Complexes and Automated Control Systems for Civil Ships and Oil-And-Gas Production Industry (For Period from 1959 to 2015)

Total Page:16

File Type:pdf, Size:1020Kb

Complexes and Automated Control Systems for Civil Ships and Oil-And-Gas Production Industry (For Period from 1959 to 2015) Complexes and automated control systems for civil ships and oil-and-gas production industry (for period from 1959 to 2015) Saint-Petersburg 2015 Quantity of Year of Name of automated control system Customer who ordered vessel/ supplied supply of № Project, name of vessel (complex) complex (system) complexes complex (systems) (system) Control systemы of: Project 92 Ministry of Marine Fleet 1 electric power plant; 1 1959 reactor protection control system; Nuclear icebreaker "Lenin" Murmansk Shipping Company protection control regulation system; Control system of: Project 92М Ministry of Marine Fleet 2 1 1970 steam plant; Nuclear icebreaker "Lenin" Murmansk Shipping Company steam-turbine plant; Complex control system of technical facilities (CCS TF) "Liman" consisting of: control system of main engine; control system of auxiliary Project 1563 Ministry of Marine Fleet 3 mechanisms and units; Dry cargo carrier Kherson Shipbuilding 10 1969-1975 control system of electric power "Svetlogorsk" Production Association plant; control system of general ship systems; centralized control system. Ministry of Marine Fleet CCS TF "Proliv" Project 1551 4 Murmansk Shipping Company 6 1974 MPP CS "Shtorm" Tanker "Krym" “Zaliv” Shipyard, Kerch Ministry of Marine Fleet 1 1971 CCS TF "Zaliv" consisting of: Fish-processing base "Vostok" control system of auxiliary Dalryba 5 mechanisms and units; Project 1584 Ministry of Marine Fleet 8 (including 2 control system of electric power Bulker "Zoya 1972 "Okean" Shipyard, Nikolaev export ships) plant; Kosmodemianskaya" 3 Quantity of Year of Name of automated control system Customer who ordered vessel/ supplied supply of № Project, name of vessel (complex) complex (system) complexes complex (systems) (system) control system of general ship Versatile dry cargo carrier Ministry of Marine Fleet 46 (including 31 1972 systems; "Geroi Panfilovtsy" Kherson Shipbuilding for export) control system of centralized Production Association control. Ministry of Marine Fleet Versatile dry cargo carrier 5 1972 Kherson Shipbuilding "Alexander Fadeyev" Production Association CCS TF "Zaliv" consisting of: Ministry of Marine Fleet 14 (including 2 control system of auxiliary Versatile dry cargo carrier 1972 Vyborg Shipyard, Vyborg export vessels) mechanisms and units; "Nikolay Zhukov" control system of electric power plant; Lumber and palletized cargo Ministry of Marine Fleet 27 (including 3 1973 control system of general ship carrier "Pioner Moskvy" Vyborg Shipyard, Vyborg export ship) systems; Ministry of Marine Fleet Project 1592 7 1974 control system of centralized Kherson Shipbuilding Bulker "Kapitan Panfilov" control. Production Association Ministry of Marine Fleet 21 (including 2 Ro-Ro "Ivan Skuridin" "Northern Shipyard", for export 1976 Saint-Petersburg vessels) Project 1593 Oil-and-ore Oil- Ministry of Marine Flee and-ore carrier "Boris Butoma" 3 1977 "Okean" Shipyard, Nikolaev Ministry of Fisheries Project 1347 Refrigerator "50 "61 Kommunar" Shipyard, 18 1978 Let SSSR" Nikolaev 4 Quantity of Year of Name of automated control system Customer who ordered vessel/ supplied supply of № Project, name of vessel (complex) complex (system) complexes complex (systems) (system) Academy of Science of the Project 1846 USSR 1 1978-1980 Research vessel "Akademik "Okean" Shipyard, Krylov" Nikolaev CCS TF "Zaliv" CCS TF "Sever" consisting of: control system of main propulsion plant; control system of reactor protection; Ministry of Marine Fleet Project 1052 Murmansk Shipping Company, 6 control system of electric power 5 1975-77 plant; Icebreaker "Arktika" "Baltiyskiy Zavod", control system of general ship Saint-Petersburg systems; system of centralized control and information representation. Ministry of Marine Fleet 7 CS "Taimyr" Salvage ship "Elbrus" "61 Kommunar" Shipyard, 1 1977 Nikolaev 5 Quantity of Year of Name of automated control system Customer who ordered vessel/ supplied supply of № Project, name of vessel (complex) complex (system) complexes complex (systems) (system) CCS "Tropik" consisting of: control system of main propulsion plant; control system of auxiliary Ministry of Marine Fleet mechanisms and units; 8 Ro-Ro "Kapitan Smirnov" “Chernomorsky Shipbuilding 4 1979 control system of electric power Plant” JSC, Nikolaev plant; control system of general ship systems; system of centralized control. Ministry of Marine Fleet Project 1607 3 1978-1881 Far East Shipping Company CCS TF "Zaliv-M" Ro-Ro "Gavriil Kurdintsev" Ministry of Marine Fleet 13 (including 6 1981 Tanker "Pobeda" "Zaliv" Shipyard, Kerch for export ships) Ministry of Marine Fleet Project 1551 Novorossijsk Shipping 6 1982 Tanker "Krym" 9 Company Dry cargo carrier "Khariton Ministry of Marine Fleet 19 (including 5 1982 Greku" "Okean" Shipyard, Nikolaev for export ships) Project 1592 Bulker "Kapitan Ministry of Marine Fleet 1978-1982 Panfilov" Severnoe Shipping Company 6 Project 1948 Ministry of Marine Fleet 1 1980 Special vessel "Imandra" Murmansk Shipping Company 6 Quantity of Year of Name of automated control system Customer who ordered vessel/ supplied supply of № Project, name of vessel (complex) complex (system) complexes complex (systems) (system) Ministry of Marine Fleet Project 12990 Novorossiysk Shipping 17 1981-1990 Tanker "Pobeda" Company Ministry of Marine Fleet 5 (including 1 1983 Tanker "Dmitriy Medvedev" Kherson Shipbuilding for export ships) Production Association Lighter-aboard ship "Aleksey Ministry of Marine Fleet Kosygin" Kherson Shipbuilding 4 1984 Production Association Ministry of Marine Fleet 15 (including 10 Tanker "Grigoriy Nesterenko" Kherson Shipbuilding 1985 for export ships) Production Association CCS TF "Zaliv-M" Ministry of Fisheries 14 (including 1 Refrigerator "Bukhta "61 Kommunar" Shipyard, 1985 Russkaya" for export ship) Nikolaev Ministry of Marine Fleet Dry cargo carrier "Vitus Kherson Shipbuilding 5 1986 Bering" Production Association Ministry of Marine Fleet Ro-Ro “Sergey Kirov” “Northern Shipyard”, Saint- 1 1989 Petersburg Ministry of Marine Fleet Dry cargo carrier “Ivan Kherson Shipbuilding 2 1990 Papanin” Production Association 7 Quantity of Year of Name of automated control system Customer who ordered vessel/ supplied supply of № Project, name of vessel (complex) complex (system) complexes complex (systems) (system) Ministry of Marine Fleet Drilling ship “Arktikshelf” Kherson Shipbuilding 1 1991 Production Association Ministry of Marine Fleet Drilling platform МСП-16712 Astrakhan Shipbuilding 1 1991 Production Association Project 10081 Ministry of Marine Fleet 10 CCS TF “Sever-81” Nuclear lighter-aboard ship Murmansk Shipping Company 2 1985-1989 “Sevmorput” “Zaliv”, Kerch Ministry of Marine Fleet Automatic and remote motion control 11 Salvage ship “Alagez” "61 Kommunar" Shipyard, 1 1986 system “Iantar-1” Nikolaev Project 10521 Ministry of Marine Fleet 12 CCS TF “Sever” Nuclear icebreaker “Sovietskij 1 1989 Murmansk Shipping Company Sojuz” Project 10580 Ministry of Marine Fleet 13 CCS TF “Sever-80” Nuclear icebreakers “Taimyr”, Murmansk Shipping Company, 2 1989-90 “Vaigach” Shipyard, Finland Control system of technical facilities Ministry of Marine Fleet Project 16280 14 of dynamic stabilization “Selvinit- Kherson Shipbuilding 1 1991 Drilling ship “Arktikshelf” 280” Production Association Ministry of Marine Fleet CS of technical facilities of dynamic Diving and salvage 15 "61 Kommunar" Shipyard, 1 1990 stabilization “Magnetit-430” “Gindukush” Nikolaev 8 Quantity of Year of Name of automated control system Customer who ordered vessel/ supplied supply of № Project, name of vessel (complex) complex (system) complexes complex (systems) (system) Ministry of Marine Fleet Control system of trim, stability and Baltic Shipping Company 16 Ro-Ro “Kronshtadt” 1 1992 insubmersibility “Baltiyskiy Zavod”, Saint- Petersburg Ministry of Marine Fleet CCS TF “Sever-M”, system of Project 10521 Baltic Shipping Company 17 1 1992 registration of emergency parameters Nuclear icebreaker “Yamal” “Baltiyskiy Zavod”, Saint- Petersburg CCS TF “Selma” consisting of: Philippines control system of electric power Timber ship “Ramon Aboitiz” Kherson Shipbuilding 1 for export ship 1993 plant; Production Association control system of auxiliary 18 mechanisms and units; control system of general ship systems; Ministry of Marine Fleet centralized control system; Project 15967 Tanker Kherson Shipbuilding 3 for export ship 1994 system of centralized uninterruptible Production Association power supply of automatics’ facilities. Phillipines Control system of main engine 19 Timber ship “Ramon Aboitiz” Kherson Shipbuilding 1 for export ship 1993 “Grom-M” Production Association 9 Quantity of Year of Name of automated control system Customer who ordered vessel/ supplied supply of № Project, name of vessel (complex) complex (system) complexes complex (systems) (system) Ministry of Marine Fleet Project 15967 3 для Tanker Kherson Shipbuilding экспортных 1994 Production Association судов Tanker “Astrakhan” Ministry of Marine Fleet 1 1990 Project 15750 Ministry of Marine Fleet 1 1990 Tanker Ministry of Marine Fleet CCS TF “Selma-MAS” Tanker “Auriga” 1 1990 20 Project 17340 Ministry of Marine Fleet 1 1990 Tanker Project 16095 Ministry of Marine Fleet 1 1990 Tanker Tanker “Viktor Dubrovskij” Ministry of Marine Fleet 1 1990 LCS of fuel (oil) separation unit “Kaluga Turbine Works” JSC, 21 Severo-Orekhovskoe oilfield-2 1 1994 “Avrolog-C” Kaluga CCS TF “Avrolog -17310” consisting “Krasnoe Sormovo” JSC, 22 River-sea dry cargo carrier 5 1995
Recommended publications
  • Government Support to Upstream Oil & Gas in Russia
    GOVERNMENT SUPPORT TO UPSTREAM OIL & GAS IN RUSSIA HOW SUBSIDIES INFLUENCE THE YAMAL LNG AND PRIRAZLOMNOE PROJECTS Page i Government Support to Upstream Oil & Gas in Russia How Subsidies Influence the Yamal LNG and Prirazlomnoe Projects GENEVA-OSLO-MOSCOW JULY 2014 Lars Petter Lunden and Daniel Fjaertoft, Sigra Group PUBLISHED IN PARTNERSHIP BY: www.globalsubsidies.org GOVERNMENT SUPPORT TO UPSTREAM OIL & GAS IN RUSSIA HOW SUBSIDIES INFLUENCE THE YAMAL LNG AND PRIRAZLOMNOE PROJECTS Page ii Government Support to Upstream Oil & Gas in Russia How Subsidies Influence the Yamal LNG and Prirazlomnoe Projects Lars Petter Lunden and Daniel Fjaertoft, Sigra Group Geneva-Oslo-Moscow, July 2014 © 2014 The International Institute for Sustainable Development/WWF Published by the International Institute for Sustainable Development. ACKNOWLEDGEMENTS This report has been commissioned by the Global Subsidies Initiative (GSI) of the International Institute for Sustainable Development (IISD) thanks to the generous support of the Ministry of Foreign Affairs of Norway and Ministry of Foreign Affairs of Denmark. The report has been prepared by Lars Petter Lunden and Daniel Fjaertoft, Sigra Group, in coordination with Ivetta Gerasimchuk, PhD in Economics, and Lucy Kitson, IISD-GSI. WWF-Russia has provided communications and outreach support for the report. This report has been peer-reviewed by: • Mikhail Babenko, PhD in Economics, Oil & Gas Officer, WWF Global Arctic Programme • James Henderson, Senior Research Fellow, Oxford Institute for Energy Studies •
    [Show full text]
  • Petroleum Activity in the Russian Barents Sea
    FNI Report 7/2008 Petroleum Activity in the Russian Barents Sea Constraints and Options for Norwegian Offshore and Shipping Companies Arild Moe and Lars Rowe Petroleum Activity in the Russian Barents Sea Constraints and Options for Norwegian Offshore and Shipping Companies Arild Moe and Lars Rowe [email protected][email protected] Report commissioned by the Norwegian Shipowners’ Association September 2008 Copyright © Fridtjof Nansen Institute 2008 Title Petroleum Activity in the Russian Barents Sea: Constraints and Options for Norwegian Offshore and Shipping Companies Publication Type and Number Pages FNI-Report 7/2008 26 Authors ISBN Arild Moe and Lars Rowe 978-82-7613-530-5-print version 978-82-7613-531-2-electronic version Project ISSN 0879 1504-9744 Abstract Presently most attention in the Barents Sea is given to the Shtokman project. Experience from development of this field, where there are still many uncertainties, will have large consequences for the further development program and relations with foreign companies. The exploration activity going on is fairly limited, but over the last few years there has been a struggle over licenses and control over exploration capacity. In the medium term the goal of rapid development of the Arctic continental shelf has become intertwined with a comprehensive government effort to modernise the domestic shipbuilding industry to make it able to cover most of the needs offshore. With the shipbuilding industry in a deep crisis these goals are not fully reconcilable. Russia will either have to accept more foreign involvement, or scale down its offshore ambitions. We believe a combination of the two alternatives is likely.
    [Show full text]
  • HVAC Systems for the Offshore Industry
    HEINEN & HOPMAN OFFSHORE > Our mission is to ensure you the perfect climate indoors, regardless of the weather outside. OUTSIDE 35 C HUMIDITY 90% ºC 22Inside PROVIDED BY HEINEN & HOPMAN Heating Ventilation Air Conditioning Refrigeration TABLE OF CONTENTS PAGE INTRODUCTION 3 PRODUCTS COOLING PLANT 4 ABSORPTION CHILLER 5 TURBOCOR CHILLER 6 PROPANE CHILLER 7 REPLACEMENT CHILLER 8 MGO COOLER 9 CONDENSING UNIT 10 AIR HANDLING UNIT 11 SELF-CONTAINED UNIT 11 PACKAGE UNIT 12 CABIN UNIT 13 TEMPORARY REFUGE UNIT 14 H2S AIR FILTRATION UNIT 15 CARGO VENTILATION 16 CONTAINERIZED HVAC ROOM 16 GALLEY INDUCTION VENTILATION 17 EXPLOSION PROOF EQUIPMENT 17 CABIN FAN COIL UNIT 18 CONTROL STARTER PANEL 19 REFERENCES 20 To stand with our clients in “ “ the harshest environments INTRODUCTION The offshore environment is harsh and unforgiving. It is essential that • Manufactured according to Eurovent standards the work and off-duty environment of your skilled, highly-paid crew is Cooling plants as comfortable as possible. Heating, ventilation and other air-handling • Produced in water and air-cooled versions, depending on the type of equipment needs to be as tough, efficient and safe as the structures offshore installation and the exact location of the equipment. themselves. • Air-cooled equipment is enclosed in stainless steel for resistance Heinen & Hopman is renowned in the offshore industry for its project- against the salty atmosphere based approach and dedication to premium quality. We think along in the • Water-cooled units can use both sea-water or fresh-water from an processes specific to the demanding offshore segment to create specific, intercooling system tailor-made solutions for your every need - super strong, super reliable Cabin units and made to last.
    [Show full text]
  • Seatec International Review 2/2013
    International Maritime Review Fast break Norwegian Breakaway was built in just 18 months seatec.fi/magazine Breaking the Ice Arctech proves its mettle with a duo of arctic-proof supply ships HANDLE ALL ASPECTS OF LNG The LNG industry is investing huge sums to meet the world’s hunger for natural gas. In this capital- and technology-intensive business, risk management is critical to success. DNV helps address the complete risk picture throughout the entire LNG value chain, from the wellhead, across the oceans – including the use of LNG as a fuel for ships – to the receiving terminal. 4BGFUZ IFBMUIBOEFOWJSPONFOUBMSJTLNBOBHFNFOUt5FDIOPMPHZRVBMJGJDBUJPOt$MBTTJGJDBUJPOt7FSJGJDBUJPOt"TTFUSJTLNBOBHFNFOUt &OUFSQSJTFSJTLNBOBHFNFOUt*OEFQFOEFOUBEWJTPSFOHJOFFS XXXEOWDPN The Cruise Industry’s Premier Global Event March 10 –13, 2014 | Miami Beach Convention Center | Miami Beach, FL USA FOOD & BEVERAGE | DESIGN & REFURBISHMENT | DESTINATIONS | SHIP SERVICES | HOTEL OPERATIONS SHIP EQUIPMENT | INFORMATION TECHNOLOGY | ENTERTAINMENT | AMUSEMENTS & RECREATIONAL ATTRACTIONS For 30 years, Cruise Shipping Miami has been the cruise industry’s premier global exhibition and conference, bringing together buyers and suppliers for a week of networking, sourcing, and education. Reserve your booth now for the 30th anniversary event. Contact th Anniversary [email protected] today! Celebrate the 30 cruiseshippingmiami.com Exclusively supported by editorial seatec 2/2013 FINNISH-RUSSIAN CO-OPERATION IS AN IMPORTANT PART OF THE FINNISH PUBLISHER PubliCo Oy MARINE CLUSTER HISTORY Pälkäneentie 19 A FI-00510 Helsinki The ship-building market is facing tough times right now. Many pro- Finland Phone +358 9 686 6250 jects have been postponed and it is impossible to predict how the glob- [email protected] al economy and the price development of oil and gas are going to im- www.publico.com pact future orders.
    [Show full text]
  • Aker Arctic Technology
    AKER ARCTIC TECHNOLOGY Swedoceans Seminarium 23.3.2021 Reko-Antti Suojanen Managing Director COPYRIGHT Copyright of all published material including photographs, drawings and images in this document remains vested in Aker Arctic. Accordingly, neither the whole nor any part of this document shall be reproduced in any form nor used in any manner without express prior written permission and applicable acknowledgements. No trademark, copyright or other notice shall be altered or removed from any reproduction. Agenda 1. Aker Arctic as company 2. Icebreaker types 3. Latest ships 4. Development and technical points 5. Ships 6. Future 23 March 2021 3 Aker Arctic Technology Inc World’s most experienced designer for icegoing ships Own Ice Model Test basin Experienced Naval Unique know-how As reference 60% of Various Architecture for ice classed world icebreaker vessel types - Power determination - Operational studies vessels designs - Hull form - Ice class approvals development - Offshore structures 23 March 2021 www.akerarctic.fi Design and 01 Naval Architecture Engineering 02 Hydrodynamics 03 Icebreaking design 04 Hull structural 05 Systems 06 Machinery 23 March 2021 6 Aker Arctic comprehensive partner From early stage planning to delivery of the ships. • Feasibility fleet Design development, • Testing and hull Basic design • Special • Delivery of vessel and vessel consept and tender design (class approval) icebreaking requirements design equipments • Trials and • Ice model testing commisioning • Budget definition • Yard support services • Open
    [Show full text]
  • The Russian Maritime Industry and Finland Hanna Mäkinen
    Hanna Mäkinen The Russian maritime industry and Finland Electronic Publications of Pan-European Institute 2/2015 ISSN 1795 - 5076 The Russian maritime industry and Finland Hanna Mäkinen 2/2015 Electronic Publications of Pan-European Institute http://www.utu.fi/pei Hanna Mäkinen PEI Electronic Publications 2/2015 www.utu.fi/pei Executive summary 1) Due to historical reasons, the civil shipbuilding industry is weakly developed in Russia and is currently not competitive in commercial sense. The Russian shipyards are in a rapid need of modernisation and the shipbuilding industry suffers from low productivity and technological inferiority compared to other shipbuilding nations. In order to improve the industry’s competitiveness, international cooperation is needed. 2) The Russian maritime industry has recently received increased political attention and funding. Particularly the growing interest in the Arctic hydrocarbon fields and sea routes as well as the continuous importance of energy exports for the Russian economy have boosted the development of the shipbuilding sector. In addition, as Russia has engaged into rearmament, the demands of the Russian navy significantly direct the development of the Russian maritime industry. 3) The current unstable political and economic situation, particularly the ruble’s decline against the euro, the plunge in world oil prices and the economic sanctions imposed on Russia, have complicated the implementation of maritime and offshore industry projects in Russia. The sanctions have a negative impact on the Russian shipbuilding and offshore industries as they complicate companies’ possibilities to attract foreign financing and prohibit exports of products and services and technology transfer to Russia if they are related to defence and oil industries.
    [Show full text]
  • Usc and Atomflot Sign a Contract for Building an Icebreaker for Yamal Lng
    FOR IMMEDIATE RELEASE USC AND ATOMFLOT SIGN A CONTRACT FOR BUILDING AN ICEBREAKER FOR YAMAL LNG Moscow, 30 April 2015. Vyborg Shipyard (part of United Shipbuilding Corporation, or USC) and Atomflot signed a shipbuilding contract for the building of a harbor icebreaker for the Yamal LNG Project. The 10 MW diesel-powered harbor icebreaker with an innovative propulsion system will be built at the Vyborg Shipyard to support the harbor operations of Yamal LNG at the port of Sabetta. Atomflot will act as the shipowner and operator of the vessel, with the expected delivery date in November 2018. In November 2014, Yamal LNG and Atomflot signed a port fleet services contract envisaging tug and icebreaker assistance in Sabetta. The contract is valid through 31 December 2040. The new harbor icebreaker will replace the icebreaker currently used at the port of Sabetta. It will be escorting the LNG tankers through the approach channel and assisting them in the port harbor. The vessel will be capable of effective navigation both bow-ahead and astern modes, maneuvering and performing various specific tasks. Overview Yamal LNG Project Yamal LNG is currently building a 16.5 mtpa natural gas liquefaction plant on the base of the hydrocarbon resources of the South-Tambeyskoye field located in the North-East of the Yamal Peninsula. First LNG production is scheduled for 2017. JSC Yamal LNG shareholders are: NOVATEK (60%), CNPC (20%), and Total (20%). The Project also envisages construction of the transportation facilities, including the Sea Port and the Airport. The international port of Sabetta is a two-phased construction project comprising the early phase and the main phase and developed via a public-private partnership.
    [Show full text]
  • Opinnäytetyön Asettelumalli
    Natalia Zusmanovskaya RESEARCH OF THE POTENTIAL SUBCONTRACTOR SUPPLIERS FOR A CASE COMPANY AT THE RUSSIAN MARKET Degree Programme in International Business and Marketing Logistics 2011 RESEARCH OF THE POTENTIAL SUBCONTRACTOR SUPPLIERS FOR A CASE COMPANY AT THE RUSSIAN MARKET Zusmanovskaya, Natalia Satakunnan ammattikorkeakoulu, Satakunta University of Applied Sciences Degree Programme in International Business and Marketing Logistics September 2011 Supervisor: Ylituomi, Liisa Number of pages: 72 Appendices: 3 Keywords: supplier research, subcontractor, Russia, contract, business habits ____________________________________________________________________ The purpose of this thesis was to research the potential subcontractor suppliers for a case company at the Russian market, and to investigate market environment and trade practises in the country. The practical problem of this study was to provide the company with the relevant information, which can be applied in the process of supplier research and further collaboration. In compliance with the purpose of the study, the framework of the project consists of several parts, and covers such topics as evaluation criteria for supplier, legislations and taxes applied in the specified industry, best transport mode and Incoterms, and trade practises established in the country, including business habits and contract agreement development. The theoretical part of the thesis contains such topics as sourcing, the process of supplier research, subcontractor relationships establishment, proper suppler criteria and certain aspects of international procurement. The materials used in this section were collected from specialized books and electronic articles. As the purpose and limitations of research did not imply the contact with potential subcontractor suppliers, among the most suitable methods for information gathering was chosen desk research, which involves the analysis of already available materials, including published and unpublished sources in printed and electronic form.
    [Show full text]
  • NOVATEK: New Major Player on Global LNG Market NOVATEK in the World
    NOVATEK: new major player on global LNG market NOVATEK in the world globally among publicly traded globally among publicly traded companies by proved natural companies by natural gas №3 gas reserves №8 production volumes bcm bcm Gazprom 18 264 Gazprom 471 Petrochina 2 300 Shell 118 NOVATEK 2 098 ExxonMobi 113 Rosneft 1 714 Petrochina 97 ExxonMobil 1 562 BP 78 BP 1 276 Total 69 Shell 1 145 Rosneft 68 Total 920 NOVATEK 63 Chevron 870 Chevron 62 Lukoil 670 Eni 50 gas liquids gas liquids Reserves Production bcm mt bcm mt С1+С2 6 068 778 2017 63,4 11,8 PRMS 3 879 366 SEC(1P) 2098 165 as of 01/ 01/ 2018 2 Yamal LNG RUSSIAN FEDERATION CURRENT PROJECT STATUS: • Project cost – $27 bln Yamal LNG Sabetta • Project financing from Russia, China, France, Japan, South-Tambeyskoye field Italy, Germany, Sweden, Austria in total amount of $19 bln equivalent SHAREHOLDING STRUCTURE • Design capacity of the plant’s three trains is 16.5 mtpa 50.1% • Over 9 months of operation the plant has shown 20.0% possibility to increase its design capacity by 4-5% 20.0% 9.9% 3 • Train 1 started up in December 2017 • Train 2 started up in August 2018 • Train 3 started up in December 2018 1 year ahead of schedule 4 Yamal LNG The modular approach used in Yamal LNG construction allowed to reach commissioning in three years and considerably decrease the environmental impact 5 Sea port International Airport 6 Yamal LNG Train 4 «Arctic Cascade» proprietary liquefaction technology Yamal LNG Sabetta LIQUEFACTION TRAIN UP TO 1 MTPA South-Tambeyskoye field START-UP IN 4Q 2019 TRAIN
    [Show full text]
  • Sovcomflot. Annual Report 2013
    ANNUAL REPORT2013 In 1988 Sovcomfl ot became one of modern Russia’s fi rst joint-stock companies and its fi rst domestic shipping enterprise, established in accordance with international standards and practice. Since then the company’s fl eet has grown almost eightfold and today Sovcomfl ot enjoys leadership positions in new and highly demanding market segments. The average fl eet age at the end of 2013 was eight years. JUNE 1988 JUNE 2013 122 158 diversified specialised vessels vessels 1.6 12.6 mln tonnes dwt mln tonnes dwt OAO SOVCOMFLOT from ship-owning to commercial and Russia’s largest and one of the world’s technical management, with offices and leading shipping companies specialising subsidiaries in St. Petersburg, Moscow, in crude oil, petroleum products and Novorossiysk, Murmansk, Vladivostok, liquefied gas transportation and the Yuzhno-Sakhalinsk, London, Madrid, servicing of offshore upstream oil and Singapore, Limassol and Dubai. gas projects. Provides a full range of services – from traditional seaborne Sovcomflot services some of the largest energy transportation to complex energy projects in Russia and beyond: engineering solutions for offshore oil and Sakhalin-1; Sakhalin-2; Varandey; gas transportation in harsh ice conditions, Prirazlomnoye; Tangguh (Indonesia); the servicing of oil platforms, geological Peregrino (Brazil); Escobar (Argentina). offshore exploration and towage. In 2013 OAO Sovcomflot (“SCF Group”) A reliable team of experienced celebrated its silver jubilee – 25 years professionals counts over 9,300 people since its foundation as an independent at sea and ashore. The company has joint-stock company. a fully integrated corporate structure: ANNUAL REPORT 2013 Annual report 2013 Contents COMPANY 06 PROFILE Today Sovcomflot is Russia's largest shipping company and one of the world leaders in energy transportation by sea.
    [Show full text]
  • Project Programm Eng.Pdf
    SEPTEMBER 17 SEPTEMBER 18 SEPTEMBER 19 TABLE OF CONTENT 4 TIMETABLE OF THE NEVA 2019 CONFERENCE 6 SEPTEMBER 17 10 SEPTEMBER 18 17 SEPTEMBER 19 24 SEPTEMBER 20 The event is accompanied by simultaneous Russian-English interpretation, unless otherwise specified. Format of participation in each event of the Business Programme is specified in the description. Please pay attention that apart from free-of-charge events open for visiting to all participants of the exhibition, there are paid events and closed sessions. Please address all questions regarding participation in specific events of the Business Programme directly to contact persons stated in the agenda of the event of interest. The contact person for other questions related to the Business Programme is Ekaterina Gritsenko, Programme Director of the NEVA 2019 Exhibition & Conference, +7 (812) 240 40 40, ext. 2807, [email protected]. The contents of this Business Programme are current at the time of printing. Please view www.neva.events for schedule updates and announcements prior to attendance. 3 BUSINESS PROGRAMME OF THE NEVA 2019 EXHIBITION AND CONFERENCE SEPTEMBER 17 09:00-18:00 Registration of participants 10:00-18:00 NEVA 2019 Exhibition and Conference open hours Tour of the exhibition, meetings and negotiations between participants, participation in business events of the conference 10:00-10:30 NEVA 2019 Exhibition and Conference official opening ceremony With participation of NEVA 2019 Exhibition and Conferenceorganising committee representatives, government structures, Opening area relevant ministries, major Russian and international corporations, companies, professional communities and associations. in front of Hall F 10:30-11:30 Official exhibition tour With participation of NEVA 2019 Exhibition and Conferenceorganising committee representatives, government structures, Halls F, G, H relevant ministries, major Russian and international corporations, companies, professional communities and associations.
    [Show full text]
  • Compact Port Icebreaker Is Designed and Built to Deal with Arctic Extremes the 12MW Diesel-Electric Port Icebreaker, of the Tender Design in 2013
    Supplied with kind permission of the ABR Company Ltd, publishers of International Tug&INCORPORATING OSV SALVAGE NEWS TUG & OSV DELIVERIES Compact port icebreaker is designed and built to deal with Arctic extremes The 12MW diesel-electric port icebreaker, of the tender design in 2013. Following Measuring 89.2m (including towing notch) Ob, has been delivered to FSUE Atomflot the selection of Vyborg Shipyard – to the x 21.9m with a 7.5m draft, Ob has a trio of by Vyborg Shipyard. After commissioning, north of St Petersburg – as the builder and main engines in the shape of three Wärtsilä the vessel will be stationed at the Sabetta FSUE Atomflot as the operator, Aker Arctic 8V31 medium-speed diesel generator sets, LNG terminal in the Gulf of Ob, in the developed the final contract design and each developing 4,880kW, while a single north of Russia inside the Arctic Circle. carried out ice model tests in 2015. Wärtsilä 4L20 800kW medium-speed Designed by Aker Arctic, the Finnish During this time, the design gradually harbour diesel gen set provides auxiliary maritime design and engineering company evolved from initial concept to final design power. Propulsion comes from a quartet that specialises in vessels and structures based on main equipment selection as well as of ABB Azipod ICE 1400 thrusters, each designed to operate in the harshest of icy close co-operation with the future owner and providing 3,000kW. conditions, Ob is the first of its Aker ARC builder. Additionally, the vessel features ABB’s 124 design, described by its creators as the In 2015, Aker Arctic submitted the final Onboard DC Grid to further improve “world’s most advanced port icebreaker”.
    [Show full text]