Urawa Saitama- Shintoshin
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
2012 Annual Report Pursuing Our Unlimited Potential Annual Report 2012
For the year ended March 31, 2012 Pursuing Our Unlimited Potential Annual Report 2012 Annual Report 2012 EAST JAPAN RAILWAY COMPANY JR East’s Strengths 1 AN OVERWHELMINGLY SOLID AND ADVANTAGEOUS RAILWAY NETWORK The railway business of the JR East Being based in the Tokyo metro- Group covers the eastern half of politan area is a major source of our Honshu island, which includes the strength. Routes originating in the Tokyo metropolitan area. We provide Kanto area (JR East Tokyo Branch transportation services via our Office, Yokohama Branch Office, Shinkansen network, which connects Hachioji Branch Office, Omiya Tokyo with regional cities in five Branch Office, Takasaki Branch directions, Kanto area network, and Office, Mito Branch Office, and intercity and regional networks. Our Chiba Branch Office) account for JR EAST’S SERVICE AREA networks combine to cover 7,512.6 68% of transportation revenue. kilometers and serve 17 million Japan’s total population may be people daily. We are the largest declining, but the population of the railway company in Japan and one of Tokyo metropolitan area (Tokyo, TOKYO the largest in the world. Kanagawa Prefecture, Saitama Prefecture, and Chiba On a daily basis, about 17million passengers travel a network of 70 train lines stretching 7,512.6 operating kilometers An Overwhelmingly Solid and Advantageous Railway Network Annual Report 2012 SECTION 1 OVERALL GROWTH STRATEGY Prefecture) continues to rise, mean- OPERATING REVENUES OPERATING INCOME ing our railway networks are sup- For the year ended March 31, 2012 For the year ended March 31, 2012 ported by an extremely sturdy Others 7.9% Transportation Others 6.1% Transportation operating foundation. -
First Half of Fiscal Year Ending March 31, 2020 (FY2019) November 14, 2019 Results Presentation Keisei Electric Railway Co., Ltd
First Half of Fiscal Year Ending March 31, 2020 (FY2019) November 14, 2019 Results Presentation Keisei Electric Railway Co., Ltd. Contents 1. Consolidated Results for First Half of Fiscal Year Ending March 31, 2020 2. Consolidated Results Forecast for Fiscal Year Ending March 31, 2020 3. Progress in E4 Plan 4. Reference Material Copyright © Keisei Electric Railway Co., Ltd. 1 1-1. Overview of Results (Year on Year) Operating revenue, operating income, ordinary income, and net profit attributable to owners of parent posted record highs. FY2019 H1 FY2018 H1 % ■ Changes in operating revenue (by segment) Unit: million yen Million yen, % Change Result Result Change 3,353 327 Operating revenue 138,007 129,916 8,090 6.2 1,881 367 -514 3,078 Operating income 19,117 17,746 1,371 7.7 -403 138,007 (Operating income margin) 13.9 13.7 0.2pt - 129,916 Ordinary income FY2018FY2018 H1TransportationDistributionDistribution Real Leisure,Leisure, Construction OtherOther EliminationFY2019FY2019 H1 28,431 26,890 1,541 5.7 H1 Estate ServiceService H1 Share of profit of entities accounted for 9,770 9,799 -28 -0.3 using equity method ■ Changes in operating income (by segment) Unit: million yen Net profit attributable to owners of parent 21,176 20,520 655 3.2 277 67 1,165 -86 Depreciation 13,555 12,656 899 7.1 -46 151 19,117 -156 17,746 FY2018FY2018 TransportationH1 TransportationDistributionDistributionRealReal Estate Leisure,Leisure, Construction Construction OtherOther EliminationEliminationFY2019FY2019 H1 H1 Estate ServiceService H1 Copyright © Keisei Electric Railway Co., Ltd. 2 1-2. Overview of Results [Consolidated Balance Sheet/Consolidated Cash Flows] • The equity ratio increased due to an increase in shareholders’ equity. -
Saitama Page 1/ 4
SAITAMA PAGE 1/ 4 PG-309 SAITAMA 10th Fl., Tokyo Kotsu Kaikan Bldg., 2-10-1, Yurakucho, Chiyoda-ku, Tokyo 100-0006 Tel. (03)3201-3331 Saitama Prefecture, pop. 6,938,000 located in the middle of the Apart from the mountainous northern region, and the Chichibu region, Kanto Plain area, is blessed with an abundance of nature. Visitors can most of the prefecture consists of level ground, and it has the same encounter beautiful scenery with clear spring waters and greenery. warm climate as the Central Tokyo. Access: To From Type of train Time required Fare(¥) Daily runs JR LEX “Narita Express” 1 hr. 2,940 23 Narita Airport JR Rapid “Airport Narita” 1 hr. 24 min. 1,280 16 Tokyo Monorail & JR Yamanote Line (change at Hamamatsu-cho Sta.) 28 min. 620 10–15/hr. Haneda Airport Keikyu Line & JR Yamanote Line 30 min. 560 Every 10 min. Tokyo St.a. (change at Shinagawa Sta.) JR Shinkansen “Nozomi” 2 hrs. 40 min. 14,720 29 Shin-Osaka Sta. JR Shinkansen “Hikari” 3 hrs. 13,750 93 Shin-Kobe Sta. JR Shinkansen “Hikari” 3 hrs. 15 min. 14,270 41 JR Shinkansen “Nozomi” 1 hr. 36 min. 11,340 29 Nagoya Sta. JR Shinkansen “Hikari” 1 hr. 50 min. 10,580 93 Keisei Railways “Skyliner” 56 min. 1,920 21 Ueno Sta. Keisei Railways LEX 1 hr. 16 min. 1,000 4–5/hr. Nippori Sta. Keisei Railways LEX 1 hr. 13 min. 1,000 4–5/hr. Narita Airport Omiya Sta. 2 hrs. ~ 2 hrs. 30 min. Saitama- Bus service “ON Liner” 2,750 18 Shintoshin Sta. -
SAITAMA, JAPAN Just North of Tokyo Nature, Koedo, Shopping and Events
Crayon Shin-chan There's plenty to see! © U/ F・S・A・A , Saitama Sightseeing Supporter SAITAMA, JAPAN Just North of Tokyo Nature, Koedo, shopping and events Chichibu & North Area West Area Central & East Area Crayon Shin-chan © U/ F・S・A・A , Saitama Sightseeing Supporter Tourism Division, Department of Industry and Labor, Saitama Prefecture ※Some of the facilities shown in this brochure may be temporarily closed, or their hours may be changed due to COVID-19. Please also note that events and festivals may either be delayed or canceled. Thank you for understanding. Visit Saitama Prefecture, where you can experience the past and present of Japan! The Chichibu Area and North Area are full of the appeal of richGUMMA nature, the West Area is where you can feel the atmosphere of Japan, and the Central Area and East Area are a fusion of city and nature. Experience Japanese history and culture in Saitama Prefecture, which is full of attractions! Fujioka IC Fujioka JCT y a w Tobu Nikko Line s e s pr x Joetsu Shinkansen/Hokuriku Shinkansen E 17 u k o Chichibu & North Area h o Chichibu Area and the North Area are full of excitement. T Refresh the soul in magnifi cent natural beauty of Chichibu and T o Hanyu IC b Nagatoro, and taste local dishes of the North Area that have Gyodashi u Ise Sta. s → FOR ak been developed independently. Tohoku Shinkansen 140 125 i L Kazo IC Narita Kumagaya Sta.Takasaki Line ine Airport Hanazono IC H a c Nagatoro Sta. h Kan-etsu ik o L Expressway y ine Kuki a w Shiraoka- l IC Mandarin orange i a Ogawamachi Sta. -
Presentation File(PDF 4.3
JR East Group Management Vision “Move Up” 2027 Investor Meeting July 4, 2018 Table of Contents 1. Changes in the business environment P3 2. JR East Group’s strengths P5 3. Basic Policies of “Move Up” 2027 P6 4. “Move Up” 2027 (1) Overview P8 (2) Making cities more comfortable P12 (3) Making regional areas more affluent P21 (4) Developing businesses for the world P23 (5) Numerical targets (FY2023), etc. P24 Environmental Group “Move Up” 2027 “Move Up” 2027 1. Changes in the business environment: Decreasing population change strengths Basic Policies Overview Urban cities Regional areas World Targets ■ After 2025, the population in Tokyo metropolitan area (Tokyo, Saitama, Chiba, Kanagawa) is expected to decrease gradually. ■ In Tohoku region (Aomori, Iwate, Miyagi, Akita, Yamagata, Fukushima), the population is expected to decrease by nearly 30% by 2040. (Population in 2015 = 100) 100% Tokyo metropolitan area 90% JR East service area National 80% By 2040 Tohoku region 70% 2015 2020 2025 2030 2035 2040 (Year) Decrease by nearly 30% Source: IPSS (National Institute of Population and Social Security Research) Population Projections by Prefecture (2018) 3 Environmental Group “Move Up” 2027 “Move Up” 2027 1. Changes in the business environment: Decreasing need for railway transportation change strengths Basic Policies Overview Urban cities Regional areas World Targets ■ After 2020, due to decreasing population, changes in the working style, development of internet society and practical application of autonomous driving technologies, the need for railway transportation is expected to decline. Since our railway business has large xed costs, we face a high risk of a drastic prot loss. -
East Japan Railway Company Shin-Hakodate-Hokuto
ANNUAL REPORT 2017 For the year ended March 31, 2017 Pursuing We have been pursuing initiatives in light of the Group Philosophy since 1987. Annual Report 2017 1 Tokyo 1988 2002 We have been pursuing our Eternal Mission while broadening our Unlimited Potential. 1988* 2002 Operating Revenues Operating Revenues ¥1,565.7 ¥2,543.3 billion billion Operating Revenues Operating Income Operating Income Operating Income ¥307.3 ¥316.3 billion billion Transportation (“Railway” in FY1988) 2017 Other Operations (in FY1988) Retail & Services (“Station Space Utilization” in FY2002–2017) Real Estate & Hotels * Fiscal 1988 figures are nonconsolidated. (“Shopping Centers & Office Buildings” in FY2002–2017) Others (in FY2002–2017) Further, other operations include bus services. April 1987 July 1992 March 1997 November 2001 February 2002 March 2004 Establishment of Launch of the Launch of the Akita Launch of Launch of the Station Start of Suica JR East Yamagata Shinkansen Shinkansen Suica Renaissance program with electronic money Tsubasa service Komachi service the opening of atré Ueno service 2 East Japan Railway Company Shin-Hakodate-Hokuto Shin-Aomori 2017 Hachinohe Operating Revenues ¥2,880.8 billion Akita Morioka Operating Income ¥466.3 billion Shinjo Yamagata Sendai Niigata Fukushima Koriyama Joetsumyoko Shinkansen (JR East) Echigo-Yuzawa Conventional Lines (Kanto Area Network) Conventional Lines (Other Network) Toyama Nagano BRT (Bus Rapid Transit) Lines Kanazawa Utsunomiya Shinkansen (Other JR Companies) Takasaki Mito Shinkansen (Under Construction) (As of June 2017) Karuizawa Omiya Tokyo Narita Airport Hachioji Chiba 2017Yokohama Transportation Retail & Services Real Estate & Hotels Others Railway Business, Bus Services, Retail Sales, Restaurant Operations, Shopping Center Operations, IT & Suica business such as the Cleaning Services, Railcar Advertising & Publicity, etc. -
Pdf/Rosen Eng.Pdf Rice fields) Connnecting Otsuki to Mt.Fuji and Kawaguchiko
Iizaka Onsen Yonesaka Line Yonesaka Yamagata Shinkansen TOKYO & AROUND TOKYO Ōu Line Iizakaonsen Local area sightseeing recommendations 1 Awashima Port Sado Gold Mine Iyoboya Salmon Fukushima Ryotsu Port Museum Transportation Welcome to Fukushima Niigata Tochigi Akadomari Port Abukuma Express ❶ ❷ ❸ Murakami Takayu Onsen JAPAN Tarai-bune (tub boat) Experience Fukushima Ogi Port Iwafune Port Mt.Azumakofuji Hanamiyama Sakamachi Tuchiyu Onsen Fukushima City Fruit picking Gran Deco Snow Resort Bandai-Azuma TTOOKKYYOO information Niigata Port Skyline Itoigawa UNESCO Global Geopark Oiran Dochu Courtesan Procession Urabandai Teradomari Port Goshiki-numa Ponds Dake Onsen Marine Dream Nou Yahiko Niigata & Kitakata ramen Kasumigajo & Furumachi Geigi Airport Urabandai Highland Ibaraki Gunma ❹ ❺ Airport Limousine Bus Kitakata Park Naoetsu Port Echigo Line Hakushin Line Bandai Bunsui Yoshida Shibata Aizu-Wakamatsu Inawashiro Yahiko Line Niigata Atami Ban-etsu- Onsen Nishi-Wakamatsu West Line Nagaoka Railway Aizu Nō Naoetsu Saigata Kashiwazaki Tsukioka Lake Itoigawa Sanjo Firework Show Uetsu Line Onsen Inawashiro AARROOUUNNDD Shoun Sanso Garden Tsubamesanjō Blacksmith Niitsu Takada Takada Park Nishikigoi no sato Jōetsu Higashiyama Kamou Terraced Rice Paddies Shinkansen Dojo Ashinomaki-Onsen Takashiba Ouchi-juku Onsen Tōhoku Line Myoko Kogen Hokuhoku Line Shin-etsu Line Nagaoka Higashi- Sanjō Ban-etsu-West Line Deko Residence Tsuruga-jo Jōetsumyōkō Onsen Village Shin-etsu Yunokami-Onsen Railway Echigo TOKImeki Line Hokkaid T Kōriyama Funehiki Hokuriku -
Saitama Prefecture 埼玉県
February 2017 Saitama Prefecture 埼玉県 一 1 Overview of Saitama Pref.埼 2 Fiscal Position 玉 3 Bond Issue Policies 県 勢 Mt.Buko Kawagoe Bell Tower Saitama Shintoshin Saitama Super Arena Saitama Stadium 2002 Sakitama Ancient Burial Mounds “Toki-no-kane” “Sakitama Kohun-gun” 1 Overview of Saitama Population, Industry, Transportation and Rising Potential Population of 7.3 million equal to that of Switzerland・・・Relatively lower average age and larger productive age population ratio than other prefectures A variety of industries generate nominal GDP worth JPY21trn, equal to that of Czech and New Zealand Hokkaido Convenient transportation network and lower disaster risks Prefectural Gross Product (Nominal) Population 7.27mn (#5) Akita Source: 2015 National Census JPY20.7trn(#5) Source: FY2013 Annual Report on Prefectural Accounts, Cabinet Office 1 Tokyo Metro. 13,520,000 1 Tokyo Metro. JPY93.1trn Yamagata 2 Kanagawa Pref. 9,130,000 2 Osaka Pref. JPY37.3trn 3 Osaka Pref. 8,840,000 3 Aichi Pref. JPY35.4trn 4 Aichi Pref. 7,480,000 4 Kanagawa Pref. JPY30.2trn 5 Saitama Pref. 7,270,000 5 Saitama Pref. JPY20.7trn Population Growth 1.0%(#3) Hokuriku oban Metropolitan Employer compensation Inter-City per capita Kyoto Saitama Expressway Nagoya Tokyo Gaikan Tokyo Expressway JPY4,620,000(#7) Osaka Narita Source: FY2013 Annual Report on Prefectural Accounts, Cabinet Haneda Office Expressway Japan Shinkansen Japan’s Key Transportation Hub Lower Risk of Natural Disaster ・Connected to major eastern Japan cities with 6 Shinkansen lines Estimated damage on buildings -
Directions to Tennozu Office | Reception
Directions to Tennozu Office | reception From Tennozu Isle Station: Tokyo Monorail / Rinkai Line To Shibaura To Hamamatsucho To Shinagawa Konan Park Rakusui-bashi Fureai-bashi Kaigan-dori Boardwalk Seafort Square Tennozu First Tower T.Y. Metropolitan Expressway Route No.1 Haneda Harbor Tennozu Central Tower Starbucks Coffee Chuo-guchi exit Skywalk Kyukaigan-dori Tennozu Isle Station Tokyo Monorail Sphere Tower To Daiba Yusen Building Bond Street Center Street TV Tokyo Seven Uchiyama Concrete Eleven Minami-guchi Police exit To Osaki Shintokai-bashi Yamate-dori Higashishinagawa 1-chome Terrada Warehouse Harbor One Tennozu Parkside Company Building B A Shinagawafuto-iriguchi Tennozu-koen Rinkan Line Baseball Park Tennozu Isle Station Details Boardwalk T.Y. HARBOR By Public Transportation From Tennozu Isle Station: Tokyo Monorail Use Minami-guchi exit and turn right. Cross Shinagawafuto-Iriguchi crossing. Turn right at Bond Street.5 minutes walk. From Tennozu Isle Station: Rinkai Line Use B exit and turn left. Turn left at Shinagawafuto-Iriguchi crossing. Turn right at Bond Street.5 minutes walk. Bond Street By Car From Metropolitan Expressway Route No.1 Haneda, heading Heiwajima. T2 Use Shibaura Ramp exit. Turn right at Shinagawafuto-Iriguchi crossing. 10 minute from Shibaura Ramp. Contact 2-2-43 Higashishinagawa, Shinagawa-ku, Tokyo 140-0002 Tel: 03-3740-4011 Directions to Tennozu Office | amana square From Tennozu Isle Station: Tokyo Monorail / Rinkai Line To Shibaura To Hamamatsucho To Shinagawa Konan Park Rakusui-bashi Fureai-bashi Kaigan-dori -
Suica Pasmo Network
To Matō Kassemba Ienaka Tōbu-kanasaki Niregi Momiyama Kita-kanuma Itaga Shimo-goshiro Myōjin Imaichi Nikkō Line To Aizu-Wakamatsu To Sendai To Fukushima Jōban Line To Haranomachi Watarase Keikoku Railway Nikkō Ban-etsu-East Line Shin-kanuma Niigata Area Akagi Tanuma Tada Tōbu Nikkō Line Minami- Tōbu-nikkō Iwaki / Network Map To Chuo-Maebashi ※3 To Kōriyama Kuzū Kami- Uchigō To Murakami ★ Yashū-ōtsuka Kuniya Omochanomachi Nishikawada Esojima utsunomiya Tōhoku Line Tōbu Sano Line TsurutaKanumaFubasami Shin-fujiwara Jomo Electric Railway Yoshimizu Shin-tochigi Shimo- imaichi Shin-takatokuKosagoeTobu WorldKinugawa-onsen SquareKinugawa-kōen Yumoto ■Areas where Suica /PASMO can be used Yashū-hirakawa Mibu Tōbu Utsunomiya Line Yasuzuka Kuroiso Shibata Tōhoku Tōhoku Shinkansen imaichi Line Aizu Kinugawa Aioi Nishi-Kiryu Horigome Utsunomiya Line Shimotsuke-Ōsawa Tōbu Kinugawa Line Izumi Daiyamukō Ōkuwa Railway Yagantetsudo To Naoetsu To Niigata Omata YamamaeAshikagaAshikaga TomitaFlower Park Tōbu-utsunomiya Ueda Yaita Nozaki Nasushiobara Nishi-Shibata Nakaura Echigo TOKImeki Railway Ishibashi Suzumenomiya Nakoso Kunisada Iwajuku Shin-kiryū Kiryū Ryōmō Line Sano Iwafune Ōhirashita Tochigi Omoigawa To Naganoharakusatsuguchi ShikishimaTsukudaIwamotoNumataGokan KamimokuMinakami Shin-ōhirashita Jichi Medical Okamoto Hōshakuji Karasuyama Ujiie Utsunomiya Kamasusaka Kataoka Nishi-Nasuno Ōtsukō Sasaki To Echigo-Yuzawa Azami Sanoshi To Motegi Utsunomiya Line Line Uetsu LineTsukioka Jōmō-Kōgen ★ Shizuwa University Isohara Shibukawa Jōetsu Line Yabuzuka -
Chapter 8 Taxation
A Guide to Living in Saitama Chapter 8 Taxation 1 Income Tax Saitama’s Prefectural Mascot Kobaton 2 Inhabitant Tax 3 Other Major Taxes All residents of Japan, regardless of nationality, are obligated to pay taxes. Taxes are an important resource used to promote a happy and stable environment for everyone. Taxes support various projects across a wide range of fields such as education, welfare, civil engineering, medical treatment, culture, environment, and industry. The two main taxes are income tax, which is levied by the national government, and inhabitant tax (prefectural and municipal tax), which is levied by both the prefectural and municipal governments. You may be exempt from paying income tax and inhabitant tax because of a taxation treaty between your country and Japan. To avoid double taxation, special exemptions have been established through bilateral taxation treaties between Japan and various countries. To check if these exemptions apply to you, please contact your country's embassy in Japan for further information. Payment of taxes must be done by the due date. If payment is overdue, an overdue fee will be incurred every day from the day after the due date until the payment is made. If your taxes remain unpaid for an extended period of time, your taxable assets will be seized. We encourage you to pay these taxes by the due date. Payment of taxes (Saitama Prefectural Government Taxation Division website) URL: http://www.pref.saitama.lg.jp/a0209/z-kurashiindex/z-3.html Explanation of prefectural taxes (Saitama Prefectural Government Taxation Division website) URL: http://www.pref.saitama.lg.jp/a0209/z-kurashiindex/z-3.html URL: http://www.pref.saitama.lg.jp/a0209/z-kurashiindex/documents/r1_kurasi-to-kenzei_e.pdf (English) 8-1 A Guide to Living in Saitama URL: http://www.pref.saitama.lg.jp/a0209/z-kurashiindex/documents/r1_kurasi-to-kenzei_c.pdf (Chinese) 1 Income Tax and Special Reconstruction Income Tax Income tax is levied on a person’s total income earned between January 1 and December 31. -
Keisei Electric Railway Co., Ltd. Incident Type
Railway serious incident investigation report Railway operator : Keisei Electric Railway Co., Ltd. Incident type : Violating closure section for construction, the railway serious incident related with the situation that train ran in the section under construction works, while the construction work or the maintenance work that should be implemented to stop train operation was implemented, prescribed in Number 5, Clause 1, Article 4, of the Ordinance on Report on Railway Accidents, etc. Date and time : About 00:55, July 27, 2016 Location : At around 46,062 m from the origin at Keisei-Ueno station, between Keisei-Usui station and Keisei-Sakura station, double track, Keisei Main Line, Sakura City, Chiba Prefecture SUMMARY On July 27, 2016, the assistant manager of Sogo Branch Office of the Conductor's Office of Keisei Electric Railway Co., Ltd., accepted the request to start construction work in the down track between Keisei-Usui station and Sogosando station, from the person in charge of the closed track construction work. The assistant manager confirmed that the outbound 2345 train, the last train bound for Keisei-Narita station departing from the down track of Sogosando station, had departed from Sogosando station, and approved to start construction works at about 00:51. On the other hand, the outbound 2373K train, the last train bound for Keisei-Sakura station, departed from Keisei-Usui station about one minute behind schedule, at about 00:55, and went into the closed track section after the start of the construction works was approved. PROBABLE CAUSES It is highly probable that the serious incident had occurred as the 2373K train ran in the closed track section after the approval of the construction works that should be implemented to stop train operation, because the request to start the closed track construction works was approved without confirmed arrival of the 2373K train at Keisei-Sakura station, the last train bound for Keisei-Sakura station.