World Bank Document 51423 1 Procurement Plan (Updated 19 February 2009) 1. GENERAL Public Disclosure Authorized Project information: Country: Angola Project Emergency Multisectorial Recovery Project (EMRP – Phase I) Financing: Credit No. 4035 ANG and Grant Number H146 ANG Borrower: Republic of Angola Project Implementing Agency: Ministry of Planning Project Management Implementation Unit (PMIU) Participating Sector Ministries: Ministry of Transport Ministry of Energy and Water Ministry of Agriculture Ministry of Public Works Ministry of Health Public Disclosure Authorized Participating Sectors/Agencies: INEA, EDEL, ENE, DNE, IIA, SENSE, IDA 2. Bank’s approval Date of the Procurement Plan 3. Date of General Procurement Notice: July 13, 2005, number 659 4. Period covered by this Procurement Plan: March 01, 2009 to December 31, 2010 (with assumption that the request for extension will be approved) I. Goods and Works and non-consulting services 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Public Disclosure Authorized Thresholds for applicable procurement methods (not limited to the list below) will be determined by the Procurement Specialist /Procurement Accredited Staff based on the assessment of the implementing agency’s capacity. Procurement Method Prior Review Threshold Comments 1. ICB and LIB (Goods) 200.000 or more All contracts 2. NCB (Goods) Below 200.000 Post review 3. ICB (Works) 500.000 or more All contracts 4. NCB (Works) Below 500.000 Post review 5. Direct Contracting All contracts 6. United Nations Agencies All contracts 7. Shopping (Goods and Works) Below 30.000 Post review 2. Prequalification: Applicable Public Disclosure Authorized 3. Reference to (if any) Project Operational/Procurement Manual: The PMIU has a Manual of Procurement Plan. 4. Any Other Special Procurement Arrangements: Not Applicable 2 5. Procurement Packages with Methods and Time Schedule Estimate Expecte Domestic Review d Procure d Contract Prequalificati Preferenc by Bank Ref. No. Cost ment Bid- Comments (Description) on (yes/no) e (Prior/Post US$ Method Opening (yes/no) ) Million Date 12 seeds processor ICB NA No Prior 14.07.09 machines for the 1A.G4 EDAs and 1 for the EEA 1A.G8 Air conditioners for Shopping NA No Post 14.07.09 EEA of Huambo and Cacuso (6) 1A.G10 Hand tools for Shopping NA No Post 14.07.09 EDAs (12) and EEAs (2) 1A.G11 2 freezers for the Shopping NA No Post 14.07.09 EEAs of Huambo and Cacuso 1A.G12 Diesel water pump Shopping NA No Post 14.07.09 for EEA of Huambo 1A.G14 Material for seed Shopping NA No Post 14.07.09 certification for SENSE 1A.W1 EDAs building ICB No No Prior 18.8.09 reconstruction in Huambo and Bie Privinces (6 Lots:(i)Chinguar, (ii) Kuito, (iii) Catabola, (iv) Andulo N’harea, (v) Camacupa, (vi) Chianga) 1A.W2 EEA and SENSE ICB No No Prior 18.8.09 laboratory building reconstruction in Luanda and Malange Provinces (7 Lots (i) Caculama, (ii) Cacusao, (iii) Calandula, (iv) Cangadala, (v) Kwaba Nzogi,, (6) Luanda, (7) Malange 1H.G5 IEC materials for Shopping NA No Post 18.03.09 HIV/AIDS BCC interventions – Posters, leaflets etc 1H G9 1,000 kits of NCB NA No Post 02.07.09 support of the nurse 1H G10 Four manual fork Shopping NA No Post 18.05.09 lifts 1H G11 Contract 25 radio Shopping NA No Post 18.03.09 Programs/advertise ment spots for IEC on HIV AIDS in the local radios of 4 provinces 1D G2 Office Equipment Shopping NA No Post NA for local governments Kits for Teachers 1E G2 Lot 1 ICB NA NA Prior 29.05.09 3 Estimate Expecte Domestic Review d Procure d Contract Prequalificati Preferenc by Bank Ref. No. Cost ment Bid- Comments (Description) on (yes/no) e (Prior/Post US$ Method Opening (yes/no) ) Million Date & Lot 2 IE G3 III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Threshold Comments 1. QCBS 100.000 or more All contracts 2. ICS 50.000 or more All contracts 3. SSS All contracts 4. CQS Below 100.000 Post review 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $100.000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: Not Applicable 4. Consultancy Assignments with Selection Methods and Time Schedule Estimated Review Expected Description of Ref. No. Cost Selection by Bank Proposals Assignment Comments US$ Method (Prior / Submission Million Post) Date 1A C3 Supervision NGOs and ICS Prior 15.01.09 other partner (2 years) - Agriculture 1A.C4 Supervision of the ICS Post 19.06.09 reconstruction of the EDAs in the province of Huambo and Bie 1A.C5 Supervision of the ICS Post 19.06.09 reconstruction of the EDAs in the province of Malange 1A.C6 Supervision of the ICS Post 19.05.09 reconstruction of the EDAs in the province of Luanda 1D C1 Study to define the QCBS Prior 21.01.09 nature of fiscal transfers 1D C3 Design of a Framework ICS Prior 27.01.09 for Monitoring local revenues 1D C4 Revenue generation CQS Post 29.01.09 feasibility study 1D C5 Logistical and SSS Prior 02.02.09 Administrative capacity (UNV) building in local governments 1H C4 Outreach programs for ICS Post 05.06.09 sex workers and trucks 1H C8 Medium and Long-Term ICS Prior 05.06.09 Policy Development 4 Estimated Review Expected Description of Ref. No. Cost Selection by Bank Proposals Assignment Comments US$ Method (Prior / Submission Million Post) Date 1H C14 KAP (knowledge, ICS Post 05.06.09 attitude, and practices) study with NGO support in 4 provinces PC TA to Municipal and ICS Post NA 005/H/2006 Provincial Health Teams (1H C5) – Province 1 Bie Prov PC TA to Municipal and ICS Post NA 007/H/2006 Provincial Health Teams (1H C7) – Province 3 Kwanza- Norte PC TA to Municipal and ICS Post NA 008/H/2006 Provincial Health Teams (1H C8) – Province 4 Moxico 1O C4 Administrator/Project ICS Prior 27.05.09 Manager in the PMIU, 3 years 1P.C1 EDEL: Design and QCBS Prior 16.6.09 preparation of tender documents (Luanda) 1U C2 Design for erosion QCBS Prior 20.05.09 control in Moxico IV. Training A. Rural Development and Delivery of Social Services A1. Rural Development Review Estimated Expected outcome / by No. Cost Selection Estimated Start Activity Description Bank Comments US$ Method Duration Date (Prior Million / Post) 1 short term capacitation training CQS Prior 30 days 07.09.09 for 20 technicians of SENSE 2 short term capacitation training CQS Prior 30 days 07.09.09 for 20 technicians of SENSE 3 training for laboratory CQS Prior 15 days 07.09.09 technicians inspectors on field of seed productors on production technology and conservation and storage process for seeds 4 training in investigation and CQS Prior 15 days 07.09.09 extension services for production, multiplication and certification of seeds A2. Education Services Review Estimated Expected outcome / by No. Cost Selection Estimated Start Activity Description Bank Comments US$ Method Duration Date (Prior Million / Post) 1 Training of 1379 Teachers and QCBS Prior 12 months 16.07.09 School Directors 5 A3. Health Services Review Estimated Expected outcome / by No. Cost Selection Estimated Start Activity Description Bank Comments US$ Method Duration Date (Prior Million / Post) 1 Basic primary health care CQS Prior 22 days 03.08.09 management 2 Integrated management of CQS Prior 5 days 03.08.09 childhood illnesses training 3 Tr. adult common CQS Prior 5 days 03.08.09 diseases/sexually transmitted infections/AIDS 4 Emergency obstetric care CQS Prior 21 days 03.08.09 training 5 Health surveillance CQS Prior 15 days 03.08.09 6 Refresher training for CQS Prior 15 days 03.08.09 Laboratory technicians 7 Upgrade training for UNITA CQS Prior 365 days 03.08.09 and GOA promoters 8 Internship in Luanda National CQS Prior 15 days 03.08.09 Hospital for MDs 9 Internship for anesthesiology CQS Prior 21 days 03.08.09 technicians 10 Training of Trainers in teaching CQS Prior 15 days 03.08.09 techniques 11 Internship for specialized nurses CQS Prior 15 days 03.08.09 12 In Service Field Training CQS Prior 5 days 03.08.09 Decentralization and Support to Local Development Selection Review Estimated Expected outcome / Method by No. Cost Estimated Start Activity Description Bank Comments US$ Duration Date (Prior Million / Post) 1 Training of local officers in the CQS Prior 5 days 18.03.09 management of fiscal transfers Others Estimated Expected outcome / No. Cost Estimated Start Activity Description Comments US$ Duration Date Million 1 Financial Management and 15 days Disbursement in WB financed projects – 2008 2 Project Monitoring, Reporting 15 days and Evaluation - 2008 V. Implementing Agency Capacity Building Activities with Time Schedule 1. In this section the agreed Capacity Building Activities (some items could be from CPAR recommendation) are listed with time schedule. Project Management Implementation Unit - PMIU Estimated Expected outcome / No. Cost Estimated Start Activity Description Comments US$ Duration Date Million 6 1 Procurement Seminar ILI – 2008 15 days 2 Selection and Recruitment of 15 days consultants (World Bank-ILO- Turin) – 2008 3 Works Procurement 15 days Management (World Bank-ILO- Turin) - 2008 7.
Recommended publications
  • 406964062018.Pdf
    Vibrant: Virtual Brazilian Anthropology ISSN: 1809-4341 Associação Brasileira de Antropologia (ABA) Dulley, Iracema; Sampaio, Luísa Tui Accusation and Legitimacy in the Civil War in Angola1 Vibrant: Virtual Brazilian Anthropology, vol. 17, e17355, 2020 Associação Brasileira de Antropologia (ABA) DOI: 10.1590/1809-43412020v17a355 Available in: http://www.redalyc.org/articulo.oa?id=406964062018 How to cite Complete issue Scientific Information System Redalyc More information about this article Network of Scientific Journals from Latin America and the Caribbean, Spain and Journal's webpage in redalyc.org Portugal Project academic non-profit, developed under the open access initiative Article Accusation and Legitimacy in the Civil War in Angola Iracema Dulley 1 Luísa Tui Sampaio 1 1 Universidade Federal de São Carlos, Centro de Ciências Humanas e Sociais, Departamento de Ciências Sociais, São Carlos/SP, Brasil Abstract This article analyses the main categories of accusation found in the speeches of leaders from the People’s Movement for the Liberation of Angola (MPLA) and the National Union for the Total Independence of Angola (UNITA) during the Civil War in Angola (1975-2002). Seeking to understand the entanglements between the global and local dimensions of the conflict, we argue that the accusations made by Agostinho Neto (MPLA), José Eduardo dos Santos (MPLA), and Jonas Savimbi (UNITA) aimed to delegitimize the ‘other’ in the act of claiming legitimacy to occupy the state. This is achieved through the opposition between accusatory categories attributed to the ‘other’ and their inverse, categories attributed to the person making the accusation. We thereby show how the understanding of political conflicts in general, and the conflict in Angola specifically, can be illuminated through the analysis of categories whose linguistic dimension is entangled with historically constituted social positionalities.
    [Show full text]
  • 2854 ISS Monograph 130.Indd
    FFROMROM SSOLDIERSOLDIERS TTOO CCITIZENSITIZENS THE SOCIAL, ECONOMIC AND POLITICAL REINTEGRATION OF UNITA EX-COMBATANTS J GOMES PORTO, IMOGEN PARSONS AND CHRIS ALDEN ISS MONOGRAPH SERIES • No 130, MARCH 2007 CONTENTS ACKNOWLEDGEMENTS iii ABOUT THE AUTHORS v LIST OF ACRONYMS vi INTRODUCTION viii CHAPTER ONE 1 Angola’s Central Highlands: Provincial Characterisation and Fieldwork Review CHAPTER TWO 39 Unita’s Demobilised Soldiers: Portrait of the post-Luena target group CHAPTER THREE 53 The Economic, Social and Political Dimensions of Reintegration: Findings CHAPTER FOUR 79 Surveying for Trends: Correlation of Findings CHAPTER FIVE 109 From Soldiers to Citizens: Concluding Thoughts ENDNOTES 127 BIBLIOGRAPHY 139 ANNEX 145 Survey Questionnaire iii ACKNOWLEDGMENTS The research and publication of this monograph were made possible by the generous funding of the Swedish International Development Cooperation Agency (SIDA), the Swiss Federal Department of Foreign Affairs, and the Norwegian Institute of International Affairs (NUPI), through the African Security Analysis Programme at the ISS. The project “From Soldiers to Citizens: A study of the social, economic and political reintegration of UNITA ex-combatants in post-war Angola” was developed jointly by the African Security Analysis Programme at ISS, the London School of Economics and Political Science (LSE), and the Norwegian Institute for International Affairs (NUPI). In addition, the project established a number of partnerships with Angolan non-governmental organisations (NGOs), including Development
    [Show full text]
  • 2.3 Angola Road Network
    2.3 Angola Road Network Distance Matrix Travel Time Matrix Road Security Weighbridges and Axle Load Limits For more information on government contact details, please see the following link: 4.1 Government Contact List. Page 1 Page 2 Distance Matrix Uige – River Nzadi bridge 18 m-long and 4 m-wide near the locality of Kitela, north of Songo municipality destroyed during civil war and currently under rehabilitation (news 7/10/2016). Road Details Luanda The Government/MPLA is committed to build 1,100 km of roads in addition to 2,834 km of roads built in 2016 and planned rehabilitation of 7,083 km of roads in addition to 10,219 km rehabilitated in 2016. The Government goals will have also the support from the credit line of the R. of China which will benefit inter-municipality links in Luanda, Uige, Malanje, Cuanza Norte, Cuanza Sul, Benguela, Huambo and Bié provinces. For more information please vitsit the Website of the Ministry of Construction. Zaire Luvo bridge reopened to trucks as of 15/11/2017, this bridge links the municipality of Mbanza Congo with RDC and was closed for 30 days after rehabilitation. Three of the 60 km between MCongo/Luvo require repairs as of 17/11/2017. For more information please visit the Website of Agencia Angola Press. Works of rehabilitation on the road nr, 120 between Mbanza Congo (province Zaire) and the locality of Lukunga (province of Uige) of a distance of 111 km are 60% completed as of 29/9/2017. For more information please visit the Website of Agencia Angola Press.
    [Show full text]
  • Angola Food Security Update
    Angola Food Security Update June 2004 USAID Funded Activity Prices of staple foods in Huambo remain stable due to improved trade flow from Kuanza Sul, Huila and Bie provinces In April 2004, FEWS NET conducted a short survey in the informal markets of Huambo, Huila and Luanda. Regional Trade Flows In May and June 2004, following requests from a few Increased trade flow since the main crop harvest NGOs, FEWS NET conducted a similar survey to in May/June 2004 monitor trade flows and market prices, now including Benguela and Uige provinces. This food security The demand for maize and beans in urban and update discusses the findings of this work. rural areas of Huambo and Bengula continues to attract supplies from Huila and Kuanza Sul Trade Flow and Maize Prices provinces. During the last two months, the supply of maize, sorghum and beans from Huila to Maize prices remain stable and further decline is Benguela increased substantially. Sorghum, expected which was almost not traded in April 2004, is now Prices of staple foods in local markets have an impact reaching the urban markets in Benguela. This on food security, as many vulnerable families rely on reflects good sorghum harvest in Huila, which is markets to supplement their food needs. Trade flows estimated to have increased by six percent – from and price analysis during May and June revealed two 33,000 MT in the 2002-03 season to 35,000 MT in major factors positively influencing food availability. the 2003-04 season. Farmers in Kaluqumbe, Firstly, continued trade activity between Huambo and Matala, Kipungo and Quilengues supply the bulk the neighbouring provinces is helping to stabilise food of the produces to Buenguela.
    [Show full text]
  • Inventário Florestal Nacional, Guia De Campo Para Recolha De Dados
    Monitorização e Avaliação de Recursos Florestais Nacionais de Angola Inventário Florestal Nacional Guia de campo para recolha de dados . NFMA Working Paper No 41/P– Rome, Luanda 2009 Monitorização e Avaliação de Recursos Florestais Nacionais As florestas são essenciais para o bem-estar da humanidade. Constitui as fundações para a vida sobre a terra através de funções ecológicas, a regulação do clima e recursos hídricos e servem como habitat para plantas e animais. As florestas também fornecem uma vasta gama de bens essenciais, tais como madeira, comida, forragem, medicamentos e também, oportunidades para lazer, renovação espiritual e outros serviços. Hoje em dia, as florestas sofrem pressões devido ao aumento de procura de produtos e serviços com base na terra, o que resulta frequentemente na degradação ou transformação da floresta em formas insustentáveis de utilização da terra. Quando as florestas são perdidas ou severamente degradadas. A sua capacidade de funcionar como reguladores do ambiente também se perde. O resultado é o aumento de perigo de inundações e erosão, a redução na fertilidade do solo e o desaparecimento de plantas e animais. Como resultado, o fornecimento sustentável de bens e serviços das florestas é posto em perigo. Como resposta do aumento de procura de informações fiáveis sobre os recursos de florestas e árvores tanto ao nível nacional como Internacional l, a FAO iniciou uma actividade para dar apoio à monitorização e avaliação de recursos florestais nationais (MANF). O apoio à MANF inclui uma abordagem harmonizada da MANF, a gestão de informação, sistemas de notificação de dados e o apoio à análise do impacto das políticas no processo nacional de tomada de decisão.
    [Show full text]
  • Final Draft – Not Intended for Distribution ***
    DUTCH AGRIFOOD PRIVATE SECTOR INVOLVEMENT IN ANGOLA Developing Angolan-Dutch private sector cooperation *** FINAL DRAFT – NOT INTENDED FOR DISTRIBUTION *** The Netherlands, January 2015 Commissioned by The Netherlands Embassy in Luanda Acknowledgments The writer of this report would like to thank all of the private persons that were interviewed in Angola and The Netherlands and that presented their much appreciated personal view on agrifood developments in Angola, all people interviewed are listed in chapter 23. A special word of thanks to Jan Alderliesten (Embassy Council based in Pretoria), Niek Schelling (Agricultural Council based in Pretoria) and Cynthia Soares da Silva (EKN Luanda) for their most appreciated assistance. Contacts Netherlands Embassy in Pretoria Mr. N. Schelling 210 Florence Ribeiro Avenue New Muckleneuk, Pretoria, South Africa Phone: +27 (12) 4254573 Mail: [email protected] Netherland Embassy in Luanda Mr. J. Alderliesten Tv. Ho Chi Minh, Torre B, piso 8 Luanda, Angola Phone: +244 (923) 503254 Mail: [email protected] Agrix: Feed Food Fibers Fuel Mr. A.C.M. Graumans Phone: +31 (570) 853414 Mail: [email protected] Dutch agrifood private sector involvement in Angola PAGE 2 Agrix January 2015 Dutch agrifood private sector involvement in Angola PAGE 3 Agrix January 2015 1 Executive summary Experts on agriculture worldwide acknowledge the fact that Angola has the potential to become an agricultural world power. This point of view is supported by the fact of the 58 mln ha agricultural land available in Angola, some 35 mln ha can be considered as good arable land and only 5 mln ha is actually being used.
    [Show full text]
  • Tribunal De Contas De Angola
    REPOBLICA DE ANGOLA TRIBUNAL DE CONTAS 10 CAMARA RESOLUcAO N°.z8 /FP/1 Processos n.°s: 446 a 496,593,698 e 741/PV/2014 I. Dos Factos O Departamento Ministerial das Finangas, submeteu para efeitos de Fiscalizagao Previa, por intermedio do Officio n.° 2175/04/03/GMF/2014, de 9 • de Julho, corn entrada nesta Corte de Contas no dia 30 de Julho do corrente ano, os contratos abaixo descritos celebrados entre o Departamento Ministerial da Construgao e diversas empresas privadas que passamos a enunciar: I. A empresa Engevia - Construcao Civil e Obras Ptiblicas, Lda celebrou os contratos seguintes: -Reabi I itagao da Estrada Nacional EN - 150, Trogo: Camacupa/Ringoma/Umpulo, corn extensao de 113 Km na Provincia do Bie, e do Servigo de Elaboragao do Pro jecto Executivo da Obra, no valor global de Akz: 9.604.999.895,00 ( Nove Mil Milhiies, Seiscentos e Quatro Milhiies, Novecentos e Noventa e Nove Mil e Oitocentos e Noventa e Cinco • Kwanzas); -Reab I itagao da Estrada Nacional EN - 150, Trogo: Alfandega/Caiongo/Cangola, corn extensao de 62 Km, na Provincia do Urge, e do Servigo de Elaboragao do Pro jecto Executivo da Obra, no valor global de Akz: 4.649.872.610,00 ( Quatro Mil Milhaes, Seiscentos e Quarenta e Nove Milhoes, Oitocentos e Setenta e Dols Mil e Seiscentos e Dez Kwanzas); -Reabilitagao da Estrada Nacional EN 160, Trogo: Quimbianda/Buengas/CuiloFuta, corn extensao de 78 Km, na Provincia do Ufge, eclo Servigo de Elaboragao do Pro jecto Executivo da bra, no valor de Akz: 1 11, 6.629.997.606,00 ( Seis Mil Milhaes, Seiscentos e Vinte e Nove
    [Show full text]
  • A Crude Awakening
    Dedicated to the inspiration of Jeffrey Reynolds ISBN 0 9527593 9 X Published by Global Witness Ltd P O Box 6042, London N19 5WP,UK Telephone:+ 44 (0)20 7272 6731 Fax: + 44 (0)20 7272 9425 e-mail: [email protected] a crude awakening The Role of the Oil and Banking Industries in Angola’s Civil War and the Plunder of State Assets http://www.oneworld.org/globalwitness/ 1 a crude awakening The Role of the Oil and Banking Industries in Angola’s Civil War and the Plunder of State Assets “Most observers, in and out of Angola, would agree that “There should be full transparency.The oil companies who corruption, and the perception of corruption, has been a work in Angola, like BP—Amoco, Elf,Total and Exxon and the critical impediment to economic development in Angola.The diamond traders like de Beers, should be open with the full extent of corruption is unknown, but the combination of international community and the international financial high military expenditures, economic mismanagement, and institutions so that it is clear these revenues are not syphoned corruption have ensured that spending on social services and A CRUDE AWAKENING A CRUDE development is far less than is required to pull the people of off but are invested in the country. I want the oil companies Angola out of widespread poverty... and the governments of Britain, the USA and France to co- operate together, not seek a competitive advantage: full Our best hope to ensure the efficient and transparent use of oil revenues is for the government to embrace a comprehensive transparency is in our joint interests because it will help to program of economic reform.We have and will continue to create a more peaceful, stable Angola and a more peaceful, encourage the Angolan Government to move in this stable Africa too.” direction....” SPEECH BY FCO MINISTER OF STATE, PETER HAIN,TO THE ACTION FOR SECRETARY OF STATE, MADELEINE ALBRIGHT, SUBCOMMITTEE ON FOREIGN SOUTHERN AFRICA (ACTSA) ANNUAL CONFERENCE, SCHOOL OF ORIENTAL OPERATIONS, SENATE COMMITTEE ON APPROPRIATIONS, JUNE 16 1998.
    [Show full text]
  • 31 CFR Ch. V (7–1–05 Edition) Pt. 590, App. B
    Pt. 590, App. B 31 CFR Ch. V (7–1–05 Edition) (2) Pneumatic tire casings (excluding tractor (C) Nharea and farm implement types), of a kind (2) Communities: specially constructed to be bulletproof or (A) Cassumbe to run when deflated (ECCN 9A018); (B) Chivualo (3) Engines for the propulsion of the vehicles (C) Umpulo enumerated above, specially designed or (D) Ringoma essentially modified for military use (E) Luando (ECCN 9A018); and (F) Sachinemuna (4) Specially designed components and parts (G) Gamba to the foregoing (ECCN 9A018); (H) Dando (f) Pressure refuellers, pressure refueling (I) Calussinga equipment, and equipment specially de- (J) Munhango signed to facilitate operations in con- (K) Lubia fined areas and ground equipment, not (L) Caleie elsewhere specified, developed specially (M) Balo Horizonte for aircraft and helicopters, and specially (b) Cunene Province: designed parts and accessories, n.e.s. (1) Municipalities: (ECCN 9A018); [Reserved] (g) Specifically designed components and (2) Communities: parts for ammunition, except cartridge (A) Cubati-Cachueca cases, powder bags, bullets, jackets, (B) [Reserved] cores, shells, projectiles, boosters, fuses (c) Huambo Province: and components, primers, and other det- (1) Municipalities: onating devices and ammunition belting (A) Bailundo and linking machines (ECCN 0A018); (B) Mungo (h) Nonmilitary shotguns, barrel length 18 (2) Communities: inches or over; and nonmilitary arms, (A) Bimbe discharge type (for example, stun-guns, (B) Hungue-Calulo shock batons, etc.), except arms designed (C) Lungue solely for signal, flare, or saluting use; (D) Luvemba and parts, n.e.s. (ECCNs 0A984 and 0A985); (E) Cambuengo (i) Shotgun shells, and parts (ECCN 0A986); (F) Mundundo (j) Military parachutes (ECCN 9A018); (G) Cacoma (k) Submarine and torpedo nets (ECCN (d) K.
    [Show full text]
  • ANGOLA FOOD SECURITY UPDATE July 2003
    ANGOLA FOOD SECURITY UPDATE July 2003 Highlights The food security situation continues to improve in parts of the country, with the overall number of people estimated to need food assistance reduced by four percent in July 2003 relieving pressure on the food aid pipeline. The price of the least-expensive food basket also continues to decline after the main harvest, reflecting an improvement in access to food. According to the United Nations Children’s Fund (UNICEF), the results of both the latest nutritional surveys as well as the trend analysis on admissions and readmissions to nutritional rehabilitation programs indicate a clear improvement in the nutritional situation of people in the provinces considered at risk (Benguela, Bie, Kuando Kubango). However, the situation in Huambo and Huila Provinces still warrants some concern. Household food stocks are beginning to run out just two months after the main harvest in the Planalto area, especially for the displaced and returnee populations. In response to the current food crisis, relief agencies in Angola have intensified their relief efforts in food insecure areas, particularly in the Planalto. More than 37,000 returnees have been registered for food assistance in Huambo, Benguela, Huila and Kuando Kubango. The current food aid pipeline looks good. Cereal availability has improved following recent donor contributions of maize. Cereal and pulse projections indicate that total requirements will be covered until the end of October 2003. Since the planned number of beneficiaries for June and July 2003 decreased by four percent, it is estimated that the overall availability of commodities will cover local food needs until end of November 2003.
    [Show full text]
  • Mapa Rodoviario Angola
    ANGOLA REPÚBLICA DE ANGOLA MINISTÉRIO DAS FINANÇAS FUNDO RODOVIÁRIO Miconje ANGOLA Luali EN 220 Buco Zau Belize Inhuca Massabi EN 220 Necuto Dinge O Chicamba ANG LU O EN 101 EN 100 I R CABINDA Bitchequete Cacongo Zenza de Lucala Malembo Fubo EN 100 EN 201 CABINDA Cabassango Noqui Luvo Pedra do Buela EN 210 Feitiço EN 120 EN 210 Sacandica Lulendo Maquela Sumba ZAIRE Cuimba do Zombo Icoca Soyo Béu EN 160 Cuango Lufico M´BANZA Quimbocolo Canda Cuilo Futa Quiende CONGO EN 140 Quimbele Quielo Camboso EN 210 Mandimba Sacamo Camatambo Quincombe Fronteira EN 120 Damba Quiximba Lucunga Lemboa Buengas Santa Tomboco 31 de Janeiro Quinzau EN 160 RIO BRIDG Cruz M E Quimbianda Uambo EN 100 Bessa Bembe Zenguele UIGE Macocola Macolo Monteiro Cuilo Pombo N´Zeto EN 120 Massau Tchitato Mabaia Mucaba Sanza Uamba EN 223 E EN 223 OG O L EN 140 Quibala Norte RI Songo Pombo Lovua Ambuíla Bungo Alfândega DUNDO EN 220 EN 220 Quinguengue EN 223 Musserra UÍGE Puri EN 180 Canzar Desvio do Cagido Caiongo Quihuhu Cambulo Quipedro EN 120 Negage EN 160 Zala Entre os Rios Ambriz Bela Dange EN 220 Vista Gombe Quixico Aldeia Quisseque Cangola EN 140 Mangando EN 225 EN 100 MuxaluandoViçosa Bindo Massango BENGO Tango MALANGE Camissombo Luia Canacassala Cambamba Bengo EN 165 Caluango Tabi Quicunzo Cabombo Cuilo Quicabo Vista Quiquiemba Camabatela Cuale EN 225 Ramal da Barra Cage Alegre Maua Caungula Camaxilo Capaia Cachimo DANDE do Dande Libongos O RI S. J.das Terreiro EN 225 Barra do BolongongoLuinga Marimba Luremo Quibaxe Matas Cateco Micanda Lucapa Dande Mabubas EN 225
    [Show full text]
  • United Nations Office for the Coordination of Humanitarian Affairs (Ocha)
    UNITED NATIONS OFFICE FOR THE COORDINATION OF HUMANITARIAN AFFAIRS (OCHA) HUMANITARIAN SITUATION IN ANGOLA Situation Report Reporting Period: 1 – 15 October 2003 Critical Issues q Humanitarian partners reported concerns about the food security situation in Chicuma, Ganda Municipality, Benguela Province. q The Kuito – Chipeta road in Bié Province was reopened for humanitarian operations. q A drought is causing hunger amongst populations in the municipalities of Cahama, Kuvelai, Kwanhama and Ombanja, Cunene Province. q Thirty metric tons of food for distribution in Rivungo were delayed at the Namibian border due to transport problems and bad road conditions. q Food distribution was temporarily suspended in Calandula Municipality, Malanje Province, after humanitarian workers were beaten during a distribution. q Due to an increased number of returning refugees from Zambia, there is a shortage in seeds and tools for distribution in Lumbala N’Guimbo, Moxico Province. Provincial Update Bengo Province: The road to Muxaluando has been partially rehabilitated easing access to Nambuangongo which will be assessed at the end of the month. Humanitarian partners are beginning interventions in Cassoneca, including much-needed water facilities projects, in preparation for the expected arrival of 2,000 refugees and returning populations. Benguela Province: Humanitarian partners conducting an assessment in Chicuma, Ganda Municipality report the food security situation is alarming. During a recent assessment humanitarian partners found that the population lacked adequate food reserves and seeds and tools for the agricultural season. Although malnutrition levels are currently under control, humanitarian partners recommend the extending the supplementary feeding centre as a preventive measure due to the food insecurity combined with a weak health system.
    [Show full text]