MINUTES of the meeting of the Committee held in Committee room 1 at Church House, on 9th March 2020.

PRESENT: Revd D Witchell (Chairman), Archdeacon of Dorchester, Revd Canon Dr P Groves (Acting Archdeacon of Oxford), Mr D Clark, Mr J Munby, Mrs J Christie, Revd Canon J West, Prof J Missenden, Ven C Allsopp, Mr D Mason

DAC Staff: Ms L Kitch, Mrs S Hammond, Ms J Schillig, Mrs Catriona Turnbull, Mrs H Robertson Observer: Mr Peter Preston

APOLOGIES: Archdeacon of , Ms G O’Farrell, Mr B Martin, Archdeacon of Buckingham, Mrs H Ensor, Revd V Plumb, Revd A Doig.

1. Minutes of the meeting held on 13th January 2020 were approved

2. Declarations of interest

Peter Preston – Shipton on Cherwell. Christine Allsopp – St Mary’s Convent

3. Correspondence, policy and other matters for consideration

Buckingham SS Peter & Paul: Reordering of Lady Chapel. The CBO explained that the parish has had contact from St. Thomas Church in Kensal Town, London, explaining they would be willing to take the complete Lady Chapel altar by Nicholson proposed for disposal, without the need to break the piece up. Kensal Town St Thomas is in the Anglo-Catholic tradition, and so the altar would be a welcome addition, despite the rebuilt church there being later than the altar. A delegation visit with the 20th Century Society and Historic took place on 4th March, and although feedback from either had not been received, neither indicated any strong objection to the proposal on site. In order to give encouragement to both the parish and the recipient church, the DAC agreed to recommend the disposal of the altar by donation in its entirety to St Thomas, Kensal Town, subject to the comments of the 20th Century Society and Historic England.

DAC Staffing updates The SCBO gave an update on the recent appointment process and notified the DAC that the post of Casework Coordinator had been secured and would be advertised shortly.

Page 1 of 17

Applications submitted to DAC January and February 2020:

Jan - 92

List B Faculty DA Faculty Faculty Interim/variation/PP Early stage Minor Major Enq 16 5 15 7 8 41

Feb - 90

List B Faculty DA Faculty Faculty Interim/variation/PP Early stage Minor Major Enq 30 14 7 7 8 24

4. Returning Casework

2017- Marlow: All Buckingham II* Rule Rule 9.6: Case type: Case 017322 Saints 9.9: Yes Churchyard officer: No SH

Conservation of the Gratton memorial in churchyard: installation of kerbing and stone ledger commemorating conservation work, possible lifting/lowering of the existing plain ledger over the grave; slight repositioning of George Gratton’s portrait within the church and associated installation of a light; revision of the interpretative information board within the church to include new research. Submission documents: Consultees: Project architect: Times on agenda: Method spec for Church Buildings Council NA 2 nanolime by Matthew Beasley; contextual information on history of George Gratton Reviewing DAC Submitted to DAC: Visited: Report: members/advisors: JM, March 19 April 2019 (SH and Julian Appended GE Munby)

On Heritage at Risk Major Parish Church: Significance of fabric Memorials / burials Register: Yes affected: Medium-high affected: Yes No 9th March 2020 Minute: The committee noted that the CBC is now content with the proposed methods and materials for the conservation of the memorial and has no further comments. The DAC agreed to issue an NOA for the project subject to the following provisos: • That some brief interpretative information on George Gratton and his significance to the Vincentian and Grenadines community, in addition to the wording already agreed to commemorate the conservation, is included on the new commemorative ledger stone, and that details of the size and location of this new tablet, and a method for securing it in the ground, together with details of the treatment of the existing plain ledger are agreed with the subcommittee (the Archdeacon, Diocesan Archaeologist and an officer of the DAC), prior to works commencing.

Page 2 of 17

• That the content, layout and size of any interpretative information board (if the size is different from the existing) is to be agreed with the subcommittee prior to installation. If the location for this changes, this too will need agreement by the subcommittee. It was strongly recommended that a transcribed inscription on the memorial stone should be included out on any new interpretative board. • That the standard wiring condition for the installation of the light over the portrait is adhered to.

Finally, the DAC urged that Mr Beesley and SV2G publish the details of this research and the conservation of the memorial via the relevant channels, such is the interest it is likely to generate.

5. Pre – application or technical site visits by officers to note

East Claydon, St Mary – QI works (JS) Cowley, St James – boundary wall repairs (JS) Marston, St Nicholas – removal of pews (JS) Marston, St Nicholas – lighting demonstration (JS) Middleton Stoney, All Saints – new facilities (JS) Fifield, St John the Baptist – new facilities (SH) Deddington, St Peter and St Paul – relocation of organ (SH) Penn, Holy Trinity – new facilities (HR) Horspath, St Giles – (HR) Oxford, St Mary the Virgin – outside furniture (HR) Buckland, All Saints – (CT) Aston Clinton, St Michael and All Angels – new facilities (CT) Drayton Beauchamp, St Mary the Virgin – heating and new facilities (CT and LK) Calverton, All Saints – Removal of 6 pews (CT and LK) Oxford, St Thomas – CCTV and lighting (CT) Littlemore, St Mary the Virgin and St Nicholas – numerous variations to reordering (LK) Brasenose College – Introduction of new organ (LK) Cowley, St Albans – use of the building by other congregations (LK) Beenham Valence, St Mary – phasing of extension project (LK) Aldermaston, St Mary – introduction of temporary toilet (LK) Burghfield, St Mary the Virgin – new facilities (LK) Leckhampstead, St James – reordering (LK)

Page 3 of 17

6. New cases

2020- Oxford: St Oxford II* Rule Rule 9.6: Case type: Case 047278 Aldate 9.9: Yes No Extension officer: LK

Extension of existing modern extension to the north aisle.

Submission documents: Consultees: Project architect: Times on agenda: 1st Design and access Historic England, Charles Derby MEB statement, preliminary Victorian Society, SPAB, Design drawings. CBC, AMS Visiting DAC Submitted to DAC: Visited: Report: members/advisors: November 2019 21.2.20 Attached

On Heritage at Risk Major Parish Church: Significance of fabric Memorials / burials Register: No No affected: affected: moderate yes 9th March 2020 Minute: The DAC resolved to support the scheme in principle and ratified the draft site visit report.

2020- Bodicote: St Dorchester II* Rule Rule 9.6: Case type: Case 046699 John the 9.9: No Yes Liturgical officer: Baptist SH

Removal of 2nd Victorian Font, wooden coat of arms to Queen Elizabeth II, and other items considered to be redundant. Submission documents: Consultees: Project architect: Times on agenda: 1st Statements of need and Historic England, CBC and significance, photos Victorian Society

Visiting DAC Submitted to DAC: Visited: Report: members/advisors: Jan 2020 N/A

On Heritage at Risk Major Parish Church: Significance of fabric Memorials / burials Register: No affected: affected: No Font: Moderate (as part No of Plowman reordering, moderate/high) Other items: Low 9th March 2020 Minute: The DAC resolved to recommend the disposal of the Victorian font, subject to the comments of the amenity societies listed above, and conditional upon disposal being by donation to another church, or

Page 4 of 17 by its burial if, after an agreed period of time, a recipient church cannot be found via the Central Contents Register or other means. The DAC also resolved to recommend the disposal of the other items, subject to 1) consultation with the donor family in the case of the plaques, as it may be they would like them back, 2) Consultation with the Diocesan Textiles Adviser in the case of the banners, and attempts being made to donate the banners to a suitable recipient, i.e. a museum, a fellow church with the same dedication or New College.

2020- Knowl Hill St Berkshire NL Rule Rule 9.6: Case type: Case 046768 Peter 9.9: No No New facilities officer: LK

The introduction of new kitchen and toilet facilities, removal of pews, fabric repairs and associated landscaping works to enable use by the school and village hall users. The introduction of new heating and lighting.

Submission documents: Consultees: Project architect: Times on agenda: 1st Statements of Currently - none Nick Rule Significance and Need, drawings

Visiting DAC Submitted to DAC: Visited: Report: members/advisors: Jan 2020 21.2.20 attached Derek Witchell, John Missenden Jeff West

On Heritage at Risk Major Parish Church: Significance of fabric Memorials / burials Register: No affected: affected: No low No

9th March 2020 Minute: The DAC resolved to support the principle of the scheme, with the exception of the car park on the north side of the churchyard, and welcomed progression of discussions between the school and the PCC. The site visit report was ratified.

2020- Great Buckingham II* Rule Rule 9.6: Case type: Case 048678 Hampden, St 9.9: Yes Liturgical officer: Mary No JS Magdalene

Page 5 of 17

Installation of new statues in chancel niches

Submission documents: Consultees: Project architect: Times on agenda: 1st Sketch proposals CBC Christian Randall

Visiting DAC Submitted to DAC: Visited: Report: members/advisors: NA

On Heritage at Risk Major Parish Church: Significance of fabric Memorials / burials Register: No affected: affected: No Not relevant No 9th March 2020 Minute: The DAC resolved to support the principle of the introduction of new statues in the niches at the east end of the chancel. Further information is required before the proposal is brought back to a full DAC meeting for consideration: • Theological justification of the iconography of the statues and how this will relate to the east window. • Detail drawings of the statues and the niches with an elevation drawing showing the how the statues will sit in the niches. • Proposals for the medieval heads currently displayed in the niches. Where will they go? How will they be displayed?

2019- Shipton-under- Dorchester II* Rule Rule 9.6: Case type: Case 043037 Wychwood 9.9: No No Churchyard officer: SH

Installation of commemorative communal memorial stone by Giles McDonald in area set aside for interment of cremated remains Submission documents: Consultees: Project architect: Giles Times on agenda: 1st Rationale, design, plans LPA in case planning McDonald (Memorial and illustration permission is needed. Mason)

Visiting DAC Submitted to DAC: Visited: Report: members/advisors: Jan 2020 N/A None as yet- suggest Archdeacon On Heritage at Risk Major Parish Church: Significance of fabric Memorials / burials Register: No affected: affected: No Low No

Page 6 of 17

9th March 2020 Minute: The DAC resolved to issue an NOA for the proposed Welsh slate memorial stone, with a view to extending to a second stone as needed, subject to the width extending to 440mm to ensure as many names on one line each as possible. It was agreed that, in order to maximise the length of time these stones would cater for the community, the other recommendations concerning using one-inch lettering, beginning lower down the stones with accumulated names prior to the installation of each, to be carved in Mr MacDonald’s workshop, were sensible. The LPA are to be consulted in case planning permission is required.

2020- Shipton-on- Dorchester II Rule Rule 9.6: Case type: Case 048636 Cherwell, Holy 9.9: No New Facilities officer: Cross Yes JS

Removal of pews in northwest corner of church to form servery and construction of standalone WC in churchyard.

Submission documents: Consultees: Project architect: Times on agenda: 1st Existing and proposed Cherwell DC Peter Preston plans and elevation Historic England Statements of need and Victorian Society significance Drainage feasibility study

Visiting DAC Submitted to DAC: Visited: Report: members/advisors: 29.10.18 – JS and LK Pre-app SV report Julian Munby 26.09.19 (29.10.19) David Clark David Tyler

On Heritage at Risk Major Parish Church: Significance of fabric Memorials / burials Register: No affected: affected: No Moderate Yes

9th March 2020 Minute: The DAC resolved to support the proposals in principle with the steeper roof pitch as proposed by their architect. Resolution of details to be delegated to a subcommittee consisting of David Clark, Julian Munby and Joyce Christie.

2019- Oxford: St Giles Oxford I Rule Rule 9.6: Case type: Case 039856 9.9: No No Liturgical officer: CT

Page 7 of 17

Permanent installation of Nick Myneer statue in the chancel.

Submission documents: Consultees: Project architect: Times on agenda: 1st Design and photos None NA

Visiting DAC Submitted to DAC: Visited: Report: members/advisors: September 2019 NA NA NA On Heritage at Risk Major Parish Church: Significance of fabric Memorials / burials Register: No No affected: affected: low No 9th March 2020 Minute: The DAC resolved to recommend the proposal. No explanatory plaque to be placed in the sanctuary as it is very ‘clean’ and uncluttered at present. Draw attention to the presence of the statue by means of a pamphlet, guide or similar so that visitors are made aware of it being in the Sanctuary and do not miss it.

2019- Ickford, St Buckingham I Rule Rule 9.6: Case type: Case 043063 Nicholas 9.9: Yes No Heritage Crime officer: JS

Replacement stolen lead cladding to north aisle with interlocking plain clay tiles

Submission documents: Consultees: Project architect: Times on agenda: 1st Interlocking tile SPAB, Historic England, Christian Randall brochure LPA Plans, specification etc for slate no longer relevant

Consulted DAC Submitted to DAC: Visited: Report: members/advisors: 1.10.19 – returned to 16.08.19 – JS and CT (not NA Bryan Martin proposal in preparation related to lead theft) 10.10.19 for additional information On Heritage at Risk Major Parish Church: Significance of fabric Memorials / burials Register: No affected: affected: No Moderate High No

9th March 2020 Minute: The DAC were not content with the proposal to clad the roof with an interlocking plain clay tile. It was felt that metal cladding is more appropriate for the low pitched roof of the Grade I listed church. Concerns were also expressed about the potential for leaks should a tile be damaged or missing. The committee recommended that the parish submit an application for a temporary felt roof covering for a period of 5 years to allow them to raise funds to replace the stolen cladding with terne coated stainless steel.

Page 8 of 17

2019- Drayton: St Dorchester II Rule Rule 9.6: Case type: Case 037547 Catherine and 9.9: Yes No Development officer: St Leonard HR

Re-roofing the vestry with slate

Submission documents: Consultees: Project architect: Times on agenda: 1st Statement of need, Local Planning Authority, David Birkett Statement of SPAB significance, photos, contractor’s schedule of works Visiting DAC Submitted to DAC: Visited: Report: members/advisors: Not October 2019 Not applicable Not applicable applicable

On Heritage at Risk Major Parish Church: Significance of fabric Memorials / burials Register: No No affected: affected: 20th century vestry No 9th March 2020 Minute: The committee raised no objections subject establishing the suitability of the roof angle for slate. The DAC reiterated the CHO’s request to receive confirmation of the roof slope angle.

The DAC resolved to consult SPAB (Society for the Protection of Ancient Buildings) on the proposals prior to issuing an NOA.

2019- Calverton All Buckingham II* Rule Rule 9.6: Case type: Case 045885 Saints 9.9: Yes No Seating officer: CT

To reorder south west corner of the church, install multimedia system and repair nave pew platform.

Submission documents: Consultees: Project architect: Times on agenda: 1st Statements of Historic England, Andrew Perkins Significance and Need, Victorian Society, SPAB, (Acanthus Clews) Specification CBC, GG, LPA Visiting DAC Submitted to DAC: Visited: Report: members/advisors: December 2019 24.1.20 Attached Jeff West

Page 9 of 17

On Heritage at Risk Major Parish Church: Significance of fabric Memorials / burials Register: No No affected: affected: moderate No 9th March 2020 Minute: The DAC were supportive of the proposals.

Pew frontal: The Vic Soc had stated a preference to retain the pew frontal from the set of pews in the SW corner, but the DAC did not feel this was practical or necessary. Suggest moving frontal to front of N side of pews in the nave.

Tiles: cases for both tile patterns in the cleared area were discussed, and no preference identified. New tiles ought to be robust enough to deal with wear from tables and chairs.

Tables and chairs to be used in ‘cleared’ SW corner: the selection of these will need careful thought if they are to cope with being stored in an external shed. DAC subcommittee to review proposals for tables and chairs once these are received.

2019- Wantage: St Dorchester II* Rule Rule 9.6: Case type: Case 044685 Mary’s Covent 9.9: Yes No Development, officer: Chapel mechanical and HR electrical Installation of new lighting scheme, fire detection system and sound system. Introduction of new double glass doors in cloisters and new timber doors in chapel.

Submission documents: Consultees: Project designers: Times on agenda: 1st Fire detection scheme, Historic England Bruce Kirk Lighting lighting design by Bruce Hall McKnight Architects Kirk, Visiting DAC Submitted to DAC: Visited: Report: members/advisors: Not February 2020 Not applicable Not applicable applicable

On Heritage at Risk Major Parish Church: Significance of fabric Memorials / burials Register: No No affected: affected: 19th Century chapel No 9th March 2020 Minute: The committee raised no objection to the introduction of new double glass doors in the cloisters and new timber doors in the vestry area. Although the DAC raised no strong objections, the architect members wished to point out that the glass doors in the cloister were not fit for purpose as they would inevitably blow open in the draught. It would be better to determine the cause and origin of the draught so it can be ascertained how to remove or reduce it effectively.

Fire detection system

Page 10 of 17

The DAC resolved that there was not enough information available on the fire detection system and asked for further details to be provided.

Lighting scheme

The DAC were not content with the proposed lighting arrangement for the Calvary, it was felt the pendant relocation and stark brightness did not work well. They also raised concerns over the proposed arrangement on the rood screen; it was felt the spotlights on the statues were too bright.

The DAC asked that fixing details for new lights and product specifications are added to the application.

The DAC were supportive of the re-use of the lighting pendants; however, they were unsure about the new location of some of these pendants. The DAC requested a clearer lighting layout, without circuit information and only showing light fitting locations to help them to understand and assess the lighting scheme holistically.

Offline – Sandhurst St Berkshire II* Rule Rule 9.6: Case type: Case documents Michael and 9.9: No No Private petition officer: on All Angels LK powerpoint The introduction of a personal memorial outside of the Churchyard Regulations (Sayers).

Submission documents: Consultees: Project architect: Times on agenda: 1st Application form NA NA

Visiting DAC Submitted to DAC: Visited: NA Report: members/advisors: January 2020 NA NA

On Heritage at Risk Major Parish Church: Significance of fabric Memorials / burials Register: No No affected: affected: NA Yes 9th March 2020 Minute: The DAC resolved not to object to the proposals.

8. List Bs and Notifications of Advice issued under sub committees and delegated authority since last meeting

Page 11 of 17

Lavendon: St BUCKINGHAM Grade I List B Catriona R&C Redecoration of List B Michael the church and issued resolution of damp issues Fawley: St BUCKINGHAM Grade II Faculty - Hannah R&C Replacement of NOA issued Mary DA rainwater goods with on apse provisos

Sulhamstead BERKSHIRE Grade I Faculty - Hannah R&C Retrospective Faculty Abbots: St DA application: Repair issued Mary and painting of chancel ceiling panels with standard plasterboard and white Earthborn clay paint.

Rotherfield DORCHESTER Grade II* Faculty - Catriona Churchyard Remove 4 cypress NOA issued Peppard: All DA trees and Saints resurface path

Mollington: DORCHESTER Grade II* Faculty - Liz Churchyard To fix CWGC sign NOA issued All Saints DA to boundary wall Newbury: St BERKSHIRE Grade II Faculty - Liz H&S introduction of NOA issued John the DA improvements hand rails to Evangelist baptistry stairs

Newbury: St BERKSHIRE Grade II Faculty - Liz Churchyard installation of a NOA issued John the DA cycle rack Evangelist

Marlow: All BUCKINGHAM Grade II* Faculty - Sophie H&S Bell tower safety NOA issued Saints DA improvements works

Sutton DORCHESTER Grade I Faculty - Sophie Churchyard relocation of shed NOA issued Courtenay: All DA Saints

Marcham: All DORCHESTER Grade II* Faculty - Hannah M&E Installation of two Registrar to Saints DA external and two issue internal CCTV faculty cameras.

Great Tew: St DORCHESTER Grade I Faculty - Sophie Development Extension to NOA issued Michael & All Major include vestry and with Angels WC (internal provisos reordering to be second phase and separate app). Hampstead BERKSHIRE Grade I Faculty - Sophie OBC Restoration of the NOA issued Norreys: St Major bells and bell with Mary frame to enable provisos safe ringing

Page 12 of 17

Marsh BUCKINGHAM Grade II* Faculty - Sophie Heritage Replacement roof Petition Gibbon: St Major Crime in TCSS following submitted Mary the lead theft to Dio Reg Virgin

Bicester: St DORCHESTER Grade I Faculty - Sophie Development Removal of Petition Edburg HAR Major majority of pews submitted in nave and to Dio Reg associated floor works; removal of speaker cabinets in choristalls Priestwood: BERKSHIRE Ungraded Faculty - Jennie Liturgical Donation of Faculty St Andrew Minor vestments to issued parish in Africa

Hethe: St DORCHESTER Grade II Faculty - Sophie OBC Removal of NOA issued Edmund & St Minor Harmonium George

Wendover: St BUCKINGHAM Grade II* Faculty - Catriona R&C CCTV NOA issued Mary Minor Langley Road: BUCKINGHAM Ungraded Faculty - Liz M&E Place an NOA issued Christ the Minor illuminated cross Worker of top of the building Bradwell: St BUCKINGHAM Grade II* Faculty - Jennie Heritage half of nave roof NOA issued Lawrence Minor Crime has been stolen, no alarm, no other lead Weston-on- DORCHESTER Grade II* Faculty - Jennie OBC Works to bells and NOA issued the-Green: St Minor tower to provide Mary easier ringing and sound attenuation including insertion of ceiling. 28.10.19 CJ chased and offered assistance

Cold Ash: St BERKSHIRE Ungraded Faculty - Hannah Churchyard Conservation of NOA issued Mark Minor war memorial Aston DORCHESTER Grade II* Faculty - Catriona Churchyard Improving the NOA issued Rowant: St Minor churchyard and Peter & St tree work in the Paul churchyard. Including the removal of some trees. Sulham: St BERKSHIRE Grade II Faculty - Jennie Heritage Lead theft from NOA issued Nicholas Minor Crime ridge of nave and apse

Page 13 of 17

New Windsor: BERKSHIRE Grade II* Faculty - Sophie M&E Upgrade Telecoms NOA issued St John the Minor to 5G with Baptist provisos

Charlbury: St DORCHESTER Grade I Faculty - Sophie Liturgical Installation of NOA issued Mary the Minor statue of Virgin with Virgin Mary provisos

Bampton DORCHESTER Grade I Faculty - Liz Disposal of Disposal of 2no Petition Proper: St Minor items 1870 clergy stalls submitted Mary to Dio Reg

Denham: St BUCKINGHAM Grade I Faculty - Hannah R&C Installation of new Petition Mary the Minor gutters/downpipes submitted Virgin for the nave roof to Dio Reg

Chalfont: St BUCKINGHAM Grade I Faculty - Jennie PP & M correction of error Registrar to Giles Minor on war memorial issue faculty

Mortimer BERKSHIRE Ungraded Faculty - Sophie Heritage Repairs to Registrar to West End: St Minor Crime vandalised stained issue Saviour glass window faculty

South Ascot: BERKSHIRE Grade II* Faculty - Jennie Churchyard Replacement of Registrar to All Souls Minor railings between issue path and faculty churchyard Wantage: St DORCHESTER Grade I Interim Liz OBC Installation of Faculty Peter & St temporary digital issued Paul organ

New Windsor: BERKSHIRE Grade II* Interim Liz OBC Temporary Interim St John the introduction of an faculty Baptist electronic organ issued whilst permission and funds are obtained for the restoration of the pipe organ

Stony BUCKINGHAM Grade II* Interim Liz R&C urgent remedial Interim Stratford: St works to prevent faculty Mary & St water ingress into issued Giles the sacristy

Old Windsor: BERKSHIRE Grade II* Interim Jennie Liturgical Introduction oif Interim St Peter & St new plaque faculty Andrew commemorating issued royal visit for 800th anniversary

Henley-on- DORCHESTER Grade II* Interim Liz Liturgical purchase of Interim Thames: St candlesticks and faculty Mary the crucifix needs issued Virgin MAJOR faculty

Page 14 of 17

PARISH CHURCH HAR

Stony BUCKINGHAM Grade II* Interim Liz Churchyard Application for Interim Stratford: St erecting scaffold in faculty Mary & St churchyard by issued Giles local authority

Grendon BUCKINGHAM Grade II* List B Liz M&E Installation of roof Awaiting Underwood: alarm Archdeacon St Leonard HAR

Mollington: DORCHESTER Grade II* List B Jennie M&E Fit alarm system Awaiting All Saints to protect the Archdeacon church roof from thieves Nether DORCHESTER Grade II* List B Jennie M&E Fit roof alarm to Awaiting Worton: St Tower roof Archdeacon James

Denchworth: DORCHESTER Grade II* List B Jennie R&C Plaster repairs Awaiting St James followed by Archdeacon redecoration of interior

Oxford: St OXFORD Grade I List B Sophie R&C Replacement of Awaiting Michael at one lead sheet to Archdeacon the Northgate tower roof.

Nuffield: Holy DORCHESTER Grade II* List B Jennie Churchyard Felling of 2 Awaiting Trinity leylandii fouling Archdeacon electrical line at request from SSE Knowl Hill: St BERKSHIRE Ungraded List B Liz M&E Replacement Awaiting Peter boiler Archdeacon : DORCHESTER Grade II* List B Hannah Churchyard The felling of a List B St Leonard lime tree, 2 x goat issued willow trees, rowan tree, crack willow tree and plum tree. Lifting crowns of the yew tree and 6 conifers.

Radley: St DORCHESTER Grade II* List B Hannah OBC Relocate clock List B James the issued Great

Page 15 of 17

Ascot Heath: BERKSHIRE Grade II List B Sophie Development Installation of an List B All Saints internal issued noticeboard (SH advised Maz Down this would be a List B 03.09.19) Ellesborough: BUCKINGHAM Grade II* List B Liz Churchyard Tree works List B St Peter & St issued Paul

Kelmscott: St DORCHESTER Grade II* List B Liz Heritage Recovering of the List B George Crime chancel, porch and issued south chapels roofs with lead following theft. Installation of E bound alarm Ashampstead: BERKSHIRE Grade I List B Catriona M&E Installation of loop List B St Clement system issued

High BUCKINGHAM Grade I List B Jennie Seating disposal of 3 List B Wycombe: All chapel chairs issued Saints MAJOR PARISH CHURCH

Rotherfield DORCHESTER Grade II* List B Catriona Churchyard Remove dying List B Peppard: All silver birch tree issued Saints

Duns Tew: St DORCHESTER Grade II List B Catriona Churchyard Trimming of trees, List B Mary raise crown of issued Magdalen limes and various yew Cropredy: St DORCHESTER Grade I List B Catriona Churchyard Fell remainder of List B Mary the conifer tree which issued Virgin HAR was damaged during high winds Hornton: St DORCHESTER Grade I List B Hannah M&E Installation of roof List B John the alarm issued Baptist

Swyncombe: DORCHESTER Grade II* Private Catriona Churchyard Construction of a Petition St Botolph Petition memorial submitted churchyard wall to Dio Reg

Clewer: St BERKSHIRE Grade II Variation Liz OBC Organ works Amended Stephen faculty issued

Amersham: St BUCKINGHAM Grade I Variation Catriona M&E rationalisation of NOA issued Mary the new lighting with Virgin scheme provisos

Page 16 of 17

Bledlow: Holy BUCKINGHAM Grade I Faculty - Hannah Development Introduction of NOA issued Trinity DA banners to the west end of the nave

9. Completed projects feedback

Blewbury window

Page 17 of 17