I RECEI V EO Volume 1

I RECEI V EO Volume 1

Government of Hong Kong Highways Department LANTAU FIXED CROSSING I [ i ~ Environmental Assessment Final Report RECEI VEO Volume 1 Agreement No. CE/11j78 Mott MacDonald Hong Kong Ltd. in association with Harris & Sutherland (Far East) L G. Mouchel & Partners (Asia) [ li LANTAU FIXED CROSSING AGREEMENT NO. CE/11I78 [I ENVIRONMENTAL ASSESSMENT FINAL REPORT [j VOLUME 1 o TABLE OF CONTENTS Page 1. INTRODUCTION 1.1 o 1.1 Background 1.1 1.2 Synopsis 1.2 1.2.1 Objectives of the Environmental Planning Assessment 1.2 o 1.2.2 Methodology 1.2 1.2.3 Air Quality 1.3 1.2.4 Water Quality 1.4 o 1.2.5 Noise Pollution 1.8 1.2.6 Visual Impacts 1.11 1.2.7 Land Use Impacts 1.11 [I 1.2.8 Recommendations in the EPA 1.12 2. AIR QUALITY 2.1 C I 2.1 Introduction 2.1 l. 2.2 Background 2.1 2.3 Air Sensitive Receivers 2.2 2.4 Meteorological D~ta 2.3 U 2.5 Methodology for the Construction Phase Assessment 2.3 2.5.1 Modelling Techniques 2.4 2.5.2 Wind Conditions 2.4 [J 2.5.3 Emission Factors 2.5 2.5.4 Construction Activities for the LFC 2.5 2.5.5 Construction Activities for Route 3 2.6 [I 2.5.6 Works Areas 2.6 2.6 Assessment of Construction of the LFC excluding the 2.6 North Lantau Road o 2.6.1 Predicted Dust Levels 2.6 2.6.2 Mitigation Measures 2.10 2.7 Assessment of Construction of the LFC including the 2.11 U North Lantau Road 2.7.1 Introduction 2.11 2.7.2 1 Hour Dust Levels 2.11 [1 2.7.3 24 Hour Dust Levels 2.16 2.7.4 Mitigation Measures 2.16 2.8 Operational Phase Assessment 2.17 2.8.1 Methodology 2.17 o 2.8.2 Operation Stage Impact Assessment and Evaluation 2.18 2.8.3 Combined Operation Stage Impacts from Route 3 2.19 u 2.8.4 Mitigation Measures during Operation 2.19 Jj i 1 ~ . -' [ Page [ 3. WATER QUALITY 3.1 3.1 Background 3.1 [ 3.2 Extension of the Tung Wan Embayment 3.2 3.3 Penny's Bay Works Site 3.4 3.4 Kap Shui Mun Works Sites 3.6 [ 3.5 Underwater Blasting 3.8 3.6 Disposal of Dredged Materials 3.8 3.7 Monitoring during Construction 3.8 3.8 Environmental Audit 3.9 D 4. CONSTRUCTION NOISE 4.1 4.1 Introduction 4.1 [ 4.2 The EXCO Exemption 4.1 4.3 Methodology 4.2 4.4 Construction Activities 4.6 [ 4.5 Sensitive Receivers 4.6 4.6 Acceptable Noise Levels 4.7 4.7 Noise from Construction of the Tsing Ma Bridge 4.8 [ 4.7.1 General 4.8 4.7.2 Impacts during Period 1 4.11 4.7.3 Impacts during Period 2 4.11 [ 4.7.4 Noise Mitigation at Receivers 4.11 4.7.5 Conclusions and Recommendations 4.15 4.8 Noise from the Construction of the Kap Shui Mun Bridge/ 4.15 [ Ma Wan Viaducts 4.8.1 General 4.15 4.8.2 Impacts during Period 1 4.19 [ 4.8.3 Impacts during Period 2 4.26 4.8.4 Noise Mitigation at Receivers 4.26 4.8.5 Conclusions and Recommendations 4.26 [ 5. RAILWAY NOISE 5.1 5.1 Introduction 5.1 5.2 Tsing Ma Bridge 5.1 C 5.2.1 Introduction 5.1 5.2.2 Trackform Options Considered 5.1 5.2.3 Acoustic Considerations 5.3 [ 5.2.4 Engineering Aspects 5.5 5.3 Kap Shui Mun Bridge and Ma Wan Viaducts 5.7 r· 5.3.1 Environmental Reference Scheme 5.7 L 5.3.2 Technical Decisions 5.8 5.3.3 Predicted Noise Levels 5.10 5.3.4 Conclusions 5.12 [ 6. LAND USE 6.1 6.1 Afteruse of Project Works Sites 6.1 [ 6.2 Potential Afteruses 6.1 [ 0 [. [ U LIST OF TABLES Page 0 2.1 Background Levels of Air Pollution at East Tsing Yi 2.2 2.2 Air Quality Data Collected at Tung Chung 2.2 2.3 Air Quality Objectives 2.4 0 2.4 Maximum Predicted TSP Levels (Without Mitigation) 2.7 2.5 Maximum Predicted RSP Levels (Without Mitigation) 2.8 Q 2.6 Summary of the Percentage Exceedance of 24-Hour AQO during 2.10 Construction (Without Mitigation) 2.7 Highest I-Hr .TSP (p.g/m') Concentration for the North Lantau Road 2.12 - Background Level Excluded (Without Mitigation) n 2.8 Combined I-Hr TSP (p.g/m') Concentration - Background Level 2.12 Included (Without Mitigation) 2.9 Combined I-Hr TSP (p.g/m') Concentration - Background Level 2.12 [I Included (With Mitigation) 2.10 Highest I-Hr RSP (p.g/m') Concentration for the North Lantau Road 2.13 - Background Level Excluded (Without Mitigation) 0 2.11 Combined I-Hr RSP (p./m') Concentration - Background Level 2.13 Included (Without Mitigation) 2.12 Combined I-Hr RSP (p.g/m') Concentration - Background Level 2.13 [l Included (With Mitigation) 2.13 24-Hr Averaged TSP (p.g/m') Concentration for the North Lantau 2.14 Road - Background Level Excluded (Without Mitigation) [I 2.14 Combined 24-Hr Averaged TSP (p.g/m') Concentration - Background 2.14 Level Excluded (Without Mitigation) 2.15 Combined 24-Hour Averaged TSP (p.g/m') Concentration - Background 2.14 11 Level Excluded (With Mitigation) t J 2.16 24-Hr Averaged RSP (p.g/m') Concentration for the North Lantau 2.15 Road - Background Level Excluded (Without Mitigation) [] 2.17 Combined 24-Hr Averaged RSP (p.g/m') Concentration - Background 2.15 Level Excluded (Without Mitigation) 2.18 Combined 24-Hr Averaged RSP (p.g/m') Concentration - Background 2.15 Level Excluded (With Mitigation) 0 2.19 Average Traffic Mix 2.17 2.20 Traffic Flow during Operation Phase 2.17 0 2.21 Modelling Results - Operation Stage (including background) 2.18 3.1 Net Velocity Vectors of Stations 1, 4 and 6 on Neap and Spring Tide 3.3 Cycles at Tung Wan Bay [j 3.2 Net Velocity Vectors of Stations 1, 3 and 7 on Neap and Spring Tide 3.7 Cycles at Kap Shui Mun [ Page [ 4.1 Noise Mitigation 4.5 4.2 Sensitive Receivers 4.7 [i 4.3 Area Sensitivity Ratings (ASRs) 4.8 4.4 Basic Noise Levels (BNLs) 4.8 4.5 Sound Power Levels from Tsing Ma Bridge/Ma Wan Substructure 4.9 4.6 Sound Power Levels from Tsing Ma Bridge/Tower Construction 4.9 C 4.7 Sound Power Levels from Tsing Ma Bridge/Tsing Yi Substructure 4.10 4.8 Sound Power Levels from Tsing Ma Bridge/Suspension Cables 4.10 4.9 Sound Power Levels from Tsing Ma Bridge/Deck Superstructure 4.10 C 4.10 Tsing Ma Bridge Construction Noise - Without Mitigation 4.12 4.11 Exceedance of ANL for Period 1 - with Mitigation Methods A, B and C 4.13 4.12 Exceedance of ANL for Period 2 - with Mitigation Methods A, B and C 4.14 C 4.13 Maximum Noise Levels for the Tsing Ma Bridge Contract 4.15 4.14 Sound Power Levels from Kap Shui Mun Bridge/Lantau Works Site 4.15 4.15 Sound Power Levels from Kap Shui Mun Bridge/Ma Wan Works Site 4.16 C 4.16 Sound Power Levels from Kap Shui Mun BridgelLantau Anchorage 4.16 4.17 Sound Power Levels from Kap Shui Mun Bridge/Ma Wan Anchorage 4.16 4.18 Sound Power Levels from Kap Shui Mun Bridge/Lantau Tower 4.17 C 4.19 Sound Power Levels from Kap Shui Mun Bridge/Ma Wan Tower 4.17 4.20 Sound Power Levels from Kap Shui Mun Bridge/Lantau Pier 4.17 4.21 Sound Power Levels from Kap Shui Mun Bridge/Ma Wan Pier 4.18 [ 4.22 Sound Power Levels from Kap Shui Mun Bridge/Deck Superstructure 4.18 4.23 Sound Power Levels from Ma Wan Viaducts/Piers A to H 4.18 4.24 Sound Power Levels from Ma Wan ViaductslWorks Area and Haul Road 4.19 4.25 Kap Shui Mun Bridge Construction Noise - Without Mitigation 4.20 C 4.26 Exceedance of ANL for Period 1 for the Kap Shui Mun Bridge - with 4.21 Mitigation Methods A, B and C 4.27 Exceedance of ANL for Period 2 for the Kap Shui Mun Bridge - with 4.22 C Mitigation Methods A, B and C 4.28 Ma Wan Viaducts Construction Noise - without Mitigation 4.23 4.29 Exceedance of ANL for Period 1 for the Ma Wan Viaducts - with 4.24 C Mitigation Methods A, B and C 4.30 Exceedance of ANL for Period 2 for the Ma Wan Viaducts - with 4.25 Mitigation Methods A, B and C [ 4.31 Maximum Noise Levels for the Kap Shui Mun/Ma Wan Viaducts Contracts 4.26 5.1 Predicted Facade Noise Levels 5.11 [ 11 LJ 0 u11 L [ lJI r~ L! li lj LIST OF FIGURES 2.1 Study Area and Locations of Sensitive Receivers [l 2.2 Key Construction Activities during Period 1 Excluding NLR 2.3 Key Construction Activities during Period 2 Excluding NLR 2.4 Key Construction Activities during Period 3 Excluding NLR 2.5 Key Construction Activities during North Lantau Road Construction 0 2.6 Highest I-Hour TSP Level Distribution during Period 1 Excluding NLR 2.7 Highest I-Hour RSP Level Distribution during Period 1 Excluding NLR [1 2.8 Highest I-Hour TSP Level Distribution during Period 2 Excluding NLR J 2.9 Highest I-Hour RSP Level Distribution during Period 2 Excluding NLR 2.10 Highest I-Hour TSP Level Distribution during Period 3 Excluding NLR 2.11 Highest I-Hour RSP Level Distribution during Period 3 Excluding NLR n 2.12 Predicted 24-Hour TSP Concentration in Period 1 Excluding NLR 2.13 Predicted 24-Hour RSP Concentration in Period 1 Excluding NLR 2.14 Predicted 24-Hour TSP Concentration in Period 2 Excluding NLR n 2.15 Predicted 24-Hour RSP Concentration in Period 2 Excluding NLR 2.16 Predicted 24-Hour TSP Concentration in Period 3 Excluding NLR 2.17 Predicted 24-Hour RSP Concentration in Period 3 Excluding NLR n 2.18 Highest I-Hour TSP Level Distribution during Period 3 Including NLR 2.19 Highest I-Hour RSP Level Distribution during Period 3 Including NLR 2.20 Highest I-Hour TSP Level Distribution during Period 3 Including NLR With Mitigation [1J 2.21 Highest I-Hour RSP Level Distribution during Period 3 Including NLR With Mitigation 2.22 24-Hour Average TSP Distribution during Period 3 Including NLR [-I 2.23 24-Hour Average RSP Distribution during Period 3 Including NLR .1 2.24 24-Hour Average TSP Distribution during Period 3 Including NLR With Mitigation 2.25 24-Hour Average RSP Distribution during Period 3 Including NLR With Mitigation 2.26 Predicted 24-Hour TSP Concentration in Period 3 Including NLR [-I 2.27 Predicted 24-Hour RSP Concentration in Period 3 Including NLR ~) .2.28 Predicted 24-Hour TSP Concentration in Period 3 Including NLR With Mitigation 2.29 Predicted 24-Hour RSP Concentration in Period 3 Including NLR With Mitigation

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    145 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us