Download Article (PDF)

Total Page:16

File Type:pdf, Size:1020Kb

Download Article (PDF) Advances in Economics, Business and Management Research, volume 83 2nd International Scientific Conference on ‘Competitive, Sustainable and Safe Development of the Regional Economy’ (CSSDRE 2019) Priority directions of development of enterprises of the shipbuilding complex of the Astrakhan region as a potential to improve the competitiveness of the region Natalia A. Dubinina Olga Yu. Michurina Astrakhan State Technical University Astrakhan State Technical University Institute of Economics Institute of Economics Astrakhan, Russia Astrakhan, Russia [email protected] [email protected] Maria V. Shendo Oleg I. Losenkov Astrakhan State Technical University Astrakhan State Technical University Institute of Economics Institute of Economics Astrakhan, Russia Astrakhan, Russia [email protected] [email protected] Abstract — Astrakhan region is a strategically important technical operation of the fleet, training for the fleet, in territory in the South of Russia, being one of the most comparison with other Caspian states. At the present stage of dynamically developing in economic terms region. The economic development, the shipbuilding enterprises of the development of a competitive shipbuilding complex in the Astrakhan region are positioned as a developed, Astrakhan region will improve the competitiveness and economic technologically advanced complex capable of performing stability of Russia and implement major investment and large-scale projects of the Russian and international level due innovative projects to create high-tech shipbuilding products, to to the long-term increase in production capacity, accumulation ensure the production of new competitive products in the of shipbuilding technologies, accumulated experience, military and civil shipbuilding. The choice of priority directions expansion of production facilities. of development of the shipbuilding complex of the Astrakhan region presented in the article is based on the presence of the In the context of global challenges for the development of enterprises of the accumulated experience, the corresponding the Russian shipbuilding industry, the task of reorientation to production capacities, shipbuilding technologies, opportunities the production of civil shipbuilding is set, which allows to for expansion of production areas. The implementation of these realize the potential of the shipbuilding industry with areas will increase the competitiveness of the shipbuilding maximum efficiency. That is why the leading shipbuilding complex, the development of shipbuilding enterprises, increase companies of the Astrakhan region need to build their production, expansion of the range of products, which will development exclusively on competitive areas of activity, inevitably contribute to the strengthening of competitive provided with cost-effective support conditions to improve positions, both in the region and the country as a whole. competitiveness, not only through the deep modernization of Keywords — market segments, offshore shipbuilding, civil existing production facilities, but also the creation of shipbuilding, inland water transport, fishing fleet fundamentally new high-tech facilities. II. MATERIALS AND METHODS (MODEL) I. INTRODUCTION The basis of the study was the concepts, approaches, methods presented by domestic and foreign scientists and economists in the field of the theory of formation and For Russia, the presence in the strategically important implementation of cluster policy, the theory of network and region of the Caspian Sea is associated with the presence of integrated organizations, the creation and functioning of significant industrial potential in shipbuilding and ship repair. integrated business groups in the market. The primary role in this positioning belongs to the Astrakhan region, which has a huge potential in shipbuilding, ship repair, Copyright © 2019, the Authors. Published by Atlantis Press. This is an open access article under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/). 472 Advances in Economics, Business and Management Research, volume 83 The legal framework of the study was made up of in the dock or on the slipway on ships weighing up to 6 legislative, regulatory and legal acts of the President, the thousand tons. Government of the Russian Federation, as well as the authorities and management of the Astrakhan region. The shipbuilding industry of Russia receives significant state support. For the Astrakhan region, this has found its The information and empirical basis of the study is the expression in the arrival in the region of JSC "United data of the Federal State Statistics Service, programs and Shipbuilding Corporation" (JSC "USC"), in the revitalization strategies for the development of the shipbuilding industry of and support of the formation of a shipbuilding cluster in the the Russian Federation, socio-economic development of the region, in the creation of a special economic zone (SEZ), in Russian Federation and the Astrakhan region, the development the placement of state orders, the implementation of financial of the shipbuilding cluster of the Astrakhan region, and other schemes for investing shipbuilding projects, which involve materials. state structures [2]. III. RESULTS AND DISCUSSION In the field of civil shipbuilding of the society, the USC Group in 2017 transferred a total of 11 civil facilities with a A. Monitoring of the development of enterprises of the total displacement of 41293 tons with a total cost of 33897.8 shipbuilding complex of the Astrakhan region million rubles, according to table 2 [3], [4]. Currently, shipbuilding and ship repair enterprises of the TABLE II. PRODUCTS OF CIVIL SHIPBUILDING COMPANIES OF Astrakhan region in mechanical engineering occupy about THE GROUP OF USC IN 2017 70%, in the long term, the share of shipbuilding in the GRP of Type of product Number of the region is projected to 10-15%. In 2018, the index of units industrial production for the entire list of enterprises of the Multifunctional ice-class supply vessel 1 Astrakhan region reached 116.2% (table I) [1]. Ice class support vessel 2 Cargo pontoon 7514 1 TABLE I. DYNAMICS OF THE INDEX OF INDUSTRIAL Oil tanker RST27M 3 PRODUCTION Oil tanker RST27 1 Years Chemical tanker RST27 2 Indicators 2015 2016 2017 2018 Launch complex LSP-1F 1 On all list of the enterprises of 109.6 108.6 137.2 116.2 the Astrakhan region, % in mining mineral resource 117.3 117.9 165.5 122.5 The enterprises of the Astrakhan region included in JSC in the production of electricity, «USC» and their activities are reflected in table 3 [5]. 102.6 100.5 97.5 98.2 gas and water TABLE III. THE MAIN SUBSIDIARIES OF OSK IN THE ASTRAKHAN in processing industries 98.9 104.3 99.9 99.9 REGION in the production of vehicles and 130.6 113.4 117.1 107.4 Enterprise Type of activity equipment JSC "Shipyard construction of ships, vessels and marine "LOTOS" equipment JSC "ASPO" construction of ships, vessels and marine Despite the unstable dynamics of the index of industrial equipment, repair of underwater and surface production in the manufacturing industry, and its decline in ships and vessels, supply and installation of 2018 to 99.9%, in the production of vehicles and equipment ship structures, equipment and engineering there was an increase to 107.4%, compared to the same period products JSC "ASPO" site No. construction of ships, vessels and marine last year. The main volume of production for this type of 3 (JSC "Shipbuilding equipment, repair of underwater and surface economic activity is produced by shipbuilding enterprises. and Ship Repair Yard ships and vessels, supply and installation of named after III ship structures, equipment and engineering This dynamics of growth is provided by the active International") products implementation of shipbuilding projects for the construction of JSC "CS construction of ships, vessels and marine offshore facilities, as part of the development of the field. "Zvezdochka" - branch equipment, repair of underwater and surface Filanovsky, which allowed the industry in 2012 to reach a new "Astrakhan shipyard" ships and vessels, service and warranty service, level of development [1]. supply and installation of ship structures, equipment and engineering products The shipbuilding complex of the Astrakhan region is JSC "YCSS" corporate center represented by 10 enterprises, including: JSC "Astrakhan Shipbuilding Production Association» (ASPO), JSC "Shipyard "LOTOS", JSC "Shipbuilding and Ship Repair Yard named after III International», JSC "Akhtubinsky Shipyard", LLC The main orders completed by the enterprises in 2017 and "Galaktika-M", LLC "Marine Shipyard - 2", Astrakhan Ship delivered to the customers are reflected in table 4 [5]. Repair Plant - branch of JSC CS "Zvezdochka", JSC "Volga- Caspian Shipyard", JSC "Pervomaisky Ship Repair yard", JSC "SSP named after Lenin". These are large and medium-sized enterprises capable of building ships for various purposes, perform ship repair work 473 Advances in Economics, Business and Management Research, volume 83 TABLE IV. REALISED PROJECTS IN 2017 Since the 2000s, the shipbuilding industry in Astrakhan Name of the Implemented project has been implementing a process of technological company modernization aimed at upgrading production facilities and JSC "Shipyard - construction of two passenger cruise paddle- bringing them up to world standards. Production capacities of "LOTOS" wheel ships, project PCS 180 "Golden ring"; the shipbuilding industry of the Astrakhan region have a large
Recommended publications
  • Government Support to Upstream Oil & Gas in Russia
    GOVERNMENT SUPPORT TO UPSTREAM OIL & GAS IN RUSSIA HOW SUBSIDIES INFLUENCE THE YAMAL LNG AND PRIRAZLOMNOE PROJECTS Page i Government Support to Upstream Oil & Gas in Russia How Subsidies Influence the Yamal LNG and Prirazlomnoe Projects GENEVA-OSLO-MOSCOW JULY 2014 Lars Petter Lunden and Daniel Fjaertoft, Sigra Group PUBLISHED IN PARTNERSHIP BY: www.globalsubsidies.org GOVERNMENT SUPPORT TO UPSTREAM OIL & GAS IN RUSSIA HOW SUBSIDIES INFLUENCE THE YAMAL LNG AND PRIRAZLOMNOE PROJECTS Page ii Government Support to Upstream Oil & Gas in Russia How Subsidies Influence the Yamal LNG and Prirazlomnoe Projects Lars Petter Lunden and Daniel Fjaertoft, Sigra Group Geneva-Oslo-Moscow, July 2014 © 2014 The International Institute for Sustainable Development/WWF Published by the International Institute for Sustainable Development. ACKNOWLEDGEMENTS This report has been commissioned by the Global Subsidies Initiative (GSI) of the International Institute for Sustainable Development (IISD) thanks to the generous support of the Ministry of Foreign Affairs of Norway and Ministry of Foreign Affairs of Denmark. The report has been prepared by Lars Petter Lunden and Daniel Fjaertoft, Sigra Group, in coordination with Ivetta Gerasimchuk, PhD in Economics, and Lucy Kitson, IISD-GSI. WWF-Russia has provided communications and outreach support for the report. This report has been peer-reviewed by: • Mikhail Babenko, PhD in Economics, Oil & Gas Officer, WWF Global Arctic Programme • James Henderson, Senior Research Fellow, Oxford Institute for Energy Studies •
    [Show full text]
  • Petroleum Activity in the Russian Barents Sea
    FNI Report 7/2008 Petroleum Activity in the Russian Barents Sea Constraints and Options for Norwegian Offshore and Shipping Companies Arild Moe and Lars Rowe Petroleum Activity in the Russian Barents Sea Constraints and Options for Norwegian Offshore and Shipping Companies Arild Moe and Lars Rowe [email protected][email protected] Report commissioned by the Norwegian Shipowners’ Association September 2008 Copyright © Fridtjof Nansen Institute 2008 Title Petroleum Activity in the Russian Barents Sea: Constraints and Options for Norwegian Offshore and Shipping Companies Publication Type and Number Pages FNI-Report 7/2008 26 Authors ISBN Arild Moe and Lars Rowe 978-82-7613-530-5-print version 978-82-7613-531-2-electronic version Project ISSN 0879 1504-9744 Abstract Presently most attention in the Barents Sea is given to the Shtokman project. Experience from development of this field, where there are still many uncertainties, will have large consequences for the further development program and relations with foreign companies. The exploration activity going on is fairly limited, but over the last few years there has been a struggle over licenses and control over exploration capacity. In the medium term the goal of rapid development of the Arctic continental shelf has become intertwined with a comprehensive government effort to modernise the domestic shipbuilding industry to make it able to cover most of the needs offshore. With the shipbuilding industry in a deep crisis these goals are not fully reconcilable. Russia will either have to accept more foreign involvement, or scale down its offshore ambitions. We believe a combination of the two alternatives is likely.
    [Show full text]
  • HVAC Systems for the Offshore Industry
    HEINEN & HOPMAN OFFSHORE > Our mission is to ensure you the perfect climate indoors, regardless of the weather outside. OUTSIDE 35 C HUMIDITY 90% ºC 22Inside PROVIDED BY HEINEN & HOPMAN Heating Ventilation Air Conditioning Refrigeration TABLE OF CONTENTS PAGE INTRODUCTION 3 PRODUCTS COOLING PLANT 4 ABSORPTION CHILLER 5 TURBOCOR CHILLER 6 PROPANE CHILLER 7 REPLACEMENT CHILLER 8 MGO COOLER 9 CONDENSING UNIT 10 AIR HANDLING UNIT 11 SELF-CONTAINED UNIT 11 PACKAGE UNIT 12 CABIN UNIT 13 TEMPORARY REFUGE UNIT 14 H2S AIR FILTRATION UNIT 15 CARGO VENTILATION 16 CONTAINERIZED HVAC ROOM 16 GALLEY INDUCTION VENTILATION 17 EXPLOSION PROOF EQUIPMENT 17 CABIN FAN COIL UNIT 18 CONTROL STARTER PANEL 19 REFERENCES 20 To stand with our clients in “ “ the harshest environments INTRODUCTION The offshore environment is harsh and unforgiving. It is essential that • Manufactured according to Eurovent standards the work and off-duty environment of your skilled, highly-paid crew is Cooling plants as comfortable as possible. Heating, ventilation and other air-handling • Produced in water and air-cooled versions, depending on the type of equipment needs to be as tough, efficient and safe as the structures offshore installation and the exact location of the equipment. themselves. • Air-cooled equipment is enclosed in stainless steel for resistance Heinen & Hopman is renowned in the offshore industry for its project- against the salty atmosphere based approach and dedication to premium quality. We think along in the • Water-cooled units can use both sea-water or fresh-water from an processes specific to the demanding offshore segment to create specific, intercooling system tailor-made solutions for your every need - super strong, super reliable Cabin units and made to last.
    [Show full text]
  • Seatec International Review 2/2013
    International Maritime Review Fast break Norwegian Breakaway was built in just 18 months seatec.fi/magazine Breaking the Ice Arctech proves its mettle with a duo of arctic-proof supply ships HANDLE ALL ASPECTS OF LNG The LNG industry is investing huge sums to meet the world’s hunger for natural gas. In this capital- and technology-intensive business, risk management is critical to success. DNV helps address the complete risk picture throughout the entire LNG value chain, from the wellhead, across the oceans – including the use of LNG as a fuel for ships – to the receiving terminal. 4BGFUZ IFBMUIBOEFOWJSPONFOUBMSJTLNBOBHFNFOUt5FDIOPMPHZRVBMJGJDBUJPOt$MBTTJGJDBUJPOt7FSJGJDBUJPOt"TTFUSJTLNBOBHFNFOUt &OUFSQSJTFSJTLNBOBHFNFOUt*OEFQFOEFOUBEWJTPSFOHJOFFS XXXEOWDPN The Cruise Industry’s Premier Global Event March 10 –13, 2014 | Miami Beach Convention Center | Miami Beach, FL USA FOOD & BEVERAGE | DESIGN & REFURBISHMENT | DESTINATIONS | SHIP SERVICES | HOTEL OPERATIONS SHIP EQUIPMENT | INFORMATION TECHNOLOGY | ENTERTAINMENT | AMUSEMENTS & RECREATIONAL ATTRACTIONS For 30 years, Cruise Shipping Miami has been the cruise industry’s premier global exhibition and conference, bringing together buyers and suppliers for a week of networking, sourcing, and education. Reserve your booth now for the 30th anniversary event. Contact th Anniversary [email protected] today! Celebrate the 30 cruiseshippingmiami.com Exclusively supported by editorial seatec 2/2013 FINNISH-RUSSIAN CO-OPERATION IS AN IMPORTANT PART OF THE FINNISH PUBLISHER PubliCo Oy MARINE CLUSTER HISTORY Pälkäneentie 19 A FI-00510 Helsinki The ship-building market is facing tough times right now. Many pro- Finland Phone +358 9 686 6250 jects have been postponed and it is impossible to predict how the glob- [email protected] al economy and the price development of oil and gas are going to im- www.publico.com pact future orders.
    [Show full text]
  • Aker Arctic Technology
    AKER ARCTIC TECHNOLOGY Swedoceans Seminarium 23.3.2021 Reko-Antti Suojanen Managing Director COPYRIGHT Copyright of all published material including photographs, drawings and images in this document remains vested in Aker Arctic. Accordingly, neither the whole nor any part of this document shall be reproduced in any form nor used in any manner without express prior written permission and applicable acknowledgements. No trademark, copyright or other notice shall be altered or removed from any reproduction. Agenda 1. Aker Arctic as company 2. Icebreaker types 3. Latest ships 4. Development and technical points 5. Ships 6. Future 23 March 2021 3 Aker Arctic Technology Inc World’s most experienced designer for icegoing ships Own Ice Model Test basin Experienced Naval Unique know-how As reference 60% of Various Architecture for ice classed world icebreaker vessel types - Power determination - Operational studies vessels designs - Hull form - Ice class approvals development - Offshore structures 23 March 2021 www.akerarctic.fi Design and 01 Naval Architecture Engineering 02 Hydrodynamics 03 Icebreaking design 04 Hull structural 05 Systems 06 Machinery 23 March 2021 6 Aker Arctic comprehensive partner From early stage planning to delivery of the ships. • Feasibility fleet Design development, • Testing and hull Basic design • Special • Delivery of vessel and vessel consept and tender design (class approval) icebreaking requirements design equipments • Trials and • Ice model testing commisioning • Budget definition • Yard support services • Open
    [Show full text]
  • The Russian Maritime Industry and Finland Hanna Mäkinen
    Hanna Mäkinen The Russian maritime industry and Finland Electronic Publications of Pan-European Institute 2/2015 ISSN 1795 - 5076 The Russian maritime industry and Finland Hanna Mäkinen 2/2015 Electronic Publications of Pan-European Institute http://www.utu.fi/pei Hanna Mäkinen PEI Electronic Publications 2/2015 www.utu.fi/pei Executive summary 1) Due to historical reasons, the civil shipbuilding industry is weakly developed in Russia and is currently not competitive in commercial sense. The Russian shipyards are in a rapid need of modernisation and the shipbuilding industry suffers from low productivity and technological inferiority compared to other shipbuilding nations. In order to improve the industry’s competitiveness, international cooperation is needed. 2) The Russian maritime industry has recently received increased political attention and funding. Particularly the growing interest in the Arctic hydrocarbon fields and sea routes as well as the continuous importance of energy exports for the Russian economy have boosted the development of the shipbuilding sector. In addition, as Russia has engaged into rearmament, the demands of the Russian navy significantly direct the development of the Russian maritime industry. 3) The current unstable political and economic situation, particularly the ruble’s decline against the euro, the plunge in world oil prices and the economic sanctions imposed on Russia, have complicated the implementation of maritime and offshore industry projects in Russia. The sanctions have a negative impact on the Russian shipbuilding and offshore industries as they complicate companies’ possibilities to attract foreign financing and prohibit exports of products and services and technology transfer to Russia if they are related to defence and oil industries.
    [Show full text]
  • Usc and Atomflot Sign a Contract for Building an Icebreaker for Yamal Lng
    FOR IMMEDIATE RELEASE USC AND ATOMFLOT SIGN A CONTRACT FOR BUILDING AN ICEBREAKER FOR YAMAL LNG Moscow, 30 April 2015. Vyborg Shipyard (part of United Shipbuilding Corporation, or USC) and Atomflot signed a shipbuilding contract for the building of a harbor icebreaker for the Yamal LNG Project. The 10 MW diesel-powered harbor icebreaker with an innovative propulsion system will be built at the Vyborg Shipyard to support the harbor operations of Yamal LNG at the port of Sabetta. Atomflot will act as the shipowner and operator of the vessel, with the expected delivery date in November 2018. In November 2014, Yamal LNG and Atomflot signed a port fleet services contract envisaging tug and icebreaker assistance in Sabetta. The contract is valid through 31 December 2040. The new harbor icebreaker will replace the icebreaker currently used at the port of Sabetta. It will be escorting the LNG tankers through the approach channel and assisting them in the port harbor. The vessel will be capable of effective navigation both bow-ahead and astern modes, maneuvering and performing various specific tasks. Overview Yamal LNG Project Yamal LNG is currently building a 16.5 mtpa natural gas liquefaction plant on the base of the hydrocarbon resources of the South-Tambeyskoye field located in the North-East of the Yamal Peninsula. First LNG production is scheduled for 2017. JSC Yamal LNG shareholders are: NOVATEK (60%), CNPC (20%), and Total (20%). The Project also envisages construction of the transportation facilities, including the Sea Port and the Airport. The international port of Sabetta is a two-phased construction project comprising the early phase and the main phase and developed via a public-private partnership.
    [Show full text]
  • Opinnäytetyön Asettelumalli
    Natalia Zusmanovskaya RESEARCH OF THE POTENTIAL SUBCONTRACTOR SUPPLIERS FOR A CASE COMPANY AT THE RUSSIAN MARKET Degree Programme in International Business and Marketing Logistics 2011 RESEARCH OF THE POTENTIAL SUBCONTRACTOR SUPPLIERS FOR A CASE COMPANY AT THE RUSSIAN MARKET Zusmanovskaya, Natalia Satakunnan ammattikorkeakoulu, Satakunta University of Applied Sciences Degree Programme in International Business and Marketing Logistics September 2011 Supervisor: Ylituomi, Liisa Number of pages: 72 Appendices: 3 Keywords: supplier research, subcontractor, Russia, contract, business habits ____________________________________________________________________ The purpose of this thesis was to research the potential subcontractor suppliers for a case company at the Russian market, and to investigate market environment and trade practises in the country. The practical problem of this study was to provide the company with the relevant information, which can be applied in the process of supplier research and further collaboration. In compliance with the purpose of the study, the framework of the project consists of several parts, and covers such topics as evaluation criteria for supplier, legislations and taxes applied in the specified industry, best transport mode and Incoterms, and trade practises established in the country, including business habits and contract agreement development. The theoretical part of the thesis contains such topics as sourcing, the process of supplier research, subcontractor relationships establishment, proper suppler criteria and certain aspects of international procurement. The materials used in this section were collected from specialized books and electronic articles. As the purpose and limitations of research did not imply the contact with potential subcontractor suppliers, among the most suitable methods for information gathering was chosen desk research, which involves the analysis of already available materials, including published and unpublished sources in printed and electronic form.
    [Show full text]
  • NOVATEK: New Major Player on Global LNG Market NOVATEK in the World
    NOVATEK: new major player on global LNG market NOVATEK in the world globally among publicly traded globally among publicly traded companies by proved natural companies by natural gas №3 gas reserves №8 production volumes bcm bcm Gazprom 18 264 Gazprom 471 Petrochina 2 300 Shell 118 NOVATEK 2 098 ExxonMobi 113 Rosneft 1 714 Petrochina 97 ExxonMobil 1 562 BP 78 BP 1 276 Total 69 Shell 1 145 Rosneft 68 Total 920 NOVATEK 63 Chevron 870 Chevron 62 Lukoil 670 Eni 50 gas liquids gas liquids Reserves Production bcm mt bcm mt С1+С2 6 068 778 2017 63,4 11,8 PRMS 3 879 366 SEC(1P) 2098 165 as of 01/ 01/ 2018 2 Yamal LNG RUSSIAN FEDERATION CURRENT PROJECT STATUS: • Project cost – $27 bln Yamal LNG Sabetta • Project financing from Russia, China, France, Japan, South-Tambeyskoye field Italy, Germany, Sweden, Austria in total amount of $19 bln equivalent SHAREHOLDING STRUCTURE • Design capacity of the plant’s three trains is 16.5 mtpa 50.1% • Over 9 months of operation the plant has shown 20.0% possibility to increase its design capacity by 4-5% 20.0% 9.9% 3 • Train 1 started up in December 2017 • Train 2 started up in August 2018 • Train 3 started up in December 2018 1 year ahead of schedule 4 Yamal LNG The modular approach used in Yamal LNG construction allowed to reach commissioning in three years and considerably decrease the environmental impact 5 Sea port International Airport 6 Yamal LNG Train 4 «Arctic Cascade» proprietary liquefaction technology Yamal LNG Sabetta LIQUEFACTION TRAIN UP TO 1 MTPA South-Tambeyskoye field START-UP IN 4Q 2019 TRAIN
    [Show full text]
  • Sovcomflot. Annual Report 2013
    ANNUAL REPORT2013 In 1988 Sovcomfl ot became one of modern Russia’s fi rst joint-stock companies and its fi rst domestic shipping enterprise, established in accordance with international standards and practice. Since then the company’s fl eet has grown almost eightfold and today Sovcomfl ot enjoys leadership positions in new and highly demanding market segments. The average fl eet age at the end of 2013 was eight years. JUNE 1988 JUNE 2013 122 158 diversified specialised vessels vessels 1.6 12.6 mln tonnes dwt mln tonnes dwt OAO SOVCOMFLOT from ship-owning to commercial and Russia’s largest and one of the world’s technical management, with offices and leading shipping companies specialising subsidiaries in St. Petersburg, Moscow, in crude oil, petroleum products and Novorossiysk, Murmansk, Vladivostok, liquefied gas transportation and the Yuzhno-Sakhalinsk, London, Madrid, servicing of offshore upstream oil and Singapore, Limassol and Dubai. gas projects. Provides a full range of services – from traditional seaborne Sovcomflot services some of the largest energy transportation to complex energy projects in Russia and beyond: engineering solutions for offshore oil and Sakhalin-1; Sakhalin-2; Varandey; gas transportation in harsh ice conditions, Prirazlomnoye; Tangguh (Indonesia); the servicing of oil platforms, geological Peregrino (Brazil); Escobar (Argentina). offshore exploration and towage. In 2013 OAO Sovcomflot (“SCF Group”) A reliable team of experienced celebrated its silver jubilee – 25 years professionals counts over 9,300 people since its foundation as an independent at sea and ashore. The company has joint-stock company. a fully integrated corporate structure: ANNUAL REPORT 2013 Annual report 2013 Contents COMPANY 06 PROFILE Today Sovcomflot is Russia's largest shipping company and one of the world leaders in energy transportation by sea.
    [Show full text]
  • Project Programm Eng.Pdf
    SEPTEMBER 17 SEPTEMBER 18 SEPTEMBER 19 TABLE OF CONTENT 4 TIMETABLE OF THE NEVA 2019 CONFERENCE 6 SEPTEMBER 17 10 SEPTEMBER 18 17 SEPTEMBER 19 24 SEPTEMBER 20 The event is accompanied by simultaneous Russian-English interpretation, unless otherwise specified. Format of participation in each event of the Business Programme is specified in the description. Please pay attention that apart from free-of-charge events open for visiting to all participants of the exhibition, there are paid events and closed sessions. Please address all questions regarding participation in specific events of the Business Programme directly to contact persons stated in the agenda of the event of interest. The contact person for other questions related to the Business Programme is Ekaterina Gritsenko, Programme Director of the NEVA 2019 Exhibition & Conference, +7 (812) 240 40 40, ext. 2807, [email protected]. The contents of this Business Programme are current at the time of printing. Please view www.neva.events for schedule updates and announcements prior to attendance. 3 BUSINESS PROGRAMME OF THE NEVA 2019 EXHIBITION AND CONFERENCE SEPTEMBER 17 09:00-18:00 Registration of participants 10:00-18:00 NEVA 2019 Exhibition and Conference open hours Tour of the exhibition, meetings and negotiations between participants, participation in business events of the conference 10:00-10:30 NEVA 2019 Exhibition and Conference official opening ceremony With participation of NEVA 2019 Exhibition and Conferenceorganising committee representatives, government structures, Opening area relevant ministries, major Russian and international corporations, companies, professional communities and associations. in front of Hall F 10:30-11:30 Official exhibition tour With participation of NEVA 2019 Exhibition and Conferenceorganising committee representatives, government structures, Halls F, G, H relevant ministries, major Russian and international corporations, companies, professional communities and associations.
    [Show full text]
  • Compact Port Icebreaker Is Designed and Built to Deal with Arctic Extremes the 12MW Diesel-Electric Port Icebreaker, of the Tender Design in 2013
    Supplied with kind permission of the ABR Company Ltd, publishers of International Tug&INCORPORATING OSV SALVAGE NEWS TUG & OSV DELIVERIES Compact port icebreaker is designed and built to deal with Arctic extremes The 12MW diesel-electric port icebreaker, of the tender design in 2013. Following Measuring 89.2m (including towing notch) Ob, has been delivered to FSUE Atomflot the selection of Vyborg Shipyard – to the x 21.9m with a 7.5m draft, Ob has a trio of by Vyborg Shipyard. After commissioning, north of St Petersburg – as the builder and main engines in the shape of three Wärtsilä the vessel will be stationed at the Sabetta FSUE Atomflot as the operator, Aker Arctic 8V31 medium-speed diesel generator sets, LNG terminal in the Gulf of Ob, in the developed the final contract design and each developing 4,880kW, while a single north of Russia inside the Arctic Circle. carried out ice model tests in 2015. Wärtsilä 4L20 800kW medium-speed Designed by Aker Arctic, the Finnish During this time, the design gradually harbour diesel gen set provides auxiliary maritime design and engineering company evolved from initial concept to final design power. Propulsion comes from a quartet that specialises in vessels and structures based on main equipment selection as well as of ABB Azipod ICE 1400 thrusters, each designed to operate in the harshest of icy close co-operation with the future owner and providing 3,000kW. conditions, Ob is the first of its Aker ARC builder. Additionally, the vessel features ABB’s 124 design, described by its creators as the In 2015, Aker Arctic submitted the final Onboard DC Grid to further improve “world’s most advanced port icebreaker”.
    [Show full text]