Transmission Plan 2017-2018 TRANSMISSION PLAN March 14, 2018 REVISED DRAFT Foreword to Revised Draft 2017-2018 Transmission Plan This revised draft transmission plan reflects a number of changes from the draft plan released on February 1, 2018. To assist our stakeholders following the transmission plan cycle, we have summarized a number of those changes, with particular emphasis on a number of projects where the recommendations have progressed since the release on February 1 and the subsequent stakeholder meeting on February 8: • The model estimating the impact of the transmission plan on the ISO’s High Voltage TAC has been updated and the results added to the model. • The Oakland Clean Energy Initiative project is recommended for approval • The Phasor Measurement Unit project has been added and is recommended for approval • The Bridgerville-Garberville #2 115 kV line project is recommended to remain on hold. • The Kearney-Caruthers 70 kV Line Reonductor project is recommended to proceed with the original scope. • The recommended revised scope for the Kern 115 kV Area Reinfoement has been updated as presented at the February 8 stakeholder meeting. • Section 2.10 addressing the need for phasor measurement units to be installed on all ISO balancing authority area interties has been added. • Several projects approved in the 2016-2017 transmission planning cycle have been added to Table 7.1-1: Status of Previously-approved Projects Costing Less than $50M, that had been omitted from the table in the Draft 2017-2018 Transmission Plan. • The in-service date for a number of previously approved projects have been updated. A number of clarifications and edits have also been added throughout the plan to address other stakeholder comments. 2017-2018 ISO Transmission Plan March 14, 2018 Table of Contents Executive Summary ..................................................................................................... 1 The Transmission Planning Process ................................................................ 3 Planning Assumptions and State Agency Coordination .................................... 4 Key Reliability Study Findings .......................................................................... 5 Renewables Portfolio Standard Policy-driven Transmission Assessment ......... 7 Key Economic Study Findings .......................................................................... 8 Non-Transmission Alternatives and Preferred Resources............................... 10 Informational Studies ...................................................................................... 10 Conclusions and Recommendations .............................................................. 11 Chapter 1 ................................................................................................................... 13 1 Overview of the Transmission Planning Process ............................................ 13 1.1 Purpose ........................................................................................ 13 1.2 Impacts of the Industry Transformation ......................................... 16 1.2.1 Load Forecasting and Distributed Energy Resources Growth Scenarios .................................................................... 17 1.2.2 Resource Planning .................................................................. 19 1.2.3 System Modeling, Performance, and Assessments ................. 29 1.3 Structure of the Transmission Planning Process ........................... 31 1.3.1 Phase 1 ................................................................................... 31 1.3.2 Phase 2 ................................................................................... 33 1.3.3 Phase 3 ................................................................................... 35 1.4 Interregional Transmission Coordination per FERC Order No. 1000 ............................................................................. 37 1.5 ISO Processes coordinated with the Transmission Plan ................ 39 Chapter 2 ................................................................................................................... 43 2 Reliability Assessment – Study Assumptions, Methodology and Results ........ 43 2.1 Overview of the ISO Reliability Assessment .................................. 43 2.1.1 Backbone (500 kV and selected 230 kV) System Assessment ............................................................................. 43 2.1.3 Regional Area Assessments .................................................... 44 2.1.4 Peak Demand ......................................................................... 44 2.2 Reliability Standards Compliance Criteria...................................... 45 2.2.1 NERC Reliability Standards ..................................................... 45 2.2.2 WECC Regional Criteria .......................................................... 45 2.2.3 California ISO Planning Standards .......................................... 45 California ISO/MID i 2017-2018 ISO Transmission Plan March 14, 2018 2.3 Study Assumptions and Methodology ........................................... 46 2.3.1 Study Horizon and Years ......................................................... 46 2.3.2 Transmission Assumptions ...................................................... 46 2.3.3 Load Forecast Assumptions .................................................... 47 2.3.4 Generation Assumptions ......................................................... 50 2.3.5 Preferred Resources ............................................................... 58 2.3.6 Firm Transfers ......................................................................... 64 2.3.7 Operating Procedures ............................................................. 65 2.3.8 Study Scenarios ...................................................................... 65 2.3.9 Contingencies ......................................................................... 70 2.3.10 Study Methodology .................................................................. 72 2.4 PG&E Bulk Transmission System Assessment ............................. 75 2.4.1. PG&E Bulk Transmission System Description ......................... 75 2.4.2. Study Assumptions and System Conditions .......................................... 76 2.4.3. Assessment and Recommendations ....................................... 81 2.5 PG&E Local Areas ........................................................................ 90 2.5.1 Humboldt Area ........................................................................ 90 2.5.2 North Coast and North Bay Areas ........................................... 95 2.5.3 North Valley Area .................................................................. 105 2.5.4 Central Valley Area ............................................................... 111 2.5.5 Greater Bay Area .................................................................. 121 2.5.6 Greater Fresno Area ............................................................. 133 2.5.7 Kern Area .............................................................................. 146 2.5.8 Central Coast and Los Padres Areas .................................... 153 2.5.9 California High Speed Train Project Load Interconnection ..... 162 2.6 Southern California Bulk Transmission System Assessment ....... 167 2.6.1 Area Description .................................................................... 167 2.6.2 Area-Specific Assumptions and System Conditions .............. 169 2.6.3 Assessment Summary ........................................................... 171 2.6.4 Request Window Project Submissions .................................. 172 2.6.5 Consideration of Preferred Resources and Energy Storage .. 172 2.6.6 Recommendation .................................................................. 172 2.7 SCE Local Areas Assessment ..................................................... 173 2.7.1 SCE Tehachapi and Big Creek Area ..................................... 173 2.7.2 North of Lugo Area ................................................................ 177 2.7.3 SCE East of Lugo Area ......................................................... 181 2.7.4 SCE Eastern Area ................................................................. 184 2.7.5 SCE Metro Area .................................................................... 188 2.8 Valley Electric Association Area .................................................. 197 2.8.1 Area Description .................................................................... 197 2.8.2 Area-Specific Assumptions and System Conditions .............. 197 2.8.3 Assessment Summary ........................................................... 199 2.8.4 Request Window Project Submissions .................................. 199 2.8.5 Consideration of Preferred Resources and Energy Storage .. 200 2.8.6 Recommendation .................................................................. 200 2.9 SDG&E Area ............................................................................... 201 2.9.1 San Diego Local Area Description ......................................... 201 2.9.2 Area-Specific Assumptions and System Conditions .............. 201 California ISO/MID ii 2017-2018 ISO Transmission Plan March 14, 2018 2.9.3 Assessment Summary ........................................................... 204 2.9.4 Request Window Project Submissions .................................. 204 2.9.5 Operational Modification and RAS Mitigations ......................
Recommended publications
  • Board-Approved 2013-2014 Transmission Plan
    2013-2014 ISO Transmission Plan March 25, 2014 APPENDIX A: System Data California ISO/MID A-1 2013-2014 ISO Transmission Plan March 25, 2014 A1 Existing Generation Table A1-1: Existing generation plants in PG&E planning area Planning Area Generating Plant Maximum Capacity Humboldt Bay 166 Kekawaka 4.9 Pacific Lumber 32.5 PG&E - LP Samoa 25 Humboldt Fairhaven 17.3 Blue Lake 12 Humboldt Area Total 258 Santa Fe 160 Bear Canyon 20 Westford Flat 30 Western Geo 38 Geysers 5 53 Geysers 6 53 PG&E - North Coast and Geysers 7 53 North Bay Geysers 8 53 Geysers 11 106 Geysers 12 106 Geysers 13 133 Geysers 14 109 Geysers 16 118 California ISO/MID A-2 2013-2014 ISO Transmission Plan March 25, 2014 Planning Area Generating Plant Maximum Capacity Geysers 17 118 Geysers 18 118 Geysers 20 118 Bottle Rock 55 SMUD Geo 72 Potter Valley 11 Geo Energy 20 Indian Valley 3 Sonoma Landfill 6 Exxon 54 Monticello 12 North Coast and North Bay Area Total 1,619 Pit River 752 Battle Creek 17 Cow Creek 5 North Feather River 736 South Feather River 123 PG&E - West Feather River 26 North Valley Black Butte 11 CPV 717 Hatchet Ridge Wind 103 QFs 353 North Valley Area Total 2,843 California ISO/MID A-3 2013-2014 ISO Transmission Plan March 25, 2014 Planning Area Generating Plant Maximum Capacity Wadham 27 Woodland Biomass 25 UC Davis Co-Gen 4 Cal-Peak Vaca Dixon 49 Wolfskill Energy Center 60 Lambie, Creed and Goosehaven 143 EnXco 60 Solano 100 High Winds 200 Shiloh 300 Bowman Power House 4 PG&E - Camp Far West (SMUD) 7 Central Valley Chicago Park Power House 40 Chili Bar Power House 7 Colgate Power House 294 Deer Creek Power House 6 Drum Power House 104 Dutch Plat Power House 49 El Dorado Power House 20 Feather River Energy Center 50 French Meadow Power House 17 Green Leaf No.
    [Show full text]
  • Calpine Corporation (A Delaware Corporation) I.R.S
    10-K 1 cpn_10kx12312014.htm CALPINE 10-K FOR YEAR-ENDED DECEMBER 31, 2014 UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C. 20549 ____________________ Form 10-K ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF [X] 1934 For the fiscal year ended December 31, 2014 TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT [ ] OF 1934 For the transition period from to Commission File No. 001-12079 ______________________ Calpine Corporation (A Delaware Corporation) I.R.S. Employer Identification No. 77-0212977 717 Texas Avenue, Suite 1000, Houston, Texas 77002 Telephone: (713) 830-2000 Not Applicable (Former Address) Securities registered pursuant to Section 12(b) of the Act: Calpine Corporation Common Stock, $0.001 Par Value Name of each exchange on which registered: New York Stock Exchange Securities registered pursuant to Section 12(g) of the Act: None Indicate by check mark if the registrant is a well-known seasoned issuer, as defined in Rule 405 of the Securities Act. Yes [X] No [ ] Indicate by check mark if the registrant is not required to file reports pursuant to Section 13 or Section 15(d) of the Act. Yes [ ] No [X] Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days.
    [Show full text]
  • U.S. Department of the Interior Bureau of Land Management
    U.S. Department of the Interior Bureau of Land Management Final Environmental Assessment DOI-BLM-NV0S010-2009-1014-EA May 2016 Eastern Nevada Transmission Project APPLICANT Silver State Energy Association GENERAL LOCATION Clark County, Nevada BLM CASE FILE SERIAL NUMBER N-086357 PREPARING OFFICE U.S. Department of the Interior Bureau of Land Management Las Vegas Field Office 4701 N. Torrey Pines Drive Las Vegas, NV 89130 Phone: (702) 515-5172 Fax: (702) 515-5010 This page intentionally left blank. Table of Contents Chapter 1 - Purpose and Need ...................................................................................................1 1.1 Introduction ....................................................................................................................1 1.2 Project Background ........................................................................................................1 1.3 Purpose and Need for Action .........................................................................................2 1.4 Decisions to be Made .....................................................................................................7 1.5 BLM Policies, Plans, Authorizing Actions, and Permit Requirements .........................7 Chapter 2 - Proposed Action and Alternatives ........................................................................9 2.1 Introduction ....................................................................................................................9 2.1.1 Regulatory Framework for Alternatives
    [Show full text]
  • APPENDIX A: System Data
    2012-2013 ISO Transmission Plan March 20, 2013 APPENDIX A: System Data California ISO/MID A-1 2012-2013 ISO Transmission Plan March 20, 2013 A1 Existing Generation Table A1-1: Existing generation plants in PG&E planning area Planning Area Generating Plant Maximum Capacity Humboldt Bay 166 Kekawaka 4.9 Pacific Lumber 32.5 PG&E - LP Samoa 25 Humboldt Fairhaven 17.3 Blue Lake 12 Humboldt Area Total 258 Santa Fe 160 Bear Canyon 20 Westford Flat 30 Western Geo 38 Geysers 5 53 Geysers 6 53 PG&E - North Coast and Geysers 7 53 North Bay Geysers 8 53 Geysers 11 106 Geysers 12 106 Geysers 13 133 Geysers 14 109 Geysers 16 118 California ISO/MID A-2 2012-2013 ISO Transmission Plan March 20, 2013 Planning Area Generating Plant Maximum Capacity Geysers 17 118 Geysers 18 118 Geysers 20 118 Bottle Rock 55 SMUD Geo 72 Potter Valley 11 Geo Energy 20 Indian Valley 3 Sonoma Landfill 6 Exxon 54 Monticello 12 North Coast and North Bay Area Total 1,619 Pit River 752 Battle Creek 17 Cow Creek 5 North Feather River 736 South Feather River 123 PG&E - West Feather River 26 North Valley Black Butte 11 CPV 717 Hatchet Ridge Wind 103 QFs 353 North Valley Area Total 2,843 California ISO/MID A-3 2012-2013 ISO Transmission Plan March 20, 2013 Planning Area Generating Plant Maximum Capacity Wadham 27 Woodland Biomass 25 UC Davis Co-Gen 4 Cal-Peak Vaca Dixon 49 Wolfskill Energy Cener 60 Lambie, Creed and Goosehaven 143 EnXco 60 Solano 100 High Winds 200 Shiloh 300 Bowman Power House 4 PG&E - Camp Far West (SMUD) 7 Central Valley Chicago Park Power House 40 Chili Bar Power House 7 Colgate Power House 294 Deer Creek Power House 6 Drum Power House 104 Dutch Plat Power House 49 El Dorado Power House 20 Feather River Energy Center 50 French Meadow Power House 17 Green Leaf No.
    [Show full text]
  • 2021 Unitary Value-Setting Meeting May 25, 2021
    2021 Unitary Value-Setting Meeting May 25, 2021 This document was created for public distribution and does not contain the Lead Values or Staff Recommended Values provided to the Board Members State-Assessed Properties Division Jack McCool, Chief _______________________________________________________________________________________________________________________ TED GAINES MALIA M. COHEN ANTONIO VAZQUEZ MIKE SCHAEFER BETTY T. YEE BRENDA FLEMING BOARD MEMBERS First District Second District Third District Fourth District State Controller Executive Director Sacramento San Francisco Santa Monica San Diego Item AA (Rev1: 5/19/21) CALIFORNIA STATE BOARD OF EQUALIZATION 5/25/21 STATE BOARD OF EQUALIZATION – STATE-ASSESSED PROPERTIES DIVISION UNITARY VALUE-SETTING WORKBOOK LIEN DATE 2021 PAGE INDUSTRY CLASSIFICATION NUMBER Electric Generation Facilities (1100 – 1199) 1 – 2 Energy Companies (100 - 199) 3 – 4 Pipeline Companies (400-499) 5 Railroad Companies (800-899) 6 Telecommunications Companies (Local Exchange) (200 - 399) 7 Telecommunications Companies (Wireless) (2500 - 3999) 8 Telecommunications Companies (Interexchange) (2000-2499 and 7500-8999) 9 – 14 STATE BOARD OF EQUALIZATION - STATE-ASSESSED PROPERTIES DIVISION Unitary Value Setting Workbook - Lien Date 2021 Electric Generation Facilities Item SBE No. No. Assessee Name 1 1100 AES Alamitos, LLC 2 1101 AES Redondo Beach, LLC 3 1102 AES Huntington Beach, LLC 4 1103 Dynegy Moss Landing, LLC 5 1105 Dynegy Oakland, LLC 6 1111 Long Beach Generation LLC 7 1112 CXA La Paloma, LLC 8 1115 GenOn California South LP - Ormond Beach 9 1117 GenOn California South LP - Ellwood 10 1122 MRP San Joaquin Energy, LLC - Hanford 11 1123 MRP San Joaquin Energy, LLC - Henrietta 12 1124 MRP San Joaquin Energy, LLC - Tracy 13 1126 Elk Hills Power, LLC 14 1127 High Desert Power Trust 15 1128 Delta Energy Center, LLC 16 1129 Gilroy Energy Center, LLC 17 1131 Pastoria Energy Facility, LLC 18 1132 CCFC Sutter Energy, LLC 19 1133 Metcalf Energy Center, LLC 20 1134 Otay Mesa Generating Company, LLC 21 1136 Blythe Energy, Inc.
    [Show full text]
  • Responses to Comments on The
    CITY OF SANTA CLARA, CALIFORNIA Dual-Branded Hotel at Coleman and Brokaw RESPONSES TO COMMENTS ON THE INITIAL STUDY & MITIGATED NEGATIVE DECLARATION JULY 2021 Responses to Comments RESPONSES TO COMMENTS This document contains all of the written comments received by the City of Santa Clara on the Dual-Branded Hotel at Coleman and Brokaw Initial Study/Mitigated Negative Declaration (IS/MND) and presents the City’s responses to each of the substantive comments submitted by public agencies and members of the public. Written comments were received during the 30-day public review period, which extended from March 26, 2021 to April 26, 2021. Pursuant to the California Environmental Quality Act (CEQA), prior to approving a project, the decision- making body of the lead agency must consider the proposed Mitigated Negative Declaration, together with all comments received during the public review process. (CEQA Guidelines Section 15074.) Although written responses to comments on an MND are not required by CEQA, the City has determined to exceed the minimum requirements and prepare a response to the comments received that pertain to the adequacy of the IS/MND. According to the Governor’s Office of Planning and Research (OPR), the State agencies that were invited to review the IS/MND included the following:1 • California Natural Resources Agency • California Department of Conservation (DOC) • California Department of Fish and Wildlife (CDFW), Regions 2 and 3 • California Department of Forestry and Fire Protection (CAL FIRE) • California Department
    [Show full text]
  • Final 2018-2019 Study Plan
    2018-2019 Transmission Planning Process Unified Planning Assumptions and Study Plan March 30, 2018 Final ISO Market and Infrastructure Development Division March 30, 2018 Intentionally left blank Study Plan 2018-2019 Transmission Planning Process Table of Contents 1 Introduction ........................................................................................................ 1 2 Overview of 2018-2019 Stakeholder Process Activities and Communications .. 2 2.1 Stakeholder Meetings and Market Notices ....................................... 2 2.3 Interregional Coordination ................................................................ 5 2.4 Stakeholder Comments .................................................................... 5 2.5 Availability of Information .................................................................. 5 3 Reliability Assessments ..................................................................................... 7 3.1 Reliability Standards and Criteria ..................................................... 7 3.1.1 NERC Reliability Standards ........................................................ 7 3.1.2 WECC Regional Criteria ............................................................. 8 3.1.3 California ISO Planning Standards ............................................. 8 3.2 Frequency of the study ..................................................................... 8 3.3 Study Horizon and Years .................................................................. 8 3.4 Study Areas .....................................................................................
    [Show full text]
  • U.S. Department of the Interior Bureau of Land Management
    U.S. Department of the Interior Bureau of Land Management Final Environmental Assessment DOI-BLM-NV-S010-2010-0091-EA November 2014 Southern Nevada Intertie Project APPLICANT Great Basin Transmission, LLC GENERAL LOCATION Clark County, Nevada BLM CASE FILE SERIAL NUMBER N-086359 PREPARING OFFICE U.S. Department of the Interior Bureau of Land Management Las Vegas Field Office 4701 N. Torrey Pines Drive Las Vegas, Nevada 89130 Phone: (702) 515-5172 Fax: (702) 515-5010 This page intentionally left blank. TABLE OF CONTENTS Chapter 1. Introduction .......................................................................................................... 1-1 1.1. Identifying Information ...................................................................................... 1-2 1.1.1. Title, EA Number, and Type of Project .............................................. 1-2 1.1.2. Location of Proposed Action ............................................................... 1-2 1.1.3. Name and Location of Preparing Office ............................................. 1-2 1.1.4. Identify the Case File Number ............................................................ 1-2 1.1.5. Applicant Name ................................................................................... 1-2 1.2. Purpose and Need for Action ............................................................................. 1-2 1.2.1. Background ......................................................................................... 1-2 1.2.2. BLM Purpose and Need .....................................................................
    [Show full text]
  • EB-2011-0140 in the MATTER of Sections 70
    EB-2011-0140 IN THE MATTER OF sections 70 and 78 of the Ontario Energy Board Act 1998, S.O. 1998, c. 15 (Schedule B); AND IN THE MATTER OF a Board-initiated proceeding to designate an electricity transmitter to undertake development work for a new electricity transmission line between Northeast and Northwest Ontario: the East-West Tie line. INTERROGATORIES OF RES CANADA TRANSMISSION LP to EWT L.P. January 30, 2013 12115001_5|TORDOCS EB-2011-0140 Interrogatories of RES Canada Transmission LP to EWT L.P. Filed: January 30, 2013 Page 2 of 24 Interrogatory #1 Project Schedules Reference: a. AltaLink: Part B, Section 7 b. EWT: Part B, Exhibit 7 c. CNPI: Part B, Section 7 d. Iccon/TPT: Volume 1, Section 7 e. UCT: Section B, Section 7 f. RES: Exhibit N Preamble: Each applicant has prepared development and construction cost estimates that are dependent, inter alia, upon underpinning project schedule assumptions. Some applicants have assumed aggressive project schedules. For example, both UCT and EWT assume that the leave to construct process – from application to decision – can be completed in less than one year. The generalized phase-by-phase project schedule of each applicant is shown in the table below. The questions below are intended to test the reasonableness of the scheduling assumption and the sensitivity of development and construction cost estimates to changes in the project schedule that underpins each such estimate. Table 1: Project Schedules Questions: a. What evidence can EWT offer that a nine month leave-to-construct phase – from application to decision – is reasonable and achievable? 12115001_5|TORDOCS EB-2011-0140 Interrogatories of RES Canada Transmission LP to EWT L.P.
    [Show full text]
  • Appendix C to California’S Proposed Compliance Plan for the Federal Clean Power Plan: Target Recalculation Calculations
    Appendix C to California’s Proposed Compliance Plan for the Federal Clean Power Plan: Target Recalculation Calculations Prime Nameplate Generator mover Capacity Summer ARB Updated List EPA Original Plant Name Operator Name ORIS Code ID Fuel type type (MW) Capacity (MW) EXCLUDE EXCLUDE Rollins Nevada Irrigation District 34 1P WAT HY 12.1 12.1 EXCLUDE EXCLUDE Venice Metropolitan Water District 72 1 WAT HY 10.1 10.1 EXCLUDE EXCLUDE J S Eastwood Southern California Edison Co 104 1 WAT PS 199.8 199.8 EXCLUDE EXCLUDE McClure Modesto Irrigation District 151 1 DFO GT 71.2 56.0 EXCLUDE EXCLUDE McClure Modesto Irrigation District 151 2 DFO GT 71.2 56.0 EXCLUDE EXCLUDE Turlock Lake Turlock Irrigation District 161 1 WAT HY 1.1 1.1 EXCLUDE EXCLUDE Turlock Lake Turlock Irrigation District 161 2 WAT HY 1.1 1.1 EXCLUDE EXCLUDE Turlock Lake Turlock Irrigation District 161 3 WAT HY 1.1 1.1 EXCLUDE EXCLUDE Hickman Turlock Irrigation District 162 1 WAT HY 0.5 0.5 EXCLUDE EXCLUDE Hickman Turlock Irrigation District 162 2 WAT HY 0.5 0.5 EXCLUDE EXCLUDE Volta 2 Pacific Gas & Electric Co 180 1 WAT HY 1.0 0.9 EXCLUDE EXCLUDE Alta Powerhouse Pacific Gas & Electric Co 214 1 WAT HY 1.0 1.0 EXCLUDE EXCLUDE Alta Powerhouse Pacific Gas & Electric Co 214 2 WAT HY 1.0 1.0 EXCLUDE EXCLUDE Angels Utica Power Authority 215 1 WAT HY 1.4 1.0 EXCLUDE EXCLUDE Balch 1 Pacific Gas & Electric Co 217 1 WAT HY 31.0 31.0 EXCLUDE EXCLUDE Balch 2 Pacific Gas & Electric Co 218 2 WAT HY 48.6 52.0 EXCLUDE EXCLUDE Balch 2 Pacific Gas & Electric Co 218 3 WAT HY 48.6 55.0 EXCLUDE EXCLUDE
    [Show full text]
  • Western Area Power Administration Desert Southwest Region's
    FINAL Western Area Power Administration Desert Southwest Region’s Facilities Historic Context Statement Edited by Lisa M. Meyer September 2014 FINAL Western Area Power Administration Desert Southwest Region’s Facilities Historic Context Edited by Lisa M. Meyer September 2014 DSW Region’s Facilities Historic Context Statement CONTENTS Contents Executive Summary ................................................................................................................... ES-1 1. Introduction ........................................................................................................................... 1-1 Purpose and Need .................................................................................................................. 1-1 Data Sources Consulted ......................................................................................................... 1-5 Current Document ................................................................................................................. 1-8 2. Statement of Context Part 1: DSW Region’s Transmission Power Systems………………………………………… ...................................................................................... 2-1 Temporal Context .................................................................................................................. 2-1 Geographic Context ............................................................................................................... 2-1 Historic Context ....................................................................................................................
    [Show full text]
  • Attachment 13
    ATTACHMENT 13 Project List PROJECT NAME CEC DOCKET# PROJECT OWNER* ALMOND 2 POWER PLANT 09-AFC-2C Turlock Irrigation District ALAMITOS ENERGY CENTER 13-AFC-01C AES ALLIANCE CENTURY ENERGY 01-EP-04C FACILITY Clarion Energy West, LLC ALLIANCE DREWS ENERGY 01-EP-05C FACILITY Clarion Energy West, LLC ALMOND II POWER PLANT 09-AFC-02C Turlock Irrigation District BLYTHE ENERGY PROJECT 99-AFC-08C AltaGas/Blythe Energy Inc BLYTHE ENERGY / 99-AFC-08C TRANSMISSION LINE AltaGas/Blythe Energy Inc BLYTHE SOLAR POWER 09-AFC-06C NextEra Energy Resources PROJECT BORDER PROJECT 01-EP-14C CalPeak Power-Border, LLC BOTTLE ROCK GEOTHERMAL 79-AFC-4C AltaRock Energy CALISTOGA GEYSER 81-AFC-1C Calpine Corporation CAMPBELL COGENERATION 93-AFC-3C SPA SMUD So California Public Power CANYON POWER PLANT 07-AFC-9C Authority CARLSBAD ENERGY CENTER 07-AFC-6C Carlsbad Energy Center LLC COLUSA GENERATING 06-AFC-9C STATION PG&E COSUMNES POWER PLANT 01-AFC-19C SMUD *The Energy Commission compiled the list of project owners based on the application for c Energy Commission. This list may be incomplete. Project Owner includes the business en certification or petition to amend, all of its parent companies and subsidiaries, and investo ownership interest. The Applicant is responsible for listing all Project Owners that meet the listed on this Attachment 15. CPV SENTINEL ENERGY 07/AFC-3C PROJECT Attachment 13 CPV Sentinel, LLC RFQ-19-703 Page 1 of 12 On Call DCBO ATTACHMENT 13 Project List PROJECT NAME CEC DOCKET# PROJECT OWNER* CROCKETT COGENERATION 92-AFC-1C Crocket Cogeneration
    [Show full text]