VIAPONTE - Projetos E Corporation Form Directors Turnover (2019) Consultoria De Engenharia, Joint-Stock Company João Prego, Civil Eng

Total Page:16

File Type:pdf, Size:1020Kb

VIAPONTE - Projetos E Corporation Form Directors Turnover (2019) Consultoria De Engenharia, Joint-Stock Company João Prego, Civil Eng VIAPONTE - Projetos e Corporation Form Directors Turnover (2019) Consultoria de Engenharia, Joint-Stock Company João Prego, Civil Eng. 1 821 524 Euros Paulo Gomes, Civil Eng. S.A. Registered Capital João Campos, Civil Eng. Main Associations 50.000 Euros Maurício Outeiro, Civil Eng. • APPC - Portuguese Assoc. Alfrapark - Estrada do Seminário, 4 Ana Castro, Civil Eng. of Engineering and Edif. C, Piso 1 Sul - Alfragide Board of Directors Luis Gonçalves, Civil Eng. Management Consultants 2614-523 AMADORA Nuno Alexandre Paiva Pais Tel.: (351) 21 006 72 00 Costa Permanent Personnel E-mail: [email protected] João Alexandre Palma Total: 23 Web site: www.viaponte.com Silveira Costa Graduates: 12 Nuno Miguel Batista Martins Other Technicians: 5 Tiago Miguel Paiva Costa Administrative Staff: 6 Delegations / Associated companies General Description In Portugal VIAPONTE, S.A. is 100% owned by QUADRANTE Group, which is currently the largest group of Engineering Services with full • Lisboa Portuguese capital. • Porto VIAPONTE is a Portuguese Engineering Consulting firm with 22 years of experience, which has the expertise and the capacityto undertake major projects concerning transport infrastructures, such as motorway and highway concessions, high speed railway lines, Abroad conventional (freight and passenger) railway lines, and metro lines. • Brazil • Peru • Romania Main Expertise Certificações • Roadways (Urban Roads, Motorways, Crosings, Rural Roads, Service Areas, Tollbooths, Car Parks) • • Certified according to standards NP Railways (Metro and Railway Systems, Stations and Terminals) EN ISO 9001:2015 and NP EN ISO • Bridges (Road and Railway Bridges; Surveys and Inventories) 14001:2015. Certifications were • Marine or port works (Port planning, Container Cargo, Ore and Cruise Ship Terminals, Shipyards and Marinas; Mooring Facilities; awarded by SGS ICS Support Studies) • Tunnels (Rail and Road Tunnels; Mining Tunnels, Water, Wastewater or Gas Transport Tunnels) Services The services cover the entire project life cycle: Consulting, Design (Preliminary Studies, Preparatory Studies, Base Project, Execution and Technical Assistance Project), EPC (Engineering, Procurement and Construction) and Project Management. Significant Last Works Roadways: • Douro Interior Subconcession: IP2 • Dublin Metro – LUAS Line B1 (7,5km), • Consulting services for the PMI of the BR Motorway - Vale Benfeito / Junqueira Ireland -101, BR-116, BR-386 and BR-290 Stretch (29,9km), Portugal Highways Concession, Brazil • Salvador BRT Corridor (10km) in Salvador Bridges: • Panamerican Highway between la da Bahia, Brazil • Viaduct at km 462, over Carajás Railway Chorrera and Santa Cruz – Panama • Predeal - Brasov Motorway (30km), (20.3m), Açailândia, Brazil (36km) – Panama; Romania • Viaduct at km 722 (72m) and Viaduct at • Intersection of Central Mountain Range - • Luanda - Viana Expressway (10km), km 731 (177m) – Marabá, Brazil Túnel II Centenário: Calarca - Cajamarca Angola • Modernization of the “Northern Railway Interchange (40km), Colombia • Road between Birkelane and Koungheul Line”: Santana do Cartaxo Viaduct • Federal Motorway BR-163/MT: Trevo (111km), Senegal (1300m), Portugal Largo - Rosário Oeste (108km), Brazil • N9 / N10 – Phase 3: Kilcullen – Carlow • Grande Lisboa Motorway Concession – • Federal Motorway BR153/SP – Lot 2 (27,5km), Ireland Molhapão Viaduct (122m) and Telhal (62km) and Marília Bypass(34km), Brazil • Kaedi - M'bout - Selibaby – Gouraye Viaduct (195m), Portugal • Ciurel – A1 Motorway (8km), Romania Road (308km), Mauritania • Costa Prata Motorway Concession: Rio • A10: Sebes – Turda Motorway (13,3km), • A4 Motorway: Dungannon – Ballygawley Jardim Viaduct (194m) and Rio Antuã Romania; (20,2km), Ireland Viaduct (199m), Portugal • A2: Cernavoda – Constanta Motorway • A13 Motorway: Santo Estevão – Pegões • Pinhal Interior Motorway Concession - (51km), Romania; Stretch (21km), Portugal Ribeira Vale de Abelheira Viaduct • Duplication of the Federal Motorway BR- • A3 Motorway: Maia – Santo Tirso and (195m), Ribeira da Mata Viaduct (140m), 163: Lot 7 - Preliminary and Basic Santo Tirso – Famalicão Stretches Ribeira Pequena Viaduct (270m) and Designs (867 km) and Detailed Design (18,5km), Portugal Cabouco Bridge 273m), Portugal (453 km), Brazil • A2 Motorway: Alcácer / Grândola Norte • N7: Nenagh – Limerick, Ireland – 7 • Duplication of the Federal Motorways BR Stretch (23,2km), Portugal Structures -060-153-262: Lot 5 - Preliminary and • Autopista del Coral: 20 Structures, Basic Designs (1176,5 km) and Detailed Railways: Dominican Republic Design (98 km), Brazil • New Railway Line between Évora and • Duplication of the Federal Motorway BR- North Évora (10km), Portugal Project Management and Construction 040: Lot 9 (936,8 km), Brazil • New Railway Line between Évora Norte Supervision: • Widening of Rodovia dos Bandeirantes and Elvas/Caia (84,1km), Portugal • SR-1 (72.88km) and UGEM (30.70km) (Sp-348) – Additional Lanes on The • Salvador - Lauro de Freitas Metro Line Motorway Construction Supervisions, Jundiaí – Campinas Stretch (10,4km), (36,4km), Brazil Brazil Brazil • Oporto Metro – New Lines (16km), • Expressway Motorway - Technical • Cambuí Expressay (9,5km), Brazil Portugal Assistance (45km), Brazil • Vial Sur Expressway (11,5km), Peru • High Speed Railway Line between • Road and Logistic Concession of Suape - • Canta Callao Expressway (29km), Peru Poceirão and Caia (167km), Portugal Expressway (45km), Brazil • Road and Logistic Complex of Suape – • High Speed Railway Line – Lot C1: • Motorway Concessions – Pinhal Interior Expressway – Intersections (8,7km), Alenquer (Ota) – Pombal Stretch (520km); Douro Interior (242km); Brazil (120km), Portugal Grande Lisboa (90km); Grande Porto • Medias Transport Project: Urban Road • Nacala Corridor – Railway between (56km); Scut Beiras Litoral e Alta Sector Investment and Associated Moatize / Nacala (550km), Mozambique (168km); Costa da Prata (110km); Performance-Based Road Maintenance • Modernization of the “Northern Railway Concessão Norte (146km), Portugal Contracting, Romania Line” between Azambuja and Vale de • IC13: Alter do Chão – Portalegre Stretch • Pinhal Interior Subconcession: IC3 Santarém (15km), Portugal (29km), Portugal Motorway - Condeixa / Coimbra (IP3/ • Oporto Metro – Duplication of Line P • Calueque Dam, Angola IC2) Stretch (25,6km), Portugal between Custóias and Póvoa de Varzim • Euro 2004: Leiria Stadium, Portugal (22,5km), Portugal International Experience • Angola • Ireland • Mozambique • Spain • Brazil • Libya • Panama • United Kingdom • Colombia • Macao • Peru • Dominican Republic • Mauritania • Romania Last update: 10-07-2020 • Gambia • Mexico • Senegal .
Recommended publications
  • INSIDE PAGE 04 02-03 RC-IMS1:02-03.Qxd 26-06-2009 12:18 Page 2
    01:01.qxd 02-07-2009 11:21 Page 1 INSIDE PAGE 04 02-03 RC-IMS1:02-03.qxd 26-06-2009 12:18 Page 2 INSIDE PAGE 04 02-03 RC-IMS1:02-03.qxd 26-06-2009 12:18 Page 3 Editorial A conjuntura da oportunidade A combination of opportunities Para este terceiro número da COOL assumi que o tronco editorial devia focar-se nas oportunidades que surgem amiúde no mercado, mesmo quando a conjuntura económica não vive dias de bonança. É com bons exemplos, atitudes positivas, lutas e olhares perspicazes que o mundo avança em cada segmento. Faz parte da natureza huma- na progredir, inventar, reinventar e suplantar-se. E são esses exem- plos de progresso, assumidos em várias expressões, das empresas, à cultura ou ao lazer que quis partilhar consigo nesta edição. Sem perder o sentido realista do período actual, estamos confiantes na Jordão que melhores dias virão, temos que estar preparados para dar a resposta necessária de um modo rápido e eficiente. E porque sou um “optimista militante” e procuro transmitir a todos os meus colaboradores os conceitos que devem ter presentes no seu dia-a-dia, o meu léxico abrange palavras de ordem como ambição, ousadia, Isidro Lobojosé determinação, persistência, perseverança, capacidade de adaptação. Director-Geral da José Julio Jordão, Lda. No fundo, qualidades estratégicas para um mercado em mudança, cujas dificuldades encaramos como um desafio que se estende aos nossos parceiros. Estaremos ao seu lado para os ajudar a suplantar este período, sempre com o lema da “Atitude Positiva” que irá encon- trar em todas as páginas da nossa revista.
    [Show full text]
  • Il Calendario Dei Divieti Di Circolazione Della Grecia E Della Spagna Non È Ancora Disponibile
    Driving restrictions, 2008 Austria 1. GENERAL DRIVING RESTRICTIONS Vehicles concerned Trucks with trailers, if the maximum authorised total weight of the motor vehicle or the trailer exceeds 3.5t; trucks, articulated vehicles and self-propelled industrial machines with an authorised total weight of more than 7.5t. Area Nationwide, with the exception of journeys made exclusively as part of a combined transport operation within a radius of 65km of the following transloading stations: Brennersee; Graz-Ostbahnhof; Salzburg-Hauptbahnhof; Wels-Verschiebebahnhof; Villach-Fürnitz; Wien-Südbahnhof; Wien-Nordwestbahnhof; Wörg; Hall in Tirol CCT; Bludenz CCT; Wolfurt CCT. Prohibition Saturdays from 15h00 to 24h00; Sundays and public holidays from 00h00 to 22h00 Public holidays 2008 1 January New Year’s Day 6 January Epiphany 24 March Easter Monday 1 May Labour Day; Ascension 12 May Whit Monday 22 May Corpus Christi 15 August Assumption 26 October National holiday 1 November All Saints’ Day 8 December Immaculate Conception 25 December Christmas Day 26 December Boxing Day Exceptions concerning trucks with trailers exceeding 3.5t · vehicles transporting milk; concerning vehicles with an authorised total weight of more than 7.5t · vehicles carrying meat or livestock for slaughter (but not the transport of heavy livestock on motorways), perishable foodstuffs (but not deep frozen goods), the supply of refreshments to tourist areas, urgent repairs to refrigeration plant, towing services (in all cases, according to § 46 StVO, it is obligatory to leave the motorway at the nearest exit), breakdown assistance vehicles, emergency vehicles, vehicles of a scheduled transport company (regular lines), and local trips on the two Saturdays preceding 24 December.
    [Show full text]
  • (CEF) 2019 TRANSPORT MAP CALL Proposal for the Selection of Projects
    Connecting Europe Facility (CEF) 2019 TRANSPORT MAP CALL Proposal for the selection of projects July 2020 Innovation and Networks Executive Agency THE PROJECT DESCRIPTIONS IN THIS PUBLICATION ARE AS SUPPLIED BY APPLICANTS IN THE TENTEC PROPOSAL SUBMIS- SION SYSTEM. THE INNOVATION AND NETWORKS EXECUTIVE AGENCY CANNOT BE HELD RESPONSIBLE FOR ANY ISSUE ARISING FROM SAID DESCRIPTIONS. The Innovation and Networks Executive Agency is not liable for any consequence from the reuse of this publication. Brussels, Innovation and Networks Executive Agency (INEA), 2020 © European Union, 2020 Reuse is authorised provided the source is acknowledged. Distorting the original meaning or message of this document is not allowed. The reuse policy of European Commission documents is regulated by Decision 2011/833/EU (OJ L 330, 14.12.2011, p. 39). For any use or reproduction of photos and other material that is not under the copyright of the European Union, permission must be sought directly from the copyright holders. PDF ISBN 978-92-9208-086-0 doi:10.2840/16208 EF-02-20-472-EN-N Page 2 / 168 Table of Contents Commonly used abbreviations ......................................................................................................................................................................................................................... 7 Introduction ................................................................................................................................................................................................................................................................
    [Show full text]
  • Annual Report 2012
    2012 ANNUAL REPORT www.autostrade.it L REPORT A NNU A 2012 CONTENTS 1. Highlights and overview 3 2. 3. 4. Introduction Report on operations Financial statements and notes 11 17 77 5. 6. 7. Reports Key indicators extracted Shareholders’ resolutions from the most recent financial statements of subsidiaries, principal associates and joint ven- tures, according to art. 2497, paragraphs 3 and 4 of the Italian Civil Code 185 193 205 HIGHLIGHTS 1. AND OVERVIEW 1.1 Corporate bodies 4 1.2 Financial and operating highlights 5 1.3 Group structure 6 1.4 Key performance indicators for Autostrade per l’Italia’s principal subsidiaries 7 1.5 Map of planned upgrades and modernisation of the network operated under concession in Italy 8 3 3 1.1 Corporate bodies BOARD OF DIRECTORS IN OFFICE UNTIL APPROVAL OF THE FINANCIAL STATEMENTS FOR THE YEAR ENDED 31 DECEMBER 2012 CHAIRMAN Fabio Cerchiai CEO Giovanni Castellucci DIRECTORS Valerio Bellamoli Stefano Cao Giuseppe Piaggio Roberto Pistorelli Giovanni Quaglia (*) Antonino Turicchi (**) SECRETARY Andrea Grillo BOARD OF STATUTORY AUDITORS ELECTED FOR THE THREE-YEAR PERIOD 2012-2014 CHAIRMAN Alessandro Trotter AUDITORS Gaetana Celico Giandomenico Genta Antonio Mastrapasqua Stefano Meroi ALTERNATE AUDITORS Salvatore Benedetto Francesco Mariano Bonifacio INDEPENDENT AUDITORS FOR THE PERIOD 2012-2020 Deloitte & Touche SpA (*) Prof. Giovanni Quaglia resigned with effect from 31 December 2012. (**) Antonino Turicchi was co-opted on to the Board of Directors on 18 January 2013. 4 1. Highlights and overview 1.2 Financial
    [Show full text]
  • Public-Private Partnerships Financed by the European Investment Bank from 1990 to 2020
    EUROPEAN PPP EXPERTISE CENTRE Public-private partnerships financed by the European Investment Bank from 1990 to 2020 March 2021 Public-private partnerships financed by the European Investment Bank from 1990 to 2020 March 2021 Terms of Use of this Publication The European PPP Expertise Centre (EPEC) is part of the Advisory Services of the European Investment Bank (EIB). It is an initiative that also involves the European Commission, Member States of the EU, Candidate States and certain other States. For more information about EPEC and its membership, please visit www.eib.org/epec. The findings, analyses, interpretations and conclusions contained in this publication do not necessarily reflect the views or policies of the EIB or any other EPEC member. No EPEC member, including the EIB, accepts any responsibility for the accuracy of the information contained in this publication or any liability for any consequences arising from its use. Reliance on the information provided in this publication is therefore at the sole risk of the user. EPEC authorises the users of this publication to access, download, display, reproduce and print its content subject to the following conditions: (i) when using the content of this document, users should attribute the source of the material and (ii) under no circumstances should there be commercial exploitation of this document or its content. Purpose and Methodology This report is part of EPEC’s work on monitoring developments in the public-private partnership (PPP) market. It is intended to provide an overview of the role played by the EIB in financing PPP projects inside and outside of Europe since 1990.
    [Show full text]
  • DLA Piper. Details of the Member Entities of DLA Piper Are Available on the Website
    EUROPEAN PPP REPORT 2009 ACKNOWLEDGEMENTS This Report has been published with particular thanks to: The EPEC Executive and in particular, Livia Dumitrescu, Goetz von Thadden, Mathieu Nemoz and Laura Potten. Those EPEC Members and EIB staff who commented on the country reports. Each of the contributors of a ‘View from a Country’. Line Markert and Mikkel Fritsch from Horten for assistance with the report on Denmark. Andrei Aganimov from Borenius & Kemppinen for assistance with the report on Finland. Maura Capoulas Santos and Alberto Galhardo Simões from Miranda Correia Amendoeira & Associados for assistance with the report on Portugal. Gustaf Reuterskiöld and Malin Cope from DLA Nordic for assistance with the report on Sweden. Infra-News for assistance generally and in particular with the project lists. All those members of DLA Piper who assisted with the preparation of the country reports and finally, Rosemary Bointon, Editor of the Report. Production of Report and Copyright This European PPP Report 2009 ( “Report”) has been produced and edited by DLA Piper*. DLA Piper acknowledges the contribution of the European PPP Expertise Centre (EPEC)** in the preparation of the Report. DLA Piper retains editorial responsibility for the Report. In contributing to the Report neither the European Investment Bank, EPEC, EPEC’s Members, nor any Contributor*** indicates or implies agreement with, or endorsement of, any part of the Report. This document is the copyright of DLA Piper and the Contributors. This document is confidential and personal to you. It is provided to you on the understanding that it is not to be re-used in any way, duplicated or distributed without the written consent of DLA Piper or the relevant Contributor.
    [Show full text]
  • 1 Brisa – Concessão Rodoviária, SA (Incorporated
    Brisa – Concessão Rodoviária, S.A. (incorporated with limited liability under the laws of Portugal) Euro 3,000,000,000 Euro Medium Term Note Programme Base Prospectus Under this Euro 3,000,000,000 Euro Medium Term Note Programme (the “Programme”), Brisa - Concessão Rodoviária, S.A. (“Issuer” or “Concessionaire”) may from time to time issue notes (the “Notes”) denominated in any currency agreed between the Issuer and the relevant Dealer or Dealers (as defined below) subject to applicable legal and regulatory central bank and securities authority requirements. The maximum aggregate nominal amount of all Notes from time to time outstanding under the Programme will not exceed Euro 3,000,000,000 (or its equivalent in other currencies calculated as described herein), subject to increase as described herein. Application has been made to the Commission de Surveillance du Secteur Financier (the “CSSF”) in its capacity as competent authority under the Luxembourg Act dated 10 July 2005 on prospectuses for securities (loi relative aux prospectus pour valeurs mobilières) to approve this document as a base prospectus in relation to the Issuer. The CSSF assumes no undertaking as to the economical and financial soundness of the information contained herein and the quality or solvency of the Issuer, pursuant to the provisions of article 7 (7) of the Luxembourg Law dated 10 July 2005 on prospectuses for securities (implementing Directive 2003/71/EC of the European Parliament and of the Council of 4 November 2003 and amendment thereto, including Directive 2010/73/EU (the “Prospectus Directive”)). Application has also been made to the Luxembourg Stock Exchange for Notes issued under the Programme to be admitted to trading on the Bourse de Luxembourg, which is the regulated market of the Luxembourg Stock Exchange and to be listed on the Official List of the Luxembourg Stock Exchange.
    [Show full text]
  • T12 Traffic Management.Pdf
    Page 2 / 99 Submitted by: Task 12 group leader, Paul van der Kroon Prepared by: Group leader: Paul van der Kroon (The Netherlands) Group members: Austria Markus Bartsch , Sigrid Pirkelbauer , Michael Schneider Cyprus Alexis Avgoustis Denmark Finn Krenk Finland Petteri Portaankorva France Christophe Desnouailles Germany Georg Stern Italy Sandro La Monica, Pier Paolo Cartolano The Netherlands Bert Helleman Henk Jan de Haan Maarten Amelink (supporting consultant) Sweden Maria Nichan i Henrik Sundquist Bjorn Carselid Switzerland Gerhard Petersen / Markus Bartsch United Kingdom David Stones Nicholas Taylor (supporting consultant) Felicity Keen Overview meetings: 3–4 June 2009 Utrecht, the Netherlands 24 –25 September 2009 Stockho lm, Sweden 19 –21 January 2010 Paris, France (joint meeting with task group 11) 19 –20 May 2010 Frankfurt, Germany 6–7 October 2010 Vienna, Austria 10 –11 February 2011 Rome, Italy 22 –23 June 2011 Helsinki, Finland 3–4 November 2011 Bern, Switzerland 22 –23 February 2012 Copenhagen, Denmark Edited and published by: CEDR's Secretariat General Approved and amended by: CEDR's EXECUTIVE BOARD on 29 June 2012 Addressed to: CEDR's GOVERNING BOARD on 27 September 2012 This document expresses solely the current view of CEDR. Readers should not consider these views to be statements of the official position of CEDR's member states. ISBN : 979-10-93321-00-4 Traffic management to reduce congestion Page 3 / 99 This report is: FOR DECISION 1. Executive summary Purpose of the paper Congestion on the European road network has increased significantly over the past decade. This is the result of an increase in car ownership and car use in most European countries.
    [Show full text]
  • Presentation Egis Romania
    Regional development and projects TEM / HEEP Area V EGIS Romania 2011 Annual Meeting June 2011 1 Summary EGIS Romania organization Activity fields Involvement in infrastructure projects Objectives EGIS Romania organization Organization chart Project Transportation Management department and Urban Development Civil, industry General manager Water and and Energy and Deputy General Environmental departments manager department Commercial and Marketing Finance and administration Human resources and support 3 EGIS Romania organization Organization chart Design Supervision Support Management HR Tender preparation Financial 4 Transport infrastructure Egis Romania’s activity mainly covers the roads, highways and motorways transport sector, on which market we are already known as quality services provider. In Transport Infrastructure field, Egis Romania, based on the international experience, provides services for: Roads, highways and motorways ‐ Design –even 3D road modeling ‐ On site technical assistance during construction ‐ Supervision of construction works ‐ Short term expertises ‐ Design verification ‐ Feasibility studies and other studies ‐ Operation and maintenance Railway/ subway Egis Rail is authorized by the Romanian Rail Authority to provide "services for design, consultancy and technical assistance for rail and subway works". Airports Egis Avia is in progress to obtain the authorization from the Romanian Civil Aviation Authority. 5 Water & Environment Water/ Waste Water Based on the international experience, Egis Romania provides high
    [Show full text]
  • Eib Information
    EUROPEAN INVESTMENT BAN ¡998 1958 Φ+ilô EIB INFORMATION DEN EUROPÆISKE INVESTERINGSBANK BANQUE EUROPEENNE D'INVESTISSEMENT EUROPÄISCHE INVESTITIONSBANK BANCA EUROPEA PER GII INVESTIMENTI EUROPESE INVESTERINGSBANK ΕΥΡΩΠΑΪΚΗ ΤΡΑΠΕΖΑ ΕΠΕΝΔΥΣΕΩΝ BANCO EUROPEU DE INVESTIMENTO 1 ­ 1998·Ν°96 EUROPEAN INVESTMENT BANK EUROOPAN INVESTOINTIPANKKI ISSN 0250­3891 BANCO EUROPEO DE INVERSIONES EUROPEISKA INVESTERINGSBANKEN 1997: European Investment Bank aunches ¡ob-support action plan and strengthens its commitment to EMU In 1997, the European Investment Bank intensified its support for economic and social cohesion in Europe in the run up to Economic and Monetary Union. The Bank launched a special action programme to encourage job-creating investment to underpin the European Union's growth and employment policies, and expanded its financing for investment in key areas sucri as regional development and Trans-European Networks. Total lending in the year increased by 13%, to ECU 26.2 billion (of which ECU 23 billion was in the Member States of the Union) and the Bank borrowed ECU 23 billion on the international capital markets, making it the world's largest non-sovereign borrower. "Our two top priorities during 1997 have been to step up our activities to help the European Union move successfully towards Economic and Monetary Union and the single currency and to prepare the way for the Union's enlargement. We responded rapidly and in a practical way to the Resolution on Growth and Employment of the June Amsterdam Summit by launching our Amsterdam Special Action Programme (ASAP). This is now well under way with substantial financing operations already con­ cluded in the areas of health and education and through a "special window" for venture capital, in the high-growth, technology oriented, small and medium-sized enterprise sector.
    [Show full text]
  • 2019 Annual Report Annual 2019
    a force for good. 2019 ANNUAL REPORT ANNUAL 2019 1, cours Ferdinand de Lesseps 92851 Rueil Malmaison Cedex – France Tel.: +33 1 47 16 35 00 Fax: +33 1 47 51 91 02 www.vinci.com VINCI.Group 2019 ANNUAL REPORT VINCI @VINCI CONTENTS 1 P r o l e 2 Album 10 Interview with the Chairman and CEO 12 Corporate governance 14 Direction and strategy 18 Stock market and shareholder base 22 Sustainable development 32 CONCESSIONS 34 VINCI Autoroutes 48 VINCI Airports 62 Other concessions 64 – VINCI Highways 68 – VINCI Railways 70 – VINCI Stadium 72 CONTRACTING 74 VINCI Energies 88 Eurovia 102 VINCI Construction 118 VINCI Immobilier 121 GENERAL & FINANCIAL ELEMENTS 122 Report of the Board of Directors 270 Report of the Lead Director and the Vice-Chairman of the Board of Directors 272 Consolidated nancial statements This universal registration document was filed on 2 March 2020 with the Autorité des Marchés Financiers (AMF, the French securities regulator), as competent authority 349 Parent company nancial statements under Regulation (EU) 2017/1129, without prior approval pursuant to Article 9 of the 367 Special report of the Statutory Auditors on said regulation. The universal registration document may be used for the purposes of an offer to the regulated agreements public of securities or the admission of securities to trading on a regulated market if accompanied by a prospectus or securities note as well as a summary of all 368 Persons responsible for the universal registration document amendments, if any, made to the universal registration document. The set of documents thus formed is approved by the AMF in accordance with Regulation (EU) 2017/1129.
    [Show full text]
  • 2012 VINCI Concessions Activity Report
    2012ACTIVITY REPORT SUPPORTING A CHANGING WORLD REPORT Y IT V 2012 ACTI 2012 S — S NCESSION CO 9 PLACE DE L’EUROPE – 92851 RUEIL-MALMAISON CEDEX – FRANCE – TEL.: +33 1 47 16 35 00 – FAX: +33 1 47 16 35 33 www.vinci-concessions.com VINCI VINCI_Concessions_RA2012_GabaritCouv_GB.indd 1 03/05/13 19:01 70 VINCI’S CONCESSIONS PORTFOLIO INFRASTRUCTURE DESCRIPTION COUNTRY SHARE CAPITAL END OF HELD CONTRACT HIGHWAY AND ROAD INFRASTRUCTURE NETWORK UNDER CONCESSION ASF network (excl. Puymorens tunnel) 2,709 km France 100% 2033 Coroute network (excl. A86 Duplex tunnel) 1,100 km France 83% 2031 Escota network 459 km France 99% 2027 Arcour (A19) 101 km France 100% 2070 Openly, Lyons 10 km France 100% 2013 (1) R1 expressway (2) (PR1BINA) 52 km Slovakia 50% 2041 A4 “A-Modell“ highway 45 km Germany 50% 2037 A5 “A-Modell“ highway (2) 60 km Germany 50% 2039 A9 “A-Modell“ highway (2) 46.5 km Germany 50% 2031 Newport Southern Distributor Zone 10 km United Kingdom 50% 2042 Road district, Hounslow 432 km of roads and 763 km of pavements United Kingdom 50% 2038 Road district, Isle of Wight 821 km of roads and 767 km of pavements United Kingdom 50% 2038 Moscow-Saint Petersburg highway (2) 43 km Russia 39% 2040 Athens-Tsakona highway (2) 365 km Greece 30% 2038 Maliakos-Kleidi highway (2) 240 km Greece 14% 2038 Fredericton-Moncton highway 200 km Canada 25% 2028 Trans Jamaican highway 34 km Jamaica 13% 2030 ROAD BRIDGES AND TUNNELS A86 Duplex tunnel Rueil-Malmaison – Jouy-en-Josas / Versailles (11 km) France 83% 2086 Puymorens tunnel Tunnel in the Pyrenees (5 km)
    [Show full text]