West Metro 40 Road Pricing 41 Wider Public Transport Investments 42 Other considerations 43 6 CONCLUDING REMARKS 44 APPENDIX 1.
    [Show full text]
  • Forward Pesticide Application Program North East Sydney Period of Coverage To: 31 May 2016
    Forward Pesticide Application Program North East Sydney Period of coverage to: 31 May 2016 Downer EDI Works Pty Ltd ABN 66 008 709 608 www.downergroup.com Page 1 of 21 Contents General Information 3 Information Line: 1300 776 069 3 Warnings: 3 Round-up Bioactive Herbicide 3 Lynx WG 3 Forward Program 4 MSDS 11 Downer EDI Works Pty Ltd ABN 66 008 709 608 www.downergroup.com Page 2 of 21 General Information Pesticide use is used for weed and vegetation control. The pesticides used is a standard mixture of Lynx WG Round-up Bioactive Herbicide All pesticide spraying is programmed between: Sunday to Thursday 8pm – 5am Works will be rescheduled if rain is forecasted within 24hours or the wind speed is above 15kmph. Information Line: 1300 776 069 Warnings: Round-up Bioactive Herbicide Do not contaminate dams, rivers or streams with the product or used container. When controlling weeds in aquatic situations refer to label directions to minimise the entry of spray into the water. Lynx WG DO NOT use chlorine bleach with ammonia. All traces of liquid fertilizer containing ammonia, ammonium nitrate or ammonium sulphate must be rinsed with water from the mixing and application equipment before adding chlorine bleach solution. Failure to do so will release a gas with a musty chlorine odour which can cause eye, nose, throat and lung irritation. Do not clean equipment in an enclosed area. DO NOT contaminate streams, rivers or waterways with the chemical or used containers. A nil withholding period is applicable for LYNX WG Herbicide. It is recommended, however, not to graze treated areas for 3 days to ensure product efficacy.
    [Show full text]
  • Forward Pesticide Application Program North East Sydney – Period of Coverage Between July 2016 and June 2017
    Forward Pesticide Application Program North East Sydney – Period of coverage between July 2016 and June 2017 Contents 1 General Information 3 For further information, call the information line: 1300 776 069 3 1.1.1 Summary of Warnings 3 Downer EDI Limited ABN 97 003 872 848 www.downergroup.com Page 2 of 3 1 General Information Pesticides are used for weed and vegetation control across north east Sydney. The pesticides used include: Lynx WG; and Round-up Bioactive Herbicide. All pesticide spraying is programmed between the following days and times: Sunday to Thursday between 8pm and 5am. Works will be rescheduled if: Rain is forecast within 24 hours of the proposed weed control activities; and Wind speed is likely to be above 15 km/per hour during proposed weed control activities. For further information, call the information line: 1300 776 069 1.1.1 Summary of Warnings Round-up Bioactive Herbicide Do not contaminate dams, rivers or streams with the product or used containers. When controlling weeds in aquatic environments, refer to product label directions to minimise the impact of spray on aquatic environment. Lynx WG Do not use chlorine bleach with ammonia. The mixing and application equipment must be cleaned of all traces of liquid fertiliser containing ammonia, ammonium nitrate or ammonium sulphate prior to adding chlorine bleach. Failure to do so will release a gas with a musty chlorine odour which can cause eye, nose, throat and lung irritation. Do not clean equipment in an enclosed area. Do not contaminate streams, rivers or waterways with the chemical or used containers.
    [Show full text]
  • Beaches Link and Gore Hill Freeway Connection Scoping Report BLANK PAGE Document Controls
    October 2017 Beaches Link and Gore Hill Freeway Connection Scoping Report BLANK PAGE Document controls Title: Beaches Link and Gore Hill Freeway Connection Scoping report Approval and authorisation Prepared by: Arcadis | Jacobs Accepted on behalf of Roads and Maritime Camilla Drover Services NSW by: Executive Director Motorways Signed: Date: 30/10/2017 Location File name BL_Scoping Report_Final Document status Date Final Scoping Report 30 October 2017 © Roads and Maritime Services NSW Executive summary Introduction and need The Western Harbour Tunnel and Beaches Link is a NSW Government initiative to provide additional road network capacity across Sydney Harbour and to improve connectivity with Sydney’s northern beaches. The Western Harbour Tunnel and Beaches Link program of works includes: The Western Harbour Tunnel and Warringah Freeway Upgrade project, comprising a new tolled motorway tunnel connection across Sydney Harbour, and the Warringah Freeway Upgrade to integrate the new motorway infrastructure with the existing road network and to connect to the Beaches Link and Gore Hill Freeway Connection The Beaches Link and Gore Hill Freeway Connection, including a new tolled motorway tunnel connection from the Warringah Freeway to Balgowlah and Frenchs Forest, and upgrade and integration works to connect to the Gore Hill Freeway. This scoping report relates to the Beaches Link and Gore Hill Freeway Connection (the project). A separate application and scoping report has been prepared for the Western Harbour Tunnel and Warringah Freeway Upgrade project. The project would involve construction and operation of a 7.5 kilometre, tolled twin tunnel motorway to improve transport connections to the Northern Beaches, reduce road congestion, improve amenity and provide better access to employment centres.
    [Show full text]
  • This Is an Objection to Many Aspects of the Proposed Northconnex Tunnel
    SUMMARY OF CONCERNS IN RELATION TO THE PROPOSED NORTHCONNEX TUNNEL This is an objection to many aspects of the proposed NorthConnex tunnel. We would like to record that we are in favour of a tunnel linking the M2 with the F3 / M1. We see this as a necessary improvement to The Hills Area and the Sydney road network as a whole. It will clearly benefit most residents along the Pennant Hills Road corridor. It will also greatly benefit the long-haul freight vehicles travelling between Victoria, New South Wales and Queensland. However, on careful reading of the NorthConnex Environmental Impact Statement (EIS), we have serious concerns with regard to the tunnel project as it is currently proposed in the EIS. Our concerns are detailed in six sections which show the changes we consider necessary to make the project acceptable. Section A - Page 2 The connectivity of the NorthConnex Southern Ventilation facility at the Southern Interchange, the southbound tunnel in particular. Section B - Page 16 The location and operation of the NorthConnex Southern Ventilation facility at the Southern Interchange. Section C - Page 17 Air Quality and Health. Section D - Page 20 Traffic arrangements during and after the construction of the Northconnex tunnel. Section E - Page 22 The restoration and preservation of the landscape around residential properties. Section F - Page 23 Involvement in the consultation process after the closure date for submissions in relation to the EIS. Date: 6 August 2014 Page 1 of 23 SECTION A: THE CONNECTIVITY OF NORTHCONNEX SOUTHERN VENTILATION FACILITY AT THE SOUTHERN INTERCHANGE, THE SOUTHBOUND TUNNEL IN PARTICULAR On careful reading of the NorthConnex Environmental Impact Statement (EIS) , which purports to include all details of the project construction We find that there is no detailed description of how and where the southbound tunnel will be connected to the ventilation facility at the southern interchange.
    [Show full text]
  • John Marinovich Director
    John Marinovich Director Areas of Expertise Planning, Programming, Project Management, Dispute Resolution Industries Infrastructure, Roads, Resource & Mining, ICT Qualifications Bachelor of Applied Science (Building) Post Graduate Diploma Project Management Accredited Expert Witness (RICS) Certificate in SOPA Adjudication (NSW) Key Experiences John joined TBH as a consultant in 1989 and has been a Director since 2004. He has over 30 years’ experience in the construction and infrastructure industries, with a particular emphasis on project delivery and planning advice, contractual claims and dispute advice. John has been responsible for providing advice on project strategies, time management of design, procurement, construction and commissioning, contract management, risk management, value management and the preparation and, or defence of contractual claims. John has worked on several major capital works program projects, undertaking the role of project co-ordinator throughout the design, documentation, tender, construction and commissioning phases. Prior to joining TBH, John worked for developers and building companies with on-site and office positions and gained experience in contract administration, estimating, tender preparation and project planning. A Director of TBH since 2004, John has been responsible for providing advice on the project delivery strategies and control of time on numerous projects. John Marinovich | tbhconsultancy.com John’s work at TBH includes: Project Management Advice • Providing advice to various clients (public
    [Show full text]
  • ASX Release Template
    asx release 2 February 2015 Financial Close on the NorthConnex Project in NSW Transurban, along with its partners in the Westlink M7, announces financial close on the NorthConnex project in Sydney, NSW. This represents the culmination of a process initiated and led by Transurban that began with the submission of an unsolicited proposal to the NSW Government in March 2012. Key project details remain consistent with the in-principle agreement announced in May 2013, when the project progressed into Stage 3 of the unsolicited proposal assessment process. NorthConnex project construction and capital cost The NorthConnex project includes the following construction and capital costs: • Nine kilometre tolled twin tunnels connecting the southern end of the M1 Pacific Highway at Wahroonga to the Hills M2 Motorway at the Pennant Hills Road interchange; • Total project cost of approximately $2.9 billion, which includes a fixed price Design and Construction contract to be delivered by a Lend Lease / Bouygues Construction joint venture, together with development, planning, approvals, and financing costs; • Combined Federal and NSW Government contribution of circa $800 million; • Construction will commence early in 2015 and is expected to be complete by the end of 2019; and • M7 and NorthConnex to be wholly owned by the umbrella entity known as North West Roads Group. Transurban will own 50% of the North West Roads Group. NorthConnex project financial returns The NorthConnex project will deliver financial returns principally through the following sources: • Toll revenue derived from the NorthConnex tunnel through a concession agreement until 2048, governed by pricing that is aligned with the Hills M2 main toll point (currently cars $6.36 and trucks $19.06) and quarterly escalation of CPI or one percent (whichever is greater); and • M7 concession adjustments comprising a concession extension to June 2048 (11.4 years) and an increase in the truck toll multiplier to three times the rate for cars (currently parity with cars) commencing in early February 2015.
    [Show full text]
  • Submission to Senate Committee Inquiry Into Operations of Existing and Proposed Toll Roads in Australia
    Submission to Senate Committee Inquiry into Operations of existing and proposed toll roads in Australia This document contains the formal submission made by WestConnex Action Group Incorporated (WAG) to the aforementioned Inquiry. We would welcome the opportunity to appear before the Committee. We also urge the Committee to hold at least one hearing in Western Sydney so that its community has an opportunity to present its views. WAG is a community group made up of residents from across western, inner and southwest Sydney. We are not affiliated with any political party. For enquiries relating to this submission, please contact us at: WestConnex Action Group PO Box 3249 Marrickville Metro NSW 2204 [email protected] 1.0 Terms of reference We note that the terms of reference for the Inquiry are as follows: Operations of existing and proposed toll roads in Australia, including: a. financial arrangements of existing and proposed private toll roads, and transparency, accountability and equity aspects of these arrangements; b. interaction of commercial considerations of private toll road operators with federal and state transport and infrastructure policy; and c. any other related matters. 2.0 Overview of issues covered in this submission 1 Due to the overlapping nature of these terms of reference, we have not dealt with the issue under those specific headings but instead dealt with the issues under the following headings. 1. Tolling regimes are designed to deliver private profit rather than ongoing public benefit. 2. Lack of transparency around tolling arrangements 3. New tolls levied on existing motorways to subsidise other toll roads 4.
    [Show full text]
  • Two Bridges and Epping Road
    On the Streets Where You Live Two Bridges and Epping Road The 2013 Heritage Festival theme was Community Longueville Roads and after road widening in 1967 the Milestones; one milestone in the Lane Cove Municipality North Ryde section of the Spooner Highway was was the building of Epping Road and the construction of renamed Epping Road. The Epping Road/Longueville bridges across the Lane Cove River and Stringybark Road corridor was linked to the Warringah Freeway with Creek. the opening of the Gore Hill Freeway in August 1992. This corridor continues to provide a major arterial route During the 19th century North Shore suburbs of Sydney for northern Sydney. were dependant on ferry services across the harbour and along the river for transport. The North Shore rail By the 1970s units had been built on the northern side line opened in 1890 linking Hornsby to St Leonards and of Epping Road through Lane Cove and in 1972 azaleas extended to Milsons Point in May 1893. The tramline were first planted along this section of the road and from Crows Nest to Gore Hill commenced in 1900 and have since become a noted landmark for their colorful was extended along the Pacific Highway to Longueville floral display every September. Road, Lane Cove in 1909, but these still left large parts of the municipality not accessible to transport routes. In the 1920s the NSW government was proposing a railway line which would link Eastwood with St. Leonards and assist in the development of post WWI Sydney. The route of the rail line was to be built along the approximate line of today’s Epping Road and would allow for the development of the suburbs away from the foreshores of the river.
    [Show full text]
  • APPENDIX 1 APPROVED 4.6 METRE HIGH VEHICLE ROUTES Note: The
    APPENDIX 1 APPROVED 4.6 METRE HIGH VEHICLE ROUTES Note: The following link helps clarify where a road or council area is located: www.rta.nsw.gov.au/heavyvehicles/oversizeovermass/rav_maps.html Sydney Region Access to State roads listed below: Type Road Road Name Starting Point Finishing Point Condition No 4.6m 1 City Road Parramatta Road (HW5), Cleveland Street Chippendale (MR330), Chippendale 4.6m 1 Princes Highway Sydney Park Road Townson Street, (MR528), Newtown Blakehurst 4.6m 1 Princes Highway Townson Street, Ellis Street, Sylvania Northbound Tom Blakehurst Ugly's Bridge: vehicles over 4.3m and no more than 4.6m high must safely move to the middle lane to avoid low clearance obstacles (overhead bridge truss struts). 4.6m 1 Princes Highway Ellis Street, Sylvania Southern Freeway (M1 Princes Motorway), Waterfall 4.6m 2 Hume Highway Parramatta Road (HW5), Nepean River, Menangle Ashfield Park 4.6m 5 Broadway Harris Street (MR170), Wattle Street (MR594), Westbound travel Broadway Broadway only 4.6m 5 Broadway Wattle Street (MR594), City Road (HW1), Broadway Broadway 4.6m 5 Great Western Church Street (HW5), Western Freeway (M4 Highway Parramatta Western Motorway), Emu Plains 4.6m 5 Great Western Russell Street, Emu Lithgow / Blue Highway Plains Mountains Council Boundary 4.6m 5 Parramatta Road City Road (HW1), Old Canterbury Road Chippendale (MR652), Lewisham 4.6m 5 Parramatta Road George Street, James Ruse Drive Homebush (MR309), Granville 4.6m 5 Parramatta Road James Ruse Drive Marsh Street, Granville No Left Turn (MR309), Granville
    [Show full text]