Summary the Applicability Or Non-Applicability of a Claim For

Total Page:16

File Type:pdf, Size:1020Kb

Summary the Applicability Or Non-Applicability of a Claim For Summary The applicability or non-applicability of a claim for damages by the stockholders of a company that was delisted due to false statements as to the number of stocks in its securities reports etc., against the company and the directors and major stockholders of the company by reason of their torts, and the amount of losses; the amount of losses shall be calculated by deducting 90 percent of the amount of the fall due to the factors irrelevant to the false statements of the company, such as the economic situation, the market trend, and the business performance of the company before the publication from the amount of the difference between the acquisition price and the appraisal price of the stocks at the time of the conclusion of the oral argument in the inquisition for the holding stockholders and from the amount of the difference between the acquisition price and the disposal price for the disposing stockholders, respectively (partially affirmed for the holding stockholders and denied for the disposing stockholders). [LEX/DB(TKC Corporation)25503064] Cases for appeal for claims for damages The Tokyo High Court in 2011, Case No. (ne) 6335 Judgment rendered by the Civil Division No.2 of said High Court on January 30, 2014 The date of conclusion of oral argument: October 3, 2013 Main Text of Judgment 1. The Court dismisses all of the present appeals by the Holding Plaintiffs, the present appeal by the Plaintiffs at the first trial as numbers 231 and 286 of the Plaintiffs to the Defendant P1 and the Defendant P2, the present appeal by Seibu Railway, a Defendant at the first trial, Prince Hotels, a Defendant at the first trial, P3, a Defendant at the first trial, and P4, a Defendant at the first trial, and the present appeal by the Defendant P1 and the Defendant P2 to the Plaintiffs at the first trial as numbers 21 and 187 of the Plaintiffs. 2. Based on the present appeal by the Plaintiffs at the first trial as numbers 21 and 187 of the Plaintiffs, the present appeal by the Plaintiffs at the first trial as numbers 231 and 286 of the Plaintiffs to Seibu Railway, a Defendant at the first trial, Prince Hotels, a Defendant at the first trial, P3, a Defendant at the first trial, and P4, a Defendant at the first trial, and the present appeal by the Defendant P1 and the Defendant P2 to the Plaintiffs at the first trial as numbers 231 and 286 of the Plaintiffs and the Disposing Plaintiffs B, the Court changes paragraphs 1- 3 of the Main Text of Judgment of the original judgment as follows: (1) The Court orders Seibu Railway, a Defendant at the first trial, Prince Hotels, a Defendant at the first trial, P3, a Defendant at the first trial, the Defendant P1, and the Defendant P2 to pay jointly and severally the Plaintiffs at the first trial as numbers 21, 187, and 231 of the Plaintiffs, the monies described in the column of “Admitted Amounts of Seibu” (however, for the Defendant P1 and the Defendant P2, each amount in “Admitted Amounts of P5”) in Attachment 3: Admitted Amount List and the late penalty of five (5) percent per annum from October 13, 2004, until the monies will have been completely paid. (2) The Court orders Seibu Railway, a Defendant at the first trial, Prince Hotels, a Defendant at the first trial, and P3, a Defendant at the first trial, to pay jointly and severally the Plaintiff at the first trial as number 286 of the Plaintiffs, the monies described in the column of “Admitted Amounts of Seibu” in Attachment 3: Admitted Amount List and the late penalty of five (5) percent per annum from October 13, 2004, until the monies will have been completely paid. (3) The Court orders P4, a Defendant at the first trial, to pay the Plaintiffs at the first trial as numbers 231 and 286 of the Plaintiffs, the monies described in the column of “Admitted Amounts of P4” in Attachment 3: Admitted Amount List and the late penalty of five (5) percent per annum from October 13, 2004, until the monies will have been completely paid, jointly and severally with Seibu Railway, a Defendant at the first trial, Prince Hotels, a Defendant at the first trial, and P3, a Defendant at the first trial, to the extent that the property inherited from deceased P6 exists. (4) The Court orders the Defendant P1 and the Defendant P2 to pay the Plaintiff at the first trial as number 231 of the Plaintiffs and the Disposing Plaintiffs B, the monies described in the column of “Admitted Amounts of P5” in Attachment 3: Admitted Amount List and the late penalty of five (5) percent per annum from October 13, 2004, until the monies will have been completely paid, jointly and severally with Seibu Railway, a Defendant at the first trial, Prince Hotels, a Defendant at the first trial, and P3, a Defendant at the first trial. (5) The Court dismisses all of the remaining claims by the Disposing Plaintiffs A and the Disposing Plaintiffs B. 3. The litigation costs for the first trial, the second trial before remand, the final appeal trial, and the second trial after remand will be borne as follows: (1) Between the Holding Plaintiffs and the Defendants at the first trial, all costs incurred by the parties will be borne by the Holding Plaintiffs. (2) Between the Disposing Plaintiffs A and Seibu Railway, a Defendant at the first trial, Prince Hotels, a Defendant at the first trial, P3, a Defendant at the first trial, the Defendant P1, and the Defendant P2, with respect to the costs incurred by the parties, one-third (1/3) of the cost incurred by said Plaintiffs at the first trial and the cost incurred by the Defendants will be borne by said Defendants at the first trial, and the remaining costs incurred by said Plaintiffs at the first trial will be borne by said Plaintiffs at the first trial. (3) Between the Plaintiffs at the first trial as numbers 231 and 286 of the Plaintiffs and P4, a Defendant at the first trial, one-third (1/3) of the cost incurred by said Plaintiffs at the first trial and the cost incurred by P4, a Defendant at the first trial, will be borne by P4, a Defendant at the first trial, and the remaining costs incurred by said Plaintiffs at the first trial will be borne by said Plaintiffs at the first trial. (4) Between the Disposing Plaintiffs B and the Defendant P1 and the Defendant P2, one- third (1/3) of the cost incurred by said Plaintiffs at the first trial and the cost incurred by said Defendants will be borne by said Defendants, and the remaining costs incurred by said Plaintiffs at the first trial will be borne by said Plaintiffs at the first trial. 4. This judgment may be executed provisionally only in Paragraph 2 (1)-(4). Facts and Reasoning I. Purport of Appeal by the Plaintiffs at the First Trial1. The Court changes the original judgment as follows: 2. The Court orders Seibu Railway, a Defendant at the first trial, Prince Hotels, a Defendant at the first trial, P3, a Defendant at the first trial, the Defendant P1, and the Defendant P2 to pay jointly and severally the Plaintiff at the first trial as numbers 3, 9, 17, 21, 40, 49, 52-1-3, 79, 89, 101, 107, 119, 123, 125, 127, 185, 187, 190, 211, 212, 226, 231, 252, 254, 268, 274, 275, and 286 of the Plaintiffs, the monies described in the column of “Claimed Amounts” in the Losses, etc., List of Attachment of the original judgment and the late penalty of five (5) percent per annum from October 13, 2004, until the monies will have been completely paid. 3. The Court orders P4, a Defendant at the first trial, to pay the Plaintiff at the first trial as numbers 3, 9, 17, 21, 40, 49, 52-1-3, 79, 89, 101, 107, 119, 123, 125, 127, 185, 187, 190, 211, 212, 226, 231, 252, 254, 268, 274, 275, and 286 of the Plaintiffs the monies described in the column of “Claimed Amounts” in the Losses, etc., List of Attachment of the original judgment and the late penalty of five (5) percent per annum from October 13, 2004, until the monies will have been completely paid, to the extent that the property inherited from deceased P6 exists, jointly and severally with Seibu Railway, a Defendant at the first trial, Prince Hotels, a Defendant at the first trial, P3, a Defendant at the first trial, the Defendant P1, and the Defendant P2. II. Purport of Appeal by the Defendants at the First Trial 1. The Court cancels the portion for which the Defendants at the first trial lost in the original judgment. 2. The Court dismisses all of the claims by the Plaintiffs at the first trial for the portion related to the above cancellation. II. Overview of the Case 1. In the present case, the Plaintiffs at the first trial, who acquired the stocks of Seibu Railway, a Defendant at the first trial (Seibu Railway Stocks), listed on the Tokyo Stock Exchange, at the exchange market, or who are heirs of those, assert that despite the fact that the share of the amount of Seibu Railway Stocks held by certain minority holders, such as Kokudo Co., Ltd. (Kokudo), was applicable to the reason for delisting specified by the Tokyo Stock Exchange, Seibu Railway, a Defendant at the first trial, presented false statements in its securities reports and semi-annual reports (hereinafter collectively referred to as the “securities reports, etc.”) in order to conceal the aforementioned fact while Kokudo cooperated with the aforementioned concealment by presenting the false statements in its substantial shareholding report of Seibu Railway Stocks (hereinafter, the aforementioned false statements in the securities reports etc.
Recommended publications
  • 2012 Annual Report Pursuing Our Unlimited Potential Annual Report 2012
    For the year ended March 31, 2012 Pursuing Our Unlimited Potential Annual Report 2012 Annual Report 2012 EAST JAPAN RAILWAY COMPANY JR East’s Strengths 1 AN OVERWHELMINGLY SOLID AND ADVANTAGEOUS RAILWAY NETWORK The railway business of the JR East Being based in the Tokyo metro- Group covers the eastern half of politan area is a major source of our Honshu island, which includes the strength. Routes originating in the Tokyo metropolitan area. We provide Kanto area (JR East Tokyo Branch transportation services via our Office, Yokohama Branch Office, Shinkansen network, which connects Hachioji Branch Office, Omiya Tokyo with regional cities in five Branch Office, Takasaki Branch directions, Kanto area network, and Office, Mito Branch Office, and intercity and regional networks. Our Chiba Branch Office) account for JR EAST’S SERVICE AREA networks combine to cover 7,512.6 68% of transportation revenue. kilometers and serve 17 million Japan’s total population may be people daily. We are the largest declining, but the population of the railway company in Japan and one of Tokyo metropolitan area (Tokyo, TOKYO the largest in the world. Kanagawa Prefecture, Saitama Prefecture, and Chiba On a daily basis, about 17million passengers travel a network of 70 train lines stretching 7,512.6 operating kilometers An Overwhelmingly Solid and Advantageous Railway Network Annual Report 2012 SECTION 1 OVERALL GROWTH STRATEGY Prefecture) continues to rise, mean- OPERATING REVENUES OPERATING INCOME ing our railway networks are sup- For the year ended March 31, 2012 For the year ended March 31, 2012 ported by an extremely sturdy Others 7.9% Transportation Others 6.1% Transportation operating foundation.
    [Show full text]
  • East Japan Railway Company Shin-Hakodate-Hokuto
    ANNUAL REPORT 2017 For the year ended March 31, 2017 Pursuing We have been pursuing initiatives in light of the Group Philosophy since 1987. Annual Report 2017 1 Tokyo 1988 2002 We have been pursuing our Eternal Mission while broadening our Unlimited Potential. 1988* 2002 Operating Revenues Operating Revenues ¥1,565.7 ¥2,543.3 billion billion Operating Revenues Operating Income Operating Income Operating Income ¥307.3 ¥316.3 billion billion Transportation (“Railway” in FY1988) 2017 Other Operations (in FY1988) Retail & Services (“Station Space Utilization” in FY2002–2017) Real Estate & Hotels * Fiscal 1988 figures are nonconsolidated. (“Shopping Centers & Office Buildings” in FY2002–2017) Others (in FY2002–2017) Further, other operations include bus services. April 1987 July 1992 March 1997 November 2001 February 2002 March 2004 Establishment of Launch of the Launch of the Akita Launch of Launch of the Station Start of Suica JR East Yamagata Shinkansen Shinkansen Suica Renaissance program with electronic money Tsubasa service Komachi service the opening of atré Ueno service 2 East Japan Railway Company Shin-Hakodate-Hokuto Shin-Aomori 2017 Hachinohe Operating Revenues ¥2,880.8 billion Akita Morioka Operating Income ¥466.3 billion Shinjo Yamagata Sendai Niigata Fukushima Koriyama Joetsumyoko Shinkansen (JR East) Echigo-Yuzawa Conventional Lines (Kanto Area Network) Conventional Lines (Other Network) Toyama Nagano BRT (Bus Rapid Transit) Lines Kanazawa Utsunomiya Shinkansen (Other JR Companies) Takasaki Mito Shinkansen (Under Construction) (As of June 2017) Karuizawa Omiya Tokyo Narita Airport Hachioji Chiba 2017Yokohama Transportation Retail & Services Real Estate & Hotels Others Railway Business, Bus Services, Retail Sales, Restaurant Operations, Shopping Center Operations, IT & Suica business such as the Cleaning Services, Railcar Advertising & Publicity, etc.
    [Show full text]
  • Pdf/Rosen Eng.Pdf Rice fields) Connnecting Otsuki to Mt.Fuji and Kawaguchiko
    Iizaka Onsen Yonesaka Line Yonesaka Yamagata Shinkansen TOKYO & AROUND TOKYO Ōu Line Iizakaonsen Local area sightseeing recommendations 1 Awashima Port Sado Gold Mine Iyoboya Salmon Fukushima Ryotsu Port Museum Transportation Welcome to Fukushima Niigata Tochigi Akadomari Port Abukuma Express ❶ ❷ ❸ Murakami Takayu Onsen JAPAN Tarai-bune (tub boat) Experience Fukushima Ogi Port Iwafune Port Mt.Azumakofuji Hanamiyama Sakamachi Tuchiyu Onsen Fukushima City Fruit picking Gran Deco Snow Resort Bandai-Azuma TTOOKKYYOO information Niigata Port Skyline Itoigawa UNESCO Global Geopark Oiran Dochu Courtesan Procession Urabandai Teradomari Port Goshiki-numa Ponds Dake Onsen Marine Dream Nou Yahiko Niigata & Kitakata ramen Kasumigajo & Furumachi Geigi Airport Urabandai Highland Ibaraki Gunma ❹ ❺ Airport Limousine Bus Kitakata Park Naoetsu Port Echigo Line Hakushin Line Bandai Bunsui Yoshida Shibata Aizu-Wakamatsu Inawashiro Yahiko Line Niigata Atami Ban-etsu- Onsen Nishi-Wakamatsu West Line Nagaoka Railway Aizu Nō Naoetsu Saigata Kashiwazaki Tsukioka Lake Itoigawa Sanjo Firework Show Uetsu Line Onsen Inawashiro AARROOUUNNDD Shoun Sanso Garden Tsubamesanjō Blacksmith Niitsu Takada Takada Park Nishikigoi no sato Jōetsu Higashiyama Kamou Terraced Rice Paddies Shinkansen Dojo Ashinomaki-Onsen Takashiba Ouchi-juku Onsen Tōhoku Line Myoko Kogen Hokuhoku Line Shin-etsu Line Nagaoka Higashi- Sanjō Ban-etsu-West Line Deko Residence Tsuruga-jo Jōetsumyōkō Onsen Village Shin-etsu Yunokami-Onsen Railway Echigo TOKImeki Line Hokkaid T Kōriyama Funehiki Hokuriku
    [Show full text]
  • Special Assistance for Project Implementation for Bangkok Mass Transit Development Project in Thailand
    MASS RAPID TRANSIT AUTHORITY THAILAND SPECIAL ASSISTANCE FOR PROJECT IMPLEMENTATION FOR BANGKOK MASS TRANSIT DEVELOPMENT PROJECT IN THAILAND FINAL REPORT SEPTEMBER 2010 JAPAN INTERNATIONAL COOPERATION AGENCY ORIENTAL CONSULTANTS, CO., LTD. EID JR 10-159 MASS RAPID TRANSIT AUTHORITY THAILAND SPECIAL ASSISTANCE FOR PROJECT IMPLEMENTATION FOR BANGKOK MASS TRANSIT DEVELOPMENT PROJECT IN THAILAND FINAL REPORT SEPTEMBER 2010 JAPAN INTERNATIONAL COOPERATION AGENCY ORIENTAL CONSULTANTS, CO., LTD. Special Assistance for Project Implementation for Mass Transit Development in Bangkok Final Report TABLE OF CONTENTS Page CHAPTER 1 INTRODUCTION ..................................................................................... 1-1 1.1 Background of the Study ..................................................................................... 1-1 1.2 Objective of the Study ......................................................................................... 1-2 1.3 Scope of the Study............................................................................................... 1-2 1.4 Counterpart Agency............................................................................................. 1-3 CHAPTER 2 EXISTING CIRCUMSTANCES AND FUTURE PROSPECTS OF MASS TRANSIT DEVELOPMENT IN BANGKOK .............................. 2-1 2.1 Legal Framework and Government Policy.......................................................... 2-1 2.1.1 Relevant Agencies....................................................................................... 2-1 2.1.2
    [Show full text]
  • WHITE PAPER on LAND, INFRASTRUCTURE, TRANSPORT and TOURISM in JAPAN, 2009 Ministry of Land, Infrastructure, Transport and Tourism (MLIT)
    2009 WHITE PAPER ON LAND, INFRASTRUCTURE, TRANSPORT AND TOURISM IN JAPAN, 2009 Ministry of Land, Infrastructure, Transport and Tourism (MLIT) Contents Part II Trends in MLIT policies Chapter 1: New MLIT Policies Accommodating the Needs of the Times ................................................................... 1 Chapter 2: Realizing a Tourism Nation and Creating a Beautiful Country ................................................................... 7 Chapter 3: Promoting Regional Revitalization .......................................................................................................... 14 Chapter 4: Forming the comfortable living place ....................................................................................................... 27 Chapter 5: Construction of a Competitive Economic Society ..................................................................................... 36 Chapter 6: Building a Safe and Peaceful Society ....................................................................................................... 57 Chapter 7: Creating and Preserving a Beautiful and Favorable Environment ............................................................. 88 Chapter 8: Strengthening International Cooperation, Contributions and Competitiveness for the Sustainable Development of our Country ........................................................ 110 Chapter 9: Use of Information and Communication Technology (ICT) and Promotion of Technical Research and Development ......................................................................
    [Show full text]
  • Initiative to Standardize Tokyo Commuter Emus Satoru Sone
    F Rolling Stock and Manufacturers (part 1) eature Initiative to Standardize Tokyo Commuter EMUs Satoru Sone distance for such travel is about 60 km railway transport in commuting is quite Commuting in Greater Tokyo using conventional railway lines and more low, illustrating the importance of railway than 100 km using shinkansen lines. The services in the GTCA. Greater Tokyo vs. mega-cities in average commuting time exceeds 60 West and Asia minutes. Clearly, the number of daily Current situation of radial The residential population of Tokyo’s 23 commuters and their travel distance in the railway lines in GTCA wards, including the central business area, Greater Tokyo Commuting Area (GTCA) Some 40,000 long-distance commuters is approximately 8 million but the daytime are far larger than the figures for Paris, are using the Tokaido, Tohoku and Joetsu population is believed to be which has a high proportion of inner city shinkansen lines. Since trains on the approximately 11 million. Since more dwellers, or London and New York both Joetsu Shinkansen use the tracks of the than a few workers and students commute with relatively high proportions of Tohoku Shinkansen for the 30-km section from central Tokyo to suburban areas, it suburban dwellers. in and out of Tokyo, the shinkansen is safe to assume that more than 3 million Although there are other mega-cities with service in the immediate vicinity of Tokyo people commute almost every morning a huge number of commuters, such as is provided by two double-track lines. into Tokyo. In many cases,
    [Show full text]
  • Railway Systems
    Railway Systems Urban Railway Systems 1 Exterior (top) and interior (bottom) of Okinawa Urban Monorail rolling stock 1 Okinawa Urban Monorail 1,480 mm, and space has been provided next to Additional 1000 Series Rolling the doors to make the interior more spacious, Stock for Urasoe Extension allowing for easier entry and exit when crowded. To accompany this more spacious interior, the Okinawa Urban Monorail, Inc. has ordered an rolling stock has been equipped with a safety additional six trainsets for use on the Urasoe function for preventing the limits on axle loads Extension (which runs for 4.1 km from Shuri from being exceeded when at maximum pas- Station). Th e new trainsets have the same senger capacity. Th is function detects when the basic design as the existing 1000 series roll- axle load limit is exceeded and interlocks this ing stock but with upgraded safety and service with the door close mechanism. performance. Th e route display has been upgraded by Internally, the space in front of the longitudi- changing the format from a map to a liquid nal seats has been enlarged from 1,300 mm to crystal display (LCD). In addition to enhancing Hitachi Review Vol. 67, No. 3 302–303 43 161-kV feeders from Taiwan Power Company G AC22 kV AC380 V DC750 V AC: alternating current DC: direct current 2 Diagram of power supply system for access line to Taiwan Taoyuan International Airport (left ), and rolling stock (right) accessibility by being able to display four dif- approximately 40 million people annually), to ferent languages in six diff erent character sets suburban residential areas and Zhongli District.
    [Show full text]
  • New Seibu Limited Express Train 001 Series Laview Harmonized with Both Urban and Natural Surroundings
    FEATURED ARTICLES Advanced Railway Systems through Digital Technology New Seibu Limited Express Train 001 Series Laview Harmonized with both Urban and Natural Surroundings The development of Seibu Railway Co., Ltd.’s new limited express 001 series started out of the necessity to replace the older New Red Arrow Seibu 10000 Series. This coin- cided with the 100th anniversary of the company’s Ikebukuro Line, which runs between Ikebukuro Station and Hanno Station, leading to the decision to adopt a new flagship train that would mark the beginning of the company’s second century. Seibu Railway decided to go in a new direction in the development of this limited express train, entrust- ing its design to world-renowned architect Kazuyo Sejima, and including Hitachi to handle manufacturing of the rolling stock in a three-way project. This article describes the development of the new limited express Laview through this project, together with the key features that emphasize the power of its design. Naoji Ueki Yasunori Tanii Naotoshi Inoue Hidenori Yagi Yuta Kawaguchi 1. Introduction 2. Overview of the 001 Series Recent years have seen the development of many types 2. 1 of rolling stock that emphasize their visual designs. Seibu Design Concept Railway Co., Ltd.’s latest limited express 001 series Laview is the successor to the New Red Arrow 10000 Series. It Th e year 2015, when development work began on the 001 features a spherical front, a silver body that blends into the series, was the 100th anniversary of the opening of the scenery, large windows to enjoy a panoramic view, and an Ikebukuro Line of Seibu Railway, linking Ikebukuro Station interior in which passengers can feel at home.
    [Show full text]
  • Around Tokyo from Narita Airport Model Course Depart Narita Airport ➡ Nikko ➡ Chichibu ➡ Narita ➡ Arrive Narita Airport (A Model Course)
    Nikko Area Nikko Area *Please be aware that transport and the time required for a model course may vary depending on the weather and/or traffic conditions *Please note that Chichibu 2-Day Pass does not cover the Red Arrow Limited Express fare Around Tokyo from Narita Airport Model course Depart Narita Airport ➡ Nikko ➡ Chichibu ➡ Narita ➡ Arrive Narita Airport (A model course) Keisei Skyliner & Tokyo Subway Ticket NIKKO ALL AREA PASS Keisei Skyliner & Tokyo Subway Ticket Chichibu 2-Day Pass Keisei Skyliner & Tokyo Subway Ticket Narita-Kaiun Pass Keisei Tokyo Metro Tobu Limited Express Tobu Limited Express Tokyo Metro Ginza Line / Tozai Line / Red Arrow Red Arrow Tokyo Metro Marunouchi Line / Tozai Line / Keisei Skyliner Ginza Line SPACIA, Revaty SPACIA, Revaty Marunouchi Line Limited Express Limited Express Ginza Line Skyliner Keisei Main Line Keisei Main Line Narita Airport Ueno Sta. Asakusa Sta. Tobu Nikko Sta. Asakusa Sta. Ikebukuro Sta. Seibu Chichibu Sta. Ikebukuro Sta. Ueno Sta. Narita Airport Keisei Narita Sta. Narita Airport About 44 minutes About 5 minutes About 110 minutes About 110 minutes About 29 minutes About 78 minutes About 78 minutes About 16 minutes About 44 minutes About 10 minutes About 10 minutes Nikko Area Narita Area Chichibu Area Narita Area Chichibu Area Use the Use the Use the Chichibu 2-Day pass Narita-Kaiun pass Experience the mysterious charm of Nikko NIKKO ALL AREA PASS Try Sanja Meguri (visiting three shrines) to feel nature and history for sightseeing in Chichibu! Multifarious places well worth visiting near the airport! for sightseeing in Narita! for sightseeing in Nikko! Please refer to the back of the brochure for details.
    [Show full text]
  • Integrated Report 2019 Tokyu Corporation
    INTEGRATED 2019 REPORT INTEGRATED TOKYU CORPORATION Corporate Planning Office https://www.tokyu.co.jp/global/english/index.html This product is made of FSC® -certified and other controlled material. INTEGRATED REPORT 2019 Urban Development DNA That Has Flowed Through Our Veins Since the founding of the Tokyu Group, we have balanced our public and private natures with Tokyu Corporation traces its roots back to Den-en-toshi Company, the development of public transportation and residential areas as our two pillars. At the same time, which was started in 1918 under the leadership of Eiichi Shibusawa. we have strived to offer new life values ahead of our competitors as we continued to work on In 1922, Den-en-toshi Company’s railway division was separated to independently found developing sustainable communities. Meguro-Kamata Electric Railway Company. Going forward, we will always offer quality of living from new perspectives and create beautiful living In the approximately 100 years since our founding, we have been undertaking environments so that all people may find genuine happiness and express an individual lifestyle amid urban development as a private company together with local residents. a harmonious society overflowing with kindness and consideration. The characteristics of our urban development have been summarized below. Balancing the convenience of urban access with the living environment of the suburbs based on the garden city ideology founded by Englishman Ebenezer Howard Group Slogan Creating towns centered on stations, and urban
    [Show full text]
  • Corporate Information [PDF/1.01MB]
    Corporate Information 088 JR East: Domestic and International Perspectives 101 Glossary 102 Consolidated Subsidiaries and Equity-Method Affiliated Companies 104 Corporate Data 105 Stock Information Annual Report 2010 087 Corporate Information JR East: Domestic and International Perspectives PEER GROUP COMPARISONS In this section, several key performance indicators illustrate how JR East compares with selected well- known companies. Total Stock Market Value Millions of U.S. Dollars International Domestic JR East 27,647 JR East 27,647 British Airways 4,233 ANA 7,196 Lufthansa 7,210 Tokyu 5,249 Union Pacific 32,288 TEPCO 36,142 FedEx 17,259 NTT 56,058 UPS 56,957 • Data in these graphs have been computed from each company’s share price and shares outstanding at the end of the previous fiscal year. Operating Revenues Millions of U.S. Dollars International Domestic JR East 27,674 JR East 27,674 British Airways 12,071 ANA 13,208 Lufthansa 29,859 Tokyu 13,227 Union Pacific 14,143 TEPCO 53,938 FedEx 35,497 NTT 109,477 UPS 45,297 Net Income (Loss) Millions of U.S. Dollars International Domestic JR East 1,293 JR East 1,293 British Airways –642 ANA –617 Lufthansa –150 Tokyu 160 Union Pacific 1,898 TEPCO 1,438 FedEx 98 NTT 5,293 UPS 2,152 088 East Japan Railway Company Cash Flows from Operating Activities Millions of U.S. Dollars International Domestic JR East 5,152 JR East 5,152 British Airways 500 ANA 892 Lufthansa 2,668 Tokyu 1,623 Union Pacific 3,234 TEPCO 10,627 FedEx 2,753 NTT 30,299 UPS 5,285 Return on Average Equity (ROE) % International Domestic JR East 6.9 JR East 6.9 British Airways –21.5 ANA –14.4 Lufthansa –1.8 Tokyu 4.0 Union Pacific 11.7 TEPCO 5.5 FedEx 0.7 NTT 6.5 UPS 29.9 Average equity is the average of equity at the end of the previous and applicable fiscal years.
    [Show full text]
  • The "Travel Japan and Taiwan! Railroad Stamp Rally"
    August 4, 2015 4 company joint event by Seibu Railway, Keikyu Railway, JR East and the Taiwan Railways Administration The "Travel Japan and Taiwan! Railroad Stamp Rally" to be held beginning August 25, 2015 (Tue.)! Collect stamps at 2 stations in Japan, 2 stations in Taiwan and 1 station anywhere for a total of 5 stations to receive special souvenir presents! Special souvenir gifts of an original tote bag with female character illustrations and the logos of each company will be presented to the first 2,000 customers!! Seibu Railway Co., Ltd. Keikyu Corporation East Japan Railway Company Taiwan Railways Administration From August 25, 2015 (Tue.) to August 31, 2016 (Wed.), Seibu Railway Co., Ltd. (Head Office: Tokorozawa City, Saitama Prefecture, President: Hisashi Wakabayashi, hereinafter "Seibu Railway"), Keikyu Corporation (Head Office: Minato Ward, Tokyo, President: Kazuyuki Harada, hereinafter "Keikyu Railway"), East Japan Railway Company (Head Office: Shibuya Ward, Tokyo, President Tetsuro Tomita, hereinafter "JR East") and the Taiwan Railways Administration (Head Office: Taipei City, Taiwan, Director: Yung-Hui Cho, hereinafter "TRA") will be holding the "Travel Japan and Taiwan! Railroad Stamp Rally" event. This stamp rally is aimed at promoting development in both Japan and Taiwan as well as development of the participating companies, and the stamp rally is being implemented to commemorate the conclusion of agreements between Seibu Railway, Keikyu Railway and JR East with the TRA. Stamps will be placed at major tourist locations and terminal stations along each rail line (Seibu Chichibu Station and Hon-Kawagoe Station for Seibu Railway, Miurakaigan Station and Haneda Airport International Terminal Station for Keikyu Railway, Tokyo Station for JR East, and Taipei Station, Hsinchu Station, Taichung Station, Chiayi Station, and Hualien Station for the TRA).
    [Show full text]