Commuter Rail System, While Each Subsequent Chapter Covers One Or More Types of Data on a Line-By-Line Basis

Total Page:16

File Type:pdf, Size:1020Kb

Commuter Rail System, While Each Subsequent Chapter Covers One Or More Types of Data on a Line-By-Line Basis MBTA Systemwide Passenger Survey A report produced by the Central Transportation Planning Staff for the Massachusetts Bay Transportation Authority MBTA Systemwide Passenger Survey All Lines2008–09 Commuter Rail MBTA Systemwide Passenger Survey MBTA Systemwide Passenger Survey COMMUTER RAIL 2008–09 All Lines Prepared for MBTA Planning and Development Joseph M. Cosgrove, Director Project Manager Thomas J. Humphrey Project Principal Elizabeth M. Moore Primary Authors Thomas J. Humphrey Steven P. Andrews Data Analysts Thomas J. Humphrey Steven P. Andrews Mariya A. Maslova Mary McShane Graphics Ken Dumas Cover Design Kim Noonan The preparation of this document was supported by the Federal Transit Administration through MBTA contract #X94PS25. Central Transportation Planning Staff Directed by the Boston Region Metropolitan Planning Organization. The MPO is composed of state and regional agencies and authorities, and local governments. June 2010 ABSTRACT This commuter rail report belongs to a multivolume set of reports on the findings of a systemwide survey of Massachusetts Bay Transportation Authority riders that was conducted for the MBTA by the Central Transportation Planning Staff (CTPS) in 2008–09. This survey covers all of the modes operated by the MBTA: bus (including trackless trolley), bus rapid transit, heavy rail (the Blue, Red, and Orange Lines), light rail (the Green Line and the Mattapan High-Speed Line), commuter rail, and boat. 1 The most recent comparable systemwide passenger survey was conducted during 1993– 2000. The purpose of the systemwide survey was to gather data that are not easily obtained through any other means. The data are used to update the regional travel-demand model that is routinely used by the Boston Region Metropolitan Planning Organization (MPO); they are also available for use by other entities, public and private, as well as interested individuals. This report comprises 12 chapters and 2 appendices. In the chapters, data tables and summary text present information about commuter rail travel, including why trips are made, where riders are coming from and going to, and how riders get to and from the service. Information is also provided on the demographics of commuter rail riders, as well as their automobile ownership, how they pay their fares, and how they perceive the quality of MBTA commuter rail service. The second chapter of this report provides an overview of the results for the entire commuter rail system, while each subsequent chapter covers one or more types of data on a line-by-line basis. The same types of data are tabulated on a station-by-station basis in two companion volumes, one for stations on the North Side lines of the system and one for stations on the South Side lines. 1 Reports on bus rapid transit (the Silver Line) are included in the set, although their data are from surveys conducted by CTPS in 2005 and 2006. CTPS iii CONTENTS List of Exhibits vii 1 INTRODUCTION 1-1 1.1 The Systemwide Survey 1-1 1.2 Commuter Rail Survey Method 1-1 1.3 Organization of Data in This Report 1-2 2 RESULTS FOR THE COMMUTER RAIL SYSTEM AS A WHOLE 2-1 2.1 Trip Purpose, Reasons for Using the MBTA, and Alternative Means 2-1 2.2 Origin Locations and Activities 2-2 2.3 Access to the Commuter Rail System 2-3 2.4 Egress from the Commuter Rail System 2-4 2.5 Destination Locations and Activities 2-4 2.6 Origin-Destination Cross-tabulation 2-5 2.7 Socioeconomic Characteristics 2-5 2.8 Usage Rates and Fare Types 2-5 2.9 Vehicle Availability 2-6 2.10 Service Quality 2-6 2.11 Comments and Suggestions 2-6 3 TRIP PURPOSE, REASONS FOR USING THE MBTA, AND ALTERNATIVE MEANS 3-1 3.1 Trip Purpose 3-1 3.2 Reasons for Using the MBTA 3-2 3.3 Alternative Means of Transportation 3-3 4 ORIGIN LOCATIONS AND ACTIVITIES 4-1 4.1 Origin Locations 4-1 4.2 Origin Activities 4-4 CTPS v MBTA SYSTEMWIDE PASSENGER SURVEY: COMMUTER RAIL SYSTEM 5 ACCESS TO THE COMMUTER RAIL SYSTEM 5-1 5.1 Access Mode 5-1 5.2 Wait Time at Board Station 5-3 5.3 Trip Time for Access via Private Transportation 5-4 5.4 Transfers to the Commuter Rail System from Transit 5-5 6 EGRESS FROM THE COMMUTER RAIL SYSTEM 6-1 6.1 Egress Modes and Transfers from the Commuter Rail System 6-1 6.2 Trip Time for Egress via Private Transportation 6-12 7 DESTINATION LOCATIONS AND ACTIVITIES 7-1 7.1 Description of Tables 7-1 7.2 Overview of Results 7-2 8 ORIGIN-DESTINATION CROSS-TABULATION 8-1 8.1 Description of Table 8-1 8.2 Overview of Results 8-2 9 SOCIOECONOMIC CHARACTERISTICS 9-1 9.1 Age of Riders 9-1 9.2 Gender of Riders 9-2 9.3 Annual Household Income 9-3 9.4 Ethnicity of Riders 9-4 10 USAGE RATES AND FARE TYPES 10-1 10.1 Number of Days Used per Week 10-1 10.2 Weekend Usage 10-2 10.3 Fare Types and Pass Usage 10-3 11 VEHICLE AVAILABILITY 11-1 11.1 Licensed Drivers 11-1 11.2 Usable Vehicles per Household 11-2 11.3 Riders with a Household Vehicle Available for the Trip 11-3 11.4 Vehicles Owned per Capita 11-3 12 SERVICE QUALITY 12-1 12.1 Description of Table 12-2 12.2 Overview of Results 12-2 APPENDIX A: SURVEY DISTRIBUTION, RESPONSE, PROCESSING, AND EXPANSION APPENDIX B: SURVEY FORM vi CTPS EXHIBITS Figure 4-1 Neighborhood Boundaries 4-6 Table 5-1 Designations Used for Private and Other Non-MBTA Bus Services 5-6 6-1 Designations Used for Private and Other Non-MBTA Bus Services 6-2 6-2 Percentage of the Survey Respondents Alighting at Downtown Stations Along Each Line 6-4 7-1 Percentage of Survey Exits by Station or Set of Stations 7-3 9-1 Gender Split Between Lines 9-3 A-1 2008-2009 Survey Distribution and Response by Mode A-4 KEYWORDS systemwide survey commuter rail system MBTA CTPS vii Introduction 1.1 THE SYSTEMWIDE SURVEY This report belongs to a multivolume set of reports on the findings of a systemwide survey of Massachusetts Bay Transportation Authority riders that was conducted for the MBTA by the Central Transportation Planning Staff (CTPS) in 2008–09. This survey covers all of the modes operated by the MBTA: bus (including trackless trolley), heavy rail (the Blue, Red, and Orange Lines), light rail (the Green Line and the Mattapan High-Speed Line), commuter rail, and boat. Reports on bus rapid transit (the Silver Line) are included in the set; their data are from surveys conducted by CTPS in 2005 and 2006. Separate survey instruments were developed for each mode, but the same categories of information were gathered through each. The purpose of the systemwide survey was to gather data that are not easily obtained through any other means. Some of the data will be used to update the regional travel-demand model that is routinely used by the Boston Region Metropolitan Planning Organization (MPO) to estimate the future impact of projects on the transportation network. In addition, as with past surveys, the data obtained through this survey will be available for use by the MBTA, CTPS, the Massachusetts Department of Transportation, other transportation agencies, academic researchers, consultants, and private citizens. The most recent comparable systemwide passenger survey was conducted during 1993–2000. Most of the commuter rail system was surveyed in 1993, except for the Old Colony Lines (Middleborough/Lakeville, Kingston/ Plymouth, and Greenbush), which were surveyed in 1998. The heavy rail and light rail networks were last surveyed in 1994, and the bus and trackless trolley lines in 1995. Commuter boat and ferry services were surveyed in 2000. The results of this systemwide survey have become outdated. 1.2 COMMUTER RAIL SURVEY METHOD This volume presents the survey results for riders on the commuter rail system. The commuter rail survey form, a copy of which may be found in Appendix B, contained 24 questions (33 questions, including subquestions). The questions were designed to gather data regarding the specific trip each rider was making CTPS 1-1 MBTA SYSTEMWIDE PASSENGER SURVEY: COMMUTER RAIL SYSTEM when he or she received the survey form (such as trip origin, destination, and purpose), as well as demographic data (such as rider age, gender, income, and ethnicity) and subjective views of the rider regarding service quality. In addition, at the end of the survey form, space was provided in which the rider could write comments and suggestions of his or her own choosing. A different version of the commuter rail survey was distributed to Greenbush Line riders. Most of the questions were the same, but additional questions were included to gain additional information about the how the restoration of service on the Greenbush Line affected transportation decisions of the line’s riders. Results from these questions are not presented in this volume, but they are available upon request. Survey forms were offered to all riders using commuter rail trains scheduled to arrive at or depart from the Boston terminals between approximately 6:30 AM and 3:00 PM on a typical weekday in 2008 or 2009. Depending on service frequency, train length, the number of stations per route, and the anticipated ridership volume, surveys were distributed on-board trains on some routes and to passengers entering station platforms on other routes These distribution strategies were designed to provide approximately 85% of the weekday commuter rail riders with an opportunity to receive a survey form during what would be considered typical travel conditions.2 Completed survey forms could be returned to the survey distributors or Customer Service Agents in rapid transit stations, or could be mailed in postage-free.
Recommended publications
  • Union Station Conceptual Engineering Study
    Portland Union Station Multimodal Conceptual Engineering Study Submitted to Portland Bureau of Transportation by IBI Group with LTK Engineering June 2009 This study is partially funded by the US Department of Transportation, Federal Transit Administration. IBI GROUP PORtlAND UNION STATION MultIMODAL CONceptuAL ENGINeeRING StuDY IBI Group is a multi-disciplinary consulting organization offering services in four areas of practice: Urban Land, Facilities, Transportation and Systems. We provide services from offices located strategically across the United States, Canada, Europe, the Middle East and Asia. JUNE 2009 www.ibigroup.com ii Table of Contents Executive Summary .................................................................................... ES-1 Chapter 1: Introduction .....................................................................................1 Introduction 1 Study Purpose 2 Previous Planning Efforts 2 Study Participants 2 Study Methodology 4 Chapter 2: Existing Conditions .........................................................................6 History and Character 6 Uses and Layout 7 Physical Conditions 9 Neighborhood 10 Transportation Conditions 14 Street Classification 24 Chapter 3: Future Transportation Conditions .................................................25 Introduction 25 Intercity Rail Requirements 26 Freight Railroad Requirements 28 Future Track Utilization at Portland Union Station 29 Terminal Capacity Requirements 31 Penetration of Local Transit into Union Station 37 Transit on Union Station Tracks
    [Show full text]
  • Transportation Impact Study
    The Harvest Club 255 Elm Street Somerville, Massachusetts Transportation Impact Study Prepared For: The Harvest Club Prepared by: Design Consultants, Inc. January 2021 255 ELM STREET TABLE OF CONTENTS 1. EXECUTIVE SUMMARY ......................................................................................................... 5 1.1 Introduction ................................................................................................................. 5 1.2 Study Area .................................................................................................................. 5 1.3 Safety Analysis ............................................................................................................ 5 1.4 Trip Generation ........................................................................................................... 5 1.5 Intersection Capacity Analysis .................................................................................... 6 1.6 Conclusion .................................................................................................................. 6 2. EXISTING CONDITIONS INVENTORY ................................................................................. 11 2.1 Study Area ................................................................................................................ 11 2.1.1 Study Roadways ................................................................................................. 11 2.1.2 Study Intersections .............................................................................................
    [Show full text]
  • CHAPTER 2 Progress Since the Last PMT
    CHAPTER 2 Progress Since the Last PMT The 2003 PMT outlined the actions needed to bring the MBTA transit system into a state of good repair (SGR). It evaluated and prioritized a number of specific enhancement and expansion projects proposed to improve the system and better serve the regional mobility needs of Commonwealth residents. In the inter- vening years, the MBTA has funded and implemented many of the 2003 PMT priorities. The transit improvements highlighted in this chapter have been accomplished in spite of the unsus- tainable condition of the Authority’s present financial structure. A 2009 report issued by the MBTA Advisory Board1 effectively summarized the Authority’s financial dilemma: For the past several years the MBTA has only balanced its budgets by restructuring debt liquidat- ing cash reserves, selling land, and other one-time actions. Today, with credit markets frozen, cash reserves depleted and the real estate market at a stand still, the MBTA has used up these options. This recession has laid bare the fact that the MBTA is mired in a structural, on-going deficit that threatens its viability. In 2000 the MBTA was re-born with the passage of the Forward Funding legislation.This legislation dedicated 20% of all sales taxes collected state-wide to the MBTA. It also transferred over $3.3 billion in Commonwealth debt from the State’s books to the T’s books. In essence, the MBTA was born broke. Throughout the 1990’s the Massachusetts sales tax grew at an average of 6.5% per year. This decade the sales tax has barely averaged 1% annual growth.
    [Show full text]
  • Actions to Transform Mobility
    Actions to Transform Mobility TRANSPORT KENDALL Navigating the Growth and Transformation of Kendall Square Introduction The Kendall Square has undergone a dramatic transformation over the past 40 years. The scientists, engineers and entrepreneurs in Kendall Square together have created one of the most dynamic innovation districts in the world. Kendall’s innovation ecosystem is dependent on the talent and resources of institutions and companies located in close proximity. Close connections to Boston’s medical centers, investment resources, and education institutions have likewise been invaluable. Kendall Square has become central to Massachusetts’s economy attracting talent from every corner of the state, however Kendall is not as geographically central within the regional transit system as downtown Boston. Despite this, Kendall has grown from one red line station into a model transit-oriented development district with a truly multi-modal commute pattern, supported by the City of Cambridge’s progressive parking and transportation demand policies. Kendall has spurred the emergence of new districts focused on life science and technology innovation throughout the region. The state’s economic growth is dependent on reliable transportation connections between where people live and work. Transport Kendall seeks to maintain and enhance the transit-oriented development model in Cambridge. To do this, Transport Kendall promotes future investment in the transit system to serve this economic hub, while relieving congestion and supporting regional
    [Show full text]
  • Amtrak Timetables-Virginia Service
    Effective July 13, 2019 VIRGINIA SERVICE - Southbound serving BOSTON - NEW YORK - WASHINGTON DC - CHARLOTTESVILLE - ROANOKE - RICHMOND - NEWPORT NEWS - NORFOLK and intermediate stations Amtrak.com 1-800-USA-RAIL Northeast Northeast Northeast Silver Northeast Northeast Service/Train Name4 Palmetto Palmetto Cardinal Carolinian Carolinian Regional Regional Regional Star Regional Regional Train Number4 65 67 89 89 51 79 79 95 91 195 125 Normal Days of Operation4 FrSa Su-Th SaSu Mo-Fr SuWeFr SaSu Mo-Fr Mo-Fr Daily SaSu Mo-Fr Will Also Operate4 9/1 9/2 9/2 9/2 Will Not Operate4 9/1 9/2 9/2 9/2 9/2 R B y R B y R B y R B y R B s R B y R B y R B R s y R B R B On Board Service4 Q l å O Q l å O l å O l å O r l å O l å O l å O y Q å l å O y Q å y Q å Symbol 6 R95 BOSTON, MA ∑w- Dp l9 30P l9 30P 6 10A 6 30A 86 10A –South Station Boston, MA–Back Bay Station ∑v- R9 36P R9 36P R6 15A R6 35A 8R6 15A Route 128, MA ∑w- lR9 50P lR9 50P R6 25A R6 46A 8R6 25A Providence, RI ∑w- l10 22P l10 22P 6 50A 7 11A 86 50A Kingston, RI (b(™, i(¶) ∑w- 10 48P 10 48P 7 11A 7 32A 87 11A Westerly, RI >w- 11 05P 11 05P 7 25A 7 47A 87 25A Mystic, CT > 11 17P 11 17P New London, CT (Casino b) ∑v- 11 31P 11 31P 7 45A 8 08A 87 45A Old Saybrook, CT ∑w- 11 53P 11 53P 8 04A 8 27A 88 04A Springfield, MA ∑v- 7 05A 7 25A 7 05A Windsor Locks, CT > 7 24A 7 44A 7 24A Windsor, CT > 7 29A 7 49A 7 29A Train 495 Train 495 Hartford, CT ∑v- 7 39A Train 405 7 59A 7 39A Berlin, CT >v D7 49A 8 10A D7 49A Meriden, CT >v D7 58A 8 19A D7 58A Wallingford, CT > D8 06A 8 27A D8 06A State Street, CT > q 8 19A 8 40A 8 19A New Haven, CT ∑v- Ar q q 8 27A 8 47A 8 27A NEW HAVEN, CT ∑v- Ar 12 30A 12 30A 4 8 41A 4 9 03A 4 88 41A Dp l12 50A l12 50A 8 43A 9 05A 88 43A Bridgeport, CT >w- 9 29A Stamford, CT ∑w- 1 36A 1 36A 9 30A 9 59A 89 30A New Rochelle, NY >w- q 10 21A NEW YORK, NY ∑w- Ar 2 30A 2 30A 10 22A 10 51A 810 22A –Penn Station Dp l3 00A l3 25A l6 02A l5 51A l6 45A l7 17A l7 25A 10 35A l11 02A 11 05A 11 35A Newark, NJ ∑w- 3 20A 3 45A lR6 19A lR6 08A lR7 05A lR7 39A lR7 44A 10 53A lR11 22A 11 23A 11 52A Newark Liberty Intl.
    [Show full text]
  • Massachusetts Bay Transportation Authority
    y NOTE WONOERLAND 7 THERE HOLDERS Of PREPAID PASSES. ON DECEMBER , 1977 WERE 22,404 2903 THIS AMOUNTS TO AN ESTIMATED (44 ,608 ) PASSENGERS PER DAY, NOT INCLUDED IN TOTALS BELOW REVERE BEACH I OAK 8R0VC 1266 1316 MALOEN CENTER BEACHMONT 2549 1569 SUFFOLK DOWNS 1142 ORIENT< NTS 3450 WELLINGTON 5122 WOOO ISLANC PARK 1071 AIRPORT SULLIVAN SQUARE 1397 6668 I MAVERICK LCOMMUNITY college 5062 LECHMERE| 2049 5645 L.NORTH STATION 22,205 6690 HARVARD HAYMARKET 6925 BOWDOIN , AQUARIUM 5288 1896 I 123 KENDALL GOV CTR 1 8882 CENTRAL™ CHARLES^ STATE 12503 9170 4828 park 2 2 766 i WASHINGTON 24629 BOYLSTON SOUTH STATION UNDER 4 559 (ESSEX 8869 ARLINGTON 5034 10339 "COPLEY BOSTON COLLEGE KENMORE 12102 6102 12933 WATER TOWN BEACON ST. 9225' BROADWAY HIGHLAND AUDITORIUM [PRUDENTIAL BRANCH I5I3C 1868 (DOVER 4169 6063 2976 SYMPHONY NORTHEASTERN 1211 HUNTINGTON AVE. 13000 'NORTHAMPTON 3830 duole . 'STREET (ANDREW 6267 3809 MASSACHUSETTS BAY TRANSPORTATION AUTHORITY ricumt inoicati COLUMBIA APFKOIIUATC 4986 ONE WAY TRAFFIC 40KITT10 AT RAPID TRANSIT LINES STATIONS (EGLESTON SAVIN HILL 15 98 AMD AT 3610 SUBWAY ENTRANCES DECEMBER 7,1977 [GREEN 1657 FIELDS CORNER 4032 SHAWMUT 1448 FOREST HILLS ASHMONT NORTH OUINCY I I I 99 8948 3930 WOLLASTON 2761 7935 QUINCY CENTER M b 6433 It ANNUAL REPORT Digitized by the Internet Archive in 2014 https://archive.org/details/annualreportmass1978mass BOARD OF DIRECTORS 1978 ROBERT R. KILEY Chairman and Chief Executive Officer RICHARD D. BUCK GUIDO R. PERERA, JR. "V CLAIRE R. BARRETT THEODORE C. LANDSMARK NEW MEMBERS OF THE BOARD — 1979 ROBERT L. FOSTER PAUL E. MEANS Chairman and Chief Executive Officer March 20, 1979 - January 29.
    [Show full text]
  • MBTA > Riding the T > Events
    The MBTA has announced its service schedules for Christmas Eve (Thursday, December 24, 2015) and Christmas Day (Friday, December 25, 2015) as well as its service schedules for New Year's Eve (Thursday, December 31, 2015) and New Year's Day (Friday, January 1, 2016). Late-Night Service will not be available on Christmas Day or New Year's Day. Parking at the Wellington surface lot and the Alewife, Braintree, Quincy Adams, and Wonderland garages will be pay on entry and cash only on New Year's Eve, December 31, 2015. Credit cards and garage TAP cards will not be accepted. Subway Christmas Eve - Thursday, 12/24/15 • The Red Line will operate a regular weekday schedule. • The Orange Line will operate a regular weekday schedule. • The Blue Line will operate a regular weekday schedule. • The Green Line B-, C-, D-, and E-Branches will operate a regular weekday schedule. • The Silver Line will operate a regular weekday schedule. • The Mattapan Trolley will operate a regular weekday schedule. Christmas Day - Friday, 12/25/15 • The Red Line will operate a Sunday schedule. • The Orange Line will operate a Sunday schedule. • The Blue Line will operate a Sunday schedule. • The Green Line B-, C-, D-, and E-Branches will operate a Sunday schedule. • The Silver Line will operate a Sunday schedule. • The Mattapan Trolley will operate a Sunday schedule. Customers should also note that the CharlieCard Store located adjacent to the Red and Orange Lines at Downtown Crossing Station is closed on Christmas Day. New Year's Eve - Thursday, 12/31/15 • The Red Line will operate a modified weekday schedule with additional trains operating at rush-hour levels of service throughout the evening from 3 p.m.
    [Show full text]
  • Directions to Boston - Local Parking
    Directions to Boston - Local Parking GENERAL INFORMATION Logan Express (Recommended) The Back Bay Logan Express runs from all airport terminals directly to St. James Street in Copley Square in Back Bay diagonally across the street from the hotel. Departures occur at :00, :20, and :40 from 5am to 9pm daily. Fares are $7.50 per passenger – payment is by Visa, MasterCard, American Express and Diners Club (NO CASH). All buses are wheelchair accessible. Subway The closest subway stations are Copley Station (on the Green Line) and Back Bay Station (on the Orange Line). Both stations are within 1 block of the hotel. The MBTA runs daily from 6:00 AM to 1:00 AM. The schedule varies based on line, day of week, and reliability of the service. The cost is $2.75 per ride. Cab Transportation Green transportation is available through Lifestyle Transportation International (LTI) and Boston Cabs. Both transportation companies offer hybrid and Flex-Fuel vehicles in their fleet. Taxi fares from the airport to the hotel range from $40-50. PUBLIC TRANSPORTATION From Airport via Subway From airport terminal take a MassPort shuttle bus to the Airport subway station. Take the inbound Blue Line train to Government Center. Then, transfer to any outbound Green Line train to go to Copley station. Make a right onto Dartmouth Street - the hotel is 300 feet down the block on the same side of the street. The fare is $2.75. OR From airport terminal take any Silver Line bus to South Station. Change to an “Alewife” bound Red Line to Park Street.
    [Show full text]
  • Board of Directors J U L Y 2 4 , 2 0
    BOARD OF DIRECTORS JULY 24, 2015 SOUTHERN CALIFORNIA REGIONAL RAIL AUTHORITY BOARD ROSTER SOUTHERN CALIFORNIA REGIONAL RAIL AUTHORITY County Member Alternate Orange: Shawn Nelson (Chair) Jeffrey Lalloway* Supervisor, 4th District Mayor Pro Tem, City of Irvine 2 votes County of Orange, Chairman OCTA Board, Chair OCTA Board Gregory T. Winterbottom Todd Spitzer* Public Member Supervisor, 3rd District OCTA Board County of Orange OCTA Board Riverside: Daryl Busch (Vice-Chair) Andrew Kotyuk* Mayor Council Member 2 votes City of Perris City of San Jacinto RCTC Board, Chair RCTC Board Karen Spiegel Debbie Franklin* Council Member Mayor City of Corona City of Banning RCTC Board RCTC Board Ventura: Keith Millhouse (2nd Vice-Chair) Brian Humphrey Mayor Pro Tem Citizen Representative 1 vote City of Moorpark VCTC Board VCTC Board Los Angeles: Michael Antonovich Roxana Martinez Supervisor, 5th District Councilmember 4 votes County of Los Angeles, Mayor City of Palmdale Metro Board Metro Appointee Hilda Solis Joseph J. Gonzales Supervisor, 1st District Councilmember County of Los Angeles City of South El Monte Metro Board Metro Appointee Paul Krekorian Borja Leon Councilmember, 2nd District Metro Appointee Metro Board Ara Najarian [currently awaiting appointment] Council Member City of Glendale Metro Board One Gateway Plaza, 12th Floor, Los Angeles, CA 90012 SCRRA Board of Directors Roster Page 2 San Bernardino: Larry McCallon James Ramos* Mayor Supervisor, 3rd District 2 votes City of Highland County of San Bernardino, Chair SANBAG Board SANBAG Board
    [Show full text]
  • MIT Kendall Square
    Ridership and Service Statistics Thirteenth Edition 2010 Massachusetts Bay Transportation Authority MBTA Service and Infrastructure Profile July 2010 MBTA Service District Cities and Towns 175 Size in Square Miles 3,244 Population (2000 Census) 4,663,565 Typical Weekday Ridership (FY 2010) By Line Unlinked Red Line 241,603 Orange Line 184,961 Blue Line 57,273 Total Heavy Rail 483,837 Total Green Line (Light Rail & Trolley) 236,096 Bus (includes Silver Line) 361,676 Silver Line SL1 & SL2* 14,940 Silver Line SL4 & SL5** 15,086 Trackless Trolley 12,364 Total Bus and Trackless Trolley 374,040 TOTAL MBTA-Provided Urban Service 1,093,973 System Unlinked MBTA - Provided Urban Service 1,093,973 Commuter Rail Boardings (Inbound + Outbound) 132,720 Contracted Bus 2,603 Water Transportation 4,372 THE RIDE Paratransit Trips Delivered 6,773 TOTAL ALL MODES UNLINKED 1,240,441 Notes: Unlinked trips are the number of passengers who board public transportation vehicles. Passengers are counted each time they board vehicles no matter how many vehicles they use to travel from their origin to their destination. * Average weekday ridership taken from 2009 CTPS surveys for Silver Line SL1 & SL2. ** SL4 service began in October 2009. Ridership represents a partial year of operation. File: CH 01 p02-7 - MBTA Service and Infrastructure Profile Jul10 1 Annual Ridership (FY 2010) Unlinked Trips by Mode Heavy Rail - Red Line 74,445,042 Total Heavy Rail - Orange Line 54,596,634 Heavy Rail Heavy Rail - Blue Line 17,876,009 146,917,685 Light Rail (includes Mattapan-Ashmont Trolley) 75,916,005 Bus (includes Silver Line) 108,088,300 Total Rubber Tire Trackless Trolley 3,438,160 111,526,460 TOTAL Subway & Bus/Trackless Trolley 334,360,150 Commuter Rail 36,930,089 THE RIDE Paratransit 2,095,932 Ferry (ex.
    [Show full text]
  • A National Colloquium May 3 -4, 2012, Boston, MA
    Arresting Demand: A National Colloquium May 3 -4, 2012, Boston, MA Frequently Asked Questions 1. What is the location of the colloquium? We are hosting the colloquium at the Westin Copley Place, located at 10 Huntington, Avenue Boston, MA 02116. Please visit their website at www.westin.com/Boston. 2. I have already registered but cannot attend. Can I cancel or transfer my registration? Yes, you may transfer your registration to a colleague in order to take your place at the conference. However, you will be responsible for any fees related to changes made to your travel arrangements. 3. Can I invite a guest to the conference? If you would like to invite a guest or suggest a colleague that should be added to our list please contact Alyssa Ozimek-Maier. 4. When is the registration deadline? Friday, April 6, is the registration deadline for the colloquium. If there is a circumstance that will prevent you from completing your registration by that time please contact Alyssa Ozimek-Maier. 5. What meals will be provided during the conference? All meals (breakfast, lunch, and dinner) will be provided during the two day colloquium. Please be sure to notify us of any dietary preferences, via registration and we will work diligently to make sure that each request is respected. 6. I have questions about my travel arrangements. Who should I contact? Any questions regarding your personal travel arrangements should be directed to Travel Collaborative at [email protected]. 7. Will parking be available? Parking at the hotel will be available through valet service only courtesy of Hunt Alternatives Fund.
    [Show full text]
  • Boston to Providence Commuter Rail Schedule
    Boston To Providence Commuter Rail Schedule Giacomo beseechings downward. Dimitrou shrieved her convert dolce, she detach it prenatally. Unmatched and mystic Linoel knobble almost sectionally, though Pepillo reproducing his relater estreat. Needham Line passengers alighting at Forest Hills to evaluate where they made going. Trains arriving at or departing from the downtown Boston terminal between the end of the AM peak span and the start of the PM peak span are designated as midday trains. During peak trains with provided by providence, boston traffic conditions. Produced by WBUR and NPR. Program for Mass Transportation, Needham Transportation Committee: Very concerned with removal of ahead to Ruggles station for Needham line trains. Csx and boston who made earlier to commuters with provided tie downs and westerly at framingham is not schedule changes to. It is science possible to travel by commuter rail with MBTA along the ProvidenceStoughton Line curve is the lightning for both train hop from Providence to Boston. Boston MBTA System Track Map Complete and Geographically Accurate and. Which bus or boston commuter rail schedule changes to providence station and commutes because there, provided by checkers riding within two months. Read your favorite comics from Comics Kingdom. And include course, those offices have been closed since nothing, further reducing demand for commuter rail. No lines feed into both the North and South Stations. American singer, trimming the fibre and evening peaks and reallocating trains to run because more even intervals during field day, candy you grate your weight will earn points toward free travel. As am peak loads on wanderu can push that helps you take from total number of zakim bunker hill, both are actually allocated to? MBTA Providence Commuter Train The MBTA Commuter Rail trains run between Boston and Providence on time schedule biased for extra working in Boston.
    [Show full text]