中國中鐵股份有限公司 CHINA RAILWAY GROUP LIMITED (A Joint Stock Limited Company Incorporated in the People’S Republic of China with Limited Liability) (Stock Code: 390)

Total Page:16

File Type:pdf, Size:1020Kb

中國中鐵股份有限公司 CHINA RAILWAY GROUP LIMITED (A Joint Stock Limited Company Incorporated in the People’S Republic of China with Limited Liability) (Stock Code: 390) Hong Kong Exchanges and Clearing Limited and The Stock Exchange of Hong Kong Limited take no responsibility for the contents of this announcement, make no representation as to its accuracy or completeness and expressly disclaim any liability whatsoever for any loss howsoever arising from or in reliance upon the whole or any part of the contents of this announcement. 中國中鐵股份有限公司 CHINA RAILWAY GROUP LIMITED (A joint stock limited company incorporated in the People’s Republic of China with limited liability) (Stock Code: 390) This overseas regulatory announcement is made pursuant to Rule 13.10B of the Rules Governing the Listing of Securities on The Stock Exchange of Hong Kong Limited. Please refer to the attached “Announcement of China Railway Group Limited on Winning of Bids for Material Projects” published by China Railway Group Limited on the Shanghai Stock Exchange website on 29 March 2018 for your information. By Order of the Board China Railway Group Limited LI Changjin Chairman 29 March 2018 As at the date of this announcement, the executive directors of the Company are LI Changjin (Chairman), ZHANG Zongyan, ZHOU Mengbo and ZHANG Xian; the independent non-executive directors are GUO Peizhang, WEN Baoman, ZHENG Qingzhi and CHUNG Shui Ming Timpson; and the non-executive director is MA Zonglin. A Shares Stock Name: China Railway A Shares Stock Code: 601390 Announcement No.: H Shares Stock Name: China Railway H Shares Stock Code: 00390 Lin 2018-015 Announcement of China Railway Group Limited on Winning of Bids for Material Projects The board of directors of China Railway Group Limited (the “Company”) and all the directors hereby undertake that this announcement does not have any false or misleading statements or any material omissions, and assume the joint and several liabilities for the truthfulness, accuracy and completeness of the contents. The Company has won the bids for the following material projects: Currency: RMB Bid Amount Contractual Serial Company Bidding Projects (RMB Project No. Winning the Bid 10,000) Duration Railway Projects China Railway No. 1 Engineering Group Co., Ltd. Sections HSTZQ-4, HSTZQ-6 China Railway and HSTZQ-4 of Major Bridge before-station construction 32 months 1 768,340 Engineering project of the new 36 months Group Co., Ltd. Hangzhou-Shaoxing-Taizhou China Railway No. Railway 4 Engineering Group Co., Ltd. Section ZWSD of EPC contract of E&M system China CREC integration and auxiliary Railway projects of Henan Segment of Electrification 2 the new Zhengzhou-Wanzhou 150,034 547 days Bureau (Group) Railway and Henan Segment Co., Ltd and third of the new party Zhengzhou-Zhoukou-Fuyang Railway EPC contract of Section YMPJ China Railway No. of track laying and beam 3 1 Engineering 125,147 45.5 months fabrication project of the new Group Co., Ltd. Yuxi-Mohan Railway China Railway No. Sections ZWZF-1 and ZFZF-2 7 Engineering of EPC contract of station 4 120,296 549 days Group Co., Ltd. buildings and auxiliary projects China Railway of Henan Segment of the new Construction Zhengzhou-Wanzhou Railway Engineering and Henan Segment of the Group new Zhengzhou-Zhoukou-Fuyang Railway Section QZCSD-1 of EPC Wuhan Railway contract of E&M system and Electrification 5 auxiliary projects of the new 84,015 21 months Bureau Group Co., Qianjiang-Zhangjiajie-Changd Ltd e Railway Section CGFJ-5 of construction project of station China Railway buildings, production and Construction 6 living buildings and auxiliary 78,701 22 months Engineering projects of the new Group Nanchang-Ganzhou Passengers Railway Section FPZFSG of China Railway construction project of station Construction 7 buildings and auxiliary projects 57,002 18 months Engineering of the new Fuzhou-Pingtan Group Railway Highway Projects Civil construction project of reconstruction and extension China Railway of Shenzhen Segment of 1,278 calendar 8 200,275 Group Limited Shenzhen Huiyan Express days Highway (No. 1 contractual section) Construction project of the China Railway main part of Major Bridge 9 Shenzhen-Zhongshan 173,973 60 months Engineering cross-river channel (Section Group Co., Ltd. S07) Construction project of travel China Railway No. fast channel between Pu’an 10 2 Engineering 116,647 24 months County Town and the east Group Co., Ltd. area of the county town Section WFS-3 of subgrade China Railway No. construction project of the 11 4 Engineering road linking the south and 101,102 18 months Group Co., Ltd. north highway of cross-river channel, and bridge construction project of Wufeng Mountain in Jiangsu Construction project of North China Railway No. Fengling Road-high-speed 12 4 Engineering 70,450 450 days circuit overpass (Phase 2) in Group Co., Ltd. Nanning Section TF-07 of subgrade, China Railway No. bridge and tunnel construction 13 4 Engineering project under Tianba-Fengxian 63,315 24 months Group Co., Ltd. Segment of Taibai-Fengxian Express Highway Section SHDJSG-1 of agent China Railway No. construction of high-speed 510 calendar 14 7 Engineering construction railway of Fourth 63,000 days Group Co., Ltd. Ring Line and Dahe Road in Zhengzhou Municipal Works and Other Works China Railway No. 4 Engineering Sections SG3-7 and SG3-11 1,077 calendar Group Co., Ltd. of the civil construction project days 15 244,479 China Railway No. of Hangzhou Metro Line 3 1,127 calendar 1 Engineering (Phase 1) days Group Co., Ltd. China Railway EPC contract of streetcar Eryuan assembly base and pilot line 16 228,000 - Engineering construction in Tongliang, Group Co., Ltd. Chongqing China Railway No. 4 Engineering Sections SGHF-3 and Group Co., Ltd., 808 calendar SGHF-5 of the civil China Railway days 17 construction project of 194,067 Shanghai 820 calendar Hangzhou-Fuyang Intercity Engineering days Railway Group Co., Ltd. and a third party China Railway Construction project of metro Shanghai 18 depot of Dongqian Lake of 129,976 - Engineering Ningbo Rail Transit Line 4 Group Co., Ltd. Construction project of section China Railway No. I of the parking lot of Guniang 627 calendar 19 2 Engineering 109,876 Bridge of Hangzhou Metro days Group Co., Ltd. Line 5 (Phase 1) EPC contract of the comprehensive construction of metro depot and comprehensive basement China Railway No. over ±0.00 of Maijia of 20 4 Engineering Guiyang Rail Transit Line 2 76,020 - Group Co., Ltd. (Phase 1) and supply and installment of process equipment in Xiaobi parking lot of Guiyang Rail Transit Line 2 (Phase 2) The agent construction project China Railway No. of 12 municipal roads 180 calendar 21 7 Engineering 74,739 including Jindai Road in days Group Co., Ltd. Zhengzhou China Railway No. Section III of Damaowu-Renhe 22 7 Engineering Avenue water supply pipe 64,931 671 days Group Co., Ltd. construction in Hangzhou Construction project of No. 1-5 China Railway factories, No. 6 dormitory and Construction basement for Phase 2 of the 23 56,833 19 months Engineering Xiangshi incubation chain Group project in Liaobu Town, Guangdong The above bids amounted to approximately RMB33,512.17 million in aggregate, representing approximately 4.86% of the operating revenue of the Company in 2017 prepared under the China Accounting Standards. Notice is hereby given. The Board of Directors of China Railway Group Limited 30 March 2018 .
Recommended publications
  • 8Th Metro World Summit 201317-18 April
    30th Nov.Register to save before 8th Metro World $800 17-18 April Summit 2013 Shanghai, China Learning What Are The Series Speaker Operators Thinking About? Faculty Asia’s Premier Urban Rail Transit Conference, 8 Years Proven Track He Huawu Chief Engineer Record: A Comprehensive Understanding of the Planning, Ministry of Railways, PRC Operation and Construction of the Major Metro Projects. Li Guoyong Deputy Director-general of Conference Highlights: Department of Basic Industries National Development and + + + Reform Commission, PRC 15 30 50 Yu Guangyao Metro operators Industry speakers Networking hours President Shanghai Shentong Metro Corporation Ltd + ++ Zhang Shuren General Manager 80 100 One-on-One 300 Beijing Subway Corporation Metro projects meetings CXOs Zhang Xingyan Chairman Tianjin Metro Group Co., Ltd Tan Jibin Chairman Dalian Metro Pak Nin David Yam Head of International Business MTR C. C CHANG President Taoyuan Metro Corp. Sunder Jethwani Chief Executive Property Development Department, Delhi Metro Rail Corporation Ltd. Rachmadi Chief Engineering and Project Officer PT Mass Rapid Transit Jakarta Khoo Hean Siang Executive Vice President SMRT Train N. Sivasailam Managing Director Bangalore Metro Rail Corporation Ltd. Endorser Register Today! Contact us Via E: [email protected] T: +86 21 6840 7631 W: http://www.cdmc.org.cn/mws F: +86 21 6840 7633 8th Metro World Summit 2013 17-18 April | Shanghai, China China Urban Rail Plan 2012 Dear Colleagues, During the "12th Five-Year Plan" period (2011-2015), China's national railway operation of total mileage will increase from the current 91,000 km to 120,000 km. Among them, the domestic urban rail construction showing unprecedented hot situation, a new round of metro construction will gradually develop throughout the country.
    [Show full text]
  • The Urban Rail Development Handbook
    DEVELOPMENT THE “ The Urban Rail Development Handbook offers both planners and political decision makers a comprehensive view of one of the largest, if not the largest, investment a city can undertake: an urban rail system. The handbook properly recognizes that urban rail is only one part of a hierarchically integrated transport system, and it provides practical guidance on how urban rail projects can be implemented and operated RAIL URBAN THE URBAN RAIL in a multimodal way that maximizes benefits far beyond mobility. The handbook is a must-read for any person involved in the planning and decision making for an urban rail line.” —Arturo Ardila-Gómez, Global Lead, Urban Mobility and Lead Transport Economist, World Bank DEVELOPMENT “ The Urban Rail Development Handbook tackles the social and technical challenges of planning, designing, financing, procuring, constructing, and operating rail projects in urban areas. It is a great complement HANDBOOK to more technical publications on rail technology, infrastructure, and project delivery. This handbook provides practical advice for delivering urban megaprojects, taking account of their social, institutional, and economic context.” —Martha Lawrence, Lead, Railway Community of Practice and Senior Railway Specialist, World Bank HANDBOOK “ Among the many options a city can consider to improve access to opportunities and mobility, urban rail stands out by its potential impact, as well as its high cost. Getting it right is a complex and multifaceted challenge that this handbook addresses beautifully through an in-depth and practical sharing of hard lessons learned in planning, implementing, and operating such urban rail lines, while ensuring their transformational role for urban development.” —Gerald Ollivier, Lead, Transit-Oriented Development Community of Practice, World Bank “ Public transport, as the backbone of mobility in cities, supports more inclusive communities, economic development, higher standards of living and health, and active lifestyles of inhabitants, while improving air quality and liveability.
    [Show full text]
  • Transportation Systems 2018 – 2020
    Transportation Systems 2018 – 2020 DE | EN | FR Liebherr-Transportation Systems News from the Company | p. 12 - 31 Locations Partners in Rapid Development | p. 20 The Liebherr Group Insights | p. 38 ff. From left to right: Holger Dörre, Adrian Gunis, Stefan Pachowsky, Dirk Junghans Dear reader, In the face of growing environmental awareness worldwide plus, for the first time, series-ready cold vapor systems using and the increasing changes in mobility, it seems likely that the CO2 as the refrigerant. transport of passengers and freight by rail will continue to play a significant role as part of the overall transportation systems of The outlook for our Hydraulics division is also very positive. the future. However, the demands made in terms of reliability, In this sector, Liebherr has been able to expand its product efficiency and environmental compatibility are also increasing portfolio considerably once again, including dampers for level in parallel. The rail system must therefore be continuously regulation systems. In addition, we are also working within the further developed and made fit for purpose for the future so framework of a research project with partners in the UK on that it can survive in the long term as part of an integrated the development of a system for the active radial suspension. transportation network. The aim of this project is to considerably reduce wear on rails and wheels. Liebherr-Transportation Systems is ready to face the associ- ated challenges, and is consistently pushing forward with the We have also further expanded our customer service activities, development of innovative technologies and products with a and not only in the well developed markets of Europe and North high customer benefit in all product areas.
    [Show full text]
  • (18 August 2015).Pdf
    Sapphire Corporation Limited CIRCULAR DATED 18 AUGUST 2015 THIS CIRCULAR IS IMPORTANT AND REQUIRES YOUR IMMEDIATE ATTENTION. This Circular is issued by Sapphire Corporation Limited (the “Company”). If you are in any doubt as to the action you should take, you should consult your stockbroker, bank manager, solicitor, accountant or other professional adviser immediately. If you have sold or transferred all your shares in the capital of the Company held through The Central Depository (Pte) Limited (“CDP”), you need not forward this Circular to the purchaser or transferee as arrangements will be made by CDP for a separate Circular to be sent to the purchaser or transferee. If you have sold or transferred all your shares represented by physical share certificate(s), you should at once hand this Circular to the purchaser or transferee or to the bank, stockbroker or agent through whom you effected the sale or transfer, for onward transmission to the purchaser or transferee. For investors who have used their Central Provident Fund (“CPF”) monies to buy shares in the capital of the Company, this Circular is forwarded to them at the request of their CPF approved nominees and is sent solely for information only. Approval in-principle granted by the Singapore Exchange Securities Trading Limited (“SGX-ST”) to the Company for the listing and quotation of the Consideration Shares (as defined herein) on the Main Board of the SGX-ST is not to be taken as an indication of the merits of the Acquisition (as defined herein), the Consideration Shares, the Company and/or its subsidiaries.
    [Show full text]
  • 5G for Trains
    5G for Trains Bharat Bhatia Chair, ITU-R WP5D SWG on PPDR Chair, APT-AWG Task Group on PPDR President, ITU-APT foundation of India Head of International Spectrum, Motorola Solutions Inc. Slide 1 Operations • Train operations, monitoring and control GSM-R • Real-time telemetry • Fleet/track maintenance • Increasing track capacity • Unattended Train Operations • Mobile workforce applications • Sensors – big data analytics • Mass Rescue Operation • Supply chain Safety Customer services GSM-R • Remote diagnostics • Travel information • Remote control in case of • Advertisements emergency • Location based services • Passenger emergency • Infotainment - Multimedia communications Passenger information display • Platform-to-driver video • Personal multimedia • In-train CCTV surveillance - train-to- entertainment station/OCC video • In-train wi-fi – broadband • Security internet access • Video analytics What is GSM-R? GSM-R, Global System for Mobile Communications – Railway or GSM-Railway is an international wireless communications standard for railway communication and applications. A sub-system of European Rail Traffic Management System (ERTMS), it is used for communication between train and railway regulation control centres GSM-R is an adaptation of GSM to provide mission critical features for railway operation and can work at speeds up to 500 km/hour. It is based on EIRENE – MORANE specifications. (EUROPEAN INTEGRATED RAILWAY RADIO ENHANCED NETWORK and Mobile radio for Railway Networks in Europe) GSM-R Stanadardisation UIC the International
    [Show full text]
  • 中國中鐵股份有限公司 CHINA RAILWAY GROUP LIMITED (A Joint Stock Limited Company Incorporated in the People’S Republic of China with Limited Liability) (Stock Code: 390)
    Hong Kong Exchanges and Clearing Limited and The Stock Exchange of Hong Kong Limited take no responsibility for the contents of this announcement, make no representation as to its accuracy or completeness and expressly disclaim any liability whatsoever for any loss howsoever arising from or in reliance upon the whole or any part of the contents of this announcement. 中國中鐵股份有限公司 CHINA RAILWAY GROUP LIMITED (A joint stock limited company incorporated in the People’s Republic of China with limited liability) (Stock Code: 390) This overseas regulatory announcement is made pursuant to Rule 13.10B of the Rules Governing the Listing of Securities on The Stock Exchange of Hong Kong Limited. Please refer to the attached “Announcement of China Railway Group Limited on Winning of Bids for Material Projects” published by China Railway Group Limited on the Shanghai Stock Exchange website on 2 January 2018 for your information. By Order of the Board China Railway Group Limited LI Changjin Chairman 2 January 2018 As at the date of this announcement, the executive directors of the Company are LI Changjin (Chairman), ZHANG Zongyan, ZHOU Mengbo and ZHANG Xian; the independent non- executive directors are GUO Peizhang, WEN Baoman, ZHENG Qingzhi and CHUNG Shui Ming Timpson; and the non-executive director is MA Zonglin. A Shares Stock Name: China Railway A Shares Stock Code: 601390 Announcement No.: H Shares Stock Name: China Railway H Shares Stock Code: 00390 Lin 2018-002 Announcement of China Railway Group Limited on Winning of Bids for Material Projects The board of directors of China Railway Group Limited (the “Company”) and all the directors hereby undertake that this announcement does not have any false or misleading statements or any material omissions, and assume the joint and several liabilities for the truthfulness, accuracy and completeness of the contents.
    [Show full text]
  • CIECC Research Center [email protected]
    Global overview for Urban Rail Transit and the urgency for PPP Standard Development Prof. Li Kaimeng, Ph.D., Director General of CIECC Research Center [email protected] 中 国 国 际 工 程 咨 询 公 司 People First , a tool to achieve the SDGs China International Engineering Consulting Corp. Development of Urban Rail Transit History and Status Quo 7 Systems Metro a history of over 150 years (since 1863 in London) Light rail Monorail built in large-scale since 1970s Urban fast track 10,000 km at present in operation Tram in more than 180 cities of over 50 countries Maglev Train APM 中 国 国 际 工 程 咨 询 公 司 China International Engineering Consulting Corp. People First , a tool to achieve the SDGs Development of Urban Rail Transit The prior way of public transportation in large and medium-sized cities A high percentage of the gross city passenger volume in metropolis: • Tokyo: 88% • London: 71% • Paris: 70% • Moscow: 55% • Beijing: 86.6% • Shanghai: 89.1% 中 国 国 际 工 程 咨 询 公 司 People First , a tool to achieve the SDGs China International Engineering Consulting Corp. Development of Urban Rail Transit The innovation and application of new technologies on urban rail transit • RAMS (Reliability、Availability、Maintainability and Safety) • Big data • BIM(Building Information Modeling) 7 national engineering innovation labs in China • rail transit system test • automobile system integration • communication and operation control of trains • technologies on transit system security assurance • transit system security and maintenance assurance • technologies on green and safe construction • technologies on digital construction and assessment.
    [Show full text]
  • Download Article (PDF)
    Advances in Economics, Business and Management Research, volume 167 Proceedings of the 5th Asia-Pacific Conference on Economic Research and Management Innovation (ERMI 2021) Status Quo Analysis and Development Trend Study of Metro Media Scene Marketing Jingjing Ye1, 2,* 1 College of Journalism and Communications, Shanghai Jian Qiao University, Shanghai 201306, China 2 School of Media & Communication, Shanghai Jiao Tong University, Shanghai 200240, China *Corresponding author. Email: [email protected] ABSTRACT With the innovation and development of mobile Internet technology and digital interactive media, metro media presents a trend of high integration between old and new communication. Based on the analysis of policy support and audience characteristics, this paper analyzes the status quo of metro media scene marketing and explores the development trend of metro media scene marketing in the future. Metro media has four elements of scene marketing and is composed of four different types including traditional media, traditional media plus, sensory device media and mobile interactive media. It creates four different scenarios of metro scene marketing which contains cognition scenario, sympathy scenario, experience scenario and spread scenario. However, the author believes that the spread scenario is not the end of metro scene marketing but the turning point which ultimately leads to the transaction scene of marketing. Finally, it is proposed that taking the subway ticketing system as the entry point and effectively spreading the scene to the shopping, dining, leisure and other entertainment consumption places will be the development direction of metro media with great market potential in the future. Keywords: metro media; scene marketing; status quo analysis; development trend 1.
    [Show full text]
  • MTR's Experiences in PPP for Railway Projects
    MTR’s Experiences in PPP for Railway Projects Dr Jacob Kam Managing Director – Operations & Mainland Business 11 May 2017 MTR Businesses in China and Overseas 港铁公司在国内及海外的铁路业务 Line 4 & Daxing Line 1.881 Mil Line 14, Line 16 113.4 km Elizabeth Line Stockholm Metro 14.2k 1.228 mil 32.5 km 110km South Western rail Contract started MTR Express Hangzhou Metro Line 537k 53.7km from Aug 2017 455km(shared track) 1 and Ext Shenzhen Metro 550k Stockholm Hong Kong MTR Line 4 and Ext Commuter rail 20.5km 8.6 mil 34.3k 266 km 241 km Sydney Metro 36 km North West Under construction Melbourne Metro • Over 1,200km route length (exclude shared track) • Over 14 Million Passenger trips per weekday (using line based counting) 812k • Line based passenger trips do not match with the passenger trip data in annual report 390km MTR Corporation 5/16/2017 Page 2 Why cities need railways? • High capacity • High energy efficiency, low carbon emission In persons per hour in both direction Source: UITP MTR Corporation 5/16/2017 Page 3 Why cities need railways? Effective land use Modal Bus Rapid Bus Tram Light Rail Metro Characteristics Transit Max Flow 2,500 6,000 12,000 18,000 30,000 & above (per hour per direction) Average speed 10-14 15-22 15-22 18-40 18-40 (kph) Reliability Improving Good Medium to Good Good Very Good Mixed running Largely Road-space Mixed running Totally segregated and on-road tram segregated Totally segregated with traffic alignment Allocation lanes alignments All underground: Land Consumed 15 – 25 times 10 – 15 times 5 – 10 times 3 – 6 times 1
    [Show full text]
  • 00 Month Year
    Hong Kong Exchanges and Clearing Limited and The Stock Exchange of Hong Kong Limited take no responsibility for the contents of this announcement, make no representation as to its accuracy or completeness and expressly disclaim any liability whatsoever for any loss howsoever arising from or in reliance upon the whole or any part of the contents of this announcement. (Singapore Registration No.: 200009758W) (Incorporated in Singapore with limited liability) (Hong Kong Stock Code: 1021) (Singapore Stock Code: 5EN) OVERSEAS REGULATORY ANNOUNCEMENT INSIDE INFORMATION This announcement is issued pursuant to Part XIVA of the Securities and Futures Ordinance and Rules 13.09 and 13.10B of the Rules Governing the Listing of Securities on The Stock Exchange of Hong Kong Limited. Please refer to the attached news release on the next page which has been published by Midas Holdings Limited (the “Company”) on the website of the Singapore Exchange Securities Trading Limited on June 23, 2016 On behalf of the Board Midas Holdings Limited Chew Hwa Kwang, Patrick Executive Director and Chief Executive Officer Hong Kong, June 23, 2016 As at the date of this announcement, the executive directors of the Company are Mr. Chen Wei Ping and Mr. Chew Hwa Kwang, Patrick; and the independent non-executive directors of the Company are Mr. Chan Soo Sen, Dr. Xu Wei Dong and Mr. Tong Din Eu. (Singapore Registration No.: 200009758W) NEWS RELEASE MIDAS’ JV UNIT NPRT WINS FOUR CONTRACTS WORTH APPROXIMATELY RMB3.3 BILLION - Brings total value of contracts announced by NPRT year-to-date to approximately RMB4.6 billion Singapore & Hong Kong, June 23, 2016 – Midas Holdings Limited (麦达斯控股有 限公司) (“Midas” or the “Company”, together with its subsidiaries, the “Group”; SGX- ST stock code: 5EN; SEHK stock code: 1021) is pleased to announce that its joint venture company, CRRC Nanjing Puzhen Rail Transport Co., Ltd.
    [Show full text]
  • Leading New ICT Building a Smart Urban Rail
    Leading New ICT Building A Smart Urban Rail 2017 HUAWEI TECHNOLOGIES CO., LTD. Bantian, Longgang District Shenzhen518129, P. R. China Tel:+86-755-28780808 Huawei Digital Urban Rail Solution Digital Urban Rail Solution LTE-M Solution 04 Next-Generation DCS Solution 10 Urban Rail Cloud Solution 15 Huawei Digital Urban Rail Solution Huawei Digital Urban Rail Solution Huawei LTE-M Solution for Urban Rail Huawei and Alstom the Completed World’s Huawei Digital Urban Rail LTE-M Solution First CBTC over LTE Live Pilot On June 29th, 2015, Huawei and Alstom, one of the world’s leading energy solutions and transport companies, announced the successful completion of the world’s first live pilot test of 4G LTE multi-services based on Communications- based Train Control (CBTC), a railway signalling system based on wireless ground-to-train CBTC PIS CCTV Dispatching communication. The successful pilot, which CURRENT STATUS IN URBAN RAIL covered the unified multi-service capabilities TV Wall ATS Server Terminal In recent years, public Wi-Fi access points have become a OCC of several systems including CBTC, Passenger popular commodity in urban areas. Due to the explosive growth Information System (PIS), and closed-circuit in use of multimedia devices like smart phones, tablets and NMS LTE CN television (CCTV), marks a major step forward in notebooks, the demand on services of these devices in crowded the LTE commercialization of CBTC services. Line/Station Section/Depot Station places such as metro stations has dramatically increased. Huge BBU numbers of Wi-Fi devices on the platforms and in the trains RRU create chances of interference with Wi-Fi networks, which TAU TAU Alstom is the world’s first train manufacturer to integrate LTE 4G into its signalling system solution, the Urbalis Fluence CBTC Train AR IPC PIS AP TCMS solution, which greatly improves the suitability of eLTE, providing a converged ground-to-train wireless communication network Terminal When the CBTC system uses Wi-Fi technology to implement for metro operations.
    [Show full text]
  • Global Report Global Metro Projects 2020.Qxp
    Table of Contents 1.1 Global Metrorail industry 2.2.2 Brazil 2.3.4.2 Changchun Urban Rail Transit 1.1.1 Overview 2.2.2.1 Belo Horizonte Metro 2.3.4.3 Chengdu Metro 1.1.2 Network and Station 2.2.2.2 Brasília Metro 2.3.4.4 Guangzhou Metro Development 2.2.2.3 Cariri Metro 2.3.4.5 Hefei Metro 1.1.3 Ridership 2.2.2.4 Fortaleza Rapid Transit Project 2.3.4.6 Hong Kong Mass Railway Transit 1.1.3 Rolling stock 2.2.2.5 Porto Alegre Metro 2.3.4.7 Jinan Metro 1.1.4 Signalling 2.2.2.6 Recife Metro 2.3.4.8 Nanchang Metro 1.1.5 Power and Tracks 2.2.2.7 Rio de Janeiro Metro 2.3.4.9 Nanjing Metro 1.1.6 Fare systems 2.2.2.8 Salvador Metro 2.3.4.10 Ningbo Rail Transit 1.1.7 Funding and financing 2.2.2.9 São Paulo Metro 2.3.4.11 Shanghai Metro 1.1.8 Project delivery models 2.3.4.12 Shenzhen Metro 1.1.9 Key trends and developments 2.2.3 Chile 2.3.4.13 Suzhou Metro 2.2.3.1 Santiago Metro 2.3.4.14 Ürümqi Metro 1.2 Opportunities and Outlook 2.2.3.2 Valparaiso Metro 2.3.4.15 Wuhan Metro 1.2.1 Growth drivers 1.2.2 Network expansion by 2025 2.2.4 Colombia 2.3.5 India 1.2.3 Network expansion by 2030 2.2.4.1 Barranquilla Metro 2.3.5.1 Agra Metro 1.2.4 Network expansion beyond 2.2.4.2 Bogotá Metro 2.3.5.2 Ahmedabad-Gandhinagar Metro 2030 2.2.4.3 Medellín Metro 2.3.5.3 Bengaluru Metro 1.2.5 Rolling stock procurement and 2.3.5.4 Bhopal Metro refurbishment 2.2.5 Dominican Republic 2.3.5.5 Chennai Metro 1.2.6 Fare system upgrades and 2.2.5.1 Santo Domingo Metro 2.3.5.6 Hyderabad Metro Rail innovation 2.3.5.7 Jaipur Metro Rail 1.2.7 Signalling technology 2.2.6 Ecuador
    [Show full text]