Second Five Year Plan Progress Report 1959-60

Total Page:16

File Type:pdf, Size:1020Kb

Second Five Year Plan Progress Report 1959-60 GOVERNMENT OF RAJASTHAN SECOND FIVE YEAR PLAN SS REPORT 1959-60 51RECTORATE OF ECONOMICS a STATISTICS RAJASTHAN, JAIPUR -N- IJIO-O S6S5D V :>-> w Printed at the Government Central Press, Jaipur. INTRODUCTION Xhis publication, the fourth in the series of yearly Plan reviews, co.yers the year 1959-60 and appraises the reader of the main lines of development visualised under the Plan by the Government of Rajasthan, the extent of fulfilment of financial and physical targets as well as brings out the nr.ain features of organisation developed for executing the programmes, the bottlenecks and difficulties encoun-. tered, the progress made in utilising the assets or resources created under the Plan; the methods adopted for securing greater efficiency and effectiveness in implementation and the steps taken to elicit fuller public participation and' use of local resources etc. The scope of this report has been enlarged by addition of three new chapters dealing with the “Hconomic Classification of the Plan Budget”, an Analysis of the “Buildings Programme” and A Brief Review of the “Districtwise Progress of the Plan Schemes”. In dealing with the sectorwise progress of the Plan schemes as well, this year, we have gone into some greater detail. The cumulative progress_50 far .made under different sectors is also available from the report. We are endeavouring to make this publication comprehensive so as to render proper assessment of the Slate’s efforts towards planned progress of the State. While the report has been in the press, certain additional inloni ation with regard' to expenditure has become available. Tt has not been possible to incorporate these changes at appropriate places. The latest total expenditure during the year 1959-60 is reported to be Rs. 21.94 crores as against Rs. 21.86 crores referred to in the tables and accounts incorporated in this report. The reconciliation of the previous years’ data as well has also resulted into certain minor changes. The total expenditure for the years 1956-57, 1957-58 and 1958-59 now stands at Rs. 13.18 crores, 15.04 crores and 20.50 crores as against the figures of Rs. 13.68 crores, 15.81 crores and 20.48 crores reported in the main body and appendices of this report. Of these changes, the major ones related to Rs. 9.88 lakhs and Rs. 38.17 lakhs during the year 1956-57 under the Cooperation and Water Supply Schemes due to the inclusion of centrally sponsored schemes in the Plan; of Rs. 20.41 lakhs and Rs. 55.82 lakhs during the year 1957-58 under Irrigation and Water Supply Schemes, the former on account of accounting adjustments and the latter on account of inclusion of centrally sponsored schemes; and Rs. 5.14 lakhs during 1959-60 under Education. L. K. VERMA, Director of Economics and Statistics, Rajasthan. 25th November, 1960. CONTENTS SECTION I I, General Review : Page C h a p t e r I Economic trends and achievements .. 1 C h a p t e r II Plan outlay and its financing 11 C h a p t e r III Overall progress of expenditure 17 C h a p t e r IV Training programmes 24 C h a p t e r V Economic classification of plan budget 30 C h a p t e r VI Districtwise expenditure 33 C h a p t e r VII Progress under Ajmer Plan 36 C h a p t e r VIII Bviilding Programmes 45 SECTION II n. Sectorwise Review : C h a p t e r IX Agriculture and Community Development .. 51 C h a p t e r X Irrigation .. 76 C h a p t e r XI Power 83 C h a p t e r XII Industries and Mining 89 C h a p t e r XIII Roads 98 C h a p t e r XIV Social Services 101 C h a p t e r XV Miscellaneous 120 SECTION III ni. Statistical Appendices : 1. Allotment and expenditure under Second Five Year Plan II 2. Plan allotment for 1958-59 and 1959-60 .. .. I ll 3. Comparative expenditure during 1958-59 and 1959-60 .. IV 4. Distribution of expenditure during Second Plan period .. V 5. Expenditure indices during Second Plan period .. VI 6. Distribution of allotnient and expenditure between Revemie, Capital and Loans during 1959^60 .. .. VII 7. Expenditure pattern duiing 195‘.>-60 .. .. .. IX 8. State and Central share in expenditure during 1959-60 .. X 9. Allotment ani expenditure under State Plan schemes, Rajasthan................. .. ... .. XII 10. Physical targets and achievements under Plan schemes, Rajasthan .. .. .. .. XL 11. Districtwise expenditure on Plan schemes during Second Five Year Plan (1956-60) .. .. .. LXVIII 12. Expenditure under Second Five Year Plan schemes, 1959-60 (sectorwise according to districts) .. .. LXX 13. Districtwise ter-capita expenditure on Plan schemes, 1959-60 .. .. .. .. .. .. LX XIII 14. Sectorwise expenditure on Plan schemes, Ajmer Plan,1956-60 LXXIV ( i i ) Page 15. Physical targets and achievements under Plan schemes, Ajmer Plan, 1959-60 .. .. .. .. LXXVI 16. Allotment and expenditure on buildings, 1959-60 .. LXXXVI 17. Land utilisation in Rajasthan .. .. .. LXXXVIII 18. Net irrigated area by sources in Rajasthan .. .. LXXXIX 19. Gross irrigated area under crops in Rajasthan .. .. LXL 20. Area under crops in Rajasthan .. .. .. LXLI 21. Production of crops in Rajasthan .. .. .. LXLII 22. Targets and achievements of food production in Rajasthan, 1959-60 .. .. .. .. .. .. LXLIII 23. Targets and achievements under sugarcane development scheme, Rajasthan, 1959-60 .. .. .. .. LXLIV 21. Targets and achievements under cotton development scheme, Rajasthan, 1959-60 .. .. .. .. LXLV 25. Co operative movement, Rajasthan .. .. .. LXLVI 26. Number and Membership of co-operative institutions by type, Rajaathan .. .. .. .. ., LXLVII 27. Irrigation works under Second Five Year Plan, Rajasthan LXLVIII 28. Electricity generation, Rajasthan, 1959 .. .. LLI 29. Electricity consumption, Rajasthan, 1959 .. .. LLII 30. Statement showing percentage distribution of generated power for different uses .. .. .. .. LLIll 31. Industrial production, Rajasthan .. .. .. LLIV 32. Mineral Production .. .. .. .. .. LLV 33. Road mileage, Rajasthan, as. on 31st March, 1959 .. LLVl 34. Road works newly taken up during 1959-60 .. .. LLVII 35. Road works continuing from previous years and completed during the year 1959-60 .. .. .. .. LLVII 1 36. Progress of road works (Plan) Rajasthan, 1959-60 .. LLIX 37. Educational institutions in Rajasthan .. .. LLX 38. Scholars in educational institutions in Rajasthan .. LLXI 39. Teachers in educational institutions in Rajasthan .. LL.'CII 40. Government hospitals, dispensaries and beds, Rajasthan LLX[11 41. Index numbers of wholsaIe price,s in Rajasthan .. LLXIV SECTION IV Facing p^ige IV. Charts and Diagrams : 1. Sec:)iid Five Year Plan—Progress of expenditure 13 2. R ajasthan Budget, 1959-60 .. 15 3. Allotment and expenditure on i\.griculture and Commuuity Development ' .. 53 4. Agricultural production 57 5. Allotment and expenditure ou Irrigation 77 6. Allotment and exy)enditure on Power .. 85 7. Allotment and expenditure ou Industries and Mining 91 8. Allotnieat and expenditure on Roads !)i» 9. Allotment and expenditure on Social Services .. 103 CHAPTER I ECONOMIC TRENDS AND ACHIEVEMENTS Rajasthan is an integral part of the Indian Repubhc and its economy could hardly be reviewed in isolation. The Indian economy during the year 1959-60 revealed* mixed trends of sustained progress and stresses and strains of a developing plan. While there was improvement in the rate of growth of industrial output and the balance of payment position, the agricultural production declined and the prices continued to rise, though the rise as compared to the previous year was a little less during the year under review as compared to the rise in the preceding year over the year prior to that. The slow rate of growth of industrial output during the preceding two years showed a marked recovery during the year under review. The balance of payment position continued to maintain the improvement noticed since 1958 and this process was stirrulated by continued import curbs, better export performances and large scale foreign aid by friendly countries. The agricultural production for the country' as a whole during the year under review is estimated to have shown a decline as compared to the record production of the preceding year (1958-59). With increased plan investments both in the public and private sectors, the overall investment in the economy during the year under review is also reported to have recorded a modest rise. The annual average wholesale price index number with base year 1952-53 prepared by the Economic Adviser, Ministry of Commerce and Industry, recorded a rise of 3.7 per cent during the period under review as compared to the preceding year which in itself was higher by 4.2 per cent as compared to the annual average index number for the year preceding to that. It is in this back ground of the country’s economy that the trends in the State’s economy are to be reviewed. The food and price situation in the State had considerably eased down during the year under review. The Average Index Number of wholesale prices prepared by the Directorate of Economics and Statistics, Rajasthan (with base year 1952-53== 1(X)) declined from 119.6 during the year 1958-59 to 117.7 during the current year, thereby showing a fall of 1.59 per cent. The rising prices during 1958-59 which had brought the index number of wholesale prices to a peak voini of 128.4 in 2 P rogbess R b po bt, 1959-60 February, 1959, had already started declining in March 1959 w to the wholesale prices index number was recorded at 120.2. ine substantial regulatory measures adopted by the Government which combined with the bumper crop during 1958-59 brought down the trend of the general index number of wholesale prices in Rajasthan.
Recommended publications
  • RAJASTHAN STATE LEGAL SERVICES AUTHORITY, JAIPUR MEDIATION TRAINING PROGRAMME up to 31-5-2012 S.No
    RAJASTHAN STATE LEGAL SERVICES AUTHORITY, JAIPUR MEDIATION TRAINING PROGRAMME UP TO 31-5-2012 S.No. Divisional Head Date of holding the Concerned No. of No. Judicial officer Total No. of No. of No. of Name of trainers Remarks. Quarter Mediation training districts Advocates Trained Trained Referral mediators Judicial Judges. Advocates Offers as Mediator 01 Jaipur HQ 25 .4.2009 to -- 13Adv.+4 02 Dy. 18 02 --- Mr. Prasad Subbanna, 30.4.2009 Adv. Total Sec. RSLSA Advocate and 18 Mediator and co- ordinator, Bangalore. Mr. B.K. Mehta, Advcoate & mediator, Bangalore 02 Jodhpur HQ 31 Marth 2011 to 1st RHC Jodhpur 18 -- 18 -- 25 Mrs. Neena Krishna April,2011 and 9 to Bansal- Home Court 12 April, 2011 Delhi. Shri Arun Kumar Arya- Home Court – Delhi. 03 Jaipur Division 15.7.2011 to Jaipur Distt. 07 08 40+01 42 32 Mr. V.K. Bansal- Home 17.7.2011 Jaipur Metro 11+01 S.W. 14 123 Court,Delhi 22.7.2011 to Dausa 05 04 11 09310384709 24.7.2011 Sikar 04 04 13 Ms. Anju Bajaj 2nd round Jhunjhunu 06 04 12 Chandra- Home 06-01-2012 to 08-1- Alwar 07 08 55 Court,Delhi 2012 and 27-1-2012 09910384712 to 29-1-2012 2nd round 10-2-2012 to 12-2- Anju Bajaj chandana & 2012and 24 to 26-02- V.Khana , Shalinder 2012 JPR DISTT. kaur.(Jaipur Distt.) 11-5-2012 to 13-5- Ms. Neena Krishana 2012 and 25-5-2012 Bansal 09910384633 to 27-5-2012 Sh. Dharmesh Sharma 09910384689 04 Ajmer Division 05.08-2011 to Ajmer 10+01 S.W.
    [Show full text]
  • OVERVIEW of BIKANER DIVISION 1.0 BRIEF  the First Railway Link to Bikaner Was Established on 9Th Dec., 1891 As Part of Jodhpur State Railway
    OVERVIEW OF BIKANER DIVISION 1.0 BRIEF The first Railway link to Bikaner was established on 9th Dec., 1891 as part of Jodhpur State Railway. Bikaner State Railway came into existence in 1924. Direct Rail link between Bikaner and Delhi was established in 1941. Bikaner Division was formed in 1952 (during re-organization of Railways) with merger of part of Delhi-Rewari-Fazilka section with Bikaner State Railway. After formation of NorthWestern railway, Bikaner division became part of NWR in October 2002 Presently this division is spread over three states viz Rajasthan, Haryana, and Punjab. It is 2nd largest divison in terms of RKM on IR and largest in terms of TKM. Total route & track Kms are .:- Gauge B.G. Under G.C. Total RKMs. 1555.925 224.940 1780.865 TKMs -- -- 2228.339 1.1. Important Milestones: Initially it was MG division with over 1800 route Kms. spreading over four states i.e. Rajasthan, Haryana, Punjab and Delhi. * BG conversion started on this division in 1978. After conversion, Kotkapura- Fazilka section was transferred to Firozpur Division to maintain BG continuity. * With conversion of Bathinda- Rewari section to BG in 1994, an alternate shorter BG route has been opened connecting Ambala & Firozepur Divisions with Western & Central Railways, thereby, reducing congestion in Delhi Area. * Similarly with conversion of Bikaner-Merta Road route to BG, an alternate North- South route viz. Bathinda - Lalgarh - Bikaner - Merta Road - Jaipur and Bikaner - Merta Road -Ahmedabad has been opened. * Steam traction operation on MG was discontinued in Jan.,1994 and all the steam sheds have since been closed and all the services dieselised.
    [Show full text]
  • BN No.:-3022301903/2019-20
    RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LTD. [Corporate Identity Number (CIN):U40109RJ2000SGC016485] Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur-302005 OFFICE OF THE EXECUTIVE ENGINEER (T&C), RRVPNL, Ratangarh. Phone No. 01567-222060 ,Mobile No. 9414061072 E-mail:[email protected]. Website: www.rv~n.cO.in NO. RVPNI XENI T&CI RTGH 1BN. 30223019031Tech. 1F.I D .1Date...•............. Notice for Inviting BID for Transportation of GSS Material & Equipment's ,Fable Drums others item of New Construction work of 01 No. 132 KV Bay for 132 KV SIC ~2- Phase( fit for DIC Tower) Transmission Line from 132 KV GSS, RVPNSadulpur to Proposed 132/25 KV Traction Sub-Station at Sadulpur ( Under Deposit work of Railways( NWR Bikaner Division ). from ACOS (T&C),RVPN,Jodhpur to 132 KV GSS, RVPN, Sad~lpur (Churu) Including loading, unloading, weighting ,stacking & Insurance :- BN No.:-3022301903/2019-20 II i Limited Sealed tenders are invited from the Eligible and Experienced contractors Ifirms for Transportation of GSS Material & Equipment's ,Cable Drums others item of New Construction work of 01 No. 132 KV Bay for 132 KV SIC, 2- Phase( fit for DIC Tower) Transmission Line from 132 KV GSS, RVPN Sadulpur to Proposed 132/25 KV Traction Sub-Station at Sadulpur ( Under Deposit work of Railways( NWR Bikaner Division ). from ACOS (T&C),RVPN ,Jodhpur to 132 KV GSS, RVPN, Sadulpur (Churu) Including loading, unloading, weighting ,stacking & Insurance (410 KM Approx..) as per details given below:- BN No.: 3022301903/2019-20 Transportation of GSS Material & Equipment's ,Cable Drums others item of New Construction work of 01 WORK DESCRIPTION No.
    [Show full text]
  • District Census Handbook, Churu, Rajasthan and Ajmer
    CENSUS, 195 1 RAJASTHAN AND AJMER DISTRICT CERUS' ,HANDBOOK CHURU PART .-GENERAL DESCRIPTION AND CENSUS TABLES By Pt. YAMUNA LAL DASHORA, B.A., LL.B., Superintendent of Censl1s Operations, Rajasthan and Aimer. JODHPUR: P.RINTED AT THE GOVE]1};llENT PRESS 1956 1f.R:EFAcE, .... ,:, . - , 'The "CensuA Reports' ill' .qlq.en -·times :were printed one for the whole Province. of Ra.j­ putana and.another for A-jIl1:er-:Merwara._"Soin~ of the Principal 8tates now merged in Rajasthan published 'their own reports. This time the -State Census H eports have been published in the following volumes:- 1. Part I A .. Report. 2. Part 1--B .. ~ubsidiary Tables and District Index of Non-Agricultural Occupations. 3. Part I -C .. Appendices. 4. Part U-A .. r::eneral Population Tables, Household and Age Sample Tables, Social and Cultural Tables, Table E Summary Figures by Administrative Units, and Local 'KA' Infirmities. 5. Part II-B .. Economic Tables. They contain statistics down to the district level The idea of preparing the District Census Handbook separately for each district was put forward .by' Shri R. A. GopaJaswami. I. C. R., Registrar General. India, and ex-officio Census' Commissioner of' India, as part of a plan intended to secu~e an effective, method of preserving the census records prepared for areas below the qistrict level. 'He proposed that all the district, census tables and census abstracts prepared during the process of sorting and cOinpilatiori should be bound together in a single manuscript volume, called the District Census Handbook, and suggested to the State Governments that the Handbook (with or without the addition of other useful information relating to the district) should be printed and pub­ lished at their own cost in the same manner as the village statistics in the past.
    [Show full text]
  • Final Population Figures, Series-18, Rajasthan
    PAPER 1 OF 1982 CENSUS OF INDIA 1981 SERIES 18 RAJASTHAN fINAL POPULATION FIGU~ES (TOTAL POPULATION, SCHEDULED CASTE POPULATION AND .sCHEDULED TRIBE POPULATION) I. C. SRIVASTAVA ·1)f the Indian Administrative Service Director of Census Operations Rajasthan INTRODUCfION The final figures of total population, scheduled caste and scheduled tribe population of Rajasthan Stat~ are now ready for release at State/District/Town and Tehsil levels. This Primary Census Abs­ tract, as it is called, as against the provisional figures contained in our three publications viz. Paper I, fFacts & Figures' and Supplement to Paper-I has been prepared through manual tabulation by over 1400 census officials including Tabulators, Checkers and Supervisors whose constant and sustained efforts spread over twelve months enabled the Directorate to complete the work as per the schedule prescribed at the national level. As it will take a few months more to publish the final population figures at the viJ1age as well as ward levels in towns in the form of District Census Handbooks, it is hoped, this paper will meet the most essential and immediate demands of various Government departments, autonomous bodies, Cor­ porations, Universities and rtsearch institutions in relation to salient popUlation statistics of the State. In respect of 11 cities with One lac or more population, it has also been possible to present ~the data by municipal wards as shown in Annexure. With compliments from Director of Census Operations, Rajasthan CONTENTS INTRODUCTION (iii) Total Population, Scheduled Caste and Scheduled Tribt' Population by Districts, 1981 Total Schedu1ed Caste and Scheduled Tribe Population. ( vi) 1. Ganganagar District 1 2.
    [Show full text]
  • Annexure-EIA/EMP
    Prepared by M/s Udaipur Min-Tech Pvt. Ltd. STUDY PERIOD-DEC, 2013 TO FEB , 2014 NON-FOREST LAND ENVIRONMENTAL IMPACT ASSESSMENT ENVIRONMENTAL MANAGEMENT PLAN FOR RIVER BED MINING PROJECT OF MINOR MINERAL ORDINARY SAND(BAJRI) IN Tehsil: Bilara, District: Jodhpur, Rajasthan NAME OF RIVER – LUNI & MITRI RIVER AND ITS CONNECTED FLOW NALLAHS Purpose – Fresh Grant, Proposed Production – 40,00,000 MTPA APPLIED LEASE AREA– 2439Hect. PROJECT COST – 2.5 CRORE. CATEGORY- ΄A΄ APPLICANT EIA CONSULTANT Sh. Himmat Singh Sekhawat M/S UDAIPUR MIN-TECH PVT. LTD 98, Rooprajat Township 206-APEKSHA COMPLEX Phase-II,Pal Road, SECTOR NO.-11 Jodhpur, Rajasthan HIRAN MAGARI, UDAIPUR-313002 (RAJ.) Mobs. 09799955444 PH- 91-294-2489672 (OFF.) E mail:- yagyapratap@gmailcom E mail :- [email protected] ACCREDITED BY NABET (S.NO. 159) CATEGORY “A” FOR SECTOR 1 & ‘B’ CATEGORY FOR SECTOR 22 & 38 M/s Himmat Singh Shekhawat River Bed Mining 1 Prepared by M/s Udaipur Min-Tech Pvt. Ltd. CONTENTS CHAPTER PARTICULAR PAGE NO. NO. 0 ACCREDITATION CERTIFICATE OF NABET 3 0 COMPLIANCE TO TERM OF REFERENCE 32 (TOR) I INTRODUCTION 34-41 II PROJECT DESCRIPTION 42-54 III DESCRIPTION OF THE ENVIRONMENT 55-157 IV ANTICIPATED ENVIRONMENTAL IMPACTS 158-172 & MITIGATION MEASURES V ANALYSIS OF ALTERNATIVES 173-174 VI ENVIRONMENTAL MONITORING 175-178 PROGRAMME VII ADDITIONAL STUDIES 179-192 VIII PROJECT BENEFITS 193-195 IX ENVIRONMENTAL MANAGEMENT PLAN 196-205 X SUMMARY &CONCLUSION 206-209 XI DISCLOSURE OF CONSULTANTS ENGAGED 210-212 M/s Himmat Singh Shekhawat River Bed Mining 2 Prepared by M/s Udaipur Min-Tech Pvt. Ltd.
    [Show full text]
  • Accounts Department – Nw Railway
    TELEPHONE NUMBERS – ACCOUNTS DEPARTMENT – N.W. RAILWAY Name Designation Rly. No.095+ BSNL No.0141+ Mobile/CUG Mr/Mrs/Ms. Office Res. Office Res. K.S. Sunila FA & CAO 25100 44074 2725835* 2221148 90011-95100 B.C. Meena FA&CAO/F&B & G 25101 2725446* 2753882 90011-95101 Amilal Meena FA&CAO/WS & IT 25102 2725837* 2606565 90011-95102 Sanjay Lavania FA&CAO/T, C&P 25103 2708864 90011-95118 M.M. Goyal Dy.CAO/G 25111 2725838* 90011-95103 L.S. Meena Dy.CAO/T 25112 2725841* 2353568 90011-95104 S.S. Wadhawan Dy.CAO(W&S) 25113 44016 2725842* 2225112 90011-95105 V.D. Sharma Dy.FA&CAO/Fin. 25114 2725840* 90011-95106 M.H. Khan Dy.FA&CAO(B&B) 25116 90011-95131 M.G. Sharma Sr.EDPM 25090 2725831* 90011-95126 R.P. Mathur Dy.CAO(C&P/Sales) 25115 2725839 90011-95107 S.K. Garg AFA(TA) 25138 90011-95108 Vishnu Bajaj S&AO & SAFA(BD) 25121 2725847 90011-95109 G.L. Meena SAFA/S-Fin & S-Exp 25124 90011-95110 SAFA(BD) 90011-95111 Nishta Puri SAFA(Fin) 25122 90011-95123 J.P. Jat SAFA/Books 25125 90011-95112 Y.N. Vijay AFA/Bud 25135 90011-95113 R.L. Khandelwal SAFA/Adm 25126 90011-95114 G.S. Sodhi SAFA/Sales & Susp 25134 90011-95115 R.K. Chaturvedi SAFA(Effy,Gen) 25128 2784341 90011-95120 AFA/Insp & AJ 25131 90011-95119 M.C. Gupta AFA/Exp. 25132 90011-95116 Dinesh Kumar Sharma AFA/PF & Pen 25123 90011-95117 AFA(Stores) 90011-95121 45135 90011-95122 Amit Bagari Chief Cashier 2221103 25117 Chandresh Gupta SAFA(IC/Stores) 25129 44165 90011-95129 AFA/EG-ENG & 90011-95124 Shiv Karan Meena 25136 AJ/Insp AFA/Pension 25137 90011-95130 Anurag Kapil Dy.CVO(A/cs) 25054 2725827 90011-95022 PS to FA&CAO 25100 2725835 90011-95193 Name Designation Rly.
    [Show full text]
  • Jktlfkku Yksd Lsok Vk;Ksx }Kjk Iz/ Kkuk/;Kid&Ekfo Izf R
    jktLFkku yksd lsok vk;ksx }kjk iz/kkuk/;kid&ekfo izfr;ksxh ijh{kk &2018 esa p;fur vk'kkfFkZ;ksa ds inLFkkiu gsrq la'kksf/kr dkmlfyax ofj;rk dkmlfyax esfjV fo'ks"k tkWap jksy ua0 vkosfnr oxZ p;u oxZ uke tUefrfFk irk dkmlfyax fnol ofj;rk dzekWad uEcj oxZ ny dz- 1 134840 366 BC,WE,LD,RG GENF MANJU 1 20-07-1987 WARD NO 01, MANAKSAR, SURATGARH, MANAKSAR, SRI GANGANAGAR, 1 14-10-2019 Rajasthan, 335804 2 190024 428 BC,LD,RG OBCM MOHAN LAL KALBI 1 07-05-1986 KALBIVAS NAVIN BHAWARI POST BHAWARI TEHSIL PINDWARA, BHAWARI, 2 14-10-2019 SIROHI, Rajasthan, 307023 3 168049 531 MB,LD,RG MBCM RAJESH KUMAR GURJAR 1 01-08-1981 DHANI MANDHA, VPO BHAGEGA, NEEM KA THANA, SIKAR, Rajasthan, 3 14-10-2019 332714 4 133150 578 BC,LD,RG OBCM AMANDEEP 1 08-06-1986 VPO KISHANPURA UTTRADHA, TEH SANGARIA, DIST HANUMANGARH, 4 14-10-2019 KISHANPURA UTTRADHA, HANUMANGARH, Rajasthan, 335062 5 180021 629 BC,LD,RG OBCM KESA RAM BISHNOI 1 08-07-1988 VILLAGE MALIYO KA GOLIYA, POST BHADRUNA, TEH SANCHORE, MALIYO KA 5 14-10-2019 GOLIYA, JALORE, Rajasthan, 343041 6 130758 631 BC,LD,RG OBCM VIKRAM SWAMI 1 15-09-1981 VPO.KARWASAR, Karwasar, CHURU, Rajasthan, 331001 6 14-10-2019 7 147570 679 GE,LD,RG GENM SHANKER LAL SHARMA 1 01-05-1979 MUKAM POST-JAISINGHPURA GUARDY, VIA- KALADERA, TEH.-CHOMU, 7 14-10-2019 RAMDEV BABA KI DHANI, JAIPUR, Rajasthan, 303801 8 105779 689 GE,LD,RG GENM HEMENDRA SINGH RATHORE 1 14-11-1976 NEAR TELEPHONE EXCHANGE, GANDHI NAGAR COLONY, GULABPURA, 8 14-10-2019 GULABPURA, BHILWARA, Rajasthan, 311021 9 142328 760 ST,LD,RG STM RAM RATAN MEENA 1 02-10-1982 VPO-KHORA LADKHANI, VIA-GATHWARI, TEH-SHAHPURA, KHORA 9 14-10-2019 LADKHANI, JAIPUR, Rajasthan, 303120 10 132592 763 BC,WE,LD,RG OBCF MANISH 1 20-04-1986 d/o subhash chander yadav, 1 BHD,Hanumangarh,Rajasthan, 1 BHD bhojasar 10 14-10-2019 bhadra, HANUMANGARH, Rajasthan, 335501 11 180542 792 GE,LD,RG GENM HARVINDER SINGH 1 28-10-1980 PLOT NO.- 171, HANWANT - B,B.J.S.
    [Show full text]
  • Bid Document of Short Term Tender for Supply of Two Wheeler (Motorized) (BS IV Standard Or Above) for Girls
    TRIBAL AREA DEVELOPMENT DEPARTMENT Head Office: Commissioner, Tribal Area Development Department, Udaipur Phone - 0294-2428721-24, Fax No. 0294-2411417, E-Mail : [email protected] Bid Document of short term tender for supply of Two Wheeler (Motorized) (BS IV Standard or above) for Girls Page 1 of 56 TRIBAL AREA DEVELOPMENT DEPARTMENT Head Office: Commissioner, Tribal Area Development Department, Udaipur Phone - 0294-2428721-24, Fax No. 0294-2411417, E-Mail : [email protected] Bid document for supply of Two Wheeler (Motorized, BS IV Standard or above) for Girls Reference No RFP: No.F.6( )Acct./CTAD/Scooty/2019-20/4336 Date:- 10-02-2020 Mode of Bid Submission Online through e-Procurement/ e-Tendering system at http://eproc.rajasthan.gov.in Tendering Authority/ Procuring entity: Commissioner, Tribal Area Development Department, Udaipur Date & Time of Pre-bid meeting Date:- 17.02.2020 Time:- 11.30 A.M. Last Date & Time of Submission of Bid Date:- 25.02.2020 Time:- 06.00 P.M. Date & Time of Opening of Technical Bid Date:- 26.02.2020 Time:- 03.00 P.M. Fee of Tender Document: Rs. 5000 (Rupees five Thousand only) E-Tender processing fee: Rs. 1000/- (Rupees One Thousand Only) Name of the Bidding Company/ Firm: Contact Person (Authorized Bid Signatory): Correspondence Address: Mobile No Telephone & Fax Nos.: Website & E-mail : Commissioner, Tribal Area Development Department, Udaipur 1, Saheli Marg, chetak circle, Udaipur (Rajasthan) Other information: 1. Region: State of Rajasthan 2. Address for correspondence: 1, Saheli Marg, chetak circle, Udaipur (Rajasthan) 3. Phone No. 0294-2428721-24 4.
    [Show full text]
  • Impact of Quality of Ground Water Irrigation on Soil Health in Bilara
    International Journal of Chemical Studies 2019; 7(6): 1642-1648 P-ISSN: 2349–8528 E-ISSN: 2321–4902 IJCS 2019; 7(6): 1642-1648 Impact of quality of ground water irrigation on © 2019 IJCS Received: 22-09-2019 soil health in bilara tehsil of Jodhpur Accepted: 24-10-2019 Gajendra Kumar Meena Gajendra Kumar Meena, IJ Gulati and Bhagwat Singh kherawat Department of Soil Science and Agricultural Chemistry, College of Agriculture, Swami Abstract Keshwanand Rajasthan The present investigation “Impact of quality of ground water irrigation on soil health in Biara tehsil of Agricultural University, Bikaner, Jodhpur” was undertaken to assess the quality of ground water from respective irrigated fields were Rajasthan, India collected. Based on EC, SAR and RSC ground waters were classified into three categories viz: saline (15%), high SAR saline (70%) and marginally alkali (15%) and it was found that majority of ground IJ Gulati waters of the studied area are not suitable for irrigation of crops. Department of Soil Science and Agricultural Chemistry, College Keywords: Saline water, Farmer’s field of Agriculture, Swami Keshwanand Rajasthan Introduction Agricultural University, Bikaner, Rajasthan, India The natural resources of any country are the national treasure and need proper planning to make best of them. Due to the inadequacy of surface water. The ground water is becoming Bhagwat Singh kherawat more and more important in India’s agriculture and food security in the recent years. It has SMS Soil Science, Krishi Vigyan become the main source of growth in irrigated areas over the past 3 decades, and now it Kendra, Bikaner-II, Swami accounts for over 60 percent of the irrigated area in the country.
    [Show full text]
  • District Average Rainfall “ Actual & Normal” Annexure-"CB" from June 1St to September 30Th 2018
    INDEX S. No. Particulars Page No. 1 Rainfall Status of Monsoon Year – 2018 1 2 Introduction 2-3 3 IMD and its Long Range Forecast for 2018 4 4 Salient features of monsoon 2018 5-27 6 Annexures 28-80 Rainfall A District wise status of rainfall (Year 2018) 28 B Tehsil wise status of rainfall 29-36 District wise monthly average rainfall with deviation from C 37-38 normal (Year 2018) District wise monthly average rainfall with deviation from D 39-40 normal (Year 2014-18) E Maximum one day rainfall (100mm and above) 41-45 Storage Status of total water storage as on 30th September for tanks F 46 having capacity more than 4.25 MCUM (Year 1990-2018) Abstract of fully filled , partially filled and empty tanks G 47 (Year 2014-18) Gauge and capacity of tanks on 30th September having H 48-59 capacity above 4.25 MCUM (Year 2014-18) Gauge and capacity of tanks on 30th September having I 60-73 capacity below 4.25 MCUM (Year 2014-18) District wise position of over flown tanks during monsoon, J 74-79 2017 & 2018 K Year wise position of over flown tanks (2004 to 2018) 80 MONSOON MAP OF RAJASTHAN GANGANAGAR HANUMANGARH YEAR - 2018 CHURU Ü JHUNJHUNU BIKANER ALWAR SIKAR BHARATPUR NAGAUR JAISALMER JAIPUR DAUSA JODHPUR DHAULPUR KARAULI AJMER TONK SAWAI MADHOPUR BARMER PALI BHILWARA BUNDI KOTA JALORE RAJSAMAND CHITTAURGARH BARAN CHITTAURGARH Category Of Rainfall SIROHI JHALAWAR Abnormal (+60% or More) (0) UDAIPUR Excess (+59% To +20%) (6) PRATAPGARH Normal (+19% To -19%) (20) Deficit (-20% To -59%) (6) DUNGARPUR Scanty (-60% or Less) (1) BANSWARA Introduction The present report on the 2018 South-West monsoon season is prepared and published by Water Resources Department, Rajasthan that brings out detailed analysis of monitoring and forecasting aspects of the southwest monsoon.
    [Show full text]
  • Bhadla (Rajasthan)
    Draft Initial Environmental Assessment Report Document Stage: Draft Project Number: 49214-002 (IND) December 2016 IND: Solar Transmission Sector Project (Transmission System associated with Solar Power Parks at Bhadla, Rajasthan) Prepared by Power Grid Corporation of India Ltd. for the Asian Development Bank This Draft Initial Environmental Assessment Report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. TABLE OF CONTENTS S.No Title Page ABBREVIATIONS IV WEIGHTS AND MEASURES V EXECUTIVE SUMMARY 1 1.0 INTRODUCTION 4 1.1 Background 4 1.2 The Project 5 2.0 POLICY, LEGAL AND ADMINISTRATIVE FRAMEWORK 7 2.1 National Environmental Requirements 7 2.2 POWERGRID’s ESPP 9 2.3 Asian Development Bank’s Environmental Requirements 10 3.0 DESCRIPTION OF THE PROJECT 11 3.1 Project Justification 11 3.2 Objective and Benefits of The Project 11 3.3 Project Highlights 12 3.4 Scope of Work 13 3.5 Location 13 4.0 DESCRIPION OF EXISTING ENVIRONMENT 16 4.1 Rajasthan State 16 5.0 ANTICIPATED ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES 25 5.1 Project’s Area of Influence 25 5.2 Impacts and Mitigation Measures Due to Location and Design 25
    [Show full text]