NOVATEK: New Major Player on Global LNG Market NOVATEK in the World
Total Page:16
File Type:pdf, Size:1020Kb
NOVATEK: new major player on global LNG market NOVATEK in the world globally among publicly traded globally among publicly traded companies by proved natural companies by natural gas №3 gas reserves №8 production volumes bcm bcm Gazprom 18 264 Gazprom 471 Petrochina 2 300 Shell 118 NOVATEK 2 098 ExxonMobi 113 Rosneft 1 714 Petrochina 97 ExxonMobil 1 562 BP 78 BP 1 276 Total 69 Shell 1 145 Rosneft 68 Total 920 NOVATEK 63 Chevron 870 Chevron 62 Lukoil 670 Eni 50 gas liquids gas liquids Reserves Production bcm mt bcm mt С1+С2 6 068 778 2017 63,4 11,8 PRMS 3 879 366 SEC(1P) 2098 165 as of 01/ 01/ 2018 2 Yamal LNG RUSSIAN FEDERATION CURRENT PROJECT STATUS: • Project cost – $27 bln Yamal LNG Sabetta • Project financing from Russia, China, France, Japan, South-Tambeyskoye field Italy, Germany, Sweden, Austria in total amount of $19 bln equivalent SHAREHOLDING STRUCTURE • Design capacity of the plant’s three trains is 16.5 mtpa 50.1% • Over 9 months of operation the plant has shown 20.0% possibility to increase its design capacity by 4-5% 20.0% 9.9% 3 • Train 1 started up in December 2017 • Train 2 started up in August 2018 • Train 3 started up in December 2018 1 year ahead of schedule 4 Yamal LNG The modular approach used in Yamal LNG construction allowed to reach commissioning in three years and considerably decrease the environmental impact 5 Sea port International Airport 6 Yamal LNG Train 4 «Arctic Cascade» proprietary liquefaction technology Yamal LNG Sabetta LIQUEFACTION TRAIN UP TO 1 MTPA South-Tambeyskoye field START-UP IN 4Q 2019 TRAIN 4 UTILIZES EXISTING INFRASTRUCTURE TO LOWER LNG PRODUCTION COSTS 7 The Arctic Cascade process General Designer: Cryogenic heat exchanger, nitrogen expanders Gas turbine unit Compressor Gas coolers Cryogenic pumps and expanders 90% OF THE EQUIPMENT IS SOURCED FROM THE RUSSIAN INDUSTRY 8 Gas liquefaction unit Feed gas GTU noise and heat Ethane compressor Ethane compressor comporessor insulating case Main gearbox (integrally geared) valve units Maintenance platfroms Ethane compressor DGS panels Nitrogen compressor DGS panels Nitrogen compressor Gas treatment unit for DGS panels Feed gas booster compressor DGS panel Feed gas compressor Nitrogen compressor Oil supply block-box Air cooler oil valve unit valve unit 9 Project geography Sabetta Kazan Dimitrovgrad Nizhny Novgorod Voronezh Gagarin Borisoglebsk Podolsk Balashikha Kurgan Chelyabinsk Ekaterinburg Arkhangelsk Krasnodar 10 Arctic LNG 2 THE CONCEPT OF THE FUTURE PLANT • LNG trains based on gravity-based structures (GBS) • GBS fabricated and assembled at the Offshore Superfacility Construction Yard IMPLEMENTATION STAGE • Pre-FEED stage completed. • FEED stage completed. • On December 2018 first EPC contract concluded on 3 GBS bases • Detailed design and key equipment procurement stage started in 1Q 2019 SCOPE OF EQUIPMENT AND MATERIALS FOR 3 TRAINS • More than 2 000 items of process equipment (heat exchangers, columns, separators, compressors, pumps, etc.) • More than 10 000 units of valves • Approximately 40 000 tons of piping • Approximately 200 000 tons of steel structures • More than 200 000 tons for the concrete bed Murmansk 19.8 Yamal LNG mtpa 3х3х6.6 mtpa Arctic LNG 2 11 GBS-based LNG trains Targeted decrease of Arctic LNG 2 plant construction cost compared to Yamal LNG 30% Additional costs reduction potential through the scalable construction of GBS-based LNG trains 12 Offshore Topside module GBS construction & topside Superfacility fabrication complex module integration complex Pipe spool Accommodation Belokamenka fabrication camp for up to Construction Center Gydan Peninsula workshops 15,000 people Reinforced concrete Concrete structures batch fabrication (OSCC) plant shops Barents Sea The facility construction started Belokamenka Dry docks in August 2017 2х (415x175 m) Murmansk TOTAL AREA 260 HA Summer 2018 OSCC is the world’s first complex for industrial construction of GBS-based LNG trains ensuring possibility of their batch manufacturing Earthworks and blasting activities Dry dock construction Berth construction TOTAL AREA OF ALLOCATED LAND PLOTS IS 446 HA 13 Localization of production Kola Yard Murmansk Kliver TECHNOLOGIES TO BE LOCALIZED Petrozavodskmash Kaliningrad Vyborg Shipyard Vyborg (USC) Petrozavodskmash (Rosatom) • Equipment for feed gas treatment and Izhorskiye Zavody Admiralty Shipyard dehydration Saint Petersburg (OMZ) Saint Petersburg (USC) «Zvezdochka» Ship Repair Centre REP Holding Severodvinsk (USC) Saint Petersburg • Electrical equipment Russian Gas Turbines • Steel structures Rybinsk Dzerzhinskkhimmash Cryogenmash Dzerzhinsk Balashikha (OMZ) (PG Generatsiya) • Piping for modules Ordzhonikidze Plant Podolsk (Rosatom) • Refrigerant compressors for LNG plants Belenergomash-BZEM Belgorod Penzkhimmash Penza Tambovskiy Komsomolets Uralkhimmash • Cryogenic heat exchangers Tambov Ekaterinburg (OMZ) Lada-Flekt Borkhimmash Uralenergomontazh Tolyatti Atommash Borisoglebsk Salavatneftemash Berezovskiy (OMZ) Volgodonsk (Rosatom) Salavat Tyazhmash KONAR Setting-up of Russian design and engineering Syzran Chelyabinsk RKTs-Progress center and localization of LNG plant GK Electroshield LLC - TM Samara Kurgankhimmash KROHNE Engineering Kurgan Samara Chelyabinsk construction Metallurgical Plant Chelyabinsk IT IS PLANNED TO ENGAGE 800 RUSSIAN COMPANIES 14 New delivery routes Rudolf Samoylovich Christophe de Margerie Yamal LNG 17.4 mtpa RUSSIAN FEDERATION GREAT BRITAIN BELGIUM Vladimir Rusanov FRANCE USA SPAIN S.KOREA CHINA INDIA Fyodor Litke Vladimir Vize BRAZIL Boris Vilkitskiy Eduard Toll Western route to Asia 36 days Eastern route to Asia (via transshipment on Kamchatka) 19 days 15 LNG transshipment complex in Kamchatka and Murmansk Murmansk transshipment facility FOB Arctic LNG 2 19.8 mtpa Yamal LNG 17.4 mtpa RUSSIAN FEDERATION Kamchatka GREAT transshipment BRITAIN facility FOB BELGIUM FRANCE USA SPAIN S.KOREA JAPAN CHINA PAKISTAN BANGLADESH MYANMAR TAIWAN INDIA VIETNAM THAILAND THE PHILIPPINES SRI LANKA SINGAPORE MALAYSIA INDONESIA BRAZIL 16 Project execution schedule Start of works at OSCC Start-up of Start-up of Start-up of Start-up of 3 LNG trains Vysotsk Train I Vysotsk Train II Arctic LNG 2 Train I 11 18 19.5 26 33 39 57 mmt mmt mmt mmt mmt mmt mmt 2017 2018 2019 2021 2022-23 2023-24 2024-25 2025-30 Start-up of Start-up of Start-up of Yamal LNG Train II Yamal LNG Train III Arctic LNG 2 Train II Start-up of Start-up of Start-up of the LNG transshipment Start-up of Yamal LNG Train I Yamal LNG Train IV complexes in Kamchatka and Murmansk Arctic LNG 2 Train III 17.