<<

Protocol for North Arm Bay A.S. Treatment for Control of CLP =EWM Application Protocol Curly Leaf Pondweed = 4 ppb for 21 days

EWM = 2-4 ppb for 90 days

Approximately one to 2 weeks after Ice out, an Initial application of a targeted 4 ppb application of Sonar A.S. liquid fluridone application will take place. Application of Bay wide will be applied to areas delineated for CLPD in 2017.

North Arm Bay Volumes

Area between Contour and Volume Next Average (acre- Contour Area Contour Depth (feet) ft) 0 320 71 2.5 177.5 5 249 70 7.5 525 10 179 46 12.5 575 15 133 46 17.5 805 20 87 52 25 1300 30 35 28 35 980 40 7 7 65 455 90 0 0 Total 4818

At 7 and 14 days post treatment, a minimum of three samples will be collected and sent in to determine fluridone concentrations.

Bump Treatments

On day 21 a bump application will be applied to reach 4 ppb using the 14 day concentrations. This provides a (safety net) as concentrations will have decreased since day 14. Bay wide “bumps” will be applied to the 2016 EWM areas.

Total Volume 4818 acre-ft

Dose Sonar: Rate 2 ppb Amount 6.75 Gallons

Volume (0-10 ft) 2492.50 acre-ft

Dose Sonar: Rate 2 ppb Amount 3.39 Gallons

Volume (0-15 ft) 3387.5 acre-ft

Dose Sonar: Rate 2 ppb Amount 4.61 Gallons

Water samples will be collected on days 7, 14, and 21 following the bump application. Additional bump applications will follow so as a target concentration above 2.0 ppb will be maintained greater than 90 days following the initial treatment.

Thermocline determination On the days of treatment, a will be recorded and product will be allocated to the upper portion. The method used to determine the thermocline depth will be when differences of 2-3 degrees or more in one meter of water.

Responsibilities: Treatments, Water Sampling --- PLM & Land Management Corp, Sepro Corporation

Plant assessment (August Point Intercept Survey) --- Freshwater Scientific Services

Permitting--- Minnesota Department of Natural Resources