I RECEI V EO Volume 1

Total Page:16

File Type:pdf, Size:1020Kb

I RECEI V EO Volume 1 Government of Hong Kong Highways Department LANTAU FIXED CROSSING I [ i ~ Environmental Assessment Final Report RECEI VEO Volume 1 Agreement No. CE/11j78 Mott MacDonald Hong Kong Ltd. in association with Harris & Sutherland (Far East) L G. Mouchel & Partners (Asia) [ li LANTAU FIXED CROSSING AGREEMENT NO. CE/11I78 [I ENVIRONMENTAL ASSESSMENT FINAL REPORT [j VOLUME 1 o TABLE OF CONTENTS Page 1. INTRODUCTION 1.1 o 1.1 Background 1.1 1.2 Synopsis 1.2 1.2.1 Objectives of the Environmental Planning Assessment 1.2 o 1.2.2 Methodology 1.2 1.2.3 Air Quality 1.3 1.2.4 Water Quality 1.4 o 1.2.5 Noise Pollution 1.8 1.2.6 Visual Impacts 1.11 1.2.7 Land Use Impacts 1.11 [I 1.2.8 Recommendations in the EPA 1.12 2. AIR QUALITY 2.1 C I 2.1 Introduction 2.1 l. 2.2 Background 2.1 2.3 Air Sensitive Receivers 2.2 2.4 Meteorological D~ta 2.3 U 2.5 Methodology for the Construction Phase Assessment 2.3 2.5.1 Modelling Techniques 2.4 2.5.2 Wind Conditions 2.4 [J 2.5.3 Emission Factors 2.5 2.5.4 Construction Activities for the LFC 2.5 2.5.5 Construction Activities for Route 3 2.6 [I 2.5.6 Works Areas 2.6 2.6 Assessment of Construction of the LFC excluding the 2.6 North Lantau Road o 2.6.1 Predicted Dust Levels 2.6 2.6.2 Mitigation Measures 2.10 2.7 Assessment of Construction of the LFC including the 2.11 U North Lantau Road 2.7.1 Introduction 2.11 2.7.2 1 Hour Dust Levels 2.11 [1 2.7.3 24 Hour Dust Levels 2.16 2.7.4 Mitigation Measures 2.16 2.8 Operational Phase Assessment 2.17 2.8.1 Methodology 2.17 o 2.8.2 Operation Stage Impact Assessment and Evaluation 2.18 2.8.3 Combined Operation Stage Impacts from Route 3 2.19 u 2.8.4 Mitigation Measures during Operation 2.19 Jj i 1 ~ . -' [ Page [ 3. WATER QUALITY 3.1 3.1 Background 3.1 [ 3.2 Extension of the Tung Wan Embayment 3.2 3.3 Penny's Bay Works Site 3.4 3.4 Kap Shui Mun Works Sites 3.6 [ 3.5 Underwater Blasting 3.8 3.6 Disposal of Dredged Materials 3.8 3.7 Monitoring during Construction 3.8 3.8 Environmental Audit 3.9 D 4. CONSTRUCTION NOISE 4.1 4.1 Introduction 4.1 [ 4.2 The EXCO Exemption 4.1 4.3 Methodology 4.2 4.4 Construction Activities 4.6 [ 4.5 Sensitive Receivers 4.6 4.6 Acceptable Noise Levels 4.7 4.7 Noise from Construction of the Tsing Ma Bridge 4.8 [ 4.7.1 General 4.8 4.7.2 Impacts during Period 1 4.11 4.7.3 Impacts during Period 2 4.11 [ 4.7.4 Noise Mitigation at Receivers 4.11 4.7.5 Conclusions and Recommendations 4.15 4.8 Noise from the Construction of the Kap Shui Mun Bridge/ 4.15 [ Ma Wan Viaducts 4.8.1 General 4.15 4.8.2 Impacts during Period 1 4.19 [ 4.8.3 Impacts during Period 2 4.26 4.8.4 Noise Mitigation at Receivers 4.26 4.8.5 Conclusions and Recommendations 4.26 [ 5. RAILWAY NOISE 5.1 5.1 Introduction 5.1 5.2 Tsing Ma Bridge 5.1 C 5.2.1 Introduction 5.1 5.2.2 Trackform Options Considered 5.1 5.2.3 Acoustic Considerations 5.3 [ 5.2.4 Engineering Aspects 5.5 5.3 Kap Shui Mun Bridge and Ma Wan Viaducts 5.7 r· 5.3.1 Environmental Reference Scheme 5.7 L 5.3.2 Technical Decisions 5.8 5.3.3 Predicted Noise Levels 5.10 5.3.4 Conclusions 5.12 [ 6. LAND USE 6.1 6.1 Afteruse of Project Works Sites 6.1 [ 6.2 Potential Afteruses 6.1 [ 0 [. [ U LIST OF TABLES Page 0 2.1 Background Levels of Air Pollution at East Tsing Yi 2.2 2.2 Air Quality Data Collected at Tung Chung 2.2 2.3 Air Quality Objectives 2.4 0 2.4 Maximum Predicted TSP Levels (Without Mitigation) 2.7 2.5 Maximum Predicted RSP Levels (Without Mitigation) 2.8 Q 2.6 Summary of the Percentage Exceedance of 24-Hour AQO during 2.10 Construction (Without Mitigation) 2.7 Highest I-Hr .TSP (p.g/m') Concentration for the North Lantau Road 2.12 - Background Level Excluded (Without Mitigation) n 2.8 Combined I-Hr TSP (p.g/m') Concentration - Background Level 2.12 Included (Without Mitigation) 2.9 Combined I-Hr TSP (p.g/m') Concentration - Background Level 2.12 [I Included (With Mitigation) 2.10 Highest I-Hr RSP (p.g/m') Concentration for the North Lantau Road 2.13 - Background Level Excluded (Without Mitigation) 0 2.11 Combined I-Hr RSP (p./m') Concentration - Background Level 2.13 Included (Without Mitigation) 2.12 Combined I-Hr RSP (p.g/m') Concentration - Background Level 2.13 [l Included (With Mitigation) 2.13 24-Hr Averaged TSP (p.g/m') Concentration for the North Lantau 2.14 Road - Background Level Excluded (Without Mitigation) [I 2.14 Combined 24-Hr Averaged TSP (p.g/m') Concentration - Background 2.14 Level Excluded (Without Mitigation) 2.15 Combined 24-Hour Averaged TSP (p.g/m') Concentration - Background 2.14 11 Level Excluded (With Mitigation) t J 2.16 24-Hr Averaged RSP (p.g/m') Concentration for the North Lantau 2.15 Road - Background Level Excluded (Without Mitigation) [] 2.17 Combined 24-Hr Averaged RSP (p.g/m') Concentration - Background 2.15 Level Excluded (Without Mitigation) 2.18 Combined 24-Hr Averaged RSP (p.g/m') Concentration - Background 2.15 Level Excluded (With Mitigation) 0 2.19 Average Traffic Mix 2.17 2.20 Traffic Flow during Operation Phase 2.17 0 2.21 Modelling Results - Operation Stage (including background) 2.18 3.1 Net Velocity Vectors of Stations 1, 4 and 6 on Neap and Spring Tide 3.3 Cycles at Tung Wan Bay [j 3.2 Net Velocity Vectors of Stations 1, 3 and 7 on Neap and Spring Tide 3.7 Cycles at Kap Shui Mun [ Page [ 4.1 Noise Mitigation 4.5 4.2 Sensitive Receivers 4.7 [i 4.3 Area Sensitivity Ratings (ASRs) 4.8 4.4 Basic Noise Levels (BNLs) 4.8 4.5 Sound Power Levels from Tsing Ma Bridge/Ma Wan Substructure 4.9 4.6 Sound Power Levels from Tsing Ma Bridge/Tower Construction 4.9 C 4.7 Sound Power Levels from Tsing Ma Bridge/Tsing Yi Substructure 4.10 4.8 Sound Power Levels from Tsing Ma Bridge/Suspension Cables 4.10 4.9 Sound Power Levels from Tsing Ma Bridge/Deck Superstructure 4.10 C 4.10 Tsing Ma Bridge Construction Noise - Without Mitigation 4.12 4.11 Exceedance of ANL for Period 1 - with Mitigation Methods A, B and C 4.13 4.12 Exceedance of ANL for Period 2 - with Mitigation Methods A, B and C 4.14 C 4.13 Maximum Noise Levels for the Tsing Ma Bridge Contract 4.15 4.14 Sound Power Levels from Kap Shui Mun Bridge/Lantau Works Site 4.15 4.15 Sound Power Levels from Kap Shui Mun Bridge/Ma Wan Works Site 4.16 C 4.16 Sound Power Levels from Kap Shui Mun BridgelLantau Anchorage 4.16 4.17 Sound Power Levels from Kap Shui Mun Bridge/Ma Wan Anchorage 4.16 4.18 Sound Power Levels from Kap Shui Mun Bridge/Lantau Tower 4.17 C 4.19 Sound Power Levels from Kap Shui Mun Bridge/Ma Wan Tower 4.17 4.20 Sound Power Levels from Kap Shui Mun Bridge/Lantau Pier 4.17 4.21 Sound Power Levels from Kap Shui Mun Bridge/Ma Wan Pier 4.18 [ 4.22 Sound Power Levels from Kap Shui Mun Bridge/Deck Superstructure 4.18 4.23 Sound Power Levels from Ma Wan Viaducts/Piers A to H 4.18 4.24 Sound Power Levels from Ma Wan ViaductslWorks Area and Haul Road 4.19 4.25 Kap Shui Mun Bridge Construction Noise - Without Mitigation 4.20 C 4.26 Exceedance of ANL for Period 1 for the Kap Shui Mun Bridge - with 4.21 Mitigation Methods A, B and C 4.27 Exceedance of ANL for Period 2 for the Kap Shui Mun Bridge - with 4.22 C Mitigation Methods A, B and C 4.28 Ma Wan Viaducts Construction Noise - without Mitigation 4.23 4.29 Exceedance of ANL for Period 1 for the Ma Wan Viaducts - with 4.24 C Mitigation Methods A, B and C 4.30 Exceedance of ANL for Period 2 for the Ma Wan Viaducts - with 4.25 Mitigation Methods A, B and C [ 4.31 Maximum Noise Levels for the Kap Shui Mun/Ma Wan Viaducts Contracts 4.26 5.1 Predicted Facade Noise Levels 5.11 [ 11 LJ 0 u11 L [ lJI r~ L! li lj LIST OF FIGURES 2.1 Study Area and Locations of Sensitive Receivers [l 2.2 Key Construction Activities during Period 1 Excluding NLR 2.3 Key Construction Activities during Period 2 Excluding NLR 2.4 Key Construction Activities during Period 3 Excluding NLR 2.5 Key Construction Activities during North Lantau Road Construction 0 2.6 Highest I-Hour TSP Level Distribution during Period 1 Excluding NLR 2.7 Highest I-Hour RSP Level Distribution during Period 1 Excluding NLR [1 2.8 Highest I-Hour TSP Level Distribution during Period 2 Excluding NLR J 2.9 Highest I-Hour RSP Level Distribution during Period 2 Excluding NLR 2.10 Highest I-Hour TSP Level Distribution during Period 3 Excluding NLR 2.11 Highest I-Hour RSP Level Distribution during Period 3 Excluding NLR n 2.12 Predicted 24-Hour TSP Concentration in Period 1 Excluding NLR 2.13 Predicted 24-Hour RSP Concentration in Period 1 Excluding NLR 2.14 Predicted 24-Hour TSP Concentration in Period 2 Excluding NLR n 2.15 Predicted 24-Hour RSP Concentration in Period 2 Excluding NLR 2.16 Predicted 24-Hour TSP Concentration in Period 3 Excluding NLR 2.17 Predicted 24-Hour RSP Concentration in Period 3 Excluding NLR n 2.18 Highest I-Hour TSP Level Distribution during Period 3 Including NLR 2.19 Highest I-Hour RSP Level Distribution during Period 3 Including NLR 2.20 Highest I-Hour TSP Level Distribution during Period 3 Including NLR With Mitigation [1J 2.21 Highest I-Hour RSP Level Distribution during Period 3 Including NLR With Mitigation 2.22 24-Hour Average TSP Distribution during Period 3 Including NLR [-I 2.23 24-Hour Average RSP Distribution during Period 3 Including NLR .1 2.24 24-Hour Average TSP Distribution during Period 3 Including NLR With Mitigation 2.25 24-Hour Average RSP Distribution during Period 3 Including NLR With Mitigation 2.26 Predicted 24-Hour TSP Concentration in Period 3 Including NLR [-I 2.27 Predicted 24-Hour RSP Concentration in Period 3 Including NLR ~) .2.28 Predicted 24-Hour TSP Concentration in Period 3 Including NLR With Mitigation 2.29 Predicted 24-Hour RSP Concentration in Period 3 Including NLR With Mitigation
Recommended publications
  • 香港社會及經濟趨勢hong Kong Social and Economic Trends
    香港社會及經濟趨勢 Hong Kong Social and Economic Trends 二零零五年版 2005 Edition 有關本刊物的查詢,請聯絡: 政府統計處綜合統計組(二)乙 地址:中國香港灣仔港灣道十二號灣仔政府大樓二十一樓 電話:(852) 2582 4734 圖文傳真:(852) 2119 0161 電郵:[email protected] Enquiries about this publication can be directed to : General Statistics Section (2)B Census and Statistics Department Address : 21/F Wanchai Tower, 12 Harbour Road, Wan Chai, Hong Kong, China. Tel. : (852) 2582 4734 Fax : (852) 2119 0161 E-mail : [email protected] 政府統計處網頁 Website of the Census and Statistics Department http://www.censtatd.gov.hk 本刊物備有印刷版和下載版可供選擇。有關銷售途徑的詳情,請參閱本刊物內第 A9 頁。 This publication is available in both print version and download version. For details of purchase, please see page A9 of this publication. Produced by the Census and Statistics Department 政府統計處製作 序言 Foreword 每兩年出版一次的《香港社會 The biennial publication, Hong Kong Social and 及經濟趨勢》是政府統計處編製的 Economic Trends, is one of the general statistical digests 綜合性統計刊物之一,其他綜合性 compiled by the Census and Statistics Department. Other 統計刊物包括《香港經濟趨勢》 digests include Hong Kong Economic Trends (half- ( 半月刊) 、《香港統計月刊》和 monthly), Hong Kong Monthly Digest of Statistics and 《香港統計年刊》。這些綜合性統 Hong Kong Annual Digest of Statistics. Each digest 計刊物輯錄香港社會及經濟各方面 brings together statistical data covering various social and 的統計資料,提供範圍十分廣泛的 economic aspects of Hong Kong. Statistical data 數據,涉及社會、經濟和工商業各 contained cover a very wide range of topics relating to 主題。它們各具特色,出版頻次、 society, the economy and businesses. The digests are 所載數列的統計期、詳細程度及形 each featured in its own way. They are published at 式有所不同,相輔相成,組成一個 different frequencies with statistical data series presented 全面的參考系列。 in various length, depth and format. Complementing each other, together they form a comprehensive series for reference.
    [Show full text]
  • COI MTR-HH Day40 14Jan2019
    Commission of Inquiry into the Diaphragm Wall and Platform Slab Construction Works at the Hung Hom Station Extension under the Shatin to Central Link Project Day 40 Page 1 Page 3 1 Monday, 14 January 2019 1 COMMISSIONER HANSFORD: And maybe if we could look it -- 2 (10.02 am) 2 I don't know, something like 25 January; bring it as 3 MR PENNICOTT: Good morning, sir. 3 up-to-date as we possibly can. 4 CHAIRMAN: Good morning. 4 MR BOULDING: It may well even be the case that we could 5 MR PENNICOTT: Sir, you will see around the room this 5 take it up to 29 January. We will see what can be done 6 morning that there are some perhaps unfamiliar faces to 6 and we will update it as much as we possibly can. 7 you. That is because we are starting the structural 7 COMMISSIONER HANSFORD: Thank you very much. 8 engineering expert evidence this morning, and I think, 8 CHAIRMAN: Good. 9 although I haven't counted, that most if not all of the 9 MR PENNICOTT: Sir, before we get to Prof Au -- good 10 structural engineering experts are in the room. 10 morning; we'll be with you shortly, Prof Au -- could 11 CHAIRMAN: Yes. 11 I just mention this. I think it's a matter that has 12 MR PENNICOTT: As you know, Prof McQuillan is sat next to 12 been drawn to the Commission's attention, but there have 13 me, I can see Mr Southward is there, and I think 13 been some enquiries from the media, and in particular 14 Dr Glover is at the back as well, and at the moment 14 the Apple Daily, in relation to questions concerning the 15 Prof Au is in the witness box.
    [Show full text]
  • File Ref.: MA 60/1(2002) Pt.4 LEGISLATIVE COUNCIL BRIEF
    File Ref.: MA 60/1(2002) Pt.4 LEGISLATIVE COUNCIL BRIEF SHIPPING AND PORT CONTROL (AMENDMENT) REGULATION 2002 INTRODUCTION At the meeting of the Executive Council on 25 June 2002, the Council ADVISED and the Chief Executive ORDERED that the A Shipping and Port Control (Amendment) Regulation 2002, at Annex A, should be made under section 80(1) of the Shipping and Port Control Ordinance to impose a designated area in the Kap Shui Mun water area and require all vessels to tender pre-arrival notification (PAN). BACKGROUND AND ARGUMENT Imposing a Special Area in the Kap Shui Mun area 2. At present, through traffic to and from the northwestern approaches of Hong Kong waters are free to be conducted in either the Kap Shui Mun Fairway or Ma Wan Fairway. Such traffic can be both southeast-bound and northwest-bound. The average navigational width of the Kap Shui Mun Fairway and Ma Wan Fairway are 210 metres and 680 metres respectively. 3. In view of the collision incidents that happened in the Kap Shui Mun area, Marine Department conducted an in-house study in the year 2000 on the traffic using the area with a view to developing measures to improve navigational safety there. The study recommends, inter alia, that a single direction traffic scheme should be introduced to the Kap Shui Mun area. Under the scheme, through traffic in the northern part of the much narrower Kap Shui Mun Fairway should be limited to southeast-bound only. The two-way bound traffic arrangement in both the southern part of the Kap Shui Mun Fairway and the entire Ma Wan Fairway can remain unchanged.
    [Show full text]
  • Paper on the Operational Arrangements for the Hong Kong-Zhuhai-Macao Bridge and the Hong Kong
    立法會 Legislative Council LC Paper No. CB(4)1072/17-18(04) Ref. : CB4/PL/TP Panel on Transport Meeting on 18 May 2018 Background brief on the operational arrangements for the Hong Kong-Zhuhai-Macao Bridge and the Hong Kong Port Purpose This paper provides background information on the Hong Kong-Zhuhai-Macao Bridge ("HZMB") project and related Hong Kong projects. It also summarizes the major views and concerns expressed by Legislative Council ("LegCo") Members on the traffic and transport arrangements and related operational issues of HZMB upon its commissioning in past discussions. Background Hong Kong-Zhuhai-Macao Bridge and related Hong Kong projects 2. HZMB is a dual three-lane carriageway in the form of bridge-cum-tunnel structure sea-crossing, linking Hong Kong, Zhuhai and Macao. The project is a major cross-boundary transport infrastructure project. According to the Administration, the construction of HZMB will significantly reduce transportation costs and time for travellers and goods on roads. It has very important strategic value in terms of further enhancement of the economic development between Hong Kong, the Mainland and Macao. 3. With the connection by HZMB, the Western Pearl River Delta will fall within a reachable three-hour commuting radius of Hong Kong. The entire HZMB project consists of two parts: - 2 - (a) the HZMB Main Bridge (i.e. a 22.9 km-long bridge and 6.7 km-long subsea tunnel) situated in Mainland waters which is being taken forward by the HZMB Authority1; and (b) the link roads and boundary crossing facilities under the responsibility of the governments of Guangdong, Hong Kong and Macao ("the three governments").
    [Show full text]
  • “Current and Future Bridge Health Monitoring Systems in Hong Kong”
    HIGHWAYS DEPARTMENT TSING MA CONTROL AREA DIVISION BRIDGE HEALTH SECTION “Current and Future Bridge Health Monitoring Systems in Hong Kong” by Eur Ing Dr. WONG, Kai-Yuen TMCA Division, Highways Department The Government of the Hong Kong Special Administrative Region 1 HIGHWAYS DEPARTMENT TSING MA CONTROL AREA DIVISION BRIDGE HEALTH SECTION Why Bridge Health Monitoring System is needed? • Monitoring Structural Performance and Applied Loads • Facilitating the Planning of Inspection and Maintenance • Validating Design Assumptions and Parameters • Updating and Revising Design Manuals and Standards 2 HIGHWAYS DEPARTMENT TSING MA CONTROL AREA DIVISION WASHMS BRIDGE HEALTH SECTION 1. WASHMS refers to Wind And Structural Health Monitoring System. 2. Application: “wind sensitivity structures”, i.e. frequency lower than 1 Hz. 3. Existing Bridges with WASHMS: (i) Tsing Ma & Kap Shui Mun Bridges - LFC-WASHMS. (ii) Ting Kau Bridge - TKB-WASHMS. 4. Future Bridges with WASHMS: (i) The Cable-Stayed Bridge (Hong Kong Side) in Shenzhen Western Corridor - SWC-WASHMS. (ii) Stonecutters Bridge - SCB-WASHMS. 3 ShenzhenShenzhen HIGHWAYS AREA DIVISION DEPARTMENT TSING MA CONTROL BRIDGE HEALTH SECTION ShekouShekou Shenzhen Western YuenYuen LongLong Corridor NewNew TerritoriesTerritories Ting Kau Bridge TuenTuenMun Mun ShaShaTin Tin Tsing Ma Bridge TsingTsingYi Yi Kap Shui Mun Bridge KowloonKowloon Hong Kong HongHong KongKong Stonecutters Bridge InternationalInternational AirportAirport LantauLantau HongHong KongKong IslandIsland IslandIsland 4 Tsing Ma Bridge
    [Show full text]
  • WORKING PAPER No. 39 INITIAL ASSESSMENT of POSSIBLE PORT DEVELOPMENT SITES
    This subject paper is intended to be a research paper delving into different views and analyses from various sources. The views and analyses as contained in this paper are intended to stimulate public discussion and input to the planning process of the "HK2030 Study" and do not necessarily represent the views of the HKSARG. WORKING PAPER No. 39 INITIAL ASSESSMENT OF POSSIBLE PORT DEVELOPMENT SITES Background 1. The port is a vital economic infrastructure of Hong Kong. As a result of rapid economic growth in Southern China and Mainland’s accession to the World Trade Organization, the Port Development Strategy Review (PDSR) 2001 recommended that the existing container terminals may not have sufficient capacity to meet long-term need and the next container terminal would be required in early next decade1. 2. In planning for the future port development, our objective is to formulate a sustainable port development strategy which will take into account both the economic needs for further port facilities and the possible measures to mitigate the existing and new environmental problems. As for future port location, four potential sites for future container port development were shortlisted by PDSR 2001 for further investigation, namely West Tuen Mun, East Lantau, Northwest Lantau and Southwest Tsing Yi. To finalise the best site for future container port development, the sites are now being further investigated under the Study on Hong Kong Port- Master Plan 2020 (HKP2020) to be completed in early 2004. In view of the proximity of the East Lantau site to the Disney Development, this site has not been selected for further detailed assessment.
    [Show full text]
  • Development of Tung Chung New Town in Hong Kong H. Wang, W
    Transactions on the Built Environment vol 33, © 1998 WIT Press, www.witpress.com, ISSN 1743-3509 Development of Tung Chung New Town in Hong Kong H. Wang, W. Wong Department of Civil and Structural Engineering, The Hong Kong Polytechnic University, Hung Horn, Kowloon, Hong Kong Email: [email protected] Email: [email protected]. hk Abstract Hong Kong's new airport at Chek Lap Kok is scheduled to open on July 6, 1998. At present, construction of all major projects is either at the last stage or in completion. Tung Chung New Town, one of the Airport Core Programme (ACP), has been initially set up for housing 216,000 people by 2006 and providing living area for servicing staff of the new airport. Based on the case study on the development of Tung Chung New Town, this paper illustrates the relationship between transport system and land use development. In the paper, referring to many survey data and research results, the development of Tung Chung New Town is shown to be essential due to the relocation of the Hong Kong Airport. On the other hand, comparing with other new towns in Hong Kong, Tung Chung New Town is provided with better transport system links that minimize the travel time and improve the comfort and accessibility to other parts of the territory. This makes Tung Chung New Town a more attractive new town for people to reside. 1 Introduction In the past twenty years, the Hong Kong International Airport at Kai Tak has commenced a series of improvement to cater for the continuous growth in passengers and cargo.
    [Show full text]
  • ICE Breaker Newsletter of ICE Hong Kong 2018 Issue 1 Messages and News Together We Can!
    ICE Breaker Newsletter of ICE Hong Kong 2018 Issue 1 Messages and News Together we can! ear Fellow members and friends, D We are now into the final quarter of the 2017/18 session for the ICE HKA committee. It has been a remarkably challenging and fruitful time for the committee. On top of our usual suite of high quality learned society activities, we have been exceedingly bold in launching an ambitious ICE 200 programme around three strands, namely knowledge, branding and inspiration. Our vision for this milestone year of the ICE bicentenary is to enthuse the profession, enhance our public image and inspire the next generation. Our ICE 200 events are centred around the TECH (ie technology, engineering, climate and humanitarian) themes. Some of our flagship events to date are as follows: (a) Innovation Summit on 12 January 2018. The Honourable Mrs Carrie Lam, Chief Executive of HKSAR Government, gave the opening address as the Guest of Honour. (b) Distinguished Lecture on 13 March 2018 delivered by Dr Robin Sham, CBE, and Dr Ana Ruiz-Teran from Imperial College London. Mr Andrew Heyn, British Consul-General to Hong Kong and Macao, gave the opening address as the Guest of Honour. (c) Grand Opening of the World’s Longest Span LEGO® bridge on 21 March 2018. The Honourable Mr Matthew Cheung, Chief Secretary for Administration, was the Guest of Honour for the Grand Opening Ceremony. About 80 students from 8 schools contributed to pre-assembling the bridge components. The LEGO® bridge was displayed to the public in ELEMENTS for one month.
    [Show full text]
  • Hansard (English)
    LEGISLATIVE COUNCIL ─ 7 June 2006 7999 OFFICIAL RECORD OF PROCEEDINGS Wednesday, 7 June 2006 The Council met at Eleven o'clock MEMBERS PRESENT: THE PRESIDENT THE HONOURABLE MRS RITA FAN HSU LAI-TAI, G.B.S., J.P. THE HONOURABLE JAMES TIEN PEI-CHUN, G.B.S., J.P. THE HONOURABLE ALBERT HO CHUN-YAN IR DR THE HONOURABLE RAYMOND HO CHUNG-TAI, S.B.ST.J., J.P. THE HONOURABLE LEE CHEUK-YAN THE HONOURABLE MARTIN LEE CHU-MING, S.C., J.P. DR THE HONOURABLE DAVID LI KWOK-PO, G.B.S., J.P. THE HONOURABLE FRED LI WAH-MING, J.P. DR THE HONOURABLE LUI MING-WAH, S.B.S., J.P. THE HONOURABLE MARGARET NG THE HONOURABLE MRS SELINA CHOW LIANG SHUK-YEE, G.B.S., J.P. THE HONOURABLE JAMES TO KUN-SUN THE HONOURABLE CHEUNG MAN-KWONG THE HONOURABLE CHAN YUEN-HAN, J.P. 8000 LEGISLATIVE COUNCIL ─ 7 June 2006 THE HONOURABLE BERNARD CHAN, J.P. THE HONOURABLE CHAN KAM-LAM, S.B.S., J.P. THE HONOURABLE MRS SOPHIE LEUNG LAU YAU-FUN, S.B.S., J.P. THE HONOURABLE LEUNG YIU-CHUNG THE HONOURABLE SIN CHUNG-KAI, J.P. DR THE HONOURABLE PHILIP WONG YU-HONG, G.B.S. THE HONOURABLE WONG YUNG-KAN, J.P. THE HONOURABLE JASPER TSANG YOK-SING, G.B.S., J.P. THE HONOURABLE HOWARD YOUNG, S.B.S., J.P. DR THE HONOURABLE YEUNG SUM THE HONOURABLE LAU CHIN-SHEK, J.P. THE HONOURABLE LAU KONG-WAH, J.P. THE HONOURABLE LAU WONG-FAT, G.B.M., G.B.S., J.P.
    [Show full text]
  • M / SP / 14 / 172 San Tsuen ¥S SHEK LUNG KUNG –‰ Ú¥Oª SEE PLAN REF
    200 451 è¦K Catchwater 400 303 fih 100 The Cairnhill 100 ROUTE 314 TWISK 80 200 Ser Res 80 100 Catchwater Ser Res TAI LAM CHUNG RESERVOIR ú¥OªÐ 474 flA Kwong Pan Tin flW˘§⁄ł§¤‚˛†p›ˇ M / SP / 14 / 172 San Tsuen ¥s SHEK LUNG KUNG –‰ ú¥Oª SEE PLAN REF. No. M / SP / 14 / 172 Tso Kung Tam Kwong Pan Tin Tsuen “T FOR TSUEN WAN VILLAGE CLUSTER BOUNDARIES Fu Yung Shan fl” U¤á 315 80 j¤VÆ 300 Ha Fa Shan ¥—¥ flW˘ fl´« Pak Tin Pa TSUEN KING CIRCUIT San Tsuen 400 Allway Gardens 100 100 Tsuen Wan Centre fl”· 200 Tsuen King Garden ¤{ Ma Sim Pei Tsuen “T» ¥—¥ Pak Tin Pa fl Tsuen ·wƒ TSUEN KING CIRCUIT Adventist Hospital flw… A A ⁄· Tsuen Tak Garden Kam Fung r´º´s ½ Muk Min Ha Tsuen 200 259 Garden 200 Discovery Park ROUTE TWISK 300 A» 200 Summit C«s⁄‰⁄‚ CASTLE Terrace ã®W PEAK ROAD - TSUEN WAN CHAI WAN KOK _ b¥s D e NORTH Pun Shan Tsuen j ROAD HO ã®WÆ TAI C«fi Catchwater TSUEN WAN F¨L fi WAN ” fl CHAI WAN KOK STREET Fuk Loi Estate ñº¨· Tsuen Wan LineLuk Yeung 226 Catchwater HOI PA STREET Sun Chuen 3.3.5 TAI CHUNG ROAD TUEN MUN ROAD ¡º 200 SHA TSUI ROAD j¤ 300 oªa¬ Yau Kom Tau HOI SHING ROAD ½ CASTLE PEAK ROAD - TSUEN j¤e Village R˜« 8 HOI HING ROAD j¤VÆk¤ Ser Res ù Belvedere Garden flW Tai Lam Centre SAI LAU KOK j¤VÆg Ser Res for Women 100 flW˘ C Tai Lam Correctional 344 3.3.4 j¤F Institution M†§ s TAI HO ROAD ½ Tsing Fai Tong o“a‹Y New Village 1 fi‡ SHAM TSENG Yau Kom Tau ROAD flW˘ t¤s TSUEN WAN ê¶ `² w SETTLEMENT Treatment Works fl fi– Tsuen Wan HOI ON ROAD Yuen Tun Catchwater BASIN SHAM TSENG RÄ£³ A» Plaza W ³²w w… Lindo Green Greenview Court TSUEN WAN è¬w¼L MARKET
    [Show full text]
  • Economic Competitiveness
    Brand Hong Hong’s visual identity — a powerful and energetic dragon — was designed to communicate the city’s historic link with a mythical icon. The blue and green ribbons that extend from the dragon symbolise blue sky and a sustainable environment, while Lion Rock — the famous landmark that represents the Hong Kong people’s “can-do” spirit — is silhouetted by the red ribbon. The fluid shape of the ribbons evokes versatility, and the multiple colours signify the city’s diversity and dynamism. C A Lo P La C In G In F S M T A H E E E In E L G Le E E H H Tr P La Ta M T Te C To Im Le Tr T A In H U Contents ABOUT HONG KONG 4 Location Population Language Climate International Trading Centre Global Services Centre International Corporate Base Free Trade and Free Market Small Government Monetary System The Rule of Law Airport Hong Kong Port ECONOMIC COMPETITIVENESS 9 Economic Development Economic Policy International Financial Centre Economic Links with the Mainland LIVING IN HONG KONG 16 Government Structure Legal System Employment Education Health Housing Transport Pollution and Environmental Control Law and Order Tax System Mandatory Provident Fund The Media Telecommunications COMING TO HONG KONG 32 Tourism Immigration Leisure and Culture Traditional Festivals THE FUTURE OF HONG KONG 38 Asia’s Cyber City for the Cyber Century Infrastructure Projects for the 21st Century HONG KONG: THE FACTS 44 USEFUL CONTACTS 47 3 ABOUT HONG KONG About Hong Kong La Ch Described as a ‘barren the rock’ some 150 years En ago, Hong Kong is today wit a world-class financial, an trading and business pro centre and, indeed, bu a great world city.
    [Show full text]
  • Hong Kong International Airport (Chek-Lap Kok Airport)
    HongHong KongKong InternationalInternational AirportAirport (Chek(Chek--LapLap KokKok Airport)Airport) 5/10/2006 5/10/2006 5/10/2006 5/10/2006 GeneralGeneral InformationInformation • Hong Kong International Airport (HKIA) is the principal airport serving Hong Kong. • As the world's fifth busiest (2004) international passenger airport and most active worldwide air cargo operation, HKIA sees an average of more than 650 aircraft take off and land every day. • Opened in 6 July 1998, it took six years and US $20 billion to build. • By 2040 it will handle eighty million passengers per year - the same number as London’s Heathrow and New York’s JFK airports combined 5/10/2006 GeneralGeneral InformationInformation • The land on which the airport stands was once a mountainous island. • In a major reclamation programme, its 100-metre peak was reduced to 7 metres above sea level and the island was expanded to four times its original area. 5/10/2006 Transportation HKIA Kai-Tak Airport 1998 Onwards 1925-1998 28 km from CBD 10 km from CBD 5/10/2006 10TransportationTransportation Core Projects Highway + Railway Routes 5/10/2006 North Lantau Expressway 12.5 km expressway along the north Lantau coast, from the Lantau Link to the new airport. It is the first highway to be constructed along the island's northern coastline. More than half the route is on reclaimed land. 5/10/2006 Railway Transport • 35 km long • (23 mins from CBD) 5/10/2006 Lantau Link LANTAU LINK (Tsing Ma Bridge, the Kap Shui Mun Bridge and the Ma Wan Viaduct.) World's longest road-rail
    [Show full text]