Contents

PART1 - PrequalificationProcedures...... 2 Sectionl. Instructionsto Applicants (lTA) ...... 3 Sectionll. Prequalification Data Sheet...... 11 Sectionllf . QualificationCriteria and Requirements ...... 12 SectionlV. Application Forms ...... 18 PART2 - WorksRequirements...... 34 SectionV. Scopeof Works ...... 35

PRE-QUALIFICATIONFOR ELECTRO-MECHANICAL WORKS OF LOWARI TT]NNELPROJECT. PAKISTAN PART. 1

Prequal ification Proced u res

PRE-QUALIFICATIONFOR ELECTRO-MECHANICAL WORKS OF PROJECT 2 Sectionl. Instructionsto Applicants(lTA)

Tableof Clauses

A.General ...... 4 1. Scopeof Application...... 4 2. Sourceof Funds ...... 4 3. Fraudand Corruption...... , ...... 4 4. EligibleApplicants...... 5 B.Contents of the Prequalification Document...... 6 5. Sectionsof PrequalificationDocument ...... 6 6. Clarificationof Prequalification Document...... 7 7. Amendmentof PrequalificationDocument ...... 7 C.Preparation ofApplications...... 7 8. Costof Applications ...... 7 9. LanguageofApplication...... 7 10. DocumentsComprising the Application ...... 7 11. ApplicationSubmission Form...... 7 12. DocumentsEstablishing the Eligibility ofthe App1icant...... 7 13. DocumentsEstablishing the Qualifications ofthe Applicant...... 8 14. Signingof the Application and Number of Copies ...... 8 D.Submission ofApplications...... 8 15. Sealingand ldentification ofApplications...... 8 16. Deadlinefor Submission ofApplications...... 8 17. LateApplications ...... 8 18. Openingof Applications...... 8 E.Procedures for Evaluation ofApplications ...... 9 19.Confidentiality ...... 9 20.Clarification ofApplications ...... 9 21.Responsiveness ofApplications...... 9 22.Subcontractors ...... 9 F.Evaluation ofApplications and Prequalification ofApplicants...... 9 23. Evaluationof Applications...... 24. Employer'sRight to Acceptor RejectApplications ...... 1 0 25. PrequalificationofApplicants...... 10 26. Notificationof Prequalification ...... 10 27. InvitationtoBid .....10 28. Changesin Qualifications ofApplicants...... 10

PRE-QUALTFTCATIONFOR ELECTRO-MECHANICALWORKS OF LOWARTTUNNEL PROJECT a J Sectionl. Instructionsto Applicants(lTA) A. General 1. Scopeof Application 1.1 ln connectionwith the Invitationfor Pre-qualificationindicated in Sectionll, Pre-qualifibationData Sheet (PDS), the Employer,as defined in the PDS, issues this Pre-qualificationDocument (POD)to applicantsinterested in biddingfor theworks described in SectionV, Scopeof Works.The nameof Project,number of contractsand the name and identificationof each contract, correspondingto this pre-qualification, areprovided in the PDS. 2. Sourceof Funds 2.1 Thesource of fundsis describedin PDS. 3. Fraudand Corruption 3.1 The Employerrequires that Applicants,Bidders, Suppliers, Contractors,and Consultantsunder these contracts, observe the higheststandard of ethicsduring the procurement and execution of suchcontracts. ln pursuitof thispolicy, the Employer: (a) Defines,for the purposesof this provision,the terms set forthbelow as follows: (i) "corrupt practice" means the offering, giving, receiving,or soliciting,directly or indirectly,of anythingof valueto influencethe actionof a public officialin the procurementprocess or in contract execution; (ii) "fraudulentpractice" means a mis-representationor omissionof factsin orderto influencea procurement processor the executionof a contract; (iii) "collusivepractice" means a schemeor anangement betweentwo or more bidders,with or without the knowledgeof the Employer,designed to establishbid pricesat artificial,noncompetitive levels; and (iv) "coercivepractice" means harming or threateningto harm,directly or indirectly,persons or their property to influencetheir participationin the procurement processor affectthe execution of a contract; (b) will rejecta proposalfor awardif it determinesthat the Bidderrecommended for award has, directly or throughan agent,engaged in corrupt,fraudulent, collusive or coercive practicesin competingfor the Contract in question; (c) willsanction a firmor individual,including declaring them ineligible,either indefinitely or fora statedperiod of time,to be awardeda contractif it at anytime determines that they have,directly or throughan agent,engaged, in corrupt, fraudulent,collusive or coercivepractices in competingfor, or in executing,a contract;and (d) willhave the rightto requirethat a provisionbe includedin PRE-QUALIFICATION FOR ELECTRO-MECHANICAL WORKS OF LOWARI TIINNEL PROJECT 4 Bidding Documentsand requiringbidders, suppliers, contractorsand consultantsto permit the Employerto inspecttheir accounts and recordsand otherdocuments relatingto the bid submissionand contractperformance and to have them auditedby auditorsappointed by the Employer. 4. EligibleApplicants 4.1 An Applicantshall be a private,public or governmentowned legal entity,subject to ITA4.6, or any combinationof themin the form of association(s)including Joint Venture (JV) with the formal intent,as evidencedby a letter of intent;to enter into an agreementor underan existingagreement. In the caseof a JV, unlessotherwise specified in the PDS,(i) all partiesshall be jointlyand severally liable, and (ii) there shall be no limiton the numberof partners. 4.2 The eligibilitycriteria listed in this Clause4 shallapply to the Applicant,including the partiesconstituting the Applicant,i.e., its proposedpartners, subcontractors or suppliersfor any part of theContract including related services. 4.3 An Applicantand all partiesconstituting the applicantshall have to registerwith PakistanEngineering Council (PEC) in Categoryas mentionedin PDSfor participatingin the bidding (if qualified). 4.4 Applicantsand all partiesconstituting the Applicantshall not havea conflictof interest.Applicants shall be consideredto havea conflictof interest,if theyparticipated as a consultantin the preparationof the designor technicalspecifications of the Worksthat are the subject of thisprequalification. Where a firm, or a firmfrom the sameeconomic or financialgroup, in addition to consulting,also has the capabilityto manufactureor supply goodsor to constructworks, that firm,or a firm from the same economicor financialgroup, cannot normally be a supplierof goodsor works,if it providedconsulting services for the contract correspondingto this prequalification,unless it can be demonstratedthat thereis not a significantdegree of common ownership,influence or control. 4.5 An Applicantshall submitonly one applicationin the same Prequalificationprocess, either individually as an Applicantor as a partnerof a joint venture.No Applicantcan be a subcontractor whilesubmitting an applicationindividually or as a partnerof a joint venture in the same Prequalificationprocess. A Subcontractorin any application may participate in morethan one application,but only in thatcapacity. An Applicantwho submits,or participatesin, more than one applicationwill cause all the applicationsin which the Applicanthas participatedto be disqualified. 4.6 Applicantsshall not be under executionof a Bid-securing Declaration. 4.7 Applicantsand all partiesconstituting the Applicantshall provide such evidenceof their continuedeligibility satisfactory to the Employer,as the Employershall reasonablyrequest including legaland financialautonomy and compliancewith Commercial

PRE-QUALIFICATION FOR ELECTRO-MECHANICAL WORKS OF LOWARI TIJNNEL PROJECT 5 Lawin caseof Governmentowned entities of pakistan.

4.8 ln case of JVs, one of the partnerswho is responsiblefor performinga key functionin contractmanagement or is executinga majorcomponent of the proposedcontract shall be nominatedas beingin chargeduring the pre-qualificationand biddingperiods and in the eventof a successfulbid, during contractexecution. The partnerin chargeshall be authorizedto incurliabilities and receiveinstructions for and on beharfof any and all partnersof the jointventure; this authorizationshall be evidencedby submittinga powerof attorneysigned by legally authorizedsignatories of allthe partners.

B. Contentsof the PrequalificationDocument

5. Sectionsof 5.1 Thedocument for the prequalification of Applicants (hereinafter - Prequalification "PrequalificationDocument") consists of parts 1 and 2 which Document compriseall the sections indicated below, and should be readin conjunctionwith any Addendum issued in accordancewith ITA 7. PART1 - PrequalificationProcedures o Sectionl. Instructionsto Applicants (lTA) o Sectionll. PrequalificationData Sheet (pDS) . Sectionlll. QualificationCriteria and Requirements o SectionlV. ApplicationForms

PART2 WorksRequirements o SectionV. Scopeof Works 5.2 The "lnvitationfor PrequalificationApplications" issued by the Employeris notpart of the prequalificationdocument. 5.3 The Employeraccepts no responsibilityfor the completenessof the prequalificationdocument and its addenda unless they were obtaineddirectly from the Employer. 5.4 The Applicantis expectedto examineall instructions,forms, and terms in the PrequalificationDocument and to furnishall informationor documentationrequired by the prequalification Document.

PRE.QUALIFICATIONFOR ELECTRO.MECHANICALWORKS OF LOWARI TUNNEL PROJECT 6 6. Glarificationof 6.1 A prospectiveApplicant requiring any clarificationof the Prequalification PrequalificationDocument shall contact the Employerin writing Document at the Employer'saddress indicated in the PDS.The Employer willrespond in writingto anyrequest for clarificationprovided that such requestis receivedno laterthan five (05) days priorto the deadlinefor submissionof applications.The Employershall forward copies of its responseto all applicantswho have acquired the prequalificationdocument directly from the Employerincluding a descriptionof the inquirybut without identifyingits source.Should the Employerdeem it necessaryto amendthe prequalification document as a resultof a clarification,it shall do so followingthe procedureunder ITA 7 and in accordancewith the provisionsof ITA16.2.

7. Amendment of 7.1 At anytime prior to the deadlinefor submissionof applications, Prequalification the Employermay amendthe PrequalificationDocument by Document issuingaddenda.

7.2 Any addendumissued shall be part of the Prequalification Documentand shall be uploadedon NHAwebsite and shallbe communicatedin writing to all who have obtainedthe prequalificationdocument from the Employer.

G. Preparationof Applications 8. Cost of Applications 8.1 TheApplicant shall bear all costsassociated with the preparation andsubmission of its application.The Employerwill in no case beresponsible or liablefor those costs, regardless of theconduct or outcomeof the prequalificationprocess. 9. Language of 9.1 The applicationas well as all correspondenceand documents Application relatingto the prequalificationexchanged by the Applicantand the Employer,shall be writtenin the languagespecified in the PDS.Supporting documents and printedliterature that are part ofthe application shall also in same language. 10. Documents 10.1 Theapplication shall comprise the following: Comprisingthe Application (a) ApplicationSubmission Form, in accordance with ITA 11; (b) documentaryevidence establishingthe Applicant's eligibilityto prequalifo,in accordancewith ITA 12; (c) documentaryevidence establishingthe Applicant's qualifications,in accordance with ITA 13; and (d) anvother document required as specifiedin thePDS. 11. Application 11.1 The Applicantshall prepare an ApplicationSubmission Sheet SubmissionForm usingthe form furnishedin SectionlV, ApplicationForms. This Formmust be completed without any alteration to itsformat. 12. Documents 12.1To establishits eligibility in accordancewith ITA 4, theApplicant Establishingthe shall completethe eligibilitydeclarations in the Application Eligibilityof the SubmissionForm and Forms ELI (eligibility) 1.1 and 1.2, included Applicant in SectionlV, Application Forms.

PRE-QUALIFICATION FOR ELECTRO-MECHANICAL WORKS OF LOWARTTUNNEL PROJECT 1 13. Documents 13.1 To establishits qualificationsto perform the contract(s)in Establishingthe accordancewith Section lll, QualificationCriteria and Qualificationsof Requirements,the Applicantshall provide the information the Applicant requestedin the correspondingInformation Sheets included in SectionlV, Application Forms.

14. Signingof the 14.1 The Applicantshall prepare one originaldocument comprising Applicationand the applicationas describedin ITA 10 and clearlymark it Numberof Copies "ORlGlNAL".The originalof the applicationshall be typedor writtenin indelibleink and shall be signedby a personduly authorizedto signon behalfof the-Applicant. 14.2 The Applicantshall submit copies of the signed original application,in thenumber specified in the PDS,and clearly mark them "COPY".In the event of any discrepancybetween the originaland the copies, the original shall prevail.

D. Submissionof Applications

15. Sealingand 15.1 TheApplicant shall enclose the original and the copies of the ldentification of applicationin a sealedenvelope that shall: Applications (a) bearthe nameand address of the Applicant; (b) beaddressed to theEmployer, in accordancewith ITA 16.1; and (c) bear the specific identificationof this pre-qualification processindicated in thePDS 1.1. 15.2 The Employerwill accept no responsibilityfor not processingany envelopethat was not identified as required. 16. Deadlinefor 16.1 Applicationsshall be receivedby the Employerat the address Submissionof and no laterthan the deadlineindicated in the PDS.A receipt Applications will be given for all applicationssubmitted. Applicants may alwayssubmit their applications by mailor by hand.When so specifiedin the PDS.Applicants shall also submit an electronic copy of their applicationsas specifiedin PDS. Applications shallbe receivedby the Employerat the addressand no later thanthe deadlineindicated in the PDS.A receiptwill be given for allapplications submitted. 16.2The Employermay, at its discretion,extend the deadlinefor the submissionof applicationsby amendingthe Prequalification Documentin accordancewith lTA7, in whichcase all rightsand obligationsof the Employerand the Applicantssubject to the previousdeadline shall thereafter be subjectto the deadlineas extended. 17. LateApplications 17.1The Employermay at its discretion,accept the applicationafter thedeadline for submission of applicationsprescribed in ITA16. 18. Opening of 18.1 Employershall open the applicationsas per its standard Applications proceduresand shall preparea record of the openingof applicationsthat shall include, as a minimum,the nameof the Applicant.A copy of the record may be distributedto all Applicants.

PRE-QUALIFICATIONFOR ELECTRO-MECHANICAL WORKS OF LOWARI TUNNEL PROJECT 8 E. Proceduresfor Evaluationof Applications 19. Confidentiality 19.1 Informationrelating to the evaluationof applications,and recommendationfor pre-qualification,shall not be disclosedto Applicantsor any otherpersons not officiallyconcerned with suchprocess until the notificationof resultsof pre-qualification is madeto allApplicants. 19.2 Fromthe deadlinefor submissionof applicationsto the timeof notificationof the resultsof the prequalificationin accordance with tTA 26, anyApplicant that wishesto contacttfe Employer on any matterrelated to the prequalificationprocess, may do so butonly in writing. 20. Glarificationof 20.1 To assistin theevaluation of applications,the Employermay, at Applications its discretion,ask any Applicant for a clarificationof its applicationwhich shall be submittedwithin a statedreasonable periodof time.Any requestfor clarificationand all clarifications shallbe in writing. 20.2 lf an Applicantdoes not provideclarifications of the information requestedby thedate and time set in the Employer'srequest for clarification,its application may be rejected. 2'1. Responsivenessof 21.1The Employermay reject any application which is notresponsive Applications to therequiremenis of theprdquaiification document. 22. Subcontractors 221 Applicantsplanning to subcontractany of the key activities indicatedin Sectionlll, QualificationCriteria, shall specifythe activity(ies)or parts of the works to be subcontractedin the ApplicationSubmission Form. Applicants shall clearly identify the proposedspecialist subcontractors in FormsELI-1.2 and EXp (experience)-4.2in Section lV. Such proposedspecialist subcontractor(s)shall meet the correspondingquaiification requirementsspecified in Sectionlll, QualificationCriteria and Requirements. 22.2 At this time, the Employerdoes not intendto executecertain specific parts of the Works by subcontractorsselected in Nominated subcontractors) un ress 3fn5ff:3"?{"ffi Fil,gffil.( F. Evaluationof Applicationsand Prequalification of Applicants

23. Evaluationof 23.1 The Employershall use the factors,methods, criteria, and Applications requirementsdefined in Sectionlll, QualificationCriteria and Requirementsto evaluatethe qualificationsof the Applicants. The useof othermethods, criteria, or requirementsshall not be permitted.The Employerreserves the right to waive minor deviationsin the qualificationcriteria if they do not materially affectthe capability of an Applicantto performthe contract. 23.2 The Employershall also evaluatethe past performanceof the applicantagainst its equipment supplied to NHA. 23.3 only the qualificationsof subcontractorsthat have been identified in the applicationmay be consideredin the evaluationof an Applicant.However, the general experienceand financial resourcesof subcontractorsmay not be addedto those of the PRE-QUALIFICATIONFOR ELECTRO-MECHANICALWORKS OF LOWARI TUNNEL PROJECT 9 Applicantfor purposesof prequalificationof the Applicant. 23.4 ln caseof multiplecontracts, the Employershall pre-qualify each Applicantfor the maximumnumber and typesof contractsfor which the Applicant meets the appropriate aggregate requirementsof such contracts,as specifiedin sectr-onlll, QualificationCriteria and Requirements.

24. Employer'sRight 24.1 The Employerreserves the right to accept or reject any to Accept or Reject application,and to annulthe pregualificationprocess aho releit Applications allapplications at anytime, without ther.eby incuning any tiability to Applicants. 25. Prequalificationof 25.1 All Applicantswhose applicationshave met or exceeded Applicants ("passed")the specifiedthreshold requirements will, to the exclusionof allothers, be pre-qualifiedby theEmployer. 26. Notificationof 26j once the Employerhas completedthe evaluationof the Prequalification applicationsit shall notify all Applicantsin writingof the namesof thoseapplicants who have been pre-qualified. 27. lnvitationto Bid 27.1 Promptlyafter the notificationof the resultsof theprequalification the Employershall invite bids from all the Applicantsthat have beenpre-qualified.

27.2 Biddgrsmay be requiredto providea Bid Securityacceptable to the Employerin the form and an amountto be specifiedin the BiddingDocuments, and thesuccessful Bidder shall be required to providea Performancesecurity to be specifledin the Bidding Documents.

28. Changesin 28.1 Any changein the structureor formationof an Applicantafter Qualificationsof beingprequalified in accordancewith rrA 2s and invitedto bid Applicants shallbe subjectto a writtenapproval of the Employerprior to the deadlinefor submissionof bids.such approvalshill be deniedif as a consequenceof the changethe Applicantno longer substantiallymeets the qualificationcriteria set forth in section lll, Qualificationcriteria and Requirements, or if in theopinion of the Employer,a substantialreduction in competitionmay result. Any suchchanges shall be submittedto the Employernot later thanseven (07) days after the date of the Invitationfor Bids.

PRE-QUALIFICATIONFOR ELECTRO-MECHANICALWORKS OF LOWARI TUNNEL PROJECT 10 tion DataSheet (PDS)

ITA1.1 | EmPlover I NationalHighwaY AuthoritY Ministryof dommunications,Government of Pakistan 28,Mauve Area G-9/1, lslamabad, Pakistan Nameof Proiect Pakistan @rks oj_LowariTunnel Project, ITA2J- I Governmentof Pakistan' in the PrequalificationProcess' t th?JL resisterwith tTA4.3 l?Y",! for paf

PECCategory

lndividual/LeadFirm @in MEo1,MEo2,MEo3, MEO4.EEb1, EEO2, EEO3, EEO4, EEOs' EEO6, EEO7,EEOB & CElO PECregtstrction as Pershare in JV ffi PrequalificationDocument tTA6.1 GeneralManager (P&CA) NationalHighwaY AuthoritY frrfi"i.twof dommunications'Government of Pakistan 28, MauveArea G-9/1, lslamabad, P-akistan -9260419 Phone:051 - 9032727Fax:051 gov'pk Ltnuii q*p"a. nLa@gm"it. Website:vrrww' nha' "om, c. ereparationol4PP!,c"tiont is English' The languageof the a rTA10.1 D. Submissionof APPlications able amountof tTA16.1 (Rupeeso"" f["rt"to onlv)'ininu fot*. of oIP/?:T"i1-?t?1; Rs1,000 fiY Lastdate for Bi'rl iX"*ir" i"r"" or "NationalHignway Authoritvt'' The hours at the address submissionof Rppticaiionis Zt"t tUaylZOttiup to 1100 mentionedabove. withthe Applicationin Applicantsshall submit one electroniccopy in PDF Format 2018up to 1130hours ffirlitb""" Opp'i."*t *itt U" openedon 21"tMay , rTA18.1 in NHAAuditorium rs/ sub-consultants(if tTA22.1 nOffiii any). sub-contraclorsin Folm Applicantshall clearly identify the proposedspecialized ELI-|.2andexperie nce q.2 in Seciion-tV

PRE-QUAI.IFICATIoNFoRRI,I]cTRo-MECI{ANICALwoRKSoFLowARITUNNELPROJEcT ll Section III.Qualification Griteria and Requirements

ThisSeetion contains all the methods,criteria, and requirements that the Employershall use to evaluateapplications. The informationto be providedin relationto each requirementand the definitionsof the conespondingterms are includedin the respective ApplicationForms.

Gontents

1. Eligibility...... 13

2. HistoricalContract Non-Performance ...... 14

3.Financial Situation...... 1S

4.Experience...... 16

PRE-QUALIFICATIONFOR ELECTRO-MECHANICALWORKS OF LOWARI TUNNEL PROJECT t2 Joint Venture Subject Requirement Single All Parties Each Lead Submission Entity Combined Partner Partner Requirements 1. Eligibility

'1.1 Registration RegistrationCertificates in accordancewith ITA Must Not Mustmeet Mustmeet FormsELI - 1.1 Sub-Clause4.3. meet applicable as per and 1.2,with share attachments.

1.2 Conflict of No conflictsof interestin ITA Sub-Clause4.4. Must Not Mustmeet Application lnterest meet applicable SubmissionForm.

1.3 Ineligibility Not having been declared ineligible by the Must Not Mustmeet Application Employer,as describedin ITA Sub-Clause4.6. meet applicable SubmissionForm.

1.4 Government In case of Government owned entity of Must Not Mustmeet FormsELI - 1.1 owned entity Pakistan, documents establishinglegal and meet applicable and 1.2with financial autonomy and compliance with attachment. commerciallaw.

PRE-QUALIFICATION FOR ELECTRO-MECHANICAL WORKS OF LOWARI TTJNNELPROJECT, PAKISTAN JointVenture No. Subject Requirement Single All Parties Each Lead Submission Entity Combined Partner Partner Requirements 2. HistoricalContract Non-Performance

2.1 Performance Non-performanceof a contractdid not occur Must Not Mustmeet Not FormCON-2 of the withinthe last 10 yearsprior to the deadlinefor meet applicable applicable applicantand applicationsubmission based on all information. History of Non- Performing Gontracts 2.2 Failureto Sign Not being under execution of a Bid Securing Must Not Mustmeet Not Application Contract Declarationpursuant to Sub-Clause4.6 for 10 meet applicable applicabler SubmissionForm years 2.3 Resolved/ A fullysettled dispute or litigationis one that has Must Not Mustmeet Not FormCON - 2 Pending been resolved in accordancewith the Dispute meet applicable applicable Litigation Resolution Mechanism under the respective contract and where all appeal instances availableto the applicanthave beenexhausted. All pending litigationshall in total not represent more than fifty (50) % of the Appticant's net worth and shall be treated as resolved against the Applicant.

PRE.QUALIFICATIONFOR ELECTRO-MECHANICALWORKS OF LOWARI TI.JNNELPROJECT submission Single parties Each LeaU No. subject Requirement Ail Partner Partner Entity Gombined Requirements

3. Financial Situation 3.lFinancialsubmissionofauditedba|ancesheets,forthe Performance tastThree [03J years to demonstrate' The current soundness of the applicant's financialposition and its prospectivelong term profitabilitY,to evaluate; (a) Must (a) FormFIN - 3'1 cash flow reasonably'ilil, (a) (q) (a) Capacityto have meet Must withattachments meet the cash illust Mustmeet enough to atleast meet FormCL-1 of tne saiOworks is US$vv 8v meet requirements 25%of Form4'3 million (or equivalent). Followingformula will be usedfor evaluation: l[t["!l million Cash Flow = (Latest year's Working Min - Capital+ Projectspecific Credit line Facility One month's average invoicing of current contractcommitments). Note: Projectspecific credit Line Facility' if any, shall onlY be considered if submittedas Per Form CL'1' - (b) (b) (b) Must (b) FormFtN (b) AnnualTurnover of minimumUS$ Average Must Mustmeet meet Must 3.1,3.2with 40 million(or equivalent) for last 03 years' meet atleast meet attachments 2\o/oof threshold i.e.US $10 million

LOWARITUNNEL PROJECT PRE_QUALIFTCATIONFOR elEdrng.vrcHANrCAL WORKSOF t5 Joint Venture Single Submission No. Subject Requirement All Parties Each Lead Partner Partqter Entity Combined Requirements

4. Experience - Must N/A Mustmeet Mustrneet FormEXP 4.1 4.1 General Experienceunder supply contractsin the role of meet Experience contractor, subcontractor, or managemenl contractorfor at leastthe last Seven [7] years prior to the applicationsubmission deadline. Note: Letters of Award / Acceptance/ Work Order and ComPletion Certificates must be Provided with the Documents. in at leastone Must Mustmeet One FormEXP 4.2 4.2. Specific d- Participationas Contractor, size and meet partner Experience t01l contract of similar complexity having value of Electro mustmeet MechanicalWork of minimumUS $30 or allJV millioncompleted during last Seven(07) members years. mustmeet as per Note: Letters of Award / Acceptance/Work share Order along with Latest PaYment Certificate for assessing the type / amount of Work executed and Completion Certificates/Satisfaction Certificateby client must be provided with the Documents.

PRE-QUALIFICATION.FoRELECTRO-MEgHANIcALwoRKSoFLowARITUNNELPROJECT single parties Lead submission No. subject Requirement All Each Partner Partrper Entity Combined Requirements

FormEXP 4.2 b. Designcapacity of firm/oneof the firm in Must Mustmeet One partner JV / designsub consultant,to undertake meet the projecti.e. experience of designingof mustmeet at leastone (01)road tunnel project with a or allJV length of more than SKm containing memDers Oetliteddesign within the last Seven (07) mustmeet years.Bio data of proposedprofessionals as per must be attachedsuch as Chief Design share Engineer.

Chief Design Engineer shall have minimumten (10) yearsof experiencein the fieldof E&M-designof roadtunnels'

Must FormEXP 4.3 and each partner to an application Must N/A 4.3 Current Applicants provide Commitment should provide information on their current Provide commitments on all contracts that have been awarded or for which a letter of intent or acceptancehas been received,or for Contracts approachingcompletion, but for which substantial CompletionCertificate has yet to be issued' Letters of Award / Acceptance/ Work Order must be Provided with the Documents.

LOWARI TUNNEL PROjECT PRE.QUALIFICATION FOR ELECTRO-MECHANICAL WORKS OF t7 SectionlV. ApplicationForms

Tableof Forms

ApplicationSubmission Form ...... 19 ApplicantInformation Form ELI-1 .1 ...... 20 Applicant'sParty Information Form ELI-1 .2 ...... 21 Performanceof ApplicantForm CON-2 ...... 22 FinancialSituation Ofrm FIN-3.1...... 24 AverageAnnual Turnover Form 3.2...... 26 GenerafExperience Form EXP 4.1...... 27 SimilarExperience Form EXP 4.2 ...... 29 CurrentCommitments Form EXP 4.3 ...... 29 EquipmentCapabilities Form EXP 5.1(A),5.1(B)...... 30 CreditLine Faci1ity...... 32

PRE-QUALIFTCATIONFOR ELECTRO-MECHANICALWORKS OF LOWARITUNNELPROJECT,PAKISTAN ApplicationSubmission Form Date: 2018 Contract: Electro-MechanicalWorks of Lowari Tunnel Project, Pakistan on DesignBuild Basis

GeneralManager (P&CA) NationalHighway Authority Ministryof Gommunications,Government of Pakistan 28,Mauve Area G-9/1, lslamabad, Pakistan

We,the undersigned, apply to be prequalifiedforthe referenced Project.

We declarethat: (a) we have examinedand have no reservationsto the PrequalificationDocuments, includingAddendum(s) No(s)., issued in accordancewith Instructionsto Applicants (lTA)Clause 7; (b) we, includingany subcontractors or suppliers for any partof thecontract resulting from this prequalification,do not haveany conflictof interest,in accordancewith ITA Sub- Glause4.4: (c) we, includingany subcontractors or suppliers for any partof the contractresulting from this prequalification,have not been declared ineligible by theEmployer, or underthe Govemment of Pakistan'slaws, official regulations, or underexecution of a Bid SecuringDeclaration in Pakistan;

(d) we,in accordancewith ITA Sub-Clause 22.1 plan to subcontractthe works following /or partsof the works;

(e) We understandthat you may cancelthe prequalificationprocess at any time and that you are neitherbound to acceptany applicationthat you may receivenor to invitethe pre-qualifiedapplicants to bid for the contractsubject of this pre-qualification,without incuningany liability to theApplicants, in accordancewith ITA Clause 24.

Signed[insert signature(s) of an authorizedrepresentative(s) of theApplicant]

Name[insert full nameof personsigning the application] ln the Capacityof [insertcapacity of personsigning the application] Duly authorizedto signthe applicationfor andon behalfof: Applicant's Name [insert full nameof ApplicantlAddress [insert street number/town or city/country addressl . Datedon [insertday number] day of [insertmonth], finsert yea4-

PRE-QUALTFICATIONFOR ELECTRO-MECHANTCALWORKS OF LOWARTTUNNEL PROJECT T9 FormELI -1.1 ApplicantInformation Form

,2019

Contract: Electro-MechanicalWorks of Lowari Tunnel Pakistanon DesignBuild Basis

Page

Applicant'slegal name:

In caseof JointVenture (JV), legal name of each partnen

Applicant'sActual or Intendedcountry of constitution:

Applicant'sactual or lntendedyear of constitution:

Applicant'slegal address in countryof constitution:

PECRegistration Category: Validity: Detailof Ownersof Applicants Authorizedrepresentative information Name: Name: Address: Address: Telephone/Faxnumbers : Telephone/Faxnumbers: E-mailaddress: E-mailaddress: Attachedare copies of originaldocuments of: tr Articlesof Incorporationor Documentsof Constitution,and documents of registrationof the legalentity named above, in accordancewith ITA 4.1. tr In caseof Governmentowned entity, documents establishing legal and financial autonomyand compliance with commercial law, in accordancewith lTA 4.7. tr Authorizationto signthe applicationfor andon behalfof Applicant.

PRE-QUALTFICATIONFOR ELECTRO-MECHANICALWORKS OF LOWARI TUNNEL PROJECT 20 FormELI -1.2 Applicant'sParty Information Form

[The following form shall be filled in for the Applicant's parties including partner(s) of a joint venture,subcontractors, sub consultant suppliersand other partiesl Date: ,2019

Contract: Electro-MechanicalWorks of Lowari Tunnel Project,pakistan on DesignBuild Basis

Page _of JV applicant/ Sub-Contractorlegal name:

Applicant'sParty legal name:

Applicant'sParty country of registration:

ApplicantParty's year of constitution:

ApplicantParffs legaladdress in countryof constitution:

ApplicantParty's owner or authorizedrepresentative information: Name: Address:

Telephone/Faxnumbers: E-mailaddress:

Attached are copies of original documents of: tr Articlesof Incorporationor Documentsof Constitution,and Registration Documents of thelegal entity namedabove, in accordancewith ITA 4.1. tr Incase of a Governmentowned entity, documents establishing legal and financial autonomy and compliancewith commercial law, in accordancewith ITA 4.7. E VatiORegistration Certificate from pEC. E Applicanthas to providelist of specializedsub-contractors / sub-consultants(if any).

PRE.QUALIFICATIONFOR ELECTRO-MECHANICALWORKS OF LOWARI TIjNNEL PROJECT 2l FormCON - 2 Performanceof Applicant

Date: ,2018 Applicant'sLegal Name: JointVenture Party Legal Name: eohtract: Electro-MecrraniCaiworti of aowariTunnel project,pakistan on DesignBuild Basis

Page _of

Non-PerformingContracts in accordancewith Sectionlll, eualificationGriteria and Requirements

Contractnon sectionlll, Qualificationcriteria and Requirements,sub-Facior 2.1 .' Contract(s)not performed during the 10 (Ten)years specified in Sectionlll, QualificationCriteria and Requirements, requirement2.l are indicated below: Year Non Contractld entification TotalContract performed Amountcurrent portionof valueRs. contract tinsert finsertamount Contractldentifi cation : W] and percentaqel Nameof Employer: Addressof Employer:

Reason(s)for non pedormance:

PRE-QUALIFICATION FOR ELECTRO-MECHANICAL WORKS OF LOWARI TUNNEL PROJECT 22 PendingLitigation, in accordancewith Sectionlll, eualification Criteria and Requirements

No pendinglitigation in accordancewith Section lll, QualificationCriteria and Requirements,Sub-Factor 2.3. Pendinglitigation in accordancewith Section lll, QualificationCriteria and Requirements,Sub-Factor 2.3 is indicatedbetow. Year Outcomeas Contractld entification TotalContract Percentage Amount of Total (currentvalue, Assets Rs. [insert [insert Contractldentification : yearl percentagel Nameof Employer:

Addressof Employer:

Matterin dispute:

PRE.QUALIFICATIONFOR ELECTRO-MECHANICAL WORKS OF LOWARI TUNNEL PROJECT 23 FormFIN - 3'1 FinancialSituation 2018 APP|icant'sLegal Name: JointVenture PartY Legal Name:

Pakistanon Contract: Electro-MechanicalWorks of Lowari Tunnel DesignBuild Basis

Page-of 1.Financial data for previousyears Financialinformation Histor-rc'ttformation (Rupeesin millions) r V 2oio-i7-i-- F Y zots-t o F.Y2014-15 Or Or c.Y 2017 c.Y 2016 c.Y2015 informaliontrom Balance Sheet

t- fCurrent Assets (CA) L_- i CurrentLiabilities (CL)

lnformationfrom Income Statement

TotalRevenue (TR)

Protitsgetore Taxes (PBT)

F.Y FinancialYear

C.Y CalendarYear

WORKS OF LOWARI TUNNEL PROJECT PRE-QUALIFICATION FOR ELECTRO-MECHANICAL 24 2. FinancialDocuments

The Applicantshall provide duly attested copies of the balancesheets and/or financial statementsfor 03 (Three)years pursuantto Sectionlll, QualificationsCriteria and Requirements,Sub-factor 3.1. The financial statements shall:

(a) reflectthe financial situation of theApplicant and not sister or parent companies.

(c) be complete,including all notesto thefinancial statements.

(d)correspond to accountingperiods already completed and audited (no statementsfor partialperiods shall be requestedor accepted).

(Attachedare copiesof financialstatements (balance sheets, including all related notes,and incomestatements) for the 03 (Three)years requiredabove; and complyingwith the requirements

PRE-QUALIFICATTONFOR ELECTRO-MECHANICAL WORKS OF LOWARI TLTNNELPROJECT 25 Form FIN - 3.2 AverageAnnual Turnover

2018 ApPlicant'sLegal Name: JointVenturePartY Legal Name:

Project,Pakistan on Contract: Electro-MechanicalWorks of Lowari Tunnel DesrgnBuild Basis

AnnualTurnover Data (Construction) in million Year Amountand Currency Rupees 2015(2014-15) 2016(2015-16) 2017(2016-17) Average Annual Turnover' paymentsreceived for * Averageannual turnovercalculated as total certified in progressor completed,divided by the numberof yearsspecified works/supplies 3'1(b)' in Sectronlll, Quaiificition Criteria and Requirements, Sub-Factor

consideredif submittedas tr Projectspecific Credit Line Facility, if any,shall only be per'FormCL-1. Original bank certificate be attached'

flowof the Project' specificproposed sources of financingto meetthe cash

Amount(Pak Rs or of Financing Source equivalent) 1. t Z. 2 individualaPPlicant (Attach for or eachpartnerof jointventure)

PRI].QUALllllCA'|IONI]ORt:I,ljC.|Ro-MEC]t'lANlCAt-woRKSot..t,owAR|,IUNNI]LPR0JE'C]- 4azo FormEXP - 4.1 GeneralExperience

2018 Applicant'sLegal Name: JointVenture Party Legal Name:

Contraet: Eleetr,o-MeehanicalWorks of Tunnel Project, on DesignBuild Basis

Page-of

contractsthat demonstratecontinuous worl

Dateof Dateof ContractlOentitication Roleof award comple- Applicant tion Gontractname:

Brief Descriptionof the Works/Supplies performedbY the APPlicant:

Amount of contract: Nameof Employer:

i- - I I I lContractname: trl Brief Descriptionof the Works/Supplies performedbY the APPlicant.

Amountof contract: Nameof EmPloYer:

PRE-QUALIFICATIONFOR ELECTRO-MECHANIC LOWARITUNNEL PROJECT 27 FormEXP - 4.2 SimilarExperience

[The followingtable shallbe filledin for contractsperformed by the Applicant,each partnerof a JointVenture, and specia/isfsub contractorsl Date: 2018 Applicant'sLegal Name: JointVentureParty Legal Name:

Contract Electro-MechanicalWorks of Lowari Tunnel Project, Pakistanon DesignBuild Basis

Page of fldentifysimilar contracts completed over the past Seven(07) yearspursuant to Section-lll,Qualification Criteria and Requirements,Sub-Factor 4.2. Listcontracts

lnformation lSimilarContract No. . I F-oltresildelglqalion - lTotalContract Amount i I LAward dqF-1le@-qf-Award ) - I rGompletiondate i (completion Gertificate)

Rolein Contract MainContractor i MainSupplier's o/oaeeAmount TotalAmounl lf partnerin a JV.or subcontractor (specifyparticipation)

Employer'sName: Addreqs; Telephone/faxnumber: E-mail: i oqr !!e qs ilerrlv I "-rP!iqlg! | 1.Phvsical size t------' __l I I Z. Complexity ___-l [ 3 MethoQ_/Technol D Applicanthas to providedocumentation outlining the experienceof specializedsub- contractors/ sub-consultant (ifany) on additional"Form Exp-4.2". n BioData of ChiefDesign Engineer (duly signed by the Engineer).

PRE-QUALIFICATION FOR ELECTRO-MECHANICA L TUNNEL PROJECT 28 Form EXP- 4.3 Current Commitments (ProjectsMorks in Hands/ Progress) Date: 2018 Applicant'sLegal Name: Joint Venture Party Legal Name: Contract: Electro-MechanicalWorksof LowariTunnel Project, Pakistan on DesignBuild Basis Page_of _ contracts fldentify that demonstratecontinuous construction work pursuantto Section ttt, QuatificationCriteria and Requirements,Sub-Factor 4.3. List contracts chronologically, according to their commenbement (starting) dates.l

tr o o J c x k o 6re -i H ct o .u g) c, .?': gF kd +J {, q, rEi F lr iea Eb I E5 GI A tr o AE a E rie f E$ie qc E* q) bcr qlr o t H'f;* € PO ho {E{Eo o 9 IB E si*€?iE q, +, c) o lH Cr. E! I SH *t u.s +J *E &:.8 tE dl Hc dt o $FEi |. ?E F o o tE +, 6tfe +) :I \&, Fl TE (lt F- gFEIg c E 3 & fi?a o Fo; ii a *a €E H I

M=K/L

Note: Latestcompletion datebe mentioned Basedate will be the datefor submissionof pe Document.

PRE-QUALIFICATIONFOR ELECTR.O.MECHANICAL WORKS OF LOWARITI.]NNEL PROJECT. PAKISTAN 29 FormEQP - 5.1(A) EquipmentGapabilities List of Equipment(working) available with the Firm alongwith its GurrentMobilization

[The followingtable shallbe filledin for the Applicantand for each partnerof a Joint Venturel Date: 2018 Applicant'sLegal Name: Joint VentureParty Legal Name:

Contract: Electro-MechanicalWorks of LowariTunnel Project,Pakistan on DesignBuild Basis

Page fldentity equipment resourcespursuant to Section lll, QualificationCriteria and RequiremenfgSub-Factor 5.1(A). List of Equipment(working) availabtewith the Firmalong with its CurrentMobilization on on-goingProjectsl.

Descriptionof Equipment Ownership Gurrentlvmobilized (manufacturer,model, capacity status ProjectLocation GommittedTime etc.) (owned,leased, hired)

01 02

...'.

PRE-QUALIFICATIONFOR ELECTRO-MECHANICALWORKS OF LOWARI TTINNELPROJECT 30 FormEQP - 5.1(B) EquipmentGapabilities List of EquipmentProposed for theseWorks

[The followingtable shallbe filledin for the Applicantand for eachpartner of a Joint Venturel 2018 Applicant'sLegal Name: Joint VentureParty Legal Name:

Contract: Electro-MechanicalWorks of Tunnel Project,Pakistan on DesignBuild Basis

Page_of fldentity equipment resourcespursuant to Section lll, QualificationCriteria and Requiremenfs,Sub-Factor 5.1(B). Proposed arrangements to meet the requirement of equipmentsfor the executionof fheseworks are alsoto be listedl.

Descriptionof Equipment Ownership Gurrentlymobilized (manufacturer,model, capacity etc.) status Project Committed (owned,leased, Location Time hired)

PRE-QUALIFICATIONFOR ELECTRO-MECHANICAL WORKS OF LOWARITTUNNELPROJECT 3T Form CL-l

CREDIT LINE FACILITY (BankosUndertaking)

To,

GeneralManager (P&CA) National Highway Authority 28-Mauve, Area, G-9lI ISLAMABAD

This is to certifli that M/s (Name & address of the applicant) is maintaining their Account No. since with our Bank /Branch.

We also certify that our Bank (Bankname & address)has committed a credit line facility upto Pak. Rs._ to M/s(Name of the applicant) for the project (Project Name) from to on the basis of their financial strength, market reputation and securitieswith us.

1. Name l. Name 2. Designation 2. Designation

a J. Official Seal J. Official Seal of Authorized Signatory of Authorized Signatory

PRE-QUALIFICATIONFOR ELECTRO-MECHANICAL WORKS OF LOWARI TUNNEL PROJECT 32 FormlT.1

(on company's LetterheadPad)

It is certifiedthat our companyis on the Active tax payer List I our firm is

exemptedfrom lncometax asper Law.

Signature

Sealof the company

Note: (1) Pleaseattach NTN Certifi cate. (2) This Form is mandatoryto be included. (3) In caseof exemption from Governmentof Pakistan,please attach the exemption certificate

PRE-QUALIFICATIONFOR ELECTRO-MECHANICAL WORKS OF LOWARTTUNNEL PROJECT aa JJ PART.2 Works Requirements

PRE-QUALTFICATIONFOR ELECTRO-MECHANICALWORKS OF LOWARI TUNNEL PROJECT 34 SectionV. Scopeof Works

Contents

1.The Project ...... 3O 2. Descriptionof the Works .....41 3.Contract Period ...... 42

PRE-QUALIFICATION FOR ELECTRO-MECIIANICAL WORKS OF LOWARI TLINNEL PROJECT 35 1. The Project Date:--,2018

on Contract: Electro-MechanicalWorks of Lowari Tunnel Project, Pakistan DesignBuild Basis l.l Introduction

extendsfrom the The LowariTunnel Project is part of NationalHighway N-45 and km up to Drosh' outskirtsof Dir in the southvia LowariTunnel over in totalabout 47 page)'The main districtchitral, Province (overview map see next Top' partof the projectis therebythe 8.5 km LowariTunnel which underpasses Lowari at least mid- Duringwinter season the road over LowariTop is closedfrom usually cuttingoff the Decembertill mid-Aprildue to heavysnow fall and avalanches,thereby districtof Chitralfromthe restof Pakistan' the last century The historyof LowariTunnel Project extendsback to the mid-SOiesof of first600m whenattempts were made to startthe project.In the early70ies excavation get abandoneddue fromsouth portal of LowariTunnel got startedbut the projecthad to to lackof funds. Project'Break- ln late 2005 constructionworks commencedas LowariRail Tunnel throughofLowariTunneltookplaceon'l4thofJanuary'2009' in Dushanbefrom Duringbi- andtrilateral meetings with Taiikistan and ' held developmentof 28thto 30thof July,2009, approval in principalhas been given regarding throughAfghanistan road from to Tajikistani cAR (CentralAsian Republics) volumeon N45 (B2km+1l gkm). Road connection to CARwill leadto increaseof traffic trucksand trailers'For and throughLowari Tunnel including increased number of heavy morean adequatesystem' this new scenariothe prevtouslydesigned rail systemwas no neithercapacity-wise' nor cross-sectional-wise' Rail Tunnelto One-Way ThereuponMoC/Gop decided to approveModification from profileapproximately up to RoadTunnel with EmergencyLane by wideningthe existing 2.5to3m.Theroadsystemgotdesignedsoastocopewithincreasedtrafficvo|umeand driving lane and 2m expectedtraffic composition,thereby accommodating3'5m givenby the Ministryof emergencylane. Approval in principalfor Modificationhas been Communicationsin February, 2010' widenthe LowariTunnel ln late2012 the Ministerof Communicationsdecided to further lanegets extended to two so that the conceptof 3.5mdriving land and 2m emergency as one way road 3.5m lanes;this underthe conditionthat the tunnelgets operated tunnelwith emergency lane.

WORKS OF I-OWARI TUNNEL PROJECT PRE-QLJAI,IFICAI'IONFOR h,I,ECTRO-MECHANICAL 36 1,2 ProjectOverview

Projectis givenbelow: An overviewmap showing the locationof the LowariTunnel

-il ., l '-+.+.i;_: :{ ,rl

Locationof LTP presentlyof 1'5 km south The Projectas beingsubject to presentcontract consists RoadTunnel (MRT) and 4'5 AccessRoad (including South Platform), 8.5 km Modified RoadTunnel (NART) as well as km NorthAccess Road (including 1.9 km NorthAccess i.e' in totalabout14'0 km' roadconnection between NART and MRTvia NorthPlatform), Tunnelover Lowari pass is approx' The distancebetween south & northportal of Lowari 22km(11.5kmatsouthand,|0.5kmatnorth).Thisroadischaracterizedbysharphair maximumgradient of pin bends(especially on northside of LowariTop), an average many placesnot enoughto 12%(parliatty exceeding) and a road width which is at a guidelinevalue it takesabout 3 accommodatetwo lanesfor overtakingor crossing'As fromone side to the other' hoursfor loadedvehicles to maneuverover said22 km

PRE.QUALIFICA'IIONFoRL.;LECTRO.MECHANICALwoRKSoFLowARITUNNELPROJECT 37 1.3 Site Conditions

Project Layout:

LowariTop {trctt200lit}

ltort[ Plstform tsggilr Po.lal t€wl Eddge (226Sil1 (60 leter) \

[orthAccess * \ Road(6-9 firn)

llain BotdTtlDnel \ HighwayT{nnel ----r /- t t{clItt-Llnk (8500tt) \/no,t'L.o. {re00r|} Nofinoad \ uiJ'ftl".,r \ Road o?H; 12Kn.} NortiAceeds Acce$s Road Rosrl(9.3 Kn) (7.3 Km)

ilorth l-ink Acc€ss Road

r.4 GeneralTunnel Data

MRT:

Tunneltype: Singletube tunnel

Tunnellength: 8.51 km (mined section,portal lengths not included)

AverageGradient: <2o/o

No.of lanes: 1 lanefor traffic,1 emergencylane Nameof portals: NorthPortal, South Portal

Altitudeof northportal: approx.2.270 m a.S.L.

Altitudeof southportal: approx.2.405 m a.S.L. ServiceBuildings South Portal:

o VentilationBuilding . DG Buildingincluding diesel tank . TrafficControlCentre e Pump Room &WaterTank

PRE.QUALIFICATION FOR ELECTRO-MECHANICALWORKS OF LOWARI TUNNEL PROJECT 38 ServiceBuildings North Portal:

r VentilationBuilding

ElectricalSub-Stations (ESS):

. ESS01 in tunnel km2.212,00 . ESS02 intunnelkm 4.894,00 . ESS03 in tunnelkm 6.298,00 NARt

Tunneltype: Singletube tunnel

Tunnellength: 1.86 km (mined section,portal lengths included)

AverageGradient: 6 to7 o/o

No.of lanes: 2 lanefor traffic(only for uphiiltraffic) Nameof portals: Northportal, south portal

Altitudeof northportal: approx.2.105 m

Altitudeof southportal: approx.2.230 m ElectricalSub-Stations (ESS):

. ESS01 at southportal . ESS02 in tunnel km 1.314,00

EN-N at northportal

1.5 Meteorological Conditions

Availability of long-term meteorological data for the tunnel areais scarceand those records which exist relate to Dir and Drosh situated about 20 km away from the South and North portals, respectively. However, the altitudes of the meteorological stations at Dir (elevation approx. 1,375m) and Drosh (elevation approx. 1,465m) are considerably lower than those of the South Portal (elevation approx. 2,405m), the North Portal (elevation approx. 2,270m\ and the Lowari Pass(elevation approx. 3,200m).

Therefore, the weather extremes can be expectedto be more severe in the tunnel area than those recorded for Dir and Drosh.

During tunnel construction regular weatherrecords were taken which are summarizedhereunder:

1.5.1 Temperature

In summer averagetemperatures range between min. 10 to 15 "C and max. 30 to 35 oC. In oC winter avetagetemperatures range between min. -10 to 0 and max. 5 to 15 oC. Durins peak periods thesemin/max values may getexceed.

PRE-QUALIFICATIONFOR ELECTRO.MECHANICALWORKS OF LOWARI TTINNELPROJECT 39 1.5.2 Rain Heavy rainfall is expectedto take place during monsoonseason but may occur any time over theyear with occasionalflash floods and debris and mud flow.

Nalasand other stream-offsare especiallyendangered as a local heavyrain fall eventmay take placein somedistance upside the valley and subsequentlylead to suddenrise of the waterlevel in the proiectarea. The Ziarat area(between the two tunnels)as well asthe areaat southportal of MRT are especiallyto be mentionedin this regard,though the access-and otherroads may be affectedas well.

1.5.3 Snow In winterheavy snow fall may lastover days resulting in snowheights of morethan 2m at the poftalareas and occurrence ofavalanches.

PRE-QUALIFICATIONFOR ELECTRO-MECHANICALWORKS OF LOWARI TUNNEL PROJECT 40 2. Descriptionof the Works

Contract: Electro-MechanicalWorks of Lowari Tunnel Project, Pakistanon DesignBuild Basis

Scopeof Work shallbe elaboratedin the bid Documentwhich will be issuedto the QualifiedBidders. Tentative description of Workis as under:-

Works of "Electro-MechanicalWorks of Lowari Tunnel Project, Pakistan" on Design-BuildBasis include interalia the following:

TunnelVentilation Lighting TrafficManagement sYstem & Toll 1. 6. System Station Fire Detection& Fire Fighting 7. 2. Air QualityMeasurement SYstem System 3. ClosedCircuit TelePhone SYstem 8. SCADAand Tele ControlSYstem EmergencyCall, TelePhone and Power Generation,EmergencY 4. 9. RadioSystem Power& Earthing E&MPortal Buildings and PublicAddress System & Tunnel 10. 5. Fittings AssociatedCivilWorks

Contractorhas to do survey,investigation, detailed Design and reviewin the initial stageprior to constructionand installation.

PRE.QUALIFICAT'IONFOR ELECTRO-MECHANICALWORKS OF LOWARI TUNNEL PROJECT 4l 3. GontractPeriod

Contract: Electro-MechanicalWorks of LowariTunnel Project,Pakistan on DesignBuild Basis

Tentativeschedule (which may be changedduring bidding)is as under: * Timefor Completionof the Worksis 730 dayswhich can be broadlyseparated intothe following three general phases:

* The majorityof designshall get done withinfirst 6 months,limited design may continue.

.i. The Defects NotificationPeriod shall be 2 years, there from the first year overlappingwith maintenanceand warrantyas well as the first three months overlappingwith trial operation under regular traffic conditions.

PRE-QUALIFICA',fION FOR 8l.EC rRO-MECI-IANICALWORKS OF LOWARI TUNNEL PROJECT