CITY PLAN 2035 Northern Adelaide Irrigation CITY PLAN 2035 (NAIS) Scheme ($155.6M) Regional Context Regional Context City of Playford’S Elizabeth CBD Upgrade

Total Page:16

File Type:pdf, Size:1020Kb

CITY PLAN 2035 Northern Adelaide Irrigation CITY PLAN 2035 (NAIS) Scheme ($155.6M) Regional Context Regional Context City of Playford’S Elizabeth CBD Upgrade Virginia Sturt Highway to Sydney 35 minutes to Barrossa Valley Lyndoch CITY PLAN 2035 Northern Adelaide Irrigation CITY PLAN 2035 (NAIS) Scheme ($155.6m) Regional Context Regional Context City of Playford’s Elizabeth CBD upgrade Waterloo Corner Road and Park Elizabeth Terrace Upgrade - major east City Centre west connection Further investment into the Edinburgh Defence Precinct Edinburgh Realigned National Freight Rail Defence Line along Northern Connector and Industry Lyell McEwin Hospital ($58m Port Wakefield Road Corridor St Kilda Emergency Dpt, Mental Health. $25m Aged facility) Kings and McIntyre Upgrade - major east west connection Little Para River - Major Regional C Greenways Enhancement Adelaide International Bird Sanctuary and mangroves Bolivar Waste Water CSP Salisbury City Centre Station Treatment Precinct Redevelopment: Construction of ships and Salisbury - Rail Line & Park Terrace Grade submarines at Osborne City Separation Centre Osborne Salisbury Highway - Station Upgrade - Mixed Use Development Kings Road Rail Overpass - Station Car Parking Outer Torrens Harbor Island Golden Kings and McIntyre Intersection Grove Upgrade Mangroves Elder Smith Extension - major east Parafield west connection Aiport O-bahn Extension to Golden Grove Dry Creek Saltfields (Planning - Mawson estimated 25,000 residents) Lakes Completion of Technology Park Main North Road Continue infill development in the C south eastern part of Council Dry Creek - Major Regional Tea Tree Greenways Enhancement C Plaza Modbury Hospital Upgrades ($96m 2019) Grand Junction Road Port State Sports Park (Home of North South Corridor to enable Adelaide Soccer, $19m 2020) quicker freight and commuter connection with the metropolitan (Non stop to CBD by 2022) area Main South Road Continued State Government focus on CBD including Lot 14 Legend Bowden Urban Village (Active City of Salisbury Council Boundary project - expected 3,500 residents) Major Employment Areas Major Places (Activity Hubs) Council Led with State and Private Partners 25 minutes to CSP Flinders Uni & Tonleys Innovation Council Led Projects Precinct C June 2020 June 2020 26 | CITY PLAN 2035 CITY PLAN 2035 | 27.
Recommended publications
  • Falls Prevention Service Directory
    Falls Prevention Service Directory Central Adelaide Local Health Network June 2012 Welcome to the fifth edition for the Central Adelaide Local Health Network. The Falls Prevention Service Directory has become a must-have resource for health professionals working with older adults who are at risk of falls. Linking individuals to the right services is easier with maps, common referral forms, clear criteria for referral, a decision making tool and alphabetic listings. Central Adelaide Local Health Network primary health services The Central Adelaide Local Health Network (CALHN) provides care for around 420,000 people living in the central metropolitan area of Adelaide as well as providing a number of state-wide services, and services to those in regional areas. More than 3,000 skilled staff provide high quality client care, education, research and health promoting services. The Central Adelaide Local Health Network (CALHN) provides a range of acute and sub acute health services for people of all ages and covers 19 Statistical Local Areas and 10 Local Government Areas and includes the following: > Royal Adelaide Hospital > The Queen Elizabeth Hospital > Hampstead Rehabilitation Centre > St Margaret’s Rehabilitation Hospital > Ambulatory and Primary Health Care (including Super Clinics) > Sub-Acute > Mental Health Services (under the governance of the Adelaide Metro Mental Health Directorate) We are working hard to build a healthy future for South Australia by striving towards our three strategic goals of better health, better care and better services. What is ‘falls prevention’? Falls represent a common and significant problem, especially in our elderly population. Approximately 30% of community-dwelling older persons fall in Australia each year, resulting in significant mortality and morbidity, as well as increased fear of falling and restriction in physical activity.
    [Show full text]
  • Adelaide Industrial Market
    RESEARCH Population Growth Aust: 1.6% SA: 0.8% Infrastructure—North to Lonsdale— an additional 3,000m² of As at December 2018 South Corridor advance manufacturing space which will increase the manufacturing capacity by Economic Growth The North to South Corridor is starting to 250% and create jobs for up to an Aust: 1.8% SA: 1.8% come together with the majority of additional 100 workers. projects completed. Current projects March 18 to March 19 underway are the Darlington Upgrade The unemployment rate in SA currently Unemployment Rate and Northern Connector, with expected stands at 5.9%, which is 0.7% higher completion in late 2019. The remaining than the national average as of June Aust: 5.2% SA: 5.9% sections that are yet to commence are 2019 (seasonally adjusted). This figure As at June 2019 the River Torrens to Anzac Highway and has improved from 7.3% in April 2017. “Anzac Highway to Darlington”. On Moving forward, this downward trend is Infrastructure Spending completion, the 78-kilometre North-South likely to continue as a number of major SA State Budget Corridor will reduce travel times by projects in the defence and providing a continuous non-stop manufacturing sectors come online. 2019/20: $11.9 billion carriageway from Gawler to Old Engineering Noarlunga. Furthermore, it will also Low cost of capital will Construction improve access to some of the key benefit the property market Aust: -13.5% SA: 7.8% industrial areas such as Edinburgh Parks in the Outer North. Evidence from sales transactions during March 18 to March 19 CY 2018 suggested that the low cost of Manufacturing is back capital and the abolition of stamp duty had a positive impact on the number of The closure of the 122.5ha General transactions for industrial properties Motors Holden (GMH) site in Elizabeth above $5 million.
    [Show full text]
  • Traffic Impact Assessment
    APPENDIX Q9 Traffic impact assessment See attached Traffic Impact Assessment Report prepared by Arup. Olympic Dam Expansion Draft Environmental Impact Statement 2009 Appendix Q 165 BHP Billiton Olympic Dam Expansion Environmental Impact Statement Traffic Impact Assessment BHP Billiton Olympic Dam Expansion Environmental Impact Statement Traffic Impact Assessment October 2008 Arup This report takes into account the Arup Pty Ltd ABN 18 000 966 165 particular instructions and requirements of our client. It is not intended for and should not be relied upon by any third party and no Arup responsibility is undertaken to any third Level 17 1 Nicholson Street, party Melbourne VIC 3000 Tel +61 3 9668 5500 Fax +61 3 9663 1546 www.arup.com Job number 085200/01 BHP Billiton Olympic Dam Expansion Environmental Impact Statement Traffic Impact Assessment Contents Page Executive Summary i 1 Introduction 1 2 Existing Conditions 5 2.1 Road Network 5 2.2 Road Classification, Responsibilities and Policies 5 2.3 Road Environment 7 2.4 Traffic Data 13 2.5 Baseline Traffic Flows 19 2.6 Future Road Network Improvements 21 2.7 Rail Network 23 2.8 Rail Operations 25 2.9 Crash Analysis 26 3 Proposed Olympic Dam Expansion 32 3.1 Overview 32 3.2 Olympic Dam Site Expansion Heavy Vehicles AADT 33 3.3 Ancillary Traffic AADT 39 3.4 Total AADT 43 3.5 Traffic Movements Between Townships and Olympic Dam 54 3.6 Road Link Level of Service - Impact 60 3.7 Key Intersections, Peak Hour Traffic and Impacts 64 3.8 Over-Dimensional Load Movements and Impacts 66 3.9 Road Safety 81
    [Show full text]
  • Buckland Park – Traffic Impact Assessment
    Buckland Park Traffic Impact Assessment 1 April 2009 Walker Corporation Parsons Brinckerhoff Australia Pty Limited ABN 80 078 004 798 Level 16 1 King William Street 101 Pirie Street Adelaide SA 5000 GPO Box 398 Adelaide SA 5001 Australia Telephone +61 8 8405 4300 Facsimile +61 8 8405 4301 Email [email protected] 08-0875-04-2112592A NCSI Certified Quality System ISO 9001, ISO 14001, AS/NZS4801 ©Parsons Brinckerhoff Australia Pty Limited (PB) [2009]. Copyright in the drawings, information and data recorded in this document (the information) is the property of PB. This document and the information are solely for the use of the authorised recipient and this document may not be used, copied or reproduced in whole or part for any purpose other than that for which it was supplied by PB. PB makes no representation, undertakes no duty and accepts no responsibility to any third party who may use or rely upon this document or the information. Author: Gordon Benham, Sharon Billinger, Daniel Keller ......................... Signed: ..................................................................................................... Reviewer: S Lewis ......................................................................................... Signed: ..................................................................................................... Approved by: G Benham .................................................................................... Signed: ....................................................................................................
    [Show full text]
  • Northern Connector FACT SHEET July 2008
    northern connector FACT SHEET July 2008 Involved at this early stage are a wide range The planning study will include an economic Have your of government agencies, local businesses and analysis and identify relevant environmental community bodies that need to understand issues and outline an approach for design and and comment on the proposal and to raise construction. It will also provide the framework say about a any issues about it. for an environmental impact assessment to be developed throughout this year. Since the announcement in March 2008 a major project range of activities have occurred, including: The project route is expected to be confirmed > feedback on design based on traffic needs by the end of 2009. Five months ago the Minister for Transport, and engineering Patrick Conlon announced a study into a > desktop research on similar projects Where is the project? new road and rail transport corridor in the > drop-in forums held at Globe Derby Park The planning study area will investigate area west of Port Wakefield Road – the and St Kilda a 17 km corridor from north of the Brown Northern Connector. > shopping centre displays at Hollywood Road/Port Wakefield Road intersection through to the connection of the Port River This fact sheet sets out additional Plaza and Virginia Expressway and South Road. information about the project and identifies > meeting and planning with emergency the opportunities for the community to services experts This includes a section of approximately be involved in the planning process that > field surveys that look at geography, 1 km width on the western side of is underway.
    [Show full text]
  • Justification and Benefits of the Northern Expressway and Port Wakefield Road Upgrade
    northernexpressway environmental report B Part B. Need for the Proposal and Consideration of Alternatives 4. Justifi cation and benefi ts of the Northern Expressway and Port Wakefi eld Road Upgrade 4-1 5. Alternative routes considered and the selected route 5-1 6. Economic and fi nancial assessment 6-1 Northern Expressway Environmental Report 4 Justification and benefits of the Northern Expressway and Port Wakefield Road Upgrade 4.1 Introduction The proposed Northern Expressway and Port Wakefield Road Upgrade will provide significant State and regional benefits, in particular by improving access to Adelaide for freight transport via the Sturt Highway, including freight for export from key areas such as the Barossa Valley wine producing area and the Riverland wine and citrus producing area. Together with the Port River Expressway, it will provide a high standard link between the Sturt Highway at Gawler and the Port of Adelaide, South Australia’s main shipping port. It will remove much heavy freight traffic from Main North Road, Angle Vale Road and Heaslip Road, lessening congestion and improving safety for urban traffic in the northern suburbs. 4.1.1 Background Part A outlined the various studies undertaken that justify the need for the Northern Expressway. For example, the Strategic Planning Study by SKM in 1998 concluded that there was a need to provide additional capacity for traffic movement from the outer northern suburbs, and that it is significantly more cost effective to develop a new route on the fringe of the northern urban area than to upgrade the existing Main North Road through northern metropolitan Adelaide.
    [Show full text]
  • SA Speed Survey Results 2008 Road Type Speed Limit Street Suburb
    SA Speed Survey Results 2008 Percentage Number of all of Percentage vehicles Vehicles Average of all exceeding Passing Speed of vehicles the speed during the all exceeding limit by Speed week of vehicles the speed more than Road Type Limit Street Suburb/Town sampling (km/h) limit 10km/h Adelaide local 50 Gilbertson Road Seacliff Park 3227 51.9 62.8 17.5 Adelaide local 50 Coorara Avenue Payneham South 18229 51.2 58.3 10.7 Adelaide local 50 Bermudez Crescent Paralowie 8342 49.8 50.5 10.1 Adelaide local 50 Hambledon Road Campbelltown 13400 49.8 49.4 8.9 Adelaide local 50 Main Street Beverley 6332 48.1 44.1 10.3 Adelaide local 50 Vincent Road Smithfield Plains 1541 46.1 36.1 9.3 Adelaide local 50 Northcote Street Kilburn 7988 45.1 29.0 5.1 Adelaide local 50 Charles Road Beverley 5462 41.8 20.9 4.3 Adelaide local 50 Adelaide Street Maylands 2873 42.1 20.8 2.2 Adelaide local 50 London Drive Salisbury East 7469 37.6 20.0 3.7 Adelaide local 50 Commercial Street Marleston 5349 38.6 19.1 3.2 Adelaide local 50 Archer Street North Adelaide 15525 43.2 18.6 1.5 Adelaide local 50 North Esplanade Glenelg North 11603 40.7 14.7 1.8 Adelaide local 50 Olive Avenue Broadview 2604 39.5 9.2 1.1 Adelaide local 50 Bowyer Street Rosewater 3375 37.4 5.6 0.7 Adelaide local 50 Andrew Avenue Salisbury East 1541 36.9 2.3 0.1 Adelaide local 50 Farrell Street Glenelg South 2231 33.5 2.2 0.2 Adelaide local 50 George Street Adelaide 6372 28.4 0.6 0.0 Adelaide collector 50 Scenic Way Hackham 7665 53.7 68.5 23.6 Adelaide collector 50 Perry Barr Road Hallett Cove 13996 51.3
    [Show full text]
  • 36 Air Quality
    Northern Expressway Environmental Report 36 Air quality 36.1 Introduction This section describes the existing air quality conditions, examines the potential effects of the Port Wakefield Road Upgrade on these conditions and recommends adoption of the management measures identified in Part D, Section 21. An air quality assessment was undertaken to determine the effects of Port Wakefield Road Upgrade on the existing air quality of the study area and to determine if any air quality criteria and guidelines would be exceeded in the future at any sensitive receptors. Refer to Part D, Section 21 for information on the legislative and policy requirements, existing environment air quality criteria, modelling methodology, and construction effects and mitigation measures. 36.2 Effects of the project on the existing environment 36.2.1 Sensitive receptors Inspection of the alignment of the proposed Port Wakefield Road Upgrade was made to identify sensitive receptors close to the roadway. The results are provided for the four major sections of the proposed upgrade: • Section 1: Salisbury Highway to Ryans Road • Section 2: Ryans Road to Bolivar Road • Section 3: Bolivar Road to Burton Road • Section 4: Burton Road to Northern Expressway connection. Section 1: Salisbury Highway to Ryans Road There are no sensitive receptors close to the roadway between Port Wakefield Road and Globe Derby Park. The land to the west of the road is wetlands or salt crystallisation pans. The land to the east of the road is mostly wetlands apart from the new residential estate of Mawson Lakes. No existing houses in Mawson Lakes are within 200 m of the road and future houses will be at least 100 m from the roadway.
    [Show full text]
  • 224F Bus Time Schedule & Line Route
    224F bus time schedule & line map 224F City View In Website Mode The 224F bus line (City) has 2 routes. For regular weekdays, their operation hours are: (1) City: 6:41 AM - 9:02 AM (2) Elizabeth: 2:47 PM - 5:27 PM Use the Moovit App to ƒnd the closest 224F bus station near you and ƒnd out when is the next 224F bus arriving. Direction: City 224F bus Time Schedule 86 stops City Route Timetable: VIEW LINE SCHEDULE Sunday Not Operational Monday 6:41 AM - 9:02 AM Zone C Elizabeth Interchange Bus Access, Elizabeth Tuesday 6:41 AM - 9:02 AM Zone D Elizabeth City Centre - North West side Wednesday 6:41 AM - 9:02 AM Oxenham Drive, Elizabeth Thursday 6:41 AM - 9:02 AM Stop 63 Philip Hwy - East side Friday 6:41 AM - 9:02 AM 7 Philip Highway, Elizabeth Saturday Not Operational Stop 62 Philip Hwy - South East side 29 Philip Highway, Elizabeth Stop 61 Philip Hwy - South East side 224F bus Info Stop 60 Philip Hwy - South East side Direction: City 1 Deverill Street, Elizabeth Stops: 86 Trip Duration: 92 min Stop 59 Philip Hwy - South East side Line Summary: Zone C Elizabeth Interchange, Zone Phillip Highway, Elizabeth D Elizabeth City Centre - North West side, Stop 63 Philip Hwy - East side, Stop 62 Philip Hwy - South Stop 58 Philip Hwy - South East side East side, Stop 61 Philip Hwy - South East side, Stop 149 Philip Highway, Elizabeth 60 Philip Hwy - South East side, Stop 59 Philip Hwy - South East side, Stop 58 Philip Hwy - South East side, Stop 57 Hogarth Rd - North side Stop 57 Hogarth Rd - North side, Stop 56A Hogarth 109 Hogarth Road, Elizabeth
    [Show full text]
  • Old Port Wakefield Road, Two Wells Master Plan
    Old Port Wakefield Road, Two Wells May 2020 Master Plan Prepared for Adelaide Plains Council Contents Summary 3 Introduction 5 Existing conditions 7 Vision 9 Principles 10 Context 11 Master plan 15 Wayfinding + Branding 19 Village Green Concept Design 21 Tool kit 25 Implementation 29 4th May 2020 Produced by Jensen Plus Level 1, 21 Roper Street Adelaide 5000 South Australia 08 8338 5511 [email protected] www.jensenplus.com.au Old Port Wakefield Road, Two Wells Master Plan 1. Summary In late 2019, funding through the Jensen PLUS has worked with Adelaide The Drought Communities Programme along The main projects identified to be completed Australian Government’s Drought Plains Council since 2018 on master planning with the strategic direction fro Two Wells by the end of 2020 include: strategies for the main street of Two Wells. formulated the Vision for the master plan; _ Revitalised Public Space next to the Library Communities Programme provided From these works, a series of principles for the - Two Wells Village Green with nature an opportunity for the Adelaide Plains main street refresh were identified and used “By Christmas 2020 revitalise the town of playspace and new public toilet to ensure the identified projects aligned with Two Wells by innovatively implementing Council to accelerate a program to the strategic direction for Two Wells. These urban design projects along the main street.” _ Greening of the main street with new street refresh the main street of Two Wells. principles include: tree planting and opportunities for raised Working closely with Council, Jensen planters _ New street furniture PLUS used the funding as a framework _ Renewing the public Realm _ Better pedestrian crossings to identify short and long term projects _ Defining safe and accessible movement along Old Port Wakefield Road.
    [Show full text]
  • South Road Superway North-South Corridor • Regency Road to Port River Expressway
    DELIVERING OUR TRANSPORT FUTURE NOW South Road Superway north-south corridor • Regency Road to Port River Expressway Project Impact Report • Executive Summary Environment • Social • Economic South Road Superway Executive Summary The South Australian The proposed South Road Superway will The Superway will extend over the major deliver a non-stop corridor approximately intersections of South Terrace, Wingfield Government has a 4.8 kilometres in length largely consisting rail line, Cormack Road, Grand Junction strategic vision to of an elevated roadway, with multiple Road and Days Road and bypass traffic deliver to the Adelaide lanes in each direction above the existing signals. The Superway will minimise the alignment, between Regency Road and need for property and businesses to be metropolitan area a Port River Expressway. acquired and will enable regional and non-stop north–south local east–west links across South Road The project has been developed as to be maintained and enhanced. corridor for freight and part of the solution to address a lack passenger vehicles of efficiency of the South Road transport This project has been carefully designed between the Port River corridor and increasing urban to minimise adverse social and congestion. This congestion, if allowed environmental effects on the business Expressway and the to worsen, would result in more traffic and broader community. It will support Southern Expressway. delays, higher crash rates, reduced the strategically important northwest South Road is the only amenity as well as reduced business industrial precincts of Outer Harbor, and community access. Port Adelaide, Wingfield and Regency continuous transport link Park as well as the rapidly expanding between these areas An elevated roadway, is considered the industrial and employment hubs within optimum design solution, and when and is crucial for the metropolitan Adelaide and across constructed will be the first in South South Australia.
    [Show full text]
  • 5 Alternative Routes Considered and the Selected Route
    Northern Expressway Environmental Report 5 Alternative routes considered and the selected route 5.1 Northern Expressway 5.1.1 The ‘No Northern Expressway’ option (maintaining the status quo) Without the Northern Expressway, Main North Road would require substantial upgrading and widening to six lanes between Mawson Lakes and Gawler to cater for the future traffic volumes. It is not feasible to upgrade Main North Road to expressway standard considering the number of existing controlled and uncontrolled intersections already along this section and the level of development, both commercial and residential, that exists on both sides of the road. To upgrade to expressway standard would be a prohibitive cost (probably in the range of $1.5 billion to $2.5 billion), and involve extensive local roadworks, cause significant social and environmental effects relating to land acquisition, and seriously reduce community accessibility and increase noise. Realistically, any upgrade will only achieve arterial road standard. A Main North Road upgrade could not provide the same level of service as an expressway and would not meet AusLink objectives. For similar reasons, Angle Vale Road and Heaslip Road could not be upgraded to expressway standard. A number of other arterial roads in the study area would also need upgrading to improve safety and access including Womma Road between Heaslip Road and the Adelaide–Gawler/Barossa rail line, Waterloo Corner Road from Port Wakefield Road to Heaslip Road, and the access roads from the Gawler Bypass into Gawler. In addition, Heaslip–Angle Vale Road would also require upgrading and widening (including duplication) to improve safety and cater for the expected traffic volumes.
    [Show full text]