New cross-border rail connections EUSALP labelled project 4th EUSALP Mobility Conference Nice, May 20th 2021 Central Directorate for infrastructure and territory New cross-border rail connections

Where did we start from?

• Successful setting up of new cross-border rail passenger services within Interreg (2007-2013) and Interreg Italy (2014 – 2020): • MI.CO.TRA. project – rail services along the axis – Villach launched as pilot project on 09.06.2012, in cooperation with ÖBB and FUC; • CROSSMOBY project – rail services along the axis Udine-- launched on 09.09.2018, as pilot project, in cooperation with SŽ. Central Directorate for infrastructure and territory New cross-border rail connections

Why? • Venezia Giulia Region is located on the border between Austria () and Slovenia; • In 2004 took place the transferring of functions on regional and cross-border from the Italian State to FVG Region; • The offer of cross-border rail services is still very limited.

Central Directorate for infrastructure and territory New cross-border rail connections

Who?

Autonomous Region, as project promoter; • in co-operation with ÖBB-Personenverkehr AG • and with SŽ-Potniški promet d. o. o. The first two meetings among the mentioned partners were hosted in Trieste on September 26th 2019, at FVG Region premises, and in Ljubljana, at SŽ-Potniški promet premises, on October 10th 2019.

Central Directorate for infrastructure and territory New cross-border rail connections

Project idea: main goals Activating new rail passenger services between Trieste and Wien/Austria, via three alternative cross-border routes: 1. Trieste - Ljubljana - Maribor - - Wien along the historic route “Südbahn” -Graz-Trieste; 2. Trieste - Udine - Villach- - Wien: extension by 192 km until Trieste of part of the present connections Vienna-Villach-Vienna; 3. Trieste - Udine - Villach - . Extension to Udine and Trieste of the connections Salzburg – CentralVillach. Directorate for infrastructure and territory New cross-border rail connections Axis n. 1: Trieste – Ljubljana – Maribor – Graz - Wien

Villa

Central Directorate for infrastructure and territory New cross-border rail connections Trieste – Ljubljana – Maribor – Graz - Wien • extension by 149 km • Estimation of 112.000 until Trieste, of part of train-km by year (of the present Eurocity which 88.000 in Slovenia Wien – Graz – Ljubliana and 24.000 in Italy) (EC 150 – 151) • Journey time: 8 hours and 52 minutes • Daily service on both directions (dep. from Wien at 07:58 - dep. from Trieste Centrale at Central13:03) Directorate for infrastructure and territory New cross-border rail connections Axis n. 2: Trieste – Udine – Villach – Wien

Central Directorate for infrastructure and territory New cross-border rail connections

Trieste – Udine – Villach – Wien

• extension by 192 km • Estimation of 140.000 until Trieste of part of train-km by year (of the present connections which 21.000 in Austria Vienna-Villach-Vienna and 119.000 in Italy) • Journey time: 7 hours approx.

Central Directorate for infrastructure and territory New cross-border rail connections Axis n. 3: Trieste – Udine – Villach – Salzburg

Central Directorate for infrastructure and territory New cross-border rail connections

Trieste – Udine – Villach – Salzburg

• Extension to Udine and Trieste of new connections “InterRegio” Salzburg – Villach, cadenced every two hours • Journey time: 5 hours

Central Directorate for infrastructure and territory New cross-border rail connections

Timing (1)

• The first option is ready to be launched (first train on June 11th) • The contract to be signed between FVG Region and ÖBB Italia finalized in the past months, to be signed on May 21st • Due to the present COVID 19 Pandemic, the start of the services, originally expected on December 12th 2020, with the winter season timetable, was postponed to Spring 2021

Central Directorate for infrastructure and territory New cross-border rail connections

fahrplan.oebb.at

Central Directorate for infrastructure and territory New cross-border rail connections

Timing (2)

• For the axis Trieste - Villach - Wien, no estimation on starting date was done and no major obstacles have been found; • For the axis Trieste - Udine - Villach - Salzburg , the only constraint is related to the possible estimated start of the service not before 2026 (December 2025), when the new service contract for Austria will be into force, integrating the Mi.Co.Tra. train services.

Central Directorate for infrastructure and territory New cross-border rail connections

Funding

Expected co-finacing by the involved partners according to the length of the section in each crossed country, being services to be covered by public service obligations (PSO) according to Regulation (CE) No. 1370/2007.

Central Directorate for infrastructure and territory New cross-border rail connections

Thank you for your attention!

Massimiliano Angelotti Tel. +39 040 3377 4720 [email protected]. it

Central Directorate for infrastructure and territory