FY 2001 TIP for PA
Total Page:16
File Type:pdf, Size:1020Kb
FY 2001-2004 Transportation Improvement Program Pennsylvania Subregion Highway Projects Delaware Valley Regional Planning Commission Monday, October 21, 2002 FY 2001-2004 Transportation Improvement Program Pennsylvania Subregion Highway Projects Delaware Valley Regional Planning Commission Monday, October 21, 2002 DVRPC FY 2001-2004 TIP Approved by DVRPC Board on July 27, 2000 Pennsylvania - Highway Program Bucks TIP# 0508 I-95/PA Turnpike Interchange MPMS# 13347 PA Tpk. Interchange 28 to US 130 (NJ), and portions of I-95 AQ Code 2015/20 Bristol Twp. New full interchange, related widening, and new toll plazas. This is a major Interstate gap completion project which will establish continuity of the Interstate system by joining together I-95 and I-276 in Pennsylvania and facilitate a revised routing of I-95 in Pennsylvania and New Jersey. The project anticipates construction of a full interchange between I-95 and the PA Turnpike, including the relocation of toll plazas, widening I-95 between PA 413 and US 1 from two lanes in each direction to three, and widening the Turnpike between between US 1 and US 13 from two lanes in each direction to three. This is a partnership project of the PA Turnpike, PennDOT and FHWA. A Major Investment Study was completed in 1997. The Draft Environmental Impact Statement is scheduled for mid-2000 and a Record of Decision is anticipated by mid-2001. Until that time, final decisions can not be made for the right-of-way and construction phases, nor will firm cost estimates be available until the completion of the final design. Though the total project cost has not yet been determined, recent estimates put it at about $485 million (not including costs that might be associated with the construction of a new bridge or the reconstruction of the existing bridge.) Over $227 million in Federal Aid Interstate construction funds are reserved for the project. Remaining funds will be provided by the PA Turnpike Commission and through other State and Federal sources. TIP Program Years ($ 000) Later FYs Phase Fund FY 2001 FY 2002 FY 2003 FY 2004 PE FAI 3,300 PE TNPK 400 PE FAI 5,000 PE TNPK 500 DES FAI 11,700 DES TNPK 1,300 DES FAI 1,800 DES TNPK 200 PE FAI 7,740 PE TNPK 860 DES FAI 18,720 DES TNPK 2,080 ROW FAI 81,000 ROW TNPK 9,000 CON FAI 306,900 CON TNPK 34,100 Fiscal Year Total 3,700 5,500 13,000 2,000 460,400 Total FY 01-04 Cost 24,200 Monday, October 21, 2002 Page 1 of 262 DVRPC FY 2001-2004 TIP Approved by DVRPC Board on July 27, 2000 Pennsylvania - Highway Program Bucks TIP# 5020 PA 413, NEW RODGERS ROAD MPMS# 12871 US 13 (BRISTOL PIKE) - NORTH OF FORD RD. 061C025 WIDEN TO 4 LANES AQ Code T2005M Bristol Twp., Bristol Boro. This project involves reconstructing the PA 413/US 13 intersection with jughandles, widening to 5 lanes between US 13 and the I-95 Spur, and widening to 4 lanes between the I-95 Spur and Ford Rd. TIP Program Years ($ 000) Later FYs Phase Fund FY 2001 FY 2002 FY 2003 FY 2004 CON DEMO* 1,013 CON HWY 500 CON HWY* 11,845 CON STATE 3,087 ROW HWY 163 Fiscal Year Total 1,013 15,595 0 0 0 Total FY 01-04 Cost 16,608 TIP# 5312 WALNUT STREET (BRIDGE #13) MPMS# 13248 OVER PERKIOMEN CREEK 061L010 BRIDGE REPLACEMENT AQ Code XPerkasie Boro. This narrow two lane bridge with no shoulders will be replaced in kind. The project status is currently in question due to the potential affects of another project around the corner. TIP Program Years ($ 000) Later FYs Phase Fund FY 2001 FY 2002 FY 2003 FY 2004 CON BR 1,440 CON LOCAL 90 CON STATE 270 Fiscal Year Total 1,800 0 0 0 0 Total FY 01-04 Cost 1,800 Monday, October 21, 2002 Page 2 of 262 DVRPC FY 2001-2004 TIP Approved by DVRPC Board on July 27, 2000 Pennsylvania - Highway Program Bucks TIP# 5354A US 202 EXPRESSWAY (SEC 700) Env & ITS MPMS# 13484 US 202 BYPASS TO PA 63 061C071 AQ Code X Doylestown, Warrington, Montgomery Twps. US 202 stretches from Wilmington, Delaware to Bangor, Maine. In the DVRPC region, US 202 covers 61 miles, traversing 27 municipalities. It serves as a major commuter route and is a vital link for business and industry. For planning purposes, US 202 has been divided into eight sections. The limits of Section 700 are from PA 63, Welsh Road to the Doylestown Bypass (US 202/PA 611 Bypass). The US-202 Expressway will be a four lane divided highway with interchanges at PA 63, PA 309, County Line Rd., Bristol Rd., and PA 611. This portion of the project includes design coordination and environmental review as well as the design of ITS components. TIP Program Years ($ 000) Later FYs Phase Fund FY 2001 FY 2002 FY 2003 FY 2004 ENG HWY 5,958 ENG STATE 1,490 CON CMAQ 1,000 CON CMAQ 8,000 Fiscal Year Total 0 7,448 0 1,000 8,000 Total FY 01-04 Cost 8,448 TIP# 5355 US 202 EXPRESSWAY (SECTION 711) MPMS# 47396 PA 463 TO PICKERTOWN RD. 064698401 PHASE 1, FOUR LANE DIVIDED RELOCATION AQ Code 2015/20 Montgomery Twp., Warrington Twp. US 202 stretches from Wilmington, Delaware to Bangor, Maine. In the DVRPC region, US 202 covers 61 miles, traversing 27 municipalities. It serves as a major commuter route and is a vital link for business and industry. For planning purposes, US 202 has been divided into eight sections. The limits of Section 700 are from PA 63, Welsh Road to the Doylestown Bypass (US 202/PA 611 Bypass). The US-202 Expressway will be a four lane divided highway with interchanges at PA 63, PA 309, County Line Rd., Bristol Rd., and PA 611. TIP Program Years ($ 000) Later FYs Phase Fund FY 2001 FY 2002 FY 2003 FY 2004 ROW HWY 6,400 ROW STATE 1,600 DES HWY 1,680 DES STATE 420 CON HWY 48,000 CON STATE 12,000 Fiscal Year Total 8,000 2,100 0 0 60,000 Total FY 01-04 Cost 10,100 Monday, October 21, 2002 Page 3 of 262 DVRPC FY 2001-2004 TIP Approved by DVRPC Board on July 27, 2000 Pennsylvania - Highway Program Bucks TIP# 5356 US 202 EXPRESSWAY (SECTION 721) MPMS# 47395 PICKERTOWN RD. TO PA 611 BYPASS 060998400 PHASE I, FOUR LANE DIVIDED RELOCATION AQ Code 2015/20 Doylestown Boro. US 202 stretches from Wilmington, Delaware to Bangor, Maine. In the DVRPC region, US 202 covers 61 miles, traversing 27 municipalities. It serves as a major commuter route and is a vital link for business and industry. For planning purposes, US 202 has been divided into eight sections. The limits of Section 700 are from PA 63, Welsh Road to the Doylestown Bypass (US 202/PA 611 Bypass). The US-202 Expressway will be a four lane divided highway with interchanges at PA 63, PA 309, County Line Rd., Bristol Rd., and PA 611. TIP Program Years ($ 000) Later FYs Phase Fund FY 2001 FY 2002 FY 2003 FY 2004 DES HWY 2,240 DES STATE 560 ROW HWY 4,000 ROW STATE 1,000 CON HWY 42,000 CON STATE 10,500 Fiscal Year Total 2,800 0 5,000 0 52,500 Total FY 01-04 Cost 7,800 TIP# 5405 Broad St. MPMS# 13451 at PA 611 Ramps 061S001L Interchange Improvement AQ Code 2005M Doylestown Twp. This project will complete the interchange by adding a southbound entrance ramp from Broad St. to the PA 611 Bypass and a northbound entrance ramp from the PA 611 Bypass to Broad St. TIP Program Years ($ 000) Later FYs Phase Fund FY 2001 FY 2002 FY 2003 FY 2004 CON DEMO* 301 CON STAT* 75 CON DEMO* 318 CON STAT* 80 CON DEMO* 302 CON STAT* 75 Fiscal Year Total 376 398 377 0 0 Total FY 01-04 Cost 1,151 Monday, October 21, 2002 Page 4 of 262 DVRPC FY 2001-2004 TIP Approved by DVRPC Board on July 27, 2000 Pennsylvania - Highway Program Bucks TIP# 5493 GEIGEL HILL ROAD MPMS# 13167 OVER TINICUM CREEK 061C016 BRIDGE REPLACEMENT AQ Code XTinicum Twp. This project involves replacing the existing one and a half lane bridge with a two lane bridge with shoulders, and drainage improvements. TIP Program Years ($ 000) Later FYs Phase Fund FY 2001 FY 2002 FY 2003 FY 2004 ROW STATE 125 ENG STATE 200 CON STATE 1,000 Fiscal Year Total 125 200 0 0 1,000 Total FY 01-04 Cost 325 TIP# 5528 POINT PLEASANT PIKE MPMS# 13245 OVER PENNSYLVANIA CANAL 061C080 BRIDGE REPLACEMENT AQ Code XTinicum Twp. This one lane historic bridge will be rehabilitated. The intent is to retain the bridge's historic integrity. TIP Program Years ($ 000) Later FYs Phase Fund FY 2001 FY 2002 FY 2003 FY 2004 ROW STATE 150 CON STATE 900 Fiscal Year Total 150 0 0 0 900 Total FY 01-04 Cost 150 TIP# 5529 ALLENTOWN ROAD MPMS# 13237 OVER UNAMI CREEK 061C075 BRIDGE REPLACEMENT AQ Code X Milford Twp. Replace the existing bridge. The new structure will be 35' wide, with two lanes and shoulders. TIP Program Years ($ 000) Later FYs Phase Fund FY 2001 FY 2002 FY 2003 FY 2004 UTIL STATE 45 CON STATE 1,300 Fiscal Year Total 0451,3000 0 Total FY 01-04 Cost 1,345 Monday, October 21, 2002 Page 5 of 262 DVRPC FY 2001-2004 TIP Approved by DVRPC Board on July 27, 2000 Pennsylvania - Highway Program Bucks TIP# 5533 PA 332, RICHBORO ROAD MPMS# 13357 OVER NESHAMINY CREEK 061C200 BRIDGE REPLACEMENT AQ Code X Newtown Twp., Northampton Twp.