project-details.aspx?project=20508

wear a cloth face covering in public. in covering face cloth a wear

www.oregon.gov/odot/projects/pages/

curb ramps, MP 13.2 eastbound and 13.3 13.3 and eastbound 13.2 MP ramps, curb

of physical distance; cover coughs and sneezes; sneezes; and coughs cover distance; physical of

2020. Fall Completion:

lighting, and upgrade wheelchair accessible accessible wheelchair upgrade and lighting,

avoid close contact with others — keep six feet feet six keep — others with contact close avoid

closures on I-205. No daytime lane closures. lane daytime No I-205. on closures

and advanced warning signs, improve improve signs, warning advanced and

avoid touching your eyes, nose and mouth; mouth; and nose eyes, your touching avoid

Completion: Fall 2020. Fall Completion:

Nighttime lane and ramp ramp and lane Nighttime MP 9.3–13.5. 9.3–13.5. MP

Hillsboro, install a new flashing beacon beacon flashing new a install Hillsboro,

often with soap and water or hand sanitizer; sanitizer; hand or water and soap with often

Short-term lane and shoulder closures. closures. shoulder and lane Short-term

82nd Avenue near the OR 224 interchange, interchange, 224 OR the near Avenue 82nd

between SE 44th and SE 45th avenues in in avenues 45th SE and 44th SE between

Protect yourself and others: clean your hands hands your clean others: and yourself Protect

several locations on SW Capitol Highway. Highway. Capitol SW on locations several

the Abernethy Bridge in West Linn and SE SE and Linn West in Bridge Abernethy the pedestrian safety along OR 8/TV Highway Highway 8/TV OR along safety pedestrian

Drive and new green painted bike lanes at at lanes bike painted green new and Drive

installing rumble strips on I-205 between between I-205 on strips rumble installing

OR 8 OR — Improve Improve — 10. (Tualatin Valley Highway) Valley (Tualatin

higher risk of severe illness. severe of risk higher

new rumble strips along six miles of Marine Marine of miles six along strips rumble new

to SE 82nd Avenue, improve safety by by safety improve Avenue, 82nd SE to

safely and efficiently! and safely

www.OR8construction.org

Practice social distancing, especially if you are at at are you if especially distancing, social Practice

of Portland project will improve safety with with safety improve will project Portland of

— Pave the Abernethy Bridge Bridge Abernethy the Pave —

Freeway)

through the work zone work the through flaggers directing traffic directing flaggers . Completion: 2020. 2020. Completion: .

possible, especially if your trip is not essential. essential. not is trip your if especially possible,

Rumble strips and bike lanes bike and strips Rumble — This city city This — 15.

Interstate 205 Interstate 5.

(War Veterans Memorial Memorial Veterans (War

pedestrian and bicycle detour signs or or signs detour bicycle and pedestrian

Be kind! Be Our goal is to get you get to is goal Our

CDC recommends you stay home as much as as much as home stay you recommends CDC

tunnel closures. tunnel Completion: Winter 2020. 2020. Winter Completion: Interstate 205 Interstate

and intermittent crosswalk closures with with closures crosswalk intermittent and

Stay home. Save lives. Save home. Stay

closures with intermittent partial or full full or partial intermittent with closures

Lane closures closures Lane intersection, MP 10–13.3. 10–13.3. MP intersection,

before you head out. head you before

www.i-84Troutdale.org

Night lane lane Night and reducing carbon emissions. emissions. carbon reducing and

lane at the S First Avenue and SW Oak Street Street Oak SW and Avenue First S the at lane

and road and weather conditions weather and road and Completion: Winter 2020. 2020. Winter Completion: Portland area, saving energy, saving costs costs saving energy, saving area, Portland

curb ramps and a new southbound left turn turn left southbound new a and ramps curb

Graham Road, I-84, and the frontage roads. frontage the and I-84, Road, Graham

www.TripCheck.com to check routes, work zones work routes, check to www.TripCheck.com existing roadway lights with new LEDs in the the in LEDs new with lights roadway existing

lighting, upgraded wheelchair accessible accessible wheelchair upgraded lighting,

Intermittent closures with detours on on detours with closures Intermittent LED lighting LED — Replace more than 8,000 8,000 than more Replace — 14.

Know before you go! you before Know Call 511 or visit or 511 Call new traffic signals and signs, improved improved signs, and signals traffic new

sidewalk and a bike lane, MP 17.1–17.5. 17.1–17.5. MP lane, bike a and sidewalk

REGION-WIDE PROJECTS REGION-WIDE Hillsboro. Improvements include paving, paving, include Improvements Hillsboro.

height to improve freight mobility, add new new add mobility, freight improve to height

safety on OR 8/TV Highway at OR 219 in in 219 OR at Highway 8/TV OR on safety

you can drive safely through the work zone. zone. work the through safely drive can you

at exit 17 in Troutdale, adding increased increased adding Troutdale, in 17 exit at

www.or212improvements.org

OR 8 OR — Improve Improve — 9.

(Tualatin Valley Highway) Valley (Tualatin Expect delays — plan for them for plan — delays Expect and leave early so early leave and

Replace the I-84 bridges over Graham Road Road Graham over bridges I-84 the Replace

Completion: 2021. 2021. Completion:

OREGON HIGHWAYS OREGON

Interstate 84 Interstate — 4. (Columbia River Highway) River (Columbia OR 212 with flaggers directing traffic. traffic. directing flaggers with 212 OR

them as they travel into and out of the work areas. areas. work the of out and into travel they as them

Interstate 84 Interstate

closures, day and night lane closures on on closures lane night and day closures,

www.OuterPowellSafety.org

Steer clear of construction vehicles construction of clear Steer

and don’t follow don’t and for 12 days in summer 2020. Sidewalk Sidewalk 2020. summer in days 12 for

both directions. directions. both Completion: Fall 2020. 2020. Fall Completion:

tinyurl.com/OnRampMaintenance

212 closed 24/7 at North Fork Deep Creek Creek Deep Fork North at 24/7 closed 212

and striped bike lane will be maintained in in maintained be will lane bike striped and

Summer 2020. 2020. Summer

OR OR OR 224: MP 5.2–8.2; OR 212: MP 0.1–8.6. 0.1–8.6. MP 212: OR 5.2–8.2; MP 224: OR

either side of the roadway. roadway. the of side either with flaggers. A marked pedestrian path path pedestrian marked A flaggers. with

time. No impact to I-5 traffic. I-5 to impact No time. Completion: Completion:

friendly bridge at North Fork Deep Creek. Creek. Deep Fork North at bridge friendly

Be aware of temporary construction accesses construction temporary of aware Be on some intermittent nighttime lane closures closures lane nighttime intermittent some

10 am weekdays, and not both at the same same the at both not and weekdays, am 10

intersections along OR 212, and install fish- install and 212, OR along intersections

Two-way traffic maintained on Powell with with Powell on maintained traffic Two-way

closures over a month, but not 5 a.m. to to a.m. 5 not but month, a over closures

curb ramps and pedestrian facilities at 26 26 at facilities pedestrian and ramps curb

lanes, storm drains and lighting. MP 7.1–8.0. 7.1–8.0. MP lighting. and drains storm lanes,

space between them and your vehicle. vehicle. your and them between Both ramps will have intermittent intermittent have will ramps Both MP 297. 297. MP

Damascus and Boring, install accessible accessible install Boring, and Damascus

improve crosswalks, bike lanes, center turn turn center lanes, bike crosswalks, improve

move over to give workers more workers give to over move When possible, possible, When weight capacity to improve long-term safety, safety, long-term improve to capacity weight

— Repair and repave OR 212 through through 212 OR repave and Repair —

to SE 136th Avenue: install sidewalks, sidewalks, install Avenue: 136th SE to

Terwilliger boulevards will get improved improved get will boulevards Terwilliger

OR 212 OR 13.

(Clackamas-Boring Highway) (Clackamas-Boring

Safety Improvements from SE 122nd Avenue Avenue 122nd SE from Improvements Safety

ramps to NB I-5 from both SW Bertha and and Bertha SW both from I-5 NB to ramps

narrow

, without shoulders or emergency lanes. lanes. emergency or shoulders without ,

tinyurl.com/OR211Improvements U.S. 26 U.S.

— Outer Powell Powell Outer — 8.

(SE Powell Boulevard) Powell (SE

Interstate 5 Interstate — The on- The — 3.

(Pacific Highway) (Pacific

work zone traffic lanes are often often are lanes traffic zone work Remember, Remember, flagging.

Completion: 2021. Completion:

U.S. HIGHWAYS U.S.

tinyurl.com/ODOTRealTime

temporary lane closures and occasional occasional and closures lane temporary

directions. Completion: Summer 2020. 2020. Summer Completion:

Mostly shoulder work with with work shoulder Mostly MP 11.5–12.0. 11.5–12.0. MP

Get in the correct lane correct the in Get in advance. advance. in

www.i405ramps.org

four nighttime full I-5 closures in both both in closures I-5 full nighttime four

OR 211 at Ona Way, near OR 213 in Molalla, Molalla, in 213 OR near Way, Ona at 211 OR

Completion: Fall 2020. 2020. Fall Completion:

ramp and lane closures and from two to to two from and closures lane and ramp

Provide a pedestrian and bicycle path on on path bicycle and pedestrian a Provide

closures and weekend day lane closures. lane day weekend and closures

Double your following distance. following your Double Don’t tailgate. Don’t

Night Night traffic information, MP 303.3–308.6. 303.3–308.6. MP information, traffic

OR 211 OR — — 12.

(Woodburn-Estacada Highway) (Woodburn-Estacada Weekend ramp closures and night lane lane night and closures ramp Weekend

Marine Drive to I-405, to provide real time time real provide to I-405, to Drive Marine

project-details.aspx?project=20471

and increase freeway lifespan, MP 1.4–3.9. 1.4–3.9. MP lifespan, freeway increase and

new RealTime signs in seven locations, locations, seven in signs RealTime new

for your safety and the safety of workers. workers. of safety the and safety your for

www.oregon.gov/odot/projects/pages/

Bridge and at U.S. 26, to improve safety safety improve to 26, U.S. at and Bridge

Interstate 5 Interstate — Install Install — 2.

(Pacific Highway) (Pacific

Obey all speed signs speed all Obey , because speed may be reduced be may speed because ,

2020. Fall Completion:

sections on either side of the Fremont Fremont the of side either on sections

www.InterstateBridge.org

with one lane for northbound traffic. northbound for lane one with

bridge joints and make repairs to elevated elevated to repairs make and joints bridge

Completion: Fall 2020. 2020. Fall Completion:

barrels, cones and barricades. and cones barrels,

day single lane closure across the bridge, bridge, the across closure lane single day

Interstate 405 Interstate — Replace Replace — 7. (Stadium Freeway) (Stadium

directions sharing the southbound bridge. southbound the sharing directions

A 30- A Pay attention when you see orange signs, orange see you when attention Pay Tualatin River Bridge, MP 12.1–12.3. 12.1–12.3. MP Bridge, River Tualatin

Orange is your clue! clue! your is Orange Interstate

traffic Sept. 12-20, with traffic in both both in traffic with 12-20, Sept. traffic

on the northbound side of the OR 99W 99W OR the of side northbound the on

Northbound span closed to all all to closed span Northbound MP 0.6. 0.6. MP

new concrete bridge deck and replace joints joints replace and deck bridge concrete new

www.i205corridor.org of work zone crashes. zone work of

longevity, Oregon MP 307.7 to Washington Washington to 307.7 MP Oregon longevity,

OR 99W OR — Install a a Install — 11.

(Pacific Highway West) Highway (Pacific

Fall 2020. 2020. Fall

zone before the work area. Inattentive driving is the most common cause cause common most the is driving Inattentive area. work the before zone

and lower the bridge, increasing safety and and safety increasing bridge, the lower and

full nighttime I-205 closures. I-205 nighttime full www.OR8construction.org Completion:

Pay complete attention to your driving, your to attention complete Pay especially in the transition transition the in especially Bridge Trunnion. Replace parts that help lift lift help that parts Replace Trunnion. Bridge

traffic. some and closures lane Nighttime Completion: 2020. 2020. Completion: 0.0–13.0

Interstate 5 Interstate — Interstate Interstate — 1.

(Pacific Highway) (Pacific

bicycle detour signs or flaggers directing directing flaggers or signs detour bicycle signs on I-205 between I-5 and OR 212, MP MP 212, OR and I-5 between I-205 on signs

various locations various

Interstate 5 Interstate

in Work Zones Work in crosswalk closures with pedestrian and and pedestrian with closures crosswalk Install five RealTime traveler information information traveler RealTime five Install

Region-wide Projects Region-wide

INTERSTATE HIGHWAYS INTERSTATE

Interstate 205 Interstate Lane closures and intermittent intermittent and closures Lane westbound. westbound. — 6. (East Portland Freeway) Portland (East

Tips for Driving Safely Driving for Tips Portland Area Improvement Projects Improvement Area Portland

Know before you go... Online Information Highway Projects Key Oregon Improvement Projects

Travel Information quick visit to www.TripCheck.com can help you avoid traffic snags, he following descriptions will give you an idea of what to expect when Summer 2020 Visit www.TripCheck.com work zone delays and hazardous road conditions. Before you go, find you encounter a road project. The amount of delay and congestion 511 (in-state callers only) Athe best way to get there. dependsT on overall traffic volume, time of day, and the size and type of (503) 588-2941 (out-of-state callers) the project. Call 511 for the latest highway conditions by route, major city or mountain For questions or comments about ODOT call Resurfacing/Paving/Overlay — Adding pavement over existing pass. Use voice commands or use the keypad on your phone to get the (888) ASK-ODOT (275-6368). road or structure. You will likely encounter lane closures and a answers you need. lower speed limit. For information about the Oregon Department of Transportation, visit www.oregon.gov/ODOT. The ODOT website answers questions and provides in-depth information. Chip seal — A method of resurfacing that places gravel over the With our automated notification system, you can get personalized ODOT roadway to work into the pavement. For information about places to see, places to news and information emailed straight to your inbox. Sign up at www. Bridge work — Bridges may be built alongside existing bridges stay or things to do in Oregon, visit oregon.gov/ODOT. with little in the way of traffic delays. Some bridge work may www.TravelOregon.com. require lane closures or traffic detours. Our Twitter feed is @OregonDOT. You can sign up to receive Twitter alerts if there’s a problem on your favorite routes. Details for specific projects listed on this map are included on the inside of this brochure. Projects are listed by highway type and route number, Learn about interesting or lesser-known programs and projects on then sorted by milepost. Information is subject to change. Facebook. Become a fan and let us know what you think. Find us at www. This map lists only major projects on state highways. You may also facebook.com/OregonDOT. encounter short-duration maintenance projects or work being done on city or county roads. As always, you can ask questions or share comments with our helpful staff in the Ask ODOT office. Call 1-888 Ask ODOT (275-6368) or email [email protected].

ODOT is an equal opportunity, affirmative action employer committed to a diverse workforce. Accommodations will be provided to persons with disabilities. Alternative formats available upon request. ODOT does not discriminate on the basis of disability in admission or access to our programs, services, activities, hiring, and employment practices. Questions: 1-877-336-6368 (EEO-ODOT) or statewide relay, 711. Cover photo: Woodburn paving project on Interstate 5, Greg Westergaard, ODOT photographer. photographer. ODOT paving on Interstate project photo: Woodburn 5, Greg Westergaard, Cover Form No. 734-2812 REV 5/2020 64. OR 78 (Steens Highway) — Chip seal pavement preservation from New INTERSTATE HIGHWAYS Princeton to Virginia Valley, MP 37.7–47.2. Lane closures, reduced speeds, Interstate 5 flaggers, pilot cars, loose rock on the roadway, delays up to 20 minutes. Completion: 9/2020. 1. Interstate 5 (Pacific Highway) — Replace bridge deck at Exit 6 northbound Summer 2020 Improvement Projects and replace southbound outside lane south of Ashland near Siskiyou 65. OR 82 (Wallowa Lake Highway) — Improve pedestrian access and upgrade Summit, MP 5–9.5. Expect single lane traffic with ramp closures. wheelchair accessible curb ramps at various intersections in downtown Completion: 10/2020. Island City, MP 2. Sidewalk closures, pedestrian detours and possible minor delays. Completion: 11/2021. 2. Interstate 5 (Pacific Highway) — Repair bridge decks near Valley of the Rogue State Park, MP 45. Nighttime closures with short detour. 66. OR 82 (Wallowa Lake Highway) — Improve pedestrian access and upgrade Completion: 8/2020. wheelchair accessible curb ramps in downtown Imbler between Hull Lane and Brooks Road, MP 11.9–12.5. Sidewalk closures, pedestrian detours 3. Interstate 5 (Pacific Highway) — Pave five miles of I-5 and build climbing and possible minor delays. Completion: 11/2021. lanes on Roberts Mountain, about five miles south of Roseburg, MP 112– 117. Intermittent lane and shoulder closures. Completion: 6/2021. 67. OR 82 (Wallowa Lake Highway) — Improve pedestrian access and upgrade wheelchair accessible curb ramps at various Intersections in downtown 4. Interstate 5 (Pacific Highway) — Pave 11 miles of I-5 and several Elgin, MP 20. Sidewalk closures, pedestrian detours and possible minor interchange ramps between Roseburg and Sutherlin, MP 125–136. Lane delays for motorists. Completion: 11/2021. and nighttime ramp closures. Completion: 9/2020. 68. OR 82 (Wallowa Lake Highway) — Realign hairpin corner at Minam Curve 5. Interstate 5 (Pacific Highway) — Resurface Halsey Road in North Albany, to improve safety, MP 30.7. Lane closures, flaggers, pilot cars, delays up MP 216–235. Weeknight single lane closures and limited delays. to 20 minutes. Completion: 8/2020. Completion: 2021. www.tinyurl.com/odot-region5 6. Interstate 5 (Pacific Highway) — Interstate Bridge Trunnion. Replace parts 69. OR 82 (Wallowa Lake Highway) — Chip seal to preserve pavements from that help lift and lower the bridge, increasing safety and longevity, Oregon Wallowa River to railroad crossing, MP 33.7–41. Lane closures, reduced MP 307.7 to Washington MP 0.6. Northbound span closed to all traffic speeds, day and nighttime flaggers, pilot cars, loose rock on the Sept. 12-20, with traffic in both directions sharing the southbound bridge. roadway, delays up to 20 minutes. Completion: 8/2020. Completion: Fall 2020. www.InterstateBridge.org 70. OR 82 (Wallowa Lake Highway) — Pavement patching from Spring Creek east of Wallowa to Wallowa River east of Lostine, MP 49.4–60. Lane Interstate 82 closures, flaggers, delays up to 20 minutes. Completion: 10/2020. 7. Interstate 82 (McNary Highway) — Replace bridge end panels, MP 1–2. 71. OR 82 (Wallowa Lake Highway) — Improve pedestrian access and upgrade Traffic pattern changes, lane closures, reduced speeds, minor delays. wheelchair accessible curb ramps through downtown Enterprise, MP 64.5– Completion: 7/2020. 65.7. Sidewalk closures, pedestrian detours, occasional flaggers, minor delays. Completion: 11/2021. Interstate 84 72. OR 99 (Rogue River Highway) — Construct new crosswalks in Grants (Columbia River Highway) 8. Interstate 84 — Install variable message signs Pass at 6th and 7th streets, replace signals at 6th and Morgan, MP -0.25. at , I-84 at Rufus and U.S. 97 at Biggs Junction. No delays Intermittent lane closures. Completion: 10/2020. during daytime work. Less than 20 minute delays during nighttime work. 73. OR 99 (Rogue River Highway) — Improve pedestrian access and upgrade Completion: Fall 2020. wheelchair accessible curb ramps at several locations in Grants Pass (Columbia River Highway) 9. Interstate 84 — Repair Hood River bridges to between Maple and Hamilton Lanes, MP 0.5–1.3. Single lane and shoulder increase safety and lifespan, MP 64.1–64.4. Single 24/7 lane closures in both closures. Completion: Fall 2021. directions and weeknight ramp closures at Exit 63 and Exit 64; minimal 74. OR 99 (Rogue River Highway) — Improve pedestrian access and upgrade impacts Memorial Day to Labor Day. Completion: Summer 2021. wheelchair accessible curb ramps at several locations on Depot Street tinyurl.com/HoodRiverBridgesRepair between Oregon 99 and I-5 ramps, MP 8.9–9.0. Single lane and shoulder (Old Highway) 10. Interstate 84 — Install median cable barrier at closures. Completion: Fall 2021. various sites between Boardman and Idaho border, MP 155–378. Occasional 75. OR 99E (Pacific Highway East) — Chip seal to preserve road surface from lane and shoulder closures near work sites. Completion 8/2020. Birdfoot Drive in Tangent to Harrisburg, MP 9–19. Single lane closures and www.tinyurl.com/odot-region5 limited delays. Completion: Fall 2020. 11. Interstate 84 (Old Oregon Trail Highway) — Multiple safety enhancements 76. OR 99W (Pacific Highway West) — Remove and replace Ash Swale and between Pendleton and La Grande including new variable message boards, Plum Creek bridges, MP 49.7 and 51.2. Intermittent, flagger controlled road sensors and cameras, lighting and curve signs, MP 214–260. Reduced lane closures both daily and nightly. Monday through Thursday from speeds, 3-mile long lane closures on Cabbage Hill due to curves and 9 a.m.–4 p.m. and Monday through Friday from 6 p.m.–6 a.m. steep grade. Minor delays and intermittent shoulder and lane closures. Completion 10/2020. Completion: 11/2020. www.oregon.gov/odot/projects/pages/project-details.aspx?project=18584 www.tinyurl.com/odot-region5 77. OR 126 (Florence-Eugene Highway) — Widen shoulders at MP 36. Flaggers, 12. Interstate 84 (Old Oregon Trail Highway) — Add a third truck lane for lane closures. Completion: 2021. eastbound Ladd Canyon and other improvements, MP 200–273. Reduced speeds, lane closures, nighttime paving, minor delays. Detours in Ladd 78. OR 140 (Lake of the Woods Highway) — Construct roundabout at Canyon for bicycles and pedestrians. Completion: 11/2020. new intersection with Foothill Road/Atlantic Avenue, MP 1.6. Possible www.tinyurl.com/odot-region5 intermittent lane closures. Completion: Fall 2020. 13. Interstate 84 (Old Oregon Trail Highway) — Repair pavement near Lime, MP 79. OR 202/OR 47 (Nehalem Highway) — Repave highway from milepost 39– 330.4–344.8. Lane and shoulder closures, minor delays. Completion: 7/2020. 51.7. Daytime single lane closures on weekdays with flaggers controlling two-way traffic. Expect delays. Completion: 8/2020. 14. Interstate 84 (Old Oregon Trail Highway) — Repair pavement near Farewell Bend, MP 351–353. Lane and shoulder closures, minor delays. Completion: 80. OR 201 (Old Ferry-Ontario Highway) — Chip seal to preserve road surface 7/2020. from Malheur River to Weiser Junction, MP 11.5–24.5. Lane closures, reduced speeds, day and nighttime flaggers, pilot cars, loose rock on the 15. Interstate 84 (Old Oregon Trail Highway) — Upgrade pavement at Olds Ferry roadway, delays up to 20 minutes. Completion: 10/2020. truck scale, MP 354.4. Eastbound lane and shoulder closure, weight scale closure. Completion:7/2020. 81. OR 203 (Medical Springs Highway) — Improve pedestrian access and 27. U.S. 30 — New pavement, new crosswalk markings and wheelchair 39. U.S. 101 (Oregon Coast Highway) — Improve and repair the Cape Creek Wilsonville Road controlled by flaggers Monday through Friday, 9 a.m.– upgrade wheelchair accessible curb ramps through downtown Union. Interstate 105 accessible curb ramps in Cascade Locks along Wa Na Pa Street. One Bridge north of Florence, MP 166.4. Nighttime single lane closures, minor 3 p.m. Completion: 9/2020. Sidewalk closures, pedestrian detours, occasional flaggers, minor delays. 16. Interstate 105 (Eugene-Springfield Highway) — Strengthen the Willamette lane will remain open in each direction with flaggers directing traffic delays. Completion: Fall 2020. www.oregon.gov/odot/projects/pages/project-details.aspx?project=19803 Completion: 11/2021. River Bridge in Eugene, replace the bridge surface and bridge rails, MP 1. on weekdays during paving with occasional detours to side streets. 40. U.S. 101 (Oregon Coast Highway) — Paint steel truss section of McCullough 53. OR 18 — Bridge deck rehabilitation on the Yamhill River Overflow Bridge 82. OR 204 (Weston-Elgin Highway) — Road repair and paving between Single lane traffic at all times. Completion: Fall 2020. Completion: Fall 2020. Bridge, MP 234. Intermittent nighttime lane closures. Completion: 10/2021. near McMinnville. Two consecutive weekend closures in summer months. Tollgate and Elgin, MP 20.8–40.3. Lane closures, reduced speeds, pilot tinyurl.com/WaNaPaStreetscape 41. U.S. 101 (Oregon Coast Highway) — Improve pedestrian access and Completion: 9/2020. cars, delays up to 20 minutes. 24/7 flagging in work zone. Completion: U.S. HIGHWAYS 28. U.S. 30 (Court Avenue, Pendleton) — Improve pedestrian access and upgrade wheelchair accessible curb ramps at several locations in Bandon 54. OR 22 (Willamina-Salem Highway) — Pavement and bridge improvements, 11/2020. 17. U.S. 9 (The Dalles–California Highway) — Pave from Madras to Trout Creek upgrade wheelchair accessible curb ramps at SE 10th Street, SE 9th between 2nd Street and Seabird Lane, MP 261–275. Single lane and new pavement markings between Rickreall Interchange and Independence 83. OR 214 — Build an enhanced pedestrian crossing at Jefferson Street in Bridge, approximately 16.5 miles, MP 75.1–MP 91.6. Delays of 20 minutes or Street, and SE Frasier Place intersections in Pendleton. Sidewalk closures, shoulder closures. Completion: Fall 2021. Highway, MP 15–20.3. Intermittent day and nighttime lane closures Silverton. Minor daytime traffic delays with intermittent lane closures, less. Completion 11/2020. pedestrian detours and possible minor delays. Completion: 7/2020, 42. U.S. 101 (Oregon Coast Highway) — Strengthen beams, resurface travel Monday through Friday, 9 a.m.–3 p.m., and Sunday through Friday, 6 p.m. flaggers controlling two-way traffic. Completion 9/2020. 18. U.S. 20 (Cox Creek–Reeves Parkway) — Pave highway, MP 2–12.5. Single lane www.tinyurl.com/odot-region5 lanes, repair concrete on Rogue River Bridge in Gold Beach, MP 327. –6 a.m. Completion 10/2020. www.oregon.gov/odot/projects/pages/project-details.aspx?project=21190 closures, some delays. Completion: Fall 2020. 29. U.S. 30 (La Grande-Baker Highway) — Add lighting to turnaround near Intermittent lane closures. Completion: 11/2020. www.oregon.gov/odot/projects/pages/project-details.aspx?project=20129 84. OR 234 (Sams Valley Highway) — Improve pedestrian access and upgrade 19. U.S. 20 (Central Oregon Highway) — Improve pedestrian access and upgrade Gangloff Park, west of La Grande, MP 0.6.Possible flaggers, lane closures, 43. U.S. 101 (Oregon Coast Highway) — Rebuild roadway to its original 55. OR 22 (North Santiam Highway) — Improve bridge and pavement from wheelchair accessible curb ramps at several locations in Gold Hill from wheelchair accessible curb ramps in downtown Vale. Sidewalk closures, delays up to 20 minutes. Completion: 9/2020. alignment at Hooskanaden slide area, MP 344, 12 miles north of Brookings. Joseph Street to Golf Club Road, MP 3.9–13.3. Day and nighttime single Sardine Creek to Chavner Street, MP 0.7–2.5. Single lane and shoulder pedestrian detours and possible minor delays for motorists. Completion: 30. U.S. 30 (La Grande-Baker Highway) — Improve pedestrian access and Lane closures, delays. Completion: 8/2020. lane closures with flaggers controlling two-way traffic Monday through closures. Completion: Fall 2021. (La Grande-Cove Highway) 11/2021. upgrade wheelchair accessible curb ramps in downtown La Grande. 44. U.S. 395-C (John Day-Burns Highway) — Chip seal pavement protection Thursday 9 a.m.–4 p.m., and Sunday night through Friday morning 7 p.m. 85. OR 237 — Improve pedestrian access and 20. U.S. 20/26 (Central Oregon Highway) — Chip seal to preserve pavement Sidewalk closures, pedestrian detours and possible minor delays. from Starr Ridge to Harney Co. line, MP 15.5–47.2. Lane closures, reduced –6 a.m. Completion: 9/2020. upgrade wheelchair accessible curb ramps in downtown Cove between from Cairo Junction to Nyssa, MP 258.3–265.4. Lane closures, reduced Completion: 11/2021. speeds, day and nighttime flaggers, pilot cars, loose rock on the roadway, www.oregon.gov/odot/projects/pages/project-details.aspx?project=20418 Foster Street and Church Street, milepost 13.3–13.7. Sidewalk closures, speeds, day and nighttime flaggers, pilot cars, loose rock on the roadway, 31. U.S. 95 (Idaho-Oregon-Nevada Highway) — Chip seal to preserve pavement delays up to 20 minutes. Completion: 9/2020. 56. OR 22 (North Santiam Highway) — Repair Bad Banks Creek Culvert between pedestrian detours, occasional flaggers, minor delays. Completion: 11/2021. delays up to 20 minutes. Completion: 10/2020. from Burns Junction to Blue Mountain summit, MP 66–98.7. Lane closures, 45. U.S. 395 (Fremont Highway) — Replace culverts at Cogswell Creek and Gates and Detroit, MP 36.8. Intermittent daytime and nighttime delays (La Grande-Baker Highway) 21. U.S. 20/26 (Main Street in Nyssa) — Improve pedestrian access and upgrade reduced speeds, day and nighttime flaggers, pilot cars, loose rock on the Crooked Creek, MP 130.5 and MP 152.4. Delays up to 20 minutes. with periodic lane closures and flaggers controlling two-way traffic. 86. OR 237 — Improve pedestrian access and wheelchair accessible curb ramps at various Intersections in downtown roadway, delays up to 20 minutes. Completion: 10/2020. Completion: 10/2020. Completion 10/2020. upgrade wheelchair accessible curb ramps through downtown Union, MP 16–17. Sidewalk closures, pedestrian detours, occasional flaggers, minor Nyssa. Sidewalk closures, pedestrian detours and possible minor delays for 32. U.S. 97 — Bridge replacement and seismic retrofit to Spanish Hollow and 46. US 395-B (Pendleton-John Day Highway) — Upgrade signs between Ukiah www.oregon.gov/odot/projects/pages/project-details.aspx?project=21190 delays at multiple sites. Completion: 11/2021. motorists. Completion: 11/2021. Trout Creek Bridges between Biggs Junction and Wasco, MP 0.3–6.9. Minor and Nye Junction, MP 23–50. Occasional lane closures and flaggers. Minor 57. OR 37 (Pendleton-Cold Springs Highway) — Repair bridge over Union Pacific (Jacksonville Highway) 22. U.S. 26 (John Day Highway) — Chip seal to improve pavement from John delays. Completion: 10/2020. delays. Completion: 7/2020. Railroad at MP 1, one mile east of U.S. 730. Five week detour via U.S. 730 87. OR 238 — Improve pedestrian access and upgrade (The Dalles–California Highway) wheelchair accessible curb ramps in Jacksonville and Medford, MP 33.4– Day to Prairie City, MP 162.6–175. Lane closures, reduced speeds, day and 33. U.S. 97 — New passing lanes and a wildlife 47. U.S 730 (Columbia River Highway) — Upgrade pavement, storm drains and U.S. 395 through Hermiston, I-84 between Standfield and Pendleton. 38.6. Single lane and shoulder closures. Completion: Fall 2021. nighttime flaggers, pilot cars, loose rock on the roadway, delays up to 20 undercrossing five miles north of Gilchrist, MP 180.1 and MP 182.9.Delays and sidewalk/sidewalk ramps in downtown Umatilla, Umatilla River Bridge Completion: 9/2020. (Ukiah-Hilgard Highway) minutes. Completion: 10/2020. up to 20 minutes. Completion 7/2020. to Yerxa Avenue, MP 182.7–183.4. Flaggers, lane and sidewalk closures. www.tinyurl.com/odot-region5 88. OR 244 — Replace Whiskey Creek Culvert 16 23. U.S. 26 (John Day Highway) — Chip seal to improve pavement from 34. U.S. 97 (The Dalles–California Highway) — Repave highway seven miles Completion: 11/2020. 58. OR 38 (Umpqua Highway) — Replace historic Scottsburg Bridge with new miles west of La Grande, MP 45. Lane closures, flaggers, delays up to 20 Jamieson to Vale, MP 261.5–MP 278. Lane closures, reduced speeds, day south of Klamath Falls, MP 280.5–291.7. Nighttime work, delays up to 20 span, provide more room for vehicles, pedestrians and bicyclists, MP 16. minutes. Completion: 11/2020. and nighttime flaggers, pilot cars, loose rock on the roadway, delays up to minutes. Completion: 8/2020. OREGON HIGHWAYS Intermittent lane closures. Completion: Fall 2022. www.tinyurl.com/odot-region5 20 minutes. Completion: 10/2020. (Oregon Coast Highway) (Klamath Falls–Malin Highway) 89. OR 410 (Sumpter Highway) — Chip seal to preserve road surface from the 35. U.S. 101 — Repair the New Youngs Bay Bridge, MP 48. OR 3 (Enterprise-Lewiston Highway) — Chip seal pavement protection from 59. OR 39 — Repave Klamath Falls/Lakeview ( Highway) junction with OR 7 to Sumpter, MP 0.0–3.7. Lane closures, reduced speeds, 24. U.S. 26 — Repave 2.5 miles of highway, replace or 4.5–5.3. Nighttime single lane closures 9 p.m.–5:30 a.m. Expect delays. Buford Grade to Enterprise, MP 5–43. Lane closures, reduced speeds, day Junction to Matney Road, add curb, gutter and sidewalk to the west side of day and nighttime flaggers, pilot cars, loose rock on the roadway, delays install guard rails, glare shields and rumble strips between East Lolo Pass Completion: 11/2021. and nighttime flaggers, pilot cars, loose rock on the roadway, delays up the highway between Klamath Community College and the OC&E trail, MP up to 20 minutes. Completion: 10/2020. Road in Zigzag and East Arlie Mitchell Road in Rhododendron. MP 41.6–44.1. www.oregon.gov/odot/projects/pages/project-details.aspx?project=18602 to 20 minutes. Completion: 9/2020. 0.1–6.8. Delays up to 20 minutes. Completion 8/2020. Daytime lane closures with flaggers directing traffic at times. Completion: (Oregon Coast Highway) (Coos Bay-Roseburg Highway) 90. OR 542 (Powers Highway) — Install new culvert at Rhoda Creek to protect 36. U.S. 101 — Replace bridge at Farmer Creek just 49. OR 3 (Enterprise-Lewiston Highway) — Improve pedestrian access and 60. OR 42 — Improve pedestrian access and Fall 2020. roadway, improve drainage and fish passage about three miles south of north of Hebo. Widen and realign existing roadway, replace guardrails, upgrade wheelchair accessible curb ramps through downtown Enterprise, upgrade wheelchair accessible curb ramps in Camas Valley at Main Camas tinyurl.com/US26PavingatRhododendron Myrtle Point, MP 2. Temporary traffic signals, flaggers, minor delays. other improvements, MP 82.4–83.1. Nighttime construction weeknights MP 42.8–43.1. Sidewalk closures, pedestrian detours, occasional flaggers, Road and East Camas Road, MP 55. Single lane and shoulder closures. (Mount Hood Highway) Completion: 10/2020. 25. U.S. 26 — Replace and upgrade 26 guide and between 7 p.m. and midnight with flaggers controlling two-way traffic. minor delays. Completion: 11/2021. Completion: Fall 2021. warning signs on U.S. 26 and OR 35 between Government Camp and Delays up to 20 minutes. Completion: 11/2020. (Coos Bay-Roseburg Highway) 91. OR 569 (Beltline at Delta Highway Interchange) — Improve the interchange 50. OR 7 (Whitney Highway) — Chip seal pavement protection from Grant 61. OR 42 — Improve pedestrian access and Sherwood Campground. Signs will be taller to reduce the possibility of www.oregon.gov/odot/projects/pages/project-details.aspx?project=17525 in Eugene for safety and traffic flow, MP 10.Ramp closures and detours. County line to Mason Dam, MP 9.5–35.5. Lane closures, reduced speeds, upgrade wheelchair accessible curb ramps at several locations in Winston snow cover or damage during winter. Minimal traffic impacts with mostly (Oregon Coast Highway) Some nighttime lane closures. Completion: 2021. 37. U.S. 101 — Upgrade and repair bridges at Devils day and nighttime flaggers, pilot cars, loose rock on the roadway, delays between Abraham Avenue and Ross Avenue, MP 72–73. Single lane and shoulder work. Completion: Fall 2020. Lake Outlet (D-River), Schooner Creek and Siltcoos River, MP 114.8, 118 up to 20 minutes. Completion: 10/2020. shoulder closures. Completion: Fall 2021. tinyurl.com/US26SignImprovements and 197. Most work done at night. Limited delays. Completion: varies by OTHER PROJECTS 51. OR 11 (Main Street, Milton-Freewater) — Improve pedestrian access and 62. OR 58 — Pave Goshen to Pheasant Lane, MP 0.3–6.5. Single lane closures 26. U.S. 30 (Lower Columbia River Highway) — Replace multiple bridges at bridge. upgrade wheelchair accessible curb ramps at SE 10th Street in Milton- at night. Completion: Fall 2020. 92. Ontario SE 2nd Street — Pave city street between SE 12th Avenue and the Astoria Waterfront between 6th Street and 11th Street, stormwater (Oregon Coast Highway) 38. U.S. 101 — Improve and repair the Yaquina Bay Freewater. Sidewalk closures, pedestrian detours and possible minor 63. OR 62 (Crater Lake Highway) — Improve pedestrian access and upgrade SE 5th Avenue. Lane and street closures, local detours, minor delays. drainage improvements at the intersection of U.S. 30 and 30th Street. U.S. Bridge in Newport, MP 141. East sidewalk closed. Nighttime single lane delays. Completion: 6/2020. wheelchair accessible curb ramps at several locations from White City to Completion: 11/2020. 30: Single closures weeknights, 8 p.m.–7 a.m. 30th Street: Possible single closures, minor delays. Completion: 2023. 52. OR 18 (Newberg-Dundee Bypass Phase 1W) — Realign Wilsonville Road to Eagle Point, MP 6-11. Single lane and shoulder closures. Completion: Fall lane closures Monday–Thursday, 9 a.m.–4 p.m., Friday, 9 a.m.–3 p.m. and 2021. weeknights from 6 p.m.–7 a.m. Completion: 7/2020. connect to OR 219 just south of Wynooski Road. Intermittent closures on