Summer 2021 Summer Three Priorities Lead the Way: Equity, Modern Transportation System and and System Transportation Modern Equity, Way: the Lead Priorities Three
Total Page:16
File Type:pdf, Size:1020Kb
/2021 5 REV 734-2812 No. Form Cover photo: Astoria-Megler brdige inspection. Photo by Greg Westergaard. Greg Westergaard. photo: Astoria-Megler inspection.Photo brdige by Cover Questions: 1-877-336-6368 (EEO-ODOT) or statewide relay, 711. relay, statewide or (EEO-ODOT) 1-877-336-6368 Questions: to our programs, services, activities, hiring, and employment practices. practices. employment and hiring, activities, services, programs, our to does not discriminate on the basis of disability in admission or access access or admission in disability of basis the on discriminate not does T T ODO request. upon available formats Alternative disabilities. with to a diverse workforce. Accommodations will be provided to persons persons to provided be will Accommodations workforce. diverse a to ODOT is an equal opportunity, affirmative action employer committed committed employer action affirmative opportunity, equal an is ODOT and let us know what you think: [email protected]. think: you what know us let and See the plan on our website, www.oregon.gov/odot/Pages/SAP.aspx www.oregon.gov/odot/Pages/SAP.aspx website, our on plan the See we’ve identified in the Strategic Action Plan. Plan. Action Strategic the in identified we’ve with the communities we serve, and timely completion of the outcomes outcomes the of completion timely and serve, we communities the with securing adequate federal, state and local funding, effective partnering partnering effective funding, local and state federal, adequate securing environment. The transformation we desire can only be achieved by by achieved be only can desire we transformation The environment. city or county roads. roads. county or city to itself and those it serves, and responsive to a constantly changing changing constantly a to responsive and serves, it those and itself to encounter short-duration maintenance projects or work being done on on done being work or projects maintenance short-duration encounter responsive to the needs of communities across the state, accountable accountable state, the across communities of needs the to responsive This map lists only major projects on state highways. You may also also may You highways. state on projects major only lists map This must evolve. We seek to build an organization focused on the future, future, the on focused organization an build to seek We evolve. must www.TravelOregon.com. In order to create this system and meet the demands ahead, ODOT ODOT ahead, demands the meet and system this create to order In to stay or things to do in Oregon, visit visit Oregon, in do to things or stay to number, then sorted by milepost. Information is subject to change. to subject is Information milepost. by sorted then number, places see, to places about information For the inside of this brochure. Projects are listed by highway type and route route and type highway by listed are Projects brochure. this of inside the including those that the system has not served well in the past. the in well served not has system the that those including Details for specific projects listed on this map are included on on included are map this on listed projects specific for Details diverse mobility needs of those who use the transportation system, system, transportation the use who those of needs mobility diverse choices to promote a healthy environment and to respond to the the to respond to and environment healthy a promote to choices Find us at www.facebook.com/OregonDOT. at us Find require lane closures or traffic detours. traffic or closures lane require and technological advancement. It will offer a wide range of mobility mobility of range wide a offer will It advancement. technological and Our Twitter feed is @OregonDOT. is feed Twitter Our with little in the way of traffic delays. Some bridge work may may work bridge Some delays. traffic of way the in little with Oregon’s transportation system of the future will leverage innovation innovation leverage will future the of system transportation Oregon’s Bridge work Bridge — Bridges may be built alongside existing bridges bridges existing alongside built be may Bridges — www.oregon.gov/ODOT. statewide economy. statewide roadway to work into the pavement. the into work to roadway visit Transportation, a system that seamlessly supports daily life and a strong, diverse diverse strong, a and life daily supports seamlessly that system a Chip seal Chip — A method of resurfacing that places gravel over the the over gravel places that resurfacing of method A — For information about the Oregon Department of of Department Oregon the about information For guiding our work now and into the future so that we can maintain maintain can we that so future the into and now work our guiding lower speed limit. limit. speed lower manner. To that end, we’ve created a Strategic Action Plan that is is that Plan Action Strategic a created we’ve end, that To manner. (888) ASK-ODOT (275-6368). ASK-ODOT (888) road or structure. You will likely encounter lane closures and a a and closures lane encounter likely will You structure. or road Oregonians in an efficient, environmentally responsible and safe safe and responsible environmentally efficient, an in Oregonians For questions or comments about ODOT call ODOT about comments or questions For Resurfacing/Paving/Overlay — Adding pavement over existing existing over pavement Adding — of a transportation system that is modern, reliable and serves all all serves and reliable modern, is that system transportation a of T of Transportation are committed to accelerating the development development the accelerating to committed are Transportation of (503) 588-2941 (out-of-state callers) (out-of-state 588-2941 (503) the project. the he Oregon Transportation Commission and the Oregon Department Department Oregon the and Commission Transportation Oregon he 511 (in-state callers only) callers (in-state 511 depends on overall traffic volume, time of day, and the size and type of of type and size the and day, of time volume, traffic overall on depends T Visit www.TripCheck.com Visit you encounter a road project. The amount of delay and congestion congestion and delay of amount The project. road a encounter you Sufficient, Reliable Funding Reliable Sufficient, Travel Information Travel he following descriptions will give you an idea of what to expect when when expect to what of idea an you give will descriptions following he Summer 2021 Summer Three priorities lead the way: Equity, Modern Transportation System and and System Transportation Modern Equity, way: the lead priorities Three Highway Projects Key Our Strategic Action Plan Action Strategic Key Our Projects Highway go... you before Know Oregon Improvement Projects Projects Improvement Improvement Oregon Oregon Portland Area Improvement Projects Tips for Driving Safely Eastside neighborhoods. Expect I-84 to nighttime lane and ramp closures Region-wide projects 14. Accessible Ramps Improvement in Work Zones be fully closed in both directions for and full closures of U.S. 26, daytime 12. Pedestrian and Bicycle Improve- Project — Install sidewalk curb ramps Region-wide Projects one full weekend in 2021. Completion: local road lane and sidewalk closures. that meet accessibility standards in various locations ments — Portland, Milwaukie and 2021. www.portland.gov/transportation/ Completion: Fall 2021. Cornelius — Install Rectangular Rapid approximately 400 locations, making Pay complete attention to your driving, especially in the pbot-projects/construction/ www.oregon.gov/odot/projects/pages/ travel easier for those who use these Flashing Beacons at five intersections in transition zone before the work area. Inattentive driving is the congressman-earl-blumenauer-bicycle- project-details.aspx?project=20300 the Portland region to improve safety by sidewalks. The work will occur on OR and-pedestrian-bridge 8 in Cornelius and Hillsboro, U.S. 26 in 8. U.S. 30 Bypass (Lombard Street) — alerting drivers to people crossing the most common cause of work zone crashes. (Columbia River road. Expect daytime and nighttime Sandy, OR 211 in Molalla and OR 224 4. Interstate 84 Improve safety and travel-time in Estacada. Expect short-term lane Highway) — TriMet Red Line Expansion predictability for travelers on U.S. 30 lane closures and sidewalk closures. Orange is your clue! Pay attention when you see orange Completion: Spring 2022. and sidewalk closures with pedestrian to construct a second track and new Bypass/North Lombard Street between detours. Completion: Fall 2021. signs, barrels, cones and barricades. station for inbound MAX Red Line riders North Fiske Avenue and North Boston www.oregon.gov/odot/projects/pages/ project-details.aspx?project=20479 www.oregon.gov/odot/Regions/Pages/ entering Gateway Transit Center as Avenue with lane configuration changes, R1ADACurbRamps.aspx Obey all speed signs, because speed may part of its A Better Red project. Expect accessible curb ramps, traffic signal 13. Rumble Strips Safety Project — Install shoulder closures and nighttime lane improvements, and crossing beacons, approximately 400 miles of rumble 15. Bridge Screening and Rail Retrofit — be reduced for your safety and the closures on I-84, shoulder closures MP 3.3-4.8. Expect temporary vehicle strips across 17 highways in the Portland Install new screening on 12 bridges over safety of workers. on I-205 north, and lane closures and lane shifts and pedestrian detours. metro area. Expect nighttime and state highways in the Portland metro full closures of I-84 eastbound Exit 7. Completion: Fall 2022. daytime short-term lane and shoulder area and new railings on four of them to Double your following distance. Don’t Completion: 2023. www.oregon.gov/odot/projects/pages/ closures throughout the project work improve safety and reduce risk of objects https://trimet.org/betterred/ project-details.aspx?project=20413 area. Completion: Fall 2021. falling from the bridges. Traffic impacts tailgate. vary by site, with nighttime lane Interstate 205 www.oregon.gov/odot/projects/pages/ Oregon Highways project-details.aspx?project=20341 closures on highways, nighttime and Get in the correct lane well in advance.