Manukau Bus Station July 2016 | Issue 3

Total Page:16

File Type:pdf, Size:1020Kb

Manukau Bus Station July 2016 | Issue 3 Manukau Bus Station July 2016 | Issue 3 Enabling construction works come to an end soon Enabling construction works (site preparation for main construction works) for the future Manukau Bus Station will come to end in early August. Since enabling works started in February this year, our contractors Fulton Hogan have completed the following work: • Site clearance of the existing Manukau Civic o Markers have been installed which Building car parking area (northern area) extend beyond the top of preload. These will be monitored over time • A new entrance for vehicles to allow to track the ground movement access from Manukau Station Road to the remaining car park area o The main construction works for the Bus • Earthworks to reshape the existing ground profile Station will start later this year. New sand drains will be installed on the southern side • Removal of the existing stormwater system within of the site and the preload will be moved to the carpark and installation of new stormwater this area. Once the ground has settled the pipelines, connecting to the existing network preload will be removed from the site • Installation of a new sewer system o During the preloading time the area will (not currently operational) remain fenced off and closed to the public. • Installation of the vertical sand drains, drainage blanket and preload through the middle of the site Drainage blanket o This work has been completed to accelerate Water Preload Water drainage drainage settlement and to improve ground conditions for the future Manukau Bus Station o Sand drains have been installed into the ground and covered in a drainage blanket. Excess water Sand drains are 100mm diameter holes Vertical drilled vertically, 8m deep, into the ground sand drain and filled with sand material. These are Improved ground spaced at regular intervals across the site Surrounding ground o Additional fill material has been placed on top Ground improvement technique: Sand drains with preload of the drainage blanket to add weight to the existing ground and this is known as ‘preload’ o Overtime the preload consolidates the ground, What’s coming up next? squeezing moisture out of the soft saturated Auckland Transport will hold a tendering process material. The moisture will escape through for a contractor for the main construction work. the sand drains, flowing vertically upwards This is expected to start in July and the tender (very slowly) until it reaches the drainage will be awarded by October. blanket. The moisture will then flow out of the drainage blanket into the surrounding area where it will be collected on-site For more information Email [email protected] Phone 09 355 3553 or visit AT.govt.nz/manukaustation July 2016 | Issue 3 Manukau Bus Station Get ready south Auckland – so you don’t miss your bus ride Everything about buses in south Auckland, Pukekohe and Waiuku will completely change on Sunday, 30 October 2016. What is changing? What are the new times • New bus routes for my bus? • New bus numbers New bus timetables are coming. They will be • New timetables – new start times and finish times available at least a month before changes are made. • New information at bus stops Closer to the time we’ll be out in the community • Some people will need to connect with another helping people plan their new travel journeys. bus or train to complete their journey. Until then, check out the new map to see what’s different about your bus route. How does the Manukau BusGet Ready South Auckland FIND OUT MORE • Look out for the detailed brochure which Station fit with the new buses?Everything about the Southern bus network is will be sent to all households one month before changes changing on 30th October 2016 • Subscribe to the New Network email Manukau will become a central hub for south Auckland Follow us on Twitter at AKL Twitter ornewsletter sign at up www.AT.govt.nz/NewNetwork to our This map shows the new bus routes which will be introduced in South Auckland, Pukekohe and to keep in touch with what’s happening Waiuku on 30th October 2016. Some passengers will need to transfer to another bus or to a train to buses with at least 11 bus services connecting at email newsletter at www.AT.govt.nz/newnetwork• Go online regularly to: complete their journey, so people need to get ready for these changes. Timetables will be available www.AT.govt.nz/NewNetworkSouth at least one month prior to the transformation. Events to help you plan your new journeys will be as we release more detail the Manukau Bus Station. held across South Auckland closer to the time. M A P P B R a e B o ap R One Tree Hill v An d a e d R a no r n ro Ad en a r e d e a v M P R o h i y R ar o l S d i r S k C l e t b R a College o l s e w u e an m b m d 302 d h t a R w U Cockle Bay d h y R i e n s Lloyd R n i t d i R e ll i r c d o e n R n u R e l o Rd School l s Royal Oak d Oranga a Elsmore il d d t k pb G r G S 009 S S 312 R St Kentigern e e Primary a m School Refer to Central and t P s Park La Perouse S a n d a a Penrose Dr t h n u C o d h t College R d g d d M r R Howick o i Bailey Rd R a s Shelly Park R R t 552 d d a e o r Taw v o m d R d p J n R Eastern Guides y m c College i d A School t r i t School t D K e l ia The only buses to continue using a ia y n u A r rn o R Royal e o n r e R Penrose a R 551 a l f R iew Av a u d l d v e t D y t g r s r r i Sunn y d R u d d Marcellin n w s 505 R Howick b o a a K i o r g d h a n d a f O ur B t Rd Oak k a pi w 550 s a m Pa Historical s Shelly College r W Meadowland d e y o n Fergusson m a B v 500 Village S a d o G i 515 s Reserve 008 A M 390 t r Park R t Penrose C 551 r Park 312 r R Sm M D d a e ar D i t r d 501 r R n Oranga b a n h d O 525 r a 550 a e b 010 o v wl a Pakuranga o o e A o n R d eek A r m o Cr P M pe Fa a e d o Somerville a R H mart O r m e o t S a m ka Av Me M 719 545 r 011 h n ’ a T R u Sylvia Park Ree E Intermediate a ra ve d Herd Rd f u i W s s n r al o Rd J g ga R R C s a n n r n V r d d S k Riverina d n t C s d i u o e i g R n e s c y Millhouse the bus stops outside Westfield ste T o R School a a rn a Ti Rakau C d t R E a a d G e A S M E H i m sc e o a a y y ig r o d l c d e Reserve l e h s R U v s r R i w 352 L e i m r R ay b Park R 009 M G t t S d n d l ey r Mt Smart e i Gr a 580 D v a w e S a r a i n u r g G k h n a B t y l s n a Stadium t s a mi w r r S e u l e me w d n u e u m l a t M o a o a m M o n S D Pakuranga u S Onehunga y S t Botany t o R S t O s S 360x r d 501 Country Club r High m o a ood D n 009 r n w r y Te Papapa ge S u Downs D e S tto St 008 t Gro t Hamlins R e e h s d i S u St Hill or R v u t NEW NETWORK SERVICES ur 390 R ad e rth ab e B S oK Q B A d G e h l W e t T r u l h S h l i a h C c l a 302 ur n i l it Ch G e i c i r c h a ll 565 a C m m f a t o cr 757 s A s ol M ar rd p w Shopping Centre will be the Airporter oft m v fl a i s W FREQUENT SERVICES CONNECTOR SERVICES Ave e a ay R Onehunga Town Centre t o n d r n 008 o d D Sp 32 r 321 d D j a W Te Papapa R 532 r d a d 322 k C k d r R r o r a er D Botany o l At least every 15 minutes, 7am – 7pm, At least every 30 minutes, 7am – 7pm, 309 i sh i r n P i a F d D e M Edgewater a R o g vi Superclinic r p r 309x l R i s y w a D 7 days a week.
Recommended publications
  • Auckland District Plan
    E E See Appendix 6 Diagram 12 !1!82A 307 ! ! ! ! ! ! ! ! ! ! ! ! ! ! 182 ! ! !R I M ! ! U ! ! ! R ! ! O ! ! A ! D ! M O A ! ! N H ! U ! ! R ! ! N ! ! ! A ! ! ! ! G ! ! M ! ! ! A ! ! P ! ! ! ! D ! ! R 182 ! ! 2 I ! S V ! ! ! O E ! ! U ! O ! ! ! 6 T ! F ! H ! ! ! F ! - ! ! W ! ! ! R ! ! ! ! ! E A ! M ! ! S ! ! ! ! 12 T P ! ! ! E ! ! ! ! R ! ! 14A ! N ! ! ! ! Mangere Inlet M ! ! ! ! ! ! ! ! O ! ! ! ! ! Ngarango Otainui ! ! T ! ! ! ! ! ! ! ! ! O ! ! ! R ! ! ! W ! ! ! ! ! ! ! ! ! A ! ! Island ! ! Y ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! 182A ! ! ! ! D ! A ! ! RO ! ! ! ! U M IM ! ! ! ! R A ! ! H ! ! ! ! ! U ! ! ! ! ! N ! ! ! ! ! ! ! G ! ! 182A ! ! A ! ! ! ! ! ! D ! ! ! ! R ! ! ! ! I ! ! 22 V ! ! ! ! ! E ! ! ! ! ! ! ! ! ! ! S ! ! 26 ! ! ! ! ! ! ! o ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! u ! ! t ! h ! 21 ! 32 ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! AD ! RO ! ! ! O 31 MIR ! ! ! ! ! ! 21 ! ! ! ! ! 5 ! ! ! ! ! 42 ! ! ! ! ! 307 ! ! ! ! ! 22 ! 42 ! ! ! ! ! ! 16 ! 12 ! ! ! ! 46 ! ! ! ! ! ! ! ! 17C ! NUE ! VE ! ! A ! 17B A 31 ON ! M ! ! 16 ! ! 182 5 ! ! ! ! ! ! 5 17 ! ! ! ! ! ! 6 11 ! ! ! ! ! ! ! ! ! ! 7 ! ! ! ! 17A 12 ! W ! ! ! ! ! ! " c ! ! !! ! e ! ! 280 !! s ! ! ! t 11 3A ! ! ! e ! 1 ! ! r ! ! ! ! ! ! ! ! n ! ! ! ! ! ! ! ! ! ! ! ! 81 2 ! ! ! ! ! 77 ! ! ! ! ! ! ! ! 71 56 ! ! ! ! ! ! ! " c ! ! ! ! !! ! ! ! ! ! ! ! ! !! 62A ! ! ! 62 ! ! ! ! ! 5 ! ! ! ! 5 ! ! ! ! ! ! ! ! ! ! 3 ! ! 66 ! ! ! ! ! ! ! 51 ! ! ! ! ! ! ! ! E U ! ! ! ! N 11 VE ! ! E A ! I ! ! ! ST ! 41 ! ! HA ! ! ! ! ! ! ! ! ! 72 ! ! ! ! ! ! 3 ! ! 56 !
    [Show full text]
  • Southeastern Manukau / Pahurehure Inlet Contaminant Study: Hydrodynamic, Wave and Sediment-Transport Model Implementation and Calibration December TR 2008/056
    Southeastern Manukau / Pahurehure Inlet Contaminant Study: Hydrodynamic, Wave and Sediment-Transport Model Implementation and Calibration December TR 2008/056 Auckland Regional Council Technical Report No.056 December 2008 ISSN 1179-0504 (Print) ISSN 1179-0512 (Online) ISBN 978-1-877528-04-0 Technical Report. First Edition. Reviewed by: Approved for ARC Publication by: Name: Judy-Ann Ansen Name: Matthew Davis Position: Acting Team Leader Position: Group Manager Stormwater Action Team Partnerships & Community Programmes Organisation: Auckland Regional Council Organisation: Auckland Regional Council Date: 28 October 2010 Date: 28 October 2010 Recommended Citation: Pritchard, M; Gorman, R; Lewis, M. (2008). Southeastern Manukau Harbour / Pahurehure Inlet Contaminant Study. Hydrodynamic Wave and Sediment Transport Model Implementation and Calibration. Prepared by NIWA for Auckland Regional Council. Auckland Regional Council Technical Report 2008/056. © 2008 Auckland Regional Council This publication is provided strictly subject to Auckland Regional Council's (ARC) copyright and other intellectual property rights (if any) in the publication. Users of the publication may only access, reproduce and use the publication, in a secure digital medium or hard copy, for responsible genuine non-commercial purposes relating to personal, public service or educational purposes, provided that the publication is only ever accurately reproduced and proper attribution of its source, publication date and authorship is attached to any use or reproduction. This
    [Show full text]
  • Freshwater Report Card
    19-PRO-0142 MANUKAU HARBOUR MONITORING SITES – MANUKAU HARBOUR 2018 REPORTING AREA 2018 Includes Maungakiekie-Tamaki, Franklin, Papakura, Ōtara-Papatoetoe, Manurewa, Mangere-Otahuhu and Waitakere Ranges Local Boards STATE OF AUCKLAND FRESHWATER REPORT CARD WATER QUALITY A B C D E F HYDROLOGY A B C D E F HABITAT QUALITY A B C D E F BIODIVERSITY A B C D E F The grades are made up of the following MANUKAU LAND COVER indicators: Water quality: Water samples are tested for 2% a range of parameters including temperature, pH, dissolved oxygen, nutrients and E. coli. Exotic forest The results for each site are compared against 16% 9% reference sites for Auckland to produce a water 1% Horticulture quality index. Hydrology: Stream reaches are assessed for 14% Native forest how well connected they are to upstream and downstream reaches, and the floodplain. Pastoral Habitat quality: The diversity and quality of habitats both in the streams and in the riparian Rivers/lakes margins is assessed. Biodiversity: Field assessments are made Shrubland to determine the type and amount of native plants and animals. Stream macroinvertebrate 58% Urban area samples are also collected to assess the diversity and tolerance levels of the macroinvertebrate community. Each indicator is made up of several parameters. MANUKAU RAINFALL These grades represent a summary of indicator results from 2016 and 2017 from individual sites which are Driest year Wettest year on record (2002) on record (2011) amalgamated for each reporting area to provide an indicator grade. These report cards are not designed to track trends or Rainfall report on National Policy Statement for Freshwater (2017) (NPS-FM) attributes which relate to specific parameters and bands.
    [Show full text]
  • Manukau Harbour Ecological Monitoring Programme:Report
    Manukau Harbour Ecological Monitoring Programme: Report on data collected up until February 2007 June 2007 TP334 Auckland Regional Council Technical Publication No. 334, June 2007 ISSN 1175-205X$ ISBN -13 : 978-1-877416-73-6 ISBN -10 : 1-877416-72-X Manukau Harbour Ecological Monitoring Programme: Report on data collected up until February 2007 Judi E. Hewitt Sarah F. Hailes Prepared for Auckland Regional Council All rights reserved. This publication may not be reproduced or copied in any form without the permission of the client. Such permission is to be given only in accordance with the terms of the client's contract with NIWA. This copyright extends to all forms of copying and any storage of material in any kind of information retrieval system. NIWA Client Report: HAM2007-069 May 2007 NIWA Project: ARC07206 National Institute of Water & Atmospheric Research Ltd Gate 10, Silverdale Road, Hamilton P O Box 11115, Hamilton, New Zealand Phone +64-7-856 7026, Fax +64-7-856 0151 www.niwa.co.nz Recommended Citation: Hewitt, J.E.; Hailes, S.F. (2007). Manukau Harbour Ecological Monitoring Programme: Report on data collected up until February 2007. Prepared by NIWA for Auckland Regional Council. Auckland Regional Council Technical Publication Number 334. Contents 111 Executive Summary 111 222 Introduction 222 333 Methods 333 3.1 Sample collection and identification 3 3.2 Bivalve size class analysis 3 3.3 Site characteristics 4 3.4 Statistical analyses 5 444 Present status of the benthic communities of the Manukau Harbour 777 4.1 Have there
    [Show full text]
  • Māngere-Ōtāhuhu Area Plan 2013
    MANGERE-- OT- AHUHU- ARE- A PLAN maHERE A-ROHE O - - - MANGERE-OTAHUHU - - - M ANGERE-OTAHUHU AREA PLAN 2013 HE- MIHI- - M ANGERE-OTAHUHU AREA PLAN Tuia ki te rangi, Te riu o Waikato ki ‘Te tāhuhutanga o te waka Tuia ki te whenua, o Tainui’ – Ōtāhuhu ki ‘Ngā hau Māngere’ Tuia ki te ngākau tangata. – Māngere, mai anō i te tihi o te Pane o Mataaho – whakarongo atu, whakarongo mai! Te mihi tuatahi ki te Matua Nui i te Rangi, koia nei te tīmatanga me te mutunga o ngā He mihi maioha, he mihi aroha, ki te whenua mea katoa. i hīkoitia e rātou mā. Kua ngaro ō rātou tapuwae, ēngari ko ō rātou wairua, He mihi ki a Kīngi Tūheitia me tōna hoa ka mau tonu. rangatira, a Atawhai, tae atu ki tā rāua whānau e noho mai nā i runga i te ahurewa o He mahere rautaki , he kaupapa-ā-rohe, hei te Kīngitanga – Pai Mārire. arataki i ngā mahi kei mua i a tātou katoa. Ki ngā tini mate o te wā – Ko te wawata, kia haere whakamua tonu, kia haere, haere, haere. tutuki hoki i runga i ngā whakaritenga katoa – hei oranga mō te rohe ‘Te pai me te whai Te hunga mate ki te hunga mate, rawa o Tāmaki’. Te hunga ora ki te hunga ora, Tihei mauri ora ki te whaiao ki te ao mārama. Noho ora mai. Bind the sky, From the boundary of Waikato to where Bind the earth, ‘Tainui Waka was carried overland, up-turned’ Bind the heart of man. – Ōtāhuhu, to the ‘Lazy Winds’ – Māngere, and on again to the summit of the ‘Head of Mataaho’ – Māngere Mountain – listen! The first acknowledgement is to our Heavenly Father, the source and end of This is an acknowledgement of love and all things.
    [Show full text]
  • Age of the Auckland Volcanic Field Jan Lindsay and Graham Leonard
    Age of the Auckland Volcanic Field Jan Lindsay and Graham Leonard IESE Report 1-2009.02 | June 2009 ISBN: [print] 978-0-473-15316-8 [PDF] 978-0-473-15416-5 Age of the Auckland Volcanic Field Jan Lindsay1 and Graham Leonard2 1School of Environment & Institute of Earth Science and Engineering, The University of Auckland, Private Bag 92019, Auckland, New Zealand; [email protected] 2GNS Science, PO Box 30368, Lower Hutt 5040 New Zealand; [email protected] IESE Report 1-2009.02 | June 2009 ISBN: [print] 978-0-473-15316-8 [PDF] 978-0-473-15416-5 This report was prepared by IESE as part of the DEVORA Project. Disclaimer: While the information contained in this report is believed to be correct at the time of publication, the Institute of Earth Science and Engineering and its working parties and agents involved in preparation and publication, do not accept any liability for its contents or for any consequences arising from its use. Copyright: This work is copyright of the Institute of Earth Science and Engineering. The content may be used with acknowledgement to the Institute of Earth Science and Engineering and the appropriate citation. TABLE OF CONTENTS INTRODUCTION .......................................................................................................................... 2 Project objectives ..................................................................................................................... 2 Methodology ............................................................................................................................
    [Show full text]
  • Waitangi Tribunal Manukau Report (1985)
    MANUKAU REPORT WAI 8 WAITANGI TRIBUNAL 1985 W AITANGI TRIBUNAL LIBRARY REPORT OF THE WAITANGI TRIBUNAL ON THE MANUKAU CLAIM (WAI-8) WAITANGI TRIBUNAL DEPARTMENT OF JUSTICE WELLINGTON NEW ZEALAND July 1985 Original cover design by Cliff Whiting, invoking the signing of the Treaty of Waitangi and the consequent development of Maori-Pakeha history interwoven in Aotearoa, in a pattern not yet completely known, still unfolding. National Library of New Zealand Cataloguing-in-Publication data New Zealand. Waitangi Tribunal. Report of the Waitangi Tribunal on the Manukau claim (Wai 8). 2nd ed. Wellington , N.Z.: The Tribunal, 1989. 1 v. (Waitangi Tribunal reports, 0113-4124) "July 1985." First ed. published in 1985 as: Finding of the Waitangi Tribunal on the Manukau claim. ISBN 0-908810-06-7 1. Manukau Harbour (N.Z.)--Water-rights. 2. Maoris--Land tenure. 3. Waitangi, Treaty of, 1840. I. Title. II. Series: Waitangi Tribunal reports; 333.91170993111 First published 1985 by the Government Printer Wellington, New Zealand Second edition published 1989 by the Waitangi Tribunal Department of Justice Wellington, New Zealand Crown copyright reserved Waitangi Tribunal Reports ISSN 0113-4124 Manukau Report (Wai-8) ISBN 0-908810-06-7 Typeset, printed and bound by the Government Printing Office Wellington, New Zealand ii NOT FOR PUBLIC RELEASE WAI-8 BEFORE 9.30 P.M. TUESDAY, 30 JULY 1985 IN THE MATTER of a Treaty of Waitangi Act 1975 IN THE MATTER of a claim by NGANEKO MINHINNICK and Te Puaha ki Manuka concerning Manukau Harbour and environs FINDING OF THE
    [Show full text]
  • The History of Human Settlement of the Islands Annexure 1A - the History of Human Settlement of the Islands
    Annexure 1a - The history of human settlement of the islands Annexure 1a - The history of human settlement of the islands Contents Page 1.0 Introduction ...........................................................................................3 2.0 Maori settlement ..................................................................................3 3.0 European contact 1769-1840...........................................................3 4.0 Extractive industries 1840-1962 .....................................................4 5.0 Horticulture and farming ...................................................................5 6.0 The benefits of isolation .....................................................................5 7.0 Defence....................................................................................................5 8.0 Recreation...............................................................................................6 9.0 Towards the present.............................................................................6 Auckland City District Plan - Hauraki Gulf Islands Section - Proposed 2006 Page 1 Annexure 1a - The history of human settlement of the islands Page 2 Auckland City District Plan - Hauraki Gulf Islands Section - Proposed 2006 Annexure 1a - The history of human settlement of the islands 1.0 Introduction The islands held several attractions for the first settlers. They lay along strategic waterways, offered shelter to seagoing travellers, were rich in resources, and were close to the Tamaki Makaurau
    [Show full text]
  • The Sebel Auckland Manukau
    THE SEBEL AUCKLAND MANUKAU Discover the perfect mix of independent space and exceptional service at Manukau City’s newest upscale hotel, The Sebel Auckland Manukau. WELCOME LOCATION Positioned in the heart of Manukau’s bustling centre From its perfect vantage point, the hotel allows you and a short drive from the airport, The Sebel to discover the best of the area including Rainbow’s Auckland Manukau is a stylish getaway located just End, Butterfly Creek, Westfield Mall, Vector Wero 22 kilometres from the Auckland CBD. Whitewater Park and Vodafone Events Centre. Ideal for both business and leisure travellers, Auckland’s main arterial route, the Southern The Sebel Auckland Manukau offers unforgettable Motorway is a 2-minute drive away and both the experiences, a modern design and personalised International and Domestic Airports are located service. within 10 kilometres from the hotel. BOTANY RES S TREET IAN S HAW RES PARK DOW NS RES RES RES Edgewater MATERNITY UNIT HOW ICK K R E N T A R V G M RIVERHILLS L R D A H D I O A A U M V COUNTRY L I L T R R S T Z L E E G W N V B N L N D I E R L O D L T E I P G A I College R S N S D M G A W R O B A L E O L U A E O T L N D A O O O S G R PARK U I E P O W A N P A N A Y d A R O U W I W CLUB L M E Y N R A C ' O EF P T R K S C S HEN Y U E Y A A R C A R G P O R L N S A M C E U N F O E I G R U T I N V d V L R T L E Y D A Y P A R E L O I L W P I A E A L L S D K N R D L E H GOLFLANDS R H U O O A C O L E E H S Y N L P T D I P H R D C R H L R O H R T U E A X C T T RES R D K T N RES E K U E " T O T V A D E
    [Show full text]
  • Otara, in Manukau City, New Zealand
    “They didn’t care about normal kids like me” Restructuring a school to fit the kids “Nga Hau e Wha” by Chey Milne A thesis submitted as partial fulfilment of the requirements for the degree of Master of Educational Administration, Massey University, Palmerston North, New Zealand. Ann Milne 2004 i Declaration I declare that this thesis, ―They didn‘t care about normal kids like me‖ - Restructuring a school to fit the kids, represents my own work, except where due acknowledgement is made, and that it has not been previously included in a thesis, dissertation or report submitted to this University or to any other institution for a degree, diploma or other qualification. Signed: _____________________ Ann Milne Date: _________________ ii For the kids … For my grandchildren, Chey, Blake, Georgia, Kairangi, Koha, Kaya, Zion, Maioha and Mahina, who keep reminding me how important it is to be Maori everywhere in their lives & For the kids at Clover Park Middle School who show us the way to our future iii Abstract Towards the end of 2000 a group of young Maori, formerly students in Clover Park Middle School‘s bilingual unit up to Year 9 or 10, approached the school to ask if they could return to the Maori learning environment where they felt they had been successful. They reported they had been unable to feel this way again in any of their respective senior secondary school settings. In the process of explaining why he felt he hadn‘t fitted into his school, one young man said, ―They didn‘t care about normal kids like me.‖ For him, being Maori was ―normal‖ and he didn‘t see anything in his senior secondary schooling experience that valued his reality.
    [Show full text]
  • To Manukau Centre Via Mangere East and Papatoetoe to Otahuhu
    Rd Panmure y nd Bridge to Otahuhu • Downtown to Manukau Centre w Primary Irela r ve Ri via Papatoetoe and Mangere East via Mangere East and Papatoetoe on H aki Panmure Rd m a Basin anga T B rose llingt ur ai Pen R e Pak l ey R ey d St Kentigern Mt Wellington W College d t R d Countdown anga M ur Waipuna Rd Pak Manukau Papatoetoe Customs St Papatoetoe P ri Centre Town Hall Transfer Otahuhu Customs St East Otahuhu Transfer Otahuhu Town Hall Manukau ce Cr Route (Stop 6921) (Stop 6525) Otahuhu at Otahuhu (Stop 8094) East Route (Stop 7019) (Stop 8099) at Otahuhu (Stop 8099) (Stop 6520) Centre Sylvia Park 10 Primary Sylvia Park R Monday to Friday 428 Monday to Friday 428 ee d ves Rd R Riverina Sou Mt th Sylvia Park School 10 Ti ys e Pl d rn den M Wel Shopping Bow R U AM 428 5.30 5.37 5.55 471 6.05 6.41 AM --428 6.40 6.57 7.11 ot akau Dr orw Centre ay l 428 6.00 6.07 6.30 473 6.35 7.19 497 6.25 7.00 428 7.10 7.32 7.46 i r ng D mow C G Hamlins le a C reat Hill t rb 428 6.30 6.37 7.00 473 7.05 7.58 471 6.45 7.25 428 7.40 8.06 8.20 o T ine R a n r Pl bado m S Hig Ga ou Rd 428 7.00 7.10 7.32 471 7.40 8.46 497 7.15 8.00 428 8.10 8.41 8.55 Rd a rk ahan d t Mon k jway i h a Pa Edgewater 428 7.30 7.40 8.07 471 8.15 9.15 487 8.15 9.00 428 9.10 9.35 9.50 vi r Cr R l D 1 College Rd Sy Fisher iv ey e t s r 428 8.00 8.10 8.40 471 8.45 9.45 487 9.15 10.00 428 10.10 10.35 10.50 e V N ia ek 428 8.30 8.40 9.10 497 9.15 10.05 487 10.15 11.00 428 11.10 11.35 11.50 ll B re Transferu s Rd at Otahuhu Pakuranga C 428 9.10 9.20 9.50 487 9.55 10.45 487 11.15 12.00 428
    [Show full text]
  • ONEHUNGA Transform Onehunga
    ONEHUNGA Transform Onehunga High Level Project Plan – March 2017 ABBREVIATIONS AT Auckland Transport ATEED Auckland Tourism, Events and Economic Development Ltd CCO Council-controlled organisation the council Auckland Council HLPP High Level Project Plan HNZ Housing New Zealand LTP Long-term Plan Panuku Panuku Development Auckland AUP Auckland Unitary Plan (Operative in part) SOI Statement of Intent 2 PANUKU DEVELOPMENT AUCKLAND CONTENTS 1.0 INTRODUCTION 5 3.7 Infrastructure 34 7.3.4 Manukau Harbour Forum 68 1.1 Mihi 8 3.7.1 Social infrastructure 34 7.3.5 Large Infrastructure Integration Group 68 1.2 Shaping spaces for Aucklanders to love 9 3.7.2 Physical infrastructure 34 7.3.6 Onehunga community champions 68 1.3 Panuku – who we are 10 3.7.3 Infrastructure projects 35 7.3.7 Baseline engagement 69 1.4 Why Onehunga? 12 7.3.8 Auckland Council family 69 4.0 PANUKU PRINCIPLES 39 1.5 Purpose of this High Level Project Plan 13 7.3.9 Place-led engagement 69 FOR TRANSFORM PROJECTS 1.6 Developing the Transform Onehunga story 14 7.4 Place-making for Onehunga 70 4.1 Panuku’s commitment 40 2.0 VISION THEMES FOR 17 4.2 Panuku principles for Transform projects 40 8.0 PROPOSED IMPLEMENTATION 73 TRANSFORM ONEHUNGA 8.1 Development strategy 74 5.0 GOALS FOR TRANSFORM ONEHUNGA 43 8.1.1 Key infl uences 74 3.0 CONTEXT 21 6.0 STRATEGIC MOVES 47 8.1.2 Proposed delivery strategy 74 3.1 Background 22 6.1 Strategic Move: Build on existing strengths (RETAIN) 50 8.2 Town Centre Core 76 3.2 Mana Whenua 23 6.1.1 Potential projects and initiatives 51 8.3 Town Centre
    [Show full text]